ADOT File No.: IGA 21-0008115-I Amendment No. One: 22-0008472-I AG Contract No.: P001 2021 000566 Project Location/Name: Glendale Ave Detection Upgrade/Glendale Ave at 20 intersections Type of Work: Detection Systems Federal-aid No.: GLN-0(262)T ADOT Project No.: T0306 01D/01C TIP/STIP No.: GLN22-061 CFDA No.: 20.205:- Highway Planning and Construction Budget Source Item No.: N/A AMENDMENT NO. ONE TO INTERGOVERNMENTAL AGREEMENT BETWEEN THE STATE OF ARIZONA AND THE CITY.OF GLENDALE THIS AMENDMENT NO. ONE to INTERGOVERNMENTAL AGREEMENT (the “Amendment No. One”), is entered into this date... pursuant to Arizona Revised Statutes (“A.R.S.”) §§ 11-951 through 11-954, as amended, between the STATE OF ARIZONA, acting by and through its DEPARTMENT OF TRANSPORTATION (the "State" or “ADOT”) and the CITY OF GLENDALE, acting by and through its MAYOR and CITY COUNCIL (the “City’).The State and the City are each individually referred:to as:a “Party” and are collectively referred to as the “Parties.” WHEREAS, the INTERGOVERNMENTAL AGREEMENT, IGA/JPA 21-0008115-1, A.G. Contract No. P001 2021 000566, was executed on June 14, 2021, (the “Original Agreement”); WHEREAS, the State is empowered by A-R.S. § 28-401 to enter into this Amendment No. One and has delegated to the undersigned the authority to execute this Amendment No. One on behalf of the State; WHEREAS, the City is empowered by A.R.S. § 48-572 to enter into this Amendment No. One and has by resolution, a copy of which is attached and made a part of, resolved to enter into this Amendment No. One and has authorized the undersigned to execute this Amendment No. One on behalf of the City; and NOW THEREFORE, in consideration of the mutual terms expressed herein, the purpose of this Amendment No. One is to revise Project construction costs. The Parties desire to amend the Original Agreement, as follows: The Parties incorporate the Recitals set forth above as part of the body of this Amendment No. One. Page 1 of 5 IGA: 21-0008115-I Amendment No. One: 22-0008472-1 I._RECITALS (NO CHANGES) IL (8) Section II, Paragraph 2.d. is revised, as follows: 2. The State will: d. After completion of design review and prior to bid advertisement, invoice the City for the actual PDA costs, as applicable, and the City’s share of the Project construction costs, estimated at $51,578.00. After the Project costs for construction are finalized, the State will either invoice or reimburse the City for the difference between estimated:and actual costs. De-obligate or otherwise release any remaining federal funds from the scoping design phase of the Project. Section II, Paragraph 3.e. is revised, as follows: 1. The City will: e. After completion of design, within 30 days of receiptof an invoice from the State and prior to bid advertisement, pay to the:State, any outstanding PDA costs and the City’s share of the Project construction costs, estimated at $51,578.00. Be responsible for and pay the difference between the estimated and actual construction costs of the Project, within 30 days:of-receipt of an invoice. IL, MISCELLANEOU Vv (NO CHANGES) EXCEPT AS AMENDED, ALL OTHER terms and conditions of the Original Agreement remain in full force and effect. Page 2 of 5 IGA: 21-0008115-I Amendment No. One: 22-0008472-I THIS AMENDMENT NO. ONE shall become effective upon the signing and dating of all Parties. IN ACCORDANCE WITH A.R.S. § 11-952 (D), the written determination of each Party's legal counsel providing that the Parties are authorized under the laws of this State to enter into this Amendment No. One and that the Amendment No. One is in proper form is set forth below. IN WITNESS WHEREOF, the Parties have executed this Amendment No. One the day and year first above written. CITY OF GLENDALE By Date JERRY P. WEIERS Mayor ATTEST: By Date. JULIE K. BOWER City Clerk I have reviewed the above referenced Intergovernmental Agreement between the State of Arizona, acting by and through its DEPARTMENT OF TRANSPORTATION, and the CITY OF GLENDALE, an agreement among public agencies which, has been reviewed pursuant to A.R.S. §§ 11-951 through 11-954 and and A.RS. § 48-572 declare this Agreement to be in proper form and within the powers and authority granted to. the City under the laws of the State of Arizona. No opinion is expressed as to the authority.of the State to enter into this Agreement. Approved as to Form: By Date City Attorney. Page 3 of 5 IGA: 21-0008115-1 Amendment No. One: 22-0008472-I ARIZONA DEPARTMENT OF TRANSPORTATION