FY2024-2033 Capital Improvement Plan March 7th, 2023 Agenda 2 • Follow Up Items from February 14, 2023 Workshop • ARPA Update • Capital Improvement Plan (CIP) Overview • Capital Improvement Plan Projects • Council Feedback and Questions Budget Calendar 3 Item Date Workshop #1 – Budget Overview / Revenues / Five-Year Financial Forecasts February 14, 2023 Workshop #2 – FY24-33 Capital Improvement Plan March 7, 2023 Workshop #3 – (All Day) FY24 Operating Budget Department Presentations April 4, 2023 Workshop #4 – (All Day) FY24 Operating Budget Department Presentations April 6, 2023 Workshop #5 – FY24 Final Budget Workshop April 18, 2023 Voting Meeting – Tentative Budget Adoption May 9, 2023 Voting Meeting – Final Budget Adoption / Property Tax Levy June 13, 2023 Voting Meeting – Property Tax Adoption June 27, 2023 Follow Up Items – February 14, 2023 4 AZSTA Payment Schedule Fiscal Year Forecasted Payment FY20* $2,207,372 FY21* $933,646 FY22* $5,211,472 FY23* $2,127,816 FY24 $2,813,631 FY25 $3,858,697 FY26 $4,054,476 FY27 $7,457,309 FY28 $8,157,733 FY29 $8,146,533 FY30 $8,125,003 FY31 $7,509,828 TOTAL $57,219,906 *Actual Payment Received Follow Up Items – February 14, 2023 5 FY22 Budget to Actual Comparison for City Sales Tax FY22 Budget FY22 Actual Amusement $2,380,553 $ 5,793,186 Construction* $15,335,187 $ 25,105,835 Hotel/Motel $4,217,120 $ 6,380,550 License Fee $ 1,091,323 Other $8,699,343 $ 5,864,244 Rentals $19,395,572 $ 25,463,366 Restaurant/Bar $21,552,556 $ 29,081,057 Retail Sales* $99,316,898 $ 118,479,372 Retail Sales >$5,000 $7,936,415 $ 14,498,344 Telecom/Cable TV $ 2,118,910 Utilities $11,423,000 $ 9,422,143 TOTAL $190,256,644 $243,298,330 City Sales Tax 6 City Sales Tax by Category FY17-18 FY18-19 FY19-20 FY20-21 FY21-22 FY22-23 (6 Months) Amusement 4,916,662 4,893,334 4,363,114 1,452,357 5,793,186 3,645,155 Construction* 6,656,873 6,807,300 12,296,520 16,922,150 25,105,835 13,573,604 Hotel/Motel 3,825,521 3,970,644 3,761,665 3,820,245 6,380,550 3,085,217 License Fee 847,704 956,862 772,700 916,541 1,091,323 545,433 Other 4,685,870 5,301,519 5,483,839 5,540,221 5,864,244 3,600,489 Rentals 18,105,380 19,690,599 20,702,089 21,551,335 25,463,366 14,078,620 Restaurant/Bar 20,450,972 22,051,165 20,707,683 22,302,348 29,081,057 14,716,161 Retail Sales* 81,554,645 78,916,500 89,874,691 104,355,209 118,479,372 61,415,091 Retail Sales >$5,000 7,888,299 9,016,095 9,728,090 11,687,464 14,498,344 7,405,574 Telecom/Cable TV 3,485,608 3,031,501 3,019,581 2,437,948 2,118,910 959,591 Utilities 8,994,685 9,000,071 8,583,441 9,111,433 9,422,143 6,032,490 TOTAL 161,412,219 163,635,591 179,293,413 200,097,252 243,298,330 129,057,424 *One-Time Revenues Follow Up Items – February 14, 2023 7 Breakdown the following in City Sales Tax: City Sales Tax FY18 FY19 FY20 FY21 FY22 FY23 (6 Months) Residential Rental $6,805,499 $7,474,802 $8,172,710 $9,099,906 $10,749,982 $6,102,348 Commercial Rental $8,634,817 $9,329,744 $9,473,967 $9,435,470 $10,813,212 $5,876,529 Food for Home Consumption $14,483,330 $14,824,769 $16,395,389 $17,183,403 $17,382,756 $9,806,090 Wayfair (Retail Sales) N/A N/A N/A $6,419,320 $8,087,819 $4,405,629 Follow Up Items – February 14, 2023 8 Retail Sales over $5,000 • 28 of 91 Cities/Towns have the same or similar Tax Code • The Top 24 Taxpayers accounted for 96% of the taxes collected in this category Auto Dealers $13,567,829 Other $ 1,608,295 Total $15,176,124 Follow Up Items – February 14, 2023 9 Sales Tax Rates of Peer Cities City Retail Rate Avondale 2.50 Buckeye 3.00 Chandler 1.50 Gilbert 1.50 Glendale 2.90 Goodyear 2.50 Mesa 2.00 Peoria 1.80 Phoenix 2.30 Scottsdale 1.75 Surprise 2.20 Follow Up Items – February 14, 2023 10 Is the City able to recoup Street Scalloping costs from developers when development goes into an improved area? Yes, we do have this ability. Streets has not done this in the past but is working with the City Attorney’s Office to perform an analysis of viability of implementing this process. Follow Up Items – February 14, 2023 11 ARPA Strategy Category Budget Actual Remaining Public Health $14,768,300 $1,877,362 $12,890,938 Negative Economic Impacts $27,011,666 $4,485,590 $22,526,076 Public Health - Negative Economic Impact $11,583,444 $6,833,250 $4,750,194 Infrastructure $5,778,200 $0 $5,778,200 Administrative $375,000 $0 $375,000 TOTAL $59,516,610 $13,196,202 $46,320,408 Follow Up Items – February 14, 2023 12 ARPA Strategy - Actuals Category Project Actual Public Health Vaccination Clinics and Incentives, Additional Custodial Services, Continuity of Operations Projects $1,877,362 Negative Economic Impacts CBR and Arena (FY22), Parks Projects (Playground Equipment Replacement) $4,485,590 Public Health - Negative Economic Impact Retention Pay, COVID Leave, Temp Pay for Recreation Staff, Referral/Hiring Bonuses $6,833,250 Infrastructure $0 Administrative $0 TOTAL $13,196,202 Follow Up Items – February 14, 2023 13 ARPA Strategy – Remaining Budget Category Project Actual Public Health COVID Medical Claims, Building Improvements, IT Projects, and Library Resources $12,890,938 Negative Economic Impacts Parks, Special Event and Library Programming, Community Centers, Parks Improvements, including Playground and Lighting Improvements, Splash Pad Place Holders, and Heroes Regional Park Ballfields $22,526,076 Public Health - Negative Economic Impact Retention Pay, COVID Leave, Temp Pay for Recreation Staff, and Referral/Hiring Bonuses $4,750,194 Infrastructure Parks Irrigation Projects, Community Center Improvements, and Storm Water Projects $5,778,200 Administrative Senior Account, Grant Management $375,000 TOTAL $46,320,408 Elements of a Capital Improvement Plan 14 • Assets valued over $50,000 with a useful life of 5+ years • Land, buildings, streets & improvements, plants, large equipment • Ten-Year Plan (only FY23-24 is adopted as part of the FY23-24 budget) Financial Policy: A. Improve existing assets B. Replace existing assets as needed C. Construct new assets CIP Process 15 Staff Develops 5-year Financial Forecasts Departments work with Engineering on Project Scope and Timelines Projects are Submitted to Budget and Finance Budget and Finance Evaluates Funding Sources for Projects Draft CIP Presented to Council Council Adopts 10-Year CIP (Year 1 Appropriated) CIP Funding Sources 16 • Development Impact Fees • One-time charges to developers for new development • New or expanded infrastructure • General Obligation Bonds • Debt issuance must be authorized by Voters • Streets, Public Safety, Parks, Government Facilities, Open Space/Trails, Libraries, and Flood Control • Debt service paid by Secondary Property Tax • Grants • Federal or state grant funding • Often require a match contribution to the project • Pay-As-You-Go • Cash funded projects CIP Funding Sources 17 • Special Revenue Funds • Transportation Sales Tax • Half cent sales tax • Improve service for all modes of transportation • Highway User Revenue Funds • Restricted Special Revenue Fund • Right of Way acquisition, construction, reconstruction, maintenance, and repair • Enterprise Funds • Water/Sewer o Funding can come from G. O. Bonds, revenue bonds, revenue obligations or cash financing o Debt service paid from future water/sewer fee revenue • Landfill – paid by Landfill user fees • Solid Waste – paid by Solid Waste user fees CIP Funding Sources 18 Pay-As-You-Go Funds • 1080 – General Government Capital Projects (General Fund) • 2110 – Arts Commission General Obligation Bonds • 4010 – Streets Construction • 4040 – Public Safety Construction • 4050 – Parks Construction • 4060 – Government Facilities • 4080 – Cultural Facility • 4090 – Open Space/Trail Construction • 4100 – Library Construction • 4110 – Flood Control Construction CIP Funding Sources 19 Development Impact Fees (DIF) • 4173 – 2019 DIF – Fire • 4191 – 2012 DIF – Police Facilities • 4223 – 2014 DIF – Police • 4284 – 2019 DIF – Libraries • 4325 – 2014 DIF – Parks and Rec • 4383 – 2019 DIF – Parks & Rec • 4410 – 2014 DIF – Streets Zone 1 East • 4420 – 2014 DIF – Streets Zone 2 West • 4431 – 2019 DIF – Streets East • 4434 – 2023 DIF – Streets West • 6065 – 2014 DIF – Water • 6095 – 2014 DIF – Sewer CIP Funding Sources 20 HURF Operating (Pavement Management) – 2050 HURF Streets Construction – 4020 Transportation Sales Tax Operating (Pavement Management) – 2070 Transportation Sales Tax – 4030 Enterprise User Fees • 6020 – Water • 6030 – Sewer • 6110 – Landfill • 6120 – Solid Waste Grants • 2060 – Transportation Grants • 2160 – Other Grants • 2190 – Airport Capital Grants FY24-33 Draft CIP Report 21 • Change document – overall financial change in project from FY23 Adopted CIP to FY24 Draft CIP • CIP Report includes Estimated FY23 Carryover • Estimates will be updated as part of the carryover process in March/April • Final carryover will be presented as part of the Final Budget Workshop on April 18, 2023 FY24-33 DRAFT CIP By Project Type 22 Streets $450.8M Water $260.7M Wastewater $193.5M Facility Maintenance $188.5M Public Safety $142.9M Parks $129.1M Solid Waste $43.0M Landfill $39.0M Drainage $34.6M Airport $33.4M Library $30.6M Transit $11.7M Parking Lots $2.4M Arts $1.2M Total FY24-33 CIP $1.6B FY24-33 DRAFT CIP by Funding Source 23 Enterprise Funds $517.8M Bond Funds $371.9M Special Revenue Funds $299.9M Pay-As-You-Go $180.5M Grants $98.3M Development Impact Fees $93.0M Total FY24-33 CIP $1.6B FY23-24 DRAFT Capital Improvement Plan 24 Streets $86.8M Facility Maintenance $72.6M Water $44.7M Wastewater $37.9M Parks $37.7M Public Safety $24.4M Drainage $11.1M Landfill $10.5M Airport $9.5M Transit $4.5 Library $4.3M Solid Waste $3.5M Arts $1.2M Parking Lots $0.6M Total FY23-24 CIP $349.3M 25 FY24-33 Airport CIP Overview • Funded by Airport Grant Funds (84%) and Transportation Sales Tax (16%) • Projects include: • South Apron Reconstruction • Southwest Apron Expansion • Runway Rehabilitation • Air Traffic Control Tower Study • Airport Master Plan • Airport Security Fencing FY24-33 Airport Projects 26 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPAP19075 AIRPORT EA FOR CHANNELIZATION 143,295 143,295 CIPAP19076 SOUTH APRON PHASE 1 PAVEMENT RECONS 2,973,475 2,973,475 CIPAP20001 SOUTH APRON PHASE 2 REHABILITATION 2,060,276 2,070,000 4,130,276 CIPAP20002 RUNWAY REHABILITATION 716,475 7,164,750 7,881,225 CIPAP20003 WEATHER REPORTING EQUIPMENT 2,408 2,408 CIPAP20004 AIRPORT PLANNING STUDY 334,355 334,355 CIPAP20018 TAXIWAY PAVEMENT REHAB & PRESERVE 108,898 108,898 CIPAP21005 AIRPORT BUILDING CONSTRUCTION STUDY 429,885 429,885 CIPAP21007 AIRPORT MASTER PLAN STUDY 525,415 525,415 CIPAP21009 AIRPORT SECURITY FENCING 900,000 900,000 CIPAP21010 SOUTHWEST APRON DESIGN 450,000 450,000 FY24-33 Airport Projects 27 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPAP21012 AIRSIDE PAVEMENT MAINTENANCE 234,145 200,359 210,376 220,895 231,940 243,537 1,412,979 2,754,231 CIPAP22001 EAST SIDE DEVELOPMENT 190,000 95,000 285,000 CIPAP22002 AIRPORT DESIGN STANDARDS 48,777 10,000 58,777 CIPAP22003 AIRPORT AUTO PARKING LOTS 93,473 93,473 CIPAP23046 FACILITIES AESTHETIC UPGRADE STUDY 249,120 249,120 CIPAP23071 AIRPORT FIBER PROJECT 33,194 33,194 CIPAP24006 DESIGN FOR CHANNELIZATION 477,650 477,650 CIPAP24007 LAND ACQUISITION FOR CHANNELIZATION 900,000 900,000 CIPAP24008 PLANNING STUDY FOR CHANNELIZATION 334,355 334,355 CIPAP24009 SOUTH APRON RECONSTRUCT PHASE 3 2,070,000 2,070,000 CIPAP24010 SOUTHWEST APRON EXPANSION PHASE 1 2,070,000 2,070,000 FY24-33 Airport Projects 28 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPAP24011 SOUTHWEST APRON EXPANSION PHASE 2 2,070,000 2,070,000 CIPAP24012 SOUTHWEST APRON EXPANSION PHASE 3 2,070,000 2,070,000 CIPAP65078 AIRPORT MATCHING FUNDS 112,800 334,960 165,240 168,545 171,917 175,232 930,139 2,058,833 TOTAL 6,106,566 3,426,794 11,485,781 2,793,795 3,047,037 4,200,773 2,343,118 33,403,864 FY24-33 Airport by Funding Source 29 FUND FUND NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 GENERAL FUND CAPITAL 33,194 33,194 2190 AIRPORT CAPITAL GRANTS 5,335,057 2,881,475 11,110,165 2,404,355 2,643,180 3,782,005 22,821,180 4030 TRANSPORTATION SALES TAX 738,315 545,319 375,616 389,440 403,857 418,768 2,343,118 4,476,118 TOTAL 6,106,566 3,426,794 11,485,781 2,793,795 3,047,037 4,200,773 2,343,118 33,403,864 30 Airport ENV ASMT for Channelization Project Number: CIPAP19075 Description: This is a planned airport grant project. No grant has been issued yet. The project is to conduct an environmental assessment for the channelization and improvements of New River around the Runway Protection Zone. The estimated grant share is $143,295 and the local share is $6,705. Justification: The ultimate project will create re-routed riverbank that will allow for the perimeter road and fence to be relocated to meet Federal Aviation Administration (FAA) Runway Protection Zone and safety standards and enables Engineered Material Arresting System (EMA) and future runway configuration. This project is part of the five-year Arizona Department of Transportation (ADOT) Airport Capital Improvement Program (CIP). FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $143,295 $143,295 31 South Apron Phase 1 Pavement Reconstruction Project Number: CIPAP19076 Description: Full reconstruction of South Apron pavement totaling approximately 38,000 square yards. Justification: Grant funding is to be leveraged for this project. In addition to FAA, this project is required under ADOT Grant Assurances and Airport Design Standards. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $2,973,475 $2,973,475 32 South Apron Reconstruct Phase 4 Project Number: CIPAP20001 Description: This is a planned airport grant project. No grant has been issued yet. This project is Phase 4 to rehabilitate the south apron pavement adjacent to southern hangars and taxi lane approximately 36,000 SY (7.4 Acres). The estimated grant share is $2M and the local share is $230,000. Justification: The relocation of the apron intersection is to comply with FAA design standards. In addition to FAA, this project is required under ADOT Grant Assurances and Airport Design Standards. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $2,060,276 $2,070,000 $4,130,276 33 Runway Rehabilitation Project Number: CIPAP20002 Description: This is a planned airport grant project. No grant has been issued yet. Design and construction to rehabilitate runway 01/19. Anticipated mill and overlay, approximately 81,000 SY (16.7 Acres), and replace all runway and taxiway edge lights, airfield signs, Navigational Aids, and supporting underground electrical infrastructure. The estimated grant share is $7.8M and the local share is $368,775. Justification: The Airport Pavement Maintenance Management Program indicates major rehabilitation is needed on the existing runway. This project is required under FAA and ADOT Grant Assurances and Airport Design Standards. Grant funding is to be leveraged for this project. This project is part of the five- year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $716,475 $7,164,750 $7,881,225 34 Weather Reporting Equipment Project Number: CIPAP20003 Description: Project to replace existing surface observation equipment with Automated Weather Observing System to include wind information sensors at runway ends and improve the wind cones on the airport by relocating and raising existing wind cones. Justification: Outside funding is to be leveraged for this project. Project required under FAA and ADOT Grant Assurances and Airport Design Standards. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $2,408 $2,408 35 Airport Planning Study Part 150 Project Number: CIPAP20004 Description: This is a planned airport grant project. No grant has been issued yet. Complete an update of the Part 150 study that was completed in 1994. Updates are needed to coincide with recent master planning, forecasts, and ALP update. FAA/ADOT Grants of $334,355 and expected local share $15,645. This project is part of the five-year ADOT Airport CIP. Justification: Updates need to coincide with master planning, forecasts, and Airport Layout Plan updates. No operational or maintenance costs are associated with this project. Grant funding will be leveraged. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $334,355 $334,355 36 Taxiway Pavement Rehab & Preserve Project Number: CIPAP20018 Description: Realign/reconstruct Taxiways A4 and A6 (approximately 5,500 SY) and construct stabilized shoulders along the taxiways. Justification: Realign/reconstruct Taxiways A4 and A6 to meet FAA geometry standards and eliminate Hot Spots at Taxiway A/Apron intersection. Construct stabilized shoulders along the taxiways to reduce the potential for FOD and erosion. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $108,898 $108,898 37 Airport Building Construction Study Project Number: CIPAP21005 Description: This is a planned airport grant project. No grant has been issued yet. The existing Air Traffic Control Tower (ATCT) site and facilities are becoming old and require updating and relocating. The airport Master Plan calls for a new ATCT and this will be the preliminary planning and environmental study to begin the process. The expected grant is $429,885 and expected local share estimate is $20,115. Justification: The Airport Master Plan calls for a new Airport Traffic Control Tower and this will be the preliminary planning and environmental study to begin the process. The project is required under FAA and ADOT grant Assurances and Airport Design Standards. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $429,885 $429,885 38 Airport Master Plan Study Project Number: CIPAP21007 Description: This is a planned airport grant project. No grant has been issued yet. This project is to update the Airport Master Plan. The expected FAA/ADOT grant is $525,415 and expected local share estimate $24,585. Justification: The current Airport Master Plan was completed in 2007 and the Airport Layout Plan update was completed in 2017. This update will guide and enable east side development according to capacity needs. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $525,415 $525,415 39 Airport Security Fencing Project Number: CIPAP21009 Description: This is a planned airport grant project. No grant has been issued yet. Airfield gate improvement and access and CCTV control system upgrade. ADOT Grant of $900K and expected local share estimate $100K. Justification: This project is identified in the Airport Master Plan and would improve safety. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $900,000 $900,000 40 Southwest Apron Expansion Design Project Number: CIPAP21010 Description: This is a planned airport grant project. No grant has been issued yet. This project is to design a new southwest apron, taxi lane and supporting infrastructure, approximately 59,000 SY (12 Acres). ADOT Grant $450K and expected total local share $50K. Justification: Design of a new public apron, taxi lane, and infrastructure to accommodate expansion of aircraft storage to meet capacity needs. This project is required under FAA and ADOT Grant Assurances and Airport Design Standards. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $450,000 $450,000 41 Airside Pavement Maintenance Project Number: CIPAP21012 Description: Ongoing airside pavement maintenance. Justification: This project is consistent with the Airport’s Pavement Maintenance Management Plan. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030 - TRANSPORTATION CAPITAL $234,145 $200,359 $210,376 $220,895 $231,940 $243,537 $1,412,979 $2,754,231 42 East Side Development Project Number: CIPAP22001 Description: Ongoing study to examine the development potential of approximately 100 acres of land on the east side of Runway 1-19. This study is in progress and this request is to complete the study. The expected grant share is $95,000 and the local share is $5,000. Justification: The purpose of the study is to identify a specific recommended development plan for the east side of the airport. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANTS $190,000 $95,000 $285,000 43 Airport Design Standards Project Number: CIPAP22002 Description: Ongoing Project. This request it is to complete the project due to cost increase. The purpose of this project is to develop design standards for buildings on the Glendale Municipal Airport. Justification: The Airport does not have design standards. The result is facilities that are not aesthetically pleasing and clash with the vision for the area. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030 - TRANSPORTATION CAPITAL $48,777 $10,000 $58,777 44 Airport Auto Parking Lots Project Number: CIPAP22003 Description: Rehabilitate the vehicle parking lots near the Terminal and FBO area. Approximately 10,000 SY. Justification: The parking lot surfaces are severely deteriorated and are a safety issue for vehicles and pedestrians. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030 - TRANSPORTATION CAPITAL $93,473 $93,473 45 Facilities Aesthetic Upgrade Study Project Number: CIPAP23046 Description: This study will address infrastructure at the airport, including fencing, signage, landscaping, roadway improvements, the Terminal Building, and the FBO building. Improvements identified will be based on the Airport Design Standards under development now. Justification: This project is part of the Airport Strategic Plan and will identify improvements needed to City-owned facilities including the interior spaces. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030 - TRANSPORTATION CAPITAL 249,120 249,120 46 Airport Fiber Project Project Number: CIPAP23071 Description: This project is to provide fiber from the West Area Water Treatment Facility (WAWRF) to the Airport along security camera access. Justification: Bring fiber redundancy to the Airport along with access control and added security with cameras. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 - GENERAL FUND CIP $33,194 $33,194 47 Design For Channelization Project Number: CIPAP24006 Description: This is a planned airport grant project. No grant has been issued yet. This project is to complete the design for the channelization and improvements of New River around the Runway Protection Zone. The estimated grant share is $477,650 and the local share is $22,350. Justification: The ultimate project will create re-routed riverbank that will allow for the perimeter road and fence to be relocated to meet FAA RPZ and safety standards and enables EMAS and future runway configuration. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 – AIRPORT CAPITAL GRANT $477,650 $477,650 48 Land Acquisition For Channelization Project Number: CIPAP24007 Description: This is a planned airport grant project. No grant has been issued yet. This project is to acquire land for the channelization and improvements of New River around the Runway Protection Zone. The estimated grant share is $900,000 and the local share is $100,000. Justification: The ultimate project will create re-routed riverbank that will allow for the perimeter road and fence to be relocated to meet FAA RPZ and safety standards and enables EMAS and future runway configuration. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANT $900,000 $900,000 49 Planning Study For Channelization Project Number: CIPAP24008 Description: This is a planned airport grant project. No grant has been issued yet. The project is to conduct a focused planning study in advance of the Environmental Assessment and Wildlife Hazard Management Plan for the channelization and improvements of New River around the Runway Protection Zone. The estimated FAA/ADOT grant share is $334,355 and the local share is $15,645. Justification: The ultimate project will create re-routed riverbank that will allow for the perimeter road and fence to be relocated to meet FAA RPZ and safety standards and enables EMAS and future runway configuration. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANT $334,355 $334,355 50 South Apron Reconstruct Phase 3 Project Number: CIPAP24009 Description: This is a planned airport grant project. No grant has been issued yet. This project is to rehabilitate the south apron pavement adjacent to southern hangars and taxi lanes approximately 36,000 SY (7 Acres). The grant share is estimated to be $2 millions and the local share $230,000 for a total project cost of $2.3 million. Justification: Grant funding is to be leveraged for this project. In addition to FAA, this project is required under ADOT Grant Assurances and Airport Design Standards. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANT $2,070,000 $2,070,000 51 Southwest Apron Expansion Phase 1 Project Number: CIPAP24010 Description: This is a planned airport grant project. No grant has been issued yet. This project is phase 1 to construct a new southwest apron, taxi lane and supporting infrastructure, approximately 20,000 SY (4 Acres). The estimated ADOT grant share is $2 millions and the local share is $230,000. Justification: Construction of a new public apron, taxi lane, and infrastructure to accommodate expansion of aircraft storage to meet capacity needs. This project is required under FAA and ADOT Grant Assurances and Airport Design Standards. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANT $2,070,000 $2,070,000 52 Southwest Apron Expansion Phase 2 Project Number: CIPAP24011 Description: This is a planned airport grant project. No grant has been issued yet. This project is phase 2 to construct a new southwest apron, taxi lane and supporting infrastructure, approximately 20,000 SY (4 Acres). The estimated ADOT grant share is $2 millions and the local share is $230,000. Justification: Construction of a new public apron, taxi lane, and infrastructure to accommodate expansion of aircraft storage to meet capacity needs. This project is required under FAA and ADOT Grant Assurances and Airport Design Standards. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANT $2,070,000 $2,070,000 53 Southwest Apron Expansion Phase 3 Project Number: CIPAP24012 Description: This is a planned airport grant project. No grant has been issued yet. This project is phase 3 to construct a new southwest apron, taxi lane and supporting infrastructure, approximately 20,000 SY (4 Acres). The estimated ADOT grant share is $2 millions and the local share is $230,000. Justification: Construction of a new public apron, taxi lane, and infrastructure to accommodate expansion of aircraft storage to meet capacity needs. This project is required under FAA and ADOT Grant Assurances and Airport Design Standards. This project is part of the five-year ADOT Airport CIP. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2190 - AIRPORT CAPITAL GRANT $2,070,000 $2,070,000 54 Airport Matching Funds Project Number: CIPAP65078 Description: This request is to provide matching funds for Glendale Airport projects as identified in the Airport Capital Improvement Program (Fund 2190). Funding covers the local match for all airport capital costs. Justification: This request allows for projects identified in the Airport Capital Improvement Program to be completed with local match funding and leverage Federal and State funds. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030 - TRANSPORTATION CAPITAL $112,800 $334,960 $165,240 $168,545 $171,917 $175,232 $930,139 $2,058,833 55 FY24-33 Arts CIP Overview • Funded by Arts Fund (100%) – 1% of Construction Completed in Current Fiscal Year on Eligible Projects • Projects include: • Municipal Arts Program • Arts Master Plan FY24-33 Arts Projects 56 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPAT20035 MUNICIPAL ARTS PROGRAM $1,065,125 $1,065,125 CIPAT23001 ARTS MASTER PLAN $100,000 $100,000 TOTAL $1,165,125 $1,165,125 FY24-33 Arts by Funding Source 57 FUND FUND NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2110 ART COMMISSION FUND 1,165,125 1,165,125 TOTAL 1,165,125 1,165,125 58 Municipal Arts Program Project Number: CIPAT20035 Description: City Council Ordinance No. 1226 created a Municipal Art Fund which provides for the purchase of works of art for public places. This consists of commissioned, non-commissioned and the performing arts, all reviewed and recommended by the Glendale Arts Commission (via the Annual Arts Plan). These funds are used to implement the Annual Arts Plan and maintain and restore the City's art portfolio (when necessary) Justification: By City Council Ordinance No. 1226, a Municipal Art Fund is created which provides for the purchase of works of art for public places. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2110 - ART COMMISSION FUND $1,065,125 $1,065,125 59 Arts Master Plan Project Number: CIPAT23001 Description: Project is to develop an arts & culture master plan for Glendale through a comprehensive consultation and engagement process. The city will seek the services of an expert consultant/consulting firm through a request for qualifications (RFQ) process. Justification: To align with the City of Glendale's Balanced Scorecard objective of "Improve Community Experience," the goal of the master plan is to define a vision and a set of strategic directions and actions to help guide the development of arts and culture resources and activities in Glendale for the next 10 years. The plan will also provide a guide on how best to connect these resources to advance the city's overarching social and economic goals. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2110 - ART COMMISSION FUND $100,000 $100,000 60 FY24-33 Drainage CIP Overview • Funded by Flood Control G. O. Bonds (63%), Grants (29%) and General Fund (8%) • Focus on Designing and Constructing Flood Control Drainage Improvements – Large project broken into stand alone packages to continue progress • Work in coordination with internal and external partners – Maricopa County Flood Control District (MCFlood) – Maximizing matching funds – Arterial Reconstruction Program (Transportation) FY24-33 Drainage Projects 61 Project # Project Title EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPDR19040 CAMELBACK ROAD, 51ST TO 58TH $3,474,000 $3,474,000 CIPDR19078 83RD AVE, BETHANY HM TO CAMELBACK $3,443,000 $3,443,000 CIPDR19079 59TH AVE & T-BIRD RD STORM DRAIN $2,179,000 $2,179,000 CIPDR21019 DRAINAGE IMP. GLENN DR. 59TH-52ND $732,000 $3,202,000 $3,934,000 CIPDR21034 BETHANY HOME SD 43RD to 51ST AVE $3,111,842 $7,422,750 $7,279,750 $1,024,000 $18,838,342 CIPDR79004 LOCAL DRAINAGE PROBLEMS $124,210 $482,000 $241,000 $241,000 $241,000 $241,000 $1,200,000 $2,770,210 TOTAL $3,236,052 $7,904,750 $8,252,750 $7,941,000 $241,000 $241,000 $6,822,000 $34,638,552 FY24-33 Drainage by Funding Source 62 Funding Source EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $95,964 $482,000 $241,000 $241,000 $241,000 $241,000 $1,200,000 $2,741,964 2160 – OTHER GRANTS $808,612 $3,625,000 $3,840,565 $1,810,000 $10,084,177 4110 – FLOOD CONTROL G. O. BONDS $2,331,477 $3,797,750 $4,171,185 $5,890,000 $5,622,000 $21,812,412 TOTAL $3,236,052 $7,904,750 $8,252,750 $7,941,000 $241,000 $241,000 $6,822,000 $34,638,552 63 Camelback Road Storm Drain 51st to 58th Avenue Project Number: CIPDR19040 Description: Installation of storm drain in Camelback Road from 51st to 58th Avenues. Project has been moved from FY25 to FY26. Justification: This project is identified in the Stormwater Management Plan (SMP). FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4110 – FLOOD CONTROL G. O. BONDS $3,474,000 $3,474,000 64 83rd Ave Storm Drain Bethany Home to Camelback Road Project Number: CIPDR19078 Description: Installation of storm drain in 83rd Avenue from Bethany Home Road to Camelback Road. This project is currently programmed to begin design in FY28. Justification: This project is identified in the Stormwater Management Plan (SMP) completed and presented to the city and Flood Control District in July 2011. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4110 – FLOOD CONTROL G. O. BONDS $3,443,000 $3,443,000 65 59th Ave & Thunderbird Road Storm Drain Project Number: CIPDR19079 Description: Project will construct a storm drain in 59th Avenue between the Thunderbird Road intersection and the Arizona Canal Drainage Channel. It is currently programmed to begin design in FY28. Justification: Project is identified in the Stormwater Management Plan (SMP) presented to the city and Flood Control District of Maricopa County in July 2011. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4110 – FLOOD CONTROL G. O. BONDS $2,179,000 $2,179,000 66 Drainage Improvements on Glenn Drive 59th Ave to 52nd Drive Project Number: CIPDR21019 Description: This project will install storm drainage in Glenn Drive from 59th Avenue to 52nd Avenue, to correct flooding in Glenn Drive, nearby alleys, and in Murphy Park. Justification: It is anticipated that project costs will be split between the City and the Maricopa County Flood Control District. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2160 – OTHER GRANTS $286,000 $1,310,000 $1,596,000 4110 – FLOOD CONTROL G. O. BONDS $446,000 $1,892,000 $2,338,000 TOTAL $732,000 $3,202,000 $3,934,000 67 Bethany Home Storm Drain 43rd Ave to 51st Ave Project Number: CIPDR21034 Description: Design and construction of storm drainpipe, inlets, catch basins and other appurtenances in a ½ square mile area centered on Bethany Home Road between 43rd Ave. and 51st Ave. Design began in FY21. Justification: Project is identified in the Storm Water Master plan adopted by the city in 2011. Maricopa County Flood Control District has budgeted to contribute $4.5 million toward completion of the project. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2160 – OTHER GRANTS $780,365 $3,625,000 $3,554,565 $500,000 $8,459,930 4110 – FLOOD CONTROL G. O. BONDS $2,331,477 $3,797,750 3,725,185 $524,000 $10,378,412 TOTAL $3,111,842 $7,422,750 $7,279,750 $1,024,000 $18,838,342 68 Local Drainage Problems Project Number: CIPDR79004 Description: Construct localized storm drainage improvements to mitigate drainage and/or flooding issues. Justification: Ongoing program addressing drainage issues in older neighborhoods and extends existing storm drain systems. The city will request grant contributions from Maricopa County Flood Control District. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $95,964 $481,999 $241,000 $241,000 $241,000 $241,000 $1,200,000 $2,741,963 2160 – OTHER GRANTS $28,247 $28,247 TOTAL $124,211 $481,999 $241,000 $241,000 $241,000 $241,000 $1,200,000 $2,770,210 69 FY24-33 Facility Maintenance CIP Overview • Primarily Funded with General Fund (71%), Government Facility G. O. Bonds (11%), Cultural Facility G. O. Bonds (5%), ARPA Capital Projects (5%) • Focus on: – Improving existing assets through programmatic replacements • Follow industry standard replacement cycles – Replacing existing assets as needed – Downtown Campus Reinvestment FY24-33 Facility Maintenance Projects 70 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPFC19016 GLENDALE OPS CAMPUS FIELD STAFF BLD $2,297,236 $6,500,000 $3,415,157 $12,212,393 CIPFC19037 UNDERGROUND STORAGE TANK REPLACEMENT $665,000 $368,235 $1,033,235 CIPFC19038 CITY HALL BUILDING REMODEL $7,474,610 $27,280,675 $27,561,350 $62,316,635 CIPFC19061 ELECTRICAL SYSTEM RENEWAL $289,120 $220,000 $70,000 $70,000 $70,000 $70,000 $350,000 $1,139,120 CIPFC19062 ELEVATOR SYSTEM RENEWAL $36,663 $65,000 $65,000 $65,000 $65,000 $65,000 $325,000 $686,663 CIPFC19063 FIRE PROTECTION RENEWAL $240,000 $240,000 $200,000 $200,000 $200,000 $1,000,000 $2,080,000 CIPFC19064 SECURITY CAMERA IMPROVEMENTS $739,989 $1,230,763 $1,440,778 $3,411,530 CIPFC19065 PLUMBING SYSTEM RENEWAL $180,000 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 $1,180,000 CIPFC19068 ROOFING SYSTEM RENEWAL $186,651 $770,000 $797,500 $770,000 $310,000 $310,000 $1,550,000 $4,694,151 FY24-33 Facility Maintenance Projects 71 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPFC19071 HVAC REPAIR & REPLACEMENTS $710,000 $600,000 $475,000 $290,000 $100,000 $500,000 $2,500,000 $5,175,000 CIPFC21037 CITY HALL 3RD FLOOR HVAC UNIT $24,529 $24,529 CIPFC21048 CITY HALL 2ND FLOOR HVAC UNIT $18,875 $18,875 CIPFC22084 ROOF REPAIR & REPLACEMENTS $379,323 $379,323 CIPFC22086 CITY HALL PARKING GARAGE $1,152,157 $750,000 $838,650 $2,740,807 CIPFC23028 FLEET SHOP EQUIPMENT REPLACEMENT $37,549 $75,000 $112,549 CIPFC23033 ADULT CENTER EAST RENOVATION $167,509 $167,509 CIPFC23034 AIRPORT MATERIALS LAB RENOVATION $25,768 $25,768 CIPFC23035 CIVIC CENTER ANNEX RENOVATION $419,788 $419,788 FY24-33 Facility Maintenance Projects 72 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPFC23036 CIVIC CENTER BEAD MUSEUM RENOVATION $979,287 $979,287 CIPFC23037 GRPSTC SECOND FLOOR RENOVATION $67,078 $67,078 CIPFC23038 MEDIA CENTER RENOVATION $383,556 $383,556 CIPFC23039 SINE BLDG 2ND FLOOR EAST RENOVATION $111,360 $111,360 CIPFC23040 SINE BLDG 2ND FLOOR WEST RENOVATION $50,461 $50,461 CIPFC23041 GLENDALE OPS CAMPUS RENOVATION $172,416 $1,736,933 $3,119,651 $5,029,000 CIPFC23043 COUNCIL CHAMBERS $626,452 $750,000 $2,350,000 $3,726,452 CIPFC23070 EXTERIOR BUILDING ENHANCEMENTS $146,067 $800,000 $1,300,000 $2,246,067 CIPFC24044 CAR WASH REPLACEMENT $1,760,000 $1,760,000 FY24-33 Facility Maintenance Projects 73 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPFC24045 SPRING CITY DEMOLITION $2,000,000 $2,000,000 CIPFC24046 ADA PROGRAM $400,000 $400,000 $400,000 $400,000 $400,000 $2,000,000 $4,000,000 CIPFC24047 INTERIOR REFRESH PROGRAM $750,000 $750,000 $750,000 $750,000 $750,000 $3,750,000 $7,500,000 CIPFC24048 RETRO COMMISSION. PROGRAM $75,000 $75,000 $75,000 $75,000 $75,000 $375,000 $750,000 CIPFC24049 CEMETERY IMPROVEMENTS $325,000 $400,000 $500,000 $250,000 $150,000 $1,625,000 CIPFC24051 PERFORMANCE BASED CONTRACTS $12,123,383 $12,123,383 CIPFC24052 PD EVIDENCE/OPS CAMPUS FIBER $545,000 $545,000 CIPFC24053 SAHUARO RANCH PARK FIBER $475,000 $475,000 CIPFC70800 BUILDING MAINT. RESERVE $1,072,149 $1,800,000 $1,800,000 $1,800,000 $1,800,000 $1,800,000 $9,000,000 $19,072,149 CIPFC70801 CAMELBACK RANCH MAINT. $919,830 $1,479,599 $1,514,549 $1,382,849 $1,593,499 $1,382,849 $10,505,094 $18,778,269 CIPPK77516 AMPHITHEATER RENOVATIONS $504,455 $3,000,000 $6,000,000 $9,504,455 TOTAL 17,368,226 $55,182,655 $47,677,827 $10,172,501 $13,950,432 $12,337,657 $31,855,094 $188,544,392 FY24-33 Facility Maintenance by Funding Source 74 FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080-GENERAL FUND CIP $6,704,223 $38,959,242 $37,731,393 $7,702,849 $5,713,499 $5,802,849 $31,855,094 $134,469,149 4020-HURP CAPITAL PROJECTS $1,577 $3,750 $5,327 4030-TRANSPORTATION CAPITAL PROJECTS $2,606 $297,833 $333,333 $350,156 $1,817,158 $1,377,225 $4,178,311 4060-GOVERNMENT FACILITIES $3,036,059 $10,168,247 $11,972,074 $1,343,065 $2,085,574 $1,607,441 $30,212,460 4080-CULTURAL FACILITY $504,455 $3,000,000 $6,000,000 $9,504,455 4610-ARPA CAPITAL PROJECTS $7,100,069 $2,422,000 $9,522,069 6020-WATER $2,936 $299,333 $333,333 $411,052 $2,174,945 $1,684,181 $4,905,780 6030-SEWER $1,198 $2,250 $3,448 6120-SOLID WASTE $15,103 $30,000 $365,379 $2,159,256 $1,865,961 $4,435,699 TOTAL $17,368,226 $55,182,655 $47,677,827 $10,172,501 $13,950,432 $12,337,657 $31,855,094 $188,544,392 75 Glendale Ops Campus – Field Staff Building Project Number: CIPFC19016 Description: This project is for the design and construction of the field staff building located on the operations campus. The building will serve as the primary location for Water Services, Transportation, PFRSE, and Field Operations staff. Justification: Aging infrastructure, security, and operational efficiency concerns must be addressed in order to continue to provide effective service to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030 – TRANS. SALES TAX CIP $310,500 $1,495,000 $785,486 $2,590,986 4060 – GOVT. FACILITIES G. O. BONDS $1,298,236 $1,690,000 $887,941 $3,876,177 6020 – WATER FUND $364,500 $1,755,000 $922,093 $3,041,593 6120 – SOLID WASTE FUND $323,999 $1,560,000 $819,637 $2,703,636 TOTAL $2,297,235 $6,500,000 $3,415,157 $12,212,392 76 Underground Storage Tank Replacement Project Number: CIPFC19037 Description: This program is for replacement of aging below-ground double-walled vaulted fuel storage tanks located at the Operations Complex, as well as associated piping. The tanks are tested at regular intervals and are anticipated needing replacement in FY24. Justification: Fuel sites are essential for the continued operation of the City. All city departments use this fuel site, including Public Safety vehicles, Solid Waste trucks, Transit buses, Water Services vehicles etc. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4060 – GOVT. FACILITIES G. O. BONDS $665,000 $368,235 $1,033,235 77 City Hall Building Remodel Project Number: CIPFC19038 Description: This project is to reinvest in the City Hall campus by creating an updated, modernized environment. The project will include a new exterior, rebuilding the interior floor by floor, and replacement of aged infrastructure. Justification: The existing City Hall building was constructed in approximately 1984. The building no longer effectively serve the needs of the organization and the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $1,249,407 $16,408,663 $25,120,232 $42,778,302 4060 – GOVT. FACILITIES G. O. BONDS $562,025 $9,050,012 $2,441,118 $12,053,155 4610 – ARPA CAPITAL PROJECTS $5,663,178 $1,822,000 $7,485,178 TOTAL $7,474,610 $27,280,675 $27,561,350 $62,316,635 78 Electrical System Renewal Project Number: CIPFC19061 Description: This program is to reinvest in the City's existing electrical systems (including generators), for demand, capacity, and life safety issues. Priorities will be based on experience with system conditions. Justification: Programmed repair/replacement of electrical systems and components will protect public health and safety, reduce long term life cycle costs, and enable provision of service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $289,120 $220,000 $70,000 $70,000 $70,000 $70,000 $350,000 $1,139,120 79 Elevator System Renewal Project Number: CIPFC19062 Description: Program is to reinvest in the City's existing elevator systems for demand, capacity, & life safety issues. Study completed in FY 23, & internal Building assessments will identify priorities based on elevator system conditions & repair recommendations. Justification: Programmed repair/replacement of elevator systems and components will protect public health and safety, reduce long term life cycle costs, and enable provision of service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $36,663 $65,000 $65,000 $65,000 $65,000 $65,000 $325,000 $686,663 80 Fire Protection Renewal Project Number: CIPFC19063 Description: This program is to keep fire protection systems, identified as a Tier 1 Infrastructure, in good working order. Funding needed for a City-wide study, Main Public Safety Building replacement began in FY 23. Justification: Programmed repair/replacement of electrical systems and components will protect public health and safety, reduce long term life cycle costs, and enable provision of service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $240,000 $240,000 $200,000 $200,000 $200,000 $1,000,000 $2,080,000 81 Security Camera Improvements Project Number: CIPFC19064 Description: This project is to keep security camera systems, identified as a Tier 1 infrastructure, in good working order. Capital repairs are needed at multiple public safety buildings, City Hall, and buildings on the Glendale Operations Campus. Priorities are based upon building usage (Mission critical are highest tier for this component) and identified need. Justification: Programmatic repair/replacement of components of security systems will protect public health and safety, reduce long term life cycle costs, and enable provision of service delivery to the community, aligning resources with the City's strategic priorities and the Building Asset Philosophy. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $739,989 $1,230,763 $1,440,778 $3,411,530 82 Plumbing System Renewal Project Number: CIPFC19065 Description: Program addresses existing plumbing systems for current state & capacity issues. Assessments will identify priorities based on conditions, repairs recommended, and needs based on water conservation. Main Public Safety Bldg replacement began in FY23 Justification: Programmed repair/replacement of plumbing systems and components will protect public health and safety, reduce long term life cycle costs, and enable provision of service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $180,000 $100,000 $100,000 $100,000 $100,000 $500,000 $1,180,000 83 Roofing System Renewal Project Number: CIPFC19068 Description: This project is to keep roofing systems, identified as a Tier 1 infrastructure, in good working order. Capital repairs are needed in multiple locations. Priorities are based on building usage and identified need. Justification: Programmed repair/replacement of roofing systems and components will protect public health and safety, reduce long term life cycle costs, and enable provision of service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $186,651 $770,000 $797,500 $770,000 $310,000 $310,000 $1,550,000 $4,694,151 84 HVAC Repair/Replacements Project Number: CIPFC19071 Description: This project is to keep HVAC systems, identified as a Tier 1 infrastructure, in good working order. Capital repairs are needed at various locations. Priorities are based upon building usage and identified cost. Justification: Programmed maintenance of HVAC systems and components will protect public health and safety, reduce long term life cycle costs, and enable provision of service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $475,000 $290,000 $100,000 $500,000 $2,500,000 $3,865,000 4610-ARPA CAPITAL PROJ $710,000 $600,000 $1,310,000 TOTAL $710,000 $600,000 $475,000 $290,000 $100,000 $500,000 $2,500,000 $5,175,000 85 City Hall 3rd Floor HVAC Unit Project Number: CIPFC21037 Description: This project will replace the air conditioner for the third floor of City Hall Justification: The air conditioner and associated mechanical equipment had a recent coolant leak, leaving the unit operating at half of its capacity. Replacement parts are no longer available. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $24,529 $24,529 86 City Hall 2nd Floor HVAC Unit Project Number: CIPFC21048 Description: This project will replace the air conditioner for the second floor of City Hall Justification: The HVAC unit for the second floor of City Hall has exceeded it’s expected life cycle and has begun to fail. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $18,875 $18,875 87 Roof Repair / Replacements Project Number: CIPFC22084 Description: This project is to replace roof at various locations including the Glendale Operations Center Buildings A, B, F, N, O, P; Airport Maintenance Building; and Bead Museum. Justification: These roofs at mission critical locations need replacement to avoid structural damage. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4060 – GENERAL GOVT. G.O. BONDS $379,323 $379,323 88 City Hall Parking Garage Project Number: CIPFC22086 Description: This project is to complete critical structural repairs to the City Hall Parking Garage. Justification: The City Hall Parking Garage requires critical structural repairs to ensure continued safety and structural integrity. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4060 – GENERAL GOVT. G.O. BONDS $1,152,157 $750,000 $838,650 $2,740,807 89 Fleet Shop Equipment Replacement Project Number: CIPFC23028 Description: This project is to replace old and failing shop equipment used to service the city's vehicle fleet. Includes vehicle lifts, wheel aligner, plasma cutter & welder. Justification: Various pieces of equipment are in need of replacement. Having reliable shop equipment reduces downtime and outside contract maintenance costs. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080-GENERAL GOVT CAPITAL $14,129 $28,500 $42,629 4020-HURF CAPITAL PROJECTS $1,577 $3,750 $5,327 4030-TRANSPORTATION CAPITAL $2,606 $4,500 $7,106 6020-WATER $2,936 $6,000 $8,936 6030-SEWER $1,198 $2,250 $3,448 6120-SOLID WASTE $15,103 $30,000 $45,103 TOTAL $37,549 $75,000 $112,549 90 Adult Center East Renovation Project Number: CIPFC23033 Description: Buildout of 6,000 sq. ft. of raw space at the City of Glendale Adult Center 2nd Floor to accommodate the temporary relocation of employees, including office/meeting space. Justification: The City Hall Project requires the building to be vacated during the construction phase. The Adult Center 2nd Floor allows the City of Glendale to move employees into a temporary space for the duration of the City Hall construction process. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $167,509 $167,509 91 Airport Materials Lab Renovation Project Number: CIPFC23034 Description: Demolition and Renovation of 2,400 sq. ft. of space at the Airport Materials Lab to accommodate the permanent move of Engineering Inspectors from City Hall. Justification: The City Hall Project requires reconsideration of what services should be relocated. The relocation of the Building Inspectors puts them closer to the bulk of the City's growth and their work on the West Side of the City. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CAPITAL $16,815 $16,815 4610 – ARPA CAPITAL PROJECTS $8,953 $8,953 TOTAL $25,768 $25,768 92 Civic Center Annex Renovation Project Number: CIPFC23035 Description: Renovation of 2,500 sq. ft space at the Civic Center Annex to accommodate temporary installation of the One Stop Shop. This includes the front facing setup required for customer service and office space for 37 One Stop Shop employees. Justification: The City Hall Project requires the building to be vacated during the construction phase. The One Stop Shop concept integrates all City of Glendale forward facing functions under one roof, temporarily, at the Civic Center Annex. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CAPITAL $384,288 $384,288 4610 – ARPA CAPITAL PROJECTS $35,500 $35,500 TOTAL $419,788 $419,788 93 Civic Center Bead Museum Renovation Project Number: CIPFC23036 Description: Buildout of 5,000 sq. ft. of raw space at the Civic Center Campus - Bead Museum to accommodate the temporary relocation of employees. This will include office/meeting space, HVAC, walls, ceilings, and flooring. Justification: The City Hall Project requires the building to be vacated during the construction phase. The Bead Museum allows the City of Glendale to move employees into a temporary space for the duration of the City Hall construction process. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CAPITAL $211,234 $211,234 4060 – GENERAL GOVT. G. O. BONDS $277,553 $277,553 4610 – ARPA CAPITAL PROJECTS $490,500 $490,500 TOTAL $979,287 $979,287 94 GRPSTC Second Floor Renovation Project Number: CIPFC23037 Description: Demolition and Renovation of 1,650 sq. ft. of space on the GRPSTC 2nd Floor to accommodate the permanent move of Building Inspectors from City Hall Justification: The City Hall Project requires reconsideration of what services should be relocated in the City Hall Building. The relocation of Building Inspectors puts them closer to the bulk of the City's growth and their work on the West Side of the City. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CAPITAL $42,649 $42,649 4610 – ARPA CAPITAL PROJECTS $24,429 $24,429 TOTAL $67,078 $67,078 95 Media Center Renovation Project Number: CIPFC23038 Description: Renovation of 2,500 sq. ft. of space at the City of Glendale Media Center to accommodate the temporary relocation of the Executive and Elected officials (4th Floor). This renovation will include office space for 35 employees. Justification: The City Hall Project requires the building to be vacated during the construction phase. The Media Center allows the City of Glendale to move the 4th Floor functions to an executive suite office space that supports their front facing functions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CAPITAL $383,556 $383,556 96 Sine Building 2nd Floor East Renovation Project Number: CIPFC23039 Description: Completion of renovation of 4,000 sq. ft. of space at the East end of the 2nd Floor of the Sine Building to accommodate the permanent housing of the City Attorney's Department. Justification: The City Hall Project requires reconsideration of what services should be relocated. The relocation of 11 employees allows for a continuum of service with the City Attorney's Prosecutor & Code Enforcement, who will be located in Sine Building East. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CAPITAL $111,360 $111,360 97 Sine Building 2nd Floor West Renovation Project Number: CIPFC23040 Description: Renovation of 4,000 sq. ft. of space at the West end of the 2nd Floor of the Sine Building to accommodate the permanent housing of the Code Enforcement Department. This will include office space for 17 employees tied to the Code Enforcement functions. Justification: The City Hall Project requires reconsideration of what services should be relocated. The relocation of the 17 Code Enforcement Employees allows for a continuum of service with the City Attorney, who will be located in Sine Building 2nd Floor East. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CAPITAL $50,461 $50,461 98 Glendale Ops Campus Renovation Project Number: CIPFC23041 Description: This project is to renovate and demolish the existing buildings at the operations campus for adaptive re- use. Future phases from the current Master Plan such as paving, future fire resources, and carwash replacement are not included nor funded. Justification: Aging infrastructure, security, and operational efficiency concerns must be addressed in order to continue to provide effective service to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030 – TRANS. SALES TAX CAPITAL $172,416 $322,158 $591,739 $1,086,313 4060 – GENERAL GOVT. G. O. BONDS $172,416 $395,574 $719,500 $1,287,490 6020 – WATER FUND $172,416 $419,945 $762,088 $1,354,449 6120 – SOLID WASTE FUND $172,416 $599,256 $1,046,324 $1,817,996 TOTAL $172,416 $1,736,933 $3,119,651 $5,029,000 99 Council Chambers Project Number: CIPFC23043 Description: In addition to the exterior envelope upgrades to City Hall, the Council Chambers exterior will also be upgraded. Including roof replacement. Justification: The existing City Hall Campus was constructed in 1984. In order to better serve the community and organization, the City Council Chambers needs to updated to match the esthetics of the City Hall Building. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $626,452 $750,000 $2,350,000 $3,726,452 100 Exterior Building Enhancements Project Number: CIPFC23070 Description: This program is to keep exterior aesthetics in line with our current asset philosophy. Buildings included will be prioritized based on need and location Justification: Programmed maintenance of forward-facing systems and components will protect public health and safety, reduce long term life cycle costs, and enable provision of service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $146,067 $750,000 $800,000 $1,300,000 $2,246,067 101 Car Wash Replacement Project Number:CIPFC24044 Description: This project is repair and rebuild the specialized vehicle wash station on the operations campus. Justification: The existing facility is operating at about 20% of capacity and needs substantial investment. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 - GENERAL FUND CIP $1,1173,334 $1,1173,334 4030 - TRANSPORTATION CAPITAL $293,333 $293,333 6020 - WATER $293,333 $293,333 TOTAL $1,760,000 $1,760,000 102 Spring City Demolition Project Number:CIPFC24045 Description: This building was planned obsolescence in 2004 and is beyond the point of maintenance and repair. This project is to remove hazardous substance and demolish the building. Justification: This promotes overall health and safety of city employees and removes a hazard. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 - GENERAL FUND CIP $1,333,334 $1,333,334 4030 - TRANSPORTATION CAPITAL $333,333 $333,333 6020 - WATER $333,333 $333,333 TOTAL $2,000,000 $2,000,000 103 ADA Program Project Number:CIPFC24046 Description: This program is to ensure ADA compliance in buildings identified as a Tier 1 infrastructure. Capital repairs are needed at various locations. Priorities are based upon study prioritization, building usage and identified cost. Justification: Programmed repair/replacement of ADA components to ensure public access and safety and enable provision of service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $400,000 $400,000 $400,000 $400,000 $400,000 $2,000,000 $4,000,000 104 Interior Refresh Program Project Number:CIPFC24047 Description: This program ensures City of Glendale's facilities are brought to a standard allowing for efficient delivery of service and comports with buildings identified as a Tier 1 infrastructure. Priorities are based upon building usage and identified cost. Justification: Programmed repair/replacement of systems furniture, flooring, ceiling, and acoustic components to ensure public access, health and safety and enable provision of service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $750,000 $750,000 $750,000 $750,000 $750,000 $3,750,000 $7,500,000 105 Retro Commission Programming Project Number:CIPFC24048 Description: This program is for the study of existing buildings. Studies will provide insight on correcting underperformance, improving environment and comfort, and optimizing efficiency in aging facilities. Justification: This program will look at HVAC, controls, IT, security, and building management systems. It will optimize how these systems will work together. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $75,000 $75,000 $75,000 $75,000 $75,000 $375,000 $750,000 106 Cemetery Improvements Project Number:CIPFC24049 Description: Project is to address items at the Glendale Memorial Cemetery needing repair/replacement. Items identified are to demo the fountain and install a new waterless feature, refurbish the irrigation, repair/add fencing, and purchase a new Columbarium. Justification: Fountain removal will assist w/water conservation as will refurbishing the irrigation. Repairing/adding new fencing will enhance aesthetics & security of the Cemetery. A new Columbarium will allow continued revenue while offering options to our citizens. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $325,000 $400,000 $500,000 $250,000 $150,000 $1,625,000 107 Performance Based Contracts Project Number:CIPFC24051 Description: Performance contracting can be used to consolidate projects in order to leverage energy saving to pay for equipment replacement over a predetermined amount of time. This is more critical as inflation is a major topic and utility cost continue to rise Justification: Energy cost are going up by 5-13% next year. We have equipment that uses large amounts of energy that needs to be replaced. Programs like this help energy cost in these areas do down & we get new, energy efficient, reliable equipment. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $12,123,383 $12,123,383 108 PD Evidence/Ops Campus Fiber Project Number:CIPFC24052 Description: Install fiber for the Police Evidence Storage Facility and Glendale Operations Campus Justification: The current sites are void of fiber. This project will ensure that all newly constructed City facilities have access to the City’s fiber network. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $545,000 $545,000 109 Sahuaro Ranch Park Fiber Project Number:CIPFC24053 Description: Bring fiber to Sahuaro Ranch Park Justification: The current site is void of fiber. This project will ensure all newly constructed City facilities have access to the City's own fiber network. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $475,000 $475,000 110 Building Maintenance Reserve Project Number:CIPFC70800 Description: This project supports renewal and repair of major building components and systems such as HVAC, plumbing, electrical, roofing, interiors, elevators, and other building systems that have failed. Justification: Repairing buildings will align resources with the City's strategic priorities including- reducing long term life cycle costs, protecting public health and safety, and improving service delivery to the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $1,072,149 $1,800,000 $1,800,000 $1,800,000 $1,800,000 $1,800,000 $9,000,000 $19,072,149 111 Camelback Ranch Maintenance Reserve Project Number: CIPFC70801 Description: This project funds the capital repair and or replacement of contractually required components and systems such as HVAC, plumbing, electrical, roofing, interiors, elevators, and other building systems. Glendale's Camelback Ranch is a premier public facility. Justification: Programmatic replacement of capital systems and components of the complex will reduce overall lifecycle costs while aligning resources with the City's strategic priorities and the Building Asset Philosophy. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $919,830 $1,479,599 $1,514,549 $1,382,849 $1,593,499 $1,382,849 $10,505,094 $18,778,269 112 Capital Repair – Arena Project Number: CIPPK70803 Description: This project funds the capital repair and or replacement of required components and systems such as HVAC, plumbing, electrical, roofing, interiors, elevators, and other building systems. Glendale’s Desert Diamond Arena is a premier public facility. Justification: Programmatic replacement of capital systems and components of the complex will reduce overall lifecycle costs while aligning resources with the City's strategic priorities and the Building Asset Philosophy. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $531,493 $1,391,121 $500,000 $500,000 $500,000 $500,000 $2,500,000 $6,422,614 113 Amphitheater Renovations Project Number: CIPPK77516 Description: Renovations of the E Lowell Rogers Amphitheater at City Hall. Design and construction is slated for FY26. Construction includes renovation of basement of Council Chambers. O&M does not include personnel or maintenance of audio-visual equip. Justification: The Amphitheater does not adequately serve as a performance venue. Much of the equipment & systems are in poor condition & must be replaced. The public experience is poor & does not meet modern accessibility standards. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4080 – CULTURAL FACILITY G. O. BONDS $504,455 $3,000,000 $6,000,000 $9,504,455 114 FY24-33 Landfill CIP Overview • Funding Source: Enterprise – User Fee Revenues • Focus On Programed Vehicle Replacements • Follow industry standard replacement cycles • North Cell Landfill Project • North Cell Phased Construction • North Cell Liner Installation • Landfill Gas Extraction System • Stormwater Controls FY24-33 Landfill Projects 115 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPLF19019 LANDFILL COMPACTOR REPLACEMENT 100,000 110,000 850,000 900,000 3,642,000 5,602,000 CIPLF19024 BULLDOZER REPLACEMENT & REBUILDS 687,000 120,000 156,000 90,000 4,227,000 5,280,000 CIPLF19025 NORTH CELL LINER 19,894 2,803,000 2,822,894 CIPLF19091 LANDFILL SCRAPER REPLACEMENT 1,305,060 1,305,060 CIPLF20009 CLOSED LANDFILL 30,995 30,995 CIPFL21029 LANDFILL GPS SYSTEM EQUIPMENT 50,000 50,000 CIPLF21030 CLOSED LANDFILLS 898,091 300,000 104,500 109,300 115,000 119,500 445,500 2,091,891 CIPLF22005 MRF IMPROVEMENTS 555,000 500,000 1,055,000 CIPLF22006 SITE PAVING AND MARKINGS 471,600 243,400 271,400 986,400 CIPLF78503 LANDFILL CLOSURE SOUTH 514,311 640,000 1,154,311 CIPLF78505 LF NORTH CELL PHASED CONSTRUCTION 186,473 2,937,200 101,000 5,010,600 8,235,273 FY24-33 Landfill Projects 116 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPLF78506 LANDFILL 4x4 REPLACEMENT TRUCKS 430,000 430,000 CIPLF78514 SOLID WASTE INSPECTION TRUCKS 10,061 418,000 428,061 CIPLF78522 LANDFILL WATER PULL/TRUCK 60,000 211,000 1,420,000 1,691,000 CIPLF78532 AUXILIARY EQUIPMENT 537,783 570,000 400,000 40,000 1,547,783 CIPLF78534 STORMWATER CONTROLS 118,187 842,630 392,305 472,149 556,261 327,699 2,709,231 CIPLF78535 LANDFILL GAS EXTRACTION SYSTEM 607,692 533,157 525,000 685,248 635,212 550,000 3,536,309 TOTAL 3,528,486 6,941,587 4,758,205 2,843,697 2,507,473 7,065,799 11,310,960 38,956,207 FY24-33 Landfill by Funding Source 117 FUND FUND NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 LANDFILL 3,528,486 6,941,587 4,758,205 2,843,697 2,507,473 7,065,799 11,310,960 38,956,207 TOTAL 3,528,486 6,941,587 4,758,205 2,843,697 2,507,473 7,065,799 11,310,960 38,956,207 118 Landfill Compactor Replacement Project Number: CIPLF19019 Description: Project funds for rebuild or replacement of 2 landfill compactors and wheels on a 5yr, 10,000 hr schedule. Plan:FY24 -Y09 wheel resurface & tip replacement, FY25 -Y10 wheel resurface & tip replacement, FY26 -Y09 power train rebuild, FY27 -Y10 power train rebuild.. Justification: Compactors are used daily for proper waste placement & to optimize cover materials. Our compactors are outfitted with GPS systems, in order to maximize landfill compaction, improve safety, manage airspace & provide compliance. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $100,000 $110,000 $850,000 $900,000 $3,642,000 $5,602,000 119 Bulldozer Replacements and Rebuilds Project Number: CIPLF19024 Description: Project funds rebuild or replace of the 4 landfill bulldozers. Plan:FY24 -rebuild D-8, FY25-rebuild D9 under carriage and tracks, FY26-rebuild D6 & D8 under carriage and tracks, FY27-rebuild D8 under carriage and tracks, FY29-33-new D9, D6 & D8 Justification: The landfill has four (4) bulldozers that are used for a multitude of necessary landfill applications and establishing various haul roads for accessibility. Bulldozers maximize landfill operation efficiency and to meet regulatory permit requirements. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $687,000 $120,000 $156,000 $90,000 $4,227,000 $5,280,000 120 North Cell Liner Project Number: CIPLF19025 Description: Project is for design & construction of the liner for North Cell at the Landfill in accordance with our ADEQ approved permit & design plan. Justification: This liner provides a protective barrier to prevent potential groundwater contamination and is a permit requirement with the Arizona Department of Environmental Quality. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $19,894 $2,803,000 $2,822,894 121 Landfill Scraper Replacement Project Number: CIPLF19091 Description: This project provides for the rebuild and or replacement of the landfill scraper. A replacement is scheduled in FY25 based on usage and estimated life of the scraper, which is evaluated annually. Updated costs include current quotes and inflation. Justification: The scraper is an essential piece of support equipment that excavates, transports, and stockpiles soil used for covering waste disposed of at the landfill. The scraper effectively enables the City to meet the regulatory requirements of its permit. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $1,305,060 $1,305,060 122 Closed Landfill Project Number: CIPLF20009 Description: Closed landfills may need site maintenance from time to time (improvements to grading, drainage, fencing, landscaping and flare station maintenance, etc.). Part of this funding is for work at the closed landfill site located at 103rd Ave. and the Butler Dr. alignment. Funds will replace existing fencing on the south side of the site and provide drainage, grading, landscaping and access improvements.. Justification: Closed landfills may require maintenance from time to time. Improvements can include grading, drainage, fencing, landscaping, and flare station maintenance for example. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $30,995 $30,995 123 Landfill GPS System Equipment Project Number: CIPLF21029 Description: GPS systems are utilized on the landfill equipment to assist the operators in developing the landfill per engineering designs and ADEQ approved plans. The units are currently installed in two (2) compactors and the D6 dozer. Justification: The GPS equipment is critical for managing airspace efficiencies, building access roads, and operator safety. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $50,000 $50,000 124 Closed Landfills Project Number: CIPLF21030 Description: This project funds closed landfills that require ongoing maintenance including; grading, drainage, fencing, landscaping, and gas mgmt. Funding is for work at the closed landfill sites located at 103rd Ave., 99th and Olive, and Butler Drive. Justification: Closed landfills require maintenance from time to time. Improvements can include grading, drainage, fencing, landscaping, and gas management. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $898,091 $300,000 $104,500 $109,300 $115,000 $119,500 $445,500 $2,091,891 125 MRF Improvements Project Number: CIPLF22005 Description: The Materials Recovery Facility opened in 2000. The facility will undergo a slight modification to existing footprint to facilitate offsite transportation of recyclable materials. Justification: Existing facility and infrastructure need to be remodeled in order to utilize space for current recycle processing and transportation needs. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $555,000 $500,000 $1,055,000 126 Site Paving and Markings Project Number: CIPLF22006 Description: This project funds the Landfill site paving and markings to paved surfaces. FY24 - paving on the MRF haul road. FY25 - slurry is to be applied to the main entrance road along with all paved areas at the Landfill, markings will be re-applied as well. Justification: The Transportation Department recommends paved surfaces be maintained on a prescribed schedule. The entrance and roads should be repaired by performing a micro-seal approximately every 7 years. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $471,600 $243,400 $271,400 $986,400 127 Landfill Closure South Project Number: CIPLF78503 Description: Project provides for closure of the south area of the landfill (LF) as its permitted air space nears capacity. Closure of the south area will be ongoing as the north cell is developed. Justification: Req'd by landfill operating permit w/a final cover system to include: a vegetative layer/compacted soil layer/gas wells & storm water control. Annual slope stability/stormwater retention/erosion control are required to maintain regulatory compliance. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $514,311 $640,000 $1,154,311 128 Landfill North Cell Phased Construction Project Number: CIPLF78505 Description: This project is for soil excavation and stockpiling for the North Cell phased construction at the Glendale Municipal Landfill (LF) in accordance with the ADEQ permit and approved design. Justification: Activity includes stockpiling dirt as required for construction of the North Cell and operation of the South Cell, haul roads, and embankments until final closure, mandated per regulatory agency requirements for continued development of the Landfill. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $186,473 $2,937,200 $101,000 $5,010,600 $8,235,273 129 Landfill 4x4 Replacement Trucks Project Number: CIPLF78506 Description: Funding for replacement of trucks used by landfill staff to monitor ops & perform regulatory inspections; to include: FY23-(1) field truck; FY26-(5) trucks total, incl. 3 Field Sup vehicles, 1 mechanic service truck, and 1 flat bed with tommy lift. Justification: Trucks are critical to transport staff to locations throughout the LF to ensure operations and regulatory compliance is met. Conditions of the landfill require the truck fleet to be replaced at approximately seven to ten years. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $430,000 $430,000 130 Solid Waste Inspection Trucks Project Number: CIPLF78514 Description: This funding provides for replacement of trucks in the Recycling Division. Currently, there are 7 half-ton extended cab pick-up trucks with lift gates in the SW Management fleet. Truck replacement plan: FY23- (1); FY28-32-(6). Justification: Trucks enable inspectors to provide quality control by education and mandated inspections of solid waste containers in accordance with city/state/county requirements in order to have a refuse variance of collection. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $10,061 $418,000 $428,061 131 Landfill Water Pull/Truck Project Number: CIPLF78522 Description: This project funds tank refurbishing, pump rebuilds and unit replacements. FY25 - V10 refurbish tank and replace worn spray components, FY27- replacement of (1) secondary, 5,000-gallon water truck; FY31 - (1) large primary water pull truck V10. Justification: The primary water pull is a critical piece of support equipment for reducing dust and maintaining compliance with the existing air quality permit. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $60,000 $211,000 $1,420,000 $1,691,000 132 Auxiliary Equipment Project Number: CIPLF78532 Description: Funds replacement of LF aux equip including light towers, air compressors, skid steers, loaders, lube trailer & other units. FY24-vactor, trash pump, skid steer, litter control sleds; FY25 - replace MRF loader K05, FY26- one landfill forklift. Justification: The identified equipment has met or exceeded its serviceable life or is not economical to rebuild. This equipment assists in maintaining critical functions required to maintain LF operations to meet regulatory permit requirements. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $537,783 $570,000 $400,000 $40,000 $1,547,783 133 Stormwater Controls Project Number: CIPLF78534 Description: Project funds stormwater controls including berms, culvert down drains, & channels required on the LF footprint as per the approved plans and permits. FY24 design & construction of additional drainage basins to support storm water needs of north cell. Justification: Construction of stormwater controls is mandated by the landfill's regulatory permit with Arizona Department of Environmental Quality (ADEQ). FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $118,187 $842,630 $392,305 $472,149 $556,261 $327,699 $2,709,231 134 Landfill Gas Extraction System Project Number: CIPLF78535 Description: Modifications to the Gas Extraction System includes vertical wellheads, new laterals and horizontal collectors. These items are required to collect landfill gas created from placement of trash. Justification: As waste is placed and buried it is critical for the LGES to be expanded and modified. These modifications and improvements to the LGES are required to capture the methane and meet the regulatory permit requirements for the landfill. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6110 - LANDFILL FUND $607,692 $533,157 $525,000 $685,248 $635,212 $550,000 $3,536,309 135 FY24-33 Library CIP Overview • Funded by Library G. O. Bonds (99.9%) and Library DIF (<1%) • Focus on: – Improving existing facilities • Follow industry standard replacement cycles – Replacing existing assets as needed FY24-33 Library Projects 136 Project # Project Title EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPLB19045 VELMA TEAGUE LIBRARY RENOVATION $6,210,000 $6,210,000 CIPLB19046 MAIN LIBRARY RENOVATION $1,308,017 $1,075,715 $5,531,272 $5,622,996 $13,538,000 CIPLB19066 FOOTHILLS LIBRARY RENOVATION $225,000 $716,565 $3,252,372 $4,970,029 $9,163,966 CIPLB22088 YUCCA DISTRICT MEETING SPACE STUDY $13,106 $13,106 CIPLB23029 HEROES PARK LIBRARY COMMUNITY ROOM $948,649 $751,351 $1,700,000 TOTAL $30,625,072 FY24-33 Library by Funding Source 137 Funding Source EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4100-Library Construction $2,481,666 $1,827,066 $5,531,272 $6,339,561 $3,252,372 $11,180,029 $30,611,966 4284-2019-DIF Libraries $13,106 $13,106 TOTAL $2,494,772 $1,827,066 $5,531,272 $6,339,561 $3,252,372 $11,180,029 $30,625,072 138 Velma Teague Library Renovation Project Number: CIPLB19045 Description: Library renovation of electrical, plumbing, interior, exterior, HVAC, roof gutters, and improve functionality. Facility conditional assessment and study will refine the project and prioritize needs. Justification: This library needs renovation to better service the needs of the community. It is anticipated that the assessment will indicate substantial building infrastructure needs. This project will help establish libraries of the future. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4100 – LIBRARY G. O. BONDS $6,210,000 $6,210,000 139 Main Library Renovation Project Number: CIPLB19046 Description: This project is to renew all building systems, including interior renewal and functional remodeling, roofing, HVAC, ADA, and plumbing. Equipment and technology updates are also included. Justification: The library was built in 1987. This project is necessary to extend the life of the structure, to improve library services, community experience, and the lives of the people we serve. This project will help establish libraries of the future. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4100 – LIBRARY G. O. BONDS $1,308,017 $1,075,715 $5,531,272 $5,622,996 $13,538,000 140 Foothills Library Renovation Project Number: CIPLB19066 Description: Renovation and updating of Foothills Library to major building systems, modernization of the functions, technology, and equipment. Cost will be refined as assessment is conducted. Justification: The library was built in 1999. This project is necessary to extend the life of the structure, to improve library services, community experience, and the lives of the people we serve. This project will help establish libraries of the future. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4100 – LIBRARY G. O. BONDS $225,000 $716,565 $3,252,372 $4,970,029 $9,163,966 141 Yucca District Meeting Space Study Project Number: CIPLB22088 Description: Study to assess current meeting space in Yucca district, to determine if additional space is needed to meet community needs. Justification: Meeting space in Yucca district is limited. Study will determine if additional space needs to be added to Heroes Regional Park Library or other designated location. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4284 – 2019 LIBRARY DIF $13,106 $13,106 142 Heroes Park Library Community Room Project Number: CIPLB23029 Description: New community room expansion, with flexible seating that accommodates approximately 75 seats. The addition is planned to be on the north side of the existing 7,515 sq. ft. library, allowing for future expansion of the library. Justification: Library was planned for expansion due to frequent use of limited meeting space and demand for larger groups. This project funds meeting room space per study. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4100 – LIBRARY G. O. BONDS $948,649 751,351 $1,700,000 143 FY24-33 Parking Lots CIP Overview • Funded by General Fund (100%) • Annual funding for parking lot / garage repairs FY24-33 Parking Lots Projects 144 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPL19059 RENEW PARKING GARAGES/LOTS 575,000 200,000 200,000 200,000 200,000 1,000,000 2,375,000 TOTAL 575,000 200,000 200,000 200,000 200,000 1,000,000 2,375,000 FY24-33 Parking Lots by Funding Source 145 FUND FUND NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 GENERAL FUND CIP 575,000 200,000 200,000 200,000 200,000 1,000,000 2,375,000 TOTAL 575,000 200,000 200,000 200,000 200,000 1,000,000 2,375,000 146 Renew Parking Garages / Lots Project Number: CIPPL19059 Description: Project is to repair existing parking garages & parking lots across the city. Business-critical building lots & garages are highest priority. FY24 funding for asphalt repair, crack seal & seal coating for lots at the Airport and Bonsall Park. Justification: Programmatic repair/renewal of parking lots will reduce long term life cycle costs, reduce safety concerns, improve the city's brand/image and enable provision of service delivery to the community, aligning resources with the City's strategic priorities and the Building Asset Philosophy. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 - GENERAL FUND CIP $575,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 $2,375,000 147 FY24-33 Parks CIP Overview • Funded by Parks G. O. Bonds (68%), Open Space/Trail G. O. Bonds (18%), ARPA (13%), General Fund (>1%) DIF (>1%) and Cultural Facility G. O. Bonds (>1%) • Focus on Improving Infrastructure of Existing Parks, and Select New Improvements • Emphasis on Lighting and Irrigation Upgrades, and Replacement of Playground Equipment FY24-33 Parks Projects 148 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPK19032 PARK GROUND AND IRRIGATION $11,459 $11,459 CIPPK19034 PARK INFRASTRUCTURE IMPROVEMENTS $4,550,000 $7,840,000 $5,600,000 $17,990,000 CIPPK19036 HEROES REGIONAL PARK LAKE $737,645 $737,645 CIPPK19077 THUNDERBIRD CONSV. PARK IMPS $4,875,105 $6,629,200 $11,504,305 CIPPK21033 HEROES REGIONAL PARK BUILD OUT $425,580 $46,400,000 $46,825,580 CIPPK21038 COMMUNITY CENTER UPGRADES $321,532 $321,532 CIPPK21039 FRAC UPGRADES $63,936 $63,936 CIPPK21042 PARK RESTROOM REPLACEMENT $700,000 $700,000 FY24-33 Parks Projects 149 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPK21054 PLAYGROUND EQUIP. AT FOOTHILLS PARK $28,651 $28,651 CIPPK22007 ROSE LANE PARK IMPROVEMENTS $1,583,871 $1,583,871 CIPPK22008 BONSALL PARK IMPROVEMENTS $375,418 $879,000 $1,254,418 CIPPK22009 ACOMA PARK IMPROVEMENTS $276,169 $139,900 $416,069 CIPPK22010 MONDO PARK IMPROVEMENTS $123,119 $15,400 $138,519 CIPPK22011 MARY SILVA PARK IMPROVEMENTS $115,985 $115,985 CIPPK22013 HERITAGE PARK IMPROVEMENTS $10,000 $14,920 $24,920 CIPPK22014 HILLCREST PARK IMPROVEMENTS $45,500 $45,500 CIPPK22015 NEW WORLD PARK IMPROVEMENTS $28,651 $28,651 FY24-33 Parks Projects 150 PROJECT PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPK22016 MISSION PARK IMPROVEMENTS $576,112 $125,000 $701,112 CIPPK22017 O'NEIL PARK IMPROVEMENTS $4,251 $4,251 CIPPK22018 MONTARA PARK IMPROVEMENTS $299,750 $299,750 CIPPK22019 CARMEL PARK IMPROVEMENTS $90,907 $281,580 $372,487 CIPPK22020 DELICIAS PARK IMPROVEMENTS $171,949 $20,000 $191,949 CIPPK22021 LIONS PARK IMPROVEMENTS $46,710 $46,710 CIPPK22022 COUNTRY GABLES PARK IMPROVEMENTS $62,328 $62,328 CIPPK22023 SUNNYSIDE PARK IMPROVEMENTS $2,143 $434,720 $436,863 CIPPK22024 TARRINGTON RANCH PARK IMPROVEMENTS $278,230 $278,230 CIPPK22025 FOOTHILLS PARK IMPROVEMENTS $841,645 $841,645 FY24-33 Parks Projects 151 PROJECT PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPK22026 NORTHERN HORIZON PARK IMPROV. $766,520 $766,520 CIPPK22027 MYRTLE PARK IMPROVEMENTS $39,500 $47,870 $87,370 CIPPK22028 CLAVELITO PARK IMPROVEMENTS $5,749 $144,260 $150,009 CIPPK22029 BUTLER PARK IMPROVEMENTS $342,940 $342,940 CIPPK22030 CHOLLA PARK IMPROVEMENTS $344,900 $344,900 CIPPK22031 SIERRA VERDE PARK IMPROV. $391,860 $391,860 CIPPK22032 SKUNK CREEK LINEAR TRAIL $1,000,000 $1,000,000 CIPPK22033 GRAND CANAL LINEAR PARK IMPROV. $1,000,000 $4,000,000 $5,000,000 CIPPK22034 THUNDERBIRD PASEO IMPROV. $1,000,000 $4,125,000 $5,125,000 CIPPK22035 MID-CITY SPLASH PAD $3,128 $3,128 FY24-33 Parks Projects 152 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPK22036 NEW RIVER TRAIL IMPROVEMENTS $552,489 $552,489 CIPPK22093 SAHUARO RANCH DRAINAGE/GRADING $4,393 $4,393 CIPPK22096 SAHUARO RANCH SPLASH PAD $1,500,000 $1,500,000 CIPPK22097 SIERRA VERDE SPLASH PAD $1,494,750 $1,494,750 CIPPK22098 SMALL SPLASH PAD A $500,000 $500,000 CIPPK22099 SMALL SPLASH PAD B $500,000 $500,000 CIPPK22100 SMALL SPLASH PAD C $500,000 $500,000 CIPPK22101 HEROES REGIONAL PARK BALLFIELDS $7,476,400 $7,476,400 CIPPK22102 HEROES REGIONAL PARK SPLASH PAD $500,000 $500,000 CIPPK22103 SYCAMORE GROVE SPLASH PAD $200,000 $200,000 CIPPK22104 75TH / CAMELBACK SPLASH PAD $100,000 $100,000 FY24-33 Parks Projects 153 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPK22111 BONSALL NORTH PARK IRRIGATION $697,000 $697,000 CIPPK22112 SUNSET PALMS PARK IRRIGATION $697,000 $697,000 CIPPK22113 HILLCREST PARK IRRIGATION $697,000 $697,000 CIPPK22117 GLENDALE COMMUNITY CENTER FIBER $170,784 $170,784 CIPPK22118 O'NEIL RECREATION CENTER FIBER $187,789 $187,789 CIPPK22119 ROSE LANE RECREATION CENTER FIBER $355,806 $355,806 CIPPK23004 PLAZA ROSA PARK IMPROVEMENTS $143,699 $143,699 CIPPK23005 KINGS PARK IMPROVEMENTS $716,900 $716,900 CIPPK23006 DESERT VALLEY PARK IMPROVEMENTS $887,400 $887,400 CIPPK23007 DESERT ROSE PARK IMPROVEMENTS $856,700 $856,700 CIPPK23024 SANDS PARK IMPROVEMENTS $57,300 $145,000 $202,300 FY24-33 Parks Projects 154 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPK23026 PASEO SPORTS COMPLEX $1,515,000 $1,515,000 CIPPK23027 CHAPPARAL PARK IMPROVEMENTS $1,121,722 $1,121,722 CIPPK23044 MURPHY PARK $63,898 $500,000 $3,502,089 $4,065,987 CIPPK23059 BICENTENNIAL PARK PLAYGROUND $150,000 $150,000 CIPPK23065 DESERT MIRAGE PARK IRRIGATION $458,211 $458,211 CIPPK23066 DISCOVERY PARK IRRIGATION $339,210 $339,210 CIPPK23067 NEW WORLD PARK IRRIGATION $697,000 $697,000 FY24-33 Parks Projects 155 PROJECT PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPK23026 PASEO SPORTS COMPLEX $1,515,000 $1,515,000 CIPPK23027 CHAPPARAL PARK IMPROVEMENTS $1,121,722 $1,121,722 CIPPK23044 MURPHY PARK $63,898 $500,000 $3,502,089 $4,065,987 CIPPK23059 BICENTENNIAL PARK PLAYGROUND $150,000 $150,000 CIPPK23065 DESERT MIRAGE PARK IRRIGATION $458,211 $458,211 CIPPK23066 DISCOVERY PARK IRRIGATION $339,210 $339,210 CIPPK23067 NEW WORLD PARK IRRIGATION $697,000 $697,000 FY24-33 Parks Projects 156 PROJECT PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPK24001 NEW WORLD PARK IRRIGATION $80,000 $360,000 $760,000 $1,200,000 CIPPK24002 ADA UPGRADES $450,000 $450,000 CIPPK24003 PARKING LOT IMPROVEMENTS $700,000 $700,000 CIPPK73576 FOOTHILLS PARK PICKLEBALL COURTS $11,711 $11,711 TOTAL $27,553,864 $10,166,937 $16,592,444 $9,878,350 $8,204,699 $3,675,000 $53,029,200 $129,100,494 FY24-33 Parks by Funding Source 157 FUND FUND NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-32 TOTAL 1080 GENERAL FUND CIP $414,118 $414,118 4050 PARKS G. O. BONDS $3,974,031 $4,614,448 $11,467,444 $9,878,350 $8,204,699 $3,675,000 $46,400,000 $88,213,972 4080 CULTURAL FACILITY G. O. BONDS $4,393 $4,393 4090 OPEN SPACE/TRAIL G. O. BONDS $5,875,105 $5,000,000 $5,125,000 $6,629,200 $22,629,305 4325 2014 PARKS & REC DIF $11,711 $552,489 $564,200 4365 2012 PARKS & REC DIF $3,128 $3,128 4610 ARPA CAPITAL PROJECTS $17,271,379 $17,271,379 TOTAL $27,553,864 $10,166,937 $16,592,444 $9,878,350 $8,204,699 $3,675,000 $53,029,200 $129,100,494 158 Park Ground and Irrigation Project Number: CIPPK19032 Description: Project study has been completed. Future phases are for replacing aging irrigation in selected parks. Items could include controllers, valves, main line and lateral pipe, spray head, drip and rain/flow sensors. The system will be operated with Bluetooth and satellite based technology. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; “maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY 29-33 TOTAL 4050 – PARKS G. O. BONDS $11,459 $11,459 159 Park Infrastructure Improvements Project Number: CIPPK19034 Description: This project addresses the needs in park infrastructure improvements by renovating up to two thirds of the parks not currently covered in the CIP. Projects to include replacing Historic Building roofs at Sahuaro Ranch and ADA improvements. Justification: As improvements are made and tracked in assets management future lifecycle cost and replacement decisions can be made, funding in a future bond program would be needed for this. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $4,550,000 $7,840,000 $5,600,000 $17,990,000 160 Heroes Park Regional Lake Project Number: CIPPK19036 Description: This project is for the construction of an urban lake at Heroes Regional Park. The originally approved concept is for an urban lake sized to provide the necessary pumping and irrigation system needs for the proposed turf and landscaping throughout the park and provide storage capacity. The lake would be part of the Urban Fishing Program. An analysis of current lake requirements is underway to determine phasing the design and construction. Justification: This project is for the phased design and construction of the Heroes Regional Park Lake per the originally approved 2005 Design Concept Report. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $737,645 $737,645 161 Thunderbird Consv. Park Imps Project Number: CIPPK19077 Description: This project addresses key items developed through public input for the 2011 Glendale Parks and Recreation Master Plan Update. This request is for replacement of aging infrastructure at Thunderbird Conservation Park including repair of existing trails. and replacement/addition of restrooms, ramadas, parking spaces, and roadways. Justification: This project meets important elements of the master plan including Care of Infrastructure. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4090 – OPEN SPACE / TRAIL G. O. BONDS $4,875,105 $6,629,200 $11,504,305 162 Heroes Regional Park Buildout Project Number: CIPPK21033 Description: This project is for the build out of the remaining amenities at Heroes Regional Park per the previously approved design concept plan to include recreation and aquatics center, lighted soccer and baseball/softball fields, turf and irrigation system, parking, walkways, fencing, security lighting and related park amenities. Justification: This project is for the completion of the improvements at Heroes Regional Park per the originally approved 2005 design Concept Report. FUND CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $425,580 $46,400,000 $46,825,580 163 Community Center Upgrades Project Number: CIPPK21038 Description: This project will provide repairs and replacement of critical components at the three Community Centers: Glendale, Rose Lane, and O’Neil. Justification: City Staff has worked to identify and prioritize specific improvements to these facilities. Project is funded through General Fund fund balance, per Council consensus. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $321,532 $321,532 164 FRAC Upgrades Project Number: CIPPK21039 Description: This project includes renovation/replacement of multiple critical components of the Foothills Recreation and Aquatics Center (FRAC) to include: building updates and replacement of aquatic equipment. Justification: City staffhas worked to identify and prioritize specific improvements to these facilities. Project is funded through General Fund fund balance, per Council consensus. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $63,936 $63,936 165 Park Restroom Replacement Project Number: CIPPK21042 Description: This project involves the replacement of the public restrooms at three city parks: Bonsall, O’Neil, and Thunderbird-Paseo to provide four unisex restrooms in a single modular unit at these locations. Justification: City staffhas worked to identify and prioritize specific improvements to these facilities. Project is funded through General Fund fund balance, per Council consensus. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $700,000 $700,000 166 Playground Equip. At Foothills Park Project Number: CIPPK21054 Description: Replace (2) playgrounds with shade Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; “maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY 29-33 TOTAL 1080 – GENERAL FUND CIP $28,651 $28,651 167 Rose Lane Park Improvements Project Number: CIPPK22007 Description: This project is for improvements at Rose Lane Park. The improvements will include improved irrigation and a new play structure. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $1,583,871 $1,583,871 168 Bonsall Park Improvements Project Number: CIPPK22008 Description: This project is for improvements at Bonsall Park. The improvements will include improved irrigation, court resurfacing and a new play structure. These improvements are designed to accommodate the increased use and demand at the park. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $375,418 $879,000 $1,254,418 169 Acoma Park Improvements Project Number: CIPPK22009 Description: This project is for park improvements at Acoma Park. The improvements will include improved irrigation, court resurfacing and a new play structure. These improvements are designed to accommodate increased use and demand at the park. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $276,169 $139,900 $416,069 170 Mondo Park Improvements Project Number: CIPPK22010 Description: This project is for improvements at Mondo Park. The improvements will include improved lighting and a new play structure. These improvements are designed to accommodate increased use and demand at the park. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $123,119 $15,400 $138,519 171 Mary Silva Park Improvements Project Number: CIPPK22011 Description: This project is for improvements at Mary Silva Park. The improvements will include park lighting. These improvements are designed to accommodate the increased use and demand at the park. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $115,985 $115,985 172 Heritage Park Improvements Project Number: CIPPK22013 Description: This project is for improvements at Heritage Park. The improvements will include court resurfacing and a new play structure. These improvements are designed to accommodate the increased use and demand at the park. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $10,000 $14,290 $24,920 173 Hillcrest Park Improvements Project Number: CIPPK22014 Description: This project is for improvements at Hillcrest Park. The improvements will include park lighting and a new play structure. These improvements are designed to accommodate the increased use and demand at the park. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 4050 – PARKS G. O. BONDS $45,500 $45,500 174 New World Park Improvements Project Number: CIPPK22015 Description: This project is for improvements at New World Park. The improvements will include improved park lighting and a new play structure. These improvements are designed to accommodate the increased use and demand at the park. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY 229-33 TOTAL 4050 – PARKS G. O. BONDS $1,241,801 $1,241,801 175 Mission Park Improvements Project Number: CIPPK22016 Description: Improvements at Mission Park. Improvements include park lighting, a new play structure, and a new irrigation system. Improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $576,112 $125,000 $701,112 176 O’Neil Park Improvements Project Number: CIPPK22017 Description: This project is for improvements at O'Neil Park. The improvements will include improved park lighting and court resurfacing. These improvements are designed to accommodate the increased use and demand at the park. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $4,251 $4,251 177 Montara Park Improvements Project Number: CIPPK22018 Description: This project is for park improvements at Montara Park. The improvements will include improved lighting and court resurfacing. These improvements are designed to accommodate increased use and demand at the park. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $299,750 $299,750 178 Carmel Park Improvements Project Number: CIPPK22019 Description: This project is for improvements at Carmel Park. The improvements will include enhanced lighting, a new irrigation system, and court resurfacing Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $372,487 $372,487 179 Delicias Park Improvements Project Number: CIPPK22020 Description: This project is for improvements at Delicias Park. The improvements will include a new playground and shade structure. These improvements are designed to accommodate the increased use and demand. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; ""maintain and improve what we have"". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $141,820 $20,000 $161,820 4610 – ARPA CAPITAL PROJECTS $30,129 $30,129 TOTAL $171,949 $20,000 $191,949 180 Lions Park Improvements Project Number: CIPPK22021 Description: This project is for improvements at Lions Park. The improvements will include park lighting and a new play structure with shade. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $46,710 $46,710 181 Country Gables Park Improvements Project Number: CIPPK22022 Description: This project is for improvements at Country Gables Park. The improvements will include park lighting and a new play structure with shade. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $62,328 $62,328 182 Sunnyside Park Improvements Project Number: CIPPK22023 Description: This project is for improvements at Sunnyside Park. The improvements will include park lighting and a new playground with shade. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $434,720 $434,720 4610 – ARPA CAPITAL PROJECTS $2,143 $2,143 TOTAL $2,143 $434,720 $436,863 183 Tarrington Ranch Park Improvements Project Number: CIPPK22024 Description: This project is for improvements at Tarrington Ranch Park. The improvements will include park lighting and a new playground with shade. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $278,320 $278,230 184 Foothills Park Improvements Project Number: CIPPK22025 Description: This project is for improvements at Foothills Park. The improvements will include park lighting and a new playground with shade. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $861,645 $861,645 185 Northern Horizon Park Improvements Project Number: CIPPK22026 Description: This project is for improvements at Northern Horizon Park. The improvements will include park lighting and irrigation system improvements. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $766,520 $766,520 186 Myrtle Park Improvements Project Number: CIPPK22027 Description: This project is for improvements at Myrtle Park. The improvements will include new park lighting. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $39,500 $47,870 $87,370 187 Clavelito Park Improvements Project Number: CIPPK22028 Description: This project is for improvements at Clavelito Park. The improvements will include park lighting, irrigation system improvements and a new playground with shade. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $144,260 $144,260 4610 – ARPA CAPITAL PROJECTS $5,749 $5,749 TOTAL $5,749 $144,260 $150,009 188 Butler Park Improvements Project Number: CIPPK22029 Description: This project is for improvements at Butler Park. The improvements will include park lighting and a new playground with shade structure. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $342,940 $342,940 189 Cholla Park Improvements Project Number: CIPPK22030 Description: This project is for improvements at Cholla Park. The improvements will include park lighting and a new playground with shade structure. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $344,900 $344,900 190 Sierra Verde Park Improvements Project Number: CIPPK22031 Description: This project is for improvements at Sierra Verde Park. The improvements will include park lighting, court resurfacing and a new playground with shade. These improvements are designed to accommodate the increased use and demand at the park. Justification: Replacement of aging infrastructure in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $391,860 $391,860 191 Skunk Creek Linear Trail Project Number: CIPPK22032 Description: Redesign and installation of irrigation and landscaping along paved trail on the Skunk Creek Linear Trail. This 4 + mile trail system was installed in 2002 and is in disrepair. Justification: Maintaining what we have is a top priority in master plan survey of residents. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4090 – OPEN SPACE/TRAILS G. O. BONDS $1,000,000 $1,000,000 192 Grand Canal Linear Park Improvements Project Number: CIPPK22033 Description: This project is for improvements at Grand Canal Linear Park. The improvements will include irrigation system repairs or replacement. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4090 – OPEN SPACE / TRAILS G. O. BONDS $1,000,000 $4,000,000 $5,000,000 193 Thunderbird Paseo Park Improvements Project Number: CIPPK22034 Description: This project is for improvements at Thunderbird Paseo Park. The improvements will include enhanced lighting, improved irrigation, court resurfacing and a new play structure. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4090 – OPEN SPACE / TRAILS G. O. BONDS $1,000,000 $4,125,000 $5,125,000 194 Sunset Palms Splash Pad Project Number: CIPPK22035 Description: This project is for the design and construction of a new splashpad at Sunset Palms (formerly referred to as a Mid-City Park). Justification: This project addresses aging amenities and the need for new water features in parks as per the current Parks and Recreation Master Plan and what was most important to residents. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4325 – 2014 PARKS & REC DIF $3,128 $3,128 195 New River Trail Improvements Project Number: CIPPK22036 Description: This project is designed to provide a connection between New River Trail South and Heroes Regional Park. The improvements include a new concrete walkway, enhanced lighting, irrigation and plantings. Justification: This project provides an improved link between existing parks as per the current Parks and Recreation Master Plan and what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4325 – 2014 PARKS & REC DIF $552,489 $552,489 196 Sahuaro Ranch PK Drainage/Grading Project Number: CIPPK22093 Description: This project is for improvements to Sahuaro Ranch Park. The improvements will include drainage and grading improvements in the proximity of the historical buildings to further prevent water infiltration issues. Justification: This project addresses aging facilities within parks as per the current Parks and Recreation Master Plan and what has been identified as most important to residents “ maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4080-CULTURAL FACILITY $4,393 $4,393 197 Sahuaro Ranch Splash Pad Project Number: CIPPK22096 Description: This project will add a new amenity to the central area of Sahuaro Ranch Park. The splash pad will expand community access to parks. Justification: This project meets the goal of the Parks and Recreation Master Plan to increase park amenities at existing park locations. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $1,500,000 $1,500,000 198 Sierra Verde Splash Pad Project Number: CIPPK22097 Description: This project will add a new amenity to Sierra Verde Park. The splash pad will expand community access to a splash pad north of Loop 101. Justification: This project meets the goal of the Parks and Recreation Master Plan to increase park amenities at existing park locations. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $1,494,750 $1,494,750 199 Small Splash Pad A Project Number: CIPPK22098 Description: This project will add a new smaller scale splash pad amenity to small or neighborhood park. The splash pad will expand community access to parks and final location will be determined by further Council input. Justification: This project meets the goal of the Parks and Recreation Master Plan to increase park amenities at existing park locations. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $500,000 $500,000 200 Small Splash Pad B Project Number: CIPPK22099 Description: This project will add a new smaller scale splash pad amenity to small or neighborhood park. The splash pad will expand community access to parks and final location will be determined by further Council input. Justification: This project meets the goal of the Parks and Recreation Master Plan to increase park amenities at existing park locations. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $500,000 $500,000 201 Small Splash Pad C Project Number: CIPPK22100 Description: This project will add a new smaller scale splash pad amenity to small or neighborhood park. The splash pad will expand community access to parks and final location will be determined by further Council input. Justification: This project meets the goal of the Parks and Recreation Master Plan to increase park amenities at existing park locations. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $500,000 $500,000 202 Heroes Regional Park Ballfields Project Number: CIPPK22101 Description: This project will further develop the next phase of development for Heroes Regional Park. An updated park master plan will determine design plans to identify amenities which may include ballfields and other park amenities. Justification: This project meets the goal of the Parks and Recreation Master Plan to increase park amenities at existing park locations and to further the long-planned development of Heroes Regional Park. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $7,476,400 $7,476,400 203 Heroes Regional Park Splash Pad Project Number: CIPPK22102 Description: This project consists of retrofitting and replumbing the aging infrastructure of the existing splash pad in Heroes Regional Park. Justification: This project meets the goal of the Parks and Recreation Master Plan to improve infrastructure within existing parks. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $500,000 $500,000 204 Sycamore Grove Splash Pad Project Number: CIPPK22103 Description: This project consists of retrofitting and replumbing the aging infrastructure of the existing to bring it operational. Justification: This project meets the goal of the Parks and Recreation Master Plan to improve infrastructure within existing parks. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $200,000 $200,000 205 75th Ave / Camelback Splash Pad Project Number: CIPPK22104 Description: This project consists of retrofitting and replumbing the aging infrastructure of the existing to bring it operational. Justification: This project meets the goal of the Parks and Recreation Master Plan to improve infrastructure within existing parks. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $100,000 $100,000 206 Bonsall North Park Irrigation Project Number: CIPPK22111 Description: The project is to replace irrigation infrastructure, bringing the system up to standards. May include controllers, taps, meters, valves, lateral lines, and sprinkler heads. Justification: Replacement of aging infrastructure in parks in the ARPA guidelines and per the current Parks and Recreation Master Plan for what was most important to residents: “maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $697,000 $697,000 207 Sunset Palms Park Irrigation Project Number: CIPPK22112 Description: The project is to replace irrigation infrastructure, bringing the system up to standards. May include controllers, taps, meters, valves, lateral lines, and sprinkler heads. Justification: Replacement of aging infrastructure in parks in the ARPA guidelines and per the current Parks and Recreation Master Plan for what was most important to residents: “maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $697,000 $697,000 208 Hillcrest Park Irrigation Project Number: CIPPK22113 Description: The project is to replace irrigation infrastructure, bringing the system up to standards. May include controllers, taps, meters, valves, lateral lines, and sprinkler heads. Justification: Replacement of aging infrastructure in parks in the ARPA guidelines and per the current Parks and Recreation Master Plan for what was most important to residents: “maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $697,000 $697,000 209 Glendale Community Center Fiber Project Number: CIPPK22117 Description: The project brings fiber connectivity to the Community Centers (Rose Lane, Glendale Community Center, O’Neil) for tie into the city network for staff and improved connectivity for participants thru Wi-Fi. Justification: This project meets the goal of connectivity for impacted communities in the ARPA guidelines. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $170,784 $170,784 210 O’Neil Recreation Center Fiber Project Number: CIPPK22118 Description: The project brings fiber connectivity to the Community Centers (Rose Lane, Glendale Community Center, O’Neil) for tie into the city network for staff and improved connectivity for participants thru Wi-Fi. Justification: This project meets the goal of connectivity for impacted communities in the ARPA guidelines. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $187,789 $187,789 211 Rose Lane Recreation Center Fiber Project Number: CIPPK22119 Description: The project brings fiber connectivity to the Community Centers (Rose Lane, Glendale Community Center, O’Neil) for tie into the city network for staff and improved connectivity for participants thru Wi-Fi. Justification: This project meets the goal of connectivity for impacted communities in the ARPA guidelines. FUND EST CARRYOVER FY23 FY24 FY25 FY26 FY27 FY28-32 TOTAL 4610 – ARPA CAPITAL PROJECTS $355,806 $355,806 212 Plaza Rosa Park Improvements Project Number: CIPPK23004 Description: This project is for park improvements for Plaza Rosa Park. The improvements will include a more efficient irrigation system, new park amenities and a new play structure. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and focuses on what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $143,699 $143,699 213 Kings Park Improvements Project Number: CIPPK23005 Description: This project is for park improvements at Kings Park. The improvements will include a more efficient irrigation system, lighting, a new play structure and new park amenities. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and focuses on what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $716,900 $716,900 214 Desert Valley Park Improvements Project Number: CIPPK23006 Description: This project is for park improvements at Desert Valley Park. The improvements will include a more efficient irrigation system, lighting, a new play structure, amenities and parking lot resurfacing. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and focuses on what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $887,400 $887,400 215 Desert Rose Park Improvements Project Number: CIPPK23007 Description: This project is for park improvements at Desert Rose Park. The improvements will include a more efficient irrigation system, lights, new play structures, sport court resurfacing and park amenities. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan and focuses on what was most important to residents; "maintain and improve what we have". FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $856,700 $856,700 216 Sands Park Improvements Project Number: CIPPK23024 Description: The project updates the security lights in the park to LED fixtures and replaces parks benches, tables, drinking fountains, and court resurfacing Justification: Replacement of aging infrastructure per the approved Master Plan and what was most important to residents; “maintain what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $57,300 $145,000 $202,300 217 Paseo Sports Complex Project Number: CIPPK23026 Description: The project updates the sports complex field lights with LED fixtures. Justification: Replacement of aging infrastructure per the approved Master Plan and what was most important to residents; “maintain what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $1,515,000 $1,515,000 218 Chapparal Park Improvements Project Number: CIPPK23027 Description: The project improves the irrigation, updates the light fixtures with LED, resurfaces courts and relaces tables, benches and drinking fountains. Justification: Replacement of aging infrastructure per the approved Master Plan and what was most important to residents; “maintain what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $1,121,722 $1,121,722 219 Murphy Park Project Number: CIPPK23044 Description: Recognized as a great public space in downtown, modernization improvements will focus on a wholistic approach for a more integrated open space with the amphitheater, library and City Hall facilities. This includes examining pedestrian corridors, arrival points, zones for various activities, wayfinding, hardscape design, enhancing tree canopies, and irrigation & drainage. Justification: The existing City Hall Campus was constructed in 1984. In order to become a focal point of the downtown, it is important to modernize the park to make it more pedestrian friendly. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS G. O. BONDS $63,898 $500,000 $3,502,089 $4,065,987 220 Bicentennial Park Playground Project Number: CIPPK23059 Description: Replace (2) playgrounds Justification: Replacement of aging infrastructure in parks meets the goal of the Parks and Recreation Master Plan to improve existing parks. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $150,000 $150,000 221 Desert Mirage Park Irrigation Project Number: CIPPK23065 Description: The project is to replace irrigation infrastructure, bringing the system up to standards. May include controllers, taps, meters, valves, lateral lines, and sprinkler heads. Justification: Replacement of aging infrastructure in parks in the ARPA guidelines and per the current Parks and Recreation Master Plan for what was most important to residents: “maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $458,211 $458,211 222 Discovery Park Irrigation Project Number: CIPPK23066 Description: The project is to replace irrigation infrastructure, bringing the system up to standards. May include controllers, taps, meters, valves, lateral lines, and sprinkler heads. Justification: Replacement of aging infrastructure in parks in the ARPA guidelines and per the current Parks and Recreation Master Plan for what was most important to residents: “maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $339,210 $339,210 223 New World Park Irrigation Project Number: CIPPK23067 Description: The project is to replace irrigation infrastructure, bringing the system up to standards. May include controllers, taps, meters, valves, lateral lines, and sprinkler heads. Justification: Replacement of aging infrastructure in parks in the ARPA guidelines and per the current Parks and Recreation Master Plan for what was most important to residents: “maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4610 – ARPA CAPITAL PROJECTS $697,000 $697,000 224 SRP Historical Roof Replacement Project Number: CIPPK24001 Description: This project is for roof improvements on the historical buildings in Sahuaro Ranch Park. Justification: Replacement of aging infrastructure in parks in the ARPA guidelines and per the current Parks and Recreation Master Plan for what was most important to residents: “maintain and improve what we have”. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS CONSTRUCTION $80,000 $360,000 $760,000 $1,200,000 225 ADA Upgrades Project Number: CIPPK24002 Description: This project involves first updating the 2013 American with Disabilities Act Park and Facilities Assessment and then addressing identified deficiencies to bring park facilities into ADA compliance. Justification: This project is to ensure compliance with the federally adopted American with Disabilities Act and to address any known deficiencies identified by updating the assessment FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS CONSTRUCTION $450,000 $450,000 226 Parking Lot Improvement Project Number: CIPPK24003 Description: This project involves repairs and renovation to parking lots at Bonsall North, Foothills, and New World parks Justification: This project addresses needed repairs and renovations in Bonsall North, Foothills, and New World parks as identified in the 2021 Park and Facilities Parking Paving Assessment. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4050 – PARKS CONSTRUCTION $700,000 $700,000 227 Foothills Park Pickleball Courts Project Number: CIPPK73576 Description: This project is for the construction of new pickleball courts at Foothills Park to accommodate increased interest and demand in the community. Justification: This project addresses aging amenities in parks as per the current Parks and Recreation Master Plan key strategy of “Maintain and enhance park and recreation facilities and programs to promote community interaction, healthy lifestyles and safety.” FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4325 – 2014 DIF PARKS & REC $11,711 $11,711 228 FY24-33 Public Safety CIP Overview • Funded by Public Safety G. O. Bonds (65%), General Fund (17%), Fire DIF (14%) and Police DIF (3%) • Focus on: – Improving existing facilities • Follow industry standard replacement cycles • Health, safety and functional improvements – Replacing existing assets as needed FY24-33 Public Safety Projects 229 Project # Project Title EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPS19029 FIRE STATION #153 REPLACEMENT $2,945,624 $5,394,777 $3,000,000 $11,340,401 CIPPS19030 POLICE EVIDENCE STORAGE AND CRIME LAB $6,823,076 $14,696,385 $21,519,461 CIPPS19041 MAIN PUBLIC SAFETY BLDG RENOVATION $44,329 $2,500,000 $3,000,000 $3,500,000 $9,044,329 CIPPS19042 FOOTHILLS POLICE STATION RENOVATION $665,000 $1,306,043 $2,340,479 $2,340,479 $6,652,001 CIPPS19043 GATEWAY POLICE STATION RENOVATION $263,068 $2,297,021 $8,252,979 $10,813,068 FY24-33 Public Safety Projects 230 Project # Project Title EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPS19044 FIRE STATION #154 RENOVATION $1,108,793 $5,667,207 $6,776,000 CIPPS19049 FIRE STATION WESTERN AREA $20,518,889 $20,518,889 CIPPS19050 FIRE STATION #155 RENOVATION $239,936 $3,019,982 $3,019,982 $6,279,900 CIPPS19051 FIRE STATION #156 RENOVATION $254,411 $2,921,839 $3,176,250 CIPPS19052 FIRE STATION #157 RENOVATION $3,418,250 $3,418,250 CIPPS19053 POLICE STATION WEST AREA $4,529,000 $4,529,000 FY24-33 Public Safety Projects 231 Project # Project Title EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPS20033 PUBLIC SAFETY BUILDING REMODELS $9,011 $9,011 CIPPS22037 UNMANNED AERIAL VEHICLES $91,859 $91,859 CIPPS22038 GROWTH POLICE VEHICLES $2,077 $2,077 CIPPS22080 PUBLIC SAFETY HVAC REPLACEMENTS $19,409 $19,409 CIPPS22085 PUBLIC SAFETY ROOF REPAIR/REPLACE $274,716 $274,716 CIPPS22094 GRPSTC RETAINING WALL/FIRE TOWER $248,964 $248,964 CIPPS23002 LP15 HEART MONITOR REPLACEMENT $153,740 $153,740 FY24-33 Public Safety Projects 232 Project # Project Title EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPS23030 GRPSTC PARKING LOT $675,600 $675,600 CIPPS23042 COURT RENOVATION PHASE 2 $10,471,000 $10,471,000 CIPPS23074 POLICE MOBILE COMMAND VEHICLE $596,338 $596,338 CIPPS24004 FIRE CAPITAL ASSET REPLACEMENT PROG $261,600 $4,292,500 $4,554,100 CIPPS24005 GRPSTC FIRE HYDRANT REPLACEMENT $145,320 $145,320 FY24-33 Public Safety Projects 233 Project # Project Title EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPPS24050 FIRE STATION AIRPORT AREA $75,000 $75,000 CIPPS70814 FIRE APPARATUS REPLACEMENT $1,955,474 $2,294,398 $2,386,386 $1,616,688 $1,948,660 $6,064,833 $18,583,319 TOTAL $15,910,177 $8,497,910 $25,122,058 $12,599,572 $13,028,581 $49,473,828 $18,304,583 $142,936,709 FY24-33 Public Safety by Funding Source 234 Funding Source EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080-GENERAL FUND CIP $2,551,812 $2,709,738 $2,316,880 $2,386,386 $1,616,688 $1,948,660 $10,357,333 $23,887,496 2200-TRAINING FACILITY REVENUE $248,964 $145,320 $394,284 4040-PUBLIC SAFETY CONSTRUCTION $13,015,465 $5,567,852 $22,805,178 $10,213,186 $11,411,893 $27,006,279 $3,418,250 $93,438,103 4173-2019-DIF FIRE $75,000 $20,518,889 $20,593,889 4191-2012-DIF POLICE FACILITIES $93,936 $93,936 4223-2019-DIF POLICE $4,529,000 $4,529,000 TOTAL $15,910,177 $8,497,910 $25,122,058 $12,599,572 $13,028,581 $49,473,828 $18,304,583 $142,936,709 235 City Court Renovations Project Number: CIPPS21053 Description: This project will renovate the existing city court which was built in 1991 and was last remodeled in 2003. Justification: The existing facility does not meet the courts operational needs in regards to safety, security, and storage. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G. O. BONDS $1,468,707 $1,500,000 $2,968,707 236 Fire Station #153 Replacement Project Number: CIPPS19029 Description: Total replacement of the current 7,400 gross sq. ft. (2-bay)fire station with a new approx. 11,500 gross sq.ft. (3 bay) facility. The project includes the demolition of a retired adjacent community center, approx. 5,000 gross sq.ft. Justification: The station was constructed in 1974 and components are beyond their useful life, and do not support additional apparatus or space for decontamination. Preventative measures should be taken to mitigate carcinogen exposure for firefighters. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G.O. BONDS $2,945,624 $5,394,777 $3,000,000 $11,340,401 237 Police Evidence Storage /Crime Lab Project Number: CIPPS19030 Description: New warehouse type facility for police evidence, property storage, and management. Estimate includes programming, design, construction for lab and evidence storage facility. Justification: Current off-site storage facility is being decommissioned. On site storage is at capacity. Co-locating forensic evidence processing w/the storage of the evidence greatly reduces the risk of breaching Chain of Custody and is considered best practice. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G.O. BONDS $6,823,076 $14,696,385 $21,519,461 238 Main Public Safety Building Remodel Project Number: CIPPS19041 Description: This project is for design and construction of infrastructure needs at the Main PSB to include plumbing, electrical and some interior finishes. Justification: Components of the building have exceeded their useful life. This location requires significant infrastructure and functionality modernization to meet the business needs of the department. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G.O. BONDS $44,329 $2,500,000 $3,000,000 $3,500,000 $9,044,329 239 Foothills Police Station Renovation Project Number: CIPPS19042 Description: This project is for design and construction of a complete renovation of the Foothills police substation to include infrastructure needs as well as functionality. Infrastructure needs include roof, exterior finishes, plumbing fixtures and parking. Justification: The Foothills police substation requires significant infrastructure and functionality modernization to meet the business needs of the police department. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G.O. BONDS $665,000 $1,306,043 $2,340,479 $2,340,479 $6,652,001 240 Gateway Police Station Renovation Project Number: CIPPS19043 Description: This project is for design and construction of a complete renovation of the Gateway police substation to include infrastructure needs as well as functionality. Infrastructure needs identified in the building assessment include roof, and parking. Justification: The Gateway substation requires significant infrastructure and modernization to meet the business needs of the police department including additional space for parking to continue meeting the needs of the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G.O. BONDS $263,068 $2,297,021 $8,252,979 $10,813,068 241 Fire Station #154 Renovation Project Number: CIPPS19044 Description: Project will remodel FS 154 (43rd Ave & Peoria) as infrastructure components have reached the end of their useful life. Renovation will include new areas to protect firefighters' health and safety as well as functional improvements. Justification: The station was constructed in 1982 and components are beyond their useful life. The station house, drives, and equipment bays require replacement. Preventative measures should be taken to mitigate carcinogen exposure for firefighters. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G.O. BONDS $1,108,793 $5,667,207 $6,776,000 242 Fire Station – Western Area Project Number: CIPPS19049 Description: This project is for the design and construction of a new, 15,000 square feet, four bay fire station including furniture, fixtures and equipment, to support 18 personnel and one engine. Justification: Future growth in the area is projected to require an additional station to serve the needs of the community. The station will include space for future expansion as growth demands. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4173 – 2019 DIF FIRE $20,518,889 $20,518,889 243 Fire Station #155 Renovation Project Number: CIPPS19050 Description: Project will remodel FS 155 (62nd Ave & Union Hills) as infrastructure components have reached the end of their useful life. Renovation will include new areas to protect firefighters’ health and safety as well as functional improvements. Justification: The station was constructed in 1988 and components are beyond their useful life. The station house, drives, and equipment bays require replacement. Preventative measures should be taken to mitigate carcinogen exposure for firefighters. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G.O. BONDS $239,936 $3,019,982 $3,019,982 $6,279,900 244 Fire Station #156 Renovation Project Number: CIPPS19051 Description: Project will remodel FS 156 (68th Ave & Deer Valley) as infrastructure components have reached the end of their useful life. Renovation will include new areas to protect firefighters’ health and safety as well as functional improvements. Justification: The station was constructed in 1998 and components are beyond their useful life. The station house, drives, and equipment bays require replacement. Preventative measures should be taken to mitigate carcinogen exposure for firefighters. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G.O. BONDS $254,511 $2,921,839 $3,176,250 245 Fire Station #157 Renovation Project Number: CIPPS19052 Description: Project will remodel FS 157 (59th Ave and Brown) as infrastructure components have reached the end of their useful life. Renovation will include new areas to protect firefighters' health and safety as well as functional improvements. Justification: The station was constructed in 1997 and components are beyond their useful life. The station house, drives, and equipment bays require replacement. Preventative measures should be taken to mitigate carcinogen exposure for firefighters. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G.O. BONDS $3,418,250 $3,418,250 246 Police Station – West Area Project Number: CIPPS19053 Description: This project is for design & construction of a 4,000 sq. ft police substation in conjunction with the proposed west area fire station. The facility will include future expansion as growth demands. Estimates include furniture, fixtures, and equipment. Justification: Future growth in the area is projected to require an additional station to serve the needs of the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4223 – 2019 DIF POLICE $4,529,000 $4,529,000 247 Public Safety Building Remodels Project Number: CIPPS20033 Description: The $800,000 in FY20 is for design of 2nd floor GRPSTC for Fire Admin, and design of Sine for Prosecutor, as well as construction of 2nd floor GRPSTC. Projects in FY21($7,532,000) include the remodel of Sine (up to $1.25m); Court imminent needs (up to $4m); and priority 2 and 3 deficiencies identified as part of Public Safety Buildings assessments. Planned projects include: exhaust venting/removal (all Fire Stations), parking assessments (Foothills, Gateway, FS 157), roof (Gateway), HVAC (Foothills), parking lot subsidence (FS 152), and generator replacement (FS 154). The exact list will depend on individual items costs. Justification: Many components are at the end of their useful life and require work or replacement in order to provide useable buildings. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G. O. BONDS $9,011 $9,011 248 Unmanned Aerial Vehicles Project Number: CIPPS22037 Description: This project is two unmanned aerial vehicles (drones), equipment and software. Drones can be remotely deployed and provide officers with real time information while increasing safety and efficiency. Justification: Drones are used to prevent dangerous situations for officers and bystanders. They can be used at accident scenes, to assess environmental issues, and follow fleeing suspects, reducing vehicle pursuits. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4191 – 2012 DIF POLICE $91,859 $91,859 249 Growth Police Vehicles Project Number: CIPPS22038 Description: This request is for three growth police vehicles to provide for patrol services in developing western Glendale. Includes computer, radio, and other equipment required to outfit the vehicles. Justification: Future growth in the western area is projected to require patrol services to meet the needs of the community. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4191 – 2012 DIF POLICE $2,077 $2,077 250 Public Safety HVAC Replacements Project Number: CIPPS22080 Description: This project is to replace the HVAC systems at Fire Station 151, 159, and the Advocacy Center. Justification: The HVAC systems at these locations require replacement. Replacement is a proactive approach to maintaining the continuity of service to mission critical facilities. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G. O. BONDS $19,409 $19,409 251 Public Safety Roof Repair/Replacement Project Number: CIPPS22085 Description: This project is to replace roof at various public safety locations including- Fire Support, and GRPSTC Fire Station and Shooting Range. Justification: These roofs at mission critical locations need replacement to avoid structural damage. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G. O. BONDS $274,716 $274,716 252 GRPSTC Retaining Wall/Fire Tower Project Number: CIPPS22094 Description: This project it to perform a structural evaluation of the adjacent training wall, site and building at the GRPSTC Fire Training Building and any future construction to remediate the issues causing damage. Justification: The retention wall on the east and west side of the training facility are showing signs of cracking with water leakage, thus the commercial door is no longer operational and might create a safety issue. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2200 – TRAINING FACILITY REVENUE $248,964 $248,964 253 LP15 Heart Monitor Replacement Project Number: CIPPS23002 Description: Purchase of 37 cardiac monitors. The life span is difficult to gauge as wear and tear is a factor that plays into how long these units last. Justification: These monitors are used multiple times daily. Emergency medical incidents account for over 80% of all calls for service. New technology also plays a part in how long we can continue to use older equipment. Currently, the department’s heart monitors are adequate through FY 2024, at which time they are expected to reach the end of their useful life. Heart monitors are considered a capital expenditure due to the type of equipment requiring to be updated all at the same time; which cannot be phased in when replaced. Personnel must all be able to train and work on the same type, make and model of equipment... FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 - GENERAL FUND CIP $2,232,682 $2,232,682 254 GRPSTC Parking Lot Project Number: CIPPS23030 Description: Project will create additional parking area west of the main building at GRPSTC. The proposed new parking area provides approximately 50 secured parking spaces. Justification: Current parking lot lacks appropriate parking spaces to accommodate staff. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G. O. BONDS $675,600 $675,600 255 Court Renovation Phase 2 Project Number: CIPPS23042 Description: Recommended deferred maintenance of building systems and court security upgrades not included in Phase 1 renovation in CIPFC21053. Items include update power distribution, ergonomic seating, HVAC cleaning, Kevlar at court benches, ballistic glass, intrusion security, visual evidence displays/controls at courtrooms, security bollards, back of house court expansion, and restroom addition. Justification: Facility is 30 years old plus with minimal upgrades. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4040 – PUBLIC SAFETY G. O. BONDS $10,471,000 $10,471,000 256 Police Mobile Command Vehicle Project Number: CIPPS23074 Description: The vehicle will be used for critical incidents and mega events. The vehicle will have upgraded technology, better communication capabilities and more operational space allowing for multiple divisions to work at the same time. Justification: The current Mobile Command Center Vehicle is outdated and has required maintenance and major repairs, and it does not have sufficient workspace for personnel FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $596,338 $596,338 257 Fire Capital Asset Replacement Prog Project Number: CIPPS24004 Description: Replace Extrication Equipment (Battery Operated) for 3 existing Ladder Tenders and 1 Squad including the air bags used for extrication. Justification: The ability to keep our existing equipment functional and in the ready state is becoming more difficult as the manufacturers are no longer supporting older equipment. We are creating a replacement program to cover older assets as they come up for replacement per the department asset replacement program. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $261,600 $4,292,500 $4,554,100 258 GRPSTC Fire Hydrant Replacement Project Number: CIPPS24005 Description: Replace 10 training fire hydrants at GRPSTC and improve equipment reliability, to continue to train fire recruits and active-duty personnel. Justification: GRPSTC Management was advised by the water department that 10 of the "Training" fire hydrants have reached the end of their service life and need to be replaced, as they are failing on a regular basis and can no longer be rebuilt. Approval of this request will provide the approval to replace all 10 training fire hydrants and improve the reliability of the facility to continue to train fire recruits and active-duty personnel. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2200 – TRAINING FACILITY REVENUE $145,320 $145,320 259 Fire Station-Airport Area Project Number: CIPPS24050 Description: This project is for the study and may expand in the future to include design and construction of a new 15,000 square feet, four bay station including furniture, fixtures and equipment, to support 18 personnel and one engine. Justification: Future growth in the area is projected to require an additional station to serve the needs of the community. The station will include space for future expansion as growth demands. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4173-2019-DIF FIRE $75,000 $75,000 260 Fire Apparatus Replacement Project Number: CIPPS70814 Description: The project provides for the replacement of large GFD vehicles to ensure essential services are provided. The plan is to replace engines & ladder tenders (LTs) every 7 yrs or 100K miles & ladders every 10 yrs or 100K miles. FY24: (1) LT & (1) Pumper Justification: Programmatic replacement of vehicles will reduce overall lifecycle costs, protect public health and safety while aligning resources with the City's strategic priorities. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080 – GENERAL FUND CIP $1,955,474 $2,294,398 $2,316,880 $2,386,386 $1,616,688 $1,948,660 $6,064,833 $18,583,319 261 FY24-33 Solid Waste CIP Overview • Funding Source: Enterprise – User Fee Revenues • Focus On Programed Vehicle Replacements • Follow industry standard replacement cycles FY24-33 Solid Waste Projects 262 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPSW19027 REPLACE STREET SWEEPERS 363,235 372,316 381,624 2,197,746 3,314,921 CIPSW78001 REPLACE ROLLOFF TRUCKS - COMMERCIAL 236,500 273,158 509,658 CIPSW78002 REPLACE FRONTLOAD TRUCKS- COMMERCIAL 62,629 411,380 431,949 868,110 952,447 500,035 3,370,802 6,597,352 CIPSW78003 REPLACE SIDELOAD TRUCKS- RESIDENTIAL 22,915 1,558,259 1,636,172 1,717,980 1,803,879 2,367,592 11,200,870 20,307,667 CIPSW78004 REP BULK TRASH EQUIP- RESIDENTIAL 299,268 981,115 887,645 916,830 692,638 727,270 6,696,636 11,201,402 CIPSW78005 REPLACE PICKUPS / SERVICE TRUCKS 39,701 111,163 126,000 63,919 175,115 70,470 359,104 945,472 CIPSW78009 ALLEY GATING 38,150 20,000 20,000 20,000 20,000 20,000 138,150 TOTAL 462,663 3,081,917 3,465,001 4,195,655 4,025,703 3,685,367 24,098,316 43,014,622 FY24-33 Solid Waste by Funding Source 263 FUND FUND NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6120 SOLID WASTE FUND 462,663 3,081,917 3,465,001 4,195,655 4,025,703 3,685,367 24,098,316 43,014,622 TOTAL 462,663 3,081,917 3,465,001 4,195,655 4,025,703 3,685,367 24,098,316 43,014,622 264 Replace Street Sweepers Project Number: CIPSW19027 Description: Programmatic replacement of lg Solid Waste (SW) vehicles. SW has 6 street sweepers, each with a lifespan of 7yrs requiring replacement in next 10yrs. Current quotes & inflation used. Rep plan:FY25(1), FY26(1), FY27(1), FY29-33(5). MAG Grants will be pursued. Justification: Mandated by State and Federal as part of PM10 nonattainment areas to improve air quality, reduce particulate emissions, and clear streets of road hazards/debris. Programmatic replacement of vehicles will reduce overall lifecycle costs. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6120 - SOLID WASTE FUND $363,235 $372,316 $381,624 $2,197,746 $3,314,921 265 Replace Rolloff Trucks – Commercial Project Number: CIPSW78001 Description: Programmatic replacement of large Solid Waste (SW) vehicles to ensure the provision of essential services to the community. SW has 3 commercial roll-off trucks requiring replacement over next 10 yrs. Replacement plan: FY26(1), FY29-33(1). Justification: Collection/disposal of solid waste is required by city and county. Programmatic replacement of vehicles reduces overall lifecycle costs, protects public health/safety while aligning resources with the City's strategic priorities. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6120 - SOLID WASTE FUND $236,500 $273,158 $509,658 266 Replace Frontload Trucks - Commercial Project Number: CIPSW78002 Description: Replacement of SW vehicles & equip. SW has 7 front load trucks with a lifespan of 7yrs & 1 front load bin delivery truck/trailer with lifespan of 10yrs requiring replacement over next 10yrs. Plan: FY24(1), FY25(1), FY26(2), FY27(2), FY28(1), FY29-33(5). Justification: Collection/disposal of solid waste is required by County/City code. Ensures a safe & efficient operation for a revenue generating enterprise. Programmatic replacement of vehicles will reduce overall lifecycle costs. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6120 - SOLID WASTE FUND $62,629 $411,380 $431,949 $868,110 $952,447 $500,035 $3,370,802 $6,597,352 267 Replace Sideload Trucks - Residential Project Number: CIPSW78003 Description: Replacement of large Solid Waste (SW) vehicles. SW has 27 side load trucks with a lifespan of 6 yrs requiring replacement over next 10 yrs. Plan: FY24-(4), FY25 (4), FY26-(4), FY27-(4), FY28-(5), FY29-33- (20). Justification: Collection/disposal of solid waste is required by State/City code. Programmatic replacement of vehicles reduces overall lifecycle costs, protects public health/safety while aligning resources with City’s strategic priorities. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6120 - SOLID WASTE FUND $22,915 $1,558,259 $1,636,172 $1,717,980 $1,803,879 $2,367,592 $11,200,870 $20,307,667 268 Replace Residential Bulk Trash Equipment Project Number: CIPSW78004 Description: Repl lg SW veh/equip; have 15 rear load trucks/8 tractors w/life of 8yrs req repl over 10yrs. Plan: FY24(2)trucks/(1)tractor, FY25(2)trucks,(1)tractor FY26(2)trucks/(1)tractor, FY27(1)truck/(1)tractor, FY28-(1)truck(1)tractor, FY29-33(11)trucks/(5)tractors Justification: Collection/disposal of solid waste is mandated by State/City code. Programmatic replacement reduces overall lifecycle costs, protect public health and safety while aligning resources with the City's strategic priorities. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6120 - SOLID WASTE FUND $299,268 $981,115 $887,645 $916,830 $692,638 $727,270 $6,696,636 $11,201,402 269 Replace Pickups / Service Trucks Project Number: CIPSW78005 Description: Provides for programmatic replacement of Solid Waste vehicles. SW has 10 trucks used to support daily operations and provide timely customer service to the community. Replacement plan: FY24-(2), FY25- (1), FY26-(1), FY27-(2), FY28-(1), FY29-33-(5). Justification: These trucks are support units that assist in maintaining the safe and efficient operation for a revenue generating enterprise. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6120 - SOLID WASTE FUND $39,701 $111,163 $126,000 $63,919 $175,115 $70,470 $359,104 $945,472 270 Alley Gating Project Number: CIPSW78009 Description: A program that manages health/safety issues including blocking of vehicular access & difficulty of enforcement due to illegal dumping in alleys. Includes residential garbage serv. relocations/blue stake gate location/gate installation/access key/code. Justification: Promotes/enhances quality of life for residents residing near or adjacent to alley ways, providing a safer & cleaner environment. Project includes pre-gated alley clean-up & citizen notification. O&M to be an ongoing supplemental as gates get older. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6120 - SOLID WASTE FUND $38,150 $20,000 $20,000 $20,000 $20,000 $20,000 $138,150 FY24-33 Streets CIP Overview 271 • Funded by Transportation Sales Tax (55%), Streets G.O. Bonds (19%), HURF (14%), Development Impact Fees (9%) and General Fund (3%) • Safety Projects • Olive Ave: 59th Ave to 67th Ave Street Lights • 53rd Ave & Camelback Rd HAWK • 58th Ave & Bethany Home Rd HAWK • Speed Feedback Signs (School Zones) • Guardrail Update • Flashing Yellow Arrow Phase 5 • Transportation Safety Program FY24-33 Streets CIP Overview 272 • Intersection Signalization/Improvements • 61st Ave& Olive Ave • Sarival Ave & Bethany Home Rd • Sarival Ave & Glendale Ave • Litchfield Rd & Bethany Home Rd • Reems Rd & Hatcher Rd • Sarival Ave & Olive Ave • Traffic Signal Interconnect • 83 Ave & Cardinals Way Intersection Improvement FY24-33 Streets CIP Overview 273 • Active Transportation (Bicycle/Pedestrian) • Central Core Sidewalk Gaps • 67th Ave Bike Lanes • Maryland Active Transportation Improvements • Missouri Active Transportation Improvements • Infill Sidewalk • Match for Roadway Safety Projects • Scallop Street Program • RAISE Grant Match FY24-33 Streets CIP Overview 274 • PMP/Pavement/Arterial Reconstruction • Pavement Management • 51st Ave. – Olive Ave. to Peoria Ave. • Shovel Ready Projects • ST Recon 83 Ave: Glendale Ave to Northern Ave • Miscellaneous Streets Projects • Right-of-Way Landscaping Plan • Transportation Long Range Plan • Safe Streets for All Grant • Advanced Traffic System Management FY24-33 Streets Projects 275 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST19006 PAVEMENT MANAGEMENT $6,108,711 $17,137,182 $18,064,162 $18,952,391 $19,884,983 $20,864,153$120,808,232 $221,819,815 CIPST19010 BALLPARK BOULEVARD $1,316,042 $1,316,042 CIPST19048 CAPITAL BRIDGE REPAIR PROGRAM $147,296 $321,000 $337,050 $353,903 $371,598 $390,178 $2,263,776 $4,184,800 CIPST20012 FLASHING YELLOW ARROWS $513,245 $513,245 CIPST20013 VEHICLE REPLACEMENT $1,435,257 $540,800 $560,432 $584,930 $608,326 $632,660 $3,563,756 $7,926,161 CIPST20016 ST RECON GLENDALE -101 TO EL MIRAGE $625,423 $625,423 CIPST20021 ST RECON CAMELBACK - 83RD TO 91ST $452,724 $452,724 CIPST20022 BIKE PROJECTS (LOCAL MATCH) $143,208 $146,072 $148,994 $151,973 $806,694 $1,396,941 FY24-33 Streets Projects 276 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST21001 TELECOM CONDUITS $209,600 $209,600 $209,600 $209,600 $209,600 $1,048,000 $2,096,000 CIPST21014 75TH AVENUE ASPERA IMPROVEMENTS $19,348 $19,348 CIPST21015 CENTRAL CORE SIDEWALK GAPS $171,931 $226,520 $398,451 CIPST21016 67TH AVENUE BIKE LANES $755,788 $504,213 $1,260,001 CIPST21017 STREET RECON BELL RD - 51ST TO 59TH $325,986 $325,986 CIPST21018 ST RECON GLENDALE - 101 TO 91ST $1,093,044 $1,093,044 CIPST21045 ST RECON CACTUS - 59TH TO 67TH $124,930 $124,930 CIPST21051 ST RECON 75TH-GLENDALE TO NORTHERN $1,647 $1,647 FY24-33 Streets Projects 277 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST21052 ST RECON 83RD-GLENDALE TO NORTHERN $6,510 $3,060,000 $3,066,510 CIPST22043 ST RECON 67TH - GREENWAY TO BELL $51,129 $51,129 CIPST22062 PAVEMENT CUT REPAIR $5,084 $109,140 $111,323 $113,549 $115,820 $118,137 $627,081 $1,200,133 CIPST22063 TRANSPORTATION NETWORK IMPROVEMENTS $2,000,000 $2,000,000 CIPST22064 TRANSPORTATION SAFETY PROGRAM $677,487 $432,001 $440,640 $449,452 $458,442 $467,612 $2,482,155 $5,407,789 CIPST22065 SCALLOP STREET PROGRAM $4,000,000 $4,000,000 $1,000,000 $9,000,000 CIPST22067 57TH AND GREENWAY INTERSECT IMPROV. $200,000 $200,000 FY24-33 Streets Projects 278 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST22068 59TH AND NORTHERN INTERSECT IMPROV. $1,055,983 $1,055,983 CIPST22120 95TH AVE / MONTEBELLO INTERSECTION $161,382 $161,382 CIPST23014 OLIVE AVE 59-67 STREET LIGHTS $69,504 $315,433 $384,937 CIPST23015 61ST/OLIVE TRAFFIC SIGNAL UPGRADE $56,731 $211,371 $268,102 CIPST23016 53RD/CAMELBACK NEW HAWK $112,050 $390,167 $502,217 CIPST23017 NORTHERN PARKWAY CABLE BARRIER 2 $155,625 $1,042,750 $1,198,375 FY24-33 Streets Projects 279 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST23018 TMC UPGRADE $228,692 $2,013,998 $2,242,690 CIPST23019 MARYLAND ACTIVE TRANSPORTATION IMPR $1,055,983 $1,055,983 CIPST23020 MISSOURI ACTIVE TRANSPORTATION IMPR $161,382 $161,382 CIPST23047 SARIVAL AVE/BETHANY HOME RD SIGNAL $69,504 $315,433 $384,937 CIPST23048 SARIVAL AVE/GLENDALE AVE SIGNAL $56,731 $211,371 $268,102 CIPST23049 INFILL STREETLIGHTS PHASE II $112,050 $390,167 $502,217 FY24-33 Streets Projects 280 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST23050 58TH AVENUE/BETHANY HOME ROAD $2,280 $89,683 $679,643 $771,606 CIPST23051 TRAFFIC SIGNAL INTERCONNECT $249,120 $645,264 $658,169 $671,332 $2,223,885 CIPST23052 SPEED FEEDBACK SIGNS SCHOOL ZONES $90,000 $81,000 $171,000 CIPST23053 INFILL SIDEWALK $175,031 $162,000 $165,241 $168,544 $171,916 $175,354 $927,006 $1,945,092 CIPST23054 GUARDRAIL UPDATE $5,496 $108,001 $110,160 $112,363 $114,611 $116,903 $620,536 $1,188,071 CIPST23055 ARTERIAL PAVEMENT TREATMENT $535,837 $535,837 CIPST23056 ARTERIAL STREET RECONSTRUCTION $4,976,675 $3,706,776 $8,683,451 CIPST23057 FLASHING YELLOW ARROWS PHASE 5 $2,280 $89,683 $679,643 $771,606 CIPST24013 43RD AVE-PEORIA INTERSECTION IMPRV $249,120 $645,264 $658,169 $671,332 $2,223,885 CIPST24014 51ST AVE-CAMELBACK INTERSECTION IMP $90,000 $81,000 $171,000 FY24-33 Streets Projects 281 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST24015 51ST AVE-OLIVE INTERSECTION IMPRV $500,000 $500,000 CIPST24016 59TH AVE-THUNDERBIRD INTERSECTION $61,200 $353,736 $414,936 CIPST24017 67TH AVE-GREENWAY INTERSECTION $382,500 $1,170,450 $1,552,950 CIPST24018 67TH AVE-PEORIA INTERSECTION IMPRV $22,950 $132,651 $155,601 CIPST24019 67TH AVE: ARROWHEAD LP TO DVALLEY $663,255 $2,070,152 $2,733,407 CIPST24020 67TH AVE: LP 101 TO ARROWHEAD LP $260,100 $795,906 $1,056,006 CIPST24021 67TH AVE: PINNACLE PK TO DEER VAL $650,250 $1,989,765 $2,640,015 CIPST24022 67TH AVE-THUNDERBIRD INTERSECTION $500,000 $500,000 CIPST24023 83RD AVE-CARDINALS WAY INTERSECTION $61,200 $353,736 $414,936 CIPST24024 99TH AVE: GLENDALE AVE TO NORTHERN $382,500 $1,170,450 $1,552,950 FY24-33 Streets Projects 282 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST24025 BALLPARK BLVD: BHR TO MARYLAND AVE $468,180 $2,706,080 $3,174,260 CIPST24026 CAMELBACK RD: 99TH AVE TO LOOP 101 $40,800 $373,320 $414,120 CIPST24027 LITCHFIELD-BHR TRAFFIC SIGNAL $785,995 $785,995 CIPST24028 NORTHERN AVE: 303 TO SARIVAL $1,120,642 $1,120,642 CIPST24029 NORTHERN: REEMS-LITCHFIELD WIDENING $2,801,605 $2,801,605 CIPST24030 NORTHERN: SARIVAL-ALSUP WIDENING $1,400,803 $1,400,803 CIPST24031 REEMS-HATCHER TRAFFIC SIGNAL $672,385 $672,385 CIPST24032 SARIVAL: GLENDALE TO NORTHERN ROADW $3,412,603 $3,412,603 CIPST24033 SARIVAL-OLIVE TRAFFIC SIGNAL $1,008,578 $1,008,578 CIPST24034 SARIVAL-PEORIA INTERSECTION IMPRV $784,725 $784,725 FY24-33 Streets Projects 283 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST24035 RIGHT OF WAY LANDSCAPE PLAN $892,067 $918,829 $946,394 $370,144 $381,248 $797,152 $4,305,833 CIPST24036 STREET DESIGN PROJECT $1,000,000 $1,000,000 CIPST24037 TRANSPORTATION PLAN $500,000 $510,000 $1,115,122 $2,125,122 CIPST24038 CARMEL ESTATES PAVEMENT SETTLEMENT $435,960 $435,960 CIPST24039 FEDERAL GRANT FUND MATCH $2,500,000 $2,500,000 CIPST24040 51ST AVE CORRIDOR PROJECT $2,034,180 $5,981,295 $8,015,475 CIPST24041 BELL RD CORRIDOR PROJECT $1,581,360 $4,907,553 $6,488,913 CIPST24042 CENTRAL GLENDALE INFRA IMPRV $503,677 $7,162,963 $7,666,640 FY24-33 Streets Projects 284 