PowerPoint Presentation (Added 2/28/2025)*
Extracted text (via pymupdf)
51294 characters
FY2026-2035 10-Year Capital Improvement Plan March 4th, 2025 Agenda 2 • Capital Improvement Plan (CIP) Overview • Capital Improvement Plan Projects • Council Discussion Budget Calendar 3 Item Date Workshop #1 – Budget Overview / Revenues / Five-Year Financial Forecasts January 28, 2025 Workshop #2 – FY26-35 Capital Improvement Plan March 4, 2025 Workshop #3 – (All Day) FY26 Operating Budget Department Presentations April 1, 2025 Workshop #4 – FY26 Operating, CIP, Debt, Contingency April 22, 2025 Voting Meeting – Tentative Budget Adoption May 13, 2025 Voting Meeting – Final Budget Adoption / Property Tax Levy June 10, 2025 Voting Meeting – Property Tax Adoption June 24, 2025 Capital Improvement Plan 4 What is a Capital Improvement Plan (CIP)? 5 • 10-Year “roadmap” for creating, maintaining and paying for current and future capital needs • CIP Projects are: • Cost $50,000 or more • Useful life of 5+ years • Examples of CIP Projects: • Fire and Police Stations • City Buildings (Libraries, Court Facilities, Office Buildings) • Parks, Recreation Centers, Libraries • Water and Wastewater Treatment Plants • Streets, Bridges, Traffic Signals • Flood Control (Storm Drains, Retention Basins) • Major Equipment Purchases (Fire Trucks, Street Sweepers, etc.) Life Cycle of a CIP Project 6 Study Design Construction Furniture, Fixtures and Equipment (Vertical Construction) Project Completion Life Cycle of a Vertical Construction Project Life Cycle of a CIP Project 7 Life Cycle of a Horizontal Construction Project Study Design Construction Project Completion Examples of CIP Projects 8 Before After Examples of CIP Projects 9 Examples of CIP Projects 10 Before After Examples of CIP Projects 11 Why Do We Do Capital Planning? 12 • Strategic Planning • Fiscal Management • Community Improvement • Transparency and Accountability • Risk Management • Leveraging Funding Why Do We Do Capital Planning? 13 • City Council Financial Policy on Capital Asset and Debt Management A. Improve existing assets B. Replace existing assets as needed C. Construct new assets • Government Finance Officers Association (GFOA) Best Practice CIP Process 14 Staff Develops 5-year Financial Forecasts Departments work with Engineering on Project Scope/Timelines Projects are Submitted to Budget and Finance Budget and Finance Evaluates Funding Sources for Projects Proposed CIP Presented to Council Budget and Finance Evaluates Funding Sources for Projects Council Adopts 10-Year CIP (Year 1 Appropriated) How is the CIP Funded? 15 • Year 1 (FY26) is appropriated as part of the budget • Funding Sources: • Cash (Fund Balance + Revenue) • Bonds (Debt) • General Obligation Bond funded projects in Library, Government Facilities, Parks, and Flood Control require additional voter authorization • Grants • Carryover What is Carryover? 