ADOT CAR No.: IGA 22-0008671-I 
AG Contract No.: P0012024002055 
Project Location/Name: MC 85 – Van 
Buren St. – Loop 303 Outfall Channel 
Type of Work: Joint Maintenance Access 
Federal-aid No.: 303-A(219)T 
ADOT Project No.: H687001D/01C 
TIP/STIP No.: STP-303-A(ASO)T 
CFDA No.: 20.205 - Highway Planning and 
Construction 
Budget Source Item No.: 8899  
FCDMC IGA No: FCD 2024A016 
INTERGOVERNMENTAL AGREEMENT 
BETWEEN 
THE STATE OF ARIZONA 
AND 
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY 
THIS AGREEMENT (“Agreement”) is entered into this date ________________________________, pursuant 
to the Arizona Revised Statutes (“A.R.S.”) §§ 11-951 through 11-954 between the STATE OF 
ARIZONA, acting by and through its DEPARTMENT OF TRANSPORTATION (the “State” or “ADOT”) 
and the FLOOD CONTROL DISTRICT OF MARICOPA COUNTY (the “District”), a political subdivision 
of the State of Arizona, acting by and through its Board of Directors. The State and the District are 
each individually referred to as a “Party” and are collectively referred to as the “Parties.” 
I.
RECITALS
1.
The State is empowered by A.R.S. § 28-401 to enter into this Agreement and has delegated
to the undersigned the authority to execute this Agreement on behalf of the State.
2.
The District is empowered by A.R.S. § 48-3603 to construct, operate and maintain flood
control structures and facilities and enter into the Agreement and has authorized the
undersigned to execute this Agreement on behalf of the District.
3.
The State will construct State Route 303 Loop (SR 303 L), from MC 85 to Van Buren Street,
(the “Project”). The District owns, operates and maintains the Loop 303 Outfall Channel (the
“Outfall Channel”) along an alignment similar to the Project.  The purpose of this Agreement
is to define the relationship of the Parties with reference to maintenance and allowing joint
access between ADOT and the District within the other Parties’ access roads. The Project
includes realignment and reconstruction of the Outfall Channel south of the Union Pacific
Railroad (UPRR), a flowage easement to the District on the realigned portion of the Outfall
Channel, a new first flush diversion structure, construction of new outlet structures to the
Outfall Channel, land rights for a portion of the District’s fee land south of the UPRR,
easements for inlet and outlet structures. The Parties will require joint access onto all

IGA 22-0008671-I 
Page 2 of 8 
existing access roads.  The elements of this Project are shown in Exhibit A, attached and 
made a part of this Agreement. If there are any changes in ADOT’s right of way in the future 
(for example, expansion of roadway) at this location, ADOT and the District will work 
together to maintain joint use. 
4.
The foregoing Recitals and Exhibit A shall be incorporated into this Agreement.
In consideration of the mutual terms expressed herein, the Parties agree as follows: 
II. SCOPE OF WORK
1.
The State will:
a.
Grant, without cost requirements, a permit that renews automatically to the District for 
their use of the State’s access roads to perform necessary inspections and repairs of the 
District’s drainage, structures and associated facilities.
b.
Maintain the drainage features outside the limits of the District’s Outfall Channel right of 
way.
c.
Provide to the District, at no cost, a flowage easement for surface runoff conveyance 
rights to the realigned Outfall Channel within ADOT’s right of way.  Any future 
modifications to the Outfall Channel within the flowage easement shall require a Right-
of-Way Use Permit from the District.
d.
Purchase from the District, pursuant to A.R.S. § 48-3603, any District fee property 
necessary for the Project.
e.
Be responsible for funding, designing, constructing the Project’s storm drain 
connections to the Outfall Channel, the First Flush Basin and diversion structure, and 
the realignment of the Outfall Channel south of the UPRR tracks.
f.
Take the lead, with input from the District, for all aspects of the Project that impacts the 
District’s facilities including land acquisition, easements, environmental permits, utility 
relocations, public involvement, design, landscape and aesthetics, construction and 
construction management.
g.
Obtain a Right-of-Way Use Permit from the District for all preconstruction, 
construction, inspection and maintenance of State improvements within District right-
of-way.  Submit design plans and specifications to the District for review and comment, 
to be provided within 30 days of receipt of the submittal. Incorporate the District’s 
comments as appropriate.
h.
Construct the Outfall Channel facilities in accordance with the District’s latest Design 
Criteria and Specifications and provide design capacity to convey the 100-year flow.
i.
Be responsible for operation and maintenance of the Outfall Channel during 
construction. In addition, be responsible for any cleanup and repairs made necessary by

