AMENDMENT NO. 1 
Cholla WTP 2023 Improvements Design and Plant Assessment 
Chlorine Dioxide - CA Services  
(Contract No. C23-0377) 
This Amendment No. 1 (“Amendment”) to the Standard Form of Agreement between Owner and 
Design Professional (Construction Manager at Risk) (“Agreement”) is made this ______ day of 
________, 2024, (“Effective Date”), by and between the City of Glendale, an Arizona municipal 
corporation (“City”) and Wilson Engineers, LLC, an Arizona Limited Liability Company, authorized 
to do business in Arizona (“Contractor”). 
RECITALS 
A.
City and Wilson Engineers, LLC (“Contractor”) previously entered into a Standard Form of 
Agreement between Owner and Design Professional (Construction Manager at Risk), 
Contract No. C23-0377 dated April 11, 2023 (“Agreement”); and
B.
City and Contractor wish to modify and amend the Agreement subject to and strictly in 
accordance with the terms of this Amendment.
AGREEMENT 
In consideration of the mutual promises set forth herein and other good and valuable consideration, 
the receipt and sufficiency of which are hereby acknowledged, the City and Contractor hereby agree 
as follows: 
1.
Recitals.  The recitals set forth above are not merely recitals but form an integral part of this
Amendment.
2.
Term.  The term of the Agreement is extended for a one-year period from April 12, 2024
through April 11, 2025, unless otherwise terminated or canceled as provided by the
Agreement.  All other provisions of the Agreement except as set forth in this Amendment
shall remain in their entirety.
3.
Scope of Work. The Scope of Work shall be revised to include additional construction
administration (CA) and inspection services for Chlorine Dioxide improvements.
4.
Compensation. The compensation shall be increased by an additional $870,180 per the
attached Exhibit B.
5.
Insurance Certificate.  Current certificate will expire on December 31, 2024.  A new
insurance certificate must be provided prior to this date to the Materials Manager and the
Contract Administrator in order for this Agreement to remain in effect.

2 
05/10/2023 
6. 
Non-discrimination.   Contractor must not discriminate against any employee or applicant 
for employment on the basis of race, color, religion, sex, national origin, age, marital status, 
sexual orientation, gender identity or expression, genetic characteristics, familial status, U.S. 
military veteran status or any disability. Contractor will require any Sub-contractor to be bound 
to the same requirements as stated within this section. Contractor, and on behalf of any 
subcontractors, warrants compliance with this section.  
 
7.  
No Boycott of Israel.  To the extent A.R.S § 35-393 through § 35-393.03 are applicable, the 
parties hereby certify that they are not currently engaged in, and agree for the duration of the 
Agreement to not engage in, a boycott of goods or services from Israel, as that term is defined 
in A.R.S § 35-393. 
 
8. 
Uyghur Forced Labor Prevention Act (UFLPA). Contractor certifies that it does not 
currently, and during the term of this Agreement, will not use: 
 
(a) 
the forced labor of ethnic Uyghurs in the People’s Republic of China;  
 
(b) 
any goods or services produced by the forced labor of ethnic Uyghurs in the People’s 
Republic of China; and  
 
(c) 
any contractors, subcontractors or suppliers that use the forced labor or any goods or 
services produced by the forced labor of ethnic Uyghurs in the People’s Republic of 
China. 
 
9. 
Attestation of PCI Compliance.  When applicable, the Contractor will provide the City 
annually with a Payment Card Industry Data Security Standard (PCI DSS) attestation of 
compliance certificate signed by an officer of Contractor with oversight responsibility. 
 
10. 
Ratification of Agreement.  City and Contractor hereby agree that except as expressly 
provided herein, the provisions of the Agreement shall be, and remain in full force and effect 
and that if any provision of this Amendment conflicts with the Agreement, then the provisions 
of this Amendment shall prevail. 
 
[Signatures on the following page.]

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 3 of 28                Scope for CA Services 
 
CONSTRUCTION ADMINISTRATION  
 
SCOPE OF SERVICES 
 
Project Title:  Cholla Water Treatment Plant 2023 Improvements 
Chlorine Dioxide System 
 
 
TASK SERIES 100 - GENERAL 
 
This Scope of Services describes engineering services to be provided by Wilson Engineers, LLC 
(ENGINEER) for the City of Glendale (CITY). The engineering services are related to the 
construction and post construction phases of the Project and will consist of the following: 
 
Section 200 - Project Administration Services During Construction 
 
Section 300 - Engineering Services During Construction 
 
Section 400 - Resident Services During Construction 
 
Section 500 - Special Services 
 
Section 700 – Allowances and Subconsultants 
 
The level of effort associated with these services is proposed in Exhibit B. 
 
This Scope of Services will be performed during the construction and post-construction phases 
of the Project.  The duration of the construction phase services is approximately May 2024 
through May 2025 (12 months).  Post-construction services will last up to 24 months after final 
completion of the construction agreement and are prescribed as Special Services, in Section 500. 
 
The ENGINEER acknowledges that the CITY may have retained other consultants, engineering and 
otherwise, and that coordination between other consultants and the ENGINEER may be 
necessary from time to time to ensure proper performance of these services.  The ENGINEER 
agrees to provide such coordination as necessary within the scope of services. 
 
Construction contract documents (Construction Documents) are defined as the agreement, 
general conditions, supplemental conditions, drawings, standard details, specifications, 
addendum, and executed change orders prepared for construction of the Project.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 4 of 28                Scope for CA Services 
TASK SERIES 200 - PROJECT ADMINISTRATION SERVICES DURING CONSTRUCTION 
 
Task 210 - Representation on Behalf of City 
 
The ENGINEER will consult with and advise CITY and act as its representative during construction.  
The extent and limitations of the duties, responsibilities and authority of ENGINEER as assigned 
herein shall not be modified, except as ENGINEER may otherwise agree in writing.  All CITY 
instructions to Contractor(s) will be issued through ENGINEER who will have authority to act on 
behalf of CITY to the extent provided in this scope of services except as otherwise provided in 
writing. 
 
ENGINEER will not be responsible for the means, methods, techniques, sequences or procedures 
of construction selected by Contractor(s) (unless otherwise specified in the construction contract 
documents) or the safety precautions and programs associated with the work of Contractor(s). 
 
ENGINEER shall furnish the services of a competent inspector during the progress of 
construction.  ENGINEER shall coordinate the inspection, facilitate the work in general, and 
perform miscellaneous inspection work as required to assure that the work is constructed in 
accordance with the Contract documents and accepted standards of the construction 
industry.  ENGINEER shall not have the direct control of the individual workmen and their 
work.  The direct control shall be solely the responsibility of the contractor (referred to as 
“Construction Manager at Risk” or “CMAR”), to the extent provided by the contract between the 
City and the CMAR. 
 
ENGINEER will make site(s) visits appropriate for the size of Project and type of construction at 
periods appropriate to the various stages of construction to inspect, as an experienced and 
qualified professional, the progress and quality of the executed work of Contractor(s) and to 
determine if such work is proceeding in accordance with the Construction Documents. 
 
