Agreement with Certipro Fire and Life Safety

City of Glendale — Regular Meeting (2025-03-25)

View PDF Item 15 Meeting page

Extracted text (via pymupdf) 80691 characters
1 
01/28/2025 
C      
AGREEMENT FOR 
Maintenance, Repairs and Materials for Fire and Life Safety 
City of Glendale Solicitation No. RFP 25-29 
This Agreement for Maintenance, Repairs and Materials for Fire and Life Safety ("Agreement") is effective and entered 
into between CITY OF GLENDALE, an Arizona municipal corporation ("City"), and Certipro Fire and Life Safety, 
Inc., an Arizona corporation , authorized to do business in the State of Arizona, ("Contractor"), as of the _____ day 
of ____________, 2025. 
RECITALS 
A. 
City intends to undertake certain tasks or work for the benefit of the public and with public funds that is 
more fully set forth in Exhibit A, pursuant to Solicitation No. RFP 25-29 (the "Statement of Work” or 
“SOW"); 
B. 
City desires to retain the services of Contractor to perform those specific duties and produce the specific 
work as set forth in the SOW attached hereto; and 
C. 
City and Contractor desire to memorialize their agreement with this document. 
AGREEMENT 
In consideration of the Recitals, which are confirmed as true and correct and incorporated by this reference, the 
mutual promises and covenants contained in this Agreement, and other good and valuable consideration, City and 
Contractor agree as follows: 
1. 
Key Personnel; Sub-contractors. 
1.1 
Services.  Contractor will provide all services necessary to assure the SOW is completed timely and 
efficiently consistent with SOW requirements, including, but not limited to, working in close 
interaction and interfacing with City and its designated employees, and working closely with others, 
including other contractors or consultants, retained by City. 
1.2 
Project Team. 
a. 
Project Manager. 
(1) 
Contractor will designate an employee as Project Manager with sufficient training, 
knowledge, and experience to complete the SOW and handle all aspects of the SOW 
(as determined by the City in its sole discretion); such that the work produced by 
Contractor is consistent with applicable standards as detailed in this Agreement; 
(2) 
The City must approve the designated Project Manager; and 
(3) 
To assure the SOW schedule is met, Project Manager may be required to devote no 
less than a specific amount of time as set out in Exhibit A. 
b. 
Project Team. 
(1) 
The Project Manager and all other employees assigned to the SOW by Contractor 
will comprise the "Project Team." 
(2) 
Project Manager will have responsibility for and will supervise all other employees 
assigned to the SOW by Contractor. 
c. 
Discharge, Reassign, Replacement. 
(1) 
Contractor acknowledges the Project Team is comprised of the same persons and 
roles for each as may have been identified in the response to the SOW's solicitation.

2 
01/28/2025 
(2) 
Contractor will not discharge, reassign or replace or diminish the responsibilities of 
any of the employees assigned to the SOW who have been approved by City without 
City's prior written consent unless that person leaves the employment of Contractor, 
in which event the substitute must first be approved in writing by City. 
(3) 
Contractor will change any of the members of the Project Team at the City's request 
if an employee's performance does not equal or exceed the level of competence that 
the City may reasonably expect of a person performing those duties or if the acts or 
omissions of that person are detrimental to the development of the SOW. 
d. 
Sub-contractors. 
(1) 
Contractor may engage specific technical contractor (each a "Sub-contractor") to 
furnish certain service functions. 
(2) 
Contractor will remain fully responsible for Sub-contractor's services. 
(3) 
Sub-contractors must be approved by the City, unless the Sub-contractor was 
previously mentioned in the response to the solicitation. 
(4) 
Contractor shall certify by letter that contracts with Sub-contractors have been 
executed incorporating requirements and standards as set forth in this Agreement. 
2. 
Schedule.  The services will be undertaken in a manner that ensures the SOW is completed timely and 
efficiently in accordance with its terms. 
3. 
Contractor’s Work. 
3.1 
Standard.  Contractor must perform services in accordance with the standards of due diligence, care, 
and quality prevailing among contractors having substantial experience with the successful furnishing 
of services for projects that are equivalent in size, scope, quality, and other criteria under the SOW 
and identified in this Agreement. 
3.2 
Licensing.  Contractor warrants that: 
a. 
Contractor and Sub-contractors will hold all appropriate and required licenses, registrations 
and other approvals necessary for the lawful furnishing of services ("Approvals"); and 
b. 
Neither Contractor nor any Sub-contractor has been debarred or otherwise legally excluded 
from contracting with any federal, state, or local governmental entity ("Debarment"). 
(1) 
City is under no obligation to ascertain or confirm the existence or issuance of any 
Approvals or Debarments or to examine Contractor's contracting ability. 
(2) 
Contractor must notify City immediately if any Approvals or Debarment changes 
during the Agreement's duration and the failure of the Contractor to notify City as 
required will constitute a material default under the Agreement. 
3.3 
Compliance.  Services will be furnished in compliance with applicable federal, state, county and local 
statutes, rules, regulations, ordinances, building codes, life safety codes, and other standards and 
criteria designated by City. 
Contractor must not discriminate against any employee or applicant for employment on the basis of 
race, color, religion, sex, national origin, age, marital status, sexual orientation, gender identity or 
expression, genetic characteristics, familial status, U.S. military veteran status or any 
disability.  Contractor will require any Sub-contractor to be bound to the same requirements as stated 
within this section.  Contractor, and on behalf of any subcontractors, warrants compliance with this 
section.

3 
01/28/2025 
3.4 
Coordination; Interaction. 
a. 
For projects that the City believes requires the coordination of various professional services, 
Contractor will work in close consultation with City to proactively interact with any other 
professionals retained by City on the SOW ("Coordinating Project Professionals"). 
b. 
Subject to any limitations expressly stated in the SOW Budget, Contractor will meet to review 
the SOW, Schedule, SOW Budget, and in-progress work with Coordinating Project 
Professionals and City as often and for durations as City reasonably considers necessary in 
order to ensure the timely work delivery and SOW completion. 
c. 
For projects not involving Coordinating Project Professionals, Contractor will proactively 
interact with any other contractors when directed by City to obtain or disseminate timely 
information for the proper execution of the SOW. 
3.5 
Work Product. 
a. 
Ownership.  Upon receipt of payment for services furnished, Contractor grants to City, and 
will cause its Sub-contractors to grant to the City, the exclusive ownership of and all 
copyrights, if any, to evaluations, reports, drawings, specifications, project manuals, surveys, 
estimates, reviews, minutes, all "architectural work" as defined in the United States Copyright 
Act, 17 U.S.C § 101, et seq., and other intellectual work product as may be applicable ("Work 
Product"). 
(1) 
This grant is effective whether the Work Product is on paper (e.g., a "hard copy"), 
in electronic format, or in some other form. 
(2) 
Contractor warrants, and agrees to indemnify, hold harmless and defend City for, 
from and against any claim that any Work Product infringes on third-party 
proprietary interests. 
b. 
Delivery.  Contractor will deliver to City copies of the preliminary and completed Work 
Product promptly as they are prepared. 
c. 
City Use. 
(1) 
City may reuse the Work Product at its sole discretion. 
(2) 
In the event the Work Product is used for another SOW without further 
consultations with Contractor, the City agrees to indemnify and hold Contractor 
harmless from any claim arising out of the Work Product. 
(3) 
In such case, City shall also remove any seal and title block from the Work Product. 
4. 
Compensation for Completion of the Work in the SOW. 
4.1 
Compensation.  Contractor's compensation for the SOW, including those furnished by its Sub-
contractors will not exceed $3,000,000, as specifically detailed in Exhibit B (the "Compensation"). 
4.2 
Change in the SIW.  The Compensation may be equitably adjusted if the originally contemplated 
scope of services as outlined in the SOW is significantly modified. 
a. 
Adjustments to the Compensation require a written amendment to this Agreement and may 
require City Council approval. 
b. 
Additional services which are outside the scope of the SOW contained in this Agreement 
may not be performed by the Contractor without prior written authorization from the City. 
c. 
Notwithstanding the incorporation of the Exhibits to this Agreement by reference, should 
any conflict arise between the provisions of this Agreement and the provisions found in the 
Exhibits and accompanying attachments, the provisions of this Agreement shall take priority 
and govern the conduct of the parties.

