PERFORMANCE WORK STATEMENT 
FOR 
INTEGRATED SOLID WASTE MANAGEMENT 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Luke AFB 
16 March 22

1 
 
1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, 
tools, materials, vehicles, supervision, and other items and services necessary to perform 
integrated solid waste management at Luke Air Force Base. The Contractor shall perform to the 
standards in the contract as well as all local, state, and federal regulations, international 
agreements, Status of Forces Agreements (SOFA) and appropriate Final Governing Standards 
(FGS) or, in their absence, the Overseas Environmental Baseline Guidance Document 
(OEBGD). Estimated workload factors are in Appendix A and collection areas are in Appendix 
B.  
1.1. COLLECTION REQUIREMENTS. 
 
1.1.1. Main Base 
 
1.1.1.1. Municipal Solid Waste. The Contractor shall empty refuse containers based on 
historical data for the first 30 days of performance or at least weekly. The Contractor shall 
establish initial vehicle routes and collection schedules upon contract award. Details on size, 
routes, and frequencies shall be submitted to the Contracting Officer (CO) 5 calendar days prior 
to start of contract performance. The Contractor may propose adjustments to the schedule at any 
time but as a minimum the Contracting Officer’s designated Representative (COR / Quality 
Assurance Personnel) and contractor shall monitor fill capacities during the first 30 days of 
performance and during one other period to be agreed upon during the same performance period, 
in order to determine if adjustments to container size, routes, or frequencies should be made to 
provide the minimum number of pickups necessary to maintain a healthy, vector free 
environment and prevent waste container overflow. No changes are allowed to the schedule or 
haul route without CO or COR coordination. Historical frequency tables are located at Appendix 
A, Table A2. When the Contractor completes service at a location there shall be no litter, waste, 
or recyclable material on the ground within a 10 foot radius of the container. 
1.1.1.2. Food Waste. Empty containers used to dispose of food waste as necessary to maintain 
a healthy, vector free environment (on days when the serviced facility is in operation). Food 
Waste containers and pickup days are identified in Appendix A, Table A-2.  
1.1.1.3. Recycling. The Contractor shall empty recycling containers based on historical data for 
the first 30 days of performance or at least weekly. The Contractor shall establish initial vehicle 
routes and collection schedules upon contract award. Container size, routes, and frequencies 
should be established to provide the minimum number of pickups necessary to maintain a 
healthy, vector free environment and prevent waste container overflow.  They are to be 
submitted to the Contracting Officer (CO) 5 calendar days prior to start of contract performance. 
The Contractor may propose adjustments to the schedule at any time but as a minimum the 
Contracting Officer’s designated Representative (COR) (Quality Assurance Personnel) and 
contractor shall monitor fill  capacities during the first 30 days of performance and during one 
other period to be agreed upon during the same performance period, in order to determine if

2 
 
adjustments to container size, routes, or frequencies should be made. No changes are allowed to 
the schedule or haul route without CO or COR coordination. Historical frequency tables are 
located at Appendix A, Table A2. When the Contractor completes service at a location there 
shall be no litter, waste, or recyclable material on the ground within a 10 foot radius of the 
container.  
1.1.1.4 POL Spill Pad Container. The Contractor shall provide a 20 cubic yard roll-off with a 
liner and tarp cover for the accumulation of spill pads at building 374, the North 90 Day 
Hazardous Waste Storage Area. The contractor shall empty container used to dispose of spill 
pads associated with jet fuel, diesel fuel, hydraulic fluids, and engine oil bi-monthly or as 
necessary. Gasoline spill pads are not included. The contractor shall provide an annual schedule 
for the POL collection and disposals. POL Spill Pad container pickup frequency is identified as 
unscheduled swap out every other month and also listed in Appendix A. 
1.1.2. Military Family Housing (MFH) (Non-Privatized) RESERVE  
 
1.1.2.1. Municipal Solid Waste. RESERVE 
1.1.2.2. Recycling. RESERVE 
1.1.2.3. Compostable Organics. RESERVE 
1.1.3. Over and Above Requirements. RESERVE 
1.1.3.1. Unscheduled Pickup and Special Events. In addition to the scheduled solid waste 
collections, the CO or COR may request the contractor make unscheduled collections and 
disposals. For unscheduled events, the contractor shall respond within one business day of 
notification from the CO or COR. For special events, the contractor shall also provide (or re- 
position as directed) solid waste containers. These containers shall be placed in locations for a 
length of time designated by the CO or COR. The CO shall notify the contractor in writing at 
least 7 days in advance of the special event date.  See Appendix A, Table A-1 for workload data. 
1.1.3.2. Construction and Demolition Debris (C&D).  RESERVE 
1.1.3.3. Public/Common Use MSW Receptacles.   RESERVE 
 
1.1.3.4. Public/Common Use Recycling Receptacles.  RESERVE 
1.1.3.5. Ash Collection. RESERVE 
1.1.3.6. Additional Pickups: In the event unusual conditions cause a container to require 
pickup before the scheduled time, the CO or COR may request in writing (email/Fax sufficient) 
pickup within 24 hours and the contractor will be compensated at a unit rate based on the 
container size.

3 
 
1.1.3.7. Container Relocations: The Government may request relocation of containers. The 
request will be made in writing and the container will be relocated within 72 hours upon 
notification. 
1.1.4. Inclement Weather Schedule. The contractor shall collect MSW and recyclable material 
during periods of inclement weather. In cases of severe weather, the CO or COR may authorize 
exceptions. When exceptions are granted all missed collections shall be performed within 24 
hours after the severe weather has terminated, unless the CO authorizes additional time. 
1.1.5. Route Parameters. The contractor shall propose routes to the base through the Luke Air 
Force base South Gate – Building 893 Visitor Center Search Area to the CO and COR for 
acceptance. Collection shall be made between the hours of 2 am (0200 hours) to 4 pm (1600 
hours). Collection outside these hours shall require prior coordination of the CO or COR. 
1.1.6. Points of Collection. Collection stations for MSW and recyclable materials are shown in 
Appendix B. The contractor shall position bulk containers for customer ease in depositing 
MSW. The contractor shall also position containers to minimize interference with adjacent 
parking areas, sidewalks, roadways, overhead utilities, trees, storm drains, and other potential 
obstructions. 
1.1.7. Cubic Yard Capacity. Proposed capacity of containers is indicated in Appendix A, 
Table A2. The contractor is encouraged to identify changes to the capacity of containers and/or 
pickup frequency to improve the overall efficiency of MSW and recycling removal, and to 
submit these changes to the CO or COR. No changes shall be made until the proposed change is 
coordinated with the CO or COR. 
 