On the basis of on-site examination of materials, equipment, and workmanship, ENGINEER will 
keep CITY informed of the progress of the work, will endeavor to guard CITY against defects and 
deficiencies in such work and will disapprove or reject work failing to conform to the Contract 
Documents.  This task shall include the following items: 
 
1) Conduct preconstruction conference:  the ENGINEER will conduct a preconstruction 
conference.  At the conference, the ENGINEER will identify field services to be provided 
by the ENGINEER and discuss appropriate coordination procedures.  The ENGINEER will 
prepare an agenda for the meeting and will prepare and distribute the meeting minutes.  
The ENGINEER’s Resident Project Representative (RPR) will conduct the meeting. 
 
2) Provide construction administration, quality control, and coordination:  the ENGINEER 
will provide construction administration and quality control services during the course of 
construction to assure that the overall technical correctness of the construction phase 
services and that specified procedures are being followed and that schedules are being

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 5 of 28                Scope for CA Services 
met. The ENGINEER will provide coordination functions during the construction phase as 
follows; 
 
A) Hold coordination meetings with the CITY as appropriate; 
 
B) Coordinate with regulatory and approving agencies and utilities as required; 
 
C)   Manage asset information for Central Systems (Lucity) 
 
D) Coordinate the work of specialty subconsultants assigned to the Project; and 
 
E) Verify Contractor’s Safety Data Sheets (SDS) are on file at the job site. 
 
3) Provide Project Records and Documentation: The ENGINEER will maintain and provide the 
following detailed Project Records and documentation during the construction phase: 
 
A) The Project Records shall include correspondence, schedules, submittals, test 
data, project data, payments, change orders, meeting minutes, clarifications, 
mark-ups of drawings and specifications, control system documentation and other 
such documentation.  Project records shall be delivered to the CITY upon 
completion of the construction contract.  Records shall be maintained under 
Section 400.  Project Records shall be maintained in the ENGINEER’s Office. 
 
B) Status reports for the construction contract shall be provided under Task 410. 
 
Task 220 - Administer the Construction Schedule 
 
The ENGINEER’s opinions concerning the various scheduling documents produced or used by the 
Contractor are for information and are not controlling on the Contractor.  It is the Contractor’s 
responsibility to continue to exercise its independent judgment concerning means, methods and 
sequences of construction it employs.  The Contractor remains solely responsible for meeting 
contract time(s) given in the Construction Documents. 
 
1) Review progress schedule:  The ENGINEER will review and critique the Contractor's 
progress schedule in accordance with the Construction Documents.  The ENGINEER will 
examine the work sequence, durations, interim milestones, and other appropriate 
scheduling features in accordance with the requirements of the Construction Documents.  
The ENGINEER will prepare a summary of the review comments and will meet and discuss 
the schedule comments with the Contractor and the CITY's representative. 
 
2) Review progress schedule updates: The ENGINEER will review the Contractor’s progress 
schedule updates to the construction schedule in accordance with the Construction 
Documents.  The ENGINEER will perform a review of progress accomplished during the 
period and compare to planned schedule and discuss significant discrepancies with the

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 6 of 28                Scope for CA Services 
Contractor.  The ENGINEER and Contractor will establish, based on the data, the percent 
of Project completion.  ENGINEER will meet with Contractor on monthly basis to review 
and update the schedule data.  Based upon the schedule update, the ENGINEER will 
recommend processing progress payments.  The primary performance of the task will be 
performed under Task 400. 
 
Task 230 - Review of Submittals Including Shop Drawings, and Test Results Documentation  
 
The ENGINEER will receive, review, evaluate, and distribute (or take other appropriate action in 
respect of) shop drawings, samples, test results, and other data which Contractor is required to 
submit. The ENGINEER’s review shall be for conformance with the design concept of the Project 
and compliance with the information given in the Construction Documents.  Such review or other 
action shall not extend to means, methods, sequences, techniques or procedures of construction 
selected by Contractor(s), or to safety precautions and programs associated thereto.   
 
The ENGINEER will receive and review (for general contents as required by the Construction 
Documents) guarantees, and certificates of inspection which are to be assembled by 
Contractor(s) in accordance with the Construction Documents and Task 535 and 540. 
 
The ENGINEER will maintain a submittal log showing dates of all submittals, transmittal action to 
other subconsultants, dates of return and review action.  Copies of the log shall be furnished to 
the CITY and the Contractor monthly.  The ENGINEER will promptly and in accordance with 
Project schedule requirements, review and approve, reject or take other appropriate action on 
the Contractor’s request for substitutions.  The ENGINEER will not approve any proposed 
substitution unless such substitution is approved by the CITY. 
 
Submittal review efforts are based upon a maximum of two (2) reviews per submittal and that 
no more than fifty percent (50%) of the total number of first submittals will require two (2) 
reviews. For this task, it is assumed that approximately 80 total submittals will be submitted for 
review.  The total submittal quantities include approximately 60 original submittals plus 30% of 
the original total resubmitted as revise and resubmitted shop drawings. 
 
Task 240 - Issue Interpretations and Clarifications 
 
The ENGINEER will issue the CITY’s instructions to Contractor(s); issue necessary interpretations 
and clarifications of the Construction Documents; have authority, as CITY, to require special 
inspection or testing of the work; act as initial interpreter of the requirements of the Construction 
Documents and judge the acceptability of the work thereunder, and make decisions on all claims 
of CITY and Contractor(s) relating to the acceptability of the work or the interpretation of the 
requirements of the Construction Documents pertaining to the execution and progress of the 
work.  The ENGINEER will render interpretations or decisions in good faith and in accordance with 
the requirements of the Construction Documents.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 7 of 28                Scope for CA Services 
The ENGINEER will respond to the CITY and/or Contractor to clarify and/or interpret technical or 
design related questions.  Routine technical interpretations shall be responded to under Task 
410.  The ENGINEER will respond to issues raised during construction regarding interpretation 
and clarification of the contractual administrative and technical requirements of the Construction 
Documents.  The ENGINEER will serve as the CITY’s advisor in resolution of these issues. 
Clarifications shall be issued to the Contractor under Task 410.  Approximately 50 RFIs are 
anticipated. 
 
Task 250 - Certify Contractor Progress Payments 
 
The ENGINEER will review, prepare comments, and reach agreement with the Contractor on the 
progress represented in the Contractor’s schedule of values.  The monthly schedule update, 
schedule of values, in combination with the ENGINEER’s field inspections, and the progress 
schedule shall be used by the ENGINEER to determine the appropriateness of the Contractor’s 
request for payment. 
 
The ENGINEER, on review of applications for payment and the accompanying data and schedules, 
verifies the amounts owed to Contractor and recommends in writing to CITY payments to 
Contractor. Recommendations of payment will constitute a representation to CITY, based on 
such inspections and review, that; 
 
1) The work has progressed to the point indicated; 
 
2) To the best of ENGINEER's knowledge, information and belief, the quality of such work is 
in accordance with the Contract Documents (subject to an evaluation of such work as a 
functioning Project upon Substantial Completion, to the results of any subsequent tests 
called for in the Construction Documents, and to any qualifications stated in the 
recommendation); and 
 
3) Payment of the amount recommended is due and owed to the Contractor. 
 
The overall construction schedule is anticipated to be twelve (12) months.  Effort is assumed to 
be for review and approval of 12 payment applications.  
 
