FY2023-2032 Capital Improvement Plan February 1, 2022 Agenda 2 1) Capital Improvement Plan (CIP) Overview 2) Capital Improvement Plan Projects a) Arts b) Airport c) Transit d) Parking Lots e) Landfill f) Solid Waste g) Wastewater h) Water 3) Council Feedback and Questions Budget Calendar 3 Item Date Workshop #1 – Budget Overview / Revenues / Five-Year Financial Forecasts January 11, 2022 Workshop #2 – FY23-32 Capital Improvement Plan February 1, 2022 Workshop #3 – FY23-32 Capital Improvement Plan March 1, 2022 Workshop #4 – (All Day) FY23 Operating Budget Department Presentations April 5, 2022 Workshop #5 – (All Day) FY23 Operating Budget Department Presentations April 7, 2022 Workshop #6 – FY23 Final Budget Workshop April 19, 2022 Voting Meeting – Tentative Budget Adoption May 10, 2022 Voting Meeting – Final Budget Adoption / Property Tax Levy June 14, 2022 Voting Meeting – Property Tax Adoption June 28, 2022 Elements of a Capital Improvement Plan 4 • Assets valued over $50,000 with a useful life of 5+ years • Land, buildings, streets & improvements, plants, large equipment • Ten-Year Plan (only FY22-23 is adopted as part of the FY22-23 budget) Financial Policy: A. Improve existing assets B. Replace existing assets as needed C. Construct new assets CIP Funding Sources 5 • Enterprise Funds – Water/Sewer o Funding can come from G. O. Bonds, revenue bonds, revenue obligations or cash financing o Debt service paid from future water/sewer fee revenue – Landfill – paid by Landfill user fees – Solid Waste – paid by Solid Waste user fees • Development Impact Fees – One-time charges to developers for new development – New or expanded infrastructure • Grants – Federal or state grant funding – Often require a match contribution to the project CIP Funding Sources 6 • Pay-As-You-Go – Cash funded projects • Transportation Sales Tax – Half cent sales tax – Improve service for all modes of transportation • Highway User Revenue Funds – Restricted Special Revenue Fund – Right of Way acquisition, construction, reconstruction, maintenance, and repair • General Obligation Bonds – Debt issuance must be authorized by Voters – Streets, Public Safety, Parks, Government Facilities, Open Space/Trails, Libraries, and Flood Control – Debt service paid by Secondary Property Tax FY23-32 Draft CIP Report 7 • Carryover – Does not include FY22 projects that do not have new appropriation in FY23 and beyond – FY22 projects with Carryover will be added to CIP in April before final budget workshop • Arts, Airport, Transit, Parking Lots, Landfill, Solid Waste, Wastewater and Water programs presented today • Drainage, Facility Maintenance, Parks, Public Safety, and Streets will be presented at the March 1, 2022 Workshop FY23-32 Arts Projects 8 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPAT23001 ARTS MASTER PLAN 100,000 100,000 TOTAL 100,000 100,000 FY23-32 Arts by Funding Source 9 FUND FUND NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2110 ART COMMISSION FUND 100,000 100,000 TOTAL 100,000 100,000 10 Arts Master Plan Project Number: CIPAT23001 Description: Project is to develop an arts & culture master plan for Glendale through a comprehensive consultation and engagement process. The city will seek the services of an expert consultant/consulting firm through a request for qualifications (RFQ) process. Justification: To align with the City of Glendale's Balanced Scorecard objective of "Improve Community Experience," the goal of the master plan is to define a vision and a set of strategic directions and actions to help guide the development of arts and culture resources and activities in Glendale for the next 10 years. The plan will also provide a guide on how best to connect these resources to advance the city's overarching social and economic goals. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2110 – ARTS COMMISSION FUND $100,000 $100,000 11 FY23-32 Airport CIP Overview • Funded by Airport Grant Funds (74%) and Transportation Sales Tax (26%) • Focus on Pavement Maintenance – Runway, Taxiway, Apron, and Parking Lot • Plans and Studies – Environmental Assessment for Channelization – Building Construction Study – Master Plan – Facilities Aesthetic Upgrade Study FY23-32 Airport Projects 12 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPAP19075 AIRPORT EA FOR CHANNELIZATION 360,000 360,000 CIPAP19076 SOUTH APRON PHASE 1 PAVEMENT RECONS 1,425,000 1,425,000 CIPAP20001 SOUTH APRON PHASE 2 REHABILITATION 2,375,000 2,375,000 CIPAP20002 RUNWAY REHABILITATION 4,085,000 4,085,000 CIPAP20004 AIRPORT PLANNING STUDY 315,000 315,000 CIPAP20018 TAXIWAY PAVEMENT REHAB & PRESERVE 300,000 300,000 CIPAP21005 AIRPORT BUILDING CONSTRUCTION STUDY 427,500 427,500 CIPAP21007 AIRPORT MASTER PLAN STUDY 620,945 620,945 CIPAP21009 AIRPORT SECURITY FENCING 675,000 675,000 CIPAP21010 SOUTHWEST APRON DESIGN / CONSTRUCT 450,000 4,835,500 5,285,500 CIPAP21012 AIRSIDE PAVEMENT MAINTENANCE 227,500 234,326 241,354 248,595 256,053 1,400,205 2,608,033 CIPAP22003 AIRPORT AUTO PARKING LOTS 604,500 604,500 CIPAP23045 INFRASTRUCTURE BILL FUNDING 295,000 295,000 CIPAP23046 FACILITIES AESTHETIC UPGRADE STUDY 200,000 200,000 CIPAP65078 AIRPORT MATCHING FUNDS 195,001 200,851 206,876 213,082 219,475 1,200,178 2,235,463 TOTAL 5,622,001 435,177 6,018,230 5,297,177 1,838,973 2,600,383 21,811,941 FY23-32 Airport by Funding Source 13 FUND FUND NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 AIRPORT CAPITAL GRANTS 4,395,000 5,570,000 4,835,500 1,363,445 16,163,945 4030 TRANSPORTATION SALES TAX 1,227,001 435,177 448,230 461,677 475,528 2,600,383 5,647,996 TOTAL 5,622,001 435,177 6,018,230 5,297,177 1,838,973 2,600,383 21,811,941 14 Airport EA for Channelization Project Number: CIPAP19075 Description: Project to conduct an Environmental Assessment (EA) for channelization of New River. The ultimate project will create re-routed riverbank that will allow for the perimeter road and fence to be relocated to meet FAA runway protection zone and safety standards and enable engineered material arresting system and future runway configuration. Justification: This project will allow the airport to obtain additional land needed to meet Federal Aviation Administration design standards. Grant funding is to be leveraged for this project. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $360,000 $360,000 15 South Apron Phase 1 Pavement Reconstruction Project Number: CIPAP19076 Description: Full reconstruction of South Apron pavement totaling approximately 38,000 square yards. Justification: Grant funding is to be leveraged for this project. In addition to FAA, this project is required under ADOT Grant Assurances and Airport Design Standards. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $1,425,000 $1,425,000 16 South Apron Phase 2 Rehabilitation Project Number: CIPAP20001 Description: Project to rehabilitate south apron pavement by mill and overlay, totaling approximately 93,000 square yards, and relocate apron intersection. Relocation of the apron intersection will improve safety in airport operations by reducing potential aircraft conflicts. Justification: The relocation of the apron intersection is to comply with FAA design standards. In addition to FAA, this project is required under ADOT Grant Assurances and Airport Design Standards. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $2,375,000 $2,375,000 17 Runway Rehabilitation Project Number: CIPAP20002 Description: Rehabilitation of the runway a pavement mill and overlay of approximately 80,000 square yards. Replacement of all runway and taxiway lighting and signage systems to aid in aircraft navigation. Justification: The Airport Pavement Maintenance Management Program indicates rehabilitation is necessary on the existing runway. Grant funding is to be leveraged for this project. This project is required under FAA and ADOT Grant Assurances and Airport Design Standards. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $4,085,000 $4,085,000 18 Airport Planning Study Project Number: CIPAP20004 Description: Part 150 Airport Noise Compatibility Planning Update. This project will complete and update the Part 150 study that was completed in 1994. Justification: Updates need to coincide with master planning, forecasts, and Airport Layout Plan updates. No operational or maintenance costs are associated with this project. Grant funding will be leveraged. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $315,000 $315,000 19 Taxiway Pavement Rehabilitation and Preservation Project Number: CIPAP20018 Description: Mill and overlay of existing Taxiway Alpha of approximately 47,224 square yards. Project includes reorientation of Taxiways A4 and A6, and addition of stabilized shoulders along Taxiway A. Justification: Outside funding is intended to be leveraged for this project. Project is required under FAA and ADOT Grant Assurances and Airport Design Standards. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $300,000 $300,000 20 Airport Building Construction Study Project Number: CIPAP21005 Description: Conduct a site survey and site selection study for a new location for an Airport Traffic Control Tower (ATCT). Also, incorporate the preliminary design needs for a new ATCT facility. The relocation to a better spot is to address sight issues. The tower is also old and outdated in its current state. Justification: The Airport Master Plan calls for a new Airport Traffic Control Tower and this will be the preliminary planning and environmental study to begin the process. The project is required under FAA and ADOT grant Assurances and Airport Design Standards. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $427,500 $427,500 21 Airport Master Plan Study Project Number: CIPAP21007 Description: Update to Airport Master Plan. Justification: Current Airport Master Plan was completed in 2007 and the Airport Layout Plan update was completed in 2017. This update will guide and enable east side development according to capacity needs. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $620,945 $620,945 22 Airport Security Fencing Project Number: CIPAP21009 Description: Airfield Gate Improvements and Access Control System Upgrade. Project will upgrade all vehicle access gates and upgrade access control system. Justification: Project to improve and modernize airfield vehicle access gates and upgrade the access control system to include network communications and video surveillance. This project is identified in the Airport Master Plan and would improve safety. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $675,000 $675,000 23 Southwest Apron Design/Construction Project Number: CIPAP21010 Description: This project is to design and construct a new southwest apron, taxi lane and access road to accommodate capacity needs at the airport. Justification: Design and construction of a new public apron, taxi lane, and infrastructure to accommodate expansion of aircraft storage to meet capacity needs. This project is required under FAA and ADOT Grant Assurances and Airport Design Standards. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2190 – AIRPORT CAPITAL GRANTS $450,000 $4,835,500 $5,285,500 24 Airside Pavement Maintenance Project Number: CIPAP21012 Description: The proposed project is for the surface treatment of the northern portion of the center apron. It includes approximately 524,000 square feet of asphalt concrete aircraft apron pavement area and re-striping of the treated area. Justification: The pavement was fully rehabilitated in 2014 but needs required pavement maintenance. The Airport’s Pavement Maintenance Management Plan calls for surface treatment to be applied. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 4030 – TRANSPORTATION SALES TAX $227,500 $234,326 $241,354 $248,595 $256,053 $1,400,205 $2,608,033 25 Airport Auto Parking Lots Project Number: CIPAP22003 Description: Rehabilitate the vehicle parking lots near the Terminal and FBO area. Approximately 10,000 SY. Justification: The parking lot surfaces are severely deteriorated and are a safety issue for vehicles and pedestrians. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 4030 – TRANSPORTATION SALES TAX $604,500 $604,500 26 Infrastructure Bill Funding Project Number: CIPAP23045 Description: First-year of federal Airport grant award under the infrastructure law in 2021. FAA indicated that these funds may be used for runways, taxiways, safety and sustainability projects, terminal development, airport-transit connections, and roadway projects. Justification: The Federal Aviation Administration (FAA) announced that the agency will award $2.89 billion in grants to 3,075 airports across the country for the fiscal year 2022 with funds that have been made available under the Infrastructure Investment and Jobs Act (IIJA), which is being referred to as the Bipartisan Infrastructure Law (BIL). FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 4030 – TRANSPORTATION SALES TAX $295,000 $295,000 27 Facilities Aesthetic Upgrade Study Project Number: CIPAP23046 Description: This study will address infrastructure at the airport, including fencing, signage, landscaping, roadway improvements, the Terminal Building, and the FBO building. Improvements identified will be based on the Airport Design Standards under development now. Justification: This project is part of the Airport Strategic Plan and will identify improvements needed to City-owned facilities including the interior spaces. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 4030 – TRANSPORTATION SALES TAX $200,000 $200,000 28 Airport Matching Funds Project Number: CIPAP65078 Description: This request is to provide matching funds for Glendale Airport projects as identified in the Airport Capital Improvement Program (Fund 2190). Funding covers the local match for all airport capital costs. Justification: This request allows for projects identified in the Airport Capital Improvement Program to be completed with local match funding and leverage Federal and State funds. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 4030 – TRANSPORTATION SALES TAX $195,001 $200,851 $206,876 $213,082 $219,475 $1,200,178 $2,235,463 29 FY23-32 Transit CIP Overview • Funded by Transportation Sales Tax (67%) and Transportation Grants (33%) • Focus on Bus Stop Enhancements, Bus Fleet Replacement, and Transportation Program Planning FY23-32 Transit Projects 30 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPTR22069 BUS STOP ENHANCEMENTS 260,000 267,799 275,834 284,109 292,633 1,600,233 2,980,608 CIPTR22095 TRANSIT BUS FLEET REPLACEMENT 370,407 988,906 1,466,195 2,825,508 CIPTR65022 TRANSP. PROG. ENGR. CONSULTANT 270,000 275,000 275,000 280,000 280,000 1,445,000 2,825,000 TOTAL 900,407 542,799 1,539,740 2,030,304 572,633 3,045,233 8,631,116 FY23-32 Transit by Funding Source 31 FUND FUND NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2060 TRANSPORTATION GRANTS 370,407 988,906 1,466,195 2,825,508 4030 TRANSPORTATION CAPITAL PROJECTS 530,000 542,799 550,834 564,109 572,633 3,045,233 5,805,608 TOTAL 900,407 542,799 1,539,740 2,030,304 572,633 3,045,233 8,631,116 32 Bus Stop Enhancements Project Number: CIPTR22069 Description: The Glendale Bus Stop Enhancement Project is a multi-year program that will improve the passenger experience at Glendale bus stops throughout the city. This project will also bring current non-ADA compliant stops into compliance. These improvements may include shelters, benches, trash cans, concrete pads, and other related ADA improvements. Justification: This set of projects is intended to enhance the safety, convenience, and function of bus stops in support of Glendale transit service operations and ridership, ensuring all stops are accessible and ADA compliant. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 4030 – TRANSPORTATION SALES TAX $260,000 $267,799 $275,834 $284,109 $292,633 $1,600,233 $2,980,608 33 Transit Bus Fleet Replacement Project Number: CIPTR22095 Description: This project supports the Transit Fleet Replacement Plan. Our current plan is programmed out through 2035. Federal funding for these replacement buses are programmed in the Region’s Transportation Improvement Plan (TIP) based on our replacement plan. The matching funds for the federal funding are programmed in the Region’s Transit Life Cycle Program (TLCP), which is funded via Proposition 400. Justification: This program is part of the FTA’s 5307 Program, which funds local transit vehicles based on replacement and expansion schedules. The replacement of these vehicles also ensures public transit assets are kept in a “State of Good Repair” (SOGR), which ensures the safety of our passengers. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 2060 – TRANSPORTATION GRANTS $370,407 $988,906 $1,466,195 $2,825,508 34 Transportation Program Engineering Consultant Project Number: CIPTR65022 Description: Professional engineering for preparation of design concepts and administration of right-of-way purchase for roadway, bicycle, pedestrian and transit projects. This funding provides professional engineering recommendations on capital projects and operations and maintenance of completed projects. Justification: Consulting services are necessary for studies and other transportation related services. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 4030 – TRANSPORTATION SALES TAX $270,000 $275,000 $275,000 $280,000 $280,000 $1,445,000 $2,825,000 FY23-32 Parking Lots Projects 35 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPPL19059 RENEW PARKING GARAGES/LOTS 200,000 200,000 200,000 200,000 200,000 1,000,000 2,000,000 TOTAL 200,000 200,000 200,000 200,000 200,000 1,000,000 2,000,000 FY23-32 Parking Lots by Funding Source 36 FUND FUND NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 1080 GENERAL FUND CAPITAL PROJECTS 200,000 200,000 200,000 200,000 200,000 1,000,000 2,000,000 TOTAL 200,000 200,000 200,000 200,000 200,000 1,000,000 2,000,000 37 Renew Parking Garages / Lots Project Number: CIPPL19059 Description: Project is to repair existing parking garages & parking lots across the city. Business-critical building lots & garages are highest priority. FY23 funding for asphalt repair, crack seal & seal coating for lots at the Main Library & Adult Center. Justification: Programmatic repair/renewal of parking lots will reduce long term life cycle costs, reduce safety concerns, improve the city's brand/image and enable provision of service delivery to the community, aligning resources with the City's strategic priorities and the Building Asset Philosophy. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 1080 – GENERAL FUND CAPITAL PROJECTS $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 $2,000,000 38 FY23-32 Landfill CIP Overview • Funding Source: Enterprise – User Fee Revenues • Focus On Programed Vehicle Replacements • Follow industry standard replacement cycles • Forecasted using current pricing and adding 5% each year • North Cell Landfill Project • Forecast based on Engineer’s cost estimate adding 3% each year • North Cell Phased Construction • North Cell Liner Installation • Landfill Gas Extraction System • Stormwater Controls FY23-32 Landfill Projects 39 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPLF19019 LANDFILL COMPACTOR REPLACEMENT 1,768,000 1,874,000 3,642,000 CIPLF19024 BULLDOZER REPLACEMENTS AND REBUILDS 1,352,000 1,874,000 2,248,000 5,474,000 CIPLF19025 NORTH CELL LINER 225,000 3,771,000 280,000 4,659,000 8,935,000 CIPLF19090 LANDFILL MOTOR GRADER REPLACEMENT 665,000 665,000 CIPLF19091 LANDFILL SCRAPER REPLACEMENT 1,251,000 - 1,251,000 CIPLF21029 LANDFILL GPS SYSTEM EQUIPMENT 50,000 - 65,000 115,000 CIPLF21030 CLOSED LANDFILLS 265,000 75,000 79,500 84,300 90,000 540,000 1,133,800 CIPLF22005 MRF PROCESS LINE IMPROVEMENTS 555,000 555,000 CIPLF22006 SITE PAVING AND MARKINGS 229,600 - - 283,600 513,200 CIPLF78503 LANDFILL CLOSURE SOUTH 500,000 125,000 150,000 159,000 169,000 640,000 1,743,000 CIPLF78505 LF NORTH CELL PHASED CONSTRUCTION 2,514,200 2,937,200 101,000 4,609,000 10,161,400 FY23-32 Landfill Projects 40 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPLF78506 LANDFILL 4x4 REPLACEMENT TRUCKS 41,000 430,000 471,000 CIPLF78512 FUEL TANKER REPLACEMENT 273,000 273,000 CIPLF78514 SOLID WASTE INSPECTION TRUCKS 40,000 418,000 458,000 CIPLF78522 LANDFILL WATER PULL/TRUCK 211,000 1,420,000 1,631,000 CIPLF78532 AUXILIARY EQUIPMENT 550,000 475,000 40,000 1,065,000 CIPLF78534 STORMWATER CONTROLS 431,320 1,672,000 1,410,000 883,600 1,560,000 5,956,920 CIPLF78535 LANDFILL GAS EXTRACTION SYSTEM 1,010,000 87,000 280,000 310,000 280,000 280,000 2,247,000 TOTAL 7,533,520 6,622,200 6,650,100 3,775,900 10,947,000 10,761,600 46,290,320 FY23-32 Landfill by Funding Source 41 FUND FUND NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 LANDFILL FUND 7,533,520 6,622,200 6,650,100 3,775,900 10,947,000 10,761,600 46,290,320 TOTAL 7,533,520 6,622,200 6,650,100 3,775,900 10,947,000 10,761,600 46,290,320 42 Landfill Compactor Replacement Project Number: CIPLF19019 Description: This project provides funding for the rebuild and replacement of the two landfill compactors. Compactors will be replaced or rebuilt on a five year 10,000-hour schedule. Updated costs include current quotes and inflation. Justification: Compactors are used daily for proper placement & compaction of solid waste & to optimize cover materials. Compactors with GPS systems, maximizes landfill compaction, improves safety, manages airspace & provides compliance. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $1,768,000 $1,874,000 $3,642,000 43 Bulldozer Replacements and Rebuilds Project Number: CIPLF19024 Description: Rebuild and/or replacement of the three landfill bulldozers. Replacement Plan: D-8 in FY23; the D-6 is scheduled for a complete undercarriage rebuild in the same year. Replacement of D9 in FY27 and the D6 & D8 dozers in FY28-32. Justification: The landfill has 3 bulldozers, they are used for a multitude of necessary landfill applications and establishing various haul roads for accessibility. Bulldozers maximize landfill operation efficiency and to meet regulatory permit requirements. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $1,352,000 $1,874,000 $2,248,000 $5,474,000 44 North Cell Liner Project Number: CIPLF19025 Description: Project is for design & construction of the liner for North Cell at the Landfill in accordance with our ADEQ approved permit & design plan. Funding moved from FY26 to FY25 to provide for operational needs and flexibility and increased based upon phase 1 construction costs. Justification: This liner provides a protective barrier to prevent potential groundwater contamination and is a permit requirement with the Arizona Department of Environmental Quality. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $225,000 $3,771,000 $280,000 $4,659,000 $8,935,000 45 Landfill Motor Grader Replacement Project Number: CIPLF19090 Description: This project is for the replacement of the motor grader that is expected to reach the end of its serviceable life in FY 2025. The motor grader is used daily as the landfill is continually expanding and roads need continuous ongoing maintenance. Justification: The motor grader is the primary asset used to create/maintain temporary roads on the active portion of the LF. It is crucial the LF roadways are maintained for heavy equipment & customer vehicles to allow safe access throughout landfill. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $665,000 $665,000 46 Landfill Scraper Replacement Project Number: CIPLF19091 Description: This project provides for the rebuild and or replacement of the landfill scraper. A replacement is scheduled in FY24 based on usage and estimated life of the scraper, which is evaluated annually. Justification: The scraper is an essential piece of support equipment that excavates, transports, and stockpiles soil used for covering waste disposed of at the landfill. The scraper effectively enables the City to meet the regulatory requirements of its permit. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $1,251,000 $1,251,000 47 Landfill GPS System Equipment Project Number: CIPLF21029 Description: GPS systems are utilized on the landfill equipment to assist the operators in developing the landfill per engineering designs and ADEQ approved plans. The units are currently installed in two (2) compactors and the D6 dozer. Justification: The GPS equipment is critical for managing airspace efficiencies, building access roads, and operator safety. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $50,000 $65,000 $115,000 48 Closed Landfills Project Number: CIPLF21030 Description: This project funds closed landfills that require ongoing maintenance including; grading, drainage, fencing, landscaping, and gas mgmt. Part of this funding is for work at the closed landfill site located at 103rd Ave. and the Butler Dr. alignment. Justification: Closed landfills may require maintenance from time to time. Improvements can include grading, drainage, fencing, landscaping, and gas management. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $265,000 $75,000 $79,500 $84,300 $90,000 $540,000 $1,113,800 49 MRF Process Line Improvements Project Number: CIPLF22005 Description: The Materials Recovery Facility opened in 2000. The facility has many moving components that have worn over the years. The system needs major renovations/upgrades in order to process incoming materials. Justification: In FY23, installation of a metering drum will feed the system with a more consistent flow of material creating a better separation rate for sorters. FY23-installation of an optical sorter will improve overall capture rate for different plastics. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $555,000 $555,000 50 Site Paving and Markings Project Number: CIPLF22006 Description: This project funds the Landfill site paving and markings required as a result of repairs to paved surfaces. Justification: The Transportation Department recommends paved surfaces be maintained on a prescribed schedule. The entrance and roads should be repaired by performing a micro-seal approximately every 7 years. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $229,600 $283,600 $513,200 51 Landfill Closure South Project Number: CIPLF78503 Description: Project provides for closure of the south area of the landfill (LF) as its permitted air space nears capacity. Closure of the south area will be ongoing as the north cell is developed. Justification: Required by landfill operating permit w/a final cover system to include: a vegetative layer/compacted soil layer/gas wells & storm water control. Annual slope stability/stormwater retention/erosion control are required to maintain regulatory compliance. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $500,000 $125,000 $150,000 $159,000 $169,000 $640,000 $1,743,000 52 Landfill North Cell Phased Construction Project Number: CIPLF78505 Description: This project is for soil excavation and stockpiling for the North Cell phased construction at the Glendale Municipal Landfill (LF) in accordance with the ADEQ permit and approved design. Justification: Activity includes stockpiling dirt as required for construction of the North Cell and operation of the South Cell, haul roads, and embankments until final closure, mandated per regulatory agency requirements for continued development of the Landfill. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $2,514,200 $2,937,200 $101,000 $4,609,000 $10,161,400 53 Landfill 4x4 Replacement Trucks Project Number: CIPLF78506 Description: Funding for replacement of trucks used by landfill staff to monitor ops & perform regulatory inspections; to include: FY23-(1) field truck; FY26-(5) trucks total, incl. 3 Field Sup vehicles, 1 mechanic service truck, and 1 flat bed with tommy lift. Justification: Trucks are critical to transport staff to locations throughout the LF to ensure operations and regulatory compliance is met. Conditions of the landfill require the truck fleet to be replaced at approximately seven to ten years. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $41,000 $430,000 $471,000 54 Fuel Tanker Replacement Project Number: CIPLF78512 Description: This project will fund the replacement of the landfill fuel tanker truck. This unit was replaced in 2021 and will be evaluated for replacement in 2031. Justification: The fuel tanker assists in maximizing operational efficiencies and reducing downtime by having a mobile source for refueling on site for large heavy equipment. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $273,000 $273,000 55 Solid Waste Inspection Trucks Project Number: CIPLF78514 Description: This funding provides for replacement of trucks in the Recycling Division. Currently, there are 7 half-ton extended cab pick-up trucks with lift gates in the SW Management fleet. Truck replacement plan: FY23- (1); FY28-32-(6). Justification: Trucks enable inspectors to provide quality control by education and mandated inspections of solid waste containers in accordance with city/state/county requirements in order to have a refuse variance of collection. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $40,000 $418,000 $458,000 56 Landfill Water Pull/Truck Project Number: CIPLF78522 Description: This project funds the replacement of (1) secondary, 5,000-gallon water truck in FY27; and (1) large primary water pull in FY31. Justification: The primary water pull is a critical piece of support equipment for reducing dust and maintaining compliance with the existing air quality permit. Upgrading this water pull better prepares the operation for the north cell expansion. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $211,000 $1,420,000 $1,631,000 57 Auxiliary Equipment Project Number: CIPLF78532 Description: Funds replacement of LF aux equip including light towers, air compressors, skid steers, loaders, lube trailer & other units. FY23-soil screening plant, improve tarping system; FY24-vactor, trash pump, skid steer, litter control sleds; FY26- forklift. Justification: The identified equipment has met or exceeded its serviceable life or is not economical to rebuild. This equipment assists in maintaining critical functions required to maintain LF operations to meet regulatory permit requirements. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $550,000 $475,000 $40,000 $1,065,000 58 Stormwater Controls Project Number: CIPLF78534 Description: Project funds stormwater controls including berms, culvert down drains, & channels required on the LF footprint as per the approved plans and permits. FY24 design & construction of additional drainage basins to support storm water needs of north cell. Justification: Construction of stormwater controls is mandated by the landfill's regulatory permit with Arizona Department of Environmental Quality (ADEQ). FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $431,320 $1,672,000 $1,410,000 $883,600 $1,560,000 $5,956,920 59 Landfill Gas Extraction System Project Number: CIPLF78535 Description: Modifications to the Gas Extraction System includes vertical wellheads, new laterals and horizontal collectors. These items are required to collect landfill gas created from placement of trash. Justification: As waste is placed and buried it is critical for the LGES to be expanded and modified. These modifications and improvements to the LGES are required to capture the methane and meet the regulatory permit requirements for the landfill. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6110 – LANDFILL FUND $1,010,000 $87,000 $280,000 $310,000 $280,000 $280,000 $2,247,000 60 FY23-32 Solid Waste CIP Overview • Funding Source: Enterprise – User Fee Revenues • Focus On Programed Vehicle Replacements • Follow industry standard replacement cycles • Forecasted using current pricing and adding 5% each year • Software Process Improvement • Integrated GPS Routing System FY23-32 Solid Waste Projects 61 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPSW19026 SOLID WASTE PROCESS IMP. SOFTWARE 225,000 0 0 0 0 0 225,000 CIPSW19027 REPLACE STREET SWEEPERS 0 354,376 363,235 372,316 381,624 2,147,856 3,619,407 CIPSW78001 REPLACE ROLLOFF TRUCKS - COMMERCIAL 0 0 0 254,663 0 560,259 814,922 CIPSW78002 REPLACE FRONTLOAD TRUCKS-COMMERCIAL 401,346 411,380 413,500 868,110 911,516 2,165,723 5,171,575 CIPSW78003 REPLACE SIDELOAD TRUCKS-RESIDENTIAL 2,226,084 1,140,867 1,521,156 1,597,214 1,527,752 9,715,618 17,728,691 CIPSW78004 REP BULK TRASH EQUIP-RESIDENTIAL 1,538,322 862,919 750,360 909,816 669,706 5,574,351 10,305,474 CIPSW78005 REPLACE PICKUPS / SERVICE TRUCKS 39,701 125,058 120,500 45,656 137,939 320,982 789,836 CIPSW78009 ALLEY GATING 100,000 100,000 0 0 0 0 200,000 TOTAL 4,530,453 2,994,600 3,168,751 4,047,775 3,628,537 20,484,789 38,854,905 FY23-32 Solid Waste by Funding Source 62 FUND FUND NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6120 SOLID WASTE FUND 4,530,453 2,994,600 3,168,751 4,047,775 3,628,537 20,484,789 38,854,905 TOTAL 4,530,453 2,994,600 3,168,751 4,047,775 3,628,537 20,484,789 38,854,905 63 Solid Waste Process Improvement Software Project Number: CIPSW19026 Description: A Solid Waste process system City or Vendor hosted improves routing efficiency & provides a comprehensive enterprise-level solution for SW operations. Included: system software, in-vehicle mobile devices, configuration/conversion/training & support. Justification: This project will be the driver for increasing operating efficiencies for a revenue generating enterprise. Funding in FY23 is for further implementation across all divisions. O&M in FY24 will be evaluated/determined after implementation. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6120 – SOLID WASTE FUND $225,000 $225,000 64 Replace Street Sweepers Project Number: CIPSW19027 Description: Programmatic replacement of large Solid Waste (SW) vehicles. SW has 6 street sweepers, each with a lifespan of 7 yrs. requiring replacement over next 10 yrs. Updated costs include current quotes and inflation. Replacement plan: FY24-(1), FY25-(1), FY26-(1), FY27-(1), FY28-32-(5). MAG Grant funds will be pursued. Justification: Mandated by State and Federal as part of PM10 nonattainment areas to improve air quality, reduce particulate emissions, and clear streets of road hazards/debris. Programmatic replacement of vehicles will reduce overall lifecycle costs. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6120 – SOLID WASTE FUND $354,376 $363,235 $372,316 $381,624 $2,147,856 $3,619,407 65 Replace Rolloff Trucks – Commercial Project Number: CIPSW78001 Description: Programmatic replacement of large Solid Waste (SW) vehicles to ensure the provision of essential services to the community. SW has 3 commercial roll-off trucks requiring replacement over next 10 yrs. Replacement plan: FY26-(1), FY28-32-(2). Justification: Collection/disposal of solid waste is required by city and county. Programmatic replacement of vehicles reduces overall lifecycle costs, protects public health/safety while aligning resources with the City's strategic priorities. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6120 – SOLID WASTE FUND $254,663 $560,259 $814,922 66 Replace Frontload Trucks - Commercial Project Number: CIPSW78002 Description: Replacement of SW vehicles & equip. SW has 7 front load trucks with a lifespan of 7 yrs. & 1 front load bin delivery truck/trailer with lifespan of 10 yrs. requiring replacements over next 10 yrs. Plan: FY23-(1), FY24-(1), FY25-(1), FY26-(2), FY27-(2), FY28-32-(4). Justification: Collection/disposal of solid waste is required by County/City code. Ensures a safe & efficient operation for a revenue generating enterprise. Programmatic replacement of vehicles will reduce overall lifecycle costs. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6120 – SOLID WASTE FUND $401,346 $411,380 $413,500 $868,110 $911,516 $2,165,723 $5,171,575 67 Replace Sideload Trucks - Residential Project Number: CIPSW78003 Description: Replacement of large Solid Waste (SW) vehicles. SW has 27 side load trucks with a lifespan of 6 yrs. requiring replacement over next 10 yrs. Plan: FY23-(6), FY24-(3), FY25 (4), FY26-(4), FY27-(4), FY28-32- (20). Justification: Collection/disposal of solid waste is required by State/City code. Programmatic replacement of vehicles reduces overall lifecycle costs, protects public health/safety while aligning resources with City’s strategic priorities. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6120 – SOLID WASTE FUND $2,226,084 $1,140,867 $1,521,156 $1,597,214 $1,527,752 $9,715,618 $17,728,691 68 Replace Residential Bulk Trash Equipment Project Number: CIPSW78004 Description: Replace large SW vehicles/equipment; have 15 rear load trucks/8 tractors w/life of 8 yrs. req replacement over 10 yrs. Plan: FY23 (4)trucks/(1)tractor, FY24 (2)trucks/(1)tractor, FY25 (2)trucks, FY26 (2)trucks/(1)tractor, FY27 (1)truck/(2)tractors, FY28-32 (10)trucks/(5)tractors. Justification: Collection/disposal of solid waste is mandated by State/City code. Programmatic replacement reduces overall lifecycle costs, protect public health and safety while aligning resources with the City's strategic priorities. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6120 – SOLID WASTE FUND $1,538,322 $862,919 $750,360 $909,816 $669,706 $5,574,351 $10,305,474 69 Replace Pickups / Service Trucks Project Number: CIPSW78005 Description: Provides for programmatic replacement of Solid Waste vehicles. SW has 10 trucks used to support daily operations and provide timely customer service to the community. Replacement plan: FY23-(1), FY24- (3), FY25-(1), FY26-(1), FY27-(2), FY28-32-(5). Justification: These trucks are support units that assist in maintaining the safe and efficient operation for a revenue generating enterprise. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6120 – SOLID WASTE FUND $39,701 $125,058 $120,500 $45,656 $137,939 $320,982 $789,836 70 Alley Gating Project Number: CIPSW78009 Description: A program that manages health/safety issues including blocking of vehicular access & difficulty of enforcement due to illegal dumping in alleys. Includes residential garbage serv. relocations/blue stake gate location/gate installation/access key/code. Justification: Promotes/enhances quality of life for residents residing near or adjacent to alley ways, providing a safer & cleaner environment. Project includes pre-gated alley clean-up & citizen notification. O&M to be an ongoing supplemental as gates get older. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6120 – SOLID WASTE FUND $100,000 $100,000 $200,000 Capital Improvement Plan Priorities: • Provide continuous service with minimum unplanned disruptions • Provide multiple water supply sources • Replace and rehabilitate existing infrastructure • Reduce emergency repair costs • Meet all Federal and State regulations 71 FY23-32 Water Services CIP Overview Wastewater Major Projects FY23-27: • Rehabilitate sewer lines, manholes and lift stations ($36.4M) • Rehabilitate West Area Water Reclamation Facility ($19.7M) • 91st Avenue Wastewater Treatment Plant ($18.6M) Funding Sources: • 6030 – Sewer Operating • 6095 & 6101 – Sewer Development Impact Fee 72 FY23-32 Wastewater CIP Overview FY23-32 Wastewater Projects 73 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPWW19086 SEWER LINE - GLENDALE AT 91ST AVE 2,550,000 2,550,000 CIPWW19087 ARROWHEAD SEWER LINES - PHASE 2 1,800,000 4,500,000 6,300,000 CIPWW19088 ARROWHEAD SEWER LINES - PHASE 3 2,650,000 3,350,000 6,000,000 CIPWW21026 WEST AREA WRF IMPROVEMENTS 2026 1,800,000 1,800,000 10,200,000 13,800,000 CIPWW21027 ARROWHEAD WRF IMPROVEMENTS 2025 2,510,000 2,000,000 9,450,000 13,960,000 CIPWW21028 UNDERGROUND STORAGE FACILITY PERMIT 100,000 100,000 CIPWW22076 SEWER LINE - REHAB PROGRAM 2,300,000 2,150,000 2,720,000 1,050,000 1,050,000 10,490,000 19,760,000 CIPWW22077 LIFT STATION REHAB PROGRAM 1,100,000 1,400,000 2,000,000 4,500,000 CIPWW22078 SEWER LINE EXTENSION 160,000 160,000 160,000 160,000 160,000 320,000 1,120,000 CIPWW23010 ROOF REPLACEMENT – SEWER 20,200 40,400 10,100 60,600 131,300 CIPWW23012 SEWER DEVELOPMENT INFRASTRUCTURE 1,000,000 1,000,000 FY23-32 Wastewater Projects 74 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPWW60016 WEST AREA WRF IMPROVEMENTS 2017 10,000,000 6,105,000 16,105,000 CIPWW63003 99TH AVE INTERCEPTOR LINE 481,000 71,000 3,291,000 1,310,000 5,153,000 CIPWW63010 91ST AVENUE WWTP IMPROVEMENTS 4,060,000 2,720,000 3,430,000 4,400,000 4,000,000 15,000,000 33,610,000 CIPWW63016 SEWER LINE - PHASE V 300,000 300,000 CIPWW63024 SEWER MANHOLE REHAB PROGRAM 470,000 480,000 480,000 480,000 530,000 3,000,000 5,440,000 CIPWW63030 LIFT STATION REHAB- 67TH AVE & ACDC 1,888,000 1,888,000 CIPWW63031 WASTEWATER CAPITAL EQUIPMENT 250,000 250,000 250,000 250,000 250,000 1,250,000 2,500,000 CIPWW63032 WASTEWATER COLLECTION IMPROVEMENTS 300,000 300,000 300,000 300,000 300,000 1,500,000 3,000,000 TOTAL 21,329,200 17,726,40017,651,100 13,150,600 23,600,000 43,760,000 137,217,300 FY23-32 Wastewater by Funding Source 75 FUND FUND NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 SEWER FUND 20,169,200 15,016,400 17,491,100 12,990,600 23,440,000 43,440,000 132,547,300 6095 2014 SEWER DIF 1,160,000 2,710,000 160,000 160,000 160,000 320,000 4,670,000 TOTAL 21,329,200 17,726,400 17,651,100 13,150,600 23,600,000 43,760,000 137,217,300 76 Sewer Line – Glendale at 91st Avenue Project Number: CIPWW19086 Description: Assess, design and construct 24" sewer line improvements in Glendale Avenue at 91st Avenue. Justification: This project will provide additional sewer line capacity in the area along Glendale Avenue at 91st Avenue as new development occurs. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6095 – 2014 SEWER DIF $2,550,000 $2,550,000 77 Arrowhead Sewer Lines – Phase 2 Project Number: CIPWW19087 Description: Replacement or rehabilitation of sewer lines in the Arrowhead Ranch area to improve sewer flow condition and reduce odor. Phase 2 includes the line in Union Hills from 67th Ave to 79th Ave. Justification: The sewer line and manholes that collects wastewater flow to the Arrowhead Water Reclamation Facility are over 30 years old. This is the only sewer line that conveys sewage to the ARWRF for treatment. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $1,800,000 $4,500,000 $6,300,000 78 Arrowhead Sewer Lines – Phase 3 Project Number: CIPWW19088 Description: Replacement or rehabilitation of sewer lines in the Arrowhead Ranch area to improve sewer flow condition and reduce odor. Phase 3 includes the line in 67th Ave from Union Hills to Utopia. Justification: The sewer line and manholes that collects wastewater flow to the Arrowhead Water Reclamation Facility are over 30 years old. This is the only sewer line that conveys sewage to the ARWRF for treatment. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $2,650,000 $3,350,000 $6,000,000 79 West Area WRF Improvements 2026 Project Number: CIPWW21026 Description: Assess, design and rehabilitate 24' force main from 99th Avenue to plant. Includes construction of Phase III improvements to plant process areas. Justification: West Area was built in 2000 and processes 2.7 billion gallons of wastewater annually. Several of the processes were replaced over the last several years. A condition assessment will be performed first on the components not rehabbed in 2017 project. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $1,800,000 $1,800,000 $10,200,000 $13,800,000 80 Arrowhead WRF Improvements 2025 Project Number: CIPWW21027 Description: Design and construct Effluent Reuse Distribution System (ERDS) structure, outlet valves, blowers, and other process rehabilitation and improvements. Justification: Arrowhead was built in 1985 and processes 1.5 billion gallons of wastewater annually. Several of the processes were replaced over the last three years. A condition assessment will be performed first on the components not rehabbed in 2017 project. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $2,510,000 $2,000,000 $9,450,000 $13,960,000 81 Underground Storage Facility Permit Project Number: CIPWW21028 Description: Conduct required analysis to prepare application for Underground Storage Facility (USF) permit issued by the Arizona Department of Water Resources (ADWR). Justification: USF permit is required to store reclaimed effluent in the ground. The ADWR issues the permit. USF permit for West Area expires 2023. The USF permit for Arrowhead expires 2024. Permits must be renewed before the expiration date. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $100,000 $100,000 82 Sewer Line Rehabilitation Program Project Number: CIPWW22076 Description: Program to rehabilitate or replace sewer lines in segments. Design and construct based on condition assessments. Includes rehab of phase VI, and phase VII. Justification: Reliably and safely convey sewage from residential and business through the sewer system. Project is needed to reduce risk of sewer line collapse and overflows in the system. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $2,300,000 $2,150,000 $2,720,000 $1,050,000 $1,050,000 $10,490,000 $19,760,000 83 Lift Station Rehabilitation Program Project Number: CIPWW22077 Description: Assess condition and rehabilitate lift stations and related force mains citywide. Justification: It is important to ensure the lift stations are in good operational conditions and meet safety requirements. Potential equipment failure would cause sewerage overflows. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $1,100,000 $1,400,000 $2,000,000 $4,500,000 84 Sewer Line Extension Project Number: CIPWW22078 Description: Sewer line extension, oversizing, and other sewer facilities in the city to the east of 115th Avenue. Justification: Provide funding for oversizing and extension of sewer line. Funding included in 2019 Infrastructure Improvement Plan (IIP). FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6095 – 2014 SEWER DIF $160,000 $160,000 $160,000 $160,000 $160,000 $320,000 $1,120,000 85 Roof Replacement - Sewer Project Number: CIPWW23010 Description: Replace roofs on wastewater facilities per Facilities assessment schedule dated 11/22/2021. Justification: Roof rehabilitation and replacement is needed to prevent damage to building infrastructure and contents. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $20,200 $40,400 $10,100 $60,600 $131,300 86 Sewer Development Infrastructure Project Number: CIPWW23012 Description: Infrastructure Improvement Plan (IIP) includes projects for sewer line extension, oversizing, and other infrastructure for increased capacity. Justification: Provide funding for oversizing and extension of sewer line for new development. Funding included in 2019 Infrastructure Improvement Plan (IIP). FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6095 – 2014 SEWER DIF $1,000,000 $1,000,000 87 West Area WRF Improvements 2017 Project Number: CIPWW60016 Description: Study, design and construct improvements to process areas. The project has three phases. GMP 1: fine screens, ultraviolet (UV) system. GMP 2: raw sewage pump station, sedimentation basin and other plant improvements. GMP 2A: clarifiers. Justification: West Area was built in 2000 and processes 2.7 billion gallons of wastewater annually. Several of the processes were replaced over the last several years. A condition assessment will be performed first on the components not rehabbed in 2017 project. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $10,000,000 $6,105,000 $16,105,000 88 99th Avenue Interceptor Line Project Number: CIPWW63003 Description: Assess and rehabilitate 99th Ave interceptor manholes and interior lining. Glendale's share of total cost is based on ownership of 71%. Epcor repays 21% of Glendale share for Sun City use. Justification: The 99th Avenue interceptor conveys sewerage from Glendale, Sun City, Peoria, and Phoenix to the 91st Ave WWTP. The interceptor is rehabilitated in phases based on condition assessments. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $481,000 $71,000 $3,291,000 $1,310,000 $5,153,000 89 91st Avenue WWTP Improvements Project Number: CIPWW63010 Description: Improvements at the 91st Ave WWTP of which Glendale is part owner. Includes GL03 metering station rehabilitation with EPCOR sharing in the cost of this project. This is Glendale's 6.5% share of costs. Justification: Glendale is one of five partner-cities that own the 91st Avenue Wastewater Treatment Plant. Rehabilitation and improvements are on-going. Contribution is based on ownership equity and is mandatory. The City of Phoenix performs the work. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $4,060,000 $2,720,000 $3,430,000 $4,400,000 $4,000,000 $15,000,000 $33,610,000 90 Sewer Line – Phase 5 Project Number: CIPWW63016 Description: Rehabilitate or replace sewer lines in phase V segments. Design and construct based on condition assessments. Justification: Reliably and safely convey sewage from residential and business through the sewer system. Project is needed to reduce risk of sewer line collapse and system overflows. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $300,000 $300,000 91 Sewer Manhole Rehab Program Project Number: CIPWW63024 Description: Manhole rehabilitation throughout the city. Construction performed in phases. Justification: Manholes are in a very corrosive environment. It is important that sewage from residential homes and businesses can be reliably conveyed in sewer lines that have structural integrity. Rehabilitation reduces the risk of sewer line collapse. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $470,000 $480,000 $480,000 $480,000 $530,000 $3,000,000 $5,440,000 92 Lift Station Rehabilitation 67th Avenue and ACDC Project Number: CIPWW63030 Description: Assess condition and rehabilitate Lift Station #2 at 67th Avenue and the Arizona Canal Diversion Channel. Justification: It is important to ensure the lift stations are in good operational conditions and meet safety requirements. Potential equipment failure would cause system overflows. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $1,888,000 $1,888,000 93 Wastewater Capital Equipment Project Number: CIPWW63031 Description: Replacement of capital equipment at wastewater facilities. Includes pumps, motors, PLC and VFD. Justification: As equipment at the wastewater treatment plants reach the end of service-life, it is replaced. It is critical to ensure City’s treatment facilities are in good operational condition to meet demands and regulatory requirements. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000 $2,500,000 94 Wastewater Collections Improvements Project Number: CIPWW63032 Description: Study, design and construct improvements to wastewater collection system. Includes air relief valves, odor control, and force mains. Justification: As wastewater collection system equipment reaches the end of service-life, it is replaced. It is critical to ensure City’s collection system is in good operational condition to meet demands and regulatory requirements. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6030 – SEWER FUND $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000 $3,000,000 Water Major Projects FY23-27: • Rehabilitate water treatment plants ($35.7M) • Rehabilitate water lines, valves and reservoirs ($26.4M) • Drill and equip groundwater wells ($20.4M) • Acquire White Mountain Apache Tribe water rights ($7.0M) • Rehabilitate groundwater wells ($4.2M) Funding Sources: • 6020 – Water Operating • 6065 & 6071 – Water Development Impact Fee 95 FY23-32 Water CIP Overview FY23-32 Water Projects 96 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPWA19018 WHITE MTN APACHE WATER RIGHTS 3,500,000 875,000 875,000 875,000 875,000 7,000,000 CIPWA19020 SCADA REPLACEMENT STUDY 500,000 800,000 1,300,000 CIPWA19021 STORAGE & RECOVERY WELLS REHAB 445,000 450,000 455,000 460,000 2,200,000 4,010,000 CIPWA19022 ZONE 3 WELLS & INTERCONNECTS 9,750,000 2,590,000 3,117,000 1,745,000 3,640,000 14,630,000 35,472,000 CIPWA21022 OASIS WTP - 2021 IMPROVEMENTS 423,700 2,100,000 3,070,000 16,500,000 22,093,700 CIPWA21023 PYRAMID PEAK - 2022 IMPROVEMENTS 2,400,000 700,000 2,000,000 2,000,000 3,000,000 23,000,000 33,100,000 CIPWA21024 CHOLLA WTP - 2023 IMPROVEMENTS 780,000 3,280,000 2,500,000 8,000,000 5,000,000 20,000,000 39,560,000 CIPWA21025 WATER LINE - PACK 2 REHAB 2,100,000 2,100,000 CIPWA21032 67TH AVE TRANS LINE IMPROVEMENTS 800,000 800,000 CIPWA22070 WATER VALVE REPLACEMENT - ARP 908,000 397,000 350,000 350,000 350,000 1,000,000 3,355,000 CIPWA22071 WATER LINE 59TH - GLENN TO NORTHERN 800,000 1,650,000 2,450,000 CIPWA22072 WATER LINE - CAMELBACK 51ST TO 59TH 5,000,000 5,000,000 CIPWA22079 WATER LINE BETHANY HM 43RD TO 51ST 1,330,000 2,140,000 960,000 4,430,000 CIPWA23009 ROOF REPLACEMENT – WATER 181,800 161,600 101,000 30,300 474,700 FY23-32 Water Projects 97 PROJECT # PROJECT NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL CIPWA23011 WATER DEVELOPMENT INFRASTRUCTURE 1,500,000 150,000 150,000 150,000 150,000 750,000 2,850,000 CIPWA60017 WATER & WASTEWATER SYSTEM MODELING 150,000 150,000 150,000 150,000 150,000 750,000 CIPWA60018 LABORATORY EQUIPMENT REPLACEMENT 180,000 100,000 280,000 CIPWA60019 VEHICLE REPLACEMENT 750,000 750,000 1,000,000 1,000,000 1,000,000 4,000,000 8,500,000 CIPWA61001 LARGE WATER VALVE REPLACEMENT PRGM 798,000 798,000 798,000 798,000 798,000 3,280,000 7,270,000 CIPWA61013 WATER LINE REHABILITATION PROGRAM 496,000 2,596,000 2,596,000 2,700,000 2,800,000 12,650,000 23,838,000 CIPWA61023 WATER SYSTEM SECURITY 150,000 150,000 150,000 150,000 150,000 350,000 1,100,000 CIPWA61045 THUNDERBIRD RESERVOIR 550,000 1,900,000 1,050,000 3,500,000 CIPWA61047 METER VAULT REPLACEMENT PROGRAM 736,000 212,000 736,000 515,000 515,000 2,714,000 CIPWA61048 GROUNDWATER WELL REHAB PROGRAM 1,470,000 1,270,000 500,000 