By Date. STEVE BOSCHEN, PE Division Director A.G. Contract No. P001 2021 000566 (ADOT IGA 22-0008472), an Agreement between public agencies, the State of Arizona and the City of Glendale has been reviewed pursuant to A.R.S. §§ 11-951 through 11-954 and A.R.S. § 28-401 by the undersigned Assistant Attorney General who has determined that it is in the proper form and is within the powers and authority granted to the State of Arizona. No opinion is expressed as to the authority of the remaining Parties, other than the State or its agencies, to enter into said Agreement. By Date. Assistant Attorney General Page 4 of 5 IGA: 21-0008115-I Amendment No. One: 22-0008472-1 EXHIBIT A IGA 21-0008115-I Amendment No. One: 22-0008472-I Cost Estimate T0306 01D/ 01C The federal funds will be used for the construction of the Project, including the construction engineering (CE) and administration cost, The estimated Project costs are as follows: ADOT Project Development Administration (PDA) Cost, non-federal-aid: PDA costs* $ 30,000.00 Subtotal - PDA* $ 30,000.00 Construction: Federal-aid funds @:94.3% $ 853,282.00 City’s match @ 5.7% $51,578.00 Subtotal - Construction** $ 904,860.00 Estimated TOTAL Project Cost $ 934,860.00 Total Estimated City Funds $ 81,578.00 Total Federal Funds $ 853,282.00 * (Included in the City Estimated Funds; invoiced and received in accordance with Original Agreement) ** (Includes 15% CE (this percentage is subject to change, any change will require concurrence from the City) and 5% Project contingencies) Page 5 of 5 DocuSign Envelope ID: 0A71D05F-5F8B-4A99-B8E1-F672859A4EF8 ADOT CAR No.: IGA 21-0008115-1 AG Contract No.: P0012021000566 Project Location/Name: Glendale Ave Detection Upgrade/Glendale Ave at 20 Intersections Type of Work: Detection Systems Federal-aid No.: GLN-0(262)T ADOT Project No.: T0306 01D/03D/01C TIP/STIP No.; GLN22-061 CFDA No.: 20.205 - Highway Planning and Construction Budget Source Item No.: C21-0511 INTERGOVERNMENTAL AGREEMENT BETWEEN THE STATE OF ARIZONA AND THE CITY OF GLENDALE THIS AGREEMENT (“Agreement”) is entered into this date June 14, 2021 pursuant to the Arizona Revised Statutes (“A.R.S.”) §§ 11-951 through 11-954, as amended, between the ' STATE OF ARIZONA, acting by and through its DEPARTMENT OF TRANSPORTATION (the “State” or “ADOT’) and the CITY OF GLENDALE, acting by and through its MAYOR and CITY COUNCIL (the “ City”}. The State and the City are each individually referred to as a “Party” and are collectively referred to as the “Parties.” 1,__RECITALS 1. The State is empowered by A.R.S. § 28-401 to enter into this Agreement and has delegated to the undersigned the authority to execute this Agreement on behalf of the State. 2. The City is empowered by A.RS. § 48-572 to enter into this Agreement and has by resolution, a copy of which is attached and made a part of, resolved to enter into this Agreement and has authorized the undersigned to execute this Agreement on behalf of the City. 3. The work proposed under this Agreement includes the procurement and installation of smart detection systems at approximately 20 locations along Glendale Avenue, “the Project”. The Project costs are estimated at $746,512.00, as shown in Exhibit A, attached and made a part of this Agreement, which includes federal aid and the City’s match. The City will administer the design, and the State will advertise, bid and award, and administer the construction of the Project. 4, The interest of the State in this Project is the acquisition of federal funds for the use and benefit of the City and authorization of such federal funds for the Project pursuant to federal law and regulations. The State shall be the designated agent for the City for the Project, if Page 1 of 10 DocuSign Envelope ID: 0A71D05F-5F8B-4A99-B8E1-F672859A4EF8 IGA 21-0008115-I the Project is approved by Federal Highway Administration (FHWA) and funds for the Project are available. THEREFORE, the Recitals set forth above are incorporated into this Agreement and in consideration of the mutual terms expressed herein, it is agreed as follows: IL_SCOPE OF WORK 1. The Parties agree: a. The Project will be completed, accepted, and paid for in accordance with the requirements of the Project plans and specifications. The final Project amount may exceed the initial estimate(s) identified in Exhibit A, and in such case, the City is responsible for, and agrees to pay, any and all actual costs exceeding the initial estimate. If the final Project amount is less than the initial estimate, the difference between the final bid amount and the initial estimate will be de-obligated or otherwise released from the Project. The City acknowledges it remains responsible for actual costs and agrees to pay according to the terms of this Agreement. The City and ADOT will each separately file a Notice of Intent (NOI) under the Construction General Permit (CGP) with the Arizona Department of Environmental Quality (ADEQ) before construction begins, if applicable to the Project. 