-_ CITY OF GLENDALE, ARIZONA
Glendale CONTRACT CHANGE ORDER
ARIZ ONS
Project Number: 171833.2 Change Order No: 1
Project Name: GLENDALE AVENUE RECONSTRUCTION-99TH AVENUE TO EL MIRAGE RD
Description of Change: Several items were added to the project during the construction at the City's request to
minimize the need remove the newly install concrete roadway. The items include the removal of existing force main
sewer clean outs along Glendale Avenue; a new 12” ductile iron pipe that will be used for future improvements at
the landfill; two upgraded new crash cushions; installation of fiber conduits across Glendale Avenue for the Luke AFB
lift station; and, a mill and overlay for a portion of the EL Mirage Road and Glendale Avenue intersection. Itemized
detail is attached for each item.
Total amount of change order #1:
COMPLETION DATE:
Contract completion date prior to change order: 02/07/22
Change in contract time due to this change order: 0
New contract completion date: 02/07/22
cost:
Contract amount prior to this change order: $12,431,360.08
New increase (decrease), due to this change order: $321,041.57
New contract amount including this change order: $12,752,401.65
For Valuable Consideration, it is mutually agreed that the matter detailed above shall be done and payment made as shown
herein on a Supplemental Agreement Change Order in accordance with the terms of the contract. For work being performed as a
Supplemental Agreement Force Account Request, final payment shall be made as stipulated in the Standard Specifications and its
supplements upon completion of said work.
APPROVALS:
Project Eng/Manager Contractor:
City of Glendale Combs Construction
5850 W. Glendale Ave. P.O. Box 10789
Glendale, AZ 85301 Glendale, AZ 85318
an ‘yan Comgs
Date: iii Fe ~oate:__(/3 lade
City of Glendale:
ATTEST:
By: By:
Date: Date:
APPROVED AS TO FORM:
By:
Date:
PCO No. 2R3
6/\\[
6/8/21 Glendale Avenue
12" DIP Pipe
Equipment Break Down
Item Description Hours | Operated Rate Standby Rate Total
Loader 8] $ 65.00 $ 520.00
Pickup 8] $ 24.00 $ 192.00
Sawtruck and trailer 8} $ 75.00 $ 600.00
Sub-total:| $ 1,312.00
15% mark up:| $ 196.80
Total Equipment Cost:| $ 1,508.80
Labor Break Down
item Description Quanity Unit Hourly Rate Total
Operator 2 8 HR $ 30.31 | $ 242.48
Foreman 8 HR $ 45.00 | $ 360.00
Saw operator 8 HR $s 30.31 | $ 242.48
$ -
$ -
Sub-total:| $ 844.96
Burden @ 61%:| $ 515.43
15% mark up:| $ 204.06
Labor Total Cost:| $ 1,564.44
Material Break Down
Item Description Quantity Unit Rate Total
$ -
$ -
$ -
$ -
Sub-total:| § +
15% mark up:} $ -
Material Total Cost:| $ -
Subcontractor Break Down
Item Description Quantity Unit Rate Total
CACC 12" DIP PIPE 126 if S$ 300.61 | $ 37,876.86
s -
5 -
$ -
$ -
$ 37,876.86
10% mark up on sub-contractors:] $ 3,787.69
Total:| $ 41,664.55
| Cost Summary
Combs Total Cost:] $ 6,860.93
Subcontractor total cost:| 5 37,876.86
D Sub-total:} $ 44,737.79
weet Bond @.01%:| $ 447.38
Tax (.65 of 9.2%):| $ 2,702.07
De nw Ceol ed Total:| $47,887.24
Change Order Request
Central Arizona Civil Construction Co. Date: 67/2
PO Box 13910 Owner:
Mesa, AZ 85216 Project Name: 21003 GLENDALE AVE
480-612-7662 Change Order Request No, _12in DIP EFFLUENT
‘Change (add or delete) the following wark to the original contract: |
Qty UM Price | Total
J2in EFFLUENT SLEEVE
12" DIP w/ Restraints 126.0 LF $144.00 $18,144.00
Mechanical Plug - 12" x 2" Tap Cap 2.0 EA $617.00 $1,234.00
2" Riser and Cap, with Valve Box and Collar at Grade 2.0 EA $375.00 $750.00
Pu ple Polywrap, Purple Tracer Wire, Marker Balls 1.0 Ls $543.00 5543.00
1/2 Sack Backfill 115.0 cy $107.00 $12,305.00
Pressure Test 2.0 EA $750.00 $1,500.00
Hydrovac 8.0 AR $300.00 $2,400.00
Additional Mobilizatiun 1.0 Ls $1,000.00 $1,000.00
CHANGE ORDER TOTAL : $37,876.00
NOTES:
Plywood cover, concrete kicker w/ palvenized riser to grade, concrete collar around stub
GENERAL COKRACTOR CENTRAL ARIZONA CIVIL CONSTRUCTION COMPANY.