16 • Carryover is funding that is “carried over” from one fiscal to the next • Carryover occurs when a project takes more than one budget year • Budget and Finance works with Departments during budget development to estimate carryover from current fiscal year (FY25) to upcoming fiscal year (FY26) • If a project has carryover, the carryover funds remain in the same project/funding source • Carryover is adjusted after the fiscal year is closed, when all prior fiscal year expenses have been recorded. FY2026 Change Document 17 Project Slides (Presentation Only) 18 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPK25019 GREENWAY GRANADA PARK IMPROVEMENTS 0 0 0 0 817,500 0 0 817,500 CIPPK25020 SUNSET RIDGE PARK IMPROVEMENTS 0 0 0 0 267,550 0 0 267,550 CIPPK25068 SAHUARO RANCH PARK BUILDOUT 0 0 0 0 0 0 27,627,489 27,627,489 CIPPK25076 ROSE LANE POOL REPAIRS 22,096 0 0 0 0 0 0 22,096 CIPPK26004 PARK SIGNAGE IMPROVEMENTS 0 0 150,000 0 0 0 1,011,880 1,161,880 CIPPK26010 DOS LAGOS PARK IMPROVEMENTS 0 0 0 267,550 0 0 0 267,550 CIPPK73576 FOOTHILLS PARK PICKLEBALL COURTS 9,459 0 0 0 403,650 0 0 413,109 CIP Funding Sources 19 • Development Impact Fees • One-time charges to developers for new development • Can only be used for new or expanded infrastructure • General Obligation Bonds • Debt issuance must be authorized by Voters • Streets, Public Safety, Parks, Government Facilities, Open Space/Trails, Libraries, and Flood Control • Parks, Government Facilities, Libraries and Flood Control require additional voter authorization via special bond election • Debt service paid by Secondary Property Tax CIP Funding Sources 20 • Grants • Federal or state grant funding • Often require a match contribution to the project • Pay-As-You-Go • Cash funded projects CIP Funding Sources 21 • Special Revenue Funds • Transportation Sales Tax • Half cent sales tax • Improve service for all modes of transportation • Highway User Revenue Funds • Restricted Special Revenue Fund • Right of Way acquisition, construction, reconstruction, maintenance, and repair • Enterprise Funds • Water/Sewer • Funding can come from G. O. Bonds, revenue bonds, revenue obligations or cash financing • Debt service paid from future water/sewer fee revenue • Landfill – paid by Landfill user fees • Solid Waste – paid by Solid Waste user fees Project Detail Report 22 CIP Funding Sources 23 Pay-As-You-Go Funds • 1080 – General Government Capital Projects (General Fund) • 2110 – Arts Commission General Obligation Bonds • 4010 & 4011 – Streets Construction • 4040 & 4041 – Public Safety Construction • 4050 – Parks Construction • 4060 & 4061 – Government Facilities • 4080 – Cultural Facility • 4090 & 4091 – Open Space/Trail Construction • 4100 & 4101 – Library Construction • 4110 – Flood Control Construction CIP Funding Sources 24 Development Impact Fees (DIF) • 4173 – Fire (2019 DIF) • 4223 – Police (2014 DIF) • 4284 – Libraries (2019 DIF) • 4383 – Parks & Rec (2019 DIF) • 4410 – Streets Zone 1 East (2014 DIF) • 4420 – Streets Zone 2 West (2014 DIF) • 4431 – Streets East (2019 DIF) • 4434 – Streets West (2023 DIF) • 6065 – Water (2014 DIF) • 6071 – Water (2019 DIF) • 6101 – Sewer (2019 DIF) CIP Funding Sources 25 Special Revenue Funds • 2050 – HURF