Exhibit C-1

City of Glendale — Regular Meeting (2022-03-22)

View PDF Item 19 Meeting page

Extracted text (via pymupdf) 2755 characters
10/4/2021
UNIT
QTY
EXTENDED AMOUNT
SY
3000
$24,000.00
CY
65
$2,600.00
CY
650
$26,000.00
Ton
1400
$140,000.00
SY
815
$52,975.00
LF
840
$12,600.00
Lump Sum
1
$10,000.00
$268,175.00
$268,175.00
25%
$67,043.75
$335,218.75
5%
$16,760.94
$351,979.69
5%
$17,598.98
10%
$35,197.97
8%
$28,158.38
$432,935.02
* Pavement Structural Sections: 11"AC on 10" AB for Asphalt Section, 11.5" PCCP on 4" AB for PCCP Section
UNIT
QTY
EXTENDED AMOUNT
SY
3500
$28,000.00
CY
370
$14,800.00
CY
60
$2,400.00
Ton
130
$13,000.00
SY
3280
$213,200.00
LF
2580
$38,700.00
Lump Sum
1
$12,500.00
$322,600.00
$322,600.00
25%
$80,650.00
$403,250.00
5%
$20,162.50
$423,412.50
5%
$21,170.63
10%
$42,341.25
8%
$33,873.00
$520,797.38
* Pavement Structural Sections: 11"AC on 10" AB for Asphalt Section, 11.5" PCCP on 4" AB for PCCP Section
$87,862.36
MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION 
ENGINEER'S ESTIMATE  TT0327  -  Northern Parkway and SR 101L Frontage Road Concept
Preliminary Design Stage - Baseline Costs for Significant Differentiating Items
340.01190
Curb and Gutter, Variable Width Gutter, ADOT STD C-10.77, Type C
$15.00
340.01190
Curb and Gutter, Variable Width Gutter, ADOT STD C-10.77, Type C
$15.00
ITEM
DESCRIPTION
UNIT COST
(C)
SUBTOTAL ITEMS COST
310.03012
Aggregate Base Course (Class 2), 10" Thick
$40.00
301.01000
Subgrade Preparation
$8.00
ITEM
DESCRIPTION
UNIT COST
321.01302
Asphalt Concrete Pavement (Superpave 3/4 in Mix, High Traffic), 11" Thick
$100.00
324.01105
Portland Cement Pavement (PCCP) 11.5" Thick
$65.00
Pavement Marking and Signing
$10,000.00
ENGINEER'S ESTIMATE  TT0327  -  Northern Parkway and SR 101L Frontage Road Concept
Preliminary Design Stage - Frontage Road Concept Costs for Significant Differentiating Items
Sub Total:
(B)
UNIDENTIFIED ITEMS (I.E. BORROW, MISC. DRAINAGE) @
(A)
IDENTIFIED ITEMS
(G)
MOBILIZATION / DEMOBILIZATION @
(I)
TOTAL CONSTRUCTION COST
(J)
CONSTRUCTION CONTINGENCY @
(K)
CONSTRUCTION MANAGEMENT @
(L)
DESIGN @
GRAND TOTAL
310.03011
Aggregate Base Course (Class 2), 4" Thick
$40.00
310.03012
301.01000
Subgrade Preparation
$8.00
310.03011
Aggregate Base Course (Class 2), 4" Thick
$40.00
(G)
MOBILIZATION / DEMOBILIZATION @
(I)
(A)
IDENTIFIED ITEMS
324.01105
Portland Cement Pavement (PCCP) 11.5" Thick
$65.00
(L)
DESIGN @
Pavement Marking and Signing
$12,500.00
Sub Total:
Aggregate Base Course (Class 2), 10" Thick
$40.00
321.01302
Asphalt Concrete Pavement (Superpave 3/4 in Mix, High Traffic), 11" Thick
$100.00
(K)
CONSTRUCTION MANAGEMENT @
(B)
UNIDENTIFIED ITEMS (I.E. BORROW, MISC. DRAINAGE) @
(C)
SUBTOTAL ITEMS COST
GRAND TOTAL
NET COST DIFFERENCE - DEVELOPER'S RESPONSIBILITY
TOTAL CONSTRUCTION COST
(J)
CONSTRUCTION CONTINGENCY @
 MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION 
Page 1 of 1 
EXHIBIT C-1