Amendment Four

City of Glendale — Regular Meeting (2023-09-12)

View PDF Item 15 Meeting page

Extracted text (via pymupdf) 9195 characters
1 
05/10/2023 
 
 
 
 
 
 
 
 
 
  C21-0554-4 
AMENDMENT NO. 04 
67TH AVENUE PAVEMENT RECONSTRUCTION - GREENWAY RD TO BELL RD  
(PROJECT NO. 202168, Contract No. C21-0554) 
 
This Amendment No. Four (“Amendment”) to the Professional Services Agreement (“Agreement”) 
is made this ______ day of ________, 2023, (“Effective Date”), by and between the City of Glendale, 
an Arizona municipal corporation (“City”) and Olsson, Inc. , a Nebraska corporation, authorized to 
do business in Arizona (“Contractor”). 
 
RECITALS 
 
A. 
City and Olsson, Inc. (“Contractor”) previously entered into Professional Services Agreement, 
Contract No. C21-0554, dated June 22, 2021 (“Agreement”); and 
 
B. 
City and Olsson, Inc. entered into Amendment No. One, Contract C21-0554-1, dated 
November 8, 2022, increasing the Scope of Services and Compensation by an additional 
$5,804; and  
 
C. 
City and Olsson, Inc. entered into Amendment No. Two, Contract C21-0554-2, dated January 
24, 2023, again increasing the Scope of Services and Compensation by an additional $11,638; 
and 
 
D. 
City and Olsson, Inc. entered into Amendment No. Three, Contract C21-0554-3, dated March 
14, 2023, again increasing the Scope of Services and Compensation by an additional $29,602; 
and  
 
E.     On May 25, 2023, City and Olsson, Inc. entered into Contract Extension No. 1, extending the 
term of the agreement from June 22, 2023 through June 21, 2024. 
 
F.          City is seeking to expand the Scope of Services and increase the Compensation by an additional 
$11,702; and   
 
G. 
City and Contractor wish to modify and amend the Agreement subject to and strictly in 
accordance with the terms of this Amendment. 
 
AGREEMENT 
 
In consideration of the mutual promises set forth herein and other good and valuable consideration, 
the receipt and sufficiency of which are hereby acknowledged, the City and Contractor hereby agree 
as follows: 
 
1. 
Recitals.  The recitals set forth above are not merely recitals but form an integral part of this 
Amendment. 
 
2. 
Term.  The term of the Agreement is unchanged and shall expire on June 21, 2024. 
 
3. 
Scope of Work. This amendment includes converting the full depth pavement section  design 
to a 3-inch mill and overlay pavement section along 67th Avenue from Greenway Road to

2 
05/10/2023 
Bell Road. The consultant will evaluate the entire roadway corridor for thin degraded 
pavement areas to identify areas that will require full depth pavement replacement.  Additional 
design scope efforts will add a Wavetronix Signal detection system at the intersection of 67th 
Avenue and Paradise Lane, and removing the landscape plans from the original roadway 
design and converting these into a separate stand alone design landscape design package.   
 
4.  
Compensation. Additional compensation for Amendment No. 04 is $11,702, for a new total 
not to exceed the amount of $183,653.00. 
 
5. 
Insurance Certificate.  Current certificate will expire on January 1, 2024 and a new certificate 
applying to the extended term must be provided prior to this date to Materials Management 
and the Contract Administrator. 
 
6. 
Non-discrimination.   Contractor must not discriminate against any employee or applicant 
for employment on the basis of race, color, religion, sex, national origin, age, marital status, 
sexual orientation, gender identity or expression, genetic characteristics, familial status, U.S. 
military veteran status or any disability. Contractor will require any Sub-contractor to be bound 
to the same requirements as stated within this section. Contractor, and on behalf of any 
subcontractors, warrants compliance with this section.  
 
7.  
No Boycott of Israel.  To the extent A.R.S § 35-393 through § 35-393.03 are applicable, the 
parties hereby certify that they are not currently engaged in, and agree for the duration of the 
Agreement to not engage in, a boycott of goods or services from Israel, as that term is defined 
in A.R.S § 35-393. 
 
8. 
Uyghur Forced Labor Prevention Act (UFLPA). Contractor certifies that it does not 
currently, and during the term of this Agreement, will not use: 
 
(a) 
the forced labor of ethnic Uyghurs in the People’s Republic of China;  
 
(b) 
any goods or services produced by the forced labor of ethnic Uyghurs in the People’s 
Republic of China; and  
 
(c) 
any contractors, subcontractors or suppliers that use the forced labor or any goods or 
services produced by the forced labor of ethnic Uyghurs in the People’s Republic of 
China. 
 