Operating (Pavement Management) • 4020 – HURF Capital • 2070 – TST Operating (Pavement Management) • 4030 – Transportation Sales Tax Capital • 2071 – Transportation Streets in Lieu Fund (SILF) • 2200 – GRPSTC Revenue CIP Funding Sources Enterprise User Fees • 6020 – Water • 6030 – Sewer • 6110 – Landfill • 6120 – Solid Waste Grants • 2060 – Transportation Grants • 2160 – Other Grants • 2190 – Airport Capital Grants • 4610 – ARPA Capital Projects 26 FY2025 10-Year Adopted CIP By Project Type 27 Streets $443.4M Water $364.8M Public Safety $276.7M Wastewater $211.0M Facility Maintenance $195.8M Parks $133.7M Parking Lots $76.5M Solid Waste $53.4M Airport $46.6M Library $42.0M Drainage $41.6M Landfill $36.5M Transit $12.7M Arts $1.0M Total FY25-34 CIP $1.94B FY2026 10-Year Proposed CIP By Project Type 28 Water $744.3M Streets $473.8M Public Safety $305.1M Wastewater $303.9M Parks $121.0M Facility Maintenance $105.2M Solid Waste $57.7M Drainage $56.4M Airports $54.5M Landfill $44.0M Library $36.9M Parking Lots $21.7M Tranist $11.2M Arts $1.0M Total FY26-35 CIP $2.3B 10-Year Proposed CIP by Funding Source 29 Enterprise Funds $1,147.4M Bond Funds $436.3M Special Revenue Funds $396.7M Pay-As-You-Go $183.4M Grants $106.8M DIF $66.0M Total FY26-35 CIP $2.3B One-Year Proposed Capital Improvement Plan 30 Streets $100.3M Water $62.6M Public Safety $47.1M Wastewater $39.2M Parks $31.9M Facility Maintenance $30.0M Drainage $28.9M Parking Lots $17.2M Airports $13.4M Library $11.1M Solid Waste $7.9M Landfill $7.1M Transits $6.4M Arts $1.0M Total FY25-26 CIP $404.1M Funded by Water Enterprise Fees (99%) and Water DIF (1%) Capital Improvement Plan Priorities: • Provide water supply from multiple sources • Maintain a resilient and secure infrastructure • Meet all Federal and State regulations Major Projects for first five years: • Rehab water lines, booster stations and reservoirs • Rehab water treatment plants • Add new groundwater wells and rehab existing • Add water rights and supply infrastructure 31 FY26-35 Water CIP Overview FY26-35 Water by Funding Source 32 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 6020 WATER 12,329,037 45,381,048 52,204,064 49,453,940 59,285,240 44,018,160 470,510,000 733,181,489 6065 2014-DIF WATER 784,978 0 0 0 0 0 0 784,978 6071 2019-WATER DIF 2,233,435 1,850,000 3,800,000 1,175,000 1,275,000 0 0 10,333,435 TOTAL 15,347,450 47,231,048 56,004,064 50,628,940 60,560,240 44,018,160 470,510,000 744,299,902 FY26-35 Water Projects 33 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPWA19018 WATER RIGHTS & OTHER SUPPLY SOURCES 660,000 660,000 3,650,000 1,025,000 1,025,000 1,025,000 875,000 8,920,000 CIPWA19020 SCADA IMPROVEMENTS 237,053 1,650,000 1,300,000 1,400,000 1,300,000 1,300,000 7,000,000 14,187,053 CIPWA19021 STORAGE & RECOVERY WELLS REHAB 117,570 800,000 500,000 460,000 420,000 420,000 2,200,000 4,917,570 CIPWA19022 GROUNDWATER WELLS & INTERCONNECTS 1,946,266 10,500,000 10,500,000 8,500,000 9,000,000 8,500,000 10,000,000 58,946,266 CIPWA21022 OASIS WTP IMPROVEMENTS 178,148 500,000 500,000 1,000,000 