Project Overview
3
• Public Parking Garage will be fully owned by the City of Glendale
• Provides for an additional 3063 parking spaces in the parking 
garage in addition to 744 parking spaces at grade
• Maintains City’s contractual obligations to provide 4001 at grade 
parking spaces within the Black Lot to the AZ Cardinals  and 
AZSTA
• Provides additional parking capacity for large scale events in the 
Sports and Entertainment District and at the VAI Resort 
• Provides a long term revenue stream to City

Construction Delivery Overview
4
• Design-Build Contractor – Fisher Industries (FI)
– Consistent with ARS Title 34.606
• Guaranteed Maximum Price - $71,850,000
– Includes all design, permits, sitework, landscaping, 
off-site traffic improvements

Construction Schedule
5
• FI is currently mobilized adjacent to Black Lot ready to perform
• January 8, 2024 – March 29th 2024 - Sitework, grading, utility 
relocation, asphalt removal, caisson and foundation work
• April 10th, 2024 – September 6, 2024 -  assembly of precast 
components
• September 6, 2024 - Use of 720 at grade parking spaces 
available
• November 15, 2024 - Final closeout of project including 
landscaping, signage, lighting, elevators 
• Total project schedule – 302 days

Project Financing 
6
• Source of funding – General Fund – Unreserved Fund Balance 
• $16m paid to FI between January 15th – June 1st, 2024
• $55,600,000 paid to FI between July 1st – project close out
• City to waive up to $250,000 for permits

Items of Note
7
• Project is largely concrete and steel, both products 
are supply chain sensitive with a history of volatile 
pricing.
• Fisher is vertically integrated, able to manage 
supply chain issues, and currently mobilized 
adjacent.

Aerial Footprint 
8

Temporary Parking Solutions
9
• Recycle asphalt material from garage footprint is more 
than sufficient
• 4” is the current depth of asphalt available for milling
• Fisher Industries  has confirmed that they will mill and place
• ~3500 Tons of millings required for 2” coverage
• Temporary lot can be striped using standard striping 
paint process

Temporary Parking Solution  
10

Alternate Temporary Parking Solution  
11

Garage Rendering
12

Garage Rendering
13

Garage Rendering
14

Garage Rendering
15

Garage Rendering
16

Garage Rendering
17

Garage Aesthetic
18

Garage Aesthetic
19