PowerPoint Presentation
Extracted text (via pymupdf)
11846 characters
City Council Work Study Session Glendale, Arizona January 28, 2025 DRAFT Land Use Assumptions, Infrastructure Improvements Plan, and Development Fees 2 Overview • Development Fee Basics • Land Use Assumptions (LUA) • Infrastructure Improvements Plan (IIP) • Proposed Fee Summary • Proposed Fee Comparison 3 Development Fee Basics • One-time payment for growth-related infrastructure • Collected when building permit issued • Can’t fund operations, maintenance, or replacement • Not a tax, but a contractual arrangement to build infrastructure with three requirements: • Need for infrastructure (system-level improvements, not project-level improvements) • Benefit to fee payer (service areas, accounting and expenditure controls) • Proportionate to demand • Level of Service (LOS) • May not exceed what is provided to existing development • Higher LOS must be paired with non-development fee funding source to cover existing development’s share DRAFT 4 Fee Methodologies TischlerBise | www.tischlerbise.com • Cost Recovery Approach (Past) • Future development is “buying in” to the cost the community has already incurred to provide growth-related capacity • Common in communities approaching buildout • Incremental Expansion Approach (Present) • Formula-based approach based on existing levels of service • Fee is based on the current cost to replicate existing levels of service (i.e., replacement cost) • Plan-Based Approach (Future) • Usually reflects an adopted CIP or master plan • Growth-related costs are more refined DRAFT 5 Evaluate Need for Credits • Site Specific • Developer constructs a capital facility included in fee calculations • Debt Service • Avoid double payment due to existing or future bonds • Dedicated Revenues • Property tax, local option sales tax, gas tax, etc. DRAFT 6 Arizona Legislation • Three Integrated Documents • Land Use Assumptions (LUA): 10+ years • Infrastructure Improvements Plan (IIP): limited to 10 years • Development Fees: updated every 5 years • Limitations on Necessary Public Services • Library: Limited to 10,000 square feet • Parks: 30 acres unless direct benefit to development • Public Safety: No regional training facilities • Useful life of 3 or more years DRAFT 7 Necessary Public Services • Adopted 2022 • Street • Adopted 2024 • Water • Wastewater • 2025 Update • Fire • Library • Parks • Police DRAFT 8 Project Timeline • March 2024: Project Initiation Meeting • Dec 11: Advertise (60 days) • Jan 28, 2025: Work Session • Feb 11: Public Hearing (30 days) • March 25: Adoption • March 26: Advertise (30 days) • May 15: Public Hearing (30 days) • June 24: Adoption (75 days) • Sept 8: Fees Effective Land Use Assumptions (LUA) & Infrastructure Improvements Plan (IIP) Development Fees DRAFT 9 Land Use Assumptions DRAFT Multi-Family and Employment: Maricopa Association of Governments (MAG) 2023 Socioeconomic Projections Single Family: Glendale staff based on available land 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Base Year 1 2 3 4 5 6 7 8 9 10 Population 261,600 263,766 265,545 266,860 269,026 271,115 272,256 274,363 276,294 277,875 279,104 17,504 Housing Units Single Family 67,500 67,947 68,315 68,586 69,034 69,465 69,577 69,784 69,974 70,129 70,249 2,750 Multi-Family 29,376 29,792 30,134 30,387 30,803 31,205 31,607 32,350 33,031 33,588 34,021 4,645 Total 96,875 97,739 98,449 98,973 99,837 100,670 101,184 102,134 103,004 103,717 104,270 7,395 Employment Industrial 22,292 23,837 25,382 26,927 28,471 30,016 31,561 32,353 33,144 33,936 34,727 12,435 Commercial 27,841 28,259 28,676 29,093 29,510 29,927 30,344 30,473 30,601 30,730 30,858 3,017 Office & Other Services 30,230 30,970 31,710 32,450 33,191 33,931 34,671 35,431 36,191 36,952 37,712 7,482 Institutional 10,378 10,570 10,762 10,955 11,147 11,340 11,532 11,629 11,725 11,822 11,918 1,540 Total 90,741 93,636 96,530 99,425 102,319 105,214 108,108 