Agreement

City of Glendale — Regular Meeting (2023-08-08)

View PDF Item 25 Meeting page

Extracted text (via pymupdf) 8891 characters
Page 1 of 3 
COST PARTICIPATION 
AGREEMENT BETWEEN THE 
CITY OF GLENDALE AND THE ROOSEVELT IRRIGATION 
DISTRICT ASSOCIATED WITH THE 
RID CC2 Canal-Maryland Avenue Extension 
 
THIS 
COST 
PARTICIPATION 
AGREEMENT 
FOR 
ENGINEERING 
DESIGN, 
CONSTRUCTION OBSERVATION SERVICES associated with the proposed RID CC2 
CANAL-MARYLAND AVENUE EXTENSION IMPROVEMENTS is made between THE 
ROOSEVELT IRRIGATION DISTRICT, an Arizona municipal corporation (hereinafter 
the “DISTRICT”) and THE CITY OF GLENDALE, an Arizona municipal corporation 
(hereinafter the “CITY”). 
 
RECITALS: 
 
A. The CITY has recently contacted the DISTRICT regarding a proposal to construct 
roadway and utility improvements including and adjacent Extension of Maryland 
Avenue in the City of Glendale, Maricopa County, Arizona in association with the City 
of Glendale Maryland Avenue Extension project (the “Project”). 
 
B. The DISTRICT owns, operates, and maintains RID CC2 Canal for the conveyance 
and delivery of irrigation water to lands located generally west of the Agua Fria River.  
The CITY’s proposed improvements along the Maryland Avenue Alignment cross a 
portion of these DISTRICT facilities. 
 
C. To accommodate the Project, the relocation of certain DISTRICT facilities along RID 
CC2 Canal is required.  The DISTRICT, and/or the DISTRICT’s authorized agents, 
will provide technical coordination, engineering design, construction plan preparation 
and other necessary services associated with the design and construction of the 
DISTRICT relocated facilities required for the proposed Project (the “Relocated 
Facilities”). 
 
D. The CITY and the DISTRICT desire to enter into this agreement pursuant to which 
the DISTRICT shall provide various services associated with the design and 
construction of the Relocated Facilities and the CITY shall reimburse the DISTRICT 
for such services.  Specifically, DISTRICT and/or its authorized agents shall provide 
the following services in connection with the Relocated Facilities: (i) land rights and 
right-of-way research, appraisals and access negotiations as needed; design and 
prepare specifications and construction plans for the Relocated Facilities review; and 
coordinate and obtain approvals of other utilities affected by the Relocated Facilities 
(collectively “Design Services”); and (ii) procure construction services for the 
Relocated Facilities, including sub consultant and trades coordination; construct the 
Relocated Facilities; provide contract and construction administration services; 
relocate improvements of other utilities affected by the Relocated Facilities as 
needed; undertake all required inspections and testing and provide construction and 
as-built 
surveys 
(collectively 
“Technical 
Coordination, 
Construction 
and 
Administration 
Services”). 
(Design 
Services 
and 
Technical 
Coordination, 
Construction, and Administration Services are collectively referred to as “Services”).  
The CITY shall reimburse the DISTRICT’s reasonable costs associated with the 
SERVICES, including additional costs pursuant to Section 6 below.

ATTEST: 
 
 
 
Julie K. Bower,  
 
 
(SEAL) 
City Clerk 
 
 
 
 
APPROVED AS TO FORM: 
 
 
____________________________________ 
Michael D. Bailey, 
City Attorney

DIRECTORS  
W. BRUCE HEIDEN, PRESIDENT 
K.C. GINGG 
BRANDON LEISTER 
JASON ROVEY 
JOHN K. VANDERWEY  
 
 
 
 
SUPERINTENDENT 
DONOVAN L. NEESE 
 
103 WEST BASELINE ROAD  
BUCKEYE, ARIZONA 85326  
TELEPHONE (623) 386-2046 
FAX (623) 386-4360 
 
 
 
29 March 2023 
City of Glendale 
5850 W. Glendale Ave, Ste 315 
Glendale, AZ 85301 
 
 
Attention: 
Mr. David Beard 
 
Reference: 
RID CC2 Canal – Maryland Extension at 99th Ave (181300858) 
 
Dear Mr. Beard,  
As requested, the Roosevelt Irrigation District (RID) is herein providing the funding 
requirement for the relocation of RID irrigation and/or drainage facilities along a portion 
of RID CC2 in association with the above referenced project.   
The relocation of RID facilities within the development project includes piping of existing 
ditch, removal of existing structures and the design of new appurtenant irrigation 
structures.  
Estimated RID fees for engineering design, post design, project coordination and 
expenses for the RID project are detailed in the enclosed Fee Proposal.  
A summary of the funding to be advanced to RID for this project is as follows: 
Engineering Fees & Expenses 
$89,231.50 
RID Administration Fees 
$8,923.15 
Design & post-design authorization credit 
-$46,060.00 
RID administration fee credit 
-$6,426.80 
TOTAL FUNDS DUE 
$45,667.85 
Notification will be provided prior to the exhaustion of the funds on the project. Change 
orders are requested in $20,000 increments except when a detailed scope is required. 
RID will stop work on any project that has exhausted the funding provided and resume 
once additional funding has been received.  
The attached Cost Participation Agreement (CPA) must be signed and returned to the 
RID office.  The commencement of engineering work will be scheduled once the signed 
CPA has been returned to RID.

