1 
JOINT PROJECT AGREEMENT 
BETWEEN MARICOPA COUNTY AND NORTHERN CITRUS LLP  
FOR IMPROVEMENTS TO NORTHERN AVENUE AND CITRUS ROAD 
(C-64-25-____-X-00) 
 
This Agreement (Agreement) is between the County of Maricopa, a political subdivision of the 
State of Arizona (County), and Northern Citrus LLP, an Arizona limited liability partnership, or 
Assignee, (Developer). The County and Developer are collectively referred to as the Parties or 
individually as a Party. 
 
STATUTORY AUTHORIZATION 
 
1. 
The County is authorized, pursuant to Arizona Revised Statutes (A.R.S.) § 11-251 and 
§§ 28-6701 et. seq., to lay out, maintain, control and manage public roads within the 
County. 
 
BACKGROUND 
 
2. 
Northern Citrus LLP is developing Phase 3B of the White Tank Foothills Development, a 
223 plus or minus gross acre site that is generally located on the northwest corner of 
Northern Avenue and Citrus Road. The County and the Developer will improve Northern 
Avenue and Citrus Road. The improvements will be completed in three separate projects, 
listed below: 
 
2.1. 
Northern Avenue and Citrus Road Intersection Improvements (Project 1). Project 
1 will result in the following improvements to Northern Avenue and Citrus Road, 
also shown in Exhibit A, which is attached to this Agreement and incorporated by 
reference. The total estimated cost of Project 1 is $2,106,122.61. 
 
2.1.1. 
Citrus Road, immediately north of the intersection, will have: one 
dedicated southbound right-turn lane (westbound); one dedicated 
southbound through lane; two dedicated southbound left turn lanes 
(eastbound); one dedicated northbound through lane. 
2.1.2. 
Citrus Road, immediately south of the intersection, will have: one 
dedicated southbound lane; one dedicated northbound left-turn lane 
(westbound); one northbound through/right lane. 
2.1.3. 
Northern Avenue, immediately west of the intersection will have: one 
dedicated westbound through lane; one dedicated eastbound left-turn 
lane (northbound); one eastbound through/right lane. 
2.1.4. 
Northern Avenue, immediately east of the intersection will have: two 
dedicated eastbound through lanes, tapering to one; one dedicated 
westbound left-turn lane (southbound); one westbound through/right 
lane (northbound). 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

2 
2.1.5. 
Lane Tapers: there will be lane tapering in all directions from the 
Intersection for 660 feet to tie back into the existing paved roadways.  
2.1.6. 
Construct a traffic signal at the Northern Avenue and Citrus Road 
Intersection (Project 1 Traffic Signal). 
 
2.2. 
West half street improvements on Citrus Road, between Northern Avenue and 
Seldon Lane, and north half street improvements on Northern Avenue between the 
southwest corner of White Tank Foothills Community and Citrus Road (Project 2). 
These improvements will be completed and paid for by the Developer, separately 
from this Agreement. The total estimated cost of Project 2 is estimated at 
$4,124,303. 
 
2.3. 
When warranted, design and construct a traffic signal at the Citrus Road and 
Seldon Lane Intersection (Project 3). These improvements will be completed and 
paid for by the County, separately from this Agreement. The total estimated cost 
of Project 3 is $500,000.  Note: The Developer was originally responsible for 
twenty-five percent (25%) of the cost, estimated at $125,000. However, both 
Parties agreed that the Developer would reallocate these funds towards its cost 
obligation of Project 1. Therefore, the Developer's contribution is twenty-five 
percent (25%) of the total estimated cost of Project 1 and Project 3. 
 
2.4. 
Exhibit A, which is attached to this Agreement and incorporated by reference, 
provides a depiction of the financial obligation of each Party for Project 1. However, 
the approved plans shall supersede the exhibit. 
 
3. 
The estimated total Project 1 cost for design and construction is currently $2,106,122.61, 
as described in Exhibit B for Project 1: Northern Ave and Citrus Rd Intersection. 
 
3.1. 
The County’s contribution is estimated at $1,455,807.08. 
 
3.2. 
The Developer’s contribution is estimated at $650,315.53. 
 
4. 
Items not included in each Party's Project 1 costs, shown in Exhibit B or as contemplated 
by the approved Plan for Project 1 and Project 2, that exceed the County’s standards are 
considered Project Enhancements (Enhancements) and will be the sole financial 
responsibility of the Developer. Enhancements include, but are not limited to, landscape 
and landscape irrigation, screen walls, upgraded street lighting, upgraded bridge barriers, 
bus pads and shelters, monuments, signs and kiosks, shade structures, stamped asphalt 
or concreate pavers, hardscape furniture, and underground utilities. 
 
5. 
This Agreement does not change the terms and stipulations agreed to by this 
development in the planning and zoning case. Unless explicitly stated in this Agreement, 
all other contracts and Agreements with the County for this development remain in effect. 
 
 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

3 
PURPOSE OF THE AGREEMENT 
 
6. 
The purpose of this Agreement is to identify and define the responsibilities of the County 
and the Developer for the Project, including cost sharing, design, utilities, construction, 
and construction management of the Project. 
 
