FY 2022/2023
#
FACILITIES‐ BUILDING
Estimate
B2 Flooring  ‐ CWS/Bldg K 
$ 150,000
B3 Interior Painting ‐ CWS/Bldg K 
$ 130,000
B7 HVAC (Location TBD)
$ 70,000
B8 Exterior paint Bldg B & D
$ 65,000
ECR Unplanned Repairs/ECRs
$ 141,049
FACILITIES/BUILDINGS ‐ Totals
$ 556,049
#
STADIUM FIELD, PRACTICE FIELDS & COMMON
Estimate
F1 Stadium Amp & Outfield Speaker Replacement (Phase I of II)
$ 250,000
F2 Replace Public Address System
$ 50,000
F3 Light pole Refurbishment ‐ Backfield Pathways
$ 25,000
F4 Stadium security concourse lights repair
$ 30,000
Replace Stadium Seating Inventory including various seat sizes, seat backs,
etc.   Original mfg out of business (AmericanSeating)
F5 Perimeter fencing restoration (Maury's area/NE‐SW to LAD pathway gate
section)
$ 40,000
F8 Stadium padding vinyl replacement (labor only)
$ 25,000
F9
CWSmi Batting Cages ‐ Replace end posts and cabling for tension to
tighten slack
F11 LAD (2) field replacement
$ 325,000
F12 LAD Field #1 ‐ Replace outfield fence posts, chainlink, and mesh
$ 35,000
75 CWS Quad foul line fence cap
$ 7,500
F16 Stadium elephant tunnel turf (pathway from Sox bldg to field)
$ 15,000
F17
Minor League Fields‐Chain link fencing restoration & painting as needed /
Phase I of II
$ 60,000
F18
LAD Field #2 ‐ Dugout poles padding
$ 6,000
F19 Bldg P parking lot
$ 50,000
F20
Stadium Dugouts Flooring Replacement including concrete patching as
needed
$ 40,000
FIELDS, COMMON AREA Totals
$ 862,500
Estimate
L2 Replace platform for pump house
$ 5,500
L4 Lake ‐ 75hp Pump Replacement (2 of 5)
$ 40,000
LAKE/IRRIGATION Totals
$ 45,500
$ 1,464,049
Capital Replacements Total FYE 2022
Page 1 of 1
LAKE/IRRIGATION
#                                                 Capital Replacement
CAMELBACK SPRING TRAINING, LLC
Capital Repair and Replacement