ADOT File No.: IGA 21-0008117-I
Amendment No. One: 22-0008473-I
AG Contract No.: P0O1 2021 000564
Project Location/Name: 59% Avenue
Detection Upgrade/59* Avenue at 25
Intersections

Type of Work: Detection Systems
Federal-aid No.: GLN-0(263)T

ADOT Project No.: T0307 01D/01C
TIP/STIP No.: GLN22-060

CFDA No.: 20.205°- Highway Planning and
Construction

Budget Source Item No.: NA

AMENDMENT NO. ONE
TO
INTERGOVERNMENTAL AGREEMENT

BETWEEN
THE STATE OF ARIZONA
AND
THE CITY.OF GLENDALE

THIS AMENDMENT NO. ONE to INTERGOVERNMENTAL AGREEMENT (the “Amendment No.
One”), is entered into this date , pursuant to Arizona Revised Statutes
(“A.R.S.”) §§ 11-951 through 11-954, as amended, between the STATE OF ARIZONA, acting by and
through its DEPARTMENT OF TRANSPORTATION (the “State” or “ADOT”) and the CITY OF
GLENDALE, acting by and through its Mayor and City-Council (the “City”).The State and the City are
each individually referred to.as a “Party” and are collectively referred to as the “Parties.”

WHEREAS, the INTERGOVERNMENTAL AGREEMENT, IGA 21-0008117-I, A.G. Contract No. P0O1
2021 000564, was executed on June 14, 2021, (the “Original Agreement”);

WHEREAS, the State is empowered by A-R.S. § 28-401 to enter into this Amendment No. One and
has delegated to the undersigned the authority to execute this Amendment No. One on behalf of the
State;

WHEREAS, the City is empowered by A.R.S. § 48-572 to enter into this Amendment No. One and has
by resolution, a copy of which is attached and made a part of, resolved to enter into this
Amendment No. One and has authorized the undersigned to execute this Amendment No. One on
behalf of the City; and

NOW THEREFORE, in consideration of the mutual terms expressed herein, the purpose of
this Amendment No. One is to revise Project construction costs and replace Exhibit A,
attached and made part of this Amendment No. One. The Parties desire to amend the
Original Agreement as follows:

Page 1 of 5

IGA: 21-0008117-I
Amendment No. One: 22-0008473-I

The Parties incorporate the Recitals set forth above as part of the body of this Amendment
No. One,

I RECITALS

(NO CHANGES)

IL_SCOPE OF WORK
Section II, Paragraph 2.d. is revised, as follows:
2. The State will:

d. After completion of design review and prior.to bid advertisement, invoice.the City for the
actual PDA costs, as applicable, and the City’s.share of the Project construction'costs,
estimated at $71,215.00. After the Project costs for construction are finalized, the State
will either invoice or reimburse the City for the difference between the estimated and
actual costs. De-obligate or otherwise release any remaining federal funds from the
scoping/design phase of the Project. ;

Section II, Paragraph 3.e. is revised, as follows:
3. The City will:

e. After completion of design, within 30 days of receipt of an invoice from the State and
prior to bid advertisement, pay to the State, any outstanding PDA costs and the City’s
share of the Project construction costs, estimated at $71,215.00. Be responsible for and
pay the difference between the estimated and actual construction costs of the Project,
within 30.days of receipt of an invoice.

Il]. MISCELLANEOUS PROVISION
(NO CHANGES)

EXCEPT AS AMENDED, ALL OTHER terms and conditions of the Original Agreement remain in full
force and effect.

Page 2 of 5

IGA: 21-0008117-I
Amendment No. One: 22-0008473-1

THIS AMENDMENT NO. ONE shall become effective upon the signing and dating of all Parties.

IN ACCORDANCE WITH A.RS. § 11-952 (D), the written determination of each Party’s legal counsel
providing that the Parties are authorized under the laws of this State to enter into this Amendment
No. One and that the Amendment No. One is in proper form is set forth below.

IN WITNESS WHEREOF, the Parties have executed this Amendment No. One the day and year first
above written.