4 
01/28/2025 
5. 
Billings and Payment. 
5.1 
Applications. 
a. 
Contractor will submit monthly invoices (each, a "Payment Application") to City's Project 
Manager and City will remit payments based upon the Payment Application as stated below. 
b. 
The period covered by each Payment Application will be one calendar month ending on the 
last day of the month or as specified in the solicitation. 
5.2 
Payment. 
a. 
After a full and complete Payment Application is received, City will process and remit 
payment within 30 days. 
b. 
Payment may be subject to or conditioned upon City's receipt of: 
(1) 
Completed work generated by Contractor and its Sub-contractors; and 
(2) 
Unconditional waivers and releases on final payment from Sub-contractors as City 
may reasonably request to assure the SOW will be free of claims arising from 
required performances under this Agreement. 
5.3 
Review and Withholding.  City's Project Manager will timely review and certify Payment Applications. 
a. 
If the Payment Application is rejected, the Project Manager will issue a written listing of the 
items not approved for payment. 
b. 
City may withhold an amount sufficient to pay expenses that City reasonably expects to incur 
in correcting the deficiency or deficiencies rejected for payment. 
6. 
Termination. 
6.1 
For Convenience.  City may terminate this Agreement for convenience, without cause, by delivering 
a written termination notice stating the Effective Termination date, which may not be less than 30 
days following the date of delivery. 
a. 
Contractor will be equitably compensated for Goods or Services furnished prior to receipt 
of the termination notice and for reasonable costs incurred. 
b. 
Contractor will also be similarly compensated for any approved effort expended and 
approved costs incurred that are directly associated with SOW closeout and delivery of the 
required items to the City. 
6.2 
For Cause.  City may terminate this Agreement for cause if Contractor fails to cure any breach of this 
Agreement within seven days after receipt of written notice specifying the breach. 
a. 
Contractor will not be entitled to further payment until after City has determined its damages.  
If City's damages resulting from the breach, as determined by City, are less than the equitable 
amount due but not paid Contractor for Service and Repair furnished, City will pay the 
amount due to Contractor, less City's damages, in accordance with the provision of § 5. 
b. 
If City's direct damages exceed amounts otherwise due to Contractor, Contractor must pay 
the difference to City immediately upon demand; however, Contractor will not be subject to 
consequential damages of more than $2,000,000 or the amount of this Agreement, whichever 
is greater. 
7. 
Conflict.  Contractor acknowledges this Agreement is subject to A.R.S. § 38-511, which allows for 
cancellation of this Agreement in the event any person who is significantly involved in initiating, negotiating, 
securing, drafting, or creating the Agreement on City's behalf is also an employee, agent, or consultant of any 
other party to this Agreement. 
8. 
Insurance. 
8.1 
Requirements.  Contractor must obtain and maintain the following insurance ("Required Insurance"):

5 
01/28/2025 
a. 
Contractor and Sub-contractors.  Contractor, and each Sub-contractor performing work or 
providing materials related to this Agreement must procure and maintain the insurance 
coverages described below (collectively referred to herein as the "Contractor's Policies"), 
until each Party's obligations under this Agreement are completed. 
b. 
General Liability. 
(1) 
Contractor must at all times relevant hereto carry a commercial general liability 
policy with a combined single limit of at least $2,000,000 per occurrence and 
$4,000,000 annual aggregate for each property damage and contractual property 
damage. 
(2) 
Sub-contactors must at all times relevant hereto carry a general commercial liability 
policy with a combined single limit of at least $2,000,000 per occurrence. 
(3) 
This commercial general liability insurance must include independent contractors' 
liability, contractual liability, broad form property coverage, XCU hazards if 
requested by the City, and a separation of insurance provision. 
(4) 
These limits may be met through a combination of primary and excess liability 
coverage. 
c. 
Auto.  A business auto policy providing a liability limit of at least $2,000,000 per accident for 
Contractor and $2,000,000 per accident for Sub-contractors and covering owned, non-
owned and hired automobiles. 
d. 
Workers' Compensation and Employer's Liability.  A workers' compensation and employer's 
liability policy providing at least the minimum benefits required by Arizona law. 
e. 
Notice of Changes.  Contractor's Policies must provide for not less than 30 days' advance 
written notice to City Representative of: 
(1) 
Cancellation or termination of Contractor or Sub-contractor's Policies; 
(2) 
Reduction of the coverage limits of any of Contractor or and Sub-contractor's 
Policies; and 
(3) 
Any other material modification of Contractor or Sub-contractor's Policies related 
to this Agreement. 
f. 
Certificates of Insurance. 
(1) 
Within 10 business days after the execution of the Agreement, Contractor must 
deliver to City Representative certificates of insurance for each of Contractor and 
Sub-contractor's Policies, which will confirm the existence or issuance of Contractor 
and Sub-contractor's Policies in accordance with the provisions of this section, and 
copies of the endorsements of Contractor and Sub-contractor's Policies in 
accordance with the provisions of this section. 
(2) 
City is and will be under no obligation either to ascertain or confirm the existence 
or issuance of Contractor and Sub-contractor's Policies, or to examine Contractor 
and Sub-contractor’s Policies, or to inform Contractor or Sub-contractor in the 
event that any coverage does not comply with the requirements of this section. 
(3) 
Contractor's failure to secure and maintain Contractor Policies and to assure Sub-
contractor policies as required will constitute a material default under the 
Agreement. 
g. 
Other Contractors or Vendors. 
(1) 
Other contractors or vendors that may be contracted with in connection with the 
SOW must procure and maintain insurance coverage as is appropriate to their 
particular contract.

6 
01/28/2025 
(2) 
This insurance coverage must comply with the requirements set forth above for 
Contractor's Policies (e.g., the requirements pertaining to endorsements to name the 
parties as additional insured parties and certificates of insurance). 
h. 
Policies.  Except with respect to workers' compensation and employer's liability coverages, 
City must be named and properly endorsed as additional insureds on all liability policies 
required by this section. 
(1) 
The coverage extended to additional insureds must be primary and must not 
contribute with any insurance or self insurance policies or programs maintained by 
the additional insureds. 
(2) 
All insurance policies obtained pursuant to this section must be with companies 
legally authorized to do business in the State of Arizona and reasonably acceptable 
to all parties. 
8.2 
Sub-contractors. 
a. 
Contractor must also cause its Sub-contractors to obtain and maintain the Required 
Insurance. 
b. 
City may consider waiving these insurance requirements for a specific Sub-contractor if City 
is satisfied the amounts required are not commercially available to the Sub-contractor and 
the insurance the Sub-contractor does have is appropriate for the Sub-contractor's work 
under this Agreement. 
c. 
Contractor and Sub-contractors must provide to the City proof of the Required Insurance 
whenever requested. 
8.3 
Indemnification. 
a. 
To the fullest extent permitted by law, Contractor must defend, indemnify, and hold 
harmless City and its elected officials, officers, employees and agents (each, an "Indemnified 
Party," collectively, the "Indemnified Parties"), for, from, and against any and all claims, 
demands, actions, damages, judgments, settlements, personal injury (including sickness, 
disease, death, and bodily harm), property damage (including loss of use), infringement, 
governmental action and all other losses and expenses, including attorneys' fees and litigation 
expenses (each, a "Demand or Expense"; collectively, "Demands or Expenses") asserted by 
a third-party (i.e. a person or entity other than City or Contractor) and that arises out of or 
results from the breach of this Agreement by the Contractor or the Contractor’s negligent 
actions, errors or omissions (including any Sub-contractor or other person or firm employed 
by Contractor), whether sustained before or after completion of the SOW. 
b. 
This indemnity and hold harmless provision applies even if a Demand or Expense is in part 
due to the Indemnified Party's negligence or breach of a responsibility under this Agreement, 
but in that event, Contractor shall be liable only to the extent the Demand or Expense results 
from the negligence or breach of a responsibility of Contractor or of any person or entity 
for whom Contractor is responsible. 
c. 
Contractor is not required to indemnify any Indemnified Parties for, from, or against any 
Demand or Expense resulting from the Indemnified Party's sole negligence or other fault 
solely attributable to the Indemnified Party. 
9. 
E-verify, Records and Audits. To the extent applicable under A.R.S. § 41-4401, the Contractor warrants 
their compliance and that of its subcontractors with all federal immigration laws and regulations that relate to 
their employees and compliance with the E-verify requirements under A.R.S. § 23-214(A). The Contractor or 
subcontractor’s breach of this warranty shall be deemed a material breach of the Agreement and may result 
in the termination of the Agreement by the City under the terms of this Agreement. The City retains the legal 
right to randomly inspect the papers and records of the other party to ensure that the other party is complying 
with the above-mentioned warranty. The Contractor and subcontractor warrant to keep their respective