3,000,000 3,000,000 26,500,000 34,678,148 CIPWA21023 PYRAMID PEAK WTP IMPROVEMENT 175,820 1,580,000 1,750,000 2,540,000 2,500,000 2,500,000 43,000,000 54,045,820 CIPWA21024 CHOLLA WTP IMPROVEMENTS 1,343,715 6,000,000 8,000,000 7,000,000 7,000,000 3,000,000 45,000,000 77,343,715 CIPWA22071 WATER LINE - 59TH-GLENN TO NORTHERN 83,003 0 0 0 0 0 0 83,003 CIPWA22074 DATA MANAGEMENT PROGRAM 25,000 0 0 0 0 0 0 25,000 CIPWA23008 WATER METER DATA COLLECTION SYSTEM 6,724,921 4,000,000 10,000,000 10,000,000 6,000,000 0 0 36,724,921 FY26-35 Water Projects 34 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPWA23009 FACILITIES REHAB – WATER 96,015 202,000 202,000 202,000 202,000 202,000 1,000,000 2,106,015 CIPWA23011 WATER DEVELOPMENT INFRASTRUCTURE 648,224 150,000 150,000 150,000 250,000 250,000 750,000 2,348,224 CIPWA26001 BARTLETT LAKE ADDITIONAL SPACE 0 3,490,000 500,000 4,000,000 4,000,000 0 0 11,990,000 CIPWA26002 ADVANCED WATER PURIFICATION FACILIT 0 384,048 52,064 2,736,940 13,963,240 12,271,160 231,935,000 261,342,452 CIPWA60017 WATER & WASTEWATER SYSTEMS MODELING 187,477 150,000 150,000 150,000 150,000 150,000 750,000 1,687,477 CIPWA60018 LABORATORY EQUIPMENT REPLACEMENT 99,386 150,000 150,000 150,000 500,000 150,000 0 1,199,386 CIPWA60019 VEHICLE REPLACEMENT PROGRAM 883,412 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 7,500,000 15,883,412 CIPWA61001 WATER VALVE REPLACEMENT PRGM 68,361 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 7,500,000 15,068,361 CIPWA61013 WATER LINE REHABILITATION PROGRAM 171,869 5,300,000 5,800,000 4,800,000 6,000,000 6,000,000 50,000,000 78,071,869 CIPWA61023 WATER SYSTEM SECURITY 127,000 150,000 150,000 150,000 150,000 150,000 350,000 1,227,000 FY26-35 Water Projects 35 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPWA61045 THUNDERBIRD RESERV & DIST SYS IMPRV 379,748 5,500,000 6,000,000 0 0 0 0 11,879,748 CIPWA61047 METER VAULT REPLACEMENT PROGRAM 200,000 515,000 500,000 515,000 500,000 500,000 2,500,000 5,230,000 CIPWA61048 GROUNDWATER WELL REHAB PROGRAM 74,169 550,000 1,650,000 850,000 100,000 100,000 24,650,000 27,974,169 CIPWA61054 DISTRIBUTION SYSTEM IMPROV PROGRAM 150,875 500,000 200,000 500,000 200,000 200,000 2,500,000 4,250,875 CIPWA61061 WATER CAPITAL EQUIPMENT REPLACEMENT 760,418 700,000 700,000 700,000 700,000 700,000 3,500,000 7,760,418 CIPWA61062 TRANSMISSION LINE & VALVE ASSESSMNT 9,000 800,000 600,000 800,000 600,000 600,000 3,000,000 6,409,000 TOTAL 15,347,450 47,231,048 56,004,064 50,628,940 60,560,240 44,018,160 470,510,000 744,299,902 Funded by Sewer Enterprise Fees (98%) and Sewer DIF (2%) Capital Improvement Plan Priorities: • Maintain a resilient and secure infrastructure • Meet all Federal and State regulations Major Projects for first five years: • Rehab sewer lines, manholes and lift stations • 91st Avenue Wastewater Treatment Plant • Rehabilitate West Area Water Reclamation Facility 36 FY26-35 Wastewater CIP Overview FY26-35 Wastewater by Funding Source 37 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 6030 SEWER 10,156,531 28,360,000 