CITY OF GLENDALE

By Date
JERRY P. WEIERS
Mayor

ATTEST:

By Date
JULIE K. BOWER
City Clerk

I have reviewed the above referenced Intergovernmental Agreement between the State of Arizona,
acting by and through its DEPARTMENT OF TRANSPORTATION; and the CITY OF GLENDALE, an
agreement among public agencies which, has been reviewed pursuant to A.R.S. §§ 11-951 through
11-954 and A.R.S. § 48-572 declare this Agreement to be in proper form and within the powers and
authority granted to the City under the laws of the State of Arizona.

No opinion is expressed as to the authority-of the State to enter into this Agreement. Approved as to
Form:

By Date
City Attorney

Page 3 of 5

IGA: 21-0008117-1
Amendment No. One: 22-0008473-I

ARIZONA DEPARTMENT OF TRANSPORTATION

By Date.
STEVE BOSCHEN, PE
Division Director

A.G. Contract No. P001 2021 000564 (ADOT IGA 22-0008473, Amendment No. One: 22-
0008473), an Agreement between public agencies, the State of Arizona and the City of
Glendale has been reviewed pursuant to A.R.S. §§ 11-951 through 11-954 and A.R.S. § 28-
40] by the undersigned Assistant Attorney General who has determined that it is in the proper
form and is within the powers and authority granted to the State’of Arizona. No opinion is
expressed as to the authority of the remaining Parties, other than the State or its agencies, to
enter into said Agreement.

By Date
Assistant Attorney General

Page 4 of 5

IGA: 21-0008117-1
Amendment No. One: 22-0008473-I

EXHIBIT A

IGA 21-0008117-I
Amendment No. One: 22-0008473-I
Cost Estimate

T0307 01D/01C

The federal funds will be used for the scoping/design and construction of the Project,
including the construction engineering (CE) and administration cost. The estimated
Project costs are as follows:

ADOT Project Development Administrati S = raid:

PDA costs* $ 30,000.00
Subtotal - PDA* $ 30,000.00
Construction:

Federal-aid funds @.94.3% $ 1,178,165.00
City’s match @ 5,7% $71,215.00
Subtotal - Construction** $ 1,249,380.00
Estimated TOTAL Project Cost $ 1,279,380.00
Total Estimated City Funds $ 101,215.00
Total Federal Funds $ 1,178,165.00

* (Included in the City Estimated Funds; invoiced and received in accordance with
Original Agreement)
** (Includes 15% CE (this percentage is subject to change, any change will require
concurrence from the City) and 5% Project contingencies)

Page 5 of 5

DocuSign Envelope 'D: 4048E704-3B17-41C9-8CA0-FCB258F6C543

ADOT CAR No.: IGA 21-0008117-1

AG Contract No.: P0012021000564
Project Location/Name: 59% Avenue
Detection Upgrade/59% Avenue at 25
Intersections

Type of Work: Detection Systems
Federal-aid No.: GLN-0(263)T

ADOT Project No.: T0307 01D/03D/01C
TIP/STIP No.: GLN22-060

CFDA No.: 20.205 - Highway Planning and
Construction

Budget Source Item No.:

C21-0513

INTERGOVERNMENTAL AGREEMENT

BETWEEN
THE STATE OF ARIZONA
AND
THE CITY OF GLENDALE

THIS AGREEMENT (“Agreement”) is entered into this date june 14, 2021 pursuant
to the Arizona Revised Statutes (“A.R.S.") §§ 11-951 through 11-954, as amended, between the
STATE OF ARIZONA, acting by and through its DEPARTMENT OF TRANSPORTATION (the “State” or
“ADOT”) and the CITY OF GLENDALE, acting by and through its MAYOR and CITY COUNCIL (the “
City”). The State and the City are each individually referred to as a “Party” and are collectively
referred to as the “Parties.”

1__RECITALS

1. The State is empowered by A.RS. § 28-401 to enter into this Agreement and has delegated
to the undersigned the authority to execute this Agreement on behalf of the State.

2, The City is empowered by A.R.S. § 48-572 to enter into this Agreement and has by
resolution, a copy of which is attached and made a part of, resolved to enter into this
Agreement and has authorized the undersigned to execute this Agreement on behalf of the

City.

3. The work proposed under this Agreement includes the procurement and installation of
detection systems at approximately 25 locations along 59 Avenue, the “Project”. The
Project costs are estimated at $925,641.00, as shown in Exhibit A, attached and made a part
of this Agreement, which includes federal aid and the City's match. The City will administer
the design, and the State will advertise, bid and award, and administer the construction of
the Project.