2. The State will: a. Execute this Agreement, and if the Project is approved by FHWA and funds for the Project are available, be the City’s designated agent for the Project. After this Agreement is executed, and prior to performing or authorizing any work, invoice the City for the City’s share of the initial Project Development Administration (PDA) costs, estimated at $30,000.00. If PDA costs exceed the estimate during the development of design, notify the City, obtain concurrence prior to continuing with the development of design, and invoice as determined by ADOT and the City for additional costs to complete PDA for the Project. After the Project costs for the procurement of the Equipment are finalized invoice or reimburse the City for the difference between actual costs and the amount the City has already paid for PDA. After receipt of the PDA costs, review design plans, specifications , cost estimates and other such documents required for the construction bidding and construction for the Project, including scoping/design plans and comments required by FHWA to qualify projects for and to receive federal funds, provide design review comments to the City, as appropriate. After completion of design review and prior to bid advertisement, invoice the City for the actual PDA costs, as applicable, and the City's share of the Project construction costs, estimated at $40,841.00. After the Project costs for construction are finalized, the State Page 2 of 10 DocuSign Envelope 1D: 0A71D05F-5F8B-4A99-B8E 1-F672859A4EF8 IGA 21-0008115-1 will either invoice or reimburse the City for the difference between estimated and actual costs, De-obligate or otherwise release any remaining federal funds from the scoping/design phase of the Project. e. After receipt of the actual PDA costs, if applicable, and the City's estimated share of the Project construction costs, submit all required documentation to FHWA with the recommendation that the maximum federal funds programmed for construction of this Project be approved. Should costs exceed the maximum federal funds available, it is understood and agreed that the City will be responsible for any overage. f. After receipt of FHWA authorization, proceed to advertise for, receive and open bids award and enter into a contract with the firm for the construction of the Project. If the bid amounts exceed the construction cost estimate, obtain City concurrence prior to awarding the contract. After the Project is awarded, invoice the City for the difference between estimated and actual costs, if applicable. g. Notify the City of completion and final acceptance of the Project. At such time, file a Notice of Termination (NOT) with ADEQ transferring CGP responsibilities to the City, and provide a copy to the City indicating that the State’s maintenance responsibility of the Project is terminated, as applicable. h. Notify the City of completion and final acceptance of the Project, coordinate with the City and turnover full responsibility of the Project improvements. i. Not be obligated to maintain the Project, should the City fail to budget or provide for proper and perpetual maintenance as set forth in this Agreement. 3. The City will: a. Designate the State as the City's authorized agent for the Project. b. Within 30 days of receipt of an invoice from the State, pay the City's share of the initial PDA costs, estimated at $30,000.00. Agree to be responsible for actual PDA costs, if during the development of design, PDA costs exceed the initial estimate. Be responsible and pay for the difference between the estimated and actual PDA costs of the Project within 30 days of receipt of an invoice. c. Prepare and provide design plans, specifications, cost estimates and other such documents required for the construction bidding and construction of the Project, including scoping/design plans and documents required by FHWA to qualify projects for and to receive federal funds; incorporate design review comments