Amended Agreement with Wilson Engineers LLC
Extracted text (via pymupdf)
31826 characters
1
01/28/2025
C23-1009-1
AMENDMENT NO. 1
STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN
PROFESSIONAL (CONSTRUCTION MANAGER AT RISK)
(212233.3, Contract No. C23-1009)
This Amendment No. 1 (“Amendment”) to the City of Glendale Standard Form of Agreement
Between Owner and Design Professional (Construction Manager at Risk) (“Agreement”) is made this
______ day of ________, 2025, (“Effective Date”), by and between the City of Glendale, an Arizona
municipal corporation (“City”) and Wilson Engineers, LLC, an Arizona limited liability company,
authorized to do business in Arizona (“Contractor”).
RECITALS
A.
City and Wilson Engineers, LLC (“Contractor”) previously entered into a Standard Form
Agreement between Owner and Design Professional (Construction Manager at Risk),
Contract No. C23-1009, dated September 26, 2023 (“Agreement”); and
B.
The City is seeking to expand the scope of services and increase compensation to be paid
under this agreement by an additional $794,216.00.
C.
City and Contractor wish to modify and amend the Agreement subject to and strictly in
accordance with the terms of this Amendment.
AGREEMENT
In consideration of the mutual promises set forth herein and other good and valuable consideration,
the receipt and sufficiency of which are hereby acknowledged, the City and Contractor hereby agree
as follows:
1.
Recitals. The recitals set forth above are not merely recitals, but form an integral part of this
Amendment.
2.
Term. The term of the Agreement is unchanged and shall expire on March 31, 2028.
3.
Scope of Work. The scope of work shall be revised to include additional services as shown
in the attached Exhibit A.
4.
Compensation. The compensation shall be increased by an additional $794,216.00 per the
attached Exhibit B.
5.
Insurance Certificate. Current certificate will expire on December 31, 2025 and a new
certificate applying to the extended term must be provided prior to this date to Finance
Director and the Contract Administrator.
6.
Non-discrimination. Contractor must not discriminate against any employee or applicant
for employment on the basis of race, color, religion, sex, national origin, age, marital status,
sexual orientation, gender identity or expression, genetic characteristics, familial status, U.S.
military veteran status or any disability. Contractor will require any Sub-contractor to be bound
2
01/28/2025
to the same requirements as stated within this section. Contractor, and on behalf of any
subcontractors, warrants compliance with this section.
7.
No Boycott of Israel. To the extent A.R.S § 35-393 through § 35-393.03 are applicable, the
parties hereby certify that they are not currently engaged in, and agree for the duration of the
Agreement to not engage in, a boycott of goods or services from Israel, as that term is defined
in A.R.S § 35-393.
8.
Uyghur Forced Labor Prevention Act (UFLPA). Contractor certifies that it does not
currently, and during the term of this Agreement, will not use:
(a)
the forced labor of ethnic Uyghurs in the People’s Republic of China;
(b)
any goods or services produced by the forced labor of ethnic Uyghurs in the People’s
Republic of China; and
(c)
any contractors, subcontractors or suppliers that use the forced labor or any goods or
services produced by the forced labor of ethnic Uyghurs in the People’s Republic of
China.
9.
Attestation of PCI Compliance. When applicable, the Contractor will provide the City
annually with a Payment Card Industry Data Security Standard (PCI DSS) attestation of
compliance certificate signed by an officer of Contractor with oversight responsibility.
10.
Ratification of Agreement. City and Contractor hereby agree that except as expressly
provided herein, the provisions of the Agreement shall be, and remain in full force and effect
and that if any provision of this Amendment conflicts with the Agreement, then the provisions
of this Amendment shall prevail.
[Signatures on the following page.]
1620 W Fountainhead Pkwy, Suite 501
Tempe, AZ 85282
480-893-8860 | 480-493-8968 Fax
Wilson-Engineers.com
February 13, 2025
Martin Soma
City of Glendale
Engineering Department, 3rd Floor
5850 West Glendale Avenue
Glendale, AZ 85301
Re.