500,000 500,000 5,000,000 9,240,000 CIPWA61049 DISTRIBUTION SYSTEM IMPROV ZONE 2&3 1,260,000 1,050,000 2,310,000 CIPWA61051 ACCRUE LONG-TERM WATER CREDITS 100,000 100,000 200,000 CIPWA61054 DISTRIBUTION SYSTEM IMPROV PROGRAM 500,000 500,000 500,000 500,000 500,000 2,500,000 CIPWA61061 WATER CAPITAL EQUIPMENT REPLACEMENT 500,000 500,000 500,000 500,000 500,000 2,500,000 5,000,000 CIPWA61062 TRANSMISSION LINE & VALVE ASSESSMNT 530,000 530,000 530,000 530,000 530,000 2,650,000 TOTAL 28,843,500 24,769,600 21,913,000 25,668,300 20,918,000 111,735,000 233,847,400 FY23-32 Water by Funding Source 98 FUND FUND NAME FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 WATER FUND 22,376,500 21,119,600 20,888,000 22,898,300 19,893,000 110,110,000 217,285,400 6065 2014 WATER DIF 6,467,000 3,650,000 1,025,000 2,770,000 1,025,000 1,625,000 16,562,000 TOTAL 28,843,500 24,769,600 21,913,000 25,668,300 20,918,000 111,735,000 233,847,400 99 White Mountain Apache Water Rights Project Number: CIPWA19018 Description: 100-year lease of Central Arizona Project water rights per the White Mountain Apache Tribe settlement for allocation of 2,363 acre feet annually. Execution of the agreement is at the Federal approval process level. Justification: Council approved the lease settlement on February 24, 2009 and approved the amended and restated WMAT Water Quantification agreement on February 12, 2013. Additional water rights assures water is available for growth. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6065 – 2014 WATER DIF $3,500,000 $875,000 $875,000 $875,000 $875,000 $7,000,000 100 SCADA Replacement Study Project Number: CIPWA19020 Description: Study alternative information and communication systems to develop a plan to upgrade equipment of the Supervisory Control and Data Acquisition (SCADA) system to new technologies. New project will be added for equipment based on recommendations. Justification: SCADA controls the treatment processes within the plants and distribution systems. System components are at end of service life. New technologies will reduce risk of failure at critical measurement points and increase resiliency of the systems. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $500,000 $800,000 $1,300,000 101 Storage & Recovery Wells Rehabilitation Project Number: CIPWA19021 Description: Rehabilitate four (4) Aquifer Storage and Recovery wells (two at the Arrowhead WRF & two at Oasis Lake) and eight (8) vadose zone recharge wells (six at the AWRF and two at Oasis Lake) on a 10-year cycle. Justification: Based on evaluation, need to rehabilitate one well every year to maintain the system's resiliency. These recharge wells need to recharge effluent to various groundwater levels to maximize groundwater storage credits. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $445,000 $450,000 $455,000 $460,000 $2,200,000 $4,010,000 102 Zone 3 Wells & Interconnects Project Number: CIPWA19022 Description: Design and construct new direct-connect water source in Zone 3. First source is to interconnect potable water supply with adjacent cities. Second source is to drill new groundwater wells. Justification: Provide water supply redundancy from multiple sources at times of restricted supply is critical. Wells provide direct supply during drought management, plant shut-down, or transmission failure. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $4,783,000 $2,590,000 $3,117,000 $3,640,000 $14,630,000 $28,760,000 6065 – 2014 WATER DIF $4,967,000 $1,745,000 $6,712,000 TOTAL $9,750,000 $2,590,000 $3,117,000 $1,745,000 $3,640,000 $14,630,000 $35,472,000 103 Oasis WTP – 2021 Improvements Project Number: CIPWA21022 Description: Evaluate, design, and construct improvements to brine ponds, chlorine generator, IX plant conveyance, and other processes. FY2028-32 amount is placeholder for next assess & rehab cycle. Justification: Oasis WTP was built in 2007 and expanded in 2012. Oasis provides 1.7 billion gallons of water to the southern and western portions of Glendale. After a condition assessment, several systems are in need of rehabilitation. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $423,700 $2,100,000 $3,070,000 $16,500,000 $22,093,700 104 Pyramid Peak – 2022 Improvements Project Number: CIPWA21023 Description: Study, design, and construct process improvements to gate valves, sedimentary basins, lagoon pumps, chlorine generator, and other systems. Peoria pays for 55.6% of costs. FY2028-32 amount is placeholder for next assess & rehab cycle. Justification: Pyramid is a critical water treatment plant for Glendale and Peoria. Rehabilitation reduces risk of equipment failure, loss of service to citizens, and implements new efficiencies. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $2,400,000 $700,000 $2,000,000 $2,000,000 $3,000,000 $23,000,000 $33,100,000 105 Cholla WTP – 2023 Improvements Project Number: CIPWA21024 Description: Study, design, and construct process improvements to backwash pumps, centrifuge & solid handling, filters & floc drives, chlorine generator, and other systems. FY2028-32 amount is placeholder for next assess & rehab cycle. Justification: Cholla is a critical water treatment plant. This plant provides 4 billion gallons of water annually to the central portion of Glendale. Rehabilitation reduces risk of equipment failure, loss of service to citizens, and implements new efficiencies. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $780,000 $3,280,000 $2,500,000 $8,000,000 $5,000,000 $20,000,000 $39,560,000 106 Water Line – Pack 2 Rehabilitation Project Number: CIPWA21025 Description: Design and construct waterline replacement. Work is performed in phases based on condition assessments. Includes segments in 54th Avenue, Maryland, Northern and Lamar. Justification: The average age of the water distribution system is over 35 years old. Rehabilitation or replacement is performed based on evaluation of the condition of the line segment to reduce risk of failure. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $2,100,000 $2,100,000 107 67th Ave. Transmission Line Improvements Project Number: CIPWA21032 Description: Design and install access manholes to portals in the 67th Ave transmission line from PPWTP to Deer Valley Road. Project includes emergency repair parts and fittings. Justification: Need access from the street level to assess the condition of large transmission line interior. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $800,000 $800,000 108 Water Valve Replacement - ARP Project Number: CIPWA22070 Description: Replace large water valves ahead of Arterial (streets) Reconstruction Program (ARP). Nine arterial segments are identified. Justification: Street segments identified in Arterial Reconstruction Program due to low critical Pavement Condition Index (PCI) for replacement. Replace valves 9-12 months ahead of construction start. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $908,000 $397,000 $350,000 $350,000 $350,000 $1,000,000 $3,335,000 109 Water Line 59th – Glenn to Northern Project Number: CIPWA22071 Description: Design and construct new water line and associated appurtenances. Includes 4,900'-water line, 48- valves, 16-service lines, and 5-fire hydrants in 59 Ave - Glenn to Northern Ave. Justification: Street segments identified in Arterial Reconstruction Program due to low critical Pavement Condition Index (PCI) for replacement. Replace water line and valves 9-12 months ahead of construction start. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $800,000 $1,650,000 $2,450,000 110 Water Line – Camelback – 51st to 59th Project Number: CIPWA22072 Description: Design and construct new water line and associated appurtenances in Camelback Road from 51st Ave to 59th Ave. Justification: Street segments identified in Arterial Reconstruction Program due to low critical Pavement Condition Index (PCI) for replacement. Replace water line and valves 9-12 months ahead of construction start. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $5,000,000 $5,000,000 111 Water Line – Bethany Home – 43rd to 51st Project Number: CIPWA22079 Description: Design and construct new water line & associated appurtenances. Includes 6,100' water line, 81 valves, 38 service lines, 20-fire hydrants in Bethany Hm. Rd. 43rd to 300' west of 51st under Grand Ave. Justification: Street segments identified in Arterial Reconstruction Program due to low critical Pavement Condition Index (PCI) for replacement. Replace water line and valves 9-12 months ahead of construction start. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $1,330,000 $2,140,000 $960,000 $4,430,000 112 Roof Replacement – Water Project Number: CIPWA23009 Description: Replace roofs on water facilities per Facilities assessment schedule dated 11/22/2021. Justification: Roof rehabilitation and replacement is needed to prevent damage to building infrastructure and contents. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $181,800 $161,600 $101,100 $30,300 $474,700 113 Water Development Infrastructure Project Number: CIPWA23011 Description: Infrastructure Improvement Plan (IIP) includes projects for water line extension and oversizing in the city to the east of 115th Avenue and acquisition of water supply rights. Justification: Provide funding for oversizing and extension of water line. Funding included in 2019 Infrastructure Improvement Plan (IIP). FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6065 – 2014 WATER DIF $1,500,000 $150,000 $150,000 $150,000 $150,000 $750,000 $2,850,000 114 Water & Wastewater Systems Modeling Project Number: CIPWA60017 Description: Update Integrated Master Plan to include the plans for water, sewer, reclaimed water, and stormwater systems. Perform ad hoc Water & Wastewater Systems modeling. Justification: This project provides needed planning and modeling to ensure necessary infrastructure is available, and water resources are available to meet anticipated demands to support future development. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 115 Laboratory Equipment Replacement Project Number: CIPWA60018 Description: Replace major water quality laboratory test equipment as each reaches the end of service-life. Justification: Critical laboratory test equipment is at the end of useful life. Maintenance is becoming costly versus replacement or using outside laboratory services. Water quality testing is mandatory to the treatment of water. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $180,000 $100,000 $280,000 116 Vehicle Replacement Project Number: CIPWA60019 Description: Replacement of vehicles, heavy trucks, and excavation equipment. Replacement is based on service life, usage, condition, and cost to maintain. Justification: Mobility is critical to effectively and efficiently perform work required. The fleet is comprised of over 165 units for a cost to replace of more than $10 million. Units range in value from $50,000 to $500,000 with service life of 10 to 20 years. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $750,000 $750,000 $1,000,000 $1,000,000 $1,000,000 $4,000,000 $8,500,000 117 Large Water Valve Replacement Program Project Number: CIPWA61001 Description: Replace 6" to 18" water main valves, related water lines and fire hydrants to maintain the operational reliability of the City’s water distribution and fire suppression systems. Depending on size and condition, 150 to 200 valves are replaced annually. Justification: Age of main valves vary, with many of them over 25 years old. Replacement is required along with any attached fire hydrants and service lines to reduce the risk of equipment failure. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $798,000 $798,000 $798,000 $798,000 $798,000 $3,280,000 $7,270,000 118 Water Line Rehabilitation Program Project Number: CIPWA61013 Description: Design and construct waterline replacement. Work is performed in phases based on condition assessments. As segments are scheduled, budget will be separated into single project from this placeholder. Justification: The average age of the water distribution system is over 35 years old. Rehabilitation or replacement is performed based on evaluation of the condition of the line segment to reduce risk of failure. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $496,000 $2,596,000 $2,596,000 $2,700,000 $2,800,000 $12,650,000 $23,838,000 119 Water System Security Project Number: CIPWA61023 Description: Replace video, communication, and perimeter equipment to enhance security of city's water supply, treatment plants and distribution systems. Justification: Replace cameras and equipment at Water Services facilities to further enhance security of City's water supply, treatment plants and distribution systems. Required to ensure the city complies with the federal homeland security requirements. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $150,000 $150,000 $150,000 $150,000 $150,000 $350,000 $1,100,000 120 Thunderbird Reservoir Project Number: CIPWA61045 Description: Design and construct improvements to improve water quality and water delivery during peak demand and construct roof replacement. Justification: The 12-million gallon reservoir was constructed in 1985 and is essential to meet peak hourly water demand within the northern and central portion of Glendale. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $550,000 $1,900,000 $1,050,000 $3,500,000 121 Meter Vault Replacement Program Project Number: CIPWA61047 Description: Program to replace 204 large in-ground meter vaults. Work will be contracted in phases. Have completed 142 vaults. Cost varies with each vault upgrade. Justification: The program includes evaluation of each vault as to repair or replace to meet safety standards for confined space entry. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $736,000 $212,000 $736,000 $515,000 $515,000 $2,714,000 122 Groundwater Well Rehabilitation Program Project Number: CIPWA61048 Description: Assess operating components and water quality at sixteen groundwater wells. Rehab and replace well and components per assessment. Justification: Wells need rehabilitation every 5-10 years to maintain production and water quality levels and replacement at end of service-life. Rehabilitation reduces risk of equipment failure, loss of service, and decrease in water quality. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $1,470,000 $1,270,000 $500,000 $500,000 $500,000 $5,000,000 $9,240,000 123 Distribution System Improvements Zone 2&3 Project Number: CIPWA61049 Description: Make operating improvements between Zone 2 and Zone 3 water distribution system to increase service resiliency. Includes improvements to Hillcrest Ranch booster station (HRBS). Justification: This booster station was constructed in 1992 and is being upgraded to provide emergency water supply to northern portion of Glendale if there is an event of reduced production. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $1,260,000 $1,050,000 $2,310,000 124 Accrue Long-Term Water Credits Project Number: CIPWA61051 Description: Using the Groundwater Saving Facilities, purchase Central Arizona Project water to store and accrue long-term water storage credits for use during supply shortages. Justification: Accrued long-term water storage credits (LTWC) can be recovered during a time of drought. LTWC adds to city’s water portfolio needed for the ADWR 100-year Assured Water Supply designation. This program adds resiliency to the city water supply. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $100,000 $100,000 $200,000 125 Distribution System Improvement Program Project Number: CIPWA61054 Description: Design and construct water distribution system improvements city-wide. Includes PRVs, water instrumentation, flow meters, sub-zone splitting. Justification: Pressure reducing valves (PRV) and process control systems have reached the end of useful life. It is very important to ensure the PRVs are functional to move water between different pressure zones to meet water demand and manage water pressure. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 126 Water Capital Equipment Replacement Project Number: CIPWA61061 Description: Replacement of capital equipment at water facilities. Includes Programmable Logic Controllers (PLC), Variable Frequency Drives (VFD), miscellaneous pumps and motors. Justification: As equipment at the water treatment plants reaches the end of service-life, it is replaced. It is critical to ensure City’s water treatment facilities are in good operational condition to meet water demands and regulatory requirements. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 $5,000,000 127 Transmission Line & Valve Replacement Project Number: CIPWA61062 Description: Assess condition of 48" and larger water transmission line and valves for future rehabilitation. The first assessment is for the 67th Ave line from the Pyramid Peak WTP. Justification: The 67th Ave transmission main was installed in 1987. This line conveys water from Pyramid Peak WTP to Glendale water customers in the northern portions of the City and the City of Peoria Turnout and needs the condition to be assessed. FUND FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 6020 – WATER FUND $530,000 $530,000 $530,000 $530,000 $530,000 $2,650,000 Council Questions / Discussion 128 Budget Calendar 129 Item Date Workshop #1 – Budget Overview / Revenues / Five-Year Financial Forecasts January 11, 2022 Workshop #2 – FY23-32 Capital Improvement Plan February 1, 2022 Workshop #3 – FY23-32 Capital Improvement Plan March 1, 2022 Workshop #4 – (All Day) FY23 Operating Budget Department Presentations April 5, 2022 Workshop #5 – (All Day) FY23 Operating Budget Department Presentations April 7, 2022 Workshop #6 – FY23 Final Budget Workshop April 19, 2022 Voting Meeting – Tentative Budget Adoption May 10, 2022 Voting Meeting – Final Budget Adoption / Property Tax Levy June 14, 2022 Voting Meeting – Property Tax Adoption June 28, 2022