IGA 22-0008671-I 
Page 3 of 8 
stormwater or any other discharges in the Outfall Channel during the construction of 
the State Project. 
j.
Require submittal of a new right of way permit from the District for any new work
within its right of way or joint use access roads, prior to the start of any work.
k.
Be responsible for the maintenance and operation of the First Flush Basin and diversion
structure, storm drains that outlet into the Outfall Channel and the realigned Outfall
Channel within ADOT’s right of way.
l.
The State shall participate, as desired by the District, with the District in an annual
inspection of the Project.  Any deficiencies relating to flood control that impact the safe
operation or functioning of the Outfall Channel, and for which the State is responsible,
shall be corrected by the State within sixty (60) calendar days.  If the State has not taken
corrective action within this time, the District reserves the right to perform the
corrective action and will invoice the State for the total costs incurred by the District.
m. Will provide the District with a construction sequencing plan and an emergency plan to
maintain flows in the Outfall Channel during construction.
n.
Provide the District with access to its facilities during the construction of the State
Project.
o.
Maintain ADOT right of way and the SR 303 L features outside of the District’s Outfall
Channel right of way. Repair damage to District access roads, fencing, or gates due to
any State maintenance vehicles and/or equipment accessing the area.
p.
Manage trespass enforcement within ADOT and FCD rights of way within the joint use
areas and coordinate with District Operations and Maintenance for trespass clean up on
District rights of way and maintained areas.
2.
The District will:
a.
Review design plans and specifications and provide comments within the standard
District review time, approximately 30 days of receipt of the submittal, or sooner.
b.
Grant to the State (and its agents and/or contractors), by way of Right-of-Way Use
Permit, the right to enter the District’s right of way, as required, to conduct any and all
preconstruction and construction related activities for the Project and to operate and
maintain State constructed improvements, grant easements to the State for their use of
the District’s access roads to perform necessary inspections and repairs and for
locations of outlet structures into outfall channel.
c.
Maintain all District access roads shown in Exhibit A.  Repair damage to ADOT access
roads, fencing, or gates due to any District maintenance vehicles and/or equipment
accessing the area.
d.
Be responsible for any modifications to the State’s Project that are requested by the
District after plan approval by the District of the State’s Project.