1.1.8. Government-Approved Containers. Collection of MSW and recyclable materials in all 
areas except residential areas shall be from contractor-provided, CO or COR accepted 
containers, recycling bins or plastic bags. Containers shall meet the base 
architectural/appearance standards. The occupants in residential areas will provide their own 
MSW containers. 
1.1.9. Maintaining Containers and Collection Area. The Contractor shall return all MSW 
and recycling containers to their original location after servicing, in an upright position with the 
lids securely in place (closed). The Contractor is responsible for cleaning up any spills, debris, 
etc., on the ground within 10 feet of the container when servicing a location. The contractor shall 
collect debris placed at collection stations; for example, tree branches, sacks, cartons, boxes, 
cans, tied bundles, or other containers. It is intended that the majority of debris will be placed in 
containers. The Contractor shall notify the COR of locations where debris is frequently placed 
outside of containers so the COR may notify facility managers and, if necessary, the Contractor

4 
 
can adjust the container size or pickup frequency with CO or COR approval.  The contractor 
shall also notify the COR if it is discovered that a particular receptacle is being utilized for the 
wrong material. 
1.1.10. Vehicle Weighing. All vehicles used to collect MSW, C&D, organics and recyclable 
commodities shall be weighed on state-certified public scales / weigh station, either on- or off- 
base. When use of off-base scales are the only option, a predetermined public state-certified 
scale/weight station will be identified for use. The COR may be present at the public scale for 
empty and loaded weighing with no notice to the Contractor. All weight discrepancies will be 
resolved prior to departing the scale site. The Contractor and COR (if present) shall sign all 
weight tickets. The Contractor shall submit a monthly report (para 1.5) that includes weight 
tickets that reflect the disposed tonnage, disposal date, vehicle type and landfill tipping fee cost. 
The Contractor shall be reimbursed for tipping fees according to submitted invoices.  
1.2. RECYCLABLE MATERIALS PROCESSING. RESERVE 
 
 
1.2.1. RECYCLABLE MATERIALS PROCESSING. The base operates a Qualified 
Recycling Program (QRP) to reduce the volume of non-hazardous solid waste generated. It is the 
intent of the base to conduct direct sales of recyclable commodities through a QRP. The 
contractor shall provide a detailed accounting of recyclable commodities sold (type / weight / 
price) to the QRP. The QRP understands and acknowledges that there is no revenue share or cost 
associated for processing recyclables at the contractor’s facility, as stated in Section 3.3 B of the 
agreement. The contractor shall be aware of the DoD and USAF waste diversion goals and 
notify the base QRP manager of potential waste diversion opportunities in the local area. The Air 
Force waste diversion goals can be found in the most current USAF Strategic Sustainability 
Performance Plan (SSPP). The USAF SSPP can be found at http://www.safie.hq.af.mil/esoh/.  
1.2.1. Materials. RESERVE 
1.2.2. Materials. The following items shall be recycled: Metal beverage containers, office 
paper, newspaper, corrugated fiberboard/cardboard/paperboard, plastics. Contractor may request 
to recycle materials not listed above with prior coordination of the CO or COR. All recycle 
items shall be stored, shipped and disposed of in accordance with federal and local 
environmental regulations. 
1.2.3. Pickup Points. Contractor shall provide recycling containers at the locations specified in 
Appendix A, Table A2. Containers shall be emptied as specified in section 1.1.1.3. 
1.2.4. Base Recycling Center / Material Recovery Facility. RESERVE 
1.2.4.1. Contractor Responsibilities. Separate and process recyclables in accordance with 
buyers specifications. Perform daily general maintenance such as cleaning and replacing light 
bulbs, and perform recommended maintenance on government furnished equipment. Provide 
appropriate personal protective equipment for employees. Notify Base Civil Engineer customer 
service for facility maintenance or repair requirements. Return equipment listed in Appendix C

5 
 
to the government upon conclusion of contract. With the approval of the contracting officer, 
contractor may procure and install additional equipment as required to more efficiently process 
recyclable materials. Contractor-purchased equipment will be procured at the contractor's 
expense, owned by the contractor and may be removed upon contract termination. RESERVE 
1.2.4.2. Marketing. The Contractor shall market recyclable commodities, which may include 
transporting commodities to buyers. The Contractor shall educate all residential and base 
facility occupants on the benefits of recycling and encourage the widest possible participation. 
Written publications such as original published pamphlets, brochures, or other informative 
media, may be used to inform users.   
1.2.5. Sales Receipts. The contractor shall provide a Commodity Sales Summary to the COR, 
no later than the firth working day of each month, consisting of commodity type sold, sales 
proceeds achieved by commodity and weights of commodity sold. Documentation to 
accompany the Commodity Sales Summary includes commodity sales receipts, and commodity 
sold weight tickets. The contractor shall also submit an invoice for reimbursement for costs 
associated with conducting sales transactions, collection, processing commodities, and 
transporting to commodity buyers. 
1.2.5.1. Composting.  RESERVE 
1.2.5.2. Chipping / Debagging. RESERVE 
1.2.5.3. Material Placement. RESERVE 
1.2.6.3 Windrow Maintenance. RESERVE 
1.2.6.4. Disposition. RESERVE 
1.3. DISPOSAL. 
 