4. The interest of the State in this Project is the acquisition of federal funds for the use and

benefit of the City and authorization of such federal funds for the Project pursuant to federal
law and regulations. The State shall be the designated agent for the City for the Project, if

Page 1 of 10

DocuSign Envelope ID: 4048E704-3B17-41C9-8CA0-FCB258F6C543

IGA 21-0008117-1

the Project is approved by Federal Highway Administration (FHWA) and funds for the
Project are available,

THEREFORE, the Recitals set forth above are incorporated into this Agreement and in
consideration of the mutual terms expressed herein, it is agreed as follows:

F WORK

1. The Parties agree:

a.

The Project will be completed, accepted, and paid for in accordance with the
requirements of the Project plans and specifications.

The final Project amount may exceed the initial estimate(s) identified in Exhibit A, and
in such case, the City is responsible for, and agrees to pay, any and ail actual costs
exceeding the initial estimate. If the final Project amount is less than the initial estimate,
the difference between the final bid amountand the initial estimate will be de-obligated
or otherwise released from the Project. The City acknowledges it remains responsible
for actual costs and agrees to pay according to the terms of this Agreement.

The City and ADOT will each separately file a Notice of Intent (NOI) under the
Construction General Permit (CGP) with the Arizona Department of Environmental
Quality (ADEQ) before construction begins, if applicable to the Project.

2. The State will:

a

Execute this Agreement, and if the Project is approved by FHWA and funds for the
Project are available, be the City’s designated agent for the Project.

After this Agreement is executed, and prior to performing or authorizing any work,
invoice the City for the City's share of the initial Project Development Administration
(PDA) costs, estimated at $30,000.00. If PDA costs exceed the estimate during the
development of design, notify the City, obtain concurrence prior to continuing with the
development of design, and invoice as determined by ADOT and the City for additional
costs to complete PDA for the Project. After the Project costs are finalized invoice or
reimburse the City for the difference between actual costs and the amount the City has
already paid for PDA.

After receipt of the PDA costs review design plans, specifications, cost estimates and
other such documents required for the construction bidding and construction of the
Project, including scoping,/design plans and documents required by FHWA to qualify
projects for and to receive federal funds; provide design review comments to the City as

appropriate.

After completion of design review and prior to bid advertisement, invoice the City for
the actual PDA costs, as applicable, and the City's share of the Project construction costs,
estimated at $51,052.00. After the Project costs for construction are finalized, the State

Page 2 of 10

DocuSign Envelope ID: 4048E704-3B17-41C9-8CA0-FCB258F6C543

IGA 21-0008117-1

will either invoice or reimburse the City for the difference between estimated and actual
costs. De-obligate or otherwise release any remaining federal funds from the
scoping/design phase of the Project.

e. After receipt of the actual PDA costs, if applicable, and the City's estimated share of the
Project construction costs, submit all required documentation to FHWA with the
recommendation that the maximum federal funds programmed for construction of this
Project be approved. Should costs exceed the maximum federal funds available, it is
understood and agreed that the City will be responsible for any overage.

f. After receipt of FHWA authorization, proceed to advertise for, receive and open bids
award and enter into a contract with the firm for the construction of the Project. If the
bid amounts exceed the construction cost estimate, obtain City concurrence prior to
awarding the contract. After the Project is awarded, invoice the City for the difference
between estimated and actual costs, if applicable.

g. Notify the City of completion and final acceptance of the Project. At such time, file a
Notice of Termination (NOT) with ADEQ transferring CGP responsibilities to the City,
and provide a copy to the City indicating that the State’s maintenance responsibility of
the Project is terminated, as applicable.

h. Notify the City of completion and final acceptance of the Project; coordinate with the
City and turn over full responsibility of the Project improvements.

i. Not be obligated to maintain the Project, should the City fail to budget or provide for
proper and perpetual maintenance as set forth in this Agreement.