Task 260 – Substantial and Final Completion Inspections 
 
Following notice from the Contractor, the ENGINEER and the CITY will conduct an inspection to 
determine the status of completion. If the ENGINEER does not consider the project or work 
substantially complete, the ENGINEER will notify the Contractor in writing.  If the ENGINEER 
considers the work substantially complete, the ENGINEER will deliver to the CITY a tentative 
certificate of Substantial Completion which shall fix the date of Substantial Completion.  Attached 
will be a tentative list of items to be completed or corrected before final payment.  After CITY 
reviews and approves the tentative certificate of Substantial Completion, the ENGINEER will

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 8 of 28                Scope for CA Services 
deliver to the CITY and Contractor a definitive certificate of Substantial Completion and punch 
list.   
 
The ENGINEER and the CITY will, upon completion of the punch list items as notified by the 
Contractor, make final inspection to determine if the finished work has been completed to the 
standard required by the Construction Documents, determine whether required inspections and 
approvals for permit compliance have been satisfactorily completed, and Contractor has fulfilled 
their contractual obligations so ENGINEER may recommend, in writing, final payment to 
Contractor and may give written notice to CITY and the Contractor that the work is acceptable, 
subject to any conditions therein expressed and in consultation with the CITY whether the work 
is finally complete 
  
After the work is determined to be finally complete and the ENGINEER determines that the 
Contractor has properly submitted the items required for final inspection, the ENGINEER will 
determine whether the Contractor is entitled to final payment and, if so, will so certify to the 
CITY. 
 
The ENGINEER’s certification that the Contractor is entitled to final payment constitutes the 
ENGINEER’s representation to the CITY that; 
 
1) The work complies with (a) the construction contract documents, (b) applicable building 
codes, rules or regulations of all governmental authorities having jurisdiction over the 
Project, and (c) applicable installation and workmanship standards; 
 
2) The Contractor has submitted proper Final Completion close-out documents; and 
 
3) The Contractor is entitled to final payment. 
 
The ENGINEER will provide to the CITY, at the time it submits a signed final payment request from 
the Contractor, all Final Completion close-out documents. 
 
ENGINEER will not be responsible for the acts or omissions of any Contractor, or subcontractor, 
or any of the Contractor(s)' or subcontractor(s)' agents or employees or any other persons 
(except ENGINEER's own employees and agents) at the site(s) or otherwise performing any of the 
Contractor(s)' work; however, nothing contained in Tasks 210 through 260, inclusive, shall be 
construed to release ENGINEER from liability for failure to properly perform duties in accordance 
with this scope of services. 
 
TASK SERIES 300 - ENGINEERING SERVICES DURING CONSTRUCTION 
 
Task 310 - Minor Changes, Change Order Requests, and Change Orders 
 
The ENGINEER, without the CITY’s prior approval, may authorize or direct minor changes in the 
Work which are consistent with the intent of the construction contract documents and which do

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 9 of 28                Scope for CA Services 
not involve a change in Project cost, time for construction, Project scope, aesthetics, or approved 
design elements.  Any such minor changes shall be implemented by written field order.  Except 
as provided in this paragraph, the ENGINEER shall not have authority to direct or authorize 
changes in the Work without the CITY’s prior written approval; however, the ENGINEER shall 
provide a copy of any written field order to the CITY. 
 
The ENGINEER will promptly consult with and advise the CITY concerning, and shall administer 
and manage, all change order requests and change orders. 
 
The ENGINEER will prepare, when requested by the CITY, required drawings, specifications and 
other supporting data regarding minor changes, change order requests and change orders. 
 
The ENGINEER will prepare and submit change order requests explaining the merits for the 
change and a recommendation for the CITY’s approval and acceptance. 
 
The ENGINEER will negotiate an agreement with the Contractor as to scope of work and cost, 
time or both associated with the change in Work.  The change order shall include a written 
justification for the cost of the Work. 
 
The ENGINEER will administer and manage minor changes, change order requests, and change 
orders on behalf of the CITY.  Change orders shall be prepared on a standard form provided by 
the CITY. 
 
Should a change order request be accepted by the CITY in the absence of an agreement with the 
Contractor as to cost, time, or both, the ENGINEER will; 
 
1) Receive and maintain all documentation pertaining to the change order request required 
of the Contractor; 
 
2) Examine such documentation on the CITY’s behalf; 
 
3) Take such other action as may be reasonably necessary or as the CITY may request; and 
 
4) Make a recommendation to the CITY concerning any appropriate adjustment in the 
construction cost and/or time and prepare a change order for Contractor’s acceptance 
and City approval. 
 
Changes and substitutions shall be limited to the scope of the Project as defined by the 
Construction Documents or additional work as may be requested by the CITY. 
 
Task 320 – Material Testing 
 
The ENGINEER will review conformance material testing services performed by an independent 
testing laboratory to monitor the Quality Control (QC) efforts performed by the CONTRACTOR.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 10 of 28                Scope for CA Services 
Material testing shall remain the responsibility of the CONTRACTOR as outlined in the contract 
documents.  
 
ENGINEER will review laboratory reports and reports of inspection and testing activities 
describing the tests and inspections made and maintain files of this documentation to be turned 
over to the CITY. The laboratory shall itemize any changes in specifications or acceptance criteria 
authorized by the ENGINEER and report the actual condition of all items tested and inspected. 
The laboratory shall report directly to the ENGINEER’s Resident Project Representative and shall 
receive direction with respect to work activities, duties, duration, reporting procedures, etc., 
from the ENGINEER’s Resident Project Representative. 
 
The ENGINEER’s laboratory (and its technician(s)) will perform Quality Assurance (QA) inspection 
and testing for the following: 
 
1) Soils Testing:  Select backfill, backfill and subgrade materials under and around structures, 
paved areas, pipe trenches, and duct bank/conduit, etc., for compaction to the 
appropriate percentage of the moisture-density specified for each material. Selection of 
areas to be tested shall be made by the ENGINEER. Placement of select backfill shall be 
periodically monitored by the technician for compliance with project materials quality 
specifications. Field moisture-density tests shall be conducted by the technician at the 
frequency directed by the ENGINEER. In-place density tests and sampling shall be 
conducted by the Technician on the compacted asphalt pavement at the frequency 
designated by the ENGINEER. Moisture-density relationships shall be determined in 
accordance with the moisture-density specifications specified for this Project, utilizing the 
appropriate method for each material type.  Optimum moisture and maximum density 
remolded swell and plasticity index testing as required for each sample submitted. Soil 
sieve analyses shall be conducted prior to placement of select backfill, and embedment 
and all granular fill materials. 
 
2) Concrete Placements:  The laboratory's technician shall monitor the concrete materials, 
as delivered to the Project site, for compliance with the requirements of the Construction 
Contract Documents.  These requirements include temperature, slump, air content, time 
of delivery and composition as delivered.  The technician shall report any deviations from 
the Construction Document requirements to the ENGINEER's Resident Project 
Representative.  ENGINEER's Representative will determine the acceptability of the 
products. The technician shall prepare and deliver (to the laboratory for testing) the 
concrete test cylinders in accordance with the Construction Contract Documents and 
appropriate American Concrete Institute (ACI) Standards. 
 