Project Number 212233.3
City of Glendale
Thunderbird Reservoir and Distribution Improvements
Scope of Services – Contract EXHIBIT A
Marty,
We are pleased to submit this proposal to provide Engineering Services associated with the
Thunderbird Reservoir and Distributions Improvements Project. Attached is our proposed
Scope of Services to provide construction phase engineering services and to make the
Thunderbird Reservoir Improvements Phase 2 a separate projected from the Zone 2/3
Distribution Improvements.
Thank you for the opportunity to work on this project. If you have any questions regarding
this proposal or need additional information please do not hesitate to contact me at (480)
893-8860.
WILSON ENGINEERS
Steve Todd, P.E.
Principal
City of Glendale, Arizona
Thunderbird Reservoir and Distribution Improvements
February 13, 2025
The City of Glendale owns and operates the Thunderbird Reservoir which is utilized to
store water and maintain the hydraulic grade of the Pressure Zone 2 in the City’s potable
water distribution system. The Thunderbird Reservoir facility was installed in the mid
1980’s and several components at the facility are near the end of their useful life. The
purpose of this project is to rehabilitate the existing facility by replacing and upgrading
several components of the facility. The City has performed an evaluation of the existing
facility and identified several items in need of replacement. The design of the second
phase of this project (Phase 2) is underway and includes additional improvements at the
reservoir as well as at the adjacent pressure reducing valve station and a new Zone 2 to
Zone 3 booster station. This scope is for the construction phase engineering services and
additional design efforts. The following major facility components and services are
assumed to be included in this portion of this project:
Task 4.3 Project Design Meetings. The Engineer will conduct meetings and/or workshops
with City Staff to discuss specific technical aspects of the design; progress in the
development of the design, drawings, and specifications; and related issues that may affect
Project results. The Engineer will prepare and distribute meeting agenda. A total of five
additional progress meetings (including workshops) are included in this scope to support
the lengthen design period.
TASK 4.4 PERMITS
MCESD ATC. The Engineer shall prepare the Approval to Construct Application and
coordinate with the City for signatures. The Engineer shall then submit one set of the
agency review plans and specifications to the Maricopa County Environmental Services
Department for review. One review meeting will be conducted to discuss any comments
received from the County. The Engineer shall respond to the County’s comments and
incorporate the comments into the Final Construction Documents.
City of Glendale Building Safety. The Engineer shall complete the Building Permit
application and related requirements and submit the Agency Review Plans and
Specifications to the City Building Safety Department for approval. The Engineer shall
coordinate with the Building Safety Department and provide additional information as
requested.
ADWR Jurisdictional Dam Construction Permit. The Engineer shall complete the
ADWR Permit application and related requirements (Construction Quality Assurance Plan
Report) and submit the Agency Review Plans and Specifications to the ADWR for
approval. The Engineer shall coordinate with ADWR and provide additional information
as requested.
TASK 4.6 DESIGN SUBPHASE
Preparation of Agency Review Construction Documents (90%). The Engineer shall
prepare preliminary (90%) construction documents for including plans and specifications.
The plans shall incorporate the comments received on the 60% submittal and the review
meeting. The Engineer will submit one (1) electronic copy (in .pdf format) to the City and
Contractor. In addition, electronic copies (in .pdf format) will be provided to MCESD for
Approval to Construct. An Agency review design workshop will be conducted to discuss
any comments received from the City, Contractor, and MCESD.
Preparation of 100% Plans and Specifications. The final 100% plans and specifications
will be prepared incorporating the City and Maricopa County’s comments. The Engineer
will submit one (1) electronic copy (in .pdf format) to the Final plans and specifications to
the City and Contractor.
TASK 4.8.2 C ONSTRUCTION ADMINISTRATION SUBPHASE
Construction Schedule Review. The Engineer shall review the construction schedule with
particular emphasis on assuring that reasonable time allowances have been made for the
work required. The Engineer shall observe construction progress and maintain and issue a
monthly construction observation report. All updated schedules must be reviewed and
approved prior to issuance of monthly progress payments to the Contractor.
Preconstruction Conference. Conduct a preconstruction conference with the Contractor, the
City and other interested parties prior to issuance of the Notice to Proceed.