3. The City will:
a. Designate the State as the City's authorized agent for the Project.

b. Within 30 days of receipt of an invoice from the State, pay the City's share of the initial
PDA costs, estimated at $30,000.00. Agree to be responsible for actual PDA costs, if
during the development of design, PDA costs exceed the initial estimate. Be responsible
and pay for the difference between the estimated and actual PDA and design costs of the
Project within 30 days of receipt of an invoice.

c. Prepare and provide design plans, specifications, cost estimates and other such
documents required for the construction bidding and construction of the Project,
including scoping/design plans and documents required by FHWA to qualify projects
for and to receive federal funds; incorporate design review comments from the State, as

appropriate.

d. Enter into an agreement with the design consultant which states that the design
consultant will provide professional post-design services as required and requested
throughout and at completion of the construction phase of the Project. After final
acceptance of the Project, provide an electronic version of the record drawings to the
ADOT project Manager.

Page 3 of 10

DocuSign Envelope ID: 4048E704-3B17-41C9-8CA0-FCB258F6C543

IGA 21-0008117-1

e. After completion of design, within 30 days of receipt of an invoice from the State and
prior to bid advertisement, pay to the State, any outstanding PDA costs and the City’s
share of the Project construction costs, estimated at $51,052.00 . Be responsible for and
pay the difference between the estimated and actual construction costs of the Project,
within 30 days of receipt of an invoice.

f. Be responsible for all costs incurred in performing and accomplishing the work as set
forth under this Agreement, that are not covered by federal funding. Should costs be
deemed ineligible or exceed the maximum federal funds available, it is understood and
agreed that the City is responsible for these costs; payment for these costs shall be made
within 30 days of receipt of an invoice from the State.

g. Certify that all necessary rights of way have been or will be acquired prior to
advertisement for bid and also certify that all obstructions or unauthorized
encroachments of whatever nature, either above or below the surface of the Project
area, shall be removed from the proposed right of way, or will be removed prior to the
start of construction, in accordance with The Uniform Relocation Assistance and Real
Property Acquisition Policies Act of 1970 as amended; 49 CFR 24.102 Basic Acquisition
Policies; 49 CFR 24.4 Assurances, Monitoring and Corrective Action, parts (a) & (b) and
ADOT Right of Way Procedures Manual: 8.02 Responsibilities, 8.03 Prime Functions,
9.06 Monitoring Process and 9.07 Certification of Compliance. Coordinate with the
appropriate State’s Right of Way personnel during any right of way process performed
by the City, if applicable.

h. Certify that the City has adequate resources to discharge the City’s real property related
responsibilities and ensures that its Title 23-funded projects are carried out using the
FHWA approved and certified ADOT Right of Way Procedures Manual and that they will
comply with current FHWA requirements whether or not the requirements are included
in the FHWA approved ADOT Right of Way Procedures Manual. (23 CFR 710.201)

i. Not permit or allow any encroachments on or private use of the right of way, except
those authorized by permit. In the event of any unauthorized encroachment or
improper use, the City shall take all necessary steps to remove or prevent any such
encroachment or use. Provide a copy of encroachment permits issued within the Project
limits to the State.

j. Automatically grant to the State, by execution of this Agreement, its agents and/or
contractors, without cost, the temporary right to enter City rights of way, as required, to
conduct any and all construction and preconstruction related activities for the Project,
on, to and over said City rights of way. This temporary right will expire with completion
of the Project.

k. Investigate and document utilities within the Project limits; submit findings to ADOT
determining prior rights or no prior rights; approve an easement within the final right
of way to re-establish the prior right location for those utilities with prior rights.

l. Be obligated to incur any expenditure should unforeseen conditions or circumstances
increase Project costs, Be responsible for the cost of any City requested changes to the
scope of work of the Project, such changes will require State and FHWA approval. Be
responsible for any contractor claims for additional compensation caused by Project

Page 4 of 10

DocuSign Envelope 1D: 4048E704-3B17-41C9-8CA0-FCB258F6C543

IGA 21-0008117-1

delay attributable to the City. Payment for these costs will be made to the State within
30 days of receipt of an invoice from the State.

m. After notification of final acceptance by the State, assume and maintain full
responsibility of the Project, including Storm Water Pollution Prevention Plans (SWPPP)
inspections, maintenance, and required documentation, until final stabilization is
reached. Provide the NOI number to the State and the Contractor, accept CGP
responsibilities at time of transfer, and file an NOT with ADEQ when final stabilization is

reached, as applicable.

n, After completion and final acceptance of the Project, agree to maintain and assume full
responsibility of the Project and all Project components.

il. EL PROVIS

1. This Agreement shall become effective upon signing and dating of the Determination Letter
by the State’s Attorney General.