TERMS OF THE AGREEMENT 
 
 
7. 
Responsibilities of the County: 
 
7.1. 
Review and approve design plans for Project 1 and Project 2. All development and 
engineering design shall be in conformance with Section 1205 of the Maricopa 
County Zoning Ordinance; Drainage Policies and Standards; Floodplain 
Regulations for Maricopa County; Maricopa County Department of Transportation 
(MCDOT) Roadway Design Manual; and current engineering policies, standards 
and best practices at the time of application for construction. These approvals will 
not require Maricopa Water District (MWD) signatures on plans or require the 
MWD design to be complete at the time of County plan approval. 
 
7.2. 
Be solely responsible for all of the actual Project 1 Traffic Signal design cost, as 
referenced in Exhibit B, currently estimated at $18,000.  
 
7.3. 
Be solely responsible for all of the actual Project 1 Traffic Signal construction costs 
as referenced in Exhibit B, currently estimated at $400,000 (including the value of 
signal equipment furnished by the County and Developer’s installation costs). 
 
7.4. 
Be responsible for the actual cost of the County’s share of (i) the widening and 
tapering for the area shown in yellow on Exhibit A. Project 1 construction costs 
currently estimated at $1,037,807.08 (excluding the cost stated in paragraph 7.2 
and paragraph 7.3), as described in Exhibit B for Project 1: Northern Ave and Citrus 
Rd Intersection, and (ii) associated gabions on the north side of Citrus Road and 
required guardrail, east of the intersection, and (iii) the MWD irrigation tiling 
improvements along south side of this Citrus Road section. Construction costs 
include improvements to Northern Avenue, east of the Northern Avenue and Citrus 
Road Intersection radius return, and Citrus Road, south of the Northern Avenue 
and Citrus Road intersection radius return, as shown in yellow on Exhibit A, as 
depicted on the approved White Tank Foothills Phase 3B Offsite Improvements 
plans. 
 
7.5. 
Furnish traffic signal equipment and any applicable street name signs to the 
Developer at no cost to the Developer for the Northern Avenue and Citrus Road 
intersection. 
 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

4 
7.6. 
Upon completion and approval of design, and within 30 days of receiving an 
invoice from the Developer, pay $18,000 for the Project 1 Traffic Signal design.  
 
7.7. 
Provided that the Developer has awarded a contract with Contractor, upon start of 
construction, and within 30 days of receiving a detailed invoice, pay the Developer 
fifty percent (50%) of $1,037,807.08, based on paragraph 7.7.1., paragraph 7.7.2, 
and paragraph 7.7.3. Upon final acceptance of Project 1, and within 30 days of 
receiving a detailed invoice, pay the Developer the balance of all remaining actual 
costs incurred by Developer, as contemplated by Exhibit B. 
 
7.7.1. 
County’s estimated contribution for Project 1, as referenced in paragraph 
3.1: $1,455,807.08. 
7.7.2. 
Less County’s payment for Project 1 Traffic Signal design, as referenced 
in paragraph 7.6: $18,000. 
7.7.3. 
Less the traffic signal equipment cost furnished by the County, as 
referenced in paragraph 7.3: $400,000.  
 
7.8. 
Be responsible for the Actual Cost to improve the Northern Avenue east leg, Citrus 
Road south leg, and the Project 1 Traffic Signal installation as depicted on the 
approved White Tank Foothills Phase 3B Offsite Improvements plans.  
 
7.9. 
Be responsible for up to fifty percent (50%) of the actual cost to design, construct 
and relocate the Arizona Public Service (APS) overhead electrical. The additional 
cost to relocate the APS overhead electrical improvements beyond what is 
indicated in the Exhibit B budget for APS relocation expenses of the power line is 
considered an Enhancement and will be the sole responsibility of the Developer. 
The County’s contribution shall be limited to relocating the existing power poles. 
The cost to relocate a single pole is approximately $10,340.  
 
7.10. Be responsible for up to fifty percent (50%) of the actual cost of designing the MWD 
infrastructure.  
 
7.11. When warranted, be responsible for the actual cost to design and construct a traffic 
signal at the Seldon Lane and Citrus Road intersection as a separate project. 
 
7.12. Each budget and exhibit have detailed tasks within the budgets and contingencies. 
In the event an unidentified task is encountered and the contingency does not 
cover it, the County and the Developer will split the unforeseen cost, with the 
County’s share at seventy-five percent (75%) and the Developer’s share at twenty-
five percent (25%). However, in the event of an unforeseen cost not contemplated 
by the budget that would cause the actual costs to exceed one hundred and twenty 
percent (120%) of the budget, the County and the Developer must meet to discuss 
before continuing with the Project 1 improvements to reassess the budget and the 
obligation of the cost. The above statement excludes unforeseen costs associated 
with above ground traffic installation and equipment. 
 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

5 
8. 
Responsibilities of the Developer: 
 
8.1. 
Act as manager for Project 1 and Project 2, including the Project 1 Traffic Signal 
design and construction for the Northern Avenue and Citrus Road intersection; 
roadway and drainage design and construction; and utility coordination and 
relocation. 
 
8.2. 
Submit design plans to the County for review and approval. All development and 
engineering design shall be in conformance with Section 1205 of the Maricopa 
County Zoning Ordinance; Drainage Policies and Standards; Floodplain 
Regulations for Maricopa County; MCDOT Roadway Design Manual; as well as 
the MWD design plans once completed; and current engineering policies, 
standards and best practices at the time of application for construction. 
 
