PowerPoint Presentation (Added 1/24/23)

City of Glendale — Regular Meeting (2023-01-24)

View PDF Item 4 Meeting page

Extracted text (via pymupdf) 4792 characters
hollystreet
studio.com
City of Glendale
Downtown Campus Reinvestment Project
24 January 2023
City Council Update
Architecture
Interiors
Planning

AGENDA 
recap previous discussion
review available funding
recent community discussions
review cost + benefit
next steps

recap

• Downtown Campus as the Heart of the Community
• Amphitheater to Become a True Destination
• Consolidate Community Services
• Create a State of the Art Workplace Environment
• Reflect CoG Brand in Building Design
Your Aspirations

City Hall Building
Council
Chambers
Parking 
Garage
Amphitheater
Murphy Park
Velma Teague 
Library
park
amphi.
council
garage
city 
street 
edge
DCRP Project Scope

A. Base | Scope
B. Opportunity | Scope
C. Aspirational | Scope

Garage
Guided by RFP
Focus on fire alarm + painting
Council
Guided by RFP
Focus on skin
City Hall
Guided by RFP
Focus on workspace + skin
Murphy Park
Guided by RFP
Focus on repairs to existing
Amphitheater
Guided by RFP
A. Base | Scope

Garage
0eet RFP
+ 1ew stairs
+ RemoYe bridge
+ /andscape
Council
&omplete &ouncil
+ &ode + 'eferred maint
+ ,nterior
+ (xterior
+ &ommunity rooms  
reduced seating
City Hall
&omplete
+ &ode + 'eferred maint
+ (leYators
+ 6tairs
+ +9$&
+ (ntry Pla]a
+ ,mproYe link
+ :elcome
Murphy Park
0eet RFP
+ (xtend tKe park
+ &ode + 'eferred maintenance
+ /andscape
+ Pla]a
Amphitheater 
0eet RFP
B. Opportunity | Scope

City Hall 
Murphy Park
0eet RFP
+ (xtend tKe park
+ &ode + 'eferred maintenance
+ /andscape
+ Pla]a
Amphitheater
0eet RFP
+ ,ncrease capacity
+ &anopy and stage upgrades
+ Restrooms at park
+ ,nterior space under link
&omplete
+ &ode + 'eferred maint
+ (leYators
+ 6tairs
+ +9$&
+ (ntry Pla]a
+ ,mproYe link
+ :elcome 
+ tK floor
Garage
0eet RFP
+ 1ew stairs
+ RemoYe bridge
+ /andscape
Council
0oYe &ouncil into &ity +all
  seats
 /ess formal
C. Aspirational | Scope

community discussions

• Brian Marshall 
• Dawn Albright 
• Gary Sherwood
• Linda Moran-Whittley
• John Crow
Recent Community Discussions

cost + benefit

A. Base | Scope
$62.5m
$62.5m
budget set Fall 2021
$62.5m
what:  
 
 
cost:

A. Base | Scope
 $70.4m
+ inflation
2021
2022
2023
0%
10%
15%
+$7.9m
13% over the last 15 months
economic conditions
$7.9m
5%
what:  
 
 
cost: 
why:

+ compliance
+ safety
+$5m
compliance + safety
city hall + garage + council
• ada access to buildings
• code compliant elevator
• code compliant stairs
• backflow preventor
site access
• revise turn lanes 
gagarge
• ada access
• fire alarm 
murphy park
• ada access around campus
• resolve drainage
• same requirements as private 
sector
• meet current code + ADA 
requirements
• gurney access at 1 elevator
• safety
• pedistrian access
• eliminate cut thru traffic 
• meet current code requirements
• meet current code requirements 
• meet current drainage 
requirements
  $75.4m
$5m
A. Base | Scope
what:  
cost: 
why:

B. Opportunity | Scope
+1.6m
+5.7m
elevators [2]
building system upgrades
mechanical 
• air handlers + distribution 
• chillers + pumps 
plumbing
• storm ejector pumps
• forced main replacement
• basement water proofing 
electrical 
• emergency generator
• gear + panel board upgrade
• life safety
• security + access control 
• cost of ongoing maintenance
• efficient modern technology
• cost of maintenance
• less energy + water
• environmental controls - heat
• indoor air quality improvements
• flush air born contaminates   
• warranty
• cost of repairs + maintenance
• need to temporarily close areas
• replace undersized + broken pipes
• cost of ongoing maintenance
• 5yrs to replacement
• added cost
• added disruption
• 10 year payback
• $2m gallons per yr
 
 
• 5 year payback
 
• 10 year payback
• 5yrs to replacement
 
+ technology
+ end of life
  $82.7m
$7.3m
what:  
 
cost: 
why: 
future cost:

B. Opportunity | Scope
+ program | 
    improved functionality
+1.1m
+$0.8m
+$2.5m
+$2.8m
City Hall
• light wells
• communicating stairs
Murphy Park
• shade canopies
• park ammenities
• additional Trees | plantings
Council Chambers interior
Garage Skin
• Improved work environment
• Improved communication
• Improved flexibility 
• Community Input
• Update technology
• Update building MEP systems
• Right size the Chamber
• Right size the Executive Session 
Conference Room 
• More flexible public space 
• identity from the west - complete 
the campus
• added cost
• added disruption
$2.8m
.8
1.1
2.5
what:  
cost: 
why:
future cost:

C. Aspirational | Scope
+11.1m
+$5.7m
+$0.7m
+17.5m
Relocate Amphitheater
* requires 5th floor
City Hall Level 5: shell
City Havll Level 5: T.I.
$11.1m
$6.4m
what:  
 
cost: 
why: 
• larger performance + canopy
• right size the Chamber
• Future Flexibility 
• Future Flexibility

NEXT STEPS
schematic design
programming options - 4 weeks
design progress - 8 weeks
schematic design - 12 weeks