1.3.1. Off-Base Disposal. The contractor shall transport and dispose of all municipal solid 
waste at a permitted off-base disposal site. A copy of the landfill(s) operating permit that 
material is transported to shall be provided to the CO. The contractor shall transport recyclable 
commodities to an off-base material recovery facility. The contractor shall be responsible for 
disposal in accordance with existing local, state, and federal regulations. The contractor shall 
be responsible for any permit or fees associated with the use of off-base disposal locations and 
invoice to CLIN 0018 for reimbursement. 
1.3.2. Disposal of Non-marketable Materials. Any commodity rejected by a predetermined 
commodity buyer must be reclaimed by the contractor for commodity rework or disposal. 
Commodity rejection explanation must be provided to the CO or COR within 24 hours of buyer 
rejection along with remedy of the reject and plans to prevent same future rejections. 
RESERVE 
1.3.3. Disposal of Non-marketable Materials. Any commodity rejected by a predetermined

6 
 
commodity buyer must be reclaimed by the contractor for commodity rework or disposal. This 
includes any recyclable material rejected that is below the 20% contamination limit as 
described in Section 2.3 D of the agreement. Commodity rejection explanation must be 
provided to the CO or COR within 24 hours of buyer rejection along with remedy of the reject 
and plans to prevent same future rejections. 
1.4. EQUIPMENT MAINTENANCE. The Contractor shall furnish containers that match the 
architectural/appearance standards of the base. Additional re-painting must match the approved 
color scheme. The Contractor shall maintain all Contractor and Government provided containers 
so that they have a professional appearance and ensure they are free of unpleasant odors, dirt, 
debris, and pests. All containers must remain in good, workable condition, with no leaks. They 
must remain easily accessible to customers. The Contractor shall perform all cleaning, painting, 
repair and other maintenance tasks off-base. Trucks and trailers used for hauling and collecting 
shall be free of odor, dirt, debris, and pests. Contractor vehicles and equipment shall not have 
any waste or equipment leaks such as oil or hydraulic fluid. Should any contractor vehicles or 
equipment have any leaks, the contractor is responsible for cleanup. 
 
1.4.1. Bulk Container Maintenance Methods. Maintenance shall be performed as required at 
an off-base location. The contractor shall furnish to the CO or COR the schedule of maintenance 
for the bulk containers. The contractor shall furnish replacement containers for all containers 
removed (for more than 1 hour) for cleaning, painting, or repair to ensure that collection stations 
have adequate municipal solid waste containers. Cleaning or painting includes minor repair and 
maintenance to ensure a properly operating container. Major repairs or maintenance, as 
determined by the CO or COR, shall require replacement of the container. 
 
1.4.2. Bulk Container Cleaning. The contractor shall maintain bulk containers to ensure they 
are free of unpleasant odors, dirt, debris, and pests. Cleaning should include thoroughly 
washing containers with steam, soap or detergents and water. Bulk containers used for food 
waste shall be cleaned twice a month, all other bulk containers cleaned every 6 months. 
 
1.4.2.1. Cleaning bulk containers shall be performed at Luke Air Force Base, building 343, 56 
Civil Engineer Wash Rack during normal duty hours. 
 
1.4.3. Bulk Container Painting. Painting of containers shall be accomplished by work orders 
issued by the CO or COR to maintain the base color scheme. Color of containers and paint shall 
be submitted to the CO or COR prior to placing or painting containers. Containers shall be 
cleaned prior to painting. Bulk containers shall have a station number including the signage, see 
sample on Appendix D. 
 
1.4.4. Other Municipal Solid Waste Container Cleaning. RESERVE 
1.5. REPORTS AND RECORDS. The Contractor shall provide a monthly report, by the fifth 
working day of the month, detailing the previous months total contract costs incurred, 
cumulative weight tickets for total tonnage of solid waste collected (MSW, C&D, organic, and 
recycling), tipping fees, weights diverted by recyclable commodity, cost to divert by recyclable

7 
 
commodity, and commodity sales proceeds reimbursed in sufficient detail to support Defense 
Environmental Programs Management requirements. ALL RECYCLABLE SALES RECEIPTS 
must accompany the report. Format for these monthly reports shall be coordinated with the CO 
or COR. 
1.6. REPORTS AND RECORDS. The Contractor shall provide a monthly report, by the fifth 
working day of the month, detailing the previous months total contract costs incurred, 
cumulative weight tickets for total tonnage of solid waste collected (MSW, C&D, and 
recycling), tipping fees, weights diverted by recyclable commodity, cost to divert by recyclable 
commodity, and commodity sales proceeds reimbursed in sufficient detail to support Defense 
Environmental Programs Management requirements.  ALL RECYCLABLE SALES RECEIPTS 
must accompany the report. Format for these monthly reports shall be coordinated with the CO 
or COR. 
1.6.1. Monthly report will include weight tickets for empty and return roll-offs, 4 & 6 cubic 
yard containers, and recycle totes. For tracking purposes, monthly report is to include the 
disposal of POL Spill Pad (non-hazardous/industrial waste) and a copy provided to Luke AFB 
Hazardous Waste Program manager or Hazardous Waste Disposer (signed bill of lading). 
1.7 ROLL-OFF CALL PROCEDURES. The COR shall maintain a call log for Unscheduled 
and Special Event calls to empty and return roll-offs.  The COR shall notify the contractor by 
phone or email providing a call number, building number, and date of pick-up and return. 
Contractor shall provide a ticket number and a 24 hour response time for roll-off pick-up and 
return. 
2. SERVICE SUMMARY. The contract service requirements are summarized in performance 
objectives that relate directly to mission essential items. The performance threshold briefly 
describes the minimally acceptable levels of service required for each requirement. The Services 
Summary (SS) and the Contractor’s Quality Control Plan provide information on contract 
requirements, the expected level of Contractor performance, and expected method of 
government validation and confirmation of service provided. These thresholds are critical to 
mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and 
Conditions – Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. 
During the first initial 30 days of the contract, two additional errors on each Performance 
Objective shall be allowed in an effort to identify normal phase-in problems. 
 