7 
01/28/2025 
papers and records open for random inspection during normal business hours by the other party. The parties 
shall cooperate with the City’s random inspections, including granting the inspecting party entry rights onto 
their respective properties to perform the random inspections and waiving their respective rights to keep such 
papers and records confidential. 
10.  
No Boycott of Israel.  To the extent A.R.S § 35-393 through § 35-393.03 are applicable, the parties hereby 
certify that they are not currently engaged in, and agree for the duration of the Agreement to not engage in, a 
boycott of goods or services from Israel, as that term is defined in A.R.S § 35-393. 
11. 
Uyghur Forced Labor Prevention Act (UFLPA). Contractor certifies that it does not currently, and during 
the term of this Agreement, will not use: 
a.  
the forced labor of ethnic Uyghurs in the People’s Republic of China;  
b. 
any goods or services produced by the forced labor of ethnic Uyghurs in the People’s 
Republic of China; and  
c. 
any contractors, subcontractors or suppliers that use the forced labor or any goods or 
services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China. 
12. 
Attestation of PCI Compliance.  When applicable, the Contractor will provide the City annually with a 
Payment Card Industry Data Security Standard (PCI DSS) attestation of compliance certificate signed by an 
officer of Contractor with oversight responsibility. 
13. 
Notices. 
13.1 
A notice, request or other communication that is required or permitted under this Agreement (each 
a "Notice") will be effective only if: 
a. 
The Notice is in writing; and 
b. 
Delivered in person or by overnight courier service (delivery charges prepaid), certified or 
registered mail (return receipt requested); and 
c. 
Notice will be deemed to have been delivered to the person to whom it is addressed as of 
the date of receipt, if: 
(1) 
Received on a business day, or before 5:00 p.m., at the address for Notices identified 
for the Party in this Agreement by U.S. Mail, hand delivery, or overnight courier 
service on or before 5:00 p.m.; or 
(2) 
As of the next business day after receipt, if received after 5:00 p.m. 
d. 
The burden of proof of the place and time of delivery is upon the Party giving the Notice; 
and 
e. 
Digitalized signatures and copies of signatures will have the same effect as original signatures. 
13.2 
Representatives. 
a. 
Contractor.  Contractor's representative (the "Contractor's Representative") authorized to 
act on Contractor's behalf with respect to the SOW, and his or her address for Notice 
delivery is: 
Certipro Fire and Life Safety, Inc. 
c/o Shai Erran 
2739 S. Pecan 
Mesa, AZ 85202 
 
b. 
City.  City's representative ("City's Representative") authorized to act on City's behalf, and 
his or her address for Notice delivery is:

8 
01/28/2025 
City of Glendale 
c/o  Shoalynn Gilliland 
5850 W. Glendale Ave. 
Glendale, Arizona 85301 
(623) 930-2863 
 
With required copy to: 
 
City Manager 
 
 
 
City Attorney 
City of Glendale  
 
 
City of Glendale 
5850 West Glendale Avenue 
 
5850 West Glendale Avenue 
Glendale, Arizona 85301  
             Glendale, Arizona 85301 
c. 
Concurrent Notices. 
(1) 
All notices to City's representative must be given concurrently to City Manager and 
City Attorney. 
(2) 
A notice will not be deemed to have been received by City's representative until the 
time that it has also been received by City Manager and City Attorney. 
(3) 
City may appoint one or more designees for the purpose of receiving notice by 
delivery of a written notice to Contractor identifying the designee(s) and their 
respective addresses for notices. 
d. 
Changes.  Contractor or City may change its representative or information on Notice, by 
giving Notice of the change in accordance with this section at least ten days prior to the 
change. 
14. 
Financing Assignment.  City may assign this Agreement to any City-affiliated entity, including a non-profit 
corporation or other entity whose primary purpose is to own or manage the SOW. 
15. 
Entire Agreement; Survival; Counterparts; Signatures. 
15.1 
Integration.  This Agreement contains, except as stated below, the entire agreement between City 
and Contractor and supersedes all prior conversations and negotiations between the parties regarding 
the SOW or this Agreement. 
a. 
Neither Party has made any representations, warranties or agreements as to any matters 
concerning the Agreement's subject matter. 
b. 
Representations, statements, conditions, or warranties not contained in this Agreement will 
not be binding on the parties. 
c. 
The solicitation, any addendums and the response submitted by the Contractor are 
incorporated into this Agreement as if attached hereto.  Any Contractor response modifies 
the original solicitation as stated.  Inconsistencies between the solicitation, any addendums 
and the response or any excerpts attached as Exhibit A and this Agreement will be resolved 
by the terms and conditions stated in this Agreement. 
15.2 
Interpretation. 
a. 
The parties fairly negotiated the Agreement's provisions to the extent they believed necessary 
and with the legal representation they deemed appropriate. 
b. 
The parties are of equal bargaining position and this Agreement must be construed equally 
between the parties without consideration of which of the parties may have drafted this 
Agreement. 
c. 
The Agreement will be interpreted in accordance with the laws of the State of Arizona.

9 
01/28/2025 
15.3 
Survival.  Except as specifically provided otherwise in this Agreement, each warranty, representation, 
indemnification and hold harmless provision, insurance requirement, and every other right, remedy 
and responsibility of a Party, will survive completion of the SOW, or the earlier termination of this 
Agreement. 
15.4 
Amendment.  No amendment to this Agreement will be binding unless in writing and executed by 
the parties.  Any amendment may be subject to City Council approval.  Electronic signature blocks 
do not constitute execution. 
15.5 
Remedies.  All rights and remedies provided in this Agreement are cumulative and the exercise of 
any one or more right or remedy will not affect any other rights or remedies under this Agreement 
or applicable law. 
15.6 
Severability.  If any provision of this Agreement is voided or found unenforceable, that determination 
will not affect the validity of the other provisions, and the voided or unenforceable provision will be 
deemed reformed to conform to applicable law. 
15.7 
Counterparts.  This Agreement may be executed in counterparts, and all counterparts will together 
comprise one instrument. 
16. 
Term.   
 
16.1  
Extensions. The term of this Agreement commences upon the effective date and continues for a one 
(1)-year initial period.  The City may, at its option and with the approval of the Contractor, extend 
the term of this Agreement an additional four (4) years, on an annual basis.  Contractor will be notified 
in writing by the City of its intent to extend the Agreement period at least thirty (30) calendar days 
prior to the expiration of the original or any extension period.  Price adjustments will only be reviewed 
prior to the extension period and any such price adjustment will be a determining factor for any 
renewal.  There are no automatic extensions or renewals of this Agreement. 
 
16.2 
Extension for Procurement Process. Upon the expiration of the Term of this Agreement, including 
 
the initial term and any renewals, at the City’s sole discretion, this Agreement may be extended on a 
 
month-to-month basis for a maximum of six (6) months to allow for the City to complete its 
 
procurement process to select a vendor to provide the services/materials similar to those provided 
 
under this Agreement.  The City will notify the Contractor in writing of its intent to extend the 
 
Agreement at least thirty (30) calendar days prior to the expiration of the Term.  Any extension 
 
provided under this subsection will continue under the same terms and conditions as in effect 
 
immediately prior to the expiration of the then-current term.  
17. 
Dispute Resolution.  Any controversy or claim arising out of or relating to this contract, or the breach 
thereof, shall be settled by arbitration administered according to the American Arbitration Association’s 
Commercial Arbitration Rules, and judgment on the award rendered by the arbitrator may be entered in any 
court having jurisdiction thereof. 
18. 
Cooperative Use of Contract.  This agreement may be extended for use by other governmental agencies 
and political subdivisions of the State.  Any such usage by other entities must be in accord with the ordinances, 
charter, rules and regulations of the respective entity and the approval of the Contractor and City.  For a list 
of SAVE members, click on the following link: http://www.mesaaz.gov/business/purchasing/save 
19. 
Exhibits.  The following exhibits, with reference to the term in which they are first referenced, are 
incorporated by this reference. 
Exhibit A 
SOW 
Exhibit B 
Compensation 
 
(Signatures appear on the following page.)

EXHIBIT A 
Maintenance, Repairs and Materials for Fire and Life Safety 
SOW 
 
See attached Scope of Work.

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
3     
rev. 5.8.2024 
 
1. 
INTRODUCTION  
 
The City of Glendale (City) is seeking proposals from qualified contractors to 
provide preventative maintenance, repairs on multiple types of manufactures’ 
equipment and materials for Fire and Life Safety Systems.   
 
The city has a high level of expectation that all install technicians and service 
technicians sent onsite are certified for the equipment that they will be installing 
or troubleshooting. The Contractor will be called on when it comes to the design 
and installation of various manufacturers’ equipment on all remodels as well as 
new builds. This contract will require that the Contractor be able to work with 
multiple departments to meet the expectations set forth in the scope of work.   
 
2. 
BACKGROUND 
 
The City of Glendale is comprised of multiple buildings including city offices, 
support and operations facilities, police and fire stations, water treatment 
facilities, recreational centers, and a regional training center. The City of Glendale 
Facilities Management Division is responsible for providing preventative 
maintenance and repairs to all City buildings and facilities. The Division shall 
maintain oversight of the Contractors’ performance of these services.  
 