IGA 22-0008671-I 
Page 4 of 8 
e.
Be responsible for operation and maintenance of the Outfall Channel, except for items
identified in section II.1.k and the area within the State’s right of way, after completion
of the State’s Project.
f.
Be responsible to submit an encroachment permit application for any new construction,
installation, or access within ADOT’s right of way. Permits will be issued when
appropriate insurance documents are provided as required by ADOT Risk Management.
ADOT will work with the District to continue to maintain joint use on any future
changes that are within ADOT’s right of way.
g.
Have the right to participate in Project construction meetings and inspections.
III. MISCELLANEOUS PROVISIONS
1.
Effective Date. This Agreement shall become effective upon signing and dating of all Parties.
2.
Amendments. Any change or modification to this Agreement will only occur with the mutual
written consent of all Parties.
3.
Duration. The terms, conditions and provisions of this Agreement shall remain in full force
and effect until completion of the Project. Any and all obligations of maintenance hereunder
shall remain perpetual and shall survive any termination hereof and the assignment or
assumption of this Agreement or the Project by another competent jurisdiction or entity.
4.
Cancellation. This Agreement may be canceled at any time up to 30 days before the award of
the Project contract, so long as the canceling Party provides at least 30 days’ prior written
notice to the other Party. It is further understood and agreed that in the event the Local
Agency terminates this Agreement, the State shall in no way be obligated to complete or
maintain the Project
5.
Federal Funding Accountability and Transparency Act. The Parties warrant compliance with
the Federal Funding Accountability and Transparency Act of 2006 and associated 2008
Amendments (the “Act”). Additionally, in a timely manner, the District will provide
information that is requested by the State to enable the State to comply with the
requirements of the Act, as may be applicable.
6.
Governing Law. This Agreement shall be governed by and construed in accordance with
Arizona laws. 
7.
Conflicts of Interest. This Agreement may be cancelled in accordance with A.R.S. § 38-511.
8.
Inspection and Audit. The Local Agency shall retain all books, accounts, reports, files and
other records relating to this Agreement which shall be subject at all reasonable times to
inspection and audit by the State for five years after completion of the Project. Such records
shall be produced by the Local Agency, electronically or at the State office as set forth in this
Agreement, at the request of ADOT.

IGA 22-0008671-I 
Page 5 of 8 
9.
Title VI. The Parties acknowledge and will comply with Title VI of the Civil Rights Act Of
1964. 
10. Non-Discrimination. This Agreement is subject to all applicable provisions of the Americans
with Disabilities Act (Public Law 101-336, 42 U.S.C. 12101-12213) and all applicable federal
regulations under the Act, including 28 CFR Parts 35 and 36. The Parties to this Agreement
shall comply with Executive Order Number 2009-09, as amended by Executive Order 2023-
01, issued by the Governor of the State of Arizona and incorporated in this Agreement by
reference regarding “Non-Discrimination.”
11. Non-Availability of Funds. Every obligation of the State under this Agreement is conditioned
upon the availability of funds appropriated or allocated for the fulfillment of such
obligations. If funds are not allocated and available for the continuance of this Agreement,
this Agreement may be terminated by the State at the end of the period for which the funds
are available. No liability shall accrue to the State in the event this provision is exercised,
and the State shall not be obligated or liable for any future payments as a result of
termination under this paragraph.
12. Arbitration. In the event of any controversy, which may arise out of this Agreement, the
Parties agree to abide by arbitration as is set forth for public works contracts if required by
A.R.S. § 12-1518.
13. E-Verify. The Parties shall comply with the applicable requirements of A.R.S. § 41-4401.
14. Contractor Certifications. The Parties shall certify that all contractors comply with the
applicable requirements of A.R.S. §§ 35-393.01 and 35-394.
15. Other Applicable Laws. The Parties shall comply with all applicable laws, rules, regulations
and ordinances, as may be amended.
16. Notices. All notices or demands upon any Party to this Agreement shall be in writing and
shall be delivered electronically, in person, or sent by mail, addressed as follows:
For Agreement Administration: 
Arizona Department of Transportation 
Joint Project Agreement Group 
205 S. 17th Avenue, Mail Drop 637E 
Phoenix, AZ 85007 
JPABranch@azdot.gov 
For Project Administration: 
Arizona Department of Transportation 
Project Management Group  
205 S. 17th Avenue, Mail Drop 614E 
Phoenix, AZ 85007 
PMG@azdot.gov 
Flood Control District of Maricopa County 
Chief Engineer and General Manager 
2801 W. Durango St. 
Phoenix, AZ 85009 
602.506.1501 
Flood Control District of Maricopa County 
Chief Engineer and General Manager 
2801 W. Durango St. 
Phoenix, AZ 85009 
602.506.1501