from the State, as appropriate. d. Enter into an agreement with the design consultant which states that the design consultant will provide professional post-design services as required and requested throughout and at completion of the construction phase of the Project. After final acceptance of this Project, provide an electronic version of the record drawings to the ADOT Project Manager. Page 3 of 10 DocuSign Envelope ID: 0A71DO5F-5F8B-4A99-B8E 1-F672859A4EF8 IGA 21-0008115-1 e. After completion of design, within 30 days of receipt of an invoice from the State and prior to bid advertisement, pay to the State, any outstanding PDA costs and the City's share of the Project construction costs, estimated at $40,841.00. Be responsible for and pay the difference between the estimated and actual construction costs of the Project, within 30 days of receipt of an invoice. f. Beresponsible for all costs incurred in performing and accomplishing the work as set forth under this Agreement, that are not covered by federal funding, Should costs be deemed ineligible or exceed the maximum federal funds available, it is understeod and agreed that the City is responsible for these costs; payment for these costs shall be made within 30 days of receipt of an invoice from the State. g. Certify that all necessary rights of way have been or will be acquired prior to advertisement for bid and also certify that all obstructions or unauthorized encroachments of whatever nature, either above or below the surface of the Project area, shall be removed from the proposed right of way, or will be removed prior to the start of construction, in accordance with The Uniform Relocation Assistance and Rea] Property Acquisition Policies Act of 1970 as amended; 49 CFR 24.102 Basic Acquisition Policies; 49 CFR 24.4 Assurances, Monitoring and Corrective Action, parts (a) & (b) and ADOT Right of Way Procedures Manual: 8.02 Responsibilities, 8.03 Prime Functions, 9,06 Monitoring Process and 9.07 Certification of Compliance. Coordinate with the appropriate State’s Right of Way personnel during any right of way process performed by the City, if applicable. h. Certify that the City has adequate resources to discharge the City’s real property related responsibilities and ensures that its Title 23-funded projects are carried out using the FHWA approved and certified ADOT Right of Way Procedures Manual and that they will comply with current FHWA requirements whether or not the requirements are included in the FHWA approved ADOT Right of Way Procedures Manual. (23 CFR 710.201) i. Not permit or allow any encroachments on or private use of the right of way, except those authorized by permit. In the event of any unauthorized encroachment or improper use, the City shall take ali necessary steps to remove or prevent any such encroachment or use. Provide a copy of encroachment permits issued within the Project limits to the State. j. Automatically grant to the State, by execution of this Agreement, its agents and/or contractors, without cost, the temporary right to enter City rights of way, as required, to conduct any and all construction and preconstruction related activities for the Project, on, to and over said City rights of way. This temporary right will expire with completion of the Project. k. Investigate and document utilities within the Project limits; submit findings to ADOT determining prior rights or no prior rights; approve an easement within the final right of way to re-establish the prior right location for those utilities with prior rights. Be obligated to incur any expenditure should unforeseen conditions or circumstances increase Project costs. Be responsible for the cost of any City requested changes to the scope of work of the Project, such changes will require State and FHWA approval. Be responsible for any contractor claims for additional compensation caused by Project Page 4 of 10 DocuSign Envelope ID: 0A71D05F-5F8B-4A99-B8E 1-F672859A4EF8 IGA 21-0008115-I delay attributable to the City. Payment for these costs will be made to the State within 30 days of receipt of an invoice from the State. m. After notification of final acceptance by the State, assume and maintain full responsibility of the Project, including Storm Water Pollution Prevention Plans (SWPPP) inspections, maintenance, and required documentation, until final stabilization is reached. Provide the NOI number to the State and the Contractor, accept CGP responsibilities at time of transfer, and file an NOT with ADEQ when final stabilization is reached, as applicable. n. After completion and final acceptance of the Project, agree to maintain and assume full responsibility of the Project and all Project components. TE, ELLA PROVISIONS 1, This Agreement shall become effective upon signing and dating of the Determination Letter by the State’s Attorney General. 