9. 
Attestation of PCI Compliance.  When applicable, the Contractor will provide the City 
annually with a Payment Card Industry Data Security Standard (PCI DSS) attestation of 
compliance certificate signed by an officer of Contractor with oversight responsibility. 
 
10. 
Ratification of Agreement.  City and Contractor hereby agree that except as expressly 
provided herein, the provisions of the Agreement shall be, and remain in full force and effect 
and that if any provision of this Amendment conflicts with the Agreement, then the provisions 
of this Amendment shall prevail. 
 
[Signatures on the following page.]

Page 1 of 3 
SCOPE OF SERVICES 
 
GENERAL 
Olsson is currently providing engineering design for roadway improvements as part of the 67th 
Avenue Pavement Reconstruction project. 
This scope of services is for additional services based on recent direction from the City. The added 
services are below: 
• 
Add detection system at 67th Avenue and Paradise Lane 
• 
Modify Pavement section along 67th Avenue from Greenway Road to Bell Road 
• 
Full depth pavement section at median island modifications 
• 
Evaluate thin or degraded areas of existing roadway pavement for full depth replacement. 
• 
Remove the landscape plans for original roadway design package and develop a separate 
design package for landscape only. 
 
SCOPE OF SERVICES 
Olsson shall provide the following services (Scope of Services) to Client for the Project: 
 
Signalization Improvements 
Olsson will prepare signal design documents for 67th Avenue and Paradise Lane 
to accommodate a new Wavetronix detection system per City of Glendale 
Engineering Design Standards & Details. Detection devices will be placed per 
direction of City of Glendale staff. 
Modify Pavement Section 
Olsson will modify the pavement section on 67th Avenue from Greenway Road 
to Bell Road to a 3” mill and overlay. 
Full Depth Pavement Section at Median 
The median island modifications will remain. Olsson will account for a new full 
depth pavement section in the areas where the existing median curb and asphalt 
is sawcut/removed and paved back. 
Evaluate Areas of Thin Roadway 
Olsson will utilize the pavement core samples from the Geotechnical Report to 
evaluate any areas of the existing pavement conditions where thin or degraded 
areas of existing roadway pavement are present. These locations may not 
support the 3” mill and overlay treatment. Olsson will develop a full-depth 
pavement section for these areas. A placeholder plan quantity will be calculated 
for the estimate and will be placed on the plans. 
Landscape Plans 
Olsson will remove the landscape plans, quantities and specifications from the 
original roadway design package. A new, separate design package will be 
prepared for the landscape plans only.

Page 2 of 3 
Schedule 
1) 95% Plan Submittal – August 7, 2023 
2) Final Plans Submittal – September 18, 2023 
 
Exclusions 
The following items are specifically excluded from this scope of work: 
• 
Survey (boundary and utility depths) 
• 
Research and analysis of easements and other title information 
• 
Traffic Counts 
• 
Environmental analysis 
• 
Public involvement or public meetings 
• 
Any task not specifically included in this Scope of Work 
• 
ADA Ramp improvements

Page 3 of 3 
EXHIBIT D 
Professional Services Agreement 
 
COMPENSATION 
 
METHOD AND AMOUNT OF COMPENSATION 
The City shall pay to Olsson for the performance of the Scope of Services a lump sum of $183,653.00. 
Amendment #4 is included in this fee. 
 
NOT-TO-EXCEED AMOUNT 
The total amount of compensation paid to Consultant for full completion of all work required by the Project 
during the entire term of the Project must not exceed $183,653.00. Amendment #4 is included in this fee.

HOURS
COST
60
$11,888.00
145
$21,500.00
127
$20,362.00
89
$13,781.00
186
$27,554.00
58
$8,958.00
$25.00
$20,839.00
665
$124,907.00
52
$5,804.00
77
$11,638.00
217
$29,602.00
81
$11,702.00
1092
$183,653.00
Task B - Topographic Survey
Amendment #1
Task C - Geotechnical Investigation and Pavement Design
Task D - Prelminary Engineering
Task E - 90% Design and Plans
Task F - Final Design Plans and Specs (Sealed)
Estimated Direct Expenses (Mileage)
Estimated Subconsultants
EXHIBIT D
67TH AVENUE PAVEMENT RECONSTRUCTION - GREENWAY ROAD TO BELL ROAD
FEE SCHEDULE
TASKS
TASK A - Project Management and Adminstrative Services
Median Revisions for Bike Lanes
TOTAL PROJECT COST (With Amendments)
Landscape and Irrigation Design
TOTAL PROJECT COST (Original)
Amendment #2
Signing and Striping Design
Amendment #3
Amendment #4
Signal, Pavement Section, & Landscape Modficiations