 
Deliver to the laboratory, from the construction site, the concrete test cylinders prepared 
by the Technician.  Provide test cylinder control system in accordance with the 
Laboratory's standard control procedure.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 11 of 28                Scope for CA Services 
3) Testing of Hot Mix Asphaltic Concrete:  Bitumen extraction, aggregate gradation, bitumen 
content, laboratory density and stability test shall be performed for paving operations. 
 
4) Additional Testing:  Additional testing services that may be required throughout the life 
of the construction period will be provided at the ENGINEER's request. Fees for these 
services will be invoiced through the ENGINEER to the CITY at the laboratory's standard 
unit rates in effect at the time these services are provided. 
 
Written reports of all testing results which identify the required data and identify conformance 
or non-conformance with the Construction Documents will be maintained by the ENGINEER and 
provided to the CITY at the completion of the Project.  The ENGINEER will take appropriate action 
on all such testing and inspection reports, including acceptance, rejection, requiring additional 
testing or corrective work, or such other action the ENGINEER deems appropriate.  The ENGINEER 
will promptly reject Work which does not conform to and comply with testing requirements. 
 
Task 330 – Record Drawings and Project Documents 
 
Record Drawings 
 
The ENGINEER will prepare a set of Record Drawings showing those changes made during 
construction per the current version of the City of Glendale Water Services Department 
Engineering Standards. Record drawing information shall be based on marked-up prints, 
drawings, and other data furnished by Contractor(s) to ENGINEER which ENGINEER will review 
for accuracy and completeness.  Use the original cover sheet with all the signatures and 
ENGINEER’S seal for the Record Drawings. 
 
The ENGINEER will prepare the following: 
 
• Flash Drives with the CADD and pdf files of Record Drawings – 4 each 
o One for Infrastructure Records Services for the Facility Drawings 
o One for Infrastructure Records Services for Record Drawings    
o One for the Facility Supervisor 
o One for the CITY Project Manager 
 
• Full Size Sets – 2 each 
o One to be submitted for Record Drawings 
o One for the CITY Project Manager 
 
• Half Size Sets – 2 each 
o One for Infrastructure Records Services 
o One for CITY Project Manager  
 
The ENGINEER’S Resident Project Representative will review and coordinate work associated 
with the Record Drawings.  The Record Drawings shall be available to the CITY within thirty (30)

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 12 of 28                Scope for CA Services 
days of receipt of all data in its entirety from the Contractor. 
 
 
Project Documents - 
 
As stated in paragraph 1 of Section V, Subsection J of the Construction Administration Services 
Contract between the Owner and ENGINEER, the Project Documents are required to be delivered 
to the Project Manager.  The Project Documents shall be delivered in pdf format on electronic 
media acceptable to the CITY.   
 
The project documents shall include, but is not all inclusive, the following documents, organized 
by folders on approved electronic media: 
• General Correspondence 
• Test Results 
o Equipment (pumps, motors, etc.) 
o Electrical/I&C 
o Bacteriological 
o Asphalt 
o Concrete  
o Compaction 
o Pressure 
o Leak 
o Continuity 
o Adhesion/Bond 
o Coating Thickness 
• Asset Tagging Spreadsheet 
• Work Change Directives (WCD) 
• Change Orders 
• Final Shop Drawings 
• Green Tags/Permits/ATC/AOC 
• Photos 
• Pre and post inspection video 
• Schedules 
• Public Outreach 
o Notices 
o Letter to Residents 
 
 
Task 340 – Manufacturer Operation and Maintenance Manuals 
 
Within 60 days of construction NTP, the ENGINEER will provide a preliminary list of Operation 
and Maintenance (O&M) Manuals required by the Construction Documents to be approved by 
the CITY. The ENGINEER shall verify that all required manufacturer or supplier furnished O&M

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 13 of 28                Scope for CA Services 
manuals that have been prepared and submitted per the Construction Documents.  It is expected 
that the Contractor will furnish manufacturer’s manuals prior to installation of the respective 
equipment. A list of manufacturer operation and maintenance manuals will be maintained by the 
ENGINEER as the information is submitted by the Contractor.    
The review of manufacturer operations and maintenance manuals will occur under Task 230.  The 
development of facility operation and maintenance manual will occur under Task 535 Electronic 
Standard Operating Procedures Manual (ESOPM) and Task 540 Update Computerized 
Maintenance Management System (CMMS). 
 
TASK SERIES 400 - RESIDENT SERVICES DURING CONSTRUCTION 
 
A - General 
 
A Resident Project Representative will be furnished and will act as directed by ENGINEER, in order 
to assist ENGINEER in inspecting performance of the work of the Contractor(s).  Through more 
extensive on-site inspections of the work in progress and field checks of materials and equipment 
by the Resident Project Representative and Inspector(s), ENGINEER will endeavor to provide 
further protection for CITY against defects and deficiencies in the work of Contractor(s); but the 
furnishing of such resident project representation will not make ENGINEER responsible for 
construction means, methods, techniques, sequences or procedures, or for safety precautions or 
programs, or for Contractor(s) failure to perform their work in accordance with the Contract 
Documents. 
 
Resident Project Representative, as ENGINEER's agent, will act as directed by and under the 
supervision of ENGINEER, and will confer with ENGINEER.  Resident Project Representative's 
dealings in matters pertaining to the on-site work shall in general be only with ENGINEER and 
Contractor, and dealings with subcontractors shall only be through or with the full knowledge of 
Contractor.  Written communication with CITY will be only through or as directed by ENGINEER, 
and when appropriate, may be through the Resident Project Representative. 
 
B – Duties and Responsibilities 
 
Task 410 - Field Administration 
 
Schedules:  Review the progress schedule, schedule of Shop Drawing submissions and schedule 
of values prepared by Contractor, and consult with ENGINEER concerning their acceptability. 
 
Meetings:  Conduct preconstruction conferences and periodic construction progress meetings.  
Prepare and distribute minutes of such meetings. 
 
Liaison:  Serve as ENGINEER’s liaison with Contractor, working principally through Contractor and 
assist the Contractor in understanding the meaning of the Construction Documents. Assist 
ENGINEER in serving as CITY’s liaison with Contractor, when Contractor’s operations affect CITY’s 
on-site operation.  As directed by ENGINEER, assist in obtaining from CITY additional details or

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 14 of 28                Scope for CA Services 
information, when required at the job site for proper execution of the work. 
 
Shop Drawings and Samples:  Shop drawings and samples which are furnished by Contractor will 
be received and reviewed as defined in Task 230.  Advise ENGINEER and Contractor prior to the 
commencement of any work requiring a Shop Drawing or sample submission if the submission 
has not been approved by ENGINEER. 
 
Interpretation of Construction Documents:  Receive and transmit clarifications and 
interpretations of the Construction Documents to/from the Contractor and ENGINEER as 
described in Task 240. Resident Project Representative will notify CITY of the ENGINEER’s decision 
prior to issuance to the Contractor. 
 
Changes:  Consider and evaluate Contractor's suggestions for changes in drawings or 
specifications and report suggestions with recommendations to ENGINEER.  Notify the CITY of 
changes or alterations believed to be in the CITY’s best interest.  Provide the CITY with support 
information of proposed changes.  Prepare drawings, details, and specifications needed to 
describe and justify the change.  Prepare an estimate of the cost and time impact of the change 
and negotiate scope, cost, and schedule with the Contractor. 
 