The City of Glendale reserves the right to award in whole or in part, by item or 
groups of items, by categories or geographic area, make multiple awards, or re-
assign buildings after award, where such action serves the City’s best interest.  
The City of Glendale reserves the right to competitively solicit additional 
contractors, at the City’s sole discretion, in cases where the awarded Contractors 
are of an insufficient number or skill set to satisfy the City’s needs or to ensure 
adequate completion on any project or task order work. 
 
Contractors are strongly encouraged but not required to respond on all categories. 
Contractors able to service only one (or more) categories are encouraged to 
respond to those individual categories. Although the City anticipates routine use of 
services under this contract, no commitment of any kind concerning actual use of 
services is expressed or implied.  
 
3. 
OBJECTIVES 
 
The city takes pride in providing a safe environment for its citizens and 
employees. All Contractors awarded as a result from this solicitation shall ensure 
they manage their contract efficiently, perform all requirements stated in the 
contract, meet performance expectation/standards, and manage their employees 
to ensure there is no adverse impact to the city. Additionally, the city’s goal is to 
reduce the city’s time in monitoring vendor performance. Consistent 
communication with the City Representatives is key to meeting the requirements

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
4     
rev. 5.8.2024 
 
in the Scope of Work. The city is open to contractor suggestions to gain 
efficiencies throughout the contract term.  
 
 
4. 
CURRENT PRODUCT ENVIRONMENT  
 
• 
Product Distribution and installation of Fire Alarms 
• 
Fire Alarm System 
• 
Fire Extinguishers 
• 
Fire Suppression System 
o Sprinkler System 
o Main Drain Valves 
o Water Supply Systems 
o Flow Switches 
o Tampers 
o Pre-Action Systems 
o Back-Flow Preventers 
o Clean Agent Systems 
o Fire Pumps 
o Fire Hoses 
o Fixed Wet Systems (Kitchen Hoods) 
 
 
5. 
SCOPE OF WORK 
 
5.1. INSTALLATIONS, MAINTENANCE, AND REPAIRS: 
 
5.1.1. 
Additional certifications may be required to repair and maintain the security 
systems or to apply fire and safety treatments to applicable materials 
5.1.2. 
All equipment specified must be inspected, tested, serviced and repaired in 
accordance with current NFPA, Federal, State and Municipal codes, rules, 
regulations and ordinances.  
5.1.3. 
Inspections/testing may be conducted monthly, bi-monthly, quarterly, semi-
annually or on an annual basis. 
5.1.4. 
Technicians must be certified and trained to perform maintenance, 
installations, and repairs on all systems awarded under the contract 
5.1.5. 
All work must be performed according to manufacturer’s instructions 
5.1.6. 
Warranties must be reviewed on products prior to performing maintenance 
and repairs to ensure City is not paying for services that are covered under 
warranty 
5.1.7. 
The Contractor must provide applicable software updates, patches/fixes as 
part of the maintenance program. 
5.1.8. 
The Contractor must re-execute any work that fails to conform to 
requirements of the contract.

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
5     
rev. 5.8.2024 
 
5.1.9. 
The Contractor shall immediately remedy any defects due to faulty 
workmanship. Such re-execution of work shall be the sole responsibility of 
the Contractor (including all associated costs). 
5.1.10. The Contractor must designate certified technicians to ensure performance 
measures are met 
5.1.11. All related work, offeror must possess all valid certifications and/or licenses 
as required by federal, state, or local laws at the time of submittal 
 
5.2. LOW VOLTAGE SYSTEMS: 
 
5.2.1 
Design: The Contractor must have fully certified, qualified and trained 
personnel with the ability to design a turnkey solution for Fire Protection 
5.2.2 
Installation: The Contractor must have qualified staff with the ability and 
applicable certifications to install/repair equipment and monitoring systems 
5.2.3 
Technology: State of the art technology solutions and (added) innovative 
solutions to improve efficiencies must include reporting and alert systems, 
online access to data, mobile device management, etc.  
5.2.4 
Training/Quality Assurance: Training must be available upon 
implementation of the new program as well as ongoing and continuous 
communication and quality assurance. Resources must be made available 
for quick tutorials on how to obtain Alarm history, view Monitoring Location 
information and access to similar reporting features.  
 
5.3 
FIRE ALARM SYSTEMS:  
 
5.3.1 
The fire alarm system must comply with requirements of NFPA Standard 72 
for Protected Premises Signaling Systems except as modified and 
supplemented by this specification. The system shall be electronically 
supervised and monitor the integrity of all conductors 
5.3.2 
The system and its components must be Underwriters Laboratories, Inc. 
listed under the appropriate UL testing standard as listed herein for fire 
alarm applications and the installation must be in compliance with the UL 
listing 
5.3.3 
The system installation shall be supervised by a minimum NICET (minimum 
Level II Fire Alarm Technology) technician on site to guide the final checkout 
and to ensure the systems integrity 
5.3.4 
The system shall provide or be capable of expansion to meet various sizes of 
projects 
5.3.5 
Alarm signals arriving at the FACP shall not be lost following a primary 
power failure (or outage) until the alarm signal is processed and recorded 
5.3.6 
All equipment and components shall be new, and the manufacturer's current 
model. The materials, appliances, equipment and devices shall be tested and 
listed by a nationally recognized approvals agency for use as part of a 
protective signaling system, meeting the National Fire Alarm Code

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
6     
rev. 5.8.2024 
 
5.3.7 
All equipment and components shall be installed in strict compliance with 
manufacturers' recommendations. Consult the manufacturer's installation 
manuals for all wiring diagrams, schematics, physical equipment sizes, etc., 
before beginning system installation 
5.3.8 
All equipment shall be attached to walls and ceiling/floor assemblies and 
shall be held firmly in place (e.g., detectors shall not be supported solely by 
suspended ceilings). Fasteners and supports shall be adequate to support 
the required load 
5.3.9 
Wiring shall be in accordance with local, state and national codes (e.g., NEC 
Article 760) and as recommended by the manufacturer of the fire alarm 
system. Number and size of conductors shall be as recommended by the fire 
alarm system manufacturer 
5.3.10 All wire and cable shall be listed and/or approved by a recognized testing 
agency for use with a protective signaling system. Wire and cable not 
installed in conduit shall have a fire resistance rating suitable for the 
installation as indicated in NFPA 70 (e.g., Fire Power Limited Riser) 
5.3.11 All field wiring shall be electronically supervised for open circuit and ground 
fault 
5.3.12 Systems shall have the ability to display or print system reports 
5.3.13 The display board shall reflect the status information and custom 
alphanumeric labels for all intelligent detectors, addressable modules, 
internal panel circuits, and software zones 
5.3.14 The control panel shall be housed in a UL-listed cabinet suitable for surface 
or semi-flush mounting. The cabinet and front shall be corrosion protected, 
given a rust-resistant prime coat, and manufacturer's standard finish 
5.3.15 The door shall provide a key lock and shall include a glass or other 
transparent opening for viewing of all indicators. For convenience, the door 
may be site configured for either right or left-hand hinging 
5.3.16 Horn Strobes / Strobe lights shall meet the requirements of the ADA, UL 
Standard 1971, be fully synchronized, the maximum pulse duration shall be 
2/10 of one second, the strobe intensity shall meet the requirements of UL 
1971 and the flash rate shall meet the requirements of UL 1971 and have 
selectable tone options of temporal 3 and non-temporal continuous pattern 
5.3.17 Manual fire alarm boxes shall, on command from the control panel, send 
data to the panel representing the state of the manual switch and the 
addressable communication module status 
5.3.18 System shall work with ionization smoke sensors, photo electronic smoke 
sensors, and thermal sensors. The heat detectors shall be available in a 
variety of settings, from 135° to 195°, or with a rate-of-rise temperature 
setting. Thermal units shall not be the only sensors used in a system

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
7     
rev. 5.8.2024 
 
5.4 
FIRE EXTINGUISHERS: 
 
5.4.1 
Must provide the City replacement portable fire extinguishers of equal size 
and type should any contracted equipment require off-site servicing at no 
additional cost. 
5.4.2 
Must be responsible for providing the City staff with the serial number of 
each fire extinguisher removed from the site for repairs and/or any other 
reason 
5.4.3 
Ensure all work is performed to current NFPA standards as well as State and 
Local codes 
5.4.4 
Perform visual inspection of ALL fire extinguishers annually 
5.4.5 
Perform hydrostatic/maintenance tests, if needed 
5.4.6 
Cleaning and re-hanging all extinguishers 
5.4.7 
Review of extinguisher placement, sizes and types 
5.4.8 
New certification tags, as required 
5.4.9 
Provide a written report as well as verbally notify City staff of all non-
compliant extinguishers 
5.4.10 All fire extinguishers must be returned to their proper location(s) prior to the 
submission of invoice(s) 
 