Performance Objective 
PWS para. 
Performance Threshold 
Collect Municipal Solid Waste in accordance 
with the established schedule. 
1.1 
No more than 2 Customer 
Complaints monthly. 
Perform Recyclable Materials Processing in 
accordance with QRP and USAF SSPP. 
1.2 
0 Deficiencies permitted. 
Dispose of Municipal Solid Waste in accordance 
with the established governing directives. 
1.3 
0 Deficiencies permitted.

8 
 
Maintain equipment in good workable condition. 
Trucks and solid waste containers washed and 
free of odors. 
1.4 
No more than 2 Customer 
Complaints monthly. 
Perform unscheduled collections required by the 
contracting officer in accordance with paragraph 
1.1. 
1.1.3.1 
0 Deficiencies permitted. 
(Delivery order shall not be 
accepted until all deficiencies 
are corrected.) 
Produce/maintain reports and records by fifth 
working day of the month 
1.6 
0 Deficiencies permitted. 
 
2.1. QUALITY CONTROL 
 
The contractor shall develop and maintain a quality program to ensure integrated solid waste 
management is performed in accordance with commonly accepted commercial practices. The 
contractor shall develop and implement procedures to identify, prevent, and ensure non- 
recurrence of defective services. As a minimum the contractor shall develop quality control 
procedures addressing the areas identified in paragraph 2, Service Summary. 
2.2. QUALITY ASSURANCE 
 
The Government shall inspect and evaluate the Contractor’s performance to ensure services are 
received in accordance with requirements set forth in this PWS. The contractor shall provide 
work schedules to the COR in accordance with paragraph 4.3 of this PWS. The COR shall 
inspect by validating actual work performance, physically checking an attribute of the completed 
task, checking a management information report, investigating customer complaints, conferring 
with facility managers, or otherwise inspecting the task or its results to determine whether or not 
performance meets the standards contained in this PWS. The COR will use the Contractor’s 
work schedule or modified version thereof, to record validation results. Results of the validation 
then become the official Air Force record of the Contractor’s performance. When a performance 
threshold has not been met or Contractor performance has not been accomplished, the COR will 
initiate and provide the CO a Contract Discrepancy Report (CDR) DD Form 2772 for issuance 
to the Contractor.  The Contractor shall respond to the CDR IAW instructions provided and 
return it to the CO within 10 calendar days of receipt. 
2.3 PERFORMANCE ASSESSMENT 
 
2.3.1. Periodic Validations. This method requires the COR to employ a “spot check” style of 
evaluation based on the Contractor’s schedule. Periodic validations will be conducted on a 
scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be 
adjusted, based on quality trends. 
2.3.2. Unsatisfactory Performance. Any unsatisfactory inspection (defect) result shall be 
recorded, and the Contractor shall re-perform the service after notification by the COR. Failing 
to meet the performance threshold as outlined in the SS for any of these performance objectives 
in any one month period shall result in a warning or letter of concern from the CO. Failing to

9 
 
meet the performance threshold as outlined in the SS of these performance objectives in any 
combination for any two, or more consecutive or non-consecutive months during a contract 
period shall constitute an immediate Progress Meeting with the Multi-functional Team. All 
remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - 
Commercial Items, Inspection/Acceptance. 
2.4. PERIODIC PROGRESS MEETINGS 
 
2.4.1. Meetings. The CO, Functional Commander, COR, QRP Manager and/or Solid Waste 
Manager, other government personnel as appropriate, and the Contractor shall periodically meet 
to discuss the Contractor’s performance. The following issues shall be discussed: opportunities 
to improve the contract, required contract modification(s), unsatisfactory inspections and trends 
against each performance objective observed, positive performance and steps taken by the 
Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a 
summation of unsatisfactory inspections and customer complaints and provide insight into any 
identified trends. 
2.4.2. Meeting Minutes. The minutes of these meetings will be reduced to writing, signed by 
the CO, and any other signatures as deemed appropriate, distributed to the functional area and 
the Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide 
a written notification to the CO identifying areas of non-concurrence for resolution. 
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. 
 
3.1. Recycling Center/Material Recovery Facility. Provide utility service to the recycling 
center/material recovery facility and perform facility maintenance and repairs. Provide 
use of equipment listed in Appendix C. RESERVE 
3.2. Government Furnished Items. See Appendix C. 
4. GENERAL INFORMATION. 
 
4.1. MISSION 
 
The overall Civil Engineer mission at Luke AFB is to plan, maintain, operate, and protect the 
infrastructure, facilities, and environment for assigned Airmen, families, and civilian employees. 
 
4.2. HOURS OF OPERATION. 
 
Perform integrated solid waste management services during normal duty hours and be available 
(by phone, pager, cell phone, text message or fax) during the Government Program Office’s 
hours (2:00 a.m. to 4:00 p.m., Monday through Friday) and for after-hours response to 
refuse/recycling problems or emergencies. This excludes federal holidays, unless otherwise 
required in the contract or approved by the CO. There may be situations that require the 
Contractor to work at times other than normal duty hours. When the Contractor’s work schedule 
conflicts with an Air Force mission requirement, advise the CO and reschedule the work to

10 
 
minimize disruption. 
 
4.3. HOLIDAYS & CLOSURES 
 
4.3.1. Recognized Federal Holidays. There may be federal holidays when the Contractor is 
not required to perform service, except in emergency situations or to support specific mission 
needs. The holidays are: 
 
New Year’s Day - 1 January 
Martin Luther King Day - 3rd Monday in January 
Washington’s Birthday - 3rd Monday in February 
Memorial Day - last Monday in May 
Juneteenth National Independence Day 
Independence Day - 4 July 
Labor Day - 1st Monday in September 
Columbus Day - 2nd Monday in October 
Veteran’s Day - 11 November 
Thanksgiving Day - 4th Thursday in November 
Christmas Day - 25 December 
 
If a holiday falls on a Saturday, the preceding Friday will be observed. If a holiday falls on 
Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, 
the Contractor will be responsible for rescheduling services for the first day after the holiday 
observance. 
 