Records:  Maintain files for correspondence, reports of job conferences, shop drawings and 
sample submissions, Construction Documents including all addenda, change orders, field orders, 
additional drawings issued subsequent to the execution of the construction contract, ENGINEER's 
clarifications and interpretations of the Construction Documents, progress reports, and other 
Project related documents. 
 
Prepare daily reports recording Contractor's work performed on the job site, major construction 
equipment on-site, weather conditions, data relative to questions of extras or deductions, list of 
visiting officials and representatives of manufacturers, fabricators, suppliers and distributors, 
daily activities, decisions, on-site equipment, subcontractors on-site, inspections in general and 
specific inspections in detail as to inspecting test procedures.  Send record copies to ENGINEER. 
 
Record names, addresses and telephone numbers of the Contractor’s staff, subcontractors and 
major suppliers of materials and equipment. 
 
Maintain notes to be capable of cross referencing the Contractor’s record drawing information 
for accuracy and completeness. 
 
Receive, review and process daily inspection reports. 
 
Maintain a digital photographic file of the progress of the construction activities throughout the 
duration of the Project.  This photo file will consist of color photographs taken to document 
specific construction activities where the information may be of future value.  The photographs 
will be labeled as to the subject, and date of the photo and the photos will be indexed by date 
and clearly identify specific construction area of the Project.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 15 of 28                Scope for CA Services 
 
Reports:  Each month, furnish ENGINEER and CITY the Project progress meeting minutes (as the 
construction contract status report) describing the progress of the work and Contractor's 
compliance with the approved progress schedule and schedule of shop drawing submissions. 
 
The report will include as a minimum; 
 
1) Total Project cost to date; 
 
2) Total Project cost during the period; 
 
3) Planned versus actual progress; 
 
4) Actual and/or potential defaults or violations of the Construction Documents; 
 
5) Remedies to the above; 
 
6) Change order/work change directive activity summary (Task 320); and 
 
7) Site visit by regulatory agencies; 
 
8) Other Project issues. 
 
Consult with ENGINEER in advance of scheduled major tests, inspections or start of important 
phases of the work. 
 
Promptly notify the ENGINEER of any accident relating to the Project. 
 
Contractor Pay Applications:  Review applications for payment as described in Task 250 with 
Contractor(s) for compliance with the established procedure for their submission and forward 
those with recommendations to ENGINEER, noting particularly their relation to the schedule of 
values, work completed, and materials and equipment delivered at the site but not incorporated 
in the work. 
 
Certificates, Operation and Maintenance Manuals:  During the course of the work, review and 
determine that certificates, operation and maintenance manuals and other data required to be 
assembled and furnished by Contractor are applicable to the items actually installed; and deliver 
this material to ENGINEER for review and forwarding to CITY prior to final acceptance of the work. 
 
Start-up Assistance:  Start-up services shall be sufficient to transfer finished work from a 
construction status to operating, functional system(s).  Such services may include review of 
contractor's start-up plan, prepare and coordinate a start-up plan and procedures for City 
personnel use, supervise during start-up procedures, and assist CITY during initial operation.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 16 of 28                Scope for CA Services 
 
Special Inspection:  During the course of the work, arrange and coordinate Special Inspections 
for structural, mechanical, and electrical work as required by the Special Inspection Certificates 
issued by the City’s Planning and Development Department. 
 
Task 420 - On-Site Inspection and Review of Work 
 
The Resident Project Representative shall maintain a presence at the Project site with sufficient 
frequency to be knowledgeable about the progress and quality of the work to: 
 
1) Conduct on-site inspections of the work in progress to assist ENGINEER in determining if 
the work is proceeding in accordance with the Construction Documents and that 
completed work conforms to the Construction Documents. 
 
2) Report to ENGINEER whenever it is believed that any work is unsatisfactory, faulty or 
defective or does not conform to the Construction Documents, or does not meet the 
requirements of inspections, tests or approval required to be made, or has been damaged 
prior to final payment; and advise ENGINEER when it is believed work should be corrected 
or rejected or should be uncovered for inspection, or requires special testing, inspection 
or approval. 
 
3) Verify that tests, equipment and systems start-up are conducted and witnessed in 
accordance with the Construction Documents. Verify all associated reports, tests and 
documents including the operation and maintenance manuals, are maintained and 
provided as required by the Construction Documents.  Resident Project Representative 
shall witness all test and equipment startups and report to ENGINEER appropriate details 
relative to the test procedures and start-ups. 
 
4) Accompany visitors to the job site representing public or other agencies having 
jurisdiction over the Project, record the outcome of these inspections and report to 
ENGINEER. 
 
It is anticipated that the CMAR construction schedule will have a construction duration of twelve 
(12) months, however, it is assumed that the on-site inspection efforts will consist of some full 
time and some part time efforts throughout the construction period.  This equates to, on an 
average throughout the construction phase, an inspector (civil, mechanical, structural, or CWI to 
be on-site approximately 40 hrs/wk for eight (8) months (35 weeks), and an E, I&C inspector on-
site an average of 50 hrs/month for eight (8) months out of the twelve (12) month duration.  The 
total hours for the task include the total engineer effort to support the field administration tasks.  
 
Task 430 - Completion 
1) Before ENGINEER issues a Certificate of Substantial Completion, submit to Contractor a 
list of items requiring completion or correction in accordance with the requirements of 
the Construction Documents.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 17 of 28                Scope for CA Services 
 
2) After the Contractor has completed the work on the list of Subtask 430.1 and upon 
request of the Contractor, Resident Project Representative will conduct an inspection to 
verify with the ENGINEER, CITY and Contractor.  If necessary, prepare a final list of items 
to be completed or corrected in accordance with the requirements of the Construction 
Documents for Substantial Completion. 
 
3) After the Contractor has completed the work on the list of Subtask 430.2 and upon 
written notice from the Contractor, review and determine that items on the final list have 
been completed or corrected and make recommendations to ENGINEER for Substantial 
Completion. 
 
C - Limitations of Authority 
 
Except upon written instructions, Resident Project Representative: 
 
1) Will not authorize any deviation from the Contract Documents or approve any substitute 
materials or equipment; 
 
2) Will not undertake any of the responsibilities of Contractor or subcontractors or expedite 
the work; 
 
3) Will not advise on or issue directions relative to any aspect of the means, methods, 
techniques, sequences or procedures of construction unless such is specifically called for 
in the Construction Documents; 
 
4) Will not advise on or issue directions as to safety precautions and programs in connection 
with the work; and 
 
5) Will not authorize CITY to occupy the Project in whole or in part. 
 
TASK SERIES 500 - SPECIAL SERVICES 
 
Task 510 - Warranty 
 
Services after completion of the construction phase, including inspections upon request during 
the 24-month warranty period (typical for most CITY projects), reporting discrepancies under 
guarantees in the construction contract documents, and providing assistance for resolution of 
defects to be corrected under warranty. 
 