Conduct Project Meetings. The Engineer shall conduct bi-weekly construction project
meetings, prepare an agenda and minutes of the meeting, and distribute to all attendees.
Construction Observations. The Engineer shall provide on-site construction observation
services for all items of work required by the contract documents. The Engineer shall
monitor construction for compliance with the project plans and specifications. The on-site
representative shall be available for a minimum of 50 percent of the contract construction
period. The on-site representative shall visit the project site during the course of critical
construction activities, but not less than two times per week, depending on the status of
work per the Contractor’s construction schedule.
Weekly Status Reports. The Engineer shall compile weekly construction status reports
which summary the areas of work, quantities of completed work, materials delivered, tests
conducted, and any other pertinent construction activities.
Review Contractors Payment Applications. Review the Contractor's initial and updated
schedule of estimated monthly payments and advise the City as to acceptability. Review
the Contractor's monthly payment requests, and forward to the City for final approval and
processing. The Engineer's review shall be for the purpose of making an independent
opinion of work completed and mathematical check of the Contractor's payment request.
Engineer is responsible for verifying the quantities of work which are the basis of the
payment requests. The final monthly pay requests will be approved and processed by the
City.
Submittal Reviews. The Engineer shall review and approve all shop drawings. The
Engineer will advise the Contractor before the commencement of any work requiring a
shop drawing or sample submission if the submission has not been accepted by Engineer.
The Engineer shall maintain a submittal log and coordinate all reviews and any necessary
resubmittals.
RFI’s and Change Order Requests. The Engineer will interpret construction contract
documents and respond when requested by the City or Contractor for a clarification. The
Engineer shall review and make recommendations on all change order requests from the
Contractor, including applications for extension of construction time. Evaluate the cost
and scheduling aspects of all change orders. No change order shall be implemented without
the prior approval of the City.
TASK 4.8.2 C LOSEOUT SUBPHASE
As-Built Drawings and O&M Manual Review. The Engineer shall review the record as-
built drawings and O&M Manuals as compiled by the Contractor.
Substantial and Final Completion. Upon substantial completion, inspect the construction
work and prepare a punch-list of those items to be completed or corrected before final
completion of the project. Submit results of the inspection to the City and the Contractor.
The Engineer will maintain a running deficiency list and keep the Contractor informed as to
its current status. The Engineer will conduct, with the assistance of the City, a final inspection
and prepare a final punch list, including all items remaining on the deficiency list, as well as
any additional items discovered during the final inspection.
MCESD AOC. The Engineer shall prepare the Engineers Certificate of Completion and
application required for submittal to the Maricopa County Environmental Services
Department (MCESD) to obtain the Approval of Construction (AOC) for the project.
END SCOPE OF SERVICES
I. LABOR SUMMARY
Total
Milestone
Section
Section Description
Fee
1
4.3
Project Design Meetings (5 Months)
38,920
$
1
4.4.2
Permits (MCESD ATC, and Glendale Building Permit)
3,876
$
1
4.4.2
Permits (ADWR)
15,038
$
5
4.6.1e
90% Construction Documents Subphase Submittal
17,275
$
6
4.6.1f
100% Construction Documents Subphase Submittal
18,250
$
7
4.8.1
Construction Administration Subphase
7
4.8.1.2
CM@R Schedule Review
4,000
$
7
4.8.1.5
Pre-Construction Meeting
1,200
$
7
4.8.1.6
Progress Meetings (15 Months)
97,350
$
7
4.8.1.7
Schedule of Values Review
4,000
$
7
4.8.1.8
Construction Observation
245,280
$
7
4.8.1.9
Weekly Status Reports
15,600
$
7
4.8.1.10
Certify CM@R Progress Payments
3,900
$
7
4.8.1.11
RFI’s
39,300
$
7
4.8.1.13
Submittal Reviews
76,220
$
7
4.8.1.14
Change Order Reviews
10,536
$
8
4.8.2
Closeout Subphase
8
4.8.2.3
Review CM@R As-Built Drawings
3,900
$
8
4.8.2.4
Review CM@R Substantial Completion Punchlist
2,688
$
8
4.8.2.5
Review O&M Manuals
7,616
$
8
4.8.2.6
Prepare As-Builts
20,882
$
8
4.8.2.7
Final Completion Inspection
2,840
$
9
4.8.3.1
First Warranty Walkthrough
1,420
$
Subtotal - Wilson Labor Summary
630,091
$
II. REIMBURSEABLE EXPENSE/ALLOWANCE SUMMARY
Milestone
Task No.'s
Expense Description
Total
10
1.0
100% Structural Design - Blower No. 1
12,850
$
10
1.0
100% Structural Design - Blower No. 2
21,000
$
10
1.0
Structural Construction Administration and Inspecion
25,275
$
10
1.0
Subtotal Structural - Gannett Fleming
59,125
$
10
1.0
Additional Survey - Entellus
2,500
$
10
6.0
MCESD Review Fees
2,500
$
10
8.0
Misc. Engineering Allowance
100,000
$
164,125
$
III. TOTAL DESIGN SERVICES
Item
Item
Description
Amount
I.