4.3.2. Other Base Closures. Work scheduled but not accomplished because of base closure due 
to exercises or real-world events will be accomplished as soon as possible after base reopening. 
 
4.4. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY 
 
The services under this contract are not essential for performance during crisis. The CO will 
determine circumstances which constitute a crisis based on direction from Security Forces and 
base leadership. 
 
4.5. CONTRACTOR WORK SCHEDULE 
 
4.5.1. Schedule Submission and Approval. The Contractor shall submit a schedule for all 
services described in this PWS and Appendices to the CO for approval at the post-award 
conference. The schedule shall include routes, pickup points, times, and days that pickups will 
occur. The Contractor shall not deviate from the approved schedule without prior approval from 
the CO or COR. Permanent changes to the schedule must be submitted 10 days before 
implementation and receive CO approval before the Government will allow the proposed 
changes. The schedule must be submitted electronically using a file format compatible with 
Government software.

11 
 
4.5.2. Schedule Changes. Occurrence based (non-permanent) schedule changes due to 
customer requests or base exercises shall be submitted to the COR and do not require CO 
approval. 
 
4.6. CONTRACT PERSONNEL 
 
4.6.1. Contract Manager. The contractor shall establish and maintain an office through which 
the contract manager or alternate(s) can be contacted during work hours. The contract manager 
or alternate shall be available during normal duty hours to meet on the installation within 1 hour 
with the government personnel designated by the CO to discuss problem areas. The contractor 
shall provide the CO telephone number(s) where validation results and complaints can be 
reported. The contractor shall also provide to the CO the names and phone numbers of 
contractor POCs for after business hours including nights, weekends, and holidays. This 
information will be kept updated by the contractor whenever personnel changes occur. The 
contract manager or alternate shall have full authority to act for the contractor on all contract 
matters relating to the daily operation of this contract. 
 
4.6.2. Personnel. Contractor personnel shall present a neat appearance. Contractor personnel 
shall be easily recognizable while on the installation in conjunction with this contract. This shall 
be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the 
company name or logo. The coloring or design of the items selected should be such that 
identifies personnel easily and quickly for reasons of safety and personal protection. 
 
4.6.3. Employee Restrictions. The government is authorized to restrict employment under the 
contract of any contractor employee or prospective contractor employee who is identified as a 
potential threat to the health, safety, security, general well-being, or operational mission of the 
installation and its population. 
 
4.7. CONTRACTOR MANPOWER REPORTING 
 
The Contractor shall report all contractor labor hours (including sub-contractor labor hours) 
required for performance of services provided under this contract for “U.S. Air Force” via a 
secure data collection site.  The Contractor is required to completely fill in all required data 
fields using the following web address http://www.ecmra.mil. Reporting inputs will be for the 
labor executed during the period of performance during each government fiscal year (FY), which 
runs October 1 through September 30. While inputs may be reported any time during the FY, all 
data shall be reported no later than October 31 of each calendar year. Contractors may direct 
questions to the electronic Contractor Manpower Reporting Application (eCMRA) help desk. 
 
4.8. SECURITY REQUIREMENTS. 
Contractor employees shall comply with Luke AFB security requirements imposed by the 
Installation Commander at all times while on Luke AFB premises. The Contractor shall obtain all

12 
 
necessary passes, decals, badges, or other items required for access to perform contract services 
at Luke AFB. The Contractor is responsible for accountability of all such media, which shall be 
surrendered to the Security Forces Squadron Pass and Registration Section upon completion or 
termination of the contract or upon termination of an individual’s employment for the Contractor. 
The Contractor shall comply with all Luke AFB policies regarding entry to the installation, rules 
of the road, contingency operations compliance, and photography prohibitions. Contractor 
employees are authorized entry to the installation for the purpose of work under this contract 
only, and are not authorized in other facilities or areas without prior government authorization. 
Due to safety/security requirements, Contractor personnel shall be required to fluently speak, 
comprehend, read, and write English. 
4.8.1. Base Access. The Contractor must be aware that entry requirements are subject to 
change due to installation and world situations. All employees may be subject to a background 
check through the FBI for base access. 
4.8.2. Main Base Access. Current security access restrictions at South Gate Visitor Center 
require all contractor vehicles (which are the size of a standard bread delivery truck or larger) to 
enter through the South Gate only. Contractor vehicles may be subject to search prior to gaining 
base entry. The Contractor should plan and allow for delays as a result of increased and ever- 
changing security procedures. 
4.8.3. Security Manager. Upon contract award, the Contractor shall designate, in writing to the 
CO, a Security Manager who shall be the Contractor’s point of contact for all security matters. 
Within 5 working days of contract award, the Contractor’s Security Manager shall contact the 
Civil Engineer Squadron (CES) Security Manager for assistance on accomplishing Contractor 
personnel security requirements. 
4.8.3.1. Security Training. Contractor personnel are required to attend security and OPSEC 
orientation under Homeland Security Presidential Directive (HSPD) Title 12. The Contractor 
shall schedule initial and annual refresher training (for all assigned contractor personnel) 
through the CES Security Manager. All contractor personnel shall be thoroughly briefed by 
the CES Security Manager on established security requirements and procedures as stipulated 
in Air Force Policy Directive (AFPD 31-1, Integrated Defense) 
4.8.3.2. Security Authority. The Contractor shall brief all employees that they shall 
immediately leave any area upon notification by the CO, COR, constituted authority, Security 
Forces, or when directed as occasional operational requirements, real world activities, or 
emergencies dictate. 
4.8.4. Restricted/Controlled Areas. Contractor performance within restricted/controlled areas 
shall require Contractor compliance with various levels of security and established personnel 
security entry control procedures. The Contractor shall ensure all contractor employees 
performing services in secured areas are processed for a controlled area, limited access, or visitor 
badge by the Entry Controller of the restricted/controlled area.