8.3. 
Upon completion and approval of the design, invoice the County $18,000 for the 
Project 1 Traffic Signal design costs. 
 
8.4. 
After award of contract with Contractor and upon start of construction, invoice the 
County for fifty percent (50%) of items identified in paragraph 7.7. Upon final 
acceptance of Project 1, invoice the County for the balance of all remaining actual 
costs incurred by Developer, as contemplated by Exhibit B.  
 
8.5. 
Be solely responsible for installing the traffic signal conduits in all four legs at the 
Northern Avenue and Citrus Road Intersection and installing the County's provided 
traffic signal. 
 
8.6. 
Be responsible for the Developer’s share of the Project actual construction costs 
as described in Exhibit B for Project 1: Northern Ave and Citrus Rd Intersection, 
currently estimated at $650,315.53. Construction costs include Northern Avenue 
and Citrus Road intersection improvements within the radius returns, Citrus Road, 
north of the radius returns, Northern Avenue, west of the radius returns; installation 
of a five-foot by six-foot (5’x6’) concrete box culvert, and riprap as well as a twelve-
foot (12’) drainpipe along the eastern edge of Citrus Road, as shown in purple on 
Exhibit A. 
 
8.7. 
Be responsible for the Actual Cost to improve the Northern Avenue west leg, Citrus 
Road north leg, and the intersection improvements within the radius returns.  
 
8.8. 
Be responsible for fifty percent (50%) of the actual cost to design, construct and 
relocate the APS overhead electrical. The additional cost to relocate the APS 
overhead electrical improvements beyond what is indicated in the Exhibit B budget 
for APS relocation expenses of the power line is considered an Enhancement and 
will be the sole responsibility of the Developer. The County’s contribution shall be 
limited to relocating the existing APS power poles. The cost to relocate a single 
pole is approximately $10,340. 
 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

6 
8.9. 
Be responsible for fifty percent (50%) of the actual cost of designing the MWD 
infrastructure. 
 
8.10. Be responsible for west half street improvements along its frontage on Citrus Road, 
and north half street improvements along its frontage on Northern Avenue. This 
includes any necessary pavement, five-foot by six-foot (5’X6’) culvert 
reconstruction and extension, sidewalk, curb, and gutter work, as well as any 
required utility relocations or installations, as referenced in paragraph 2.2.  
 
8.11. Be responsible for the dedication of right of way as identified in the final plat. The 
half street right of way dedication width is 65-feet on the north side of Northern 
Avenue and 65-feet on west side of Citrus Road. 
 
8.12. Each budget and exhibit have detailed tasks within the budgets and contingencies. 
In the event and unidentified task is encountered and the contingency does not 
cover it, the County and the Developer will split the unforeseen cost, with the 
County’s share at seventy-five percent (75%) and the Developer’s share at twenty-
five percent (25%).  However, in the event of an unforeseen cost not contemplated 
by the budget that would cause the actual costs to exceed one hundred and twenty 
percent (120%) of the budget, the County and the Developer must meet to discuss 
before continuing with the Project 1 improvements to reassess the budget and the 
obligation of the cost. 
 
8.13. The Developer shall be responsible for providing a performance bond to the 
County for its share of the Project 1 improvement and the engineers cost estimate 
for the west half street improvements of Citrus Road, and the north half street 
improvements on Northern Avenue. 
 
GENERAL TERMS AND CONDITIONS 
 
9. 
To the extent permitted by law, each Party will indemnify, defend and save the other Party 
harmless, including any of the Party’s departments, agencies, officers, employees, 
elected officials or agents, from and against all liability, loss, expense, damage or claim 
of any nature whatsoever to the extent caused by any activity, condition or event arising 
out of the performance or nonperformance by the indemnifying Party of any of the 
provisions of this Agreement to be performed by the indemnifying party, including but not 
limited to injuries or death of persons or damages to or destruction of property. In the 
event of an action, the damages which are the subject of this indemnity shall include 
costs, expenses of litigation and reasonable attorney’s fees. 
 
10. 
This Agreement shall become effective as of the date it is executed by all the governing 
bodies of the Parties and shall remain in full force and effect until all the Project 1 and 
Project 2 improvements indicated herein have been completed to the satisfaction of the 
County. County agrees that regardless of whether the Project 1 or Project 2 
improvements are complete or whether Developer has performed in accordance with this 
Agreement, County will not as a result withhold or delay issuance of any permits, including 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

7 
without limitation, building permits, with respect to any portion of Phase 3B of the White 
Tank Foothills Development. 
 
11. 
This Agreement may be amended only upon written Agreement executed by all Parties. 
 
12. 
This Agreement is subject to the provisions of A.R.S. § 38-511. 
 
13. 
The Parties warrant that they are in compliance with A.R.S. § 41-4401 and further 
acknowledge that: 
 
13.1. Any contractor or subcontractor who is contracted by a Party to perform work on 
the Project shall warrant their compliance with all federal immigration laws and 
regulations that relate to their employees and their compliance with A.R.S. § 23-
214(A) and shall keep a record of the verification for the duration of the employee’s 
employment or at least three (3) years, whichever is longer. 
 