I.
WILSON LABOR SUMMARY
630,091
$
II.
II.
EXPENSE/ALLOWANCE SUMMARY
164,125
$
III.
III.
TOTAL DESIGN SERVICES
794,216
$
SUBTOTAL - REIMBURSABLE EXPENSE SUMMARY
City of Glendale
Thunderbird Reservoir and Distribution Improvements
Design Services Amendment 1
FEE BREAKDOWN
1/15/2025
I. LABOR SUMMARY
Principal /
Sr Project
Senior
Project
Construction
CADD
Sr Professional
Manager
Engineer
Engineer
Inspector
Technician
Admin
Total
Total
Milestone
Section
Section Description
245.00
$
225.00
$
172.00
$
145.00
$
130.00
$
110.00
$
75.00
$
Hours
Fee
1
4.3
Project Design Meetings (5 Months)
20
60
60
60
20
220
38,920
$
1
4.4.2
Permits (MCESD ATC, and Glendale Building Permit)
4
8
8
4
0
24
3,876
$
1
4.4.2
Permits (ADWR)
2
8
24
24
44
4
106
15,038
$
5
4.6.1e
90% Construction Documents Subphase Submittal
2
15
30
30
30
8
115
17,275
$
6
4.6.1f
100% Construction Documents Subphase Submittal
2
20
30
30
30
6
118
18,250
$
7
4.8.1
Construction Administration Subphase
7
4.8.1.2
CM@R Schedule Review
8
8
8
24
4,000
$
7
4.8.1.5
Pre-Construction Meeting
2
2
2
6
1,200
$
7
4.8.1.6
Progress Meetings (15 Months)
30
180
180
180
570
97,350
$
7
4.8.1.7
Schedule of Values Review
8
8
8
24
4,000
$
7
4.8.1.8
Construction Observation
120
240
360
960
1680
245,280
$
7
4.8.1.9
Weekly Status Reports
120
120
15,600
$
7
4.8.1.10
Certify CM@R Progress Payments
30
30
3,900
$
7
4.8.1.11
RFI’s
8
30
70
70
30
60
268
39,300
$
7
4.8.1.13
Submittal Reviews
8
40
130
180
60
120
538
76,220
$
7
4.8.1.14
Change Order Reviews
2
18
18
20
58
10,536
$
8
4.8.2
Closeout Subphase
8
4.8.2.3
Review CM@R As-Built Drawings
30
30
3,900
$
8
4.8.2.4
Review CM@R Substantial Completion Punchlist
4
4
4
4
16
2,688
$
8
4.8.2.5
Review O&M Manuals
8
12
60
80
7,616
$
8
4.8.2.6
Prepare As-Builts
2
4
16
32
110
164
20,882
$
8
4.8.2.7
Final Completion Inspection
8
8
16
2,840
$
9
4.8.3.1
First Warranty Walkthrough
4
4
8
1,420
$
Subtotal - Wilson Labor Summary
78
$
533
$
638
$
1,026
$
1,444
$
218
$
278
$
4,215
$
630,091
$
II. REIMBURSEABLE EXPENSE/ALLOWANCE SUMMARY
Milestone
Task No.'s
Expense Description
Unit
Total Units
Cost / Unit
Total
10
1.0
100% Structural Design - Blower No. 1
Allowance
1
12,850
$
12,850
$
10
1.0
100% Structural Design - Blower No. 2
Allowance
1
21,000
$
21,000
$
10
1.0
Structural Construction Administration and Inspecion
Allowance
1
25,275
$
25,275
$
10
1.0
Subtotal Structural - Gannett Fleming
Allowance
1
-
59,125
$
10
1.0
Additional Survey - Entellus
Allowance
1
2,500
$
2,500
$
10
6.0
MCESD Review Fees
Allowance
1
2,500
$
2,500
$
10
8.0
Misc. Engineering Allowance
Allowance
1
100,000.00
$
100,000
$
164,125
$
III. TOTAL DESIGN SERVICES
Item
Item
Description
Amount
I.