ENGINEER will record and track all warranty repair requests and repairs during the 24-month 
warranty period.  ENGINEER will record the activities associated with any repairs on the Warranty 
Repair Request form submitted by CITY.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 18 of 28                Scope for CA Services 
Task 515 – Systems Training by ENGINEER 
ENGINEER will provide instruction to CITY personnel on the Project objectives, design intent, and 
system operational procedures.  ENGINEER will provide training on the design and operation of 
the major process systems to the CITY prior to substantial completion. 
Specific training services shall consist of the following: 
 
1) Review the contractor developed training outline, schedule and lesson plan format for 
review and approval by CITY. Review with CITY and have comments incorporated by 
contractor as appropriate. 
2) Review training lesson plans and presentation materials including training guides for the 
major process systems and submit to CITY for review before finalizing by the contractor.  
The lesson plans shall include the following subjects; 
a. purpose and design intent of system; 
b. process operations and principles; 
c. system controls and control strategies (Note:  if requested by CITY or coordinate 
with other consultant.); 
d. specific safety procedures and hazards; 
e. specific sampling, monitoring, and process calculations; and 
f. system orientation and hands-on demonstration. 
3) Conduct training on the major process systems.  Training may consist of classroom 
training for each system, followed by field orientation or hands-on instruction. 
 
Task 520 – Contractor’s and Manufacturer’s Equipment Training Coordination  
 
 
The ENGINEER will review and coordinate Contractor's training plan and instruction materials for 
compliance with Construction Documents.  Contractor or Manufacturer training presentations 
shall be scheduled and coordinated with CITY and facility operation.   
 
ENGINEER will coordinate and monitor the Contractor’s and manufacturer’s training of CITY 
personnel.   
 
1) Discuss the preliminary course and lesson plan development with the Contractor and the 
manufacturer/supplier.  Meet with CITY’s operational staff and the Contractor for these 
discussions. 
2) Review and approve lesson plans and course materials. 
3) Liaison between CITY and Contractor. 
4) Monitor training sessions; 
a. monitor attendance; 
b. evaluate course; and 
c. assist classroom discussions. 
5) Follow up with CITY for each training class conducted.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 19 of 28                Scope for CA Services 
Task 530 - Stormwater Permit for Construction Activity  
 
The ENGINEER will review and monitor the Contractor’s general stormwater pollution prevention 
plan (SWPPP) covering construction activities for this Project.  ENGINEER will verify the Project 
Notice of Intent and Notice of Termination has been properly filed by the Contractor. 
 
Task 535 – Electronic Standard Operating Procedures Manual (ESOPM) 
 
The Water Services Department has implemented a computerized, web-based, Department wide 
SharePoint platform, which contains Standard Operating Procedures and Operation and 
Maintenance Manuals for water and wastewater treatment facilities.  The ENGINEER will develop 
additional content to be added to the current facility ESOPM.  In addition, the ENGINEER will 
update the current ESOPM content to reflect modifications to existing facilities. 
 
The content development process is designed to meet CITY goals and objectives for content that 
meets user needs and is presented in an understandable, easy-to-read style.  The content level 
of detail, format, and organization will comply with format and layout to mirror that of the CITY’s 
standards.   
 
Additions and modifications to the facility ESOPM will cover new, modified and upgraded 
treatment processes and major auxiliary systems included in the Project.  New areas of the facility 
will be created as new sections of the ESOPM and will be completed in conjunction with the 
specific completion milestones of construction.   Areas of the facility that are being modified or 
upgraded will be updated in the current ESOPM. 
 
The specific ESOPM chapters to be developed with the assistance of CITY staff include: 
 
 
Cholla WTP Chlorine Dioxide System 
 
The specific existing ESOPM chapters to be updated with the assistance of CITY staff include: 
 
 
 Electrical and Instrumentation 
 
Each chapter for the major systems will consist of the following sections: 
 
• Background 
• Theory 
• Operating Strategies 
• Equipment & Control Description 
• Procedures 
• Design Criteria 
• Troubleshooting 
• Safety 
• Alarms 
• Figures 
 
The facility ESOPM will compliment equipment manufacturer’s O&M Manuals.  The ESOPM will 
cover each process and contain a process description in sufficient detail to describe the process 
to operators in a direct format.  Process chemistry and chemical application will also be covered.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 20 of 28                Scope for CA Services 
 
The facility ESOPM will cover other operational basics:  design criteria, intended operation of the 
processes, start-up, and shutdown, monitoring and troubleshooting procedures; alternate 
operations modes; and special process safety considerations.  These procedures will be field 
verified by the ENGINEER with assistance from the facility staff. 
 
The facility ESOPM will be developed using Microsoft Word and tools developed for the platform, 
which facilitate ease of use and updating of all content within the system (e.g. password-
protected and easy to use content editing tools), and also allow integration to other system 
databases to provide a host of management information.  Major features of the Facility Records 
Library will include “point and click” hyper-linking between topics; graphics and digitized 
photographs to better portray information, a full text-based search engine for finding topics or 
graphics directly without manual searching; insertion of scanned documents such as pump 
curves, CADD drawings and equipment description; summary pages of all graphics for each area 
of the plant; and capability for future video and multimedia enhancements.  The ENGINEER will 
assist the CITY in developing links to other key areas of source material.  This may include areas 
such as safety, environmental issues, CITY policies, and SDS (Safety Data Sheets).  The ENGINEER 
will update the existing facility site plan to incorporate new facilities. 
 
Workshops will be held with the CITY prior to content development activities to provide an 
overview of the content to be developed, to identify key CITY staff to review draft chapters, and 
to establish a review schedule.  The CITY will be provided with interim deliverables of completed 
ESOPM sections as the construction of major areas of the facility are completed.  As each chapter 
is completed, the ENGINEER will submit draft chapters to the CITY for their review and comment.  
The CITY will provide comments to the ENGINEER for the ENGINEER to incorporate into the final 
documents.  The interim deliverables if available will be installed and operational on the CITY’s 
Intranet web server prior to start-up of these facilities.  A schedule for the interim deliverables 
will be provided to the CITY early in the construction. 
 
Prior to submitting the final version of the ESOPM and transferring to the CITY, the ENGINEER 
will conduct a detailed final validation and field verification process.  Through this important 
quality control activity, the ENGINEER will verify that: 
 
1) Content has been field-verified and checked at the installation. 
 
2) Photographs are current and are reflective of well-maintained and clean conditions. 
 
3) Relevant documentation, such as scanned documents, figures and drawings are 
appropriately categorized for insertion into the database. 
 
4) Standard Operating Procedures are accurate and reflect actual “as-operated” conditions. 
 
 
The ENGINEER will assist in the installation and configuration of the ESOPM on the CITY’s Intranet

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 21 of 28                Scope for CA Services 
web server and confirm its operation within the existing platform. 
 
The ENGINEER will assist in providing orientation training to system users after the system has 
been installed on the CITY’s server.  User orientation training will consist of orientation sessions 
for general system users to learn how to use the SharePoint and navigate to find information. 
 
Task 540 - Update Computerized Maintenance Management System (CMMS) 
 
The goal of this task is to ensure that CMMS and asset registry have been properly updated with 
new asset information and associated preventive maintenance tasks are documented when the 
assets are commissioned into service.  The Design Engineer should have coordinated with the 
CITY’s Asset Management Team and/or Infrastructure Records Services during the design phase 
to update the asset registry during the design phase.  If there was no coordination effort during 
the design phase, then the ENGINEER and CITY will meet with Asset Management Team to discuss 
the project scope, schedule, and potential coordination effort during the construction phase.  
Based on the design phase coordination effort, the Asset Management Team and/or IRS may 
have provided an asset registry spreadsheet tailored to this project to document asset 
information changes resulting from this project.   
 