5.5 
FIRE SUPPRESSION SYSTEMS AND BACKFLOW TESTING: 
 
5.5.1 
All inspection forms utilized in this contract shall meet the minimum 
requirements as specified in NFPA Fire Protection Systems, current edition, 
Inspection, Test, and Maintenance manual 
5.5.2 
All supplies, materials, and chemicals will be new and unused 
5.5.3 
The fire suppression contractor must have the ability to place a building in 
test. All tests performed by the Contractor that will trigger the building’s fire 
alarm systems are required to disable and enable the fire panel so as not to 
disrupt building occupants 
5.5.4 
Must have access to use a closed recovery system and comply with all CFC 
regulations including Federal Clean Air Act for stratospheric ozone 
protection, or any codes, rules, or laws that apply 
5.5.5 
Must perform the work in a way to minimize disruption to the normal 
operation of building tenants. Upon completion of work, the Contractor is 
responsible for cleaning and removing all debris, materials and equipment 
associated with the work performed from the job site 
5.5.6 
Provide all labor, supervision, parts, tools, equipment, transportation, and all 
effort necessary to perform said services in accordance with all National Fire 
Protection Association (NFPA) or local codes and standards and the 
specifications herein. All repairs shall be billable except for repairs required 
due to negligence on the part of the contractor or any subcontractor 
5.5.7 
All technical staff shall be thoroughly trained and licensed on fire 
suppression systems and backflow repair and maintenance

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
8     
rev. 5.8.2024 
 
5.5.8 
Must have the CSA or NICET Level 2 Certification. Proof of such must 
accompany bid package 
5.5.9 
Copies of employee certification or completion of acceptable training on fire 
suppression system/backflow must accompany the bid package 
5.5.10 Fleet service truck shall carry a sufficient supply of repair parts and 
equipment to perform routine fire suppression service and repairs 
5.5.11 The Contractor shall have a local shop and/or warehouse that stock parts to 
keep their trucks supplied daily 
 
5.6 
FIRE SPRINKLER SYSTEMS: 
 
5.6.1 
Annual inspections with tests as recommended quarterly, semi-annually, and 
annually per NFPA 25 standards. Some sites will require testing to be 
conducted performed during weekend hours 
5.6.2 
Must inspect and test systems to ensure the proper, efficient, reliable, and 
safe performance of all equipment. Work shall be in accordance with NFPA 
25 or local codes, equipment manufacturer's recommendations, and the 
specifications herein. Any federal or municipal codes, rules, and/or 
regulations shall prevail over the specifications listed herein 
5.6.3 
A discharge hose shall be installed at all main drains and inspector test 
discharge lines during testing to prevent damage and erosion to site 
landscaping. Any damage to landscaping shall be the responsibility of the 
Contractor to repair at no additional cost to the City. Should the City find it 
necessary to make any repairs for landscape damage or erosion caused by 
the Contractor, the cost shall be deducted from monies owed to the 
Contractor 
5.6.4 
Water leaks found in plumbing lines that serve a fire suppression system 
shall be noted for repair as a billable item, unless the leak is caused by the 
Contractor wherein repairs costs shall be incurred by the Contractor 
5.6.5 
Ensure that the electrical and/or water fire alarm bell is activated on flow 
test 
5.6.6 
Inspect sprinklers, sprinkler piping, pipe hangers, seismic braces, and look 
for missing or broken escutcheons to ensure all are in good condition 
5.6.7 
Notify City staff of deficiencies for repair authorization prior to repair 
5.6.8 
Water storage tanks must be inspected annually. Test level switch and 
alarms. Lubricate all float assemblies 
5.6.9 
All discrepancies and required repairs must be noted on the inspection form 
and forwarded to City staff 
5.6.10 Complete and attach new inspection tag or punch existing tag. 
 
5.7 
FIRE PUMPS: 
 
5.7.1 
Must perform inspections and tests annually

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
9     
rev. 5.8.2024 
 
5.7.2 
All inspections, testing, and service of fire pumps systems shall be in 
accordance with current NFPA, Federal, State, and Municipal codes, rules, 
regulations, and ordinances 
5.7.3 
Notify City staff that testing will be conducted and upon completion 
5.7.4 
All Jockey pumps and main fire pumps must be inspected quarterly for 
leaks, corrosion, and proper operation. Record start and stop pressures on 
Jockey and main pump during quarterly sprinkler inspection. Routine 
cleaning and adjustments of pump packing shall be incorporated into the 
test and inspect cost and must be completed during the quarterly test 
5.7.5 
Ensure all safety devices and relief valves are functioning properly during the 
quarterly sprinkler service 
5.7.6 
Lubricate pump motors and all associated valves annually 
5.7.7 
Perform fire pump flow test annually as specified in systems in accordance 
with current NFPA, Federal, State, and Municipal codes, rules, regulations, 
and ordinances 
5.7.8 
Clean up all water spills 
5.7.9 
Complete and attach new inspection tag or punch existing 
 
5.8 
FIRE HOSE: 
 
5.8.1 
Must provide inspections and tests annually for each hose and hose cabinet 
with lined PCT hose is to be tested, inspected, and serviced using the current 
NFPA codes 
5.8.2 
Replace all defective, missing unlined hoses 
5.8.3 
Replace all missing break bars and chains on locking-type glass front 
cabinets and ensure door is operating properly. Parts missing shall be 
charged as a material cost to the City 
5.8.4 
Replace any missing or inoperable nozzles with plastic fog type units. 
Missing nozzles shall be a chargeable material to the City 
5.8.5 
Install new gasket (if needed) in female hose fitting 
5.8.6 
The new gasket (if needed) in female hose fitting 
5.8.7 
The City may request the Contractor to replace a hose cabinet that is worn, 
vandalized, or damaged due to rust or corrosion. This shall be done as a 
time and material cost 
 
5.9 
PRE-ACTION SYSTEMS: 
 
5.9.1 
Must perform inspection and test semi-annually. Test the deluge and pre-
action systems semi-annually and trip test annually. All actuating devices will 
be inspected and tested semi-annually. Check if alarm panel has been 
triggered. Alarm system contractor to be present during testing to ensure 
reporting to main fire panel and bypassing of building system devices 
5.9.2 
Must notify City staff that testing will be conducted and notify when testing is 
completed as well as of any repairs and maintenance issues that are needed

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
10     
rev. 5.8.2024 
 
5.9.3 
Any VESDA systems reporting directly to a pre-action panel shall be the 
responsibility of the Contractor as an all-inclusive service 
5.9.4 
Must supply replacement parts (i.e., filters, etc.), calibrations, and any 
preventive maintenance required to maintain system to manufacturers’ 
specifications or current codes or laws 
5.9.5 
Complete and attach new inspection tag or punch existing 
 
5.10 BACKFLOW PREVENTERS:  
 
5.10.1 
Inspection and testing to all backflow preventers shall be serviced in 
accordance with current Federal, State, and Municipal codes, rules, 
regulations and ordinances 
5.10.2 
All inspections will be performed only by persons who have a valid tester 
certification. Proof of such must accompany bid package 
5.10.3 
All test reports will be forwarded to the City staff member 
5.10.4 
All backflow preventers failing inspection and test should be noted for repair 
and re-tested at the request of the member. Facilities Supervisor or 
designated staff member should be notified within the same business day 
after the Contractor has tested and failed a backflow device. Contractor to 
obtain written request from member for any repairs required (Purchase 
Order should be issued prior to beginning any billable work for repairs) 
5.10.5 
Must tag all backflow units that have passed any testing requirements. The 
tag is to be supplied by the contractor and must be weatherproof along with 
its attaching method. Additionally, the tag must depict the date of the test 
and the tester’s initials 
 
5.11 KITCHEN HOODS AND DRY/WET CHEMICALS: 
 
5.11.1 
Inspect and test chemical kitchen hood systems in accordance with NFPA 
13, 17, 17A, and 96 or current enforceable codes 
5.11.2 
All cylinders are to be weighed and tagged in accordance with NFPA 
requirements. Fusible links and water wash automatic sprinkler heads shall 
be replaced annually and noted on the inspection report. All used fusible 
links and water wash automatic sprinkler heads replaced will be returned to 
the member. Ensure nozzle caps do not have and accumulation of grease 
and are in place 
5.11.3 
All actuating devices will be inspected and tested semi-annually. Check if 
alarm panel has been triggered 
5.11.4 
Ensure gas and electric are off during each test. Reset gas valve and re-light 
pilot lights. Reset, if necessary, and circuit breakers 
5.11.5 
Perform hydrostatic tests on cylinders as required. Hydrostatic test due 
dates on all cylinders will be noted on the inspection forms. All inspection 
reports will be submitted to the City staff member with invoicing 
5.11.6 
Discharge of systems and repairs caused by negligence of the Contractor, 
its employee, servants, or agents will be at no cost to the City