IGA 22-0008671-I 
Page 6 of 8 
For Financial Administration: 
Arizona Department of Transportation 
Central District  
205 S. 17th Avenue, Mail Drop 614E 
Phoenix, AZ 85007 
17. Revisions to Contacts. Any revisions to the names and addresses above may be updated
administratively by any Party and shall be in writing.
18. Legal Counsel Approval. In accordance with A.R.S. § 11-952 (D),  the written determination
of each Party’s legal counsel providing that the Parties are authorized under the laws of this
State to enter into this Agreement and that the Agreement is in proper form is set forth
below.
19. Electronic Signatures. This Agreement may be signed in an electronic format including
DocuSign. 
Remainder of this page is intentionally left blank. 
(Signatures begin on the next page)

IGA 22-0008671-I 
Page 7 of 8 
IN WITNESS WHEREOF, the Parties have executed this Agreement to be effective upon the full 
completion of signing and dating by all Parties to this Agreement. 
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY 
Recommended: 
By: ________________________________________ Date_________________________ 
PAUL BAUGHMAN 
Chief Engineer & General Manager 
Approved and Accepted: 
By: ________________________________________ Date_________________________ 
JUANITA GARZA 
Clerk of the Board 
Attest: 
By: ________________________________________ Date_________________________ 
THOMAS GALVIN 
Chairman, Board of Directors 
I have reviewed the above referenced Intergovernmental Agreement between the State of Arizona, 
acting by and through its DEPARTMENT OF TRANSPORTATION, and the FLOOD CONTROL 
DISTRICT OF MARICOPA COUNTY, acting through its Board of Directors, an agreement among 
public agencies which, has been reviewed pursuant to A.R.S §§ 11-951 through 11-954 and declare 
this Agreement to be in proper form and within the powers and authority granted to the District 
under the laws of the State of Arizona. 
No opinion is expressed as to the authority of the State to enter into this Agreement. 
By: ________________________________________ Date_________________________ 
 MAX CARPINELLI 
Flood Control District General Counsel

IGA 22-0008671-I 
Page 8 of 8 
ARIZONA DEPARTMENT OF TRANSPORTATION 
By: ____________________________________________ Date___________________________ 
 AUDRA MERRICK, PE 
 Infrastructure Deliver and Operations Division 
 Division Director 
This Agreement between public agencies, the State of Arizona and the Flood Control District of 
Maricopa County, has been reviewed pursuant to A.R.S. §§ 11-951 through 11-954 and A.R.S. § 28-
401, by the undersigned Assistant Attorney General who has determined that it is in the proper 
form and is within the powers and authority granted to the State of Arizona. No opinion is 
expressed as to the authority of the remaining Parties, other than the State or its agencies, to enter 
into said Agreement. 
By: ____________________________________________ Date___________________________ 
  Assistant Attorney General

P
P
P
P
P
P
P
P
SHEET:  01 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_01
       
FCDMC Channel
MATCH SHEET 02
MC85
FCDMC Channel
Buckeye Canal Rd
MC85
Buckeye
Canal Rd
Exhibit A
       
DATE:  01/14/2025
       
New ADOT O&M Rd
O&M Rd & RID
Access FCDMC
Proposed Shared
FCDMC R/W
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
FCDMC O&M Rd
Proposed Shared Access
Existing ADOT R/W
New ADOT R/W
New ADOT R/W
Existing Goodyear R/W
New ADOT R/W
       
LEGEND:
Proposed Shared Access FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Rd & RID
Existing FCDMC O&M Rd
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
New ADOT O&M Rd
FCDMC R/W
303
Loop

P
P
P
P
P
P
P
P
P
P
SHEET:  02 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\h6870_FCDMC_02
       
Atlanta Ave
MATCH SHEET 03
MC85
Exhibit A
       
MATCH SHEET 01
FCDMC Channel
MC85
Buckeye Canal Rd
New ADOT O&M Rd
FCDMC R/W
DATE:  01/14/2025
       
FCDMC O&M Rd
Proposed Shared Access
FCDMC R/W
FCDMC O&M Rd & RID
Proposed Shared Access
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
New ADOT R/W
New ADOT R/W
Existing ADOT R/W
New ADOT R/W
Existing ADOT R/W
Existing UPRR R/W
Across UPRR
No Maintenance Access
FCDMC R/W
New ADOT O&M Rd
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Rd & RID
Proposed Shared Access FCDMC O&M Rd
LEGEND:
FCDMC O&M Rd
Proposed Shared Access
Realigned Outfall Channel
303
Loop
303
Loop