2. Any change or modification to the Project will only occur with the mutual written consent of
both Parties.

3. The terms, conditions and provisions of this Agreement shall remain in full force and effect
until completion of the Project and all related deposits and/or reimbursements are made.
Any provisions for maintenance shall be perpetual, unless assumed by another competent
entity.

4. This Agreement may be cancelled at any time up to 30 days before the award of the Project
contract, so long as the cancelling Party provides at least 30 days’ prior written notice to the
other Party. it is understood and agreed that, in the event the City terminates this
Agreement, the City shall be responsible for all costs incurred by the State up to the time of
termination. It is further understood and agreed that in the event the City terminates this
Agreement, the State shall in no way be obligated to complete or maintain the Project.

5. The City shall indemnify, defend, and hold harmless the State, any of its departments,
agencies, officers or employees (collectively referred to in this paragraph as the “State”)
from any and all claims, demands, suits, actions, proceedings, loss, cost and damages of
every kind and description, including reasonable attorneys’ fees and/or litigation expenses
(collectively referred to in this paragraph as the “Claims”), which may be brought or made
against or incurred by the State on account of loss of or damage to any property or for
injuries to or death of any person, to the extent caused by, arising out of, or contributed to,
by reasons of any alleged act, omission, professional error, fault, mistake, or negligence of
the City, its employees, officers, directors, agents, representatives, or contractors, their
employees, agents, or representatives in connection with or incident to the performance of
this Agreement. The City’s obligations under this paragraph shall not extend to any Claims
to the extent caused by the negligence of the State, except the obligation does apply to any
negligence of the City which may be legally imputed to the State by virtue of the State’s
ownership or possession of land. The City’s obligations under this paragraph shall survive
the termination of this Agreement.

Page 5 of 10

DocuSign Envelope ID: 4048E704-3B17-41C9-8CA0-FCB258F6C543

10.

11.

12.

13.

14.

15.

IGA 21-0008117-1

The State shall include Section 107.13 of the 2008 version of the Arizona Department of
Transportation Standard Specifications for Road and Bridge Construction, incorporated into
this Agreement by reference, in the State’s contract with any and all contractors, of which
the City shall be specifically named as a third-party beneficiary. This provision may not be
amended without the approval of the City.

The cost of scoping and design work under this Agreement is to be covered by the federal
funds programmed for this Project, up to the maximum available. The City acknowledges
that actual Project costs may exceed the maximum available amount of federal funds, or that
certain costs may not be accepted by FHWA as eligible for federal funds. Therefore, the City
agrees to pay the difference between actual costs of the Project and the federal funds
received.

Should the federal funding related to this Project be terminated or reduced by the federal
government, or Congress rescinds, fails to renew, or otherwise reduces apportionments or
obligation authority, the State shall in no way be obligated for funding or liable for any past,
current or future expenses under this Agreement.

The cost of the Project under this Agreement includes indirect costs approved by FHWA, as
applicable.

The Parties warrant compliance with the Federal Funding Accountability and Transparency
Act of 2006 and associated 2008 Amendments (the “Act”). Additionally, in a timely manner,
the City will provide information that is requested by the State to enable the State to comply
with the requirements of the Act, as may be applicable.

The City acknowledges and will comply with Title VI of the Civil Rights Act Of 1964.

The City acknowledges compliance with federal laws and regulations and may be subject to
the CODE OF FEDERAL REGULATIONS, TITLE 2, PART 200 (also known as The Uniform
Grant Guidance). Entities that expend $750,000.00 or more (on or after 12/26/14) of
federal assistance (federal funds, federal grants, or federal awards) are required to comply
by having an independent audit in accordance with §200.331 Subpart F. Either an electronic
or hardcopy of the Single Audit is to be sent to Arizona Department of Transportation
Financial Management Services within the required deadline of nine months of the sub
recipient fiscal year end.

ADOT - FMS

Attn: Cost Accounting Administrator

206 S 17% Ave. Mail Drop 204B

Phoenix, AZ 85007

SingleAudit@azdot.gov

Pursuant to 23 USC 102(b), the City will repay all federal funds reimbursements for
preliminary engineering costs on the Project if it does not advance to right of way
acquisition or construction within 10 years after federal funds were first made available.
This Agreement shall be governed by and construed in accordance with Arizona laws.