Vertical Assets: For new or rehabilitated assets associated with a project at a facility such as a lift 
station, remote facility, or treatment plant: 
 
1) During the 30-60% construction phases, the ENGINEER will update the asset registry 
spreadsheet with asset specification information including but not limited to: 
 
• Manufacturer 
• Model 
• Size 
• Equipment Vendor Serial # 
• Material 
• Asset Capital cost 
• Year installed 
• Maximum Potential Life 
• Required Warranty Duration  
 
Additional specification information may be required for different asset types. The asset 
registry spreadsheet provided by the Asset Management Team will clearly identify the 
required specification information.  The Asset Management Team will also assign unique 
asset ID number for new assets at this time.   
 
2) The ENGINEER will be responsible to submit asset preventive maintenance data to the 
CITY to be loaded into the CITY’s CMMS.  This task requires the ENGINEER to review and 
approve preventive maintenance information submitted by the CONTRACTOR and

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 22 of 28                Scope for CA Services 
document the information in both MS WORD and EXCEL file formats.  The ENGINEER 
should coordinate with the Asset Management Team for the specific layout/templates for 
the data to be submitted.  The specific manufacturer’s procedure to conduct the 
preventive maintenance activity should be in WORD format while the following 
information required to document the preventive maintenance should be in EXCEL 
format: 
 
• Preventive maintenance (PM) task description 
• Task Frequency 
• Estimated hours to perform the task 
• Estimated number of staff to perform the task 
• Manufacturer’s procedure to conduct the preventive maintenance 
• Identify all unique asset IDs for which this PM task is required  
 
3) The ENGINEER will submit all requested asset information, including preventive 
maintenance, for assets associated with an approved shop drawing to the Asset 
Management Team prior to commissioning.  The Asset Management Team will load all 
new asset information and preventive maintenance tasks into the CMMS before the 
assets are to be commissioned into service. 
 
Linear Assets: For new or rehabilitated assets associated with a project: 
 
1) The ENGINEER will document asset specification information which may be included but 
not limited to: 
 
New Assets 
• Maximum Line pressure (for potable or reclaimed water pipes only) 
• Ground cover type (pavement, native, concrete, DG, etc.)  
• Environment of buried asset (native, concrete encased, etc.)  
• Depth of cover over asset 
• New asset location using GPS coordinate system 
o Coordinate System: US State Plane 1983 
o Zone: Arizona Central 0202 (Grid) 3. Datum: NAD 1983 (2011) 
o Elevation: NGVD 29 
o Altitude Units: feet 
o Coordinate Unit: International feet 
o Coordinate order: North/East 
o Projection: Transverse Mercator 
• Elevation to top of asset  
• Number of turns to open valve 
• Maximum recommended valve open torque 
• Size (Diameter) 
• Length of pipe asset

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 23 of 28                Scope for CA Services 
o Sewer: linear feet of pipe from center of manhole to manhole 
• Material 
• Type of corrosion protection (liner or coating) 
• Corrosion protection product 
• Manufacturer 
• Year Installed 
• Year Rehabilitated 
• Project Cost 
• Installed Unit Cost 
• Warranty Period 
 
Rehabilitated Assets 
• Rehabilitation Type (WWE are working on a definition of this in GIS) 
• Rehabilitation Material/Product 
• Rehabilitation Material/Product Manufacturer 
• Rehabilitation Contractor 
• Rehabilitation Install Date 
• Rehabilitation Project Cost 
• Rehabilitation Unit Cost 
• Warranty Period 
 
Additional specification information may be required for different asset types and the 
asset registry spreadsheet provided by the Asset Management Team will clearly identify 
the required specification information.   
 
2) The ENGINEER will ensure the Contractor is recording the GPS coordinates per the 
Construction Documents and spot-check a number of locations before the assets are 
buried.  
3) The ENGINEER will submit the final asset spreadsheet with all requested asset information 
to the WAM Team and the Record Drawings to the IRS group. 
 
Task 545 – Electrical, Instrumentation and Control System 
 
The Water Services Department (WSD) has incorporated Electrical, Instrumentation and 
Control (EI&C) Systems Testing and Inspection Services to support the WSD Water and 
Wastewater Design and Construction Management Divisions and the Operations and 
Maintenance (O&M) staff.  The services are to support the construction project phases and 
Arc Flash Hazard Analysis. 
The objective of the EI&C Systems Testing and Inspection Services project is to have a qualified 
inspection firm participate in the design, construction, start-up, and commissioning phases of 
projects associated with the WSD. The inspection firm will provide communications and 
coordination between the Design Engineers and General Contractors with the Water Design 
and Construction Management Division, WSD O&M, Computer, Electrical and

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 24 of 28                Scope for CA Services 
Instrumentation staff on the WSD standards for Instrumentation, Electrical, and WSD Guide 
Specifications and Drawings. 
The ENGINEER will schedule construction activities with the WSD assigned EI&C Inspection 
Firm to assist with the following: 
• Construction Support: 
o The construction support consists of reviewing equipment submittals, 
conducting reviews on the equipment installation and providing field 
observations reports. The Consultant will participate in factory testing, 
reviewing the completeness of required equipment testing documentation 
and witnessing the instrumentation calibrations and loop checks. 
• Start-up Testing:   
o Start-up of a site consists of functional testing of individual pieces of 
equipment and systems that make up the site as a whole. Once these tests are 
complete, the equipment will tested as part of an entire operating system.  
• Commissioning Support:  
o The commissioning support consist of providing assistance on computer 
control strategy checkout, tuning of control loops, and performing loop tests 
and troubleshooting for the computer control system programmers. The 
Consultant will maintain designated instruments through final acceptance, 
educate the plant staff on the systems, support the maintenance staff on 
developing maintenance procedures for designated equipment, conduct 
submittal reviews of the Standard Operations Procedures and review the 
accuracy of the as-built documentation for Electrical plans and the Process & 
Instrumentation Diagrams.  
• Arc Flash Hazard Analysis: 
o If a site requires an overhaul of the electrical equipment, a study firm under 
GENERAL CONTRACTOR will perform an Arc Flash Hazard Analysis. The study is 
referred to in Specification 16951 – Short Circuit, Coordination, and Arc-Flash 
Hazard Report. The Power Study includes recommended breaker settings for 
each main and feeder breakers to coordinate the trip settings to mitigate the 
fault current in case of a fault. The breaker settings will require witnessing and 
sign-off on a form provided by the study firm. Additionally, the Arc Flash 
Hazard labels are applied at the time of the breaker settings and application 
will be witnessed.  The EI&C Firm will incorporate the Power Study 
documentation into the WSD Arc Flash maintenance documents for the site.   
 
Task 550 - Commissioning 
 
The ENGINEER will provide the CITY with start-up and operations services during commissioning 
of the facilities.  Commissioning is defined as the process in which the newly constructed facility

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 25 of 28                Scope for CA Services 
will be placed into routine operation.  The commissioning process will include a planned, 
systematic approach to verify that facility systems operate as intended and there is an orderly 
transition from construction phase to routine operation.  Commissioning will include four phases 
with estimated durations as follows: 
 
Phase I - Initial start-up in manual operating mode. 
 