ROOSEVELT IRRIGATION DISTRICT
RID COLLECTION CANAL 2  - CITY OF GLENDALE MARYLAND AVENUE EXTENSION (181300858)
DESIGN & POST DESIGN SERVICES
3/29/2023
TASK NO.
TASK DESCRIPTION
Project Principal
Senior Project 
Engineer
Project Engineer/ 
Senior Designer
Senior Designer
EIT/Designer
Construction 
Observer
Project 
Administrator
Project Principal
Senior Project 
Engineer
Project Engineer/ 
Senior Designer
Senior Designer
EIT/Designer
Construction 
Observer
Project 
Administrator
Level 16
Level 13
Level 11
Level 10
Level 9
Const 
Obs
Level 7
Level 16
Level 13
Level 11
Level 10
Level 9
Const 
Obs
Level 7
102
Design
Design
• Hydraulic Analysis & Design
• Establish Horizontal Alignment & Vertical Design for RID Relocations
• Grading Design at Structures & Lateral Tie-ins
• 5 - Plan & Profile Sheets
• 2 - Site Plan Sheets
• Create Exhibit for RID, Developer, Municipality Coordination
 
• Preliminary Plan Reproduction & Submittal To District, Appropriate 
City/Municipal Entity and Their Engineer For Review & Comment
• Final Plan Reproduction & Submittal To District and Appropriate City/Municipal 
Entity for Construction
104
Post Design Services
• On-Site Construction Observation and Coordination with Contractors, District 
and District Engineer 
• Provide On-Call Engineering Support Services During Construction
• Review, Process and Archive As-Built Drawings from Contractor
• Update District System Mapping
106
Project Management
• Design Scoping
• Post Design Scoping
• Schedule Creation and Management
• Safety Protocols, Preparation and Documentation
• Project Management and Correspondence
• Project Invoicing & Closeout
990
Expenses
• Travel
• Printing
TOTAL LABOR HOURS  
6
12
39
82
19
267
6
2
1
7
0
4
63
7
515
TOTAL ENGINEERING COST  
$1,500 
$2,280 
$6,669 
$13,038 
$2,907 
$42,453 
$822 
$516 
$196 
$1,232 
$0 
$632 
$10,332 
$987 
$83,564 
$5,668 
$89,232 
0
0
3
267
0
0
6
0
6
1
63
0
0
0
29
4
0
370
2
3
0
5
20
0
3
0
4
0
7
1
4
0
$4,413  
$4,413
$60,188  
$5,668
$5,668  
$60,188
$18,963
 
$18,963  
2
82
10
0
0
7
15
116
0
0
0
0
0
Total Cost
2023 Hours
2024 Hours
Sub-Total Labor 
Hours
Sub-Total Labor 
Cost
Expenses

RID ADMINISTRATION FEES DESCRIPTION
 
RID Administration Fee (10% Engineering + Expenses)
TOTAL RID  FEES 
TOTAL  COST  
DESIGN & POST-DESIGN AUTHORIZATION CREDIT
RID ADMINISTRATION FEE CREDIT
TOTAL ADDITIONAL FUNDING DUE 
6. Acceptance of this agreement by the responsible parties acknowledges the ongoing COVID-19 pandemic and understanding that the Estimated Fee presented herein does 
not include any schedule or cost impact that may occur as a result thereof. To the extent that there are cost or schedule impacts resulting from the COVID-19 pandemic, RID 
shall notify  the responsible parties as soon as practical once impacts are realized.
$98,154.65 
-$46,060.00 
$45,667.85 
Units
LS
Cost /Unit
$8,923.15 
1. No agencies/utilities review fees have been included.  Project Sponsor will be responsible for these fees at time of RID submittal(s).
2. Permit fees not included.  RID ROW Crossing permit fees will be $500 per plan set, payable at execution. RID License to Construct permit fee will be $500 per project, 
payable at execution. Permits expire 365 days from date issued. 
3. If the project extends beyond the calendar year a change order may be required to account for annual rate increases. 
4. Travel Expenses including but not limited to mileage, fuel, rental vehicle, hotel accommodations depending on the nature and time constraints within the project. 
5. Printing expenses including but not limited to full size plans, half size plans, roll plots, letter size sheets, color or black and white, copies as requested by RID, binders and 
tabs for carrying on-site or to RID. 
-$6,426.80 
Cost
$8,923.15 
$8,923.15