13.2. Any breach of the warranty shall be deemed a material breach of this agreement 
of which breaching party may be liable for penalties including termination of the 
agreement. 
 
13.3. The Parties retain the legal right to inspect the papers of any contractor or 
subcontractor employee who works on the Project to ensure that the contractor or 
subcontractor is complying with the warranty above and that the contractor agrees 
to make all papers and employment records of said employee available during 
normal working hours in order to facilitate such an inspection. 
 
13.4. Nothing in this Agreement shall make any contractor or subcontractor an agent or 
employee of the Parties to this Agreement. 
 
14. 
Any contractor or subcontractor who engages in for-profit activity and has 10 or more 
employees, if the value of the contract is a minimum of $1,000,000, certify it is not 
currently engaged in, and agrees for the duration of this Agreement to not engage in, a 
boycott of goods or services from Israel. This certification does not apply to a boycott 
prohibited by 50 U.S.C. § 4842 or a regulation issued pursuant to 50 U.S.C. § 4842. 
 
15. 
Each Party warrants and certifies that neither it nor any contractor or vendor under 
contract with the Party to provide goods or services toward the accomplishment of the 
objectives of this Agreement currently has, and for the duration of the contract will not 
use: 
 
15.1. The forced labor of ethnic Uyghurs in the People's Republic of China. 
 
15.2. Any goods or services produced by the forced labor of ethnic Uyghurs in the 
People's Republic of China. 
 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

8 
15.3. Any contractors, subcontractors or suppliers that use the forced labor or any goods 
or services produced by the forced labor of ethnic Uyghurs in the People's Republic 
of China. 
 
If any Party becomes aware during the term of the Agreement that any contractor or 
vendor is not in compliance with this paragraph, the Party shall notify the other Party 
within five business days after becoming aware of the noncompliance. Failure of the Party 
to provide a written certification that it has remedied the noncompliance within one 
hundred eighty (180) days after notifying the public entity of its noncompliance, this 
Agreement shall terminate unless the Term of this Agreement shall end prior to said one 
hundred eighty (180) day period. 
 
16. 
It shall be a material breach of this Agreement for a Party to fail to observe or perform 
any of the material covenants, conditions or provisions of this Agreement, where such 
failure shall continue for a period of thirty (30) days after the non- defaulting Party provides 
the defaulting Party with written notice of such failure; provided, however, that such failure 
shall not be a Default if the defaulting Party has commenced to cure the Default within 
such thirty (30) day period and thereafter is diligently pursuing such cure to completion. 
The total aggregate cure period shall not exceed ninety (90) days unless the Parties 
otherwise agree in writing. In the event of Default, the non-defaulting Party, at its option, 
may terminate this Agreement without waiving any available remedies at law or in equity. 
Notwithstanding anything to the contrary contained in this Agreement, each Party hereby 
waives any right to recover punitive, indirect, consequential, special or other damages, 
other than such Party’s actual damages. 
 
17. 
All notices required under this agreement to be given in writing shall be sent to: 
 
Maricopa County Department of Transportation  
Attn: Intergovernmental Relations Branch 
2901 W. Durango Street 
Phoenix, Arizona 85009 
 
Northern Citrus LLP   
c/o Allard Developments 
Attn: Mr. Brad Clough   
10218-111 Street N.W.  
Edmonton Alberta T5K 1K9  
 
Either Party may, by written notice to the other, specify a different address for notice. All 
notices required or permitted by this Agreement or applicable law shall be in writing and 
may be delivered in person (by hand or courier) or may be sent by regular or certified mail 
or U.S. Postal Service Express Mail, with postage prepaid, or by commercial delivery 
service performed with receipt. Any notice sent by certified mail, return receipt requested, 
shall be deemed given on the date of delivery shown on the receipt card, or if no delivery 
date is shown, the postmark thereon. If sent by regular mail, the notice shall be deemed 
given 72 hours after the notice is addressed as required in this paragraph and mailed with 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

9 
postage prepaid. Notices delivered by United States Express Mail or overnight delivery 
service that guarantees next-day delivery shall be deemed given 24 hours after delivery 
of the notice to the Postal Service or courier for delivery. 
 
18. 
Any funding provided for in this Agreement, other than in the current fiscal year, is 
contingent upon being budgeted and appropriated by the governing bodies of the Parties 
in such fiscal year. This Agreement shall be construed as a whole and in accordance with 
its fair meaning and without regard to any presumption or other rule requiring construction 
against the party drafting this Agreement.  
 
19. 
The waiver by any Party of any right granted to it under this Agreement is not a waiver of 
any other right granted under this Agreement, nor may any waiver be deemed to be a 
waiver of a subsequent right obtained by reason of the continuation of any matter 
previously waived. 
 
20. 
Except as otherwise provided in this Agreement, all covenants, agreements, 
representations and warranties set forth in this Agreement or in any certificate or 
instrument executed or delivered pursuant to this Agreement shall survive the expiration 
or earlier termination of this Agreement for a period of one (1) year. 
 
21. 
This Agreement may be executed in two or more counterparts, each of which shall be 
deemed an original but all of which together shall constitute the same instrument. Electric 
signatures are acceptable as original signatures. 
 