Phase II - Transition into computer operating mode. 
 
Phase III - Transition from ENGINEER to CITY operation. 
 
Phase IV - Extended ENGINEER operating assistance. 
 
Commissioning will begin no later than substantial completion of the facilities and coordination 
of programming effort with the CITY. 
 
Start-up Plan:  ENGINEER will prepare a start-up plan and procedures for the CITY and Contractor. 
The plan will be approved by the City.  ENGINEER will ensure properly certified staff will conduct 
start-up activities as necessary.  The ENGINEER will work with the Contractor to provide 
necessary information required to provide an acceptable Manual Equipment Setup/System 
Testing Plan. This document is required to be completed by the Contractor prior to start-up and 
commissioning. The start-up plan will include identification of key milestone activities necessary 
for orderly start-up of the facilities.  The milestone activities will include coordination of chemical 
deliveries, completion of any construction activities required for substantial completion, 
coordination of required Contractor maintenance activities, etc.  The plan shall identify the time 
required for each commissioning phase. 
 
Phase I - Manual Start-up:  The objective of Phase I is for ENGINEER to verify proper operation of 
equipment and facilities in manual mode in accordance with the design concept. Phase I will 
consist of the following activities: 
 
A) The ENGINEER will provide an operations team to independently operate the new 
facilities.  Following a sequentially coordinated initial start-up of the facility, the facility 
will be operated continuously.  Phase I operation is anticipated to require continuous (24 
hours per day) operation, providing time for Contractor access for maintenance, 
troubleshooting and correcting malfunctions. 
 
B) The ENGINEER’s operations team will verify that each process, associated mechanical 
equipment, associated hydraulic control devices, and conveyance components operates 
properly under actual operating conditions.  This includes the verification that all 
hardwired electrical control interlocks and safeguards are functioning properly. 
 
C) The ENGINEER’s inspection staff will maintain documentation of the areas of operational 
concern encountered during the manual start-up phase with a determination of whether

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 26 of 28                Scope for CA Services 
the item of concern is a Contractor warranty issue or requires a design modification.  The 
ENGINEER will monitor the documented concerns and promptly notify the Contractor of 
all warranty issues. 
 
D) Design modifications will be promptly evaluated by the ENGINEER and recommendations 
shall be presented to the CITY for a determination of the necessity for implementation. 
 
E) The ENGINEER’s instrumentation support staff will complete the necessary check out of 
the instrumentation system components and initial loading of the control software 
simultaneously with the completion of the Phase I activities. 
 
Phase II - Transition to Computer Operation Mode:  The objective of Phase II is for the ENGINEER 
to verify the proper remote control and operation (to the degree of automation included in the 
instrumentation system design) of the facility in accordance with the design concept. Phase II will 
consist of the following activities: 
 
A) The ENGINEER will provide an operations team to independently operate the facility using 
the instrumentation and control system.  Following a sequentially coordinated initial 
start-up of each component, the entire facility will be operated continuously.  It is 
anticipated that Phase II operation will require continuous (24 hour per day) operation.  
The schedule shall be coordinated to accommodate Contractor and/or ENGINEER access 
for maintenance, troubleshooting and correcting malfunctions. 
 
B) The ENGINEER’s operations team will verify that each system, associated mechanical 
equipment, and instrumentation system components operate properly under actual 
operating conditions.  This includes the verification that all software based 
electrical/process control monitoring, interlocks, automatic control logic, alarms, and 
report generation subroutines are functioning properly. 
 
C) The ENGINEER’s instrumentation staff will maintain documentation of the areas of 
operational concern encountered during Phase II with a determination of whether the 
item of concern is a Contractor warranty issue or requires a design modification.  The 
ENGINEER will monitor the documented concerns and promptly notify the Contractor of 
all warranty issues. 
 
D) Design modifications will be promptly evaluated by the ENGINEER and recommendations 
shall be presented to the CITY for a determination of the need to implement. 
 
Phase III - Transition from ENGINEER to CITY Operation:  The objective of Phase III is for the 
ENGINEER to assist the CITY in the satisfactory transition of the remote control operation from 
ENGINEER to CITY staff operation.  Phase III will consist of the following activities: 
 
A) It is anticipated Phase III will require a twostep process.   
a. ENGINEER will provide an operations team to operate the facilities with support

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 27 of 28                Scope for CA Services 
from the CITY’s operating staff.   
b. ENGINEER’s operations team will be available to support the operation performed 
by the CITY.   
 
It is anticipated that Phase III operation by the ENGINEER’s operations team will require 
continuous (24-hour per day) operation for the first step and 8-hour per day operation 
for the second step. 
 
B) The ENGINEER will continue to document areas of operational concern encountered 
during the transition to CITY operation with a determination of whether any item of 
concern is a Contractor warranty issue or requires a design modification.  The ENGINEER 
will monitor the documented concerns and promptly notify the Contractor of all warranty 
issues. 
 
C) Design modifications will be promptly evaluated by the ENGINEER and recommendations 
shall be presented to the CITY for a determination of the need to implement. 
 
Phase IV - Extended Operational Assistance:  The objective of Phase IV is for the ENGINEER to 
provide “on-call” assistance to the CITY’s operational staff for an extended period of reasonable 
duration. 
 
A) The ENGINEER will document the resolution of operational issues unique to the facility in 
the Electronic Operations Manual.  The ENGINEER will document the final operational 
procedures of process associated mechanical equipment and instrumentation and 
control system components. 
 
B) The ENGINEER will continue to document warranty issues, issue warranty requests to the 
Contractor, and follow up that warranty requests are satisfactorily resolved. Refer to Task 
510.  
 
TASK SERIES 700 – Allowances and Subconsultant Services 
 
Task 701 Subconsultant 1 – NACE III Coatings Inspections (RFI Consultants) 
 
ENGINEER will retain a NACE Coatings Inspection firm to provide 3rd Party inspection of coatings 
for concrete containment areas, piping, equipment, building, and miscellaneous areas requiring 
coatings. 
 
Task 702 Architectural Subconsultant Allowance –  
 
ENGINEER will retain an architectural firm on an as needed basis that will be available for review 
of shop drawings, RFIs, change orders, and other tasks during construction that require an 
architect’s review and input.

City of Glendale                                                                                    Cholla WTP 2023 Improvements 
Water Services Department                                                                              Scope for CA Services                               
Rev2; Apr. 2024                                                    Page 28 of 28                Scope for CA Services 
 
 
Task 703 Allowance for Additional Field Inspection –  
 
Additional field inspection services may be required during construction.  This effort will be 
provided on an as needed basis, and with approval by the City. 
 
 
Task 704 Reimbursable Expenses –  
 
 
Task 704.1 Allowance 1 – Printing Costs 
As required. 
 
 
Task 705 Allowance for Additional or Extended Services -   
 
Additional services in connection with the Project, including services normally furnished by CITY 
and services not otherwise provided for in this scope of services. 
 
The CITY and ENGINEER agree that there may be certain additional or extended services 
required to be performed by the ENGINEER during the contract period that cannot be defined 
sufficiently at the time of execution of this contract.  Such services shall be authorized in writing 
in accordance with applicable contract provisions. 
 
END OF DOCUMENT