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
11     
rev. 5.8.2024 
 
5.11.7 
All service to kitchen hoods (dry or wet chemical extinguish systems) shall 
be at no additional cost other than the semi-annual maintenance fee 
5.11.8 
IMPORTANT NOTE:  The testing of systems that report back to the main 
fire alarm panel require scheduling of fire panel contractor, so they can be 
on site to verify reporting and to reset main panel and bypass evacuation 
system. Scheduling shall be the fire extinguisher Contractor’s responsibly. 
If, for unforeseen circumstances, the fire extinguisher contractor cannot 
schedule, they are to contact and notify the designated staff member 
5.11.9 
Testing of these systems may be required after normal hours due to various 
operational times 
 
5.12 WATER SUPPLY SYSTEMS: 
 
5.12.1 
All equipment specified shall be inspected, tested, serviced, and repaired 
in accordance with current NFPA, Federal, State, and Municipal codes, 
rules, regulations, and ordinances 
5.12.2 
Must notify the City staff that testing will be conducted and notify when 
testing is completed 
 
5.13 FIRE RETARDANT APPLICATION/TREATMENTS (STAGE CURTAINS/DRAPES) 
 
5.13.1 
Responsible for all measurements at the time of estimating, The City will ne 
be held accountable for miscalculations 
5.13.2 
Must prep the draperies prior to treatment to include all components such 
as linings 
5.13.3 
Protect surrounding areas from overspray 
5.13.4 
Treat materials with flame retardant chemical that is approved and 
registered by the State Fire Marhsall. Technical Data Sheet is to be included 
with the proposal 
5.13.5 
All application of chemicals should be done in conformance with laws of the 
state of Arizona and rules and regulations of the State Fire Marshal 
5.13.6 
Certification of chemical and application must be provided for every stage 
curtain 
 
5.14 MONITORING SERVICES – FIRE ALARM 
 
5.14.1 
The Contractor shall provide monitoring services for City of Glendale fire 
alarm systems and intrusion detection systems 
5.14.2 
The Contractor shall be a full-service Underwriters Laboratory (UL) or 
Factory Mutual (FM) certified central station with an automated processing 
computer that integrates with a wide range of commonly used systems 
such as, but not limited to: Ademco, Bosch, DSC, Fire Lite, Simplex, 
Notifier, Sentrol, Silent Knight, Radionics, etc

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
12     
rev. 5.8.2024 
 
5.14.3 
The Contractors that subcontract monitoring services to established local 
U.L. or F.M. certified central stations must meet qualifications set forth in 
this solicitation 
5.14.4 
The Contractor technicians must be completely trained and certified by the 
manufacturer in the monitoring and programming of systems that they 
service 
5.14.5 
The Contractor shall have the required programmers or remote 
programming software to program the systems to the City’s specifications 
at any time. Awarded contractor shall also provide training in regard to 
updated software programs 
5.14.6 
It may be preferred by the City if the contractor offer a customer dealer 
portal 
5.14.7 
The successful contractor shall be fully responsible for dispatching the 
designated emergency services, alarm response contractor, and or other 
personnel required by the City. NOTE: If the City suffers from any physical 
damage or theft resulting from lack of dispatch from the monitoring 
company, the monitoring company will be responsible for such loss. 
Dispatch may be done via network connection or telephone 
5.14.8 
The contractor shall have personnel on duty twenty-four (24 hours per day, 
seven days per week including holidays to dispatch via network connection 
such as, but not limited to, cell phone technology 
5.14.9 
The monitoring company shall have the ability to communicate with the 
City’s contracted response company on a 24-hour-a-day basis as directed 
by the City 
5.14.10 
The awarded contractor shall have an electronic communication device 
located in the Central Station. The phone is to be used for communicating 
with the City representative when responding to alarm calls as well as to 
communicate with the dispatch guard service responding to the alarm 
conditions 
5.14.11 
The Central Station shall have an up-to-date receiver connected to a 
minimum of four (4) line communications system. A full complement of 
spares as required by the manufacturer and UL or FM shall be available on 
site at all times. The Contractor shall provide and install a new 
upgraded/integrated service to add radio read dialers to approximately 
eighty (80) accounts 
5.14.12 
An inspection of the facilities to confirm all of the above items may be 
required by a City representative prior to issuance of a Purchase Order. 
The City shall have the option of any independent advisor being present at 
the inspection of the facilities 
5.14.13 
The City may expand the number of systems located on their sites 
throughout the term of this contract. New systems added will be covered 
under this proposal at the current monitoring rate until the end of the 
current term 
5.14.14 
Initial programming changes shall be considered for both Central Station 
and each panel. The monitoring company shall ensure that all account

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
13     
rev. 5.8.2024 
 
numbers, pass codes, and ID’s remain the same, unless otherwise agreed 
upon by the City 
5.14.15 
The Contractor must provide a hard copy of all account numbers, alarm 
type, pass codes, zone list, dealer codes, and other pertinent account 
information  
5.14.16 
The Contractor must provide professional labels for existing and new 
panels 
5.14.17 
Awarded contractor shall be a qualified licensed and bonded alarm 
monitoring company in the State of Arizona 
5.14.18 
It may be preferred by the City of Glendale the ability to provide the 
scripted reporting on account activations 
 
6. 
SERVICE RESPONSE TIMES:  
 
Monday - Friday 
Monday - Friday 
  
Normal Business 
Hours 
After Business 
Hours 
Weekends / Holiday 
6:00am - 5:59pm 
6:00pm - 5:59am 
  
RESPONSE 
TIMES 
 30 Minute call 
back 
acknowledgement 
 30 Minute call 
back 
acknowledgement 
See Emergency unless 
otherwise specified. 
CONTRACTOR 
ONSITE 
Within 4 Hours 
Within 2 – 3 Hours 
Within 2 Hours 
EMERGENCY 
Contractor provides telephoned acknowledgement within 30 
minutes and estimated time of arrival is within two hours or less. 
 
Note: Contractor shall be required to provide the City with a 24-hour, toll-free access 
to their staff via any communications system they choose 
 
7. 
EQUIPMENT TESTING:  
7.14.19 
The Contractor must notify the City staff at least two (2) weeks in advance 
to schedule testing with proposed dates and times within the following time 
frames: 
 
• NORMAL BUSINESS HOURS: Work performed between 6:00 am to 
5:59 pm, Monday through Friday, City Holidays excluded 
 
• AFTER HOURS SERVICE: Work preformed between 6:00 pm and before 
5:59 am the next business day 
 
• WEEKENDS/ HOLIDAYS:  Work preformed during Saturday, Sunday or 
during a City observed Holiday

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
14     
rev. 5.8.2024 
 
8. 
AUDIT RECORDS OF PROVIDED SERVICES: 
 
8.14.20 
The Contractor shall maintain complete and accurate records required 
substantiating the services provided (including required part replacements, 
programming codes and passwords) to all City staff 
8.14.21 
Such records shall, at a minimum, indicate the dates, times and type of 
servicing performed 
8.14.22 
The Contractor shall make all records available to the City Representative or 
delegate upon request at no additional cost 
8.14.23 
All such records shall become the property of the City  
 
9. 
INVOICING: 
 
9.14.24 
The Contractor shall submit invoices to the City within 30 days after the 
completion of services. Failure to submit an invoice within the timeframe may 
result in delays paying the invoice. All invoicing for Time and Materials must 
include: 
• 
Purchase Order number or Work Order number 
• 
Job site name and location 
• 
Completion date 
• 
Description of work performed 
• 
Total labor hours 
• 
Itemized part numbers  
• 
Tax on parts only 
 
10. 
PERFORMANCE METRICS: 
 
GOAL 
METRIC 
OUTCOME 
Dispatched technicians are 
certified to perform 
installation services and 
maintenance on 
equipment. 
100% of technicians are 
certified  
A higher number and diverse 
range of certifications indicate a 
broader skill set and expertise 
among personnel, leading to 
higher service quality, 
compliance with standards, and 
customer satisfaction. 
Response time to service 
requests or emergencies 
related to the maintenance 
or troubleshooting systems 
are met per the contract.    
90% average response time met 
 
 
A higher average response time 
indicates quicker 
acknowledgment and initiation of 
service, which can lead to faster 
issue resolution and minimized 
disruption to system operations. 
Accurate invoices 
submitted for payment 
100% of invoices submitted 
with correct information per 
Contract requirements.  
A higher percentage of accurate 
invoices indicates effective billing 
practices, which can lead to

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
15     
rev. 5.8.2024 
 
after service provided and 
accepted.   
timely payments, reduced 
disputes, and improved financial 
management. 
City facilities made aware 
of equipment testing of 
alarms 
Contractor notifies 2-weeks in 
advance of testing proposed 
dates and times 
By measuring and improving 
awareness of equipment testing 
among city facilities, 
organizations can enhance safety 
measures, streamline operations, 
and foster a proactive approach 
to emergency preparedness 
within the community. 
 