I.
WILSON LABOR SUMMARY
630,091
$
II.
II.
EXPENSE/ALLOWANCE SUMMARY
164,125
$
III.
III.
TOTAL DESIGN SERVICES
794,216
$
SUBTOTAL - REIMBURSABLE EXPENSE SUMMARY
City of Glendale
Thunderbird Reservoir and Distribution Improvements
Design Services Amendment 1
FEE BREAKDOWN
1/15/2025
Section
Description
Included
Excluded
4.1
General Information
X
4.2
Investigation of Existing Conditions
X
4.3
Meetings and Communication
X
4.4
Design Responsibilities
4.4.1
Identity
X
4.4.2
Code Compliance
X
4.4.3
Subconsultant Coordination
X
4.4.4
Accessible
X
4.4.5
Sustainable
X
4.4.6
Life-Cycle Model
X
4.4.7
Energy Model
X
4.4.8
Hydrology Report
X
4.4.9
SHPO Coordination
X
4.4.10
Geotechnical Report
X
4.4.11
Project Survey
X
4.5
Furniture, Fixtures and Equipment
X
4.6
Design Review Submittals
4.6.1a
Program Development Subphase Submittal
X
4.6.1b
Conceptual Design (Design Report) Subphase Submittal
X
4.6.1c
Schematic Design (30% Plans) Subphase Submittal
X
4.6.1d
Design Development (60% Plans and Specs) Subphase Submittal
X
4.6.1e
90% Construction Documents Subphase Submittal
X
4.6.1f
100% Construction Documents Subphase Submittal
X
4.7
Design Phase Services and Documents
X
4.8
Construction Phase Services and Documents
4.8.1
Construction Administration Subphase
4.8.1.1
Commence
X
4.8.1.2
CM@R Schedule Review
X
4.8.1.3
Reserved
X
4.8.1.4
Authority
X
4.8.1.5
Pre-Construction Meeting
X
4.8.1.6
Progress Meetings
X
4.8.1.7
Schedule of Values Review
X
4.8.1.8
Construction Observation
X
4.8.1.9
Weekly Status Reports
X
4.8.1.10
Certify CM@R Progress Payments
X
4.8.1.11
RFI’s
X
4.8.1.12
Respond to Claims
X
4.8.1.13
Submittal Reviews
X
4.8.1.14
Change Order Reviews
X
4.8.1.15
Direct Changes
X
4.8.1.16
Rejection of Work
X
4.8.1.17
Notification of Refusal to perform Work
X
4.8.1.18
Perform DP Responsibilities in CM@R Contract
X
4.8.1.19
Written Changes Required
X
4.8.2
Closeout Subphase
4.8.2.1
Schedule pre-closeout meeting
X
4.8.2.2
Review Closeout Documents
X
4.8.2.3
Review CM@R As-Built Drawings
X
4.8.2.4
Review CM@R Substantial Completion Punchlist
X
4.8.2.5
Review O&M Manuals
X
4.8.2.6
Prepare As-Builts
X
4.8.2.7
Final Completion Inspection
X
4.8.2.8
Claims
X
4.8.2.9
Keys
X
4.8.3
CM@R Warranty Subphase
4.8.3.1
First Warranty Walkthrough
X
4.8.3.2
MEP Testing and Balancing
X
4.8.3.3
Second Warranty Walkthrough
X
City of Glendale
Thunderbird Reservoir and Distribution Improvements
Design and Construction Administration
Inclusions/Exclusions vs Exhibit A Scope of Services
Gannett Fleming, Inc.