SIGNED BY SIGNED BY
DATE DATE,
tt ins Rilieatceneam jpaoreune
a oo+ee 00+28 00+. oo+08 00+6L co+Be
— ¥09600- © 19'¢¢=1 : : ALLO 44 MN euno 40 ove MALINO 43 RN |__|
& = 901 Le MGW. 161490 Lu MoM MS9BI'04 @ 19'¢¢=7 1d © ONTOS LsKI ‘901 LY WBN
om Gea 3507 ROSIEOF SATS 4sixa Houvey [ rae
N J na Tr
ole) Fess01~9
| _| 1snoo anuany srwoxno [7 Eog8 5298 sa3)g 901 ay man Rae Legsror a gala ig |
SHL OL JONANI9Y Ni 2Y¥ 5135340 Saal 35 Bal cg gale : Bala a
NY SNOUWIS TV “ORION asWaHIO FSeor BSS = agi 2 35/2 iF gals Bgl? Ie recor]
SHINN ‘and 40 OVE 3H. LY gees ga ele gett é aye 58s Is 3507
° oaunsvan Suv si384s0 euno Ty iON [|__| Bees ah es ares e “8 RIS Is —
m= SN a ba is a lc Ey a i
=3 0 aH 4 |—-} 4 ss x Fy Fy i Is
Zan Fi PS is S bes = bu et cs
z 5 EMF | F q beso iy - i ey z J 2 ASNOO © aNOND As:xK3 La a =
os a a E 2 a EJ :
Soy 7 i # 3 E LOTS S RESORT T WorevoF © LIST ZBI SBOE |__|
210 ral c
CBS | aes ot Pe 13 sno © Avmavou Aan 7s .
3og - Pi baad Mop ale trasar|
Sate z ag g as els g
Ze°6 3 ae El 2 ale als 3
oan 3 B Sah? 9 xsrevo+ @ zs901=1\I2 ating wzoosie xsuzor |B 8
B88 3 : ones ES waniol- @ aesint ASTWWA 3H Sion 0 we saline 19 aay
Oos$ wag | 5500 \ 4S KOLYN —
Sh
ced SNV'Id ONidtLS — |-—J ale oxi Fz 2gg | ¥eesot=o1
"$e oo ONY ONINDIS ¥O4 $B 133HS OL MARNE Tals LAS ale 2d es? ip TIE EI=M "902 130 ovn @
NV Id ad? ac fies a Bele sift. aa
© 2 9) onumor cooe wos so sans on aad g PBsOT gis Sgle als Sala aes 3/6 AVINTIES Wadd/OS_IL3¥ONOO|
sow “LNOAWT W130 Sole sole ag age 2a/8 IS t las I=L ‘,9=080 “ORay
$ NYY YOI ES ¥ 2S SIGHS OL NASAL Sal “ale F Bale S 8 wal Hum vai azannal
a |é ig ws iS ig HIGM YaLLNS BIND]
SHONTaIIIE LEIS |__| le iS iS ty > vy ANJOYTOV HOLWH OL KLOWA|
ie 8 as ti 3) “ualino “ONiNzdo. 4c ‘304
2 & Es iy i - 180 OVA "uzadN9S T13ONO9!