109,885 111,661 113,438 115,215 24,474 Nonres. Floor Area (x1,000) Industrial 28,946 30,281 31,616 32,951 34,285 35,620 36,955 37,639 38,322 39,006 39,690 10,744 Commercial 13,113 13,310 13,506 13,703 13,899 14,096 14,292 14,353 14,413 14,474 14,534 1,421 Office & Other Services 9,281 9,508 9,735 9,962 10,190 10,417 10,644 10,877 11,111 11,344 11,578 2,297 Institutional 3,425 3,488 3,552 3,615 3,679 3,742 3,806 3,837 3,869 3,901 3,933 508 Total 54,765 56,587 58,409 60,231 62,052 63,874 65,696 66,706 67,715 68,725 69,735 14,970 10-Year Increase Glendale, Arizona 10 Fire IIP • Service Area • Citywide • Fee Components • Fire Facilities: Incremental • Fire Apparatus: Incremental • 10-Year Demand • Fire Facilities: 12,000 square feet, $6.9 million • Fire Apparatus: $3.2 million DRAFT 11 Proposed Fire Fees DRAFT Fee Component Cost per Person Cost per Trip Fire Facilities $211.31 $61.30 Fire Apparatus $97.44 $28.27 Development Fee Report $1.29 $0.12 Total $310.04 $89.69 Single Family Housing Unit 2.97 $921 $655 $266 Multi-Family Housing Unit 2.01 $623 $433 $190 Industrial 1,000 Sq Ft 1.69 $152 $106 $46 Commercial 1,000 Sq Ft 12.21 $1,095 $789 $306 Office & Other Services 1,000 Sq Ft 5.42 $486 $308 $178 Institutional 1,000 Sq Ft 7.45 $668 $408 $260 Assisted Living Bed 1.30 $117 N/A N/A Lodging Room 4.00 $359 N/A N/A 1. See Land Use Assumptions Development Type Persons per Dev. Unit1 Proposed Fees Current Fees Difference Development Unit Development Type Vehicle Trips per Dev. Unit1 Proposed Fees Current Fees Difference Development Unit Residential Fees per Development Unit Nonresidential Fees per Development Unit 12 Library IIP • Service Area • Citywide • Fee Components • Library Facilities: Incremental • 10-Year Demand • Library Facilities: 2,900 square feet, $2.5 million DRAFT 13 Proposed Library Fees DRAFT Fee Component Cost per Person Cost per Job Library Facilities $118.02 $17.91 Development Fee Report $1.61 $0.06 Total $119.63 $17.97 Single Family Housing Unit 2.97 $355 $195 $160 Multi-Family Housing Unit 2.01 $240 $129 $111 Industrial 1,000 Sq Ft 1.16 $21 $9 $12 Commercial 1,000 Sq Ft 2.12 $38 $19 $19 Office & Other Services 1,000 Sq Ft 3.26 $58 $24 $34 Institutional 1,000 Sq Ft 3.03 $54 $7 $47 Assisted Living Bed 0.61 $11 N/A N/A Lodging Room 0.56 $10 N/A N/A 1. See Land Use Assumptions Development Type Persons per Dev. Unit1 Proposed Fees Current Fees Difference Development Type Jobs per Dev. Unit1 Proposed Fees Development Unit Development Unit Residential Fees per Development Unit Nonresidential Fees per Development Unit Difference Current Fees 14 Parks and Recreational IIP • Service Area • Citywide • Fee Components • Park Amenities: Incremental • 10-Year Demand • Park Amenities: $8.5 million DRAFT 15 Proposed Parks and Recreational Fees DRAFT Fee Component Cost per Person Cost per Job Park Amenities $400.44 $60.76 Development Fee Report $1.61 $0.06 Total $402.05 $60.82 Single Family Housing Unit 2.97 $1,194 $936 $258 Multi-Family Housing Unit 2.01 $808 $618 $190 Industrial 1,000 Sq Ft 1.16 $70 $48 $22 Commercial 1,000 Sq Ft 2.12 $129 $97 $32 Office & Other Services 1,000 Sq Ft 3.26 $198 $123 $75 Institutional 1,000 Sq Ft 3.03 $184 $38 $146 Assisted Living Bed 0.61 $37 N/A N/A Lodging Room 0.56 $34 N/A N/A 1. See Land Use Assumptions Development Unit Residential Fees per Development Unit Nonresidential Fees per Development Unit Difference Development Type Jobs per Dev. Unit1 Proposed Fees Current Fees Development Type Persons per Dev. Unit1 Proposed Fees Current Fees Difference Development Unit 16 Police IIP • Service Area • Citywide • Fee Components • Police Facilities: Incremental • Police Vehicles: Incremental • Police Equipment: Incremental • 10-Year Demand • Police Facilities: 4,000 square feet, $4.2 million • Police Vehicles: $1.6 million • Police Equipment: $1.8 million DRAFT 17 Proposed Police Fees DRAFT Fee Component Cost per Person Cost per Trip Police Facilities $129.10 $37.45 Police Vehicles $50.40 $14.62 Police Equipment $55.68 $16.15 Development Fee Report $1.29 $0.12 Total $236.47 $68.34 Single Family Housing Unit 2.97 $702 $719 ($17) Multi-Family Housing Unit 2.01 $475 $475 $0 Industrial 1,000 Sq Ft 1.69 $115 $117 ($2) Commercial 1,000 Sq Ft 12.21 $834 $867 ($33) Office & Other Services 1,000 Sq Ft 5.42 $370 $339 $31 Institutional 1,000 Sq Ft 7.45 $509 $448 $61 Assisted Living Bed 1.30 $89 N/A N/A Lodging Room 4.00 $273 N/A N/A 1. See Land Use Assumptions Residential Fees per Development Unit Nonresidential Fees per Development Unit Development Type Persons per Dev. Unit1 Proposed Fees Current Fees Difference Development Type Vehicle Trips per Dev. Unit1 Proposed Fees Current Fees Difference Development Unit Development Unit 18 Fee Summary (Excludes Street & Utility Fees) Proposed Current DRAFT Single Family Housing Unit $921 $355 $1,194 $702 $3,172 Multi-Family Housing Unit $623 $240 $808 $475 $2,146 Industrial 1,000 Sq Ft $152 $21 $70 $115 $358 Commercial 1,000 Sq Ft $1,095 $38 $129 $834 $2,096 Office & Other Services 1,000 Sq Ft $486 $58 $198 $370 $1,112 Institutional 1,000 Sq Ft $668 $54 $184 $509 $1,415 Assisted Living Bed $117 $11 $37 $89 $254 Lodging Room $359 $10 $34 $273 $676 Development Unit Development Type Fire Parks & Recreational Police Library Proposed Fees Single Family Housing Unit $655 $195 $936 $719 $2,505 Multi-Family Housing Unit $433 $129 $618 $475 $1,655 Industrial 1,000 Sq Ft $106 $9 $48 $117 $280 Commercial 1,000 Sq Ft $789 $19 $97 $867 $1,772 Office & Other Services 1,000 Sq Ft $308 $24 $123 $339 $794 Institutional 1,000 Sq Ft $408 $7 $38 $448 $901 Development Unit Development Type Fire Library Parks & Recreational Police Current Fees Single Family Housing Unit $266 $160 $258 ($17) $667 Multi-Family Housing Unit $190 $111 $190 $0 $491 Industrial 1,000 Sq Ft $46 $12 $22 ($2) $78 Commercial 1,000 Sq Ft $306 $19 $32 ($33) $324 Office & Other Services 1,000 Sq Ft $178 $34 $75 $31 $318 Institutional 1,000 Sq Ft $260 $47 $146 $61 $514 Development Unit Difference Development Type Fire Library Parks & Recreational Police Increase / (Decrease) 19 $0 $5,000 $10,000 $15,000 $20,000 $25,000 $30,000 $35,000 $40,000 Gilbert Phoenix - NW (Proposed) Phoenix - NE (Proposed) Peoria - West Phoenix - Deer Valley (Proposed) Buckeye - Central (Proposed) Peoria - North Surprise - SPA 2 Apache Junction Surprise - SPA 3 Surprise - SPA 4 Chandler Goodyear - South Surprise - SPA 1 Buckeye - Tartesso West (Proposed) Goodyear - North Buckeye - Central (Current) Phoenix - NW (Current) Phoenix - NE (Current) Glendale - East (Proposed) Avondale Buckeye - Tartesso West (Current) Glendale - East (Current) Phoenix - Deer Valley (Current) Queen Creek Maricopa - South Maricopa - North Glendale - West (Proposed) Glendale - West (Current) Buckeye - Festival Ranch (Proposed) Buckeye - Festival Ranch (Current) Single-Family Fee Comparison Non-Utility Utility Single-Family Fee Comparison DRAFT $14,567 $13,900 $7,747 $7,080 20 $0 $5,000 $10,000 $15,000 $20,000 $25,000 $30,000 $35,000 $40,000 Gilbert Peoria - West Peoria - North Maricopa - South Chandler Buckeye - Central (Proposed) Maricopa - North Avondale Glendale - West (Proposed) Glendale - East (Proposed) Queen Creek Glendale - West (Current) Glendale - East (Current) Apache Junction Phoenix - Deer Valley (Proposed) Phoenix - NW (Proposed) Phoenix - NW (Current) Phoenix - Deer Valley (Current) Buckeye - Festival Ranch (Proposed) Phoenix - NE (Proposed) Buckeye - Tartesso West (Proposed) Phoenix - NE (Current) Buckeye - Central (Current) Surprise - SPA 2 Surprise - SPA 3 Surprise - SPA 4 Surprise - SPA 1 Goodyear - North Goodyear - South Buckeye - Tartesso West (Current) Buckeye - Festival Ranch (Current) Single-Family Fee Comparison (Non-Utility Only) Non-Utility Single-Family Fee Comparison (Non-Utility Only) DRAFT $7,080 $6,775 $7,747 $7,442 Includes Required Credit for Excess Construction Sales Tax