Suite 1900 • 3838 N. Central Avenue • Phoenix, AZ 85012-1957
t: 602.553.8817 • f: 602.553.8816
www.gannettfleming.com
Gannett Fleming, West Structures
January 3, 2025
P23-036 Blower Support
Subject: City of Glendale – Thunderbird Reservoir and Distribution Improvements
Design and Construction Administration and Inspection Services
Two Blowers - Support Over Reservoir Roof
Client: Wilson Engineers
Structural Scope of Services
Description of Project
Gannett Fleming will provide structural 90% and 100% engineering design for the construction
of the two blowers supported above the reservoir as outlined below. These services shall be
designed in accordance with the 2018 IBC with City of Glendale addendums and the standard
of care for structural engineering in the state of Arizona,
Project Location: 67th Avenue, north of Deer Valley Road.
North of 22675 N. 67th Avenue.
Scope of Services
1. Attend meetings by remote conference.
2. Prepare 90% and 100% structural calculations and design sketches for:
a. Support system for elevating the two blower units above the reservoir roof: Blower No. 1
(project northwest direction) (blower near the site entrance) and Blower No. 2 (project
southeast direction) (blower near the existing overflow structure).
b. Concrete foundations for blower support system.
3. Deliver structural drawings for the 90% and 100% submittals.
4. Provide structural responses to Wilson and City drawing review comments for the 90% and
100% submittals.
5. Perform quality planning, quality control, and quality assurance in conformance with GF
project management guidelines, including internal reviews for drawing verification,
calculations verification, and constructability.
6. Construction phase services are included in this scope of services.
7. Review of specifications for structural coordination and edit are not included in this scope of
services.
8. Gannett Fleming will not provide construction estimates or opinion of probable construction
cost.
P23-036 Blower
P a g e | 2
Thunderbird Reservoir – Blower over roof Support System - Design Proposal
Assumptions and Conditions:
1. Wilson will provide GF with a geotechnical report for the project.
2. Existing drawings will be provided by the owner and/or Wilson.
3. Architectural, mechanical, electrical, civil, survey etc. will be provided by others.
4. Design of pavement for truck and vehicle traffic will be designed by others.
5. Gannett Fleming will not be responsible for construction means and methods or job site
safety.
6. Compensation for mileage for site visits or inspections are not included.
Compensation and Payments:
Gannett Fleming, Inc. proposes to perform the structural services described above and in the
attached schedule for Time and Material – Not to Exceed (T&M – N2E) compensation fee and
billed monthly for:
1.
Blower No. 1 – 90% & 100% Design ............................ $ 12,850.00
2.
Blower No. 2 – 90% & 100% Design ............................. $ 21,000.00
3.