P
P
P
P
P
P
P P
P
P
P
P
P
P
P
SHEET:  03 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_03
       
Broadway Rd
175th Ave
MATCH SHEET 04
MC85
175th Ave
MATCH SHEET 02
Broadway Rd
Exhibit A
       
FCDMC R/W
FCDMC R/W
FCDMC O&M Rd
Proposed Shared Access
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
DATE:  01/14/2025
       
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Exising ADOT R/W
Exising ADOT R/W
New ADOT R/W
New ADOT R/W
Existing Goodyear R/W
FCDMC O&M Rd
Proposed Shared Access
303
Loop
303
Loop

P
PP
P
SHEET:  04 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_04
       
175th Ave
MATCH SHEET 05
MC85
175th Ave
MATCH SHEET 03
Exhibit A
       
FCDMC R/W
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
DATE:  01/14/2025
       
Existing ADOT R/W
New ADOT R/W
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Existing ADOT R/W
FCDMC O&M Rd
Proposed Shared Access
303
Loop
303
Loop

P
P
P
P
P
PP
P
P
PPP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
SHEET:  05 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_05
       
Elwood St
Cotton Ln
MATCH SHEET 06
Elwood St
Lower Buckeye Rd
MATCH SHEET 04
Exhibit A
       
FCDMC R/W
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
DATE:  01/14/2025
       
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Exsting D/W
Fence to Remain
200' of Existing
Fence
Remove Existing
Existing ADOT R/W
Existing ADOT R/W
Existing ADOT R/W
New ADOT R/W
Existing Goodyear R/W
Existing Goodyear R/W
New ADOT R/W
FCDMC O&M Rd
Proposed Shared Access
303
Loop
303
Loop

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
NAIL CPT
AC CPT
BSCK AC CPT
EP ST PC
TOE1   ST
EP ST PC
TOE2 ST
TOP1 ST GB1 ST
WL GATE
CLF GATE
TOP1 GB1
WL GATE
WL GATE
CNL CL
TOP1 GB1
EW PT BOC
CNL CL
BOC ST EW ST
CONC LPS
CNL CL
CNL1  CL
CNL1 ST
WL CL SGN
VP / VENT PIPE 2
WL SGN
WL ST SGN
WL SGN
CNL2 CL
CNL2 ST
WL SGN
WL SGN
WL SGN
WL SGN
WL SGN
WL SGN
WL SGN
WL SGN
SD
SD
SD
SD
SD
SHEET:  06 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_06
       
Lower Buckeye Rd
MATCH SHEET 07
Elwood St
Lower Buckeye Rd
MATCH SHEET 05
Exhibit A
       
DATE:  01/14/2025
       
FCDMC R/W
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Fence to Remain
200' of Existing
Fence
Remove Existing
Fence to Remain
200' of Existing
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
Existing ADOT R/W
New ADOT R/W
New ADOT R/W
New ADOT R/W
New ADOT R/W
Existing Goodyear R/W
Existing Goodyear R/W
303
Loop
303
Loop

P
P
P
P
P
P
P
P
SHEET:  07 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_07
       
MATCH SHEET 08
Elwood St
Lower Buckeye Rd
MATCH SHEET 06
Exhibit A
       
DATE:  01/14/2025
       
FCDMC R/W
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Fence to Remain
200' of Existing
Fence
Remove Existing
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
Existing ADOT R/W
New ADOT R/W
Existing ADOT R/W
303
Loop
303
Loop

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
SHEET:  08 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_08
       
MATCH SHEET 09
Lower Buckeye Rd
MATCH SHEET 07
_M
Exhibit A
       
DATE:  01/14/2025
       
FCDMC R/W
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
New ADOT R/W
Existing ADOT R/W
Existing ADOT R/W
303
Loop
303
Loop