2. Any change or modification to the Project will only occur with the mutual written consent of both Parties. 3. The terms, conditions and provisions of this Agreement shall remain in full force and effect until completion of the Project and all related deposits and/or reimbursements are made. Any provisions for maintenance shall be perpetual, unless assumed by another competent entity. 4. This Agreement may be cancelled at any time up to 30 days before the award of the Project contract, so long as the cancelling Party provides at least 30 days’ prior written notice to the other Party. It is understood and agreed that, in the event the City terminates this Agreement, the City shall be responsible for all costs incurred by the State up to the time of termination. It is further understood and agreed that in the event the City terminates this Agreement, the State shall in no way be obligated to complete or maintain the Project. 5. The City shall indemnify, defend, and hold harmless the State, any of its departments, agencies, officers or employees (collectively referred to in this paragraph as the “State”) from any and all claims, demands, suits, actions, proceedings, loss, cost and damages of every kind and description, including reasonable attorneys’ fees and/or litigation expenses (collectively referred to in this paragraph as the “Claims”), which may be brought or made against or incurred by the State on account of loss of or damage to any property or for injuries to or death of any person, to the extent caused by, arising out of, or contributed to, by reasons of any alleged act, omission, professional error, fault, mistake, or negligence of the City, its employees, officers, directors, agents, representatives, or contractors, their employees, agents, or representatives in connection with or incident to the performance of this Agreement. The City’s obligations under this paragraph shall not extend to any Claims to the extent caused by the negligence of the State, except the obligation does apply to any negligence of the City which may be legally imputed to the State by virtue of the State’s ownership or possession of land. The City’s obligations under this paragraph shall survive the termination of this Agreement. Page 5 of 10 DocuSign Envelope ID: 0A71D05F-5F8B-4A99-B8E 1-F672859A4EF8 10. 11. 12. 13. 14. 15. IGA 21-0008115-1 The State shall include Section 107.13 of the 2008 version of the Arizona Department of Transportation Standard Specifications for Road and Bridge Construction, incorporated into this Agreement by reference, in the State's contract with any and all contractors, of which the City shall be specifically named as a third-party beneficiary. This provision may not be amended without the approval of the City. The cost of scoping and design work under this Agreement is to be covered by the federal funds programmed for this Project, up to the maximum available. The City acknowledges that actual Project costs may exceed the maximum available amount of federal funds, or that certain costs may not be accepted by FHWA as eligible for federal funds. Therefore, the City agrees to pay the difference between actual costs of the Project and the federal funds received. Should the federal funding related to this Project be terminated or reduced by the federal government, or Congress rescinds, fails to renew, or otherwise reduces apportionments or obligation authority, the State shall in no way be obligated for funding or liable for any past, current or future expenses under this Agreement. The cost of the Project under this Agreement includes indirect costs approved by FHWA, as applicable. The Parties warrant compliance with the Federal Funding Accountability and Transparency Act of 2006 and associated 2008 Amendments (the “Act”). Additionally, in a timely manner, the City will provide information that is requested by the State to enable the State to comply with the requirements of the Act, as may be applicable. The City acknowledges and will comply with Title VI of the Civil Rights Act Of 1964. The City acknowledges compliance with federal laws and regulations