13 
 
4.8.4.1. Access Coordination. The facility manager/user/occupant/requester will be responsible 
for providing access, escorts, or temporary visitor access badges for contractor personnel while 
performing ISWM duties. The Contractor shall be responsible for scheduling 
access/escorts/badges by contacting the facility manager/requester at the Entry Control Point of 
the restricted/controlled area. 
4.8.4.2. Escorts. At all times while in restricted/controlled areas, contractor employees shall be 
under direct surveillance of a person from that facility who is cleared to wear a controlled area 
badge and perform escort duties. Visitor badges shall be returned to the Entry Controller each 
time the employee completes the duties and leaves the area. This requirement is waived for 
contractor personnel who have unescorted access privileges and display a controlled area badge 
for the restricted/controlled areas. 
4.8.5. Employee Background Checks. All Contractor employees who do not have a current 
security investigation acceptable to the Security Forces, and who require a National Agency 
Check (NAC) for the performance of their duties, shall complete an Electronic Personnel 
Security Questionnaire (EPSQ), SF 85P, Questionnaire for Public Trust Positions, in three copies 
(original and two photocopies); and an AF Form 2583, Request for Personnel Security Action. 
For all employees requiring local area network (LAN) access (if applicable), the Contractor shall 
submit the following information: full name, date and place of birth, social security account 
number, affirmation of United States citizenship, and any current security investigation data. 
Information shall be in writing, on company letterhead, and submitted to Security Forces through 
the CES Security Manager. 
4.8.5.1. Pre-approval Coordination. The CES Security Manager is the source for the necessary 
forms and will provide instructions for receiving, preparing, and processing these forms. The 
Contractor shall coordinate with all required facilities to process all necessary paperwork. After 
forms have been properly completed, the CES Security Manager will make an appointment for 
contractor employee(s) to go to the Security Forces for submittal of paperwork and 
fingerprinting. Appointments will be scheduled within two weeks of request. 
4.8.5.2. Badge Issuance. A minimum of 180 days is required to process contractor employee 
NACs. Additional time will be required if the NAC is unfavorable and may result in denial of 
entry to restricted/controlled areas or denial of base LAN access. The CES Security Manager 
will notify the Contractor of any NAC results. After completion of a favorable NAC, each 
eligible employee shall report to the CES Security Manager for processing of AF Form 2586, 
Unescorted Entry Authorization Certificate. The CES Security Manager will schedule 
appointments for issuance of badges. 
4.8.5.3. Access Revocation. The Luke AFB Installation Commander reserves the right to deny 
restricted area entry to any contractor employee whose NAC is unfavorable, and the right to 
terminate the entry of any employee upon disclosure of information indicating the individual’s 
continued entry to a secure area is not in the best interest of national security.

14 
 
4.8.5.4. Badge Validity. Controlled area badges will be valid only for the actual period of 
employment or the term of the contract, whichever occurs first. Contractor employees must 
display the controlled area badge on their outer garment above waist level, and must, upon 
request, surrender the badge to any DoD member for identification verification. Violations or 
deviations from established security procedures by contractor employees may result in 
confiscation of controlled area badges and denial of future entry to restricted areas. 
4.8.5.5. Contract Personnel Requirements. The Contractor shall not employ persons for work 
on this contract who are identified to the Contractor by the CO as a potential threat to the health, 
safety, security, general well-being, or operational mission of the installation and its population. 
4.8.6. Contractor Vehicles. Contractor vehicles must be maintained in a safe and operational 
condition at all times while on Luke AFB. 
4.8.7. For Official Use Only (FOUO). The contractor shall comply with DoD 5400-7-R, DoD 
Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and 
procedures for the disclosure of records to the public and for marking, handling, transmitting, 
and safeguarding FOUO material. 
4.8.8. Reporting Requirements. Contractor personnel shall report to an appropriate authority 
any information or circumstances of which they are aware may pose a threat to the security or 
well-being of DoD personnel, contractor personnel, resources, and classified or unclassified 
defense information. 
 
4.8.9. Physical Security. The contractor shall be responsible for safeguarding all government 
property and controlled forms provided for contractor use. At the end of each work period, all 
government facilities, equipment, and materials shall be secured. 
4.8.10. Key Control. The contractor shall establish and implement methods of making sure all 
keys/combinations issued to the contractor by the government are not lost or misplaced and are 
not used by unauthorized persons. The contractor shall not duplicate any keys issued by the 
government. The contractor shall immediately report to the COR or CO any occurrences of lost 
or duplicated keys. In the event keys other than master keys are lost or duplicated, the contractor 
may be required, upon written direction of the CO, to re-key or replace the affected lock or locks 
without cost to the government. The government may, however, at its option, replace the 
affected lock or locks or perform re-keying and deduct the cost of such from the monthly 
payment due the contractor. In the event a master key is lost or duplicated, the government shall 
replace all locks and keys for that system, and the total cost will be deducted from the monthly 
payment due the contractor.

15 
 
4.9. SAFETY REQUIREMENTS AND REPORTS. The contractor shall perform work in a 
safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to 
the CO as soon as possible of each occurrence of damage to Government property or an accident 
resulting in death, injury, occupational disease, or adverse environmental impact. Provide a 
completed copy of required Accident Investigation Reports to the CO within five calendar days 
of each occurrence.  
4.10. CONTRACTING OFFICER AND CONTRACTING OFFICER 
REPRESENTATIVE. (QUALITY ASSURANCE PERSONNEL) 
The Contracting Officer will appoint a primary and alternate representative for management of 
the day to day activities of the contract. The identity, title, and authority of this representative 
will be provided in writing to the contractor after contract award. 
4.11. MULTI-FUNCTIONAL TEAM. The Senior Leadership may require a multi-functional 
team be established between the government and the contractor to ensure joint cooperation and 
a sound customer focus of all parties involved in the execution of this contract. 
4.12. PARTNERING AGREEMENT 
 
The CO may require a partnering agreement, or multi-functional team, between the Government 
and Contractor to facilitate joint cooperation and a sound partnership of all parties involved in 
the execution of this contract. Partnering is the creation of a Government-Contractor relationship 
that promotes achievement of mutually beneficial goals. It involves an agreement in principal to 
share the risk involved in completing the project and to establish and promote a nurturing 
partnership environment. Representatives from each organization are encouraged to participate 
in developing a partnering agreement. The partnering agreement that results may be formal or 
informal. If formal, it should be reduced to writing and signed by the parties involved. 
4.13. DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT, OR VEGETATION 
Damages to government buildings, equipment, or vegetation are addressed in FAR 52.237-2, 
Protection of Government Buildings, Equipment, and Vegetation. 
 
