PowerPoint Presentation
Extracted text (via pymupdf)
4030 characters
Engineering – Delivering the CIP City Council Workshop – May 23, 2023 Strategic Alignment 2 Partnership and Accountability 3 Partnership • Budget & Finance • City Manager’s Office • City Attorney’s Office • Operating Depts • Internal Audit Accountability - ARS Title 34 • Ensures fair access to city work • Ensures spreading the spend • Ensures transparency for selection • Ensures quality • Ensures open book pricing competition • Promotes accountability • On-Call • Direct Select • Request for Qualifications (RFQ) 4 Professional Services –Design & Engineering • Contract Awards are on a Basis of Demonstrated Competence & Qualifications • Used for Projects that require “Complex Designs” • Used for Projects where Design Costs Exceed $500K • Recent Examples: – Downtown Campus Reinvestment Project – Heroes Park Improvements – Thunderbird Reservoir Improvements – Cholla Water Treatment Plant Improvements – Police Evidence Storage – Fire Station 153 Remodel 5 Professional Services - Request for Qualifications • Architectural • Environmental Consulting • General Engineering • Geotechnical Engineering • Grading and Drainage • Hydrogeology • Land Surveying • Landscape Architecture 6 On-Call – Pre-qualified list of vendors • Mechanical/Plumbing/Electrical • Roadway/Transportation • Solid Waste Municipal Landfill • Structural Engineering • Transportation Studies & Traffic Engineering • Water/Wastewater Distribution • Water/Wastewater Facilities • On occasion, the project requires specific knowledge and experience that is available on a very limited basis. • Examples could include: – A Water modeling update – SCADA controls and integration 7 Direct Select Construction Procurement Methods 8 • Job Order Contracting - JOC • Design Bid Build - DBB (also known as low bid) • Construction Manager at Risk (CM@R) Job Order Contracting 9 • Purpose is for repair, replacement or remodel programs – Speed to market projects – To ensure we spread the spend • maximum job order amounts • maximum annual contract amount • Qualification Based – followed by open book pricing • Job Orders are Issued for individual projects • Until 2022, COG relied solely on “Linking Agreements” • Since – COG is developing our own JOC’s – Streets and Paving completed – Horizontal Water/Wastewater piping completed – Treatment Plants coming – Vertical construction coming Job Order Contracting – Recent Examples 10 • Sine Building Remodel • Adult Center Remodel • City Court Renovations • Community Center Renovations • Heroes Park & Sunset Palms Splash Pads • Various Citywide Waterline Segment Improvements • Minor Water/Wastewater Plant Improvements Design Bid Build – DBB 11 • Consultant Completes Design Package • Contractors Submit Prices Based on Designer Drawings • Lowest “Responsible” Bidder Awarded Contract Design Bid Build – Recent Examples 12 • City-Wide Valve and Hydrant Program • City-Wide Sewer and Manhole Rehab Program • City-Wide Concrete and Asphalt Cut Program • Public Safety Parking Lot Expansions • Glendale Ave – 99th Street to El Mirage Street* • Cactus Ave – 59th Street to 67th Street • Glendale Airport -Taxiway Alpha Phase I & II Construction Manager at Risk (CM@R) 13 • Used for Complex Construction Projects • Good for long lead items • CM@R selected early to work with Designer during early design phases to ensure constructability • Guaranteed Maximum Pricing – based on defined scope Construction Manager @ Risk- Recent Examples 14 • Downtown Campus Reinvestment Project • Landfill North Cell Excavation Phase I & II • Cholla Water Treatment Plant Improvements • Thunderbird Reservoir Improvements • Police Evidence Storage • Fire Station 153 Selecting Procurement Typology 15 • Use the procurement method that “best fits” the project typology Considerations: • Project Cost • Complexity • Speed to Market • Operational Considerations Summary of Use – 42 Projects 16