and may be subject to the CODE OF FEDERAL REGULATIONS, TITLE 2, PART 200 (also known as The Uniform Grant Guidance). Entities that expend $750,000.00 or more (on or after 12/26/14) of federal assistance (federal funds, federal grants, or federal awards) are required to comply by having an independent audit in accordance with §200.331 Subpart F. Either an electronic or hardcopy of the Single Audit is to be sent to Arizona Department of Transportation Financial Management Services within the required deadline of nine months of the sub recipient fiscal year end. ADOT - FMS Attn: Cost Accounting Administrator 206 S 17% Ave, Mail Drop 204B Phoenix, AZ 85007 SingleAudit@azdot.gov Pursuant to 23 USC 102(b), the City will repay all federal funds reimbursements for preliminary engineering costs on the Project if it does not advance to right of way acquisition or construction within 10 years after federal funds were first made available. This Agreement shall be governed by and construed in accordance with Arizona laws. This Agreement may be cancelled in accordance with A.RS, § 38-511. Page 6 of 10 DocuSign Envelope ID: 0A71D05F-5F8B-4A99-B8E 1-F672859A4EF8 16. 17. 18. 19. 20. 21, 22. 23. IGA 21-0008115-I The City shall retain all books, accounts, reports, files and other records relating to the Agreement for five years after completion of the Project. These documents shall be subject at all reasonable times to inspection and audit by the State. Such records shall be produced by the City at the request of ADOT. This Agreement is subject to all applicable provisions of the Americans with Disabilities Act (Public Law 101-336, 42 U.S.C. 12101-12213) and all applicable federal regulations under the Act, including 28 CFR Parts 35 and 36. The Parties to this Agreement shall comply with Executive Order Number 2009-09 issued by the Governor of the State of Arizona and incorporated in this Agreement by reference regarding “Non-Discrimination.” Non-Availability of Funds: Every obligation of the State under this Agreement is conditioned upon the availability of funds appropriated or allocated for the fulfillment of such obligations. If funds are not allocated and available for the continuance of this Agreement, this Agreement may be terminated by the State at the end of the period for which the funds are available. No liability shall accrue to the State in the event this provision is exercised, and the State shall not be obligated or liable for any future payments as a result of termination under this paragraph. In the event of any controversy, which may arise out of this Agreement, the Parties agree to abide by arbitration as is set forth for public works contracts if required by A.R.S. § 12-1518. The Parties shall comply with the applicable requirements of A.RS. § 41-4401. The Parties shall certify that all contractors comply with the applicable requirements of ARS. §35-393.01. The Parties shall comply with all applicable laws, rules, regulations and ordinances, as may be amended. All notices or demands upon any Party to this Agreement shall be in writing and shall be delivered electronically, in person, or sent by mail, addressed as follows: For Agreement Administration: Arizona Department of Transportation City of Glendale Joint Project Agreement Section Attn: Allan Galicia 205 S. 17% Avenue, Mail Drop 637E 6210 W. Myrtle Phoenix, AZ 85007 Glendale, AZ 85301 [PABranch@azdot.gov apalicila@elendaleay.com For Project Administration: Arizona Department of Transportation City of Glendale Project Management Group Attn: Allan Galicia 205 S. 17% Avenue, Mail Drop 614E 6210 W. Myrtle Phoenix, AZ 85007 Glendale, AZ 85301 glendal Page 7 of 10 DecuSign Envelope ID: 0A71D05F-5F8B-4A99-B8E 1-F672859A4EF8 IGA 21-0008115-1 For Financial Admini tion: Arizona Department of Transportation City of Glendale Project Management Group Attn: Allan Galicia 205 S.17% Avenue, Mail Drop 614E 6210 W. Myrtle Phoenix, AZ 85007 Glendale, AZ 85301 PMG@azdot.gov agalicla@elendalea: 24. Any revisions to the names and addresses above may be updated administratively by either Party and shall be in writing. 