5. APPENDICES. 
 
A. Estimated Workload Data 
 
B. Maps and/or Site Plans 
 
C. Government Furnished Property/Services/Equipment 
 
D. Photo of Station Number Placement and Signage 
 
E. Report and Records Sample

16 
 
APPENDIX A 
 
TABLE A1 - ESTIMATED WORKLOAD DATA 
 
ITEM/ 
CLIN 
REF 
NAME 
ANNUAL 
ESTIMATED 
QUANTITY 
X001 
Municipal Solid Waste 
2002 
Tons 
X002 
Food Waste 
69 
Tons 
X003 
Recyclable Commodity – Paper 
9 
Tons 
X003 
Recyclable Commodity – Glass 
222 
Tons 
X003 
Recyclable Commodity – Plastic 
12200 
Tons 
X003 
Recyclable Commodity – Cardboard 
140 
Tons 
X008 
Unscheduled Pickups 
140 
Each 
X008 
Special Event Container Placements 
24 
Each 
X009 
Construction and Demolition (C&D) Container 
Placements (RESERVE) 
0 
Each 
X009 
Construction and Demolition (C&D) Debris 
(RESERVE) 
0 
Tons 
X010 
Public / Common Use MSW Receptacles (RESERVE) 
0 
Each 
X011 
Public / Common Use Recycling Receptacles 
(RESERVE) 
0 
Each 
X012 
Ash (RESERVE) 
0 
Tons 
X013 
Additional Pickups 
30 
Each 
X014 
Container Relocations 
20 
Each 
X016 
Compostable Organics (Yard and Wood Waste) 
(RESERVE) 
0 
Tons 
X017 
Container Maintenance 
214 
Each 
X017 
Compactor Maintenance (RESERVE) 
0 
Each 
X017 
Baler Maintenance (RESERVE) 
0 
Each 
ONE WAY 
Distance To Disposal / Incinerator Site 
5 
Miles 
Distance To Recyclable Processing Center 
5 
Miles

17 
 
TABLE A1 - ESTIMATED WORKLOAD DATA (CONTINUATION) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Roll-off Swap Outs 
Building No. 
FY17 FY18 FY19 
FY20 
Average 
Usage 
343 - CES Compound 
12 
15 
12 
12 
51 
374 - CES Spill Pad 
5 
7 
7 
7 
26 
939 - DRMO Yard 
36 
16 
28 
12 
92 
948 - Packing & Crating Yard 
20 
19 
24 
20 
83 
1221/1223 - AMMO Area 
9 
7 
7 
13 
36 
1236 - AMMO Area 
2 
5 
2 
7 
16 
1390 - CES Heavy Equip. Yard (2 EACH) 
7 
99 
60 
44 
210 
2200 - Falcon Dunes Golf Course 
9 
12 
12 
13 
46 
Total:   100 
180 
152 
128 
560 
Refrigerant Disposal 
2020 2019 2018 
2017 
Total QTY 
Turn-In 
46 
31 
33 
17 
127 
Tonnage 
3.11 
2.78 
3.44 
0.81 
10.14

18 
 
TABLE A2 - TASKS & ESTIMATED FREQUENCIES 
 
 
 
TABLE A2 - ATTACHED AS SEPARATE DOCUMENT

19 
 
 
APPENDIX B 
 
MAPS AND/OR SITE PLANS 
 
BASE STREET MAP – ATTACHED AS SEPARATE DOCUMENT

20 
 
APPENDIX C 
 
GOVERNMENT FURNISHED PROPERTY/SERVICES/EQUIPMENT 
 
 
 
 
 
CONTAINERS 
Provided By 
Size 
Quantity 
Government 
4 CY 
69  
Government 
6 CY 
146  
Government 
Roll-off 
10  
Contractor  
90 Gallon Tote 
 91 
POSSIBLE GOVERNMENT FURNISHED ITEMS 
  
Location 
Site 
Description 
1300 Area 
Contractor’s Yard 
Lot, Utilities, Potable Water (if applicable)  
Bldg. 343 
Wash Rack 
Water available for washing containers 
only

21 
 
 
APPENDIX D 
 
PHOTO OF STATION NUMBER PLACEMENT AND SIGNAGE

22 
 
APPENDIX E 
 
REPORT AND RECORDS SAMPLE 
 
 
LUKE AIR FORCE BASE 
Solid Waste and Recycling Analysis 
Month: _______________ 
I. Material Removed from Base 
Material 
Tonnage 
Percentage 
A. Solid Waste 
  
  
B. Recyclable 
  
  
Total: 
  
  
II. Waste Stream Analysis 
Material 
Tonnage 
Percentage 
  
  
A. Commercial Trash 
  
  
B. Commercial Recyclables 
  
  
C. Wood Recyclables 
  
  
D. POL Spill Pads 
  
  
E. Refrigerant Disposal 
  
  
Total: 
  
  
 
 
III. Recycling Analysis by Commodity 
Material 
Tonnage 
Percentage 
OBM Price 
Potential Value 
1.  Corrugated 
  
    
    
    
2.  Mixed Paper 
  
    
    
    
3.  Computer Paper 
  
    
    
    
4.  Old Newspaper 
  
    
    
    
5.  Plastics (HDPE/PETE) 
  
    
    
    
6.  Aluminum 
  
    
    
    
7.  POL Spill Pads 
  
    
    
    
Total: 
  
    
    