20,460,000 24,956,000 27,076,000 23,150,000 162,750,000 296,908,531 6101 2019-SEWER DIF 0 700,000 700,000 700,000 700,000 700,000 3,500,000 7,000,000 TOTAL 10,156,531 29,060,000 21,160,000 25,656,000 27,776,000 23,850,000 166,250,000 303,908,531 FY26-35 Wastewater Projects 38 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPWW19088 ARROWHEAD SEWER LINE 2,439,408 3,000,000 100,000 3,000,000 0 0 5,000,000 13,539,408 CIPWW21026 WEST AREA WRF IMPROV - PHASE 3 1,278,201 5,000,000 1,000,000 3,600,000 4,800,000 4,800,000 22,050,000 42,528,201 CIPWW21027 ARROWHEAD WRF IMPROVEMENTS 127,292 2,000,000 2,950,000 2,950,000 1,500,000 1,500,000 15,000,000 26,027,292 CIPWW22076 SEWER LINE REHAB PROGRAM 51,923 4,073,400 3,754,000 3,450,000 8,550,000 6,049,000 54,495,000 80,423,323 CIPWW22077 LIFT STATION & FORCE MAIN REHAB 300,914 3,225,000 2,225,000 3,425,000 2,425,000 1,500,000 2,500,000 15,600,914 CIPWW22090 VISION 2 DEVELOPMENT PROJECT 36,437 0 0 0 0 0 0 36,437 CIPWW23010 FACILITIES REHAB – SEWER 145,117 261,600 101,000 101,000 101,000 101,000 505,000 1,315,717 CIPWW23012 SEWER DEVELOPMENT INFRASTRUCTURE 0 700,000 700,000 700,000 700,000 700,000 3,500,000 7,000,000 CIPWW60016 WEST AREA WRF IMPROV PH 1 2,041,596 0 0 0 0 0 0 2,041,596 CIPWW63003 99TH AVE INTERCEPTOR LINE 1,092,097 3,500,000 4,000,000 100,000 1,300,000 300,000 9,000,000 19,292,097 FY26-35 Wastewater Projects 39 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPWW63010 91ST AVENUE WWTP IMPROVEMENTS 1,905,653 6,000,000 5,000,000 7,000,000 7,000,000 7,500,000 35,000,000 69,405,653 CIPWW63024 SEWER MANHOLE REHAB PROGRAM 81,411 500,000 530,000 530,000 600,000 600,000 9,200,000 12,041,411 CIPWW63030 LIFT STATION REHAB- 67TH AVE & ACDC 409,279 0 0 0 0 0 0 409,279 CIPWW63031 WASTEWATER CAPITAL EQUIPMENT 44,835 500,000 500,000 500,000 500,000 500,000 5,000,000 7,544,835 CIPWW63032 WASTEWATER COLLECTION IMPROVEMENTS 202,368 300,000 300,000 300,000 300,000 300,000 5,000,000 6,702,368 TOTAL 10,156,531 29,060,000 21,160,000 25,656,000 27,776,000 23,850,000 166,250,000 303,908,531 40 FY26-35 Transit CIP Overview • Funded by Transportation Sales Tax (64%) and Transportation Grants (36%) • Projects include: – Bus Stop Enhancements – Transit Bus Fleet Replacement FY24-33 Transit by Funding Source 41 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 2060 TRANSPORTATION GRANTS 2,000,000 2,010,000 0 0 0 0 0 4,010,000 4030 TRANSPORTATION CAPITAL PROJ 1,839,987 504,864 509,362 518,949 523,628 533,401 2,771,998 7,202,189 TOTAL 3,839,987 2,514,864 509,362 518,949 523,628 533,401 2,771,998 11,212,189 FY24-33 Transit Projects 42 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPTR21013 NORTH GLENDALE PARK & RIDE PROJECT 3,109,764 0 0 0 0 0 0 3,109,764 CIPTR22069 BUS STOP ENHANCEMENTS 277,420 224,864 229,362 233,949 238,628 243,401 1,291,998 2,739,622 CIPTR22095 TRANSIT BUS FLEET REPLACEMENT 0 2,010,000 0 0 0 0 0 2,010,000 CIPTR65022 TRANSP. PROG. ENGR. CONSULTANT 452,803 280,000 280,000 285,000 285,000 290,000 1,480,000 3,352,803 TOTAL 3,839,987 2,514,864 509,362 518,949 523,628 