22. 
The Parties will execute and/or deliver to each other such other instruments and 
documents as may be reasonably necessary to fulfill the covenants and obligations to be 
performed by such Party pursuant to this Agreement. 
 
23. 
The venue for any claim arising out of or in any way related to this Agreement shall be 
Maricopa County, Arizona. 
 
24. 
This Agreement shall be governed by the laws of the State of Arizona. 
 
 
End of Agreement - Signature Pages Follow 
 
 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

10 
IN WITNESS WHEREOF, the Parties have executed this Agreement. 
 
 
Northern Citrus LLP, an Arizona limited liability partnership. 
 
 
 
 
By: 
 
Hinton Financial Services, Inc., 
Date 
Its General Partner 
 
 
 
By: 
 
Brad Clough, President 
Date 
 
 
APPROVAL OF NORTHERN CITRUS LLP ATTORNEY 
 
The foregoing Agreement has been reviewed by undersigned Counsel, who has determined that 
it is in proper form and within the powers and authority granted to the Northern Citrus LLP under 
the laws of the State of Arizona. 
 
 
 
 
Neil Biskind, 
Date  
Biskind, Hunt & Semro, PLC, Attorney 
 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF
2/24/2025
2/24/2025
2/24/2025

11 
IN WITNESS WHEREOF, the Parties have executed this Agreement. 
MARICOPA COUNTY 
Recommended by: 
Jesse Gutierrez, P.E 
Date 
Transportation Director 
Approved and Accepted by: 
_________________________________ 
Chairman 
Date 
Board of Supervisors 
Attest by: 
Clerk of the Board 
Date 
APPROVAL OF DEPUTY COUNTY ATTORNEY 
The foregoing Agreement has been reviewed pursuant to A.R.S. § 11-952, as amended, by the 
undersigned Deputy County Attorney, who has determined that it is in proper form and within 
the powers and authority granted to the Board of Supervisors under the laws of the State of 
Arizona. 
Deputy County Attorney 
Date 
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF
2/24/2025
2/24/2025

N. CITRUS RD
MARICOPA COUNTY MUNICIPAL
WATER CONSERVATION
DISTRICT NUMBER 1
APN: 502-19-028
W. NORTHERN AVE
UNDERGROUND EXISTING
OVERHEAD LINES
5'X6' CONC BOX
CULVERT
REMOVE HEAD WALLS
UNDERGROUND 300' DITCH
160'
100'
100'
200'
125'
160'
100'
55.0'
EX ROW
33.0' EX
ROW
33.0' EX
ROW
65.0'
ROW
40.0'
EX ROW
65.0'
ROW
33.0'
EX
ROW
40.0'
EX ROW
65.0'
ROW
EXISTING
ASPHALT
EXISTING
ASPHALT
REMOVE & RELOCATE
IRRIGATION STRUCTURE
GABION WALLS
Designer:
Drawn by:
Project:
Sheet No.
Job No.
Call at least two full working days
before you begin excavation.
Dial 8-1-1 or 1-800-STAKE-IT (782-5348)
In Maricopa County: (602)263-1100
w w w . e p s g r o u p i n c . c o m
T:480.503.2250
F:480.503.2258
|
1130 N Alma School Road
Suite 120
Mesa, AZ 85201
20-1596 - White Tank Foothills Ph 3B
White Tank Foothills Ph 3B
Citrus Road and Northern Avenue
Maricopa County, Arizona
EPS
EPS
20-1596
of 1
1
1
EXB01
Financial Responsibility Exhibit
N.T.S.
VICINITY MAP
N. CITRUS RD
W. NORTHERN AVE
W. OLIVE AVE
N. PERRYVILLE RD
SEC. 34,
T.3 N., R.2 W.
30
scale: 1" = 30'
0
30
60
feet
EDGE OF PAVEMENT
CURB RETURN
STRIPING
Northern Citrus LLP
Financial Responsibility
County Financial
Responsibility
Exhibit A
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

PHASE 2
PARCEL 3.11
N. CITRUS RD
MARICOPA COUNTY MUNICIPAL
WATER CONSERVATION
DISTRICT NUMBER 1
APN: 502-19-028
W. NORTHERN AVE
UNDERGROUND EXISTING
OVERHEAD LINES
5'X6' CONC BOX
CULVERT
W. NORTHERN AVE
N. CITRUS RD
REMOVE HEAD WALLS
UNDERGROUND 300' DITCH
160'
100'
160'
100'
100'
200'
125'
160'
100'
869'
700'
660'
660'
REMOVE & RELOCATE
IRRIGATION STRUCTURE
160'
100'
160'
100'
100'
200'
125'
160'
100'
869'
700'
660'
660'
775'
GABION WALLS
Designer:
Drawn by:
Project:
Sheet No.
Job No.
Call at least two full working days
before you begin excavation.
Dial 8-1-1 or 1-800-STAKE-IT (782-5348)
In Maricopa County: (602)263-1100
w w w . e p s g r o u p i n c . c o m
T:480.503.2250
F:480.503.2258
|
1130 N Alma School Road
Suite 120
Mesa, AZ 85201
20-1596 - White Tank Foothills Ph 3B
White Tank Foothills Ph 3B
Citrus Road and Northern Avenue
Maricopa County, Arizona
EPS
EPS
20-1596
of 1
1
1
EXB02
N.T.S.
VICINITY MAP
N. CITRUS RD
W. NORTHERN AVE
W. OLIVE AVE
N. PERRYVILLE RD
SEC. 34,
T.3 N., R.2 W.
100
0
100
200
scale: 1" = 100'
feet
EDGE OF PAVEMENT
CURB RETURN
STRIPING
Northern Citrus LLP
Financial Responsibility
County Financial
Responsibility
Financial Responsibility Exhibit
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

