PowerPoint Presentation (Updated 1/20/23)
Extracted text (via pymupdf)
4367 characters
RIGHT-OF-WAY LANDSCAPE PLAN January 24, 2023 - Council Workshop Plan Objectives 2 • Long-term sustainable landscape infrastructure. • Striking a balance between water conservation and aesthetic appeal. Right-Of-Way Maintenance Map 3 ACTIVITY AMOUNT PER YEAR Maintenance of developed ROW (Keep-up) $2,887,000 Maintenance of undeveloped ROW (Keep-up) $176,000 Ongoing Landscape restoration (Catch-up) $550,000 TOTAL RIGHT-OF-WAY BUDGET $3,613,000 Catch-Up Budget 4 • FY 2019 $1,550,000 (one-time) for Downtown area ROW cleanup and landscaping project. • The sum total of $550,000 (ongoing – FY 2019 & FY 2023) is not adequate for restoration needed for catch-up. Before & After Pictures 5 Before After Before & After Pictures 6 Before After Trees in Right-Of-Way 7 • 22,000 existing tree sites: –4,000 missing trees. –18,000 existing trees: • 330 dead/diseased trees. Does not include undeveloped right-of-way (adjacent to vacant parcels) Considerations 8 • Use native drought tolerant plants. • Decorative rock. • Artificial turf at select locations. • Balance tree planting, shrubs, and ground cover. • Maximize tree canopy in the City. • Maximize the opportunity to conserve water. – Water harvesting features. – Smart irrigation systems. • Site restrictions. • Ease of maintenance. Drought Tolerant Trees 9 Chinese Pistache Live Oak Desert Willow Chitalpa Acacia Willow Acacia Mulga Shrubs 10 Dwarf Oleander Mexican Bird of Paradise Green Cloud Sage Lantana "Gold“ Bougainvilleas Ground cover 11 Katie Ruellia Trailing Gazania Trailing Lantana Dalea Greggii Golden Barrel Cactus 12 EXISTING CONDITION Existing City Standard •Decorative rock •Drought tolerant vegetation •Add trees •Add shrubs •Water harvesting •Upgrade to smart irrigation system STANDARD Anticipated Cost $6.6M 13 EXISTING CONDITION Drought Friendly Plan •Decorative rock •Drought tolerant vegetation •Add trees •Add shrubs •Water harvesting •Upgrade to smart irrigation system CONCEPT Anticipated Cost $6.2M Grass Medians Concept 14 • Remove natural turf. • Install artificial turf in the narrow nose parts of the median. • Plant additional trees to keep the spacing at 30’. • Plant shrubs at 3 per tree. • Install decorative rock for dust control. Anticipated Cost $1.66M EXISTING CONCEPT Water Use 15 145,080 (445.2 AF) 181,350 (556.5 AF) 108,810 (333.9 AF) 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 Existing Existing Fully Installed Proposed Plan In Thousands of Gallons Savings of 111.3 acre-foot (AF) with the Proposed Plan. New Standard 16 • Drought tolerant trees every 30’. • 3 drought tolerant shrubs in between trees. • Water harvesting features incorporated. • Smart irrigation systems. • Decorative rock color and size. • Water crisis responsive standards. * -Inflation amounts not included in the estimates above -Potential future infill tree costs are not a part of the estimates above Proposed plan costs 17 KEEP-UP / ONGOING (To Maintain – Operating) CURRENT AMOUNT PROPOSED AMOUNT Current Ongoing Keep-up Budget $3,063,000 Additional Ongoing Keep-up - Proposed $344,000 Current Ongoing Catch-up Budget $550,000 Additional Ongoing Catch-up - Proposed $129,000 Ongoing Budget Need (Additional) $473,000 TOTAL COSTS $4,086,000 CATCH-UP (To Enhance – Capital) FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 TOTAL Current Ongoing Catch-up Budget $550,000 $550,000 $550,000 $550,000 $550,000 $550,000 $550,000 $3,850,000 Citywide Catch-up - Proposed $888,734 $888,734 $888,734 $888,734 $888,734 $888,734 $888,734 $6,221,136 Grass medians Catch-up - Proposed $553,333 $553,333 $553,333 - - - - $1,660,000 Net Difference (Catchup Budget Need) $892,067 $892,067 $892,067 $338,734 $338,734 $338,734 $338,734 $4,031,136 • Sustainable and visually appealing program maximizing water conservation. • Post completion activities: – Ongoing catch-up requires an additional $129,000 (existing $550,000) – Ongoing keep-up requires an additional $344,000 (existing $3,063,000) • The project will require General Fund support for both catch-up and keep-up. – Catch-up at $4.03M (one-time) – Ongoing Catch-up and Keep-up at $473,000 per year • The 7-year recommended program for landscaping for a total of $7.88M. • Standalone HB 2481 includes $810,000 funding for this project. Conclusions 18 Questions 19