This Agreement may be cancelled in accordance with A.R.S. § 38-511.

Page 6 of 10

DocuSign Envelope 1D: 4048E704-3B17-41C9-8CA0-FCB258F6C543

16.

17.

18.

19,

20.

21.

22.

23.

IGA 21-0008117-1

The City shall retain ali books, accounts, reports, files and other records relating to the
Agreement for five years after completion of the Project. These documents shall be subject
at all reasonable times to inspection and audit by the State. Such records shall be produced
by the City at the request of ADOT.

This Agreement is subject to all applicable provisions of the Americans with Disabilities Act
(Public Law 101-336, 42 U.S.C. 12101-12213) and all applicable federal regulations under
the Act, including 28 CFR Parts 35 and 36. The Parties to this Agreement shall comply with
Executive Order Number 2009-09 issued by the Governor of the State of Arizona and
incorporated in this Agreement by reference regarding “Non-Discrimination.”

Non-Availability of Funds: Every obligation of the State under this Agreement is conditioned
upon the availability of funds appropriated or allocated for the fulfillment of such
obligations. If funds are not allocated and available for the continuance of this Agreement,
this Agreement may be terminated by the State at the end of the period for which the funds
are available, No liability shall accrue to the State in the event this provision is exercised,
and the State shall not be obligated or liable for any future payments as a result of
termination under this paragraph.

In the event of any controversy, which may arise out of this Agreement, the Parties agree to
abide by arbitration as is set forth for public works contracts if required by A.R.S. § 12-1518.

The Parties shall comply with the applicable requirements of A.R.S. § 41-4401.

The Parties shall certify that all contractors comply with the applicable requirements of
A.R.S. §35-393.01,

The Parties shall comply with all applicable laws, rules, regulations and ordinances, as may
be amended.

All notices or demands upon any Party to this Agreement shall be in writing and shall be
delivered electronically, in person, or sent by mail, addressed as follows:

em inistration:
Arizona Department of Transportation City of Glendale
Joint Project Agreement Section Attn: Allan Galicia
205 S. 17% Avenue, Mail Drop 637E 6210 W. Myrtle
Phoenix, AZ 85007 Glendale, AZ 85301
[PABranch@azdot.gov agalicia@glendaleaz.com

Arizona Department of Transportation City of Glendale
Project Management Group Attn: Allan Galicia
205 S. 17% Avenue, Mail Drop 614E 6210 W. Myrtle
Phoenix, AZ 85007 Glendale, AZ 85301

Page 7 of 10

DocuSign Envelope (D: 4048E704-3B17-41C9-8CA0-FCB258F6C543

IGA 21-0008117-I

For Financial Administration;

Arizona Department of Transportation City of Glendale

Project Management Group Attn: Allan Galicia

205 S. 17% Avenue, Mail Drop 614E 6210 W. Myrtle

Phoenix, AZ 85007 Glendale, AZ 85301
PMG@azdct.gov aguliciad@glendaleaz.com

24. Any revisions to the names and addresses above may be updated administratively by either
Party and shall be in writing.

25. In accordance with A.RS. § 11-952 (D), attached and incorporated in this Agreement is the
written determination of each Party’s legal counsel that the Parties are authorized under
the laws of this State to enter into this Agreement and that the Agreement is in proper form.

IN WITNESS WHEREOF, the Parties have executed this Agreement the day and year first above

written.
ITY\OK GLENDALE STATE OF ARIZONA
Department of Transportation
\ DocuSigned by:
By . By <t Beth. __
JE . WEIERS e- PE
M Division Director
ATTES'
By, VA FA AY Bs
‘\)4ULIE K. BOWER
City Clerk

Page 8 of 10

DocuSign Envelope ID: 4048E704-3B17-41C9-8CA0-FCB258F6C543

IGA 21-0008117-I

T’ NEY APPROV, M FOR THE CITY OF GLENDALE

I have reviewed the above referenced Intergovernmental Agreement between the State of Arizona,
acting by and through its DEPARTMENT OF TRANSPORTATION, and the CITY OF GLENDALE, an
agreement among public agencies which, has been reviewed pursuant to Arizona Revised Statutes
§§ 11-951 through 11-954 and declare this Agreement to be in proper form and within the powers
and authority granted to the City under the laws of the State of Arizona.