Blower No. 1 & 2 – Construction Administration and
Inspection Services ....................................................... $ 25,275.00
TOTAL = $ 59,125.00
See the Schedule of Services on the following pages
P23-036 Blower
P a g e | 3
Thunderbird Reservoir – Blower over roof Support System - Design Proposal
Design services: Blower No. 1
Project Name
BLOWER NO. 1
*Principal
*Senior
Project
Manager
*Project
Engineer
*Senior CADD
Technician
*Administrative
Assistant
Total
Tasks
Project Management
2
4
3
9
Specifications - not included
0
Submittals: 90% & 100% Design
Sheet List
0
0
Blower Cantilever Support
12
10
22
Sections & details
14
16
30
QA/QC
6
6
12
Total hours
2
36
0
32
3
73
Hourly rate
270.00
$
225.00
$
170.00
$
125.00
$
70.00
$
Fee by category
540.00
$
8,100.00
$
-
$
4,000.00
$
210.00
$
Total labor
12,850.00
$
Miscellaneous expense
-
$
Blower No. 1 Finalize Design - T&M N2E
12,850.00
$
Additional Personnel
Hourly Rate
Senior Engineer
$ 215.00
Project Manager
$ 190.00
Senior Designer
$ 150.00
Structural Engineer
$ 150.00
CADD Technician
$ 105.00
Designer (EIT)
$ 105.00
Senior Inspector
$ 145.00
Inspector
$ 115.00
P23-036 Blower
P a g e | 4
Thunderbird Reservoir – Blower over roof Support System - Design Proposal
Design services: Blower No. 2
Project Name
BLOWER NO. 2
*Principal
*Senior
Project
Manager
*Project
Engineer
*Senior CADD
Technician
*Administrative
Assistant
Total
Tasks
Project Management
2
4
3
9
Specifications - not included
0
Submittals: 90% & 100% Design
Sheet List
0
0
Blower Cantilever Support
26
10
36
Sections & details
30
20
50
QA/QC
10
6
16
Total hours
2
70
0
36
3
111
Hourly rate
270.00
$
225.00
$
170.00
$
125.00
$
70.00
$
Fee by category
540.00
$
15,750.00
$
-
$
4,500.00
$
210.00
$
Total labor
21,000.00
$
Miscellaneous expense
-
$
Blower No. 2 Design - T&M N2E
21,000.00
$
Additional Personnel
Hourly Rate
Senior Engineer
$ 215.00
Project Manager
$ 190.00
Senior Designer
$ 150.00
Structural Engineer
$ 150.00
CADD Technician
$ 105.00
Designer (EIT)
$ 105.00
Senior Inspector
$ 145.00
Inspector
$ 115.00
P23-036 Blower
P a g e | 5
Thunderbird Reservoir – Blower over roof Support System - Design Proposal
Construction Administration and Inspection (CAI) services: Blower No. 1 and 2
Project Name
BLOWER NO. 1 & 2 CAI
*Principal
*Senior
Project
Manager
*Project
Engineer
*Senior CADD
Technician
*Senior
Inspector
*Administrative
Assistant
Total
Tasks
Project Management
2
6
6
4
3
21
RFIs (6 assumed)
2
9
12
2
25
Shop Drawings / Submittal Review
Concrete Mix Design
2
2
Foundation - Reinforcing
4
6
10
Wall - Reinforcing
4
6
Slab - Reinforcing
4
6
10
Miscellaneous
2
2
4
Stairs
2
4
6
Inspections
Foundations
14
14
Walls
16
16
Slabs
16
16
Record Drawings
2
4
6
12
Total hours
4
35
46
6
52
3
146
Hourly rate
270.00
$
225.00
$
170.00
$
125.00
$
145.00
$
70.00
$
Fee by category
1,080.00
$
7,875.00
$
7,820.00
$
750.00
$
7,540.00
$
210.00
$
Total labor
25,275.00
$
Miscellaneous expense
-
$
Blower No. 1 & 2 - T&M N2E
25,275.00
$
Additional Personnel
Hourly Rate
Senior Engineer
$ 215.00
Project Manager
$ 190.00
Senior Designer
$ 150.00
Structural Engineer
$ 150.00
CADD Technician
$ 105.00
Designer (EIT)
$ 105.00
Senior CADD Technician
$ 125.00
Inspector
$ 115.00
Sheet
Description
Revised
New
G-300
Overall Site Plan
X
C-300
Overall Grading Plan
X
C-301
Grading and Drainage Plan 1
X
C-302
