RIGHT-OF-WAY LANDSCAPE PLAN
January 24, 2023 - Council Workshop

Plan Objectives
2
• Long-term sustainable 
landscape infrastructure.
• Striking a balance between 
water conservation and 
aesthetic appeal.

Right-Of-Way Maintenance Map
3
ACTIVITY
AMOUNT 
PER YEAR
Maintenance of developed 
ROW (Keep-up)
$2,887,000
Maintenance of undeveloped 
ROW (Keep-up)
$176,000
Ongoing Landscape 
restoration (Catch-up)
$550,000
TOTAL RIGHT-OF-WAY 
BUDGET
$3,613,000

Catch-Up Budget
4
• FY 2019 $1,550,000 (one-time) for 
Downtown area ROW cleanup and 
landscaping project.
• The sum total of $550,000 (ongoing – FY 
2019 & FY 2023) is not adequate 
for restoration needed for catch-up.

Before & After Pictures
5
Before
After

Before & After Pictures
6
Before
After

Trees in Right-Of-Way
7
• 22,000 existing tree sites:
–4,000 missing trees.
–18,000 existing trees:
• 330 dead/diseased trees.
Does not include undeveloped right-of-way (adjacent to vacant parcels)

Considerations
8
• Use native drought tolerant 
plants.
• Decorative rock.
• Artificial turf at select 
locations.
• Balance tree planting, 
shrubs, and ground cover.
• Maximize tree canopy in the 
City.
• Maximize the opportunity 
to conserve water.
– Water harvesting features.
– Smart irrigation systems.
• Site restrictions.
• Ease of maintenance.

Drought Tolerant Trees
9
Chinese Pistache
Live Oak
Desert Willow
Chitalpa
Acacia Willow
Acacia Mulga

Shrubs
10
Dwarf 
Oleander
Mexican Bird 
of Paradise
Green Cloud 
Sage
Lantana 
"Gold“
Bougainvilleas

Ground cover
11
Katie
Ruellia
Trailing 
Gazania
Trailing 
Lantana
Dalea
Greggii
Golden 
Barrel 
Cactus

12
EXISTING CONDITION
Existing City Standard
•Decorative rock
•Drought tolerant vegetation
•Add trees
•Add shrubs
•Water harvesting
•Upgrade to smart irrigation system
STANDARD
Anticipated Cost $6.6M

13
EXISTING CONDITION
Drought Friendly Plan
•Decorative rock
•Drought tolerant vegetation
•Add trees
•Add shrubs
•Water harvesting
•Upgrade to smart irrigation system
CONCEPT
Anticipated Cost $6.2M

Grass Medians Concept
14
•
Remove natural turf.
•
Install artificial turf in the narrow nose parts of the 
median.
•
Plant additional trees to keep the spacing at 30’.
•
Plant shrubs at 3 per tree.
•
Install decorative rock for dust control.
Anticipated Cost $1.66M
EXISTING
CONCEPT

Water Use
15
145,080
(445.2 AF)
181,350
(556.5 AF)
108,810
(333.9 AF)
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
Existing
Existing Fully Installed
Proposed Plan
In Thousands of Gallons
Savings of 111.3 acre-foot (AF) with the Proposed Plan.

New Standard
16
• Drought tolerant trees every 30’.
• 3 drought tolerant shrubs in between trees.
• Water harvesting features incorporated.
• Smart irrigation systems.
• Decorative rock color and size.
• Water crisis responsive standards.

* -Inflation amounts not included in the estimates above
-Potential future infill tree costs are not a part of the estimates above
Proposed plan costs
17
KEEP-UP / ONGOING
(To Maintain – Operating)
CURRENT 
AMOUNT
PROPOSED 
AMOUNT
Current Ongoing Keep-up Budget
$3,063,000
Additional Ongoing Keep-up - Proposed
$344,000
Current Ongoing Catch-up Budget
$550,000
Additional Ongoing Catch-up - Proposed
$129,000
Ongoing Budget Need (Additional)
$473,000
TOTAL COSTS
$4,086,000
CATCH-UP
(To Enhance – Capital)
FY 2024
FY 2025
FY 2026
FY 2027
FY 2028
FY 2029
FY 2030
TOTAL
Current Ongoing Catch-up Budget
$550,000
$550,000
$550,000
$550,000
$550,000
$550,000
$550,000
$3,850,000
Citywide Catch-up - Proposed
$888,734
$888,734
$888,734
$888,734
$888,734
$888,734
$888,734
$6,221,136
Grass medians Catch-up - Proposed
$553,333
$553,333
$553,333
-
-
-
-
$1,660,000
Net Difference
(Catchup Budget Need)
$892,067
$892,067
$892,067
$338,734
$338,734
$338,734
$338,734
$4,031,136

• Sustainable and visually appealing program maximizing water 
conservation.
• Post completion activities:
– Ongoing catch-up requires an additional $129,000 (existing $550,000)
– Ongoing keep-up requires an additional $344,000 (existing $3,063,000)
• The project will require General Fund support for both catch-up 
and keep-up.
– Catch-up at $4.03M (one-time)
– Ongoing Catch-up and Keep-up at $473,000 per year
• The 7-year recommended program for landscaping for a total of 
$7.88M.
• Standalone HB 2481 includes $810,000 funding for this project.
Conclusions
18

Questions