25. In accordance with A.R.S. § 11-952 (D), attached and incorporated in this Agreement is the written determination of each Party's legal counsel that the Parties are authorized under the laws of this State to enter into this Agreement and that the Agreement is in proper form. IN WITNESS WHEREOF, the Parties have executed this Agreement the day and year first above writte STATE OF ARIZONA Department of Transportation DocuSigned by: By [ hee TY By JER oe ee PE M Division Director ATTES By : JULIE K BOWER City Clerk Page 8 of 10 DocuSign Envelope ID: 0A71D05F-5F8B-4A99-B8E 1-F672859A4EF8 IGA 21-0008115-1 ATTORNEY APPROVAL FORM FOR THE CITY OF GLENADLE I have reviewed the above referenced Intergovernmental Agreement between the State of Arizona, acting by and through its DEPARTMENT OF TRANSPORTATION, and the CITY OF GLENDALE, an agreement among public agencies which, has been reviewed pursuant to Arizona Revised Statutes §§ 11-951 through 11-954 and declare this Agreement to be in proper form and within the powers and authority granted to the City under the laws of the State of Arizona. No opinion is expressed as to the authority of the State to enter into this Agreement. A A é\1014 MICHAEC BAILEY dD DATE City Attorney Page 9 of 10 DocuSign Envelope ID: 0A71D05F-5F 8B-4A99-B8E 1-F672859A4EF8 IGA 21-0008115-1 EXHIBIT A Cost Estimate T0306 01D/03D/01C The federal funds will be used for the scoping/design and construction of the Project, including the construction engineering (CE) and administration cost. The estimated Project costs are as follows: ADOT Project Development Administration (PDA) Co: n-federal-aid: PDA costs* $ 30,000.00 Subtotal - PDA* $ 30,000.00 Construction: Federal-aid funds @ 94.3% $ 675,671.00 City’s match @ 5.7% $40,841.00 Subtotal ~ Construction** $ 716,512.00 Estimated TOTAL Project Cost $ 746,512.00 Total Estimated City Funds $ 70,841.00 Total Federal Funds $ 675,671.00 * (Included in the City Estimated Funds) ** (Includes 15% CE (this percentage is subject to change, any change will require concurrence from the City} and 5% Project contingencies) Page 10 of 10 Dawn NorTHUP OFFICE OF THE ARIZONA ATTORNEY GENERAL DIVISION CHIEF COUNSEL Eli D. Golob MARK BRNOVICH STATE GOVERNMENT DIVISION / ASSISTANT ATTORNEY GENERAL ATTORNEY GENERAL TRANSPORTATION SECTION DIRECT LINE: 602-542-8842 E-MAIL: ELILGOLOB@AZAG.GOV INTERGOVERNMENTAL AGREEMENT DETERMINATION A.G. Contract No. P0012021000566 (ADOT IGA/JPA 21-0008115-l), an Agreement between public agencies, the State of Arizona and the City of Glendale, has been reviewed pursuant to A.R.S. §§ 11-951 through 11-954 and 28-401, by the undersigned Assistant Attorney General who has determined that it is in the proper form and is within the powers and authority granted to the State of Arizona. No opinion is expressed as to the authority of the remaining Parties, other than the State or its agencies, to enter into said Agreement. DATED: June 14, 2021 MARK BRNOVICH Attorney General /s/ Eli D. Golob EL! D. GOLOB Assistant Attorney General Transportation Section EDG/sp/9584038 2005 N CENTRAL AVE, PHOENIX, AZ 85004-1592 @ www.azac.cov RESOLUTION NO. R21-51 A RESOLUTION OF THE COUNCIL OF THE CITY OF GLENDALE, MARICOPA COUNTY, ARIZONA, AUTHORIZING AND DIRECTING THE ENTERING INTO OF AN INTERGOVERNMENTAL AGREEMENT WITH THE ARIZONA DEPARTMENT OF TRANSPORTATION (IGA 21- 0008115-I) FOR THE INSTALLATION OF SMART DETECTION SYSTEMS AT APPROXIMATELY 20 LOCATIONS ALONG GLENDALE AVENUE. WHEREAS, the City of Glendale, together with other cities in the Valley use the Intelligent Transportation System (“ITS”) technologies for managing traffic; and WHEREAS, the City of Glendale applied for, and was awarded a federal grant to install additional smart-traffic detection systems at up to twenty (20) signaled intersections on Glendale Avenue to improve traffic flow and reduce delay. The City will be responsible for $70,841 of the Project. BE IT RESOLVED BY THE COUNCIL OF THE CITY OF GLENDALE as follows: SECTION 1. That it is deemed in the best interest of the City of Glendale and the citizens thereof that the Intergovernmental Agreement with the Arizona Department of Transportation (IGA 21-0008115-I) for the installation of smart detection systems at approximately 20 locations along Glendale Avenue be entered into, which agreement is now on file in the office of the City Clerk of the City of Glendale. SECTION 2. That the City Manager or designee and the City Clerk are authorized and directed to execute and deliver any and all documents necessary to effectuate said Agreement on behalf of the City of Glendale. (Signatures on the following page) PASSED, ADOPTED AND APPROVED by the Glendale, Maricopa County, Arizona, this 8" day of June, 20 ATTEST: Juli K Bower, City Clerk (SEAL) APPROVED AS TO FORM: Michadl B-Bafley, City Attomey REVIEWED BY: Kook R. Phelps, City Manager