PRELIMINARY BUDGET SUMMARY
Date:
February 14, 2025
Project:
White Tank Foothills Ph 3B Intersection - Developer
Revision
Total No. Lots
259
Municipality
Maricopa county
Cost per FF
41.11
$                      
92.02
$                      
133.13
$                     
Cost per Lot
2,510.87
$                  
5,620.88
$                  
8,131.75
$                  
No. Lots
259
                           
259
                           
259
                           
Front Foot / Linear Foot
15,820
                      
15,820
                      
15,820
                      
Net Acres
56.49
56.49
56.49
                        
Lot Size
Job Number
500
501
Description
Infra Developer
Infra County
TOTAL
Survey
-
$                          
-
$                          
-
$                          
Engineering
25,000.00
$                
25,000.00
$                
50,000.00
$                
Construction Staking
7,200.00
$                  
9,850.00
$                  
17,050.00
$                
Other Professional
-
$                          
-
$                          
-
$                          
Soils Report/testing
2,000.00
$                  
5,500.00
$                  
7,500.00
$                  
Fees & Permits
92,438.15
$                
103,455.36
$              
195,893.51
$              
Earthwork
-
$                          
-
$                          
-
$                          
Sewer
-
$                          
-
$                          
-
$                          
Water
-
$                          
16,000.00
$                
16,000.00
$                
Storm Drain
147,200.50
$              
231,965.00
$              
379,165.50
$              
Irrigation
32,700.00
$                
46,900.00
$                
79,600.00
$                
Dry Utilities
33,538.44
$                
31,020.00
$                
64,558.44
$                
Street Lights/Area Lighting
20,740.00
$                
-
$                          
20,740.00
$                
Concrete
34,025.00
$                
-
$                          
34,025.00
$                
Paving
204,886.05
$              
461,982.32
$              
666,868.37
$              
Theme Walls and Monumentation
-
$                          
-
$                          
-
$                          
Retaining Walls
-
$                          
-
$                          
-
$                          
Landscaping
-
$                          
-
$                          
-
$                          
Amenities
-
$                          
-
$                          
-
$                          
Park
-
$                          
-
$                          
-
$                          
Reimbursable Development Costs
-
$                          
-
$                          
-
$                          
Contingency
5%
29,986.41
$                
46,583.63
$                
76,570.04
$                
18,000.00
$                
18,000.00
$                
Citrus & Northern Traffic Signal
400,000.00
$              
400,000.00
$              
CM Fee for traffic signal
9,000.00
$                  
9,000.00
$                  
Sales Tax
4.095%
20,600.98
$                
50,550.77
$                
71,151.75
$                
Total
650,315.53
$              
1,455,807.08
$           
2,106,122.61
$           
Citrus & Northern Traffic Signal Design
EXHIBIT B
NOTE: 
Includes all state and county taxes
1 of 7
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

PRELIMINARY BUDGET DETAIL SHEET
Revision
Project:
White Tank Foothills Ph 3B Intersection - Developer
Lot Size
Date:
02/14/25
Acres:
56.49
Phase
Infrastructure Developer
No. of Lots:
259
Job No.
500
Municipality Maricopa county
CL
2,985
                                
Job #/ 
Cost 
Code
Description
Quantity
Unit
Unit Price
Subtotal
Total
100
Survey
500.100 Subtotal
Survey
-
$                                  
120
Engineering
50% of MWD plans and Coordination
1
                               
ls
25,000.00
$           
25,000.00
$        
500.120 Subtotal
Engineering
25,000.00
$                       
130
Construction Staking
Construction staking
1
                               
ls
7,200.00
$             
7,200.00
$          
 
500.130 Subtotal
Construction Staking
7,200.00
$                         
140
Other Professional
500.140 Subtotal
Other Professional
-
$                                  
150
Soils Report/Testing
Soils testing
1
                               
ls
2,000.00
$             
2,000.00
$          
500.150 Subtotal
Soils Report/Testing
2,000.00
$                         
160
Fees & Permits
Permit Fees - 3.5% of Constr. Cost
1
                               
ls
16,558.15
$           
16,558.15
$        
Dust Control Permits
1
                               
ls
3,500.00
$             
3,500.00
$          
APS (50% split between Developer & County responsibility)
1,034
                         
lf
70.00
$                  
72,380.00
$        
.
500.160 Subtotal
Fees & Permits
92,438.15
$                       
200
Earthwork
500.200 Subtotal
Earthwork
-
$                                  
205
Sewer
500.205 Subtotal
Sewer
-
$                                  
210
Water
500.210 Subtotal
Water
-
$                                  
215
Storm Drain
Pipe work
18" Drain Pipe
553
                            
lf
61.50
$                  
34,009.50
$        
Remove existing concrete driveway
1,455
                         
sf
5.00
$                    
7,275.00
$          
Subtotal pipe work
41,284.50
$        
Infrastructure Developer
2 of 7
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