PP
P
P P
P
P
P
P
P
P
P
PPPP
PPP
P
P
P
fuel pump
SD
SD
SD
SD
SD
SD
SD
SHEET:  09 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_09
       
MATCH SHEET 10
Yuma Rd
MATCH SHEET 08
Canyon Trails Blvd
Exhibit A
       
DATE:  01/14/2025
       
FCDMC R/W
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
to Remain
200' Existing Fence
Fence
Remove Existing
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
Existing ADOT R/W
New ADOT R/W
and Easement
Exst FCDMC Box Culvert
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
303
Loop
303
Loop

P
P
P
P
P
P
P
P
P
P
PPPP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P P
P
SD
SHEET:  10 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_10
       
MATCH SHEET 11
Yuma Rd
MATCH SHEET 09
Canyon Trails Blvd
Yuma Rd
Exhibit A
       
DATE:  01/14/2025
       
FCDMC R/W
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Existing ADOT R/W
Existing ADOT R/W
New ADOT R/W
New ADOT R/W
New ADOT R/W
New ADOT R/W
Existing Goodyear R/W
Existing Goodyear R/W
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
303
Loop
303
Loop

P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
CK CP 517
CK AC CPT
CK AC CPT
SHEET:  11 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_11
       
MATCH SHEET 12
Van Buren St
MATCH SHEET 10
Canyon Trails Blvd
Canyon Trails Blvd
Lilac St
Exhibit A
       
DATE:  01/14/2025
       
FCDMC R/W
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Existing ADOT R/W
New ADOT R/W
Existing ADOT R/W
New ADOT R/W
New ADOT R/W
Existing ADOT R/W
New ADOT R/W
Existing Goodyear R/W
Goodyear R/W
Existing
303
Loop
303
Loop

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
CK AC CPT
SHEET:  12 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_12
       
MATCH SHEET 13
Van Buren St
MATCH SHEET 11
Canyon Trails Blvd
Exhibit A
       
DATE:  01/14/2025
       
FCDMC R/W
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
Existing ADOT R/W
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Existing ADOT R/W
303
Loop
303
Loop

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
CNL CL
CNL CL
BOC EW1 ST
AC CPT
BSCK AC CPT
BOC ST PC
BOC PT
BOC ST PC
BOC PT
EW1 ST
EW BOC1
WL TOP10
WL ST TOP10
BOC PC
EW1 BOC
BOC1 ST
BOC PT
ABUT ST
BOC EW
BOC GB ST
EW ST PC
BOC ST PC
AC CPT
WL TOP10
WL TOP10
1000.59
1000.91
1006.25
1006.72
1007.71
1008.29
1009.09
WL ST WL1 ST
1009.10
1009.62
1009.65
1010.15
1010.17
1010.65
1010.66
1011.72
1011.73
1011.74
1011.76
1012.02
1012.03
1012.32
1012.33
1012.65
1012.69
1012.73
1012.79
1012.92
1012.94
1013.08
WL1 ST
1013.11
SHEET:  13 OF 13
  
SEGMENT:
       
LOCATION:
       
MC 85 to Van Buren St
       
SR 303L, Bob Stump Memorial Parkway
       
..\AZFWY1802_303L_SOUTH_MC85-Van Buren_ORD\Cadd\Exhibits\Roadway\FCDMC_13
       
Van Buren St
MATCH SHEET 12
Canyon Trails Blvd
Van Buren Street
Exhibit A
       
DATE:  01/14/2025
       
FCDMC R/W
FCDMC R/W
New ADOT O&M Road
Proposed Shared Access O&M Rd
Existing FCDMC O&M Rd to become
Existing FCDMC O&M Rd
Proposed Shared Access FCDMC O&M Road
LEGEND:
       
Shared Access O&M Rd
to become Proposed
Existing FCDMC O&M Rd
Existing ADOT R/W
Existing ADOT R/W
303
Loop
303
Loop