Grading and Drainage Plan 2
X
M-100
Blower 1 Plan & Sections
X
M-110
Blower 2 Plan & Sections
X
M-150
Sodium Hypochlorite Plan and Sections
X
M-155
Sodium Hypochlorite Section and Details
X
S-100
Blower 1 Cantilever Support
X
S-101
Blower 1 Cantilever Support Sections & Details
X
S-102
Blower 2 Cantilever Support
X
S-103
Blower 2 Cantilever Support Sections & Details
X
E-100
Electrical Single Line Diagram
X
E-101
Electrical Panel Schedules
X
E-400
Reservoir Site Plan
X
E-401
Reservoir Chlorination System Plan
X
E-101
Reservoir P&ID - 1
X
E-102
Reservoir P&ID - 2
X
City of Glendale
Thunderbird Reservoir and Distribution Improvements
Amendment 1 Sheet List for Second Construction Plan Set
1/15/2024
ID
Task Name
Duration
Start
Finish
1
Thunderbird Reservoir and Distribution Improvements Project
908 days
Wed 10/18/23
Fri 4/9/27
2
1.0 Preliminary Design
196 days
Wed 10/18/23
Wed 7/17/24
3
1.1 Design Development
0 days
Wed 10/18/23
Wed 10/18/23
5
1.2 Data Collection, Review, and Design Coordination
35 days
Wed 10/18/23
Tue 12/5/23
9
1.3 Design Basis Report/30% Design
161 days
Wed 12/6/23
Wed 7/17/24
13
2.0 Contract Document Preparation
199 days
Thu 7/18/24
Tue 4/22/25
14
2.1 Preparation of 60% Construction Documents
76 days
Thu 7/18/24
Thu 10/31/24
18
2.2 Preparation of BPS 90% Plans and Specifications
60 days
Fri 11/1/24
Thu 1/23/25
19
2.2.1 90% Plan, Specs, and Final Design Report
46 days
Fri 11/1/24
Fri 1/3/25
20
2.2.2 City Review
14 days
Mon 1/6/25
Thu 1/23/25
21
2.2.3 Design Workshop Meeting
1 day
Wed 1/15/25
Wed 1/15/25
22
2.3 Preparation of TB 90% Plans and Specifications
128 days
Fri 10/25/24
Tue 4/22/25
23
2.3.1 Blower Alternatives Evaluation and Cost Estimate
38 days
Fri 10/25/24
Tue 12/17/24
24
2.3.2 City Meeting
1 day
Wed 12/18/24
Wed 12/18/24
25
2.3.3 Contract Amendment Processing
50 days
Thu 12/19/24
Wed 2/26/25
26
2.3.4 90% Plan, Specs, and Final Design Report
25 days
Thu 2/27/25
Wed 4/2/25
27
2.3.5 City Review
14 days
Thu 4/3/25
Tue 4/22/25
28
2.3.6 Design Workshop Meeting
1 day
Wed 4/16/25
Wed 4/16/25
29
3.0 Permitting Services
123 days
Mon 1/6/25
Wed 6/25/25
30
3.1 BPS Permitting
55 days
Mon 1/6/25
Fri 3/21/25
31
3.1.1 ATC and Building Permit Application
10 days
Mon 1/6/25
Fri 1/17/25
32
3.1.2 Glendale and MCESD Review
20 days
Mon 1/20/25
Fri 2/14/25
33
3.1.3 Permit Review Comment Responses/100% Submittal
10 days
Mon 2/17/25
Fri 2/28/25
34
3.1.4 Glendale and MCESD Second Review
15 days
Mon 3/3/25
Fri 3/21/25
35
3.2 TB Permitting
60 days
Thu 4/3/25
Wed 6/25/25
36
3.1.1 ADWR, ATC, and Building Permit Application
5 days
Thu 4/3/25
Wed 4/9/25
37
3.1.2 ADWR, Glendale, and MCESD Review
30 days
Thu 4/10/25
Wed 5/21/25
38
3.1.3 Permit Review Comment Responses/100% Submittal
10 days
Thu 5/22/25
Wed 6/4/25
39
3.1.4 ADWR, Glendale, and MCESD Second Review
15 days
Thu 6/5/25
Wed 6/25/25
40
4.0 Construction and GMP
590 days
Mon 1/6/25
Fri 4/9/27
41
4.1 For Construction GMP Development
110 days
Mon 1/6/25
Fri 6/6/25
42
4.2 Constuction
480 days
Mon 6/9/25
Fri 4/9/27
10/18
1/15
4/16
Sep
Nov
Jan
Mar
May
Jul
Sep
Nov
Jan
Mar
May
Jul
Sep
Nov
Jan
Mar
May
Jul
Sep
Nov
Jan
Mar
May
Quarter
1st Quarter
3rd Quarter
1st Quarter
3rd Quarter
1st Quarter
3rd Quarter
1st Quarter
3
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
City of Glendale
Thunderbird Reservoir and Distribution Improvements
Wed 1/15/25
Page 1