 
11. 
HOW WE CHOOSE 
 
11.1 SCORING RESPONSES  
The evaluation criteria are weighted in accordance with the Submission 
Requirements. Your response will be rated as follows: 
o 
25% Experience, proven performance, and qualifications 
o 
25% Method of Approach 
o 
30% Capacity of Offeror 
o 
20% Cost 
 
11.2 EVALUATION PANEL: Submittals will be evaluated by a panel based on the 
stated criteria and are responsible for selecting the proposal that is most 
advantageous to the City.  
 
11.3 PANEL CONTACT: Offerors shall have no exclusive meetings, conversations 
or communications with an individual evaluation panel member on any 
aspect of the RFP, after submittal. 
 
11.4 INTERVIEWS: City may ask some or all Offerors to participate in an 
interview at any point during the evaluation process but is not required to 
do so. Information gathered in an interview will be used by the panel to 
make a selection. Offeror is responsible for any costs incurred to 
participate in an interview. 
 
11.5 ADDITIONAL INVESTIGATIONS: City may conduct additional 
investigations needed to determine the competence or financial stability of 
any Offeror. 
 
11.6 BEST AND FINAL OFFERS: City may request best and final offers and will 
determine the scope and subject of any best and final request.

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
16     
rev. 5.8.2024 
 
11.7 PROPOSAL EVALUATION: City reserves the right to secure additional 
information from the Offeror in various forms and to award based on 
submitted information. 
 
12. 
NOTICE OF INTENT TO AWARD AND PROTEST PERIOD:  
Information about the recommended award for this solicitation will be posted here 
and will be available immediately after the City has completed its evaluation 
process. Questions regarding the notice of intent to award must be directed to the 
listed Procurement Officer immediately. Any protest must be submitted to the 
Procurement Administrator no later than seven (7) calendar days from the date of 
posting on the Internet. Information and instructions on how to file a protest can 
be found here.          
 
13. 
WITHDRAWAL OF PROPOSAL:  
Offeror may withdraw a submitted proposal at any time prior to the specified 
solicitation due date and time through the City’s online bidding system.  
Withdrawals must be made by the Offeror or designated representative listed on 
the proposal. Telephonic or oral withdrawals cannot be accepted. 
 
14. 
OFFER ERRORS OMISSIONS AND CORRECTIONS:  
City will not be responsible for any offeror errors or omissions. Any corrections 
shall be submitted through the City’s online bidding system prior to due date and 
time of the RFP. No corrections will be permitted after the offers have been 
opened. 
 
15. 
COMPETITIVE NEGOTIATIONS:  
City may negotiate with multiple Offerors at the same time. Negotiations may 
result in changing the conditions, terms, or price of the proposed contract for the 
benefit of the City unless prohibited herein. All Offerors shall be treated fairly and 
equally while conducting negotiations and the City is prohibited from disclosing 
any information submitted by competing Offerors. Entering into negotiations does 
not constitute a contract award or confer any rights to Offerors. The City may 
formally terminate negotiations and enter into concurrent or exclusive 
negotiations with the next most qualified Offeror/s if it is in the City’s best interest 
to do so. 
 
16. 
NO CONTACT, NO INFLUENCE DURING THE RFP PROCESS:  
City is conducting a competitive RFP process for the contract, free from improper 
influence or lobbying. There shall be no contact concerning this RFP from Offerors 
submitting a Proposal with any member of the City Council, RFP Evaluation 
Committee Members, or anyone connected with the process for or on behalf of the 
City. Contact includes direct or indirect contact by the Offeror, its employees, 
attorneys, lobbyists, surrogates, etc. in an attempt to influence the RFP process.

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
17     
rev. 5.8.2024 
 
From the time the RFP is issued until the expiration of the protest period or the 
resolution of any protest, whichever is later (the “Silent”), Offerors, directly or 
indirectly through others, are restricted from attempting to influence in any 
manner the decision making process through, including but not limited to, the 
use of paid media; contacting or lobbying the City Council or City Manager or any 
other City employee (other than Material Management employees); the use of any 
media for the purpose of influencing the outcome; or in any other way that could 
be construed to influence any part of the decision-making process about this 
RFP. This provision shall not prohibit an Offeror from petitioning an elected 
official or engaging in any other protected first amendment activity after the 
protest period has run or any protest has been resolved, whichever is later. 
 
Violation of this provision will cause the proposal or offer of the Offeror to be 
found in violation and to be rejected. 
 
17. 
PROPRIETARY INFORMATION  
Offeror shall clearly mark any proprietary information contained in its bid with the 
words “Proprietary Information.” Offeror shall not mark any Solicitation Form as 
proprietary. Pricing data shall not be considered proprietary. Marking all, or 
nearly all, of a bid as proprietary may result in rejection of the bid.  
 
Offerors acknowledge that the City is required by law to make certain records 
available for public inspection. In the event that the City receives a request for 
disclosure of Proprietary Information by any person, court, agency or 
administrative body, or otherwise has a reasonable belief that it is obligated to 
disclose the Proprietary Information to any such person or authority, the City will 
provide Offeror with prompt written notice so that Offeror may seek a protective 
order or other appropriate remedy. The Offeror, by submission of materials 
marked Proprietary Information, acknowledges and agrees that the City will have 
no obligation to advocate for non-disclosure in any forum or any liability to the 
Offeror in the event that the City must legally disclose the Proprietary Information. 
 
18. 
SUBMISSION CHECKLIST 
 
This section provides an overview of the submission instructions including a 
checklist to aid in the submission of complete proposals. Offerors shall complete 
the fillable “RESPONSE WORKBOOK” attachment and submit as their proposal. 
 
Vendors are strongly advised to read this section in its entirety and complete the 
checklist to avoid disqualification. Please note that the City will NOT be able to 
consider proposals that are submitted late or that do not follow these 
guidelines. 
 
The Offeror shall bear all costs associated with submitting the proposal, 
including proposal preparation, site visitation or any travel connected with

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
18     
rev. 5.8.2024 
 
submission of the proposal. The City shall have no liability whatsoever for such 
costs. 
 
 
Checklist for Submitting Proposal 
Complete 
() 
Submission Requirements 
OFFER SHEET (Response Workbook) 
Offeror Name 
Offeror Address                                   
 
1. EXPERIENCE, PROVEN PERFORMANCE, QUALIFICATIONS 
     (4 questions) 
 
2. CERTIFICATIONS 
(9 questions) 
 
3. METHOD OF APPROACH 
(8 questions) 
 
4. CAPACITY OF OFFEROR 
(3 questions) 
 
5. PRODUCT DISTRIBUTION  
(1 question) 
 
     COMPLETED PRICING WORKBOOK 
 
ADDENDUM RESPONSES (if applicable)  
 
Return of Offer 
• 
Electronic copies of all "SUBMISSION REQUIREMENTS” listed 
above. Pricing Workbook must be submitted separately from 
the rest of the proposal.  
 
 
19. 
SUBMISSION REQUIREMENTS 
For this proposal, you must provide a completed OFFER SHEET in addition to 
answering the questions identified in the REQUIRED RESPONSES. (see Response 
Workbook) 
 
Responses must be numbered to correspond to the question numbers to aid in 
the evaluation process; failure to do so may result in disqualification.   
 
Should your offer contain any PROPRIETARY INFORMATION you must clearly 
mark that information with the words “Proprietary Information.” Only information 
contained in your response questions may be marked as such, information on the 
OFFER SHEET or PRICING SHEET (if applicable) are not considered proprietary. 
 
Offerors acknowledge that the City is required by law to make certain records 
available for public inspection. By submitting any materials marked as Proprietary

City of Glendale 
Solicitation Number: RFP 25-29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
 
CITY OF GLENDALE 
Procurement Division 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
19     
rev. 5.8.2024 
 
Information, Offeror acknowledges and agrees that the City will have no obligation 
to advocate for non-disclosure in any forum or any liability to the Offeror if the City 
must legally disclose the Proprietary Information. 
 
Helpful Hints: 
• 
Answer each question completely, your answers will be the only basis on 
which your proposal is scored. 
• 
Do not unnecessarily elaborate, keep your response complete and effective. 
• 
Do not provide general answers or reference to sales literature. 
• 
Only when applicable attach and reference supporting documents.

EXHIBIT B 
Maintenance, Repairs and Materials for Fire and Life Safety 
COMPENSATION 
 
METHOD AND AMOUNT OF COMPENSATION 
Per section 4 of the Agreement. 
NOT-TO-EXCEED AMOUNT 
The total amount of compensation paid to Contractor for full completion of all work required by the SOW during 
the entire term of this Agreement must not exceed $3,000,000. 
DETAILED COMPENSATION 
See attached price workbook.