7 = EF 5 IS i IS HCW SALLN Be
i KIS i i vg] ANz¥ra¥ Huw OL HLM
4 HALLO “ONINIdO F-2 ‘302!
Kf ‘ska Halvn 130 SVM aaa 31340NoO
iy 120m B3LLND aro
a Lu or “coz6+ - ANZOWraY HOLA OL HLCM
i Ta Fea) aie Sir 9 eto oseeoa TP b [va] aavencey pout at tcl
, 1 = a 430 SYN 'Y3¢eN9S_@L3YONOD|
af SVN LNVHQAH 3Uis SLVI072y) O71 SONIGIOH ININIS3ANI \ 2 + Laine % ean an3/s02 O71 SU/STWdNSN8/YNOZIAY Ab [zn] NOU dIIS3O ON,
by 7 3] uspoo @ Xoo awa oMN OD 4NAWZO XIN3OHd 3 r 30¥1d NI LoaLoud 40 S30uNOS3Y_TRAVYD
zeRaclovnaanc WeZ-6S-ZOl NV+ 3ovng NI jguoua a IHOM 1331S 1SK3 4v00-SS~1QS Nov w/e Asia ‘SHLON SOVNIVEO
BHO 1803
1 [3] y anal! town ismay|@D] | ap lea . = -- == ==
9 i Sav1S anvl ” a Zz 3OV1d NI L03L0ud
§) By 2 kio: ‘ S03, Hon é vaning Buna 1sng35 18 BL2e ‘os'6z+—f}———0
BH AY Bipods | mane sans Sisay wy Ae yoRe § % wauino @uno Nose
L Sj 1
ace} 2] *HLANS RY, Bund * Bao! Uno 2 aur ‘ONa/eO _ =
STONIS 3L34ON09_ZAONIE| ee wfy— 2
82] As sreave ov von] g 5
EC) ToT a} ab = _ yam ks 3
NOL a Z 7 * La weze Fzose+ . SB Ly seve ‘toss+ /\ga 7 ana z=
= : sexino fauna Nox gh +f Sauna @ guna ona! SY - |? z
- [ian 6 LHS Wiad my. ay wont ore: 7 i A 7 1u,99°2e,
335 Noulsnvan Nive Mia! ol. a \ 304 Mt 19sL0a Sua veze 2rsi+ goa." ge & 1 la
moO are alsanior 3 LuaLino 9 aura 1s : | fl CReeescan] 00 it SCRE ROR 3
Zz 130 OVA “WENA ABU oo saeresz of oy dba , ANNAAY TIVONATO | fT ae of pe —— 43
Q ze] as .9=HLOW ‘OFZ 130 Ov) | 8 EEES - - AGF 7E688 | Taare |: ot are g
mF ae ‘walino ASVWA 3L3y9N09] 3 3 1SNoo any sanmIO~”OOROB = t 3
em “waa wioses aloe i Sn i Sy oe ng erg, | s
BEM OL) waa ann ids 4038 a ya oa ee 2
gs2 lela | bod®2 130 OVA “Tvnd mm gr “Sova NI Loatowe bs
FOZ ‘shy BUND TWNOUOSEI g Pir 21 gore [oad : ©) -¥aLiNg % eu7o"LS03- |2
3 mG) tfva S-9¢% 130 ovn| inl 11 2eee “es'80+ Yor Are # fu}
ss “Wnd ‘dNV¥ eynd TWiavl bu = S) q
250 ql 5 awd 4
BEm I fied ss WA B=¥ Ry asics own. 4
30 HOIML .f ‘HIWWA3OIS_LWHaSy| | 11 6o'6t ‘Is'sz+ au G4 bd
e>0 Mm wallnd ® guna aN: Ci lagi ame
gab sty] av] -95H '¥ 3dAL ‘02z 130 Ovn 11 SS'C% ‘9L'80+ WS
BD ee "wRL1Nd_% auno TWoUURA| Wa isixa
iz a OD hasas Z NOWoSS TwerLonuis| +
cs Ss Bad LNIMIAYd JL3¥9NOO =, #
M Pets 1 HOURS TwruonuLs pid —-, ee
sr 83g LN3NGAYS OV ASI HOLVAL
a rm ae NoLeRosaa NOU zee ooure
1ePUSIO
9
SUION_ROMIMGISNOS.
UBLING GND NORE N
: SOWId Ni LogLowd X08 NOLONNP 1Six3.