    
IV. Definitions 
1. Corrugated-Cardboards, brown paper bags 
2. Mixed Paper-Office Reports 
3. Computer Paper-Computer print outs 
4. Old Newspaper-newspaper/advertisements 
5. Plastics-Empty bottles and jugs from soda, water, juice, etc. 
6. Aluminum-Non-hazardous empty aerosal cans, aluminum cans 
7. POL Spill Pads-spill pads associated with jet fuel, diesel fuel, hydraulic fluids, and engine oil. No gasoline. 
Page 1

23 
 
APPENDIX E 
 
REPORT AND RECORDS SAMPLE (CONTINUATION) 
 
 
LUKE AIR FORCE BASE 
Commercial Disposal Tonnage 
TRASH 
RECYCLE 
Day 
1st Load 
2nd Load 
3rd Load 
1st Load 
2nd Load 
2nd Load 
1 
  
  
  
  
  
  
2 
  
  
  
  
  
  
3 
  
  
  
  
  
  
4 
  
  
  
  
  
  
5 
  
  
  
  
  
  
6 
  
  
  
  
  
  
7 
  
  
  
  
  
  
8 
  
  
  
  
  
  
9 
  
  
  
  
  
  
10 
  
  
  
  
  
  
11 
  
  
  
  
  
  
12 
  
  
  
  
  
  
13 
  
  
  
  
  
  
14 
  
  
  
  
  
  
15 
  
  
  
  
  
  
16 
  
  
  
  
  
  
17 
  
  
  
  
  
  
18 
  
  
  
  
  
  
19 
  
  
  
  
  
  
20 
  
  
  
  
  
  
21 
  
  
  
  
  
  
22 
  
  
  
  
  
  
23 
  
  
  
  
  
  
24 
  
  
  
  
  
  
25 
  
  
  
  
  
  
26 
  
  
  
  
  
  
27 
  
  
  
  
  
  
28 
  
  
  
  
  
  
29 
  
  
  
  
  
  
30 
  
  
  
  
  
  
31 
  
  
  
  
  
  
Totals: 
  
  
  
  
  
  
Total Trash 
  
  
Total Recycle 
  
  
Page 2

24 
 
BID SCHEDULE 
BASIC YEAR 
CONTRACT 
LINE ITEM 
NO. (CLIN) 
SUPPLIES/SERVICE 
QTY 
UNIT 
UNIT 
PRICE 
AMOUNT 
NON-PERSONAL SERVICES: 
Provide all supervision, personnel, 
equipment, transportation, material, 
and other items and services necessary 
to perform Integrated Solid Waste 
Management services at [INSERT 
NAME OF INSTALLATION] for the 
period [INSERT PERFORMANCE 
PERIOD] in accordance with the 
Performance-based Work Statement 
(PWS) dated : 31 Mar 2021. 
This CLIN is not separately priced; 
the requirement of this CLIN applies 
to all subsequent CLINS (0001-0018) 
0001 
Municipal Solid Waste Collection – 
Base 
(PWS 1.1.1.1) 
12 
MO 
0002 
Food Waste Collection - Base 
(PWS 1.1.1.2) 
12 
MO 
0003 
Recyclable Collection – Base 
(PWS 1.1.1.3) 
12 
MO 
0004 
Municipal Solid Waste Collection – 
MFH (Non-privatized) 
(PWS 1.1.2.1) (RESERVE) 
Xx 
MO 
0005 
Recyclable Collection – MFH (Non- 
privatized) 
(PWS 1.1.2.2) (RESERVE) 
Xx 
MO 
0006 
Compostable Organics – MFH (Non- 
privatized) 
(PWS 1.1.2.3) (RESERVE) 
Xx 
MO 
0007 
Bulk Item Pickup – MFH (Non- 
privatized) 
(PWS 1.1.2.4) (RESERVE) 
Xx 
EA 
0008 
Unscheduled Items Pick-up and 
Special Events 
(PWS 1.1.3.1) 
146 
 
EA

25 
 
CONTRACT 
LINE ITEM 
NO. (CLIN) 
SUPPLIES/SERVICE 
QTY 
UNIT 
UNIT 
PRICE 
AMOUNT 
0009 
Construction and Demolition Debris 
Placement / Pick-up 
(PWS 1.1.3.2) (RESERVE) 
[NOT FOR CONSTRUCTION 
CONTRACT (SRM) DEBRIS] 
Xx 
EA 
0010 
Public / Common Use MSW 
Receptacle Collection 
(PWS 1.1.3.3) (RESERVE) 
Xx 
MO 
0011 
Public / Common Use Recycling 
Receptacle Collection 
(PWS 1.1.3.4) (RESERVE) 
Xx 
MO 
0012 
Ash Collection 
(PWS 1.1.3.5) 
(RESERVE) 
Xx 
MO 
0013 
Additional Pickups 
(PWS 1.1.3.6.) 
30 
 
EA 
0014 
Container Relocations 
(PWS 1.1.3.7) 
20 
 
EA 
0015 
Operate Base Recycling Center / 
Material Recovery Facility 
(PWS 1.2) (RESERVE) 
Xx 
MO 
0016 
Operate Composting Facility 
(PWS 1.2.6) (RESERVE) 
Xx 
MO 
0017 
Equipment Maintenance 
(PWS 1.4) 
215 
 
EA 
0018 
Landfill Tipping Fees 
(PWS 1.5) 
775 
Tons 
TOTAL CLINS: 0001-0018 
 
NOTE: CONTRACTING OFFICERS SHALL NOT DEVIATE FROM THIS SCHEDULE 
WITHOUT AFIMSC APPROVAL. A STANDARDIZED CLIN STRUCTURE IS CRITICAL 
FOR AF ACTIVITY MANAGEMENT PLANS IN ORDER TO PROVIDE FULL COST 
VISIBILITY. 
INSERT THE FOLLOWING ON SF 1449 CONTINUATION SHEET PRICING SCHEDULE 
(BLOCKS 19 THROUGH 24)