Job #/ 
Cost 
Code
Description
Quantity
Unit
Unit Price
Subtotal
Total
Infrastructure Developer
Storm concrete
5x7 Box Culvert (includes one headwall)
43
                             
lf
1,500.00
$             
64,500.00
$        
Catch Basin
3
                               
ea
9,850.00
$             
29,550.00
$        
Riprap
144
                            
sf
14.00
$                  
2,016.00
$          
Headwall
1
                               
ea
9,850.00
$             
9,850.00
$          
Subtotal storm concrete
105,916.00
$       
Dry Wells
Subtotal dry wells
-
$                   
500.215 Subtotal
Storm Drain
147,200.50
$                     
220
Irrigation
36" RID Pipe
62
                             
lf
150.00
$                
9,300.00
$          
24" RID Pipe
34
                             
lf
100.00
$                
3,400.00
$          
Construct two irrigation structures
2
                               
ea
10,000.00
$           
20,000.00
$        
500.220 Subtotal
Irrigation
32,700.00
$                       
225
Dry Utilities
Grade for Curb
2,518
                         
sy
1.00
$                    
2,518.44
$          
Utility Trench (50% split between Developer & County 
responsibility)
1,034
                         
lf
30.00
$                  
31,020.00
$        
500.225 Subtotal
Dry Utilities
33,538.44
$                       
230
Street Lights/Area Lighting
Traffic Signal Conduit
244
                            
lf
85.00
$                  
20,740.00
$        
500.230 Subtotal
Street Lights/Area Lighting
20,740.00
$                       
235
Concrete
6" Vertical Curb & Gutter M.A.G. Std Dtl 220-1"A"
168
                            
lf
25.00
$                  
4,200.00
$          
Concrete Driveway
1,455
                         
sf
15.00
$                  
21,825.00
$        
Mobilization
1
                               
ls
1,500.00
$             
1,500.00
$          
Traffic Control  
1
                               
ls
6,500.00
$             
6,500.00
$          
500.235 Subtotal
Concrete
34,025.00
$                       
240
Paving
Re-establish subgrade
2,518
                         
sy
1.00
$                    
2,518.44
$          
4" AC/ 9" ABC - Northern Avenue & Citrus Rd
2,518
                         
sy
44.40
$                  
111,818.93
$       
Asphalt Thicken Edge
674
                            
lf
8.00
$                    
5,392.00
$          
Survey Monument MAG 120-1 Type B
1
                               
ea
230.00
$                
230.00
$             
Manhole Frame and Cover Adjustment M.A.G. Std Dtl 422
1
                               
ea
1,000.00
$             
1,000.00
$          
Water Valve and Cover Adjustment M.A.G. Std Dtl 391-1 "C" 
2
                               
ea
900.00
$                
1,800.00
$          
Remove Existing Pavement
1,411
                         
sy
10.50
$                  
14,810.83
$        
Signing
8
                               
ea
450.00
$                
3,600.00
$          
Striping 
2,000
                         
lf
1.50
$                    
3,000.00
$          
Construction water
1
                               
ls
8,500.00
$             
8,500.00
$          
Mobilization
1
                               
ls
12,000.00
$           
12,000.00
$        
Offsite Grading - Citrus Road
839
                            
cy
8.00
$                    
6,715.85
$          
Traffic Control Allowance
1
                               
al
25,000.00
$           
25,000.00
$        
Potholing Allowance
1
                               
al
8,500.00
$             
8,500.00
$          
500.240 Subtotal
Paving
204,886.05
$                     
245
Theme Walls and Monumentation
500.245 Subtotal
Theme Walls and Monumentation
-
$                                  
250
Retaining Walls
500.250 Subtotal
Retaining Walls
-
$                                  
255
Landscaping
500.255 Subtotal
Landscaping
-
$                                  
3 of 7
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

Job #/ 
Cost 
Code
Description
Quantity
Unit
Unit Price
Subtotal
Total
Infrastructure Developer
260
Amenities
500.260 Subtotal
Amenities
-
$                                  
265
Park
500.265 Subtotal
Park
-
$                                  
270
Reimbursable Development Costs
500.270 Subtotal
Reimbursable Development Costs
-
$                                  
Total Budget
5% Contingency
Subtotal
Sales Tax (State & County Only)
Total Overall Budget
599,728.14
$                           
29,986.41
$                             
629,714.55
$                           
20,600.98
$                             
650,315.53
$                           
4 of 7
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

PRELIMINARY BUDGET DETAIL SHEET
Revision
Project:
White Tank Foothills Ph 3B Intersection - County
Lot Size
Date:
02/14/25
Acres:
56.49
Phase
Infrastructure County
No. of Lots:
259
Job No.
501
Municipality Maricopa county
CL
2,985
                                