533,401 2,771,998 11,212,189 FY26-35 Streets CIP Overview 43 • Funding Sources: • Transportation Sales Tax (56%) • HURF (13%) • Streets G. O. Bonds (14%) • Development Impact Fees (8%) • Transportation Grants (6%) • General Fund (3%) FY26-35 Streets CIP Overview 44 • Projects Include: • 67th Avenue and Greenway Intersection • Pavement Management • Right Of Way Landscape Plan FY26-35 Streets by Funding Source 45 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 1080 GENERAL GOVERNMENT CAPITAL PRJ 8,513,987 1,505,994 579,744 590,848 602,286 614,066 1,048,000 13,454,925 2050 HIGHWAY USER REVENUE FUND 0 3,253,124 3,415,780 3,586,568 3,765,897 3,954,192 22,941,878 40,917,439 2060 TRANSPORTATION GRANTS 2,095,862 3,410,938 18,909,337 1,507,442 636,100 1,591,023 0 28,150,702 2070 TRANSPORTATION SALES TAX 49,668 15,877,226 16,318,111 17,032,581 16,998,533 18,164,747 99,665,638 184,106,504 2071 TRANSPORTATION SILF 0 2,500,000 2,500,000 0 0 0 0 5,000,000 4010 STREETS CONSTRUCTION 0 2,719,828 6,508,637 9,166,221 7,401,587 9,005,961 27,143,895 61,946,129 4011 2024 STREET BONDS 5,866,825 0 0 0 0 0 0 5,866,825 4020 HURF CAPITAL PROJECTS 2,328,855 3,621,719 1,235,293 2,164,061 1,293,645 2,224,076 7,708,286 20,575,935 4030 TRANSPORTATION CAPITAL PROJ 18,280,813 17,450,677 21,055,027 2,498,608 6,701,904 2,508,249 10,814,834 79,310,112 4410 2014-DIF STREETS ZONE 1 EAST 556,200 0 0 0 0 0 0 556,200 FY26-35 Streets Projects 46 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 4420 2014-DIF STREETS ZN 2 WEST 101 937,975 0 0 0 0 0 0 937,975 4431 2019-DIF-STREETS 7,610,564 1,755,398 3,115,380 489,600 2,546,899 2,121,220 2,706,080 20,345,141 4434 2023-DIF STREETS WEST 967,896 967,896 124,209 380,080 1,777,844 5,726,537 2,718,800 12,663,262 TOTAL 47,208,645 53,062,800 73,761,518 37,416,009 41,724,695 45,910,071 174,747,411 473,831,149 FY26-35 Streets Projects 47 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST19006 PAVEMENT MANAGEMENT 49,668 19,130,350 19,733,891 20,619,149 20,764,430 22,118,939 122,607,516 225,023,943 CIPST19010 BALLPARK BOULEVARD 25,841 0 0 0 0 0 0 25,841 CIPST19048 CAPITAL BRIDGE REPAIR PROGRAM 213,036 772,054 371,598 390,177 409,685 430,171 2,495,808 5,082,529 CIPST20012 FLASHING YELLOW ARROWS 513,245 209,600 0 0 0 0 0 722,845 CIPST20013 VEHICLE REPLACEMENT 1,453,442 583,890 607,246 631,534 656,796 683,069 3,847,707 8,463,684 CIPST20022 BIKE PROJECTS (LOCAL MATCH) 138,942 146,072 148,994 151,973 155,013 158,113 839,284 1,738,391 CIPST21001 TELECOM CONDUITS 628,800 209,600 209,600 209,600 209,600 209,600 1,048,000 2,724,800 CIPST21015 CENTRAL CORE SIDEWALK GAPS 144,674 0 0 0 0 0 0 144,674 CIPST21016 67TH AVENUE BIKE LANES 574,182 0 0 0 0 0 0 574,182 CIPST21051 ST RECON 75TH-GLENDALE TO NORTHERN 3,030,408 0 0 0 0 0 0 3,030,408 FY26-35 Streets Projects 48 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST21052 ST RECON 83RD-GLENDALE TO NORTHERN 8,057,836 0 0 0 0 0 0 8,057,836 CIPST22043 ST RECON 67TH - GREENWAY TO BELL 468,401 0 0 0 0 0 0 468,401 CIPST22062 PAVEMENT CUT REPAIR 111,122 113,346 115,612 117,924 