City of Glendale 
Solicitation Number: IFB 25- 29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
PRICING WORKBOOK     
 
Offerors shall complete all applicable pricing requested in the PRICING WORKBOOK.   
 
The Unit Price and Discount percentage off MSRP Price shall be an all-inclusive rate and 
shall include all labor, equipment, materials, supplies, hardware, permits, certifications, 
travel, mileage, insurance, warranty, profit, and any associated direct or indirect costs to 
perform the services specified herein. No other charges shall be allowed under the 
contract. 
 
Cost of equipment, parts, materials and supplies purchased by the City under this 
contract shall be billed to the City at discount off MSRP Price. 
 
Cost of any equipment, parts, materials, and supplies purchased by the Contractor and 
used for repairs and maintenance will be billed to the City at a percentage off MSRP 
pricing. The Contractor shall submit a copy of the invoice for the equipment, parts, 
materials and supplies purchased when submitting an invoice to the City. 
 
The City shall not be invoiced at prices higher than those stated in the resultant contract. 
All unit prices quoted and percentage off of MSRP shall remain firm and fixed for the 
specified contract period.   
 
Other than contract pricing, NO additional cost, fees or surcharges shall be allowed by 
the City. 
 
2. 
PRICE SCHEDULE 
 
FIRE, INTRUSION DETECTION AND RADIO READ COMMUNICATION SYSTEM SOLUTIONS 
(MAINTENANCE AND REPAIR SERVICES) 
Item 
No. 
Description (As 
per Scope of 
Work) 
Unit 
of 
Meas
ure 
Estimated 
Annual 
Quantity 
 
Unit Price  
 
 
1 
Fire 
Extinguishers 
Per 
Each 
800 
$5.50/ea 
 
 
1.A 
ABC 
Per 
Each 
750 
$5.50/ea 
 
 
1.B 
Carbon Dioxide  
Per 
Each 
40 
$7.00/ea 
 
 
1.C 
Water 
Per 
Each 
15 
$5.50/ea 
 
 
1.D 
Class K 
Per 
Each 
10 
$7.00/ea

City of Glendale 
Solicitation Number: IFB 25- 29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
1.E 
Halotron 
Per 
Each 
5 
$7.00 
 
 
Item 
No. 
Description (As 
per Scope of 
Work) 
Unit 
of 
Meas
ure 
Estimated 
Annual 
Quantity 
 
Unit Price Per 
Hour 
(Business Hours) 
After Hours 
Unit Price 
(2 Hours minimum) 
Discount 
% 
Off MSRP 
2 
Fire Suppression 
Systems 
Semi-Annual 
Annual - testing 
 
Each 
 
80 
$95.00 
 
$142.50 
 
     % 
3 
Fire Sprinkler 
Systems 
Semi-Annual 
Annual - testing 
Each 
Each 
80 
$95.00 
$142.50 
 
     % 
4 
Fire Pumps 
Per 
Hour 
6 
$125.00 
$187.50 
 
     % 
5 
Fire Hoses – 
inspect/test 
Each 
1 
$95.00 
$142.50 
 
     % 
FIRE, INTRUSION DETECTION AND RADIO READ COMMUNICATION SYSTEM SOLUTIONS 
(MAINTENANCE AND REPAIR SERVICES) 
Item 
No. 
Description 
(As per Scope of 
Work) 
 
Unit 
of 
Meas
ure 
Estimated  
Annual 
Quantity 
 
Certified 
Technician / 
Apprentice 
(Helper)  
Unit Price Per 
Hour 
(Business Hours) 
 
Certified Technician / 
Apprentice (Helper)  
Unit Price Per Hour 
(After 
Hours/Wknd/Holiday/
Emergency) 
 
 
Discount 
% 
Off MSRP 
6 
Pre-Action 
System 
Semi-Annual - 
inspect 
Annual – 
testing/inspect 
(add a column 
for test/inspect) 
 
Each 
 
9 
$95.00 / $95.00 
$142.50 / $      
 
     % 
7 
Backflow 
Preventers 
 
Each 
6 
$95.00 / $95.00 
$142.50 / $      
 
     % 
8 
Kitchen Hoods, 
Dry/Wet 
Chemical 
Each 
1 
$95.00 / $95.00 
$142.50 / $      
 
     %

City of Glendale 
Solicitation Number: IFB 25- 29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
9 
Fire Retardant 
Application 
Treatments 
Each 
1 
$      / $      
$      / $      
 
     % 
10 
Fire Alarm 
Systems 
Semi-Annual 
Annual 
 
Each 
100 
$120.00 / $      
$180.00 / $      
 
     % 
17 
Integrated 
Communication 
Systems 
Per 
Hour 
1 
$120.00 / $      
$180.00 / $      
 
     % 
 
FIRE, INTRUSION DETECTION AND RADIO READ COMMUNICATION SYSTEM SOLUTIONS 
(MAINTENANCE AND REPAIR SERVICES) 
Item 
No. 
 
Description 
(As per Scope of Work) 
 
Unit of 
Measure 
Estimated 
Annual 
Quantity 
Unit Price Per Hour 
(Business Hours) 
18 
Design & Installation, Fire Alarm 
Panels 
Panel 
3 
$120.00 
 
MONITORING SERVICES 
 
Item 
No. 
 
Description 
(As Per Scope of Work) 
 
Unit of 
Measure 
Estimated 
Annual 
Quantity 
 
Unit Price Per System 
20 
Fire Alarm Systems 
System 
42 
$360.00/Annual 
 
LABOR 
 
Item 
No. 
 
Description 
(As Per Scope of Work) 
 
Unit of 
Measure 
Estimated 
Annual 
Quantity 
 
Unit Price Per System 
20 
Fire Alarm Systems 
System 
42 
$120.00 
 
IF PRICING IS NOT PROVIDED, IT IS INTERPRETED AS A NO-BID  
 
Provide detailed information regarding any value-added services your firm can offer to the City of 
Glendale. Keep in mind that value added services should align with the purpose and scope of work 
of the solicitation and be geared towards Fire and Safety products and services.

City of Glendale 
Solicitation Number: IFB 25- 29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
CertiPro Fire and Life Safety is committed to delivering exceptional value to the City of 
Glendale by leveraging the expertise and experience of our senior-level technicians, who 
each bring over 15 years of specialized knowledge in fire and life safety systems. This 
wealth of experience ensures that our team provides the following value-added services: 
 
1. 
Expert Consultation and Problem-Solving 
Our senior technicians are adept at identifying and addressing complex fire and life 
safety challenges. Their hands-on expertise allows for the efficient design, installation, 
and maintenance of systems, minimizing downtime and ensuring compliance with local 
and national fire safety codes. 
 
2. 
Customized System Optimization 
We go beyond standard service by evaluating existing fire and safety systems to 
recommend upgrades or adjustments that enhance performance, reduce long-term 
costs, and improve overall safety. 
 
3. 
Advanced Training and Support 
CertiPro offers tailored training sessions for city staff, ensuring proper understanding 
and operation of fire safety systems. This proactive approach minimizes user error and 
fosters a safer environment. 
 
4. 
Comprehensive Documentation and Reporting 
We provide detailed system documentation, maintenance logs, and inspection reports, 
ensuring full transparency and aiding the City of Glendale in maintaining compliance with 
regulatory requirements. 
 
5. 
Rapid Emergency Response 
With a dedicated and experienced team, we offer priority response services for 
emergency repairs, ensuring that critical fire and safety systems are restored quickly to 
protect property and lives. 
 
6. 
Sustainability Initiatives 
CertiPro is committed to environmentally conscious practices. We can recommend and 
implement energy-efficient fire safety systems and recycling programs for outdated 
equipment, aligning with Glendale's sustainability goals. 
By offering these services, CertiPro Fire and Life Safety aims to be more than a vendor—
we seek to be a trusted partner dedicated to the City of Glendale's fire and safety 
needs.Senior Level Technicians will be on all service calls,  regarless of scope of work.  
 
 
 
3. 
DISCOUNT/PAYMENT TERMS: The City standard is 2% 20 days 
 
Comply: 
YES  x  NO

City of Glendale 
Solicitation Number: IFB 25- 29 / 42500049 
MAINTENANCE, REPAIRS AND MATERIALS FOR 
FIRE AND LIFE SAFETY 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
If your answer is NO, please state terms offered: (% 
 
 
 
4. 
PAYMENT Contractor shall provide monthly statements of itemized services.  
Payment will be reviewed and approved by the Contract Administrator or designee. 
The itemized statement shall not exceed the proposal fee in this Section.    
 
5. 
TAX AMOUNT Do not include any use tax or federal tax in your proposal.   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
OFFEROR NAME:  CertiPro Fire and Life Safety, Inc.