Job #/ 
Cost 
Code
Description
Quantity
Unit
Unit Price
Subtotal
Total
100
Survey
501.100 Subtotal
Survey
-
$                                  
120
Engineering
50% of MWD plans and Coordination
1
                               
ls
25,000.00
$           
25,000.00
$        
501.120 Subtotal
Engineering
25,000.00
$                       
130
Construction Staking
Construction staking
1
                               
ls
9,850.00
$             
9,850.00
$          
 
501.130 Subtotal
Construction Staking
9,850.00
$                         
140
Other Professional
501.140 Subtotal
Other Professional
-
$                                  
150
Soils Report/Testing
Soils testing
1
                               
ls
5,500.00
$             
5,500.00
$          
501.150 Subtotal
Soils Report/Testing
5,500.00
$                         
160
Fees & Permits
Permit Fees - 3.5% of Constr. Cost
1
                               
ls
27,575.36
$           
27,575.36
$        
Dust Control Permits
1
                               
ls
3,500.00
$             
3,500.00
$          
APS (50% split between Developer & County responsibility)
1,034
                         
lf
70.00
$                  
72,380.00
$        
.
501.160 Subtotal
Fees & Permits
103,455.36
$                     
200
Earthwork
501.200 Subtotal
Earthwork
-
$                                  
205
Sewer
501.205 Subtotal
Sewer
-
$                                  
210
Water
Relocate air release valve
1
                             
ea
5,500.00
$            
5,500.00
$         
Relocate fire hydrant
1
                               
ea
10,500.00
$           
10,500.00
$        
501.210 Subtotal
Water
16,000.00
$                       
215
Storm Drain
Pipe work
Subtotal pipe work
-
$                   
Infrastructure County
5 of 7
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

Job #/ 
Cost 
Code
Description
Quantity
Unit
Unit Price
Subtotal
Total
Infrastructure County
Storm concrete
Gabions
4,646
                         
sf
42.50
$                  
197,455.00
$       
Grade Channel
406
                            
lf
85.00
$                  
34,510.00
$        
Subtotal storm concrete
231,965.00
$       
Dry Wells
Subtotal dry wells
-
$                   
501.215 Subtotal
Storm Drain
231,965.00
$                     
220
Irrigation
Underground existing ditch
247
                            
lf
150.00
$                
37,050.00
$        
Headwall
1
                               
ea
9,850.00
$             
9,850.00
$          
501.220 Subtotal
Irrigation
46,900.00
$                       
225
Dry Utilities
Utility Trench (50% split between Developer & County 
responsibility)
1,034
                         
lf
30.00
$                  
31,020.00
$        
501.225 Subtotal
Dry Utilities
31,020.00
$                       
230
Street Lights/Traffic Signal
501.230 Subtotal
Street Lights/Traffic Signal
-
$                                  
235
Concrete
501.235 Subtotal
Concrete
-
$                                  
240
Paving
Re-establish subgrade
5,097
                         
sy
1.00
$                    
5,097.33
$          
4" AC/ 9" ABC - Northern Avenue
5,097
                         
sy
44.40
$                  
226,321.60
$       
Asphalt Thicken Edge
3,329
                         
lf
8.00
$                    
26,632.00
$        
Survey Monument MAG 120-1 Type B
1
                               
ea
230.00
$                
230.00
$             
Manhole Frame and Cover Adjustment M.A.G. Std Dtl 422
3
                               
ea
1,000.00
$             
3,000.00
$          
Water Valve and Cover Adjustment M.A.G. Std Dtl 391-1 "C" 
3
                               
ea
900.00
$                
2,700.00
$          
Remove Existing Pavement
2,644
                         
sy
10.50
$                  
27,758.50
$        
Signing
8
                               
ea
450.00
$                
3,600.00
$          
Striping 
10,100
                       
lf
1.50
$                    
15,150.00
$        
Construction water
1
                               
ls
8,500.00
$             
8,500.00
$          
Mobilization
1
                               
ls
15,000.00
$           
15,000.00
$        
Offsite Grading - Northern Avenue
1,699
                         
cy
8.00
$                    
13,592.89
$        
Traffic Control Allowance
1
                               
al
45,000.00
$           
45,000.00
$        
Potholing Allowance
1
                               
al
8,500.00
$             
8,500.00
$          
Guardrail
406
                            
lf
150.00
$                
60,900.00
$        
501.240 Subtotal
Paving
461,982.32
$                     
245
Theme Walls and Monumentation
501.245 Subtotal
Theme Walls and Monumentation
-
$                                  
250
Retaining Walls
501.250 Subtotal
Retaining Walls
-
$                                  
255
Landscaping
501.255 Subtotal
Landscaping
-
$                                  
6 of 7
Docusign Envelope ID: 3CFACC56-CE61-48B7-ABA8-DE855449C9CF

Job #/ 
Cost 
Code
Description
Quantity
Unit
Unit Price
Subtotal
Total
Infrastructure County
260
Amenities
501.260 Subtotal
Amenities
-
$                                  
265
Park
501.265 Subtotal
Park
-
$                                  
270
Reimbursable Development Costs
501.270 Subtotal
Reimbursable Development Costs
-
$                                  
Total Budget
5% Contingency
Citrus & Northern Traffic Signal Design
Citrus & Northern Traffic Signal
CM Fee for traffic signal
Subtotal
Sales Tax (State & County Only)
Total Overall Budget
1,455,807.08
$                        
18,000.00
$                             
400,000.00
$                           
9,000.00
$                               
1,405,256.31
$                        
50,550.77
$                             
931,672.68
$                           
46,583.63
$                             
7 of 7