No opinion is expressed as to the authority of the State to enter into this Agreement.

aoty CoN al 4 tse
MICHAEL BAILEY DATE
City Attorney

Page 9 of 10

DocuSign Envelope ID: 4048E704-3B17-41C9-8CA0-FCB258F6C543

IGA 21-0008117-I

EXHIBIT A

Cost Estimate

T0307 01D/03D/01C

The federal funds will be used for the scoping/design and construction of the Project, including
the construction engineering (CE) and administration cost. The estimated Project costs are as

follows:

ADOT Proje velopment Administration (PDA) Cost, non-federal-aid:

PDA costs $ 30,000.00
Subtotal -PDA* $ 30,000.00
C ruction:

Federal-aid funds @ 94.3% $ 844,589.00
City's match @ 5.7% $51,052.00
Subtotal - Construction** $ 895,641.00
Estimated TOTAL Project Cost $ 925,641.00
Total Estimated City Funds $ 81,052.00
Total Federal Funds $ 844,589.00

* (Included in the City Estimated Funds)
** (Includes 15% CE (this percentage is subject to change, any change will require concurrence

from the City) and 5% Project contingencies)

Page 10 of 10

RESOLUTION NO. R21-55

A RESOLUTION OF THE COUNCIL OF THE CITY OF
GLENDALE, MARICOPA COUNTY, ARIZONA,
AUTHORIZING AND DIRECTING THE ENTERING INTO OF
AN INTERGOVERNMENTAL AGREEMENT WITH THE
ARIZONA DEPARTMENT OF TRANSPORTATION (IGA 21-
0008117-I) FOR THE INSTALLATION OF DETECTION
SYSTEMS ALONG 597# AVENUE AT 25 INTERSECTIONS IN
THE CITY OF GLENDALE.

WHEREAS, the City of Glendale, together with other cities in the Valley use the
Intelligent Transportation System (“ITS”) technologies for managing traffic; and

WHEREAS, the City of Glendale applied for, and was awarded a federal grant to install
additional smart-traffic detection systems at up to twenty-five (25) signaled intersections on 59th
Avenue to improve traffic flow and reduce delay. The City will be responsible for $81,052 of
the Project.

BE IT RESOLVED BY THE COUNCIL OF THE CITY OF GLENDALE as follows:

SECTION 1. That it is deemed in the best interest of the City of Glendale and the
citizens thereof that the Intergovernmental Agreement (IGA 21-0008117-I) with the Arizona
Department of Transportation for the installation of detection systems along 59" Avenue at 25
different intersections in the City of Glendale be entered into, which agreement is now on file in
the office of the City Clerk of the City of Glendale.

SECTION 2. That the City Manager or designee and the City Clerk are authorized and

directed to execute and deliver any and all documents necessary to effectuate said Agreement on
behalf of the City of Glendale.

(Signatures on the following page)

ATTEST:

fo a

}ilieK. Bower, City Clerk (SEAL)

APPROVED AS TO FORM:

=“)
Michael D-Baitéy, City Attorney _/

REVIEWED BY:

Kaye R. Phelps, City Sf

Dawn NorTHUP

OFFICE OF THE ARIZONA ATTORNEY GENERAL DIVISION CHIEF COUNSEL
Eli D. Golob
MARK BRNOVICH STATE GOVERNMENT DIVISION / ASSISTANT ATTORNEY GENERAL
ATTORNEY GENERAL TRANSPORTATION SECTION DIRECT LINE: 602-542-8842

E-MAIL: ELI.GOLOB@AZAG.GOV

INTERGOVERNMENTAL AGREEMENT
DETERMINATION

A.G. Contract No. P0012021000564 (ADOT IGA/JPA 21-0008117-l), an Agreement
between public agencies, the State of Arizona and the City of Glendale, has been
reviewed pursuant to A.R.S. §§ 11-951 through 11-954 and 28-401, by the undersigned
Assistant Attorney General who has determined that it is in the proper form and is within
the powers and authority granted to the State of Arizona.

No opinion is expressed as to the authority of the remaining Parties, other than the

State or its agencies, to enter into said Agreement.

DATED: June 14, 2021

MARK BRNOVICH
Attorney General

/s/ Eli D. Golob

EL! D. GOLOB
Assistant Attorney General
Transportation Section

EDG/sp/9584127