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPST24043 GLENDALE SS4A ACTION PLAN $799,834 $799,834 CIPST65005 ITS UPGRADES (LOCAL MATCH) $537,399 $205,200 $209,304 $213,491 $217,760 $222,115 $1,179,014 $2,784,283 CIPST65006 BUS PULLOUTS $315,869 $324,000 $330,479 $337,089 $343,831 $350,708 $1,861,598 $3,863,574 CIPST65016 NORTHERN PARKWAY $126,981 $670,000 $670,000 $670,000 $670,000 $2,806,981 CIPST68125 STREET RECONSTRUCTION PROGRAM $11,355,749 $11,585,029 $12,047,311 $11,502,161 $6,817,493 $28,192,255 $81,499,998 CIPST68918 INFILL LIGHTING PROGRAM PHASE I $1,206,021 $162,001 $165,240 $168,545 $171,915 $175,353 $930,806 $2,979,881 CIPST68922 STREETLIGHT POLE PROGRAM $1,007,211 $81,000 $82,620 $84,273 $85,958 $87,677 $465,399 $1,894,138 TOTAL $31,298,713 $55,496,481 $59,802,766 $43,366,430 $47,119,404 $30,951,563 $182,746,069 $450,781,427 FY24-33 Streets by Funding Source 285 Funding Source EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080-GENERAL FUND CIP $4,209,600 $5,101,667 $1,128,429 $1,155,994 $579,744 $381,248 $2,845,152 $15,401,834 2050-HURF $454,457 $3,663,680 $3,846,864 $4,039,207 $4,241,168 $4,453,226 $25,837,229 $46,535,831 2060-TRANSPORTATION GRANTS $6,855,734 $18,731,454 $924,426 $1,457,221 $27,968,835 2070-TRANS. SALES TAX $5,654,254 $13,473,502 $14,217,298 $14,913,184 $15,643,815 $16,410,927 $94,971,003 $175,283,983 2071-TRANSPORTATION SILF $2,500,000 $2,500,000 4010-STREETS CONSTRUCTION $2,681,393 $11,355,749 $11,585,029 $12,047,311 $11,502,161 $6,817,493 $28,192,255 $84,181,391 4020-HURF CAPITAL PROJECTS $5,628,183 $1,490,502 $1,080,039 $1,108,284 $1,136,298 $1,165,108 $6,287,318 $17,895,732 4030-TRANS. CAPITAL PROJECTS $9,918,070 $9,005,250 $4,354,579 $5,587,726 $2,856,442 $1,723,561 $10,555,624 $44,001,252 4410-2014-DIF ST. ZN 1 EAST $1,244,918 $1,497,335 $2,742,253 4420-2014-DIF ST. ZN 2 W 101 $967,896 $967,896 4431-2019-DIF-STREETS $1,507,837 $2,085,165 $1,391,178 $4,514,724 $10,235,351 $2,070,152 $21,804,407 4434-2023-DIF STREETS WEST $967,896 $10,530,115 $11,498,011 TOTAL $31,298,712 $55,496,480 $59,802,766 $43,366,430 $47,119,405 $30,951,563 $182,746,069 $450,781,425 286 Pavement Management Project Number: CIPST19006 Description: Project provides for street pavement treatments and potential local grant match funding. Specific activities included in this project involve surface preparation, repairs, and overlays as needed. The street locations and treatments shall be identified in the City's ongoing Pavement Management Plan. Justification: This project targets street segments that are in need of pavement treatments. Street rehabilitation is necessary to maximize the life of the city’s residential, collector, and arterial street network. FUND EST CARRYOVER FY24 FY 25 FY26 FY27 FY28 FY 29-32 TOTAL 2050 – HURF $454,457 $3,663,680 $3,846,864 $4,039,208 $4,241,168 $4,453,225 $25,837,229 $46,535,831 2070 – TRANS. SALES TAX $5,654,254 $13,473,503 $14,217,298 $14,913,184 $15,643,815 $16,410,927 $94,971,003 $175,283,984 TOTAL $6,108,711 $23,245,894 $18,064,162 $18,952,392 $19,884,983 $20,864,152 $120,808,232 $221,819,815 287 Ballpark Boulevard Project Number: CIPST19010 Description: Project to design and construct Ballpark Boulevard. This is Phase II of this project to build the roadway to its ultimate configuration and tile the Roosevelt irrigation ditch. Justification: This project was identified as necessary for network connectivity in the region. FUND EST CARRYOVER FY24 FY 25 FY26 FY27 FY28 FY 29-32 TOTAL 4410-2014-DIF STREETS ZONE $1,244,918 $1,244,918 4410-2019-DIF STREETS $71,124 $71,124 TOTAL $1,316,042 $1,316,042 288 Capital Bridge Repair Program Project Number: CIPST19048 Description: This program is needed to maintain city bridges to meet Federal Highway Administration standards. There are approximately 43 bridges that are inspected by Arizona Department of Transportation (ADOT) semi-annually. Justification: Under the National Bridge Inspection Program, administered by ADOT, the city is required to maintain its bridges to a satisfactory standard. FUND EST CARRYOVER FY24 FY 25 FY26 FY27 FY28 FY 29-32 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $147,296 $321,000 $337,050 $353,903 $371,598 $390,178 $2,263,776 $4,184,800 289 Flashing Yellow Arrows Project Number: CIPST20012 Description: The project is to convert left-turn movements at existing signalized intersections to flashing yellow arrow operation with the purpose of improving safety. The project involves median modifications to provide better alignment. Justification: According to national data, Flashing Yellow Arrows can reduce left-turn crashes by offering motorists more opportunities to make left turns. This project provides Glendale matching funds. FUND EST CARRYOVER FY24 FY 25 FY26 FY27 FY28 FY 29-32 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $513,245 $513,245 290 Vehicle Replacement Project Number: CIPST20013 Description: Replacement of existing vehicles that support transportation operations. The current 10-Year Transportation Vehicle Replacement Program includes 66 vehicles and are planned to be replaced depending on criteria and Fleet Services Division recommendation. Justification: Vehicle replacements are necessary to support the Transportation Department. This project is consistent with the Vehicle Replacement Program FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4020 HURF CAPITAL PROJECTS $708,238 $270,400 $280,216 $292,465 $304,163 $316,330 $1,781,878 $3,245,452 4030-TRANSPORTATION CAPITAL $727,019 $270,400 $280,216 $292,465 $304,163 $316,330 $1,781,878 $3,245,452 TOTAL 1,435,257 $540,800 $560,432 $584,930 $608,326 $632,660 $3,563,756 $7,926,161 291 ST Recon Glendale -101 To El Mirage Project Number: CIPST20016 Description: Project to reconstruct street segment between Glendale Avenue from Loop 101 to El Mirage Road and related improvements. Justification: This street segment has been identified in the Pavement Management Plan and Pavement Condition Inventory to be reconstructed due to poor pavement conditions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4010-STREETS CONSTRUCTION $625,423 $625,423 292 St Recon Camelback – 83rd To 91st Project Number: CIPST20021 Description: Project to reconstruct street segment between Camelback Road from 91st Avenue to 83rd Road and related improvements. Justification: This street segment has been identified in the Pavement Management Plan and Pavement Condition Inventory to be reconstructed due to poor pavement conditions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4010-STREETS CONSTRUCTION $452,724 $452,724 293 Bike Projects (Match) Project Number: CIPST20022 Description: This funding provides matching funds for bicycle and pedestrian related projects. Justification: This project enhances the quality of life for the residents and visitors by providing additional bicycle and pedestrian facilities. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $143,208 $146,072 $148,994 $151,973 $806,694 $1,396,941 294 Telecom Conduits Project Number: CIPST21001 Description: This project will allow additional conduits and sleeves to be installed in intersections and other roadway improvements as part of Capital Improvement Projects that occur throughout the city. Justification: Utility companies cut into existing city street networks to install new telecommunications. By providing conduits in the street sections when CIP projects occur, the utility companies will no longer need to cut into new/ improved streets. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080-GENERAL GOVERNMENT CAPITAL $209,600 $209,600 $209,600 $209,600 $209,600 $1,048,000 $2,096,000 295 75TH Avenue Aspera Improvements Project Number: CIPST21014 Description: Project includes median reconfiguration, street widening and wayfinding signage on Aspera Boulevard as well as restriping and signage on 75th Avenue and right-of-way acquisition. Justification: This project derives from a development agreement to complete infrastructure improvements in this area to allow for better traffic flow and mitigate congestion in the vicinity of Aspera Boulevard and 75th Avenue. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $19,348 $19,348 296 Central Core Sidewalk Gaps Project Number: CIPST21015 Description: This project identifies matching funds for the installation of continuous sidewalks in the central core area. Justification: Project addresses General Plan, identifying the need to improve sidewalks. The City was awarded $2.1 M in Federal funding for the design and construction of this project. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $171,931 $226,520 $398,451 297 67th Avenue Bike Lanes Project Number: CIPST21016 Description: This project identifies matching funds for the installation of bike lanes on 67th avenue between Missouri Avenue and Cholla Street. Justification: The city was awarded $4.3M in Federal funding for the design and construction of this project. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $755,788 $504.21 $1,260,001 298 Street Recon Bell Rd – 51st To 59th Project Number: CIPST21017 Description: Project to surface reconstruct street segment between Bell Road from 51st Avenue to 59th Avenue and related improvements. Justification: This street segment has been identified in the Pavement Management Plan and Pavement Condition Inventory to be surface reconstructed due to poor pavement conditions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4010-STREETS CONSTRUCTION $325,986 $325,986 299 St Recon Glendale - 101 TO 91st Project Number: CIPST21018 Description: Project to surface reconstruct street segment between Glendale Avenue from Loop 101 to 91st Avenue and related improvements. Justification: This street segment has been identified in the Pavement Management Plan and Pavement Condition Inventory to be surface reconstructed due to poor pavement conditions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4010-STREETS CONSTRUCTION $1,093,044 $1,093,044 300 St Recon Glendale – 59th To 67th Project Number: CIPST21045 Description: Project to reconstruct street segment between Cactus Road from 59th Avenue to 67th Avenue. Justification: This street segment has been identified in the Pavement Management Plan and Pavement Condition Inventory to be reconstructed due to poor pavement conditions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4010-STREETS CONSTRUCTION $124,930 $124,930 301 St Recon 75th-Glendale To Northern Project Number: CIPST21051 Description: Project to reconstruct street segment between 75th Ave from Glendale Avenue to Northern Avenue and related improvements. Justification: This street segment has been identified in the Pavement Management Plan and Pavement Condition Inventory to be surface reconstructed due to poor pavement conditions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4010-STREETS CONSTRUCTION $1,647 $1,647 302 ST Recon 83rd-Glendale TO Northern Project Number: CIPST21052 Description: Project to reconstruct street segment between 83rd Ave from Glendale Avenue to Northern Avenue and related improvements. Justification: This street segment has been identified in the Pavement Management Plan and Pavement Condition Inventory to be surface reconstructed due to poor pavement conditions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4010-STREETS CONSTRUCTION $6,510 $6,510 4410-2019-DIF STREETS $1,562,665 $1,562,665 4410-2014 —DIF- STREETS ZONE $1,497,335 $1,497,335 TOTAL $6,510 $3,060,000 $3,066,510 303 St Recon 67th - Greenway To Bell Project Number: CIPST22043 Description: Project to reconstruct 67th Avenue from Greenway Road to Bell Road and related improvements. Justification: This street segment has been identified in the Pavement Management Plan and Pavement Condition Inventory to be surface reconstructed due to poor pavement conditions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4010-STREETS CONSTRUCTION $51,129 $51,129 304 Pavement Cut Repair Project Number: CIPST22062 Description: Project to repair street pavement cuts. Justification: Street pavement cut repair costs are to be reimbursed by contractors or other parties that have to cut streets as part of their projects. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4020 HURF CAPITAL PROJECTS $5,084 $109,140 $111,323 $113,549 $115,820 $118,137 $627,081 $1,200,133 305 Transportation Network Improvements Project Number: CIPST22063 Description: Project for matching funds to fix safety issues throughout the City and communication system needs Justification: This project will provide for local matching funds for potential grants. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4020 HURF CAPITAL PROJECTS $2,000,000 $2,000,000 306 Transportation Safety Program Project Number: CIPST22064 Description: Project for safety street components such as raised medians, flashing yellow-arrows, intersection signalization, crash barriers and other related components. Justification: This project will aid to address immediate safety concerns throughout the city and for highway safety match funds. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4020 HURF CAPITAL PROJECTS $677,487 $432,000 $440,640 $449,452 $458,442 $467,612 $2,482,155 $5,407,789 307 Scallop Street Program Project Number: CIPST22065 Description: Glendale has streets that were initially constructed without all typical street components. These “scalloped streets” are missing one or more of the following elements: full width pavement; curb and gutter; or sidewalk on one or both sides. Justification: This project is to complete street improvement to reduce traffic accidents, enhance traffic flow, provide safety to adjacent pedestrian traffic and mitigate property flooding. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080-GENERAL GOVERNMENT $4,000,000 $4,000,000 $1,000,000 $9,000,000 308 57th and Greenway Intersect Improv Project Number: CIPST22067 Description: Installation of Traffic Signal and deceleration lane at the intersection of 57th Avenue and Greenway Road. Justification: This project emerged as development related through the approval of the Planned Area Development “Village at Thunderbird.” The City is to pay a share of the cost for this improvement to accommodate increased traffic in this area. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $200,000 $200,000 309 59th and Northern Intersect Improv Project Number: CIPST22068 Description: Right turn lane along southbound 59th Avenue to westbound Northern Avenue. Justification: Increase capacity of southbound 59th Avenue for growth in traffic due to developments in the DIF zone. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $1,055,983 $1,055,983 310 95th Ave / Montebello Intersection Project Number: CIPST22120 Description: This project is to improve the intersection of 95th Avenue and Montebello Avenue. This project will include the traffic signal and associated intersection improvements Justification: These changes will be to accommodate the growing traffic in the area due to significant development activity. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $161,382 $161,382 311 Olive Ave 59-67 Street Lights Project Number: CIPST23014 Description: This project is to add streetlights on Olive Avenue between 59th Avenue and 67th Avenue. Justification: This is a safety improvement recommendation from the Road Safety Assessment (RSA). This project has 202,123 in funding identified from Maricopa Association of Governments (MAG) towards the construction phase. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $301,644 $301,644 4020 HURF CAPITAL PROJECTS $15,554 $15,554 4030-TRANSPORTATION CAPITAL PROJECTS $53,950 $13,789 $67,739 TOTAL $69,504 $315,433 $384,937 312 61st/Olive Traffic Signal Upgrade Project Number: CIPST23015 Description: The project is to Upgrade the existing traffic signal at the intersection of Olive Avenue and 61st Avenue. Justification: This is a safety improvement recommendation from the Roadway Safety Assessment (RSA). The project has 301,644 in Maricopa Association of Governments (MAG) funding identified towards construction phase. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $202,123 $202,123 4020- HURF CAPITAL PROJECTS $6,308 $6,308 4030-TRANSPORTATION CAPITAL PROJECTS $50,423 $9,248 $59,671 TOTAL $56,731 $211,371 $268,102 313 53rd/Camelback New Hawk Project Number: CIPST23016 Description: This project is to install a high-intensity activated crosswalk beacon also known as HAWK at the intersection of 53rd Avenue and Camelback Road. Justification: A safety study conducted for this location identified a high-intensity activated crosswalk beacon also known as HAWK as a need. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $390,167 $390,167 4030-TRANSPORTATION CAPITAL PROJECTS $112,050 $112,050 TOTAL $112,050 $390,167 $502,217 314 Northern Parkway Cable Barrier 2 Project Number: CIPST23017 Description: The project is to install a median cable barrier between 143rd Avenue and 1/4-mile west of Dysart Road. This will close the gap in the median of the portion of Northern Parkway. This project is under design. Justification: The median cable barrier is intended to address safety concerns related to the potential crossover traffic. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $1,042,750 $1,042,750 4030-TRANSPORTATION CAPITAL PROJECTS $155,625 $155,625 TOTAL $155,625 $1,042,750 $1,198,375 315 TMC Upgrade Project Number: CIPST23018 Description: Upgrade the traffic management system equipment and furnish the new operations campus location for a fully functional traffic management center. Justification: The project is needed to replace failing and outdated equipment. The TMC is critical to managing traffic operations for day-to-day needs and during large/mega-events. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $228,692 $2,013,998 $2,242,690 316 Maryland Active Transportation Impr Project Number: CIPST23019 Description: This project identifies local matching funds for the installation of sidewalks and bike lanes in the area immediately south of Downtown Glendale. The project area is bounded by Maryland Ave, Bethany Home Rd, 59th Ave, and 43rd Ave. Justification: This grant funded project is to close gaps in the pedestrian and bicycle system. The project will also improve access to businesses, residences, and bus stops. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $143,490 $95,155 $238,645 317 Missouri Active Transportation IMPR Project Number: CIPST23020 Description: This project identifies matching funds for the installation of sidewalks and bike lanes in the area immediately west of Grand Avenue. The project area is bounded by Missouri Ave, Bethany Home Rd, 61st Ave, and 51st Ave. Justification: This grant funded project is to close gaps in the pedestrian and bicycle infrastructure system. The project will also improve access to businesses, residences, and bus stops. The City was awarded $2.4 M in Federal funding for the design and construction of this project. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $123,278 $123,278 318 Sarival Ave/Bethany Home Rd Signal Project Number: CIPST23047 Description: This project will install a traffic signal at the intersection of Sarival Avenue and Bethany Home Road. The project includes right-of-way acquisition and utility relocation efforts. A traffic signal is needed at this location based on Traffic Impact Analysis and due to increase in traffic volume related to development growth. Justification: This intersection location is anticipated to have an increase in traffic volume due to growth in the general vicinity requiring a new traffic signal. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4420-2014-DIF STREETS $967,896 $967,896 319 Sarival Avenue / Glendale Avenue Project Number: CIPST23048 Description: This project will install a traffic signal at the intersection of Sarival Ave and Glendale Ave. The project includes right-of-way acquisition and utility relocation efforts. A traffic signal is needed at this location based on Traffic Impact Analysis and due to increase in traffic volume related to development growth. Justification: This intersection location is anticipated to have an increase in traffic volume due to growth in the general vicinity requiring a new traffic signal. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4434-2023-DIF Streets West $967,896 $967,896 4030-TRANSPORTATION CAPITAL PROJECTS $74,845 TOTAL $74,845 $967,896 $1,042,741 320 Infill Streetlights Phase II Project Number: CIPST23049 Description: Install new streetlights along Bethany Home Road from 43rd Avenue to 59th Avenue, and 30 in other locations citywide for phase II. Justification: The locations identified as part of this project have gaps in the street lighting system requiring an infill project to improve safety. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $168,156 $493,627 $503,499 $513,569 $1,678,851 321 58th Avenue/Bethany Home Road Project Number: CIPST23050 Description: This project will install a High-intensity Activated crosswalk (HAWK) and wrought iron fencing along both sides of Bethany Home Road adjacent to the park to direct pedestrian traffic to the designated crossing locations. The project will also install a westbound right turn lane at 59th Avenue & Bethany Home Road. Justification: This project location is identified as needing a HAWK beacon to serve the high volume of pedestrians crossing the street. The wrought iron fence will aid in diverting pedestrian traffic from both park locations to designated crossing locations. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $679,643 $679,643 4030-TRANSPORTATION CAPITAL PROJECTS $89,683 $89,683 4020 HURF CAPITAL PROJECTS $2,280 $2,280 TOTAL $2,280 $89,683 $679,643 $771,606 322 Traffic Signal Interconnect Project Number: CIPST23051 Description: This project will extend the City fiber and conduit network into west Glendale by approximately 18 miles of fiber optic cable and conduit. This project would connect approximately 10 traffic signals. Justification: Traffic signals in west Glendale currently are not connected to the Glendale Traffic Management Center. Additional traffic signals are planned for west Glendale to accommodate growing traffic in the area. This infrastructure is critical to good traffic operations in the City. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $249,120 $645,264 $658,169 $671,332 $2,223,885 323 Speed Feedback Signs School Zones Project Number: CIPST23052 Description: This project will install five (5) school zone signs and flashing beacons along arterials throughout the City. These installations will address traffic in both directions approaching each school zone. FY22-23 Arrowhead Elementary & Glendale HS FY23-24 Deer Valley HS & Copper Canon HS FY 24-25 TBD (possibly 1 or both charter schools in PHX along Camelback Rd). Justification: This project is intended to remind motorists to slow down in school zones in an effort to improve traffic safety. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $90,000 $81,000 $171,000 324 Infill Sidewalk Project Number: CIPST23053 Description: The project is to install approximately one mile of new sidewalk in the City each year. Justification: This project will address gaps in the sidewalk system in the City of Glendale. Incomplete sidewalk system is an impediment to pedestrian mobility including ADA users. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $175,031 $162,000 $165,241 $168,544 $171,916 $175,354 $927,006 $1,945,092 325 Guardrail Update Project Number: CIPST23054 Description: This project is to upgrade existing bridge attenuators and guardrails at multiple locations citywide. Justification: Replacing bridge attenuators and guardrails that do not meet current standards provides safer transportation infrastructure for motorists in the City of Glendale. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $5,496 $108,001 $110,160 $112,363 $114,611 $116,903 $620,536 $1,188,071 326 Arterial Pavement Treatment Project Number: CIPST23055 Description: This project will provide pavement treatment for approximately three to five miles of arterials citywide. The mileage of improvements may vary due to cost escalation. Justification: This is to address arterial reconstruction locations that have been delayed due to the lack of bond authorization. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $535,837 $535,837 327 Arterial Street Reconstruction Project Number: CIPST23056 Description: This project will reconstruct up to two miles of arterial street pavement in FY 2023 and one mile in FY24. The mileage of improvements may vary due to cost escalation. Justification: This is to address arterial reconstruction locations that have been delayed due to the lack of bond authorization. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $4,976,675 $3,706,766 $8,683,451 328 Flashing Yellow Arrows Phase 5 Project Number: CIPST23057 Description: This project will address intersection locations that were originally part of flashing yellow arrow (FYA) Phase 3 but could not be completed due to cost escalation. Justification: Studies indicate that crashes are reduced when FYA traffic signals are implemented. The FYA treatment has a positive benefit, especially for total crashes, injury and fatal crashes, and crashes related to left-turn movements. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $924,426 $924,426 4030-TRANSPORTATION CAPITAL PROJECTS $104,970 $104,970 TOTAL $104,970 $924,426 $1,029,396 329 43rd Ave-Peoria Intersection IMPRV Project Number: CIPST24013 Description: This project is to add eastbound and southbound right turn lane on 43rd Avenue and Peoria Avenue. Justification: This road Intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan and Level of Service Intersection Analysis. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4431-2019 DIF STREETS $31,212 $180,405 $211,617 TOTAL $31,212 $180,405 $211,617 330 51ST Ave –Camelback Intersection Imp Project Number: CIPST24014 Description: This project is to add eastbound to northbound turn lane and west bound to north bound turn lane on 51st Avenue and Camelback Road. Justification: This road Intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan and Level of Service Intersection Analysis. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $191,250 $585,225 $776,475 331 51st Ave – Olive Intersection Imprv Project Number: CIPST24015 Description: This project is to add northbound and westbound right turn lanes at the intersection Justification: Addition of turn lanes will reduce delays and improve the level of service at the intersection. This road intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $500,000 $500,000 332 59th Ave-Thunderbird Intersection Project Number: CIPST24016 Description: This project is to add northbound to eastbound and westbound to northbound right turn lanes on 59th Avenue and Thunderbird Road Justification: This road Intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan and Level of Service Intersection Analysis. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019- DIF STREETS $61,200 $353,736 $414,936 333 67th Ave - Greenway Intersection Project Number: CIPST24017 Description: This project is to add west bound dual left turn lanes along 67th Avenue and Greenway Road Justification: This road intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan. A 2022 study of the intersection identifies the westbound to southbound movement is outside the acceptable level of service. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $382,500 $1,170,450 $1,552,950 334 67th Ave - Peoria Intersection Imprv Project Number: CIPST24018 Description: This project is to add a westbound left turn lane along 67th Avenue and Peoria Avenue Justification: This road intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan and Level of Service Intersection Analysis. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $22,950 $132,651 $155,601 335 67th Ave: Arrowhead LP To D-Valley Project Number: CIPST24019 Description: This project is to add a northbound through lane on 67th Avenue from Arrowhead Loop Road to Deer Valley Road to make it consistent with 67th Avenue north of Deer Valley Road. Justification: This road widening project is consistent with the City of Glendale Infrastructure Improvement Plan. Additionally, it will connect a future 3rd lane to provide a logical termini. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $663,255 $2,070,152 $2,733,407 336 67th Ave: LP 101 To Arrowhead LP Project Number: CIPST24020 Description: This project is to add a northbound through lane on 67th Avenue from Loop 101 to Arrowhead Loop Road to make it consistent with 67th Avenue north of Arrowhead Loop Road Justification: This Road widening project is consistent with the City of Glendale Infrastructure Improvement Plan. The Regional Travel Demand Forecast projects a level of service E or F in 2030 at this intersection which indicates improvements are needed. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $260,100 $795,906 $1,056,006 337 67th Ave: Pinnacle Pk to Deer Val Project Number: CIPST24021 Description: This project is to add a southbound through lane on 67th Avenue from Pinnacle Peak Road to Deer Valley Road. Justification: This road widening project is consistent with the City of Glendale Infrastructure Improvement Plan. Additionally, this project is to provide connectivity between the City of Peoria and existing lanes south of Deer Valley intersection. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $650,250 $1,989,765 $2,640,015 338 67th Ave-Thunderbird Intersection Project Number: CIPST24022 Description: This project is to add an eastbound and westbound additional through lane at 67th Avenue and Thunderbird Road. Justification: This road intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan and Level of Service Intersection Analysis. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $332,928 $489,600 $2,546,899 $3,369,427 339 83rd Ave -Cardinals Way Intersection Project Number: CIPST24023 Description: This project is to add northbound, eastbound turn lane on 83rd Avenue and Cardinals Way. Justification: This road Intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $22,500 $130,050 $152,550 340 99th Ave: Glendale Ave To Northern Project Number: CIPST24024 Description: This project is to add a north-bound thru lane to fill in gaps from the existing development improvements on 99th Avenue from Glendale Avenue to Northern Avenue Justification: This road widening project is consistent with the City of Glendale Infrastructure Improvement Plan. This location is adjacent to Thompson Thrift development and provides lane connectivity. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $229,500 $1,353,040 $1,582,540 341 Ballpark Blvd: BHR to Maryland Ave Project Number: CIPST24025 Description: This project is to add northbound and southbound through lanes on Ballpark Boulevard from Bethany Home Road to Maryland Avenue. This project will occur after the development to the east is complete. Justification: This road widening project is consistent with the City of Glendale Infrastructure Improvement Plan. This project will connect 5-lane section in Phoenix and other 5-lane section currently being developed. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $468,180 $2,706,080 $3,174,260 342 Camelback Rd: 99th Ave To Loop 101 Project Number: CIPST24026 Description: This project is to add eastbound and westbound through lanes on Camelback Road from 99th Avenue to Loop 101. Justification: This road widening project is consistent with the City of Glendale Infrastructure Improvement Plan. The Regional Travel Demand Model shows this segment as below acceptable level of service. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4410-2019-DIF STREETS $40,800 $373,320 $414,120 343 Litchfield - BHR Traffic Signal Project Number: CIPST24027 Description: This project is to add intersection signalization at Litchfield Road and Bethany Home Road. The project cost is planned to be shared with Maricopa County Department of Transportation (MCDOT). The estimated total cost of the project is approximately $785K. The City of Glendale estimated share of cost is $589K and MCDOT $196K. Justification: This road Intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan and needed per the Traffic Impact Analysis. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $196,499 $196,499 4434-2023-DIF STREETS WEST $589,496 $589,496 TOTAL $785,995 $785,995 344 Northern Ave: 303 To Sarival Project Number: CIPST24028 Description: This project is to add an east bound lane on Northern Avenue from 303 to Sarival Avenue. Justification: This road widening project is consistent with the City of Glendale Infrastructure Improvement Plan. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4434-2023-DIF Streets West $1,120,642 $1,120,642 345 Northern: Reems - Litchfield Widening Project Number: CIPST24029 Description: This project to widen 0.75 miles south side and .5 miles on north side on Northern Avenue from Reems Road to Litchfield Road. Justification: This road widening project is consistent with the City of Glendale Infrastructure Improvement Plan. This project will also complete a partial section adjacent to Luke Airforce Base. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4434-2023-DIF Streets West $2,801,605 $2,801,605 346 Northern: Sarival-Alsup Widening Project Number: CIPST24030 Description: This project is to add east bound lanes on Northern Avenue from Sarival to Alsup Road. Justification: This road widening project is consistent with the City of Glendale Infrastructure Improvement Plan. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4434-2023-DIF Streets West $1,400,803 $1,400,803 347 Reems-Hatcher Traffic Signal Project Number: CIPST24031 Description: This project is to add intersection signalization at Reems Road and Hatcher Road. A share of the cost is planned to be paid by Maricopa Department of Transportation, approximately $168K and City of Glendale share of approximately $504K. The estimated total cost of the project is $672K Justification: This road Intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan and is needed per the Traffic Impact Analysis. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $168,096 $168,096 4434-2023-DIF Streets West $504,289 $504,289 TOTAL $672,385 $672,385 348 Sarival: Glendale To Northern Roadw Project Number: CIPST24032 Description: This project is to add one northbound and one southbound lane on Sarival Avenue from Glendale to Northern Avenue Justification: This road widening project is consistent with the City of Glendale Infrastructure Improvement Plan FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4434-2023-DIF Streets West $3,412,603 $3,412,603 349 Sarival-Olive Traffic Signal Project Number: CIPST24033 Description: This project is to add intersection signalization at Sarival Avenue and Olive Avenue. The project cost is planned to be shared with Maricopa County Department of Transportation by 50%. The total cost of the project is estimated to be $1M and the City of Glendale share of cost is approximately $500K. Justification: This road Intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan and needed per the Traffic Impact Analysis. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $504,289 $504,289 4434-2023-DIF Streets West $504,289 $504,289 TOTAL $1,008,578 $1,008,578 350 Sarival-Peoria Intersection Imprv Project Number: CIPST24034 Description: This project is to add intersection signalization at Sariva Avenue and Peoria Avenue. The project cost is planned to be shared with the City of Surprise. The total cost of the project is approximately $784K. The City of Glendale estimated share of cost is approximately $196K and City of Surprise $588K. Justification: This road Intersection capacity improvement is consistent with the City of Glendale Infrastructure Improvement Plan and needed per the Traffic Impact Analysis. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $588,336 $588,336 4434-2023-DIF Streets West $196,388 $196,388 TOTAL $784,724 $784,724 351 Right of Way Landscape Plan Project Number: CIPST24035 Description: This project is to implement the right of way landscape plan including citywide landscape improvements Justification: There is a need to develop a long-term sustainable landscape infrastructure that includes water conservation efforts and upgrades. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 1080- GENERAL GOVERNMENT CAPITAL $892,067 $918,829 $946,394 $370,144 $381,248 $797,152 $4,305,833 352 Street Design Project Project Number: CIPST24036 Description: This project is for the design of street reconstruction projects to be shovel ready for potential grant funding. Justification: Shovel ready projects provide the opportunity to seek potential grant funding FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030- TRANSPORTATION $1,000,000 $1,000,000 353 Transportation Plan Project Number: CIPST24037 Description: This project is to update and develop the long-range Transportation Plan for the Transportation Department. This plan will also help staff to secure grant funding. Justification: A Transportation Plan is a major component of the Transportation Department to better understand existing conditions and to plan for the future needs and growth in the City. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORATION CAPITAL $500,000 $510,000 $1,115,122 $2,125,122 354 Carmel Estates Pavement Settlement Project Number:CIPST24038 Description: Project to repair approximately 13,730 SF of sinking pavement in four (4) areas around 54th and Taro Lanes in the Carmel Estates HOA. Justification: The underlying foundation is compromised and causing the pavement surface to sink and by extension causing some damage to adjacent property. These need to be repaired as soon as possible to prevent further deterioration of the street and adjacent properties. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4020 HURF CAPITAL PROJECTS $435,960 $435,960 355 Federal Grant Fund Match Project Number:CIPST24039 Description: This project is for federal grant fund match. This includes Camelback Road: 152nd avenue to Loop 303 to widen the roadway from an existing two lanes to six lanes with a center raised median with sidewalks, bike facilities and water harvesting features. Justification: Local matching funds for potential grant funded capacity projects FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2071-TRANSPORTATION SILF $2,500,000 $2,500,000 356 51st Ave Corridor Project Project Number:CIPST24040 Description: This safety focused project will improve the street pavement, sidewalks, streetlighting, add right turn lanes, install medians, add additional controlled intersections or crossings (traffic signal or HAWK) and develop a speed management strategy for this corridor. Justification: The purpose of the project is to significantly improve its performance of the corridor, particularly in term of safety, for all road users. The estimated local share is $5M and the grant is $8M. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $2,034,180 $5,981,295 $8,015,475 357 Bell Rd Corridor Project Project Number:CIPST24041 Description: This safety focused project will improve the street pavement, sidewalks, streetlighting, add right turn lanes, install medians, add additional controlled intersections or crossings (traffic signal or HAWK) and develop a speed management strategy for this corridor. Justification: The purpose of the project is to significantly improve the performance of the corridor, particularly in term of safety, for all road users. The estimated local share is $4M and the grant share is $6M. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $1,581,360 $4,907,553 $6,488,913 358 Central Glendale Infra Imprv Project Number:CIPST24042 Description: The project will construct new sidewalk to close gaps in the pedestrian network; install new/upgraded sidewalk curb ramps to ensure ADA compliance; install new streetlights; and convert existing pedestrian- scale streetlights to light emitting diode equipment (LED-energy efficient). Justification: This project will address pedestrian safety by supporting a continuous, connected sidewalk system and curb ramp installation throughout the project area. Installation of streetlights will increase visibility on roads, allowing pedestrians and motorists to better see each other at night. The LED streetlight conversion supports the city's evolution towards environmentally sustainable infrastructure and operations practices. The estimated local share is $1.9M and the grant share is $7.6M FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $503,677 $7,162,963 $7,666,640 359 Glendale SS4A Action Plan Project Number:CIPST24043 Description: This project will develop a holistic, well-defined Safety Action Plan to prevent roadway fatalities and serious injuries for all users of Glendale's roadway network. Justification: The Action Plan will identify and address pedestrian and driver safety. The estimated local share is$199K and the grant share is $800K FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060-TRANSPORTATION GRANTS $799,834 $799,834 360 ITS Upgrades (Local Match) Project Number: CIPST65005 Description: Project provides local match funds for Federally Funded Intelligent Transportation Systems (ITS) citywide. Justification: An enhanced system with updated communications infrastructure, traffic cameras, message signs, and networking equipment will make the traffic signal system more responsive. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $537,399 $205,200 $209,304 $213,491 $217,760 $222,115 $1,179,014 $2,784,283 361 Bus Pullouts Project Number: CIPST65006 Description: Design and construction of Bus Pullouts. Justification: Bus pullouts relieve congestion, improve air quality, and provide traffic and pedestrian safety. They will be constructed at major intersections for new routes, and to extend existing routes. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $315,869 $324,000 $330,479 $337,089 $343,831 $350,708 $1,861,598 $3,863,574 362 Northern Parkway Project Number: CIPST65016 Description: Northern Parkway is a 12.5-mile partial access-controlled roadway between Sarival and Grand avenues. The current funded phase of the project is between Sarival and 87th avenues. Justification: Per intergovernmental agreement, Glendale’s portion of local funding is $37.9 million. To date, Glendale has expended approximately $33.34 million towards this project. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030-TRANSPORTATION CAPITAL PROJECTS $126,981 $670,000 $670,000 $670,000 $670,000 $2,806,981 363 Street Reconstruction Program Project Number: CIPST68125 Description: Street reconstruction on various arterial and collector streets as identified on the Pavement Management Plan. Approximately 2 to 3 miles per year. Justification: Street reconstruction is necessary to provide safe streets for traveling FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4010-STREETS CONSTRUCTION $11,355,749 $11,585,029 $12,047,311 $11,502,161 $6,817,493 $28,192,255 $81,499,998 364 Infill Lighting Program Phase 1 Project Number: CIPST68918 Description: Ongoing project to install additional street lighting in areas determined to be inadequate due to a spacing of 350 feet or greater. Infill street lighting requests are initiated by residents or staff and require the approval of affected residents. There are 85 street light requests in phase I. Justification: This project promotes or enhances the quality of life for the residents and visitors by providing well-lit areas in the city. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4020 HURF CAPITAL PROJECTS $1,206,021 $162,001 $165,240 $168,545 $171,915 $175,353 $930,806 $2,979,881 365 Streetlight Pole Program Project Number: CIPST68922 Description: This project is to remove and replace existing streetlight poles that have been identified for replacement in the pole inspection program. This program can replace approximately 27 street light poles per year. Justification: This project reduces safety concerns. This program is to mitigate safety hazards and provide better service FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4020 HURF CAPITAL PROJECTS $1,007,211 $81,000 $82,620 $84,273 $85,958 $87,677 $465,399 $1,894,138 366 FY24-33 Transit CIP Overview • Funded by Transportation Sales Tax (54%) and Transportation Grants (46%) • Projects include North Glendale Park and Ride, Bus Stop Enhancements, Bus Fleet Replacement, and Transportation Program Planning FY24-33 Transit Projects 367 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPTR21013 NORTH GLENDALE PARK & RIDE 3,493,305 3,493,305 CIPTR22069 BUS STOP ENHANCEMENTS 141,615 216,001 220,320 224,726 229,221 233,145 1,226,890 2,491,918 CIPTR22095 TRANSIT BUS FLEET REPLACEMENT 370,407 988,906 1,466,195 2,825,508 CIPTR65022 TRANSP. PROG. ENGR. CONSULTANT 16,000 275,000 275,000 280,000 280,000 285,000 1,455,000 2,866,000 TOTAL 4,021,327 491,001 1,484,226 1,970,921 509,221 518,145 2,681,890 11,676,731 FY24-33 Transit by Funding Source 368 FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060 - TRANSPORTATION GRANTS 2,870,407 988,906 1,466,195 5,325,508 4030 - TRANSPORTATION CAPITAL PROJ 1,150,920 491,001 495,320 504,726 509,221 518,145 2,681,890 6,351,223 TOTAL 4,021,327 491,001 1,484,226 1,970,921 509,221 518,145 2,681,890 11,676,731 369 North Glendale Park & Ride Project Project Number: CIPTR21013 Description: This project will establish a permanent Park and Ride facility. There are currently two Express Routes that serve north Glendale. One of the routes will be re-routed to reduce revenue miles and lower operation and maintenance costs to the City. Justification: In 2008, Valley Metro conducted a Park and Ride Reprioritization Study and identified the north area as a future need for a Park & Ride. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060 - TRANSPORTATION GRANTS $2,500,000 $2,500,000 4030 - TRANSPORTATION CAPITAL $993,305 $993,305 TOTAL $3,493,305 $3,493,305 370 Bus Stop Enhancements Project Number: CIPTR22069 Description: The Glendale Bus Stop Enhancement Project is a multi-year program that will improve the passenger experience at Glendale bus stops throughout the city. This project will also bring current non-ADA compliant stops into compliance. These improvements may include shelters, benches, trash cans, concrete pads, and other related ADA improvements. There have been 196 total stops identified for improvements, with 31 earmarked for FY23, leaving 165 locations. This funding will also supplement bus stop advertising revenue to add kiosks, panels and pad space at additional bus stop locations as the program is expanded. Justification: This set of projects is intended to enhance the safety, convenience, and function of bus stops in support of Glendale transit service operations and ridership, ensuring all stops are accessible and ADA compliant. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030 - TRANSPORTATION CAPITAL $141,615 $216,001 $220,320 $224,726 $229,221 $233,145 $1,226,890 2,491,918 371 Transit Bus Fleet Replacement Project Number: CIPTR22095 Description: This project supports the Transit Fleet Replacement Plan. Our current plan is programmed out through 2035. Federal funding for these replacement buses are programmed in the Region’s Transportation Improvement Plan (TIP) based on our replacement plan. The matching funds for the federal funding are programmed in the Region’s Transit Life Cycle Program (TLCP), which is funded via Proposition 400. Justification: This program is part of the FTA’s 5307 Program, which funds local transit vehicles based on replacement and expansion schedules. The replacement of these vehicles also ensures public transit assets are kept in a “State of Good Repair” (SOGR), which ensures the safety of our passengers. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 2060 – TRANSPORTATION GRANTS $370,407 $988,906 $1,466,195 $2,825,508 372 Transportation Program Engineering Consultant Project Number: CIPTR65022 Description: Professional engineering for preparation of design concepts and administration of right-of-way purchase for roadway, bicycle, pedestrian and transit projects. This funding provides professional engineering recommendations on capital projects and operations and maintenance of completed projects. Supports grant funding opportunity for the City. Justification: Consulting services are necessary for studies and other transportation related services.. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 4030 – TRANSPORTATION CAPITAL PROJECTS $16,000 $275,000 $275,000 $280,000 $280,000 $285,000 $1,455,000 $2,866,000 Capital Improvement Plan Priorities: • Provide water supply from multiple sources • Maintain a resilient and secure infrastructure • Meet all Federal and State regulations 373 FY24-33 Water Services CIP Overview Major Projects for first five years: • Rehab sewer lines, manholes and lift stations $59.4M • 91st Avenue Wastewater Treatment Plant $21.8M • Rehabilitate West Area Water Reclamation Facility $21.1M Funding Sources: • 6030 – Sewer Operating • 6095 & 6101 – Sewer Development Impact Fee 374 FY24-33 Wastewater CIP Overview FY24-33 Wastewater Projects 375 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPWW19086 SEWER LINE - GLENDALE AT 91ST AVE 100,890 100,890 CIPWW19087 ARROWHEAD SEWER LINES - PHASE 2 1,800,000 1,500,000 3,300,000 CIPWW19088 ARROWHEAD SEWER LINES - PHASE 3 2,650,000 3,350,000 6,000,000 CIPWW21026 WEST AREA WRF IMPROVEMENTS 2026 1,800,000 1,800,000 4,800,000 7,010,000 15,410,000 CIPWW21027 ARROWHEAD WRF IMPROVEMENTS 2025 400,000 2,110,000 2,000,000 6,950,000 6,950,000 18,410,000 CIPWW21028 UNDERGROUND STORAGE FACILITY PERMIT 200,000 200,000 CIPWW22076 SEWER LINE - REHAB PROGRAM 2,440,000 2,350,000 4,420,000 4,250,000 4,250,000 4,550,000 26,490,000 48,750,000 CIPWW22077 LIFT STATION REHAB PROGRAM 310,000 300,000 300,000 860,000 800,000 2,000,000 4,570,000 CIPWW22078 SEWER LINE EXTENSION 160,000 160,000 CIPWW22090 VISION 2 DEVELOPMENT PROJECT 6,178,170 6,178,170 CIPWW23010 ROOF REPLACEMENT – SEWER 20,200 202,000 101,000 261,600 584,800 FY24-33 Wastewater Projects 376 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPWW23012 SEWER DEVELOPMENT INFRASTRUCTURE 189,427 5,810,000 1,160,000 160,000 160,000 160,000 320,000 7,959,427 CIPWW60016 WEST AREA WRF IMPROVEMENTS 2017 2,131,556 7,605,000 3,000,000 12,736,556 CIPWW63003 99TH AVE INTERCEPTOR LINE 658,628 571,000 3,791,000 1,310,000 1,310,000 7,640,628 CIPWW63006 ARROWHEAD SEWER LINES PHASE 1 62,753 62,753 CIPWW63010 91ST AVENUE WWTP IMPROVEMENTS 1,868,264 2,720,000 4,800,000 4,400,000 4,000,000 4,000,000 20,000,000 41,788,264 CIPWW63016 SEWER LINE - PHASE V 159,862 159,862 CIPWW63024 SEWER MANHOLE REHAB PROGRAM 420,888 500,000 500,000 500,000 530,000 530,000 3,000,000 5,980,888 CIPWW63030 LIFT STATION REHAB- 67TH AVE & ACDC 362,590 362,590 CIPWW63031 WASTEWATER CAPITAL EQUIPMENT 42,390 300,000 500,000 250,000 250,000 250,000 5,000,000 6,592,390 CIPWW63032 WASTEWATER COLLECTION IMPROVEMENTS 27,105 300,000 300,000 300,000 300,000 300,000 5,000,000 6,527,105 TOTAL 15,022,724 22,868,000 22,482,000 16,871,600 23,760,000 23,650,000 68,820,000 193,474,324 FY24-33 Wastewater by Funding Source 377 FUND FUND NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 SEWER FUND 14,673,297 17,058,000 21,322,000 16,711,600 23,600,000 23,490,000 68,500,000 185,354,897 6095 2014 SEWER DIF 349,427 5,810,000 1,160,000 160,000 160,000 160,000 320,000 8,119,427 TOTAL 15,022,724 22,868,000 22,482,000 16,871,600 23,760,000 23,650,000 68,820,000 193,474,324 378 Sewer Line – Glendale at 91st Avenue Project Number: CIPWW19086 Description: Assess, design and construct 24" sewer line improvements in Glendale Avenue at 91st Avenue. Justification: This project will provide additional sewer line capacity in the area along Glendale Avenue at 91st Avenue as new development occurs. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $100,890 $100,890 379 Arrowhead Sewer Lines – Phase 2 Project Number: CIPWW19087 Description: Replacement or rehabilitation of sewer lines in the Arrowhead Ranch area to improve sewer flow condition and reduce odor. Phase 2 includes the line in Union Hills from 67th Ave to 79th Ave. Justification: The sewer line and manholes that collects wastewater flow to the Arrowhead Water Reclamation Facility are over 30 years old. This is the only sewer line that conveys sewage to the ARWRF for treatment. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $1,800,000 $1,500,000 $3,300,000 380 Arrowhead Sewer Lines – Phase 3 Project Number: CIPWW19088 Description: Replacement or rehabilitation of sewer lines in the Arrowhead Ranch area to improve sewer flow condition and reduce odor. Phase 3 includes the line in 67th Ave from Union Hills to Utopia. Justification: The sewer line and manholes that collects wastewater flow to the Arrowhead Water Reclamation Facility are over 30 years old. This is the only sewer line that conveys sewage to the ARWRF for treatment. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $2,650,000 $3,350,000 $6,000,000 381 West Area WRF Improvements 2026 Project Number: CIPWW21026 Description: Assess, design and rehabilitate 24' force main from 99th Avenue to plant. Includes construction of Phase III improvements to plant process areas. Justification: West Area was built in 2000 and processes 2.7 billion gallons of wastewater annually. Several of the processes were replaced over the last several years. A condition assessment will be performed first on the components not rehabbed in 2017 project. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $1,800,000 $1,800,000 $4,800,000 $7,010,000 $15,410,000 382 Arrowhead WRF Improvements 2025 Project Number: CIPWW21027 Description: Design and construct Effluent Reuse Distribution System (ERDS) structure, outlet valves, blowers, and other process rehabilitation and improvements. Justification: Arrowhead was built in 1985 and processes 1.5 billion gallons of wastewater annually. Several of the processes were replaced over the last three years. A condition assessment will be performed first on the components not rehabbed in 2017 project. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $400,000 $2,110,000 $2,000,000 $6,950,000 $6,950,000 $18,410,000 383 Underground Storage Facility Permit Project Number: CIPWW21028 Description: Conduct required analysis to prepare application for Underground Storage Facility (USF) permit issued by the Arizona Department of Water Resources (ADWR). Justification: USF permit is required to store reclaimed effluent in the ground. The ADWR issues the permit. USF permit for West Area expires 2023. The USF permit for Arrowhead expires 2024. Permits must be renewed before the expiration date. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $200,000 $200,000 384 Sewer Line Rehabilitation Program Project Number: CIPWW22076 Description: Program to rehabilitate or replace sewer lines in segments. Design and construct based on condition assessments. Includes rehab of phase VI, and phase VII. Justification: Reliably and safely convey sewage from residential and business through the sewer system. Project is needed to reduce risk of sewer line collapse and overflows in the system. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $2,440,000 $2,350,000 $4,420,000 $4,250,000 $4,250,000 $4,550,000 $26,490,000 $48,750,000 385 Lift Station Rehabilitation Program Project Number: CIPWW22077 Description: Assess condition and rehabilitate lift stations and related force mains citywide. Justification: It is important to ensure the lift stations are in good operational conditions and meet safety requirements. Potential equipment failure would cause sewerage overflows. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $310,000 $300,000 $300,000 $860,000 $800,000 $2,000,000 $4,570,000 386 Sewer Line Extension Project Number: CIPWW22078 Description: Sewer line extension, oversizing, and other sewer facilities in the city to the east of 115th Avenue. Justification: Provide funding for oversizing and extension of sewer line. Funding included in 2019 Infrastructure Improvement Plan (IIP). FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6095 – 2014 DIF SEWER $160,000 $160,000 387 Vision 2 Development Project Project Number: CIPWW22090 Description: Design and construct sewer lift station adjacent to Ballpark Bvld and the SWC of the Vision 2 development area to transport wastewater to the 99th Avenue Interceptor connection on the east side of the area. Justification: A lift station pumps wastewater collected from a lower elevation area to a connection on a gravity forced sewer line that is at a higher elevation. This allows for sewer services to an area that otherwise could not be connected to the sewer system. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $6,178,170 $6,178,170 388 Roof Replacement - Sewer Project Number: CIPWW23010 Description: Replace roofs on wastewater facilities per Facilities assessment schedule dated 11/22/2021. Justification: Roof rehabilitation and replacement is needed to prevent damage to building infrastructure and contents. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $20,200 $202,000 $101,000 $261,600 $584,800 389 Sewer Development Infrastructure Project Number: CIPWW23012 Description: Infrastructure Improvement Plan (IIP) includes projects for sewer line extension, oversizing, and other infrastructure to increase capacity due to growth. Justification: Provide funding for oversizing and extension of sewer line for new development. Funding included in 2019 Infrastructure Improvement Plan (IIP). FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6095 - 2014 SEWER DIF $189,427 $5,810,000 $1,160,000 $160,000 $160,000 $160,000 $320,000 $7,959,427 390 West Area WRF Improvements 2017 Project Number: CIPWW60016 Description: Study, design and construct improvements to process areas. The project has three phases. GMP 1: fine screens, ultraviolet (UV) system. GMP 2: raw sewage pump station, sedimentation basin and other plant improvements. GMP 2A: clarifiers. Justification: West Area was built in 2000 and processes 2.7 billion gallons of wastewater annually. Several of the processes were replaced over the last several years. A condition assessment will be performed first on the components not rehabbed in 2017 project. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $2,131,556 $7,605,000 $3,000,000 $12,736,556 391 99th Avenue Interceptor Line Project Number: CIPWW63003 Description: Assess and rehabilitate 99th Ave interceptor manholes and interior lining. Glendale's share of total cost is based on ownership of 71%. Epcor repays 21% of Glendale share for Sun City use. Justification: The 99th Avenue interceptor conveys sewerage from Glendale, Sun City, Peoria, and Phoenix to the 91st Ave WWTP. The interceptor is rehabilitated in phases based on condition assessments. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $658,628 $571,000 $3,791,000 $1,310,000 $1,310,000 $7,640,628 392 Arrowhead Sewer Lines – Phase 1 Project Number: CIPWW63006 Description: Replacement or rehabilitation of sewer lines in the Arrowhead Ranch area to improve sewer flow condition and reduce odor. Phase 1 includes from ARWRF under L101 for 1,639' to apprx 76th Ave. Justification: The sewer line and manhole systems are over 32 years old, and the segments need rehabilitation condition assessments. In addition, this is the only sewer main that conveys sewage to the ARWRF for treatment. Reduce risk of sewer line collapse and sewerage overflows. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $62,753 $62,753 393 91st Avenue WWTP Improvements Project Number: CIPWW63010 Description: Improvements at the 91st Ave WWTP of which Glendale is part owner. Includes GL03 metering station rehabilitation with EPCOR sharing in the cost of this project. This is Glendale's 6.5% share of costs. Justification: Glendale is one of five partner-cities that own the 91st Avenue Wastewater Treatment Plant. Rehabilitation and improvements are on-going. Contribution is based on ownership equity and is mandatory. The City of Phoenix performs the work. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $1,868,264 $2,720,000 $4,800,000 $4,400,000 $4,000,000 $4,000,000 $20,000,000 $41,788,264 394 Sewer Line – Phase 5 Project Number: CIPWW63016 Description: Rehabilitate or replace sewer lines in phase V segments. Design and construct based on condition assessments. Justification: Reliably and safely convey sewage from residential and business through the sewer system. Project is needed to reduce risk of sewer line collapse and system overflows. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $159,862 $159,862 395 Sewer Manhole Rehab Program Project Number: CIPWW63024 Description: Manhole rehabilitation throughout the city. Construction performed in phases. Justification: Manholes are in a very corrosive environment. It is important that sewage from residential homes and businesses can be reliably conveyed in sewer lines that have structural integrity. Rehabilitation reduces the risk of sewer line collapse. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $420,888 $500,000 $500,000 $500,000 $530,000 $530,000 $3,000,000 $5,980,888 396 Lift Station Rehabilitation 67th Avenue and ACDC Project Number: CIPWW63030 Description: Assess condition and rehabilitate Lift Station #2 at 67th Avenue and the Arizona Canal Diversion Channel. Justification: It is important to ensure the lift stations are in good operational conditions and meet safety requirements. Potential equipment failure would cause system overflows. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $362,590 $362,590 397 Wastewater Capital Equipment Project Number: CIPWW63031 Description: Replacement of capital equipment at wastewater facilities. Includes pumps, motors, PLC and VFD. Justification: As equipment at the wastewater treatment plants reach the end of service-life, it is replaced. It is critical to ensure City’s treatment facilities are in good operational condition to meet demands and regulatory requirements. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $42,390 $300,000 $500,000 $250,000 $250,000 $250,000 $5,000,000 $6,592,390 398 Wastewater Collections Improvements Project Number: CIPWW63032 Description: Study, design and construct improvements to wastewater collection system. Includes air relief valves, odor control, and force mains. Justification: As wastewater collection system equipment reaches the end of service-life, it is replaced. It is critical to ensure City’s collection system is in good operational condition to meet demands and regulatory requirements. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6030 - SEWER FUND $27,105 $300,000 $300,000 $300,000 $300,000 $300,000 $5,000,000 $6,527,105 Major Projects for first five years: • Rehab water lines, booster stations and reservoirs $48.0M • Rehab water treatment plants $41.0M • Add new groundwater wells and rehab existing $26.8M • Add water rights and supply infrastructure $7.0M Funding Sources: • 6020 – Water Operating • 6065 & 6071 – Water Development Impact Fee 399 FY24-33 Water CIP Overview FY24-33 Water Projects 400 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPWA19018 WATER RIGHTS & OTHER SUPPLY SOURCES 500,000 3,500,000 875,000 1,875,000 6,375,000 13,125,000 CIPWA19020 SCADA REPLACEMENT STUDY 800,000 1,000,000 1,000,000 2,800,000 CIPWA19021 STORAGE & RECOVERY WELLS REHAB 88,969 100,000 450,000 460,000 2,200,000 3,298,969 CIPWA19022 GROUNDWATER WELLS & INTERCONNECTS 3,607,237 3,590,000 3,980,000 3,370,000 1,610,000 10,250,000 26,407,237 CIPWA21022 OASIS WTP - 2023 IMPROVEMENTS 257,642 1,280,000 1,766,000 16,500,000 19,803,642 CIPWA21023 PYRAMID PEAK - 2027 IMPROVEMENTS 1,100,000 500,000 3,000,000 3,000,000 23,000,000 30,600,000 CIPWA21024 CHOLLA WTP - 2023 IMPROVEMENTS 683,612 4,000,000 6,220,000 6,000,000 6,000,000 4,000,000 20,000,000 46,903,612 CIPWA21025 WATER LINE - PACK 2 REHAB 2,272,241 2,272,241 CIPWA21031 ASSURED WATER SUPPLY OBLIGATION 224,480 224,480 CIPWA21032 67TH AVE TRANS LINE IMPROVEMENTS 689,060 689,060 CIPWA22070 WATER VALVE REPLACEMENT - ARP 308,000 308,000 FY24-33 Water Projects 401 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPWA22071 WATER LINE 59TH - GLENN TO NORTHERN 100,000 2,200,000 400,000 2,700,000 CIPWA22072 WATER LINE - CAMELBACK 51ST TO 59TH 5,000,000 5,000,000 CIPWA22074 DATA MANAGEMENT PROGRAM 103,500 103,500 CIPWA22079 WATER LINE BETHANY HM 43RD TO 51ST 900,000 2,590,000 3,490,000 CIPWA23008 WATER METER DATA COLLECTION SYSTEM 170,000 2,500,000 1,000,000 3,670,000 CIPWA23009 ROOF REPLACEMENT – WATER 181,800 202,000 202,000 202,000 787,800 CIPWA23011 WATER DEVELOPMENT INFRASTRUCTURE 984,140 650,000 150,000 150,000 150,000 150,000 750,000 2,984,140 CIPWA60015 ASSET MANAGEMENT PROGRAM 103,706 103,706 CIPWA60017 WATER & WASTEWATER SYSTEMS MODELING 54,304 500,000 150,000 150,000 150,000 150,000 1,154,304 CIPWA60018 LABORATORY EQUIPMENT REPLACEMENT 208,912 150,000 150,000 508,912 CIPWA60019 VEHICLE REPLACEMENT PROGRAM 216,691 1,250,000 1,000,000 1,000,000 1,000,000 1,000,000 4,000,000 9,466,691 FY24-33 Water Projects 402 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPWA61001 LARGE WATER VALVE REPLACEMENT PRGM 67,769 1,195,000 1,248,000 1,248,000 1,248,000 1,248,000 9,370,000 15,624,769 CIPWA61013 WATER LINE REHABILITATION PROGRAM 506,000 2,996,000 2,996,000 3,000,000 3,000,000 3,000,000 12,650,000 28,148,000 CIPWA61023 WATER SYSTEM SECURITY 57,693 150,000 150,000 150,000 150,000 150,000 350,000 1,157,693 CIPWA61024 CHOLLA WTP - 2014 IMPROVEMENTS 920,612 920,612 CIPWA61043 PYRAMID PEAK - 2017 IMPROVEMENTS 358,813 358,813 CIPWA61045 THUNDERBIRD RESERVOIR REHAB 473,290 2,400,000 1,100,000 3,973,290 CIPWA61047 METER VAULT REPLACEMENT PROGRAM 73,817 512,000 515,000 515,000 515,000 2,130,817 CIPWA61048 GROUNDWATER WELL REHAB PROGRAM 2,556,575 400,000 1,900,000 1,670,000 3,200,000 950,000 6,000,000 16,676,575 CIPWA61049 BOOSTER STATION - 69TH & DEER VALLEY 300,211 1,850,000 2,150,211 CIPWA61051 ACCRUE LONG-TERM WATER CREDITS 200,000 100,000 300,000 CIPWA61054 DISTRIBUTION SYSTEM IMPROV PROGRAM 559,365 300,000 500,000 500,000 500,000 500,000 2,859,365 FY24-33 Water Projects 403 PROJECT # PROJECT NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL CIPWA61055 OASIS WTP - 2017 IMPROVEMENTS 360,000 360,000 CIPWA61058 PYRAMID PEAK WTP EXPANSION 93,192 93,192 CIPWA61061 WATER CAPITAL EQUIPMENT REPLACEMENT 46,950 500,000 600,000 700,000 700,000 700,000 3,500,000 6,746,950 CIPWA61062 TRANSMISSION LINE & VALVE ASSESSMNT 33,873 380,000 800,000 800,000 800,000 2,813,873 TOTAL 18,762,453 25,905,000 29,652,000 23,855,000 22,288,000 25,308,000 114,945,000260,715,454 FY24-33 Water by Funding Source 404 FUND FUND NAME EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 WATER FUND 17,689,084 23,990,000 27,612,000 19,440,000 21,263,000 23,283,000 107,820,000 241,097,084 6065 2014 WATER DIF 1,073,370 1,915,000 2,040,000 4,415,000 1,025,000 2,025,000 7,125,000 19,618,370 TOTAL 18,762,454 25,905,000 29,652,000 23,855,000 22,288,000 25,308,000 114,945,000 260,715,454 405 Water Rights & Other Supply Sources Project Number: CIPWA19018 Description: 100-year lease of Central Arizona Project water rights per the White Mountain Apache Tribe settlement for allocation of 2,363 acre feet annually. Execution of the agreement is at the Federal approval process level. 50% of settlement is required at final execution of agreement. Justification: Council approved the lease settlement on February 24, 2009, and approved the amended and restated WMAT Water Quantification agreement on February 12, 2013. Additional water rights assures water is available for growth. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6065 - 2014 WATER DIF $500,000 $3,500,000 $875,000 $1,875,000 $6,375,000 $13,125,000 406 SCADA Improvement Program Project Number: CIPWA19020 Description: Develop a plan to upgrade equipment of the Supervisory Control and Data Acquisition (SCADA) system to new technologies. Future years will add equipment and improvements based on recommendations from study. Justification: SCADA controls the automated treatment processes within the plants and distribution systems. System components are at end of service life. New technologies will reduce risk of failure at critical measurement points and increase resiliency of the systems. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $800,000 $1,000,000 $1,000,000 $2,800,000 407 Storage & Recovery Wells Rehab Project Number: CIPWA19021 Description: Rehabilitate Aquifer Storage and Recovery wells (two at the Arrowhead WRF & two at Oasis Lake) and eight vadose zone recharge wells (six at the AWRF and two at Oasis Lake). Justification: Wells require annual maintenance and equipment rehabilitation maintain the system's resiliency. These recharge wells recharge effluent to various groundwater levels to maximize groundwater storage credits for later withdrawal. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $88,969 $100,000 $450,000 $460,000 $2,200,000 $3,298,969 408 Groundwater Wells & Interconnects Project Number: CIPWA19022 Description: Design and construct new direct-connect groundwater wells and interconnects to potable water supply from adjacent cities of Phoenix and Peoria. Justification: Provide water supply for system growth and redundancy from multiple sources at times of restricted supply is critical. Wells provide direct supply during drought management, plant shut-down, or transmission interruptions. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $3,518,007 $2,325,000 $2,590,000 $2,605,000 $1,610,000 $10,250,000 $22,898,007 6065 - 2014 WATER DIF $89,230 $1,265,000 $1,390,000 $765,000 $3,509,230 TOTAL $3,607,237 $3,590,000 $3,980,000 $3,370,000 $1,610,000 $10,250,000 $26,407,237 409 Oasis WTP – 2023 Improvements Project Number: CIPWA21022 Description: Evaluate, design, and construction process improvements and rehabilitation of system components at the Oasis WTP. System components Include: brine ponds, IX plant conveyance, Entry Point to Distribution System (EPDS), HVAC, chemical feed pumps, and other processes. Last five-year amount is placeholder for next assess & rehab cycle. Justification: Oasis WTP was built in 2007 and expanded in 2012. Oasis treats 2.2 billion gallons of water for the southern and western portions of Glendale. A condition assessment and rehabilitation program of the plant every 5 - 7 years makes for a reliable and efficient treatment facility. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $257,642 $1,280,000 $1,766,000 $16,500,000 $19,803,642 410 Pyramid Peak WTP– 2027 Improvement Project Number: CIPWA21023 Description: Evaluate, design, and construct process improvements and rehabilitation of system components at the Pyramid Peak WTP. System components include gate valves, sedimentary basins, lagoon pumps, chorine generator, and other systems. Last five-year amount is placeholder for next assess & rehab cycle. Peoria will contribute 55.6% of the cost. Justification: Pyramid is a critical water treatment plant of CAP supplied water. Pyramid treats 12.1 billion gallons of water for the northern portion of Glendale and Peoria. A condition assessment and rehabilitation program of the plant every 5 - 7 years makes for a reliable and efficient treatment facility. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $1,100,000 $500,000 $3,000,000 $3,000,000 $23,000,000 $30,600,000 411 Cholla WTP – 2023 Improvements Project Number: CIPWA21024 Description: Evaluate, design, and construct process improvements and rehabilitation of system components at the Cholla WTP. The system components include: preoxidation, backwash pumps, centrifuge & solid handling, filters & floc drives, chlorine generator, and other systems. Last five-year amount is placeholder for next assess & rehab cycle. Justification: Cholla is a critical water treatment plant of SRP supplied water. Cholla treats 4.3 billion gallons of water for the central portion of Glendale. A condition assessment and rehabilitation program of the plant every 5 - 7 years makes for a reliable and efficient treatment facility. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $683,612 $4,000,000 $6,220,000 $6,000,000 $6,000,000 $4,000,000 $20,000,000 $46,903,612 412 Water Line – Pack 2 Rehabilitation Project Number: CIPWA21025 Description: Design and construct waterline replacement. Work is performed in phases based on condition assessments. Includes segments in 54th Avenue, Maryland, Northern and Lamar. Justification: The average age of the water distribution system is over 35 years old. Rehabilitation or replacement is performed based on evaluation of the condition of the line segment to reduce risk of failure. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $2,272,241 $2,272,241 413 Assured Water Supply Obligation Project Number: CIPWA21031 Description: Conduct a study of City' s water supply to prepare the renewal application to the Arizona Department of Water Resources. Permit scheduled to expire in 2023. Justification: The city must demonstrate that sufficient supplies of water are physically, continuously and legally available for at least 100 years. The application to modify/renew the designation is due to ADWR by December 31, 2023. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $224,480 $224,480 414 67th Ave. Transmission Line Improvements Project Number: CIPWA21032 Description: Design and install access manholes to portals in the 67th Ave transmission line from PPWTP to Deer Valley Road. Project includes emergency repair parts and fittings. Justification: Need access from the street level to assess the condition of large transmission line interior. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $689,060 $689,060 415 Water Valve Replacement - ARP Project Number: CIPWA22070 Description: Replace large water valves ahead of Arterial (streets) Reconstruction Program (ARP). Nine arterial segments are identified. Justification: Street segments identified in Arterial Reconstruction Program due to low critical Pavement Condition Index (PCI) for replacement. Replace valves 9-12 months ahead of construction start. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $308,000 $308,000 416 Water Line 59th – Glenn to Northern Project Number: CIPWA22071 Description: Design and construct new water line and associated appurtenances. Includes 4,900'-water line, 48- valves, 16-service lines, and 5-fire hydrants in 59 Ave - Glenn to Northern Ave. Justification: Street segments identified in Arterial Reconstruction Program due to low critical Pavement Condition Index (PCI) for replacement. Replace water line and valves 9-12 months ahead of construction start. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $100,000 $2,200,000 $400,000 $2,700,000 417 Water Line – Camelback – 51st to 59th Project Number: CIPWA22072 Description: Design and construct new water line and associated appurtenances in Camelback Road from 51st Ave to 59th Ave. Justification: Street segments identified in Arterial Reconstruction Program due to low critical Pavement Condition Index (PCI) for replacement. Replace water line and valves 9-12 months ahead of construction start. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $5,000,000 $5,000,000 418 Data Management Program Project Number: CIPWA22074 Description: Assess and implement new data management application to manage all department data base apps. Develop dashboard bench-marks. Justification: Department data bases are fragmented, out of date, and do not provide centralized management of results. New technology will "mine" all data bases and provide real-time results to manage treatment operations more effective and efficiently. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $103,500 $103,500 419 Water Line – Bethany Home – 43rd to 51st Project Number: CIPWA22079 Description: Design and construct new water line & associated appurtenances. Includes 6,100' water line, 81 valves, 38 service lines, 20-fire hydrants in Bethany Hm. Rd. 43rd to 300' west of 51st under Grand Ave. Justification: Street segments identified in Arterial Reconstruction Program due to low critical Pavement Condition Index (PCI) for replacement. Replace water line and valves 9-12 months ahead of construction start. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $900,000 $2,590,000 $3,490,000 420 Water Meter Data Collection System Project Number: CIPWA23008 Description: Evaluate Advance Metering Infrastructure (AMI) technologies. Manage the selection and implementation of the new water meter data collection infrastructure. Justification: New water meter data collection technology can now provide real-time collection and billing results to manage treatment operations effectively and efficiently and provide enhance customer experience. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $170,000 $2,500,000 $1,000,000 $3,670,000 421 Roof Replacement – Water Project Number: CIPWA23009 Description: Replace roofs on water facilities per Facilities assessment schedule dated 11/22/2021. Justification: Roof rehabilitation and replacement is needed to prevent damage to building infrastructure and contents. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $181,800 $202,000 $202,000 $202,000 $787,800 422 Water Development Infrastructure Project Number: CIPWA23011 Description: Infrastructure Improvement Plan (IIP) includes projects for water line extension and oversizing in the city to the east of 115th Avenue and acquisition of water supply rights. Justification: Provide funding for oversizing and extension of water line. Funding included in 2019 Infrastructure Improvement Plan (IIP). FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6065 - 2014 WATER DIF $984,140 $650,000 $150,000 $150,000 $150,000 $150,000 $750,000 $2,984,140 423 Asset Management Program Project Number: CIPWA60015 Description: Evaluate and replace asset management system enterprise application for additional functionalities and efficiencies. Justification: Establishing an asset management system and replacing work order software will provide governance of how we maintain and replace assets for sustainability and provide real time data for prioritizing CIP Improvements. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $103,706 $103,706 424 Water & Wastewater Systems Modeling Project Number: CIPWA60017 Description: Update Integrated Master Plan to include the plans for water, sewer, reclaimed water, and stormwater systems. Perform ad hoc Water & Wastewater Systems modeling. Justification: This project provides needed planning and modeling to ensure necessary infrastructure is available, and water resources are available to meet anticipated demands to support future development. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $54,304 $500,000 $150,000 $150,000 $150,000 $150,000 $1,154,304 425 Laboratory Equipment Replacement Project Number: CIPWA60018 Description: Replace major water quality laboratory test equipment as each reaches the end of service-life. Justification: Critical laboratory test equipment is at the end of useful life. Maintenance is becoming costly versus replacement or using outside laboratory services. Water quality testing is mandatory to the treatment of water. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $208,912 $150,000 $150,000 $508,912 426 Vehicle Replacement Program Project Number: CIPWA60019 Description: Replacement of vehicles, heavy trucks, and excavation equipment. Replacement is based on service life, usage, condition, and cost to maintain. Justification: Mobility is critical to effectively and efficiently perform work required. The fleet is comprised of over 165 units for a cost to replace of more than $10 million. Units range in value from $50,000 to $500,000 with service life of 10 to 20 years. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $216,691 $1,250,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,000,000 $9,466,691 427 Large Water Valve Replacement Program Project Number: CIPWA61001 Description: Replace 6" to 18" water main valves, related water lines and fire hydrants to maintain the operational reliability of the City’s water distribution and fire suppression systems. Depending on size and condition, 150 to 200 valves are replaced annually. Justification: Age of main valves vary, with many of them over 25 years old. Replacement is required along with any attached fire hydrants and service lines to reduce the risk of equipment failure. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $67,769 $1,195,000 $1,248,000 $1,248,000 $1,248,000 $1,248,000 $9,370,000 $15,624,769 428 Water Line Rehabilitation Program Project Number: CIPWA61013 Description: Design and construct waterline replacement. Work is performed in phases based on condition assessments. As segments are scheduled, budget will be separated into single project from this placeholder. Justification: The average age of the water distribution system is over 35 years old. Rehabilitation or replacement is performed based on evaluation of the condition of the line segment to reduce risk of failure. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $506,000 $2,996,000 $2,996,000 $3,000,000 $3,000,000 $3,000,000 $12,650,000 $28,148,000 429 Water System Security Project Number: CIPWA61023 Description: Replace video, communication, and perimeter equipment to enhance security of city's water supply, treatment plants and distribution systems. Justification: Replace cameras and equipment at Water Services facilities to further enhance security of City's water supply, treatment plants and distribution systems. Required to ensure the city complies with the federal homeland security requirements. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $57,693 $150,000 $150,000 $150,000 $150,000 $150,000 $350,000 $1,157,693 430 Cholla WTP – 2014 Improvements Project Number: CIPWA61024 Description: Study, design, and construct improvements to storage reservoirs, chemical feed system, site lighting, electrical feed system, SCADA controls, booster stations and admin building improvements. Justification: Cholla is a critical water treatment plant. This plant provides 4 billion gallons of water annually to the central portion of Glendale. Rehabilitation reduces risk of equipment failure, loss of service to citizens, and implements new efficiencies. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $920,612 $920,612 431 Pyramid Peak – 2017 Improvements Project Number: CIPWA61043 Description: Study, design, and construct process improvements to the water supply system, wash water system, chemical feed system, electrical system, and HVAC systems. City of Peoria shares in 23% of the costs. Justification: Pyramid is a critical water treatment plant. The plant provides 13 billion gallons of water annually to the northern portion of Glendale. Rehabilitation reduces risk of equipment failure, loss of service to citizens, and implements new efficiencies. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $358,813 $358,813 432 Thunderbird Reservoir Rehab Project Number: CIPWA61045 Description: Design and construct improvements to improve water quality and water delivery during peak demand and construct roof replacement. Justification: The 12-million gallon reservoir was constructed in 1985 and is essential to meet peak hourly water demand within the northern and central portion of Glendale. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $473,290 $2,400,000 $1,100,000 $3,973,290 433 Meter Vault Replacement Program Project Number: CIPWA61047 Description: Program to replace 204 large in-ground meter vaults. Work will be contracted in phases. Have completed 142 vaults. Cost varies with each vault upgrade. Justification: The program includes evaluation of each vault as to repair or replace to meet safety standards for confined space entry. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $73,817 $512,000 $515,000 $515,000 $515,000 $2,130,817 434 Groundwater Well Rehabilitation Program Project Number: CIPWA61048 Description: Assess operating components and water quality at sixteen groundwater wells. Rehab and replace well and components per assessment. Justification: Wells need rehabilitation every 5-10 years to maintain production and water quality levels and replacement at end of service-life. Rehabilitation reduces risk of equipment failure, loss of service, and decrease in water quality. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $2,556,575 $400,000 $1,900,000 $1,670,000 $3,200,000 $950,000 $6,000,000 $16,676,575 435 Booster Station – 69th & Deer Valley Project Number: CIPWA61049 Description: Make operating improvements between Zone 2 and Zone 3 water distribution system to increase service resiliency. Includes rehabilitation to Hillcrest Ranch booster station (HRBS) pumps, motors, electrical and communication components. Justification: This booster station was constructed in 1992 and is being upgraded to provide emergency water supply from the southern to the northern portion of Glendale if there is an event of reduced production. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $300,211 $1,850,000 $2,150,211 436 Accrue Long-Term Water Credits Project Number: CIPWA61051 Description: Using the Groundwater Saving Facilities, purchase Central Arizona Project water to store and accrue long-term water storage credits for use during supply shortages. Justification: Accrued long-term water storage credits (LTWC) can be recovered during a time of drought. LTWC adds to city’s water portfolio needed for the ADWR 100-year Assured Water Supply designation. This program adds resiliency to the city water supply. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $200,000 $100,000 $300,000 437 Distribution System Improvement Program Project Number: CIPWA61054 Description: Design and construct water distribution system improvements city-wide. Includes PRVs, water instrumentation, flow meters, sub-zone splitting. Justification: Pressure reducing valves (PRV) and process control systems have reached the end of useful life. It is very important to ensure the PRVs are functional to move water between different pressure zones to meet water demand and manage water pressure. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $559,365 $300,000 $500,000 $500,000 $500,000 $500,000 $2,859,365 438 Oasis WTP – 2017 Improvements Project Number: CIPWA61055 Description: Evaluate, design, and construct improvements lagoons, on-site laboratory, and other processes. Justification: Oasis WTP was built in 2007 and expanded in 2012. Oasis provides 1.7 billion gallons of water to the southern and western portions of Glendale. After a condition assessment, several systems are in need of rehabilitation. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $360,000 $360,000 439 Pyramid Peak WTP Expansion Project Number: CIPWA61058 Description: Design and construct of 15 MGD expansion to increase capacity f plant for city of Peoria. City of Peoria to fund 23% of resiliency improvements and 100% of expansion. Justification: This project was requested and funded by the City of Peoria to meet Peoria's projected water demand in accordance with the Intergovernmental Agreement (IGA) between the Cities of Glendale and Peoria. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $93,192 $93,192 440 Water Capital Equipment Replacement Project Number: CIPWA61061 Description: Replacement of capital equipment at water facilities. Includes Programmable Logic Controllers (PLC), Variable Frequency Drives (VFD), miscellaneous pumps and motors. Justification: As equipment at the water treatment plants reaches the end of service-life, it is replaced. It is critical to ensure City’s water treatment facilities are in good operational condition to meet water demands and regulatory requirements. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $46,950 $500,000 $600,000 $700,000 $700,000 $700,000 $3,500,000 $6,746,950 441 Transmission Line & Valve Replacement Project Number: CIPWA61062 Description: Assess condition of 48" and larger water transmission line and valves for future rehabilitation. The first assessment is for the 67th Ave line from the Pyramid Peak WTP. Justification: The 67th Ave transmission main was installed in 1987. This line conveys water from Pyramid Peak WTP to Glendale water customers in the northern portions of the City and the City of Peoria Turnout and needs the condition to be assessed. FUND EST CARRYOVER FY24 FY25 FY26 FY27 FY28 FY29-33 TOTAL 6020 - WATER FUND $33,873 $380,000 $800,000 $800,000 $800,000 $2,813,873 442 Questions? Budget Calendar 443 Item Date Workshop #1 – Budget Overview / Revenues / Five-Year Financial Forecasts February 14, 2023 Workshop #2 – FY24-33 Capital Improvement Plan March 7, 2023 Workshop #3 – (All Day) FY24 Operating Budget Department Presentations April 4, 2023 Workshop #4 – (All Day) FY24 Operating Budget Department Presentations April 6, 2023 Workshop #5 – FY24 Final Budget Workshop April 18, 2023 Voting Meeting – Tentative Budget Adoption May 9, 2023 Voting Meeting – Final Budget Adoption / Property Tax Levy June 13, 2023 Voting Meeting – Property Tax Adoption June 27, 2023