PD NOH ATMCMNR | COFE—n6-00 Shona
foros 2 gona ‘0ot ie aaals MDL 'W Orca
WOH «Aa|wuyy
£1 sets ‘96+ ht ano % aund ONa/¥O3 30V1d Ni Loaloul “AT hey veers arms
YBLLND 7% BY LSKI
30V1d NI Loal0¥s 30 ALI TIVaNR9
area 1SKK3 910~-%S—10S Nav
40 ALO 3IvaNaI9
Qroo-Sé~Zbl_NdV
7 SVEM ‘este
‘SapT Fs OZ0016160\Femsoou\wasnS=z1\BROD\uEeg UE GOR
POO KHa\
eOOLSIga on
Rube wy BRDU
vay SB ODOe/ER/
ane WSS
Date 6/23/21 Glendale Ave Reconstruction 99th Ave to E] Mirage Rd PCO No. 09
Crash Cushion Removal
Equipment Break Down
Item Description Hours | Operated Rate Standby Rate Total
$ ~
$ -
$ -
Sub-total:| $ -
15% mark up:| $ -
Total Equipment Cost:| $ -
Labor Break Down
Item Description Quanity Unit Hourly Rate Total
$ 7
$ ~
$ -
$ -
$ -
Sub-total:} $ -
Burden @ 6156:| $ -
15% mark up:} $ -
Labor Total Cost:| $ -
Material Break Down
Item Description Quantity Unit Rate Total
$ -
$ -
$ -
5 -
Sub-total:| $ -
15% mark up:| $ -
Material Total Cost:| $ -
Subcontractor Break Down
tem Description Quantity Unit Rate Total
Hunter Grail Removal 2 ea $ 1,500.00 | $ 3,000.00
$ -
$ -
$ -
$
$ 3,000.00
10% mark up on sub-contractors:| $ 300.00
Total:| $ 3,300.00
{ Cost Summary
Combs Total Cost:] $ 300.00
Subcontractor total cost:| $ 3,000.00
an 01%: .
Tax (.65 of 9.2%):| $ 199.31
6 fr ofr ) Total:| $ 3,532.31
Date 8/23/21 Glendale Ave Reconstruction 99th Ave to El Mirage Rd PCO No. 15
Bore Conduit
Equipment Break Down
item Description Hours | Operated Rate Standby Rate Total
$ :
$ -
$ -
Sub-total:| $ -
15% mark up:| $ -
Total Equipment Cost:| $ -
Labor Break Down
Item Description Quanity Unit Hourly Rate Total
$ -
s -
$ -
$ .
$ -
Sub-total:| $ -
Burden @ 61%:| $ -
15% mark up:| $ -
Labor Total Cost:| $ -
Material Break Down
Item Description Quantity Unit Rate Total
$ ~
$ -
$ -
5 ~
Sub-total:} $ -
15% mark up:| $ -
Material Total Cost:| $ -
Subcontractor Break Down
Item Description Quantity Unit Rate Total
Rosedin 1 Is $ 10,449.00 | § 10,449.00
Shadow Truck 8 br $ 65.00 | $ 520.00
$ ~
$ ~
5 -
$ 10,969.00
10% mark up on sub-contractors:| § 1,096.90
Total:} $ 12,065.90
L. Cost Summary
Combs Total Cost:} $ 1,096.90
Subcontractor total cost:| $ 10,969.00
Sub-total:} $ 12,065.90
SPO PPROYED f_ Bond @.01%:) $ 120.66
a Tax (.65 of 9.2%):] $ 728.76
S/2Y4/U\ Total] $12,915.32
Date 9/9/21 Glendale Ave Reconstruction 99th Ave to El Mirage Rd PCO No, 16
Farce Main Revisions
Equipment Break Down
Item Description Hours | Operated Rate Standby Rate ‘total
Pickup 40] $ 24.10 $ 964.00
Blade 8] $ 105.00 $ 840.00
Water Truck 8] $ 85.00 $ 680.00
Ten Wheeler 8] $ 105.00 $ 840.00
Roller 81$ 95.00 $ 760.00
Loader a} $s 85.00 $ 680.00
light plant 40) $ 24.00 $ 960.00
Sub-total:| $ 5,724.00
15% mark up:| $ 858.60
Total Equipment Cost:| $ 6,582.60
Labor Break Down
Item Description Quanity Unit Hourly Rate Total
Supervision 40 HR $ 55.00 | $ 2,200.00
Operator 2 32 HR $ 54.10 | $ 1,731.20
Operator 3 8 HR $s 56.05 | $ 448.40
$ -
$ -
Sub-total:| $ 4,379.60
Burden @ 61%:| $ 2,671.56
15% mark up:} $ 1,057.67
Labor Total Cost:| $ 8,108.83
Material Break Down
Item Description Quantity Unit Rate Total
water 150 mg $ 5.00 | $ 750.00
s -
$ -
$ -
Sub-total:} $ 750.00
15% mark up:| $ 112.50
Material Total Cost:| $ 862.50
Subcontractor Break Down
Item Description Quantity Unit Rate Total
CACC Force Main 7 locations 1 Is $ 110,991.00 | $ 110,991.00
ATC QC 1 Is $ 1,500.00 | $ 1,500.00
$ -
$ -
$ -
$112,491.00
5% mark up on sub-contractors:| § 5,624.55
Total:| $ 118,115.55
| Cost Summary
Combs Total Cost: $ 21,178.48
Subcontractor total cost:| $ 112,491.00
0, Sub-total:|$ 133,669.48
wl tt Bond @.01%:| $ 1,336.69
x Tax (.65 of 9.2%):| $ 8,073.37
Total:| $ 143,079.54
Date 971», 21 Glendale Ave Reconstruction 99th Ave to El Mirage Rd PCO No. 18
El Mirage Intersection
Equipment Break Down
Item Description Hours | Operated Rate Standby Rate Total
Pickup Bi $ 24.10 $ 192.80
Light Plants 16] $ 24.00 $ 384.00
$ -
$ -
$ -
5 -
$ -
Sub-total: $ 576.80
15% mark up:| $ 86.52
Total Equipment Cost:| $ 663.32
Labor Break Down
Item Description Quanity Unit Hourly Rate Total
Supervision 16 HR $ $5.00 | $ 880.00
Operator 2 16 hr $ 53.51 | $ 856.16
§ :
$ -
$ -
Sub-total:| $ 1,736.16
Burden @ 61%: $ 1,059.06
15% mark up:| $ 419.28
Lahor Total Cost:| $ 3,214.50
Material Break Down
Item Description Quantity Unit Rate Total
water 25 mg $ 5.00 | $ 125.00
Aspahalt 60 tn $ 65.00 | $ 3,900.00
plant open fee asphalt 1 ea $ 2,500.00 | $ 2,500.00
$ -
Sub-total:| $ 6,525.00
15% mark up:| $ 978.75
Material Total Cost:| $ 7,503.75
Subcontractor Break Down
Item Description Quantity Unit Rate Total
Traffic control 2 days $ 750,00 | $ 1,500.00
Paveco 1 1s $ 6,700.00 | $ 6,700.00
Metro Survey 1 Is $ 2,560.00 | $ 2,560.00
WSP 1 ls s 7,900.00 | $ 7,900.00
Sweepers 4 hr $ 105.00 | $ 420.00
$ 19,080.00
5% mark up on sub-contractors:| $ 954.00
Total:| $ 20,034.00
[ Cost Summary
Combs Total Cost:| $ 12,335.57
Subcontractor total cost:} $ 19,080.00
APPROVED Sub-total:| $ 31,415.57
te BL! Bond @.01%:/ $ 314.16
Yan (pcbes Tax (,65 of 9.2%):] § 1,897.44
Total:| $ 33,627.16
Date 12/21/21 Glendale Ave Reconstruction 99th Ave to El Mirage Rd PCO No. 26
Quad Guard Crash cushion
Equipment Break Down
Item Description Hours | Operated Rate Standby Rate Total
$ -
$ -
$ -
$ -
$ -
$ -
Sub-total:| $ -
15% mark up:| $ -
Total Equipment Cost:| $ ~
Labor Break Down
item Description Quanity Unit Hourly Rate Total
$ 65.00 | $ -
$
$ -
§ -
$ -
Sub-total:} $
Burden @ 61%:| $ -
15% mark up:| $ >
Labor Total Cost:| $ -
Material Break Down
Item Description Quantity Unit Rate Total
$ -
$ -
$ -
$
Sub-total:| $ :
15% mark up:| $
Material Total Cost:| $ ~
Subcontractor Break Down
Item Description Quantity Unit Rate Total
Hunter Guard Rail Quad Guard Crash Cushion 2 ea $ 40,000.00 | $ 80,000.00
5 -
S$ 80,000.00
10% mark up on sub-contractors:
Total:| $ 80,000.00
1 Cost Summary
Combs Total Cost:} $ -
Subcontractor total cost:| $ 80,000.00
Sub-total:| $ 80,000.00
Bond @.01%:
Tax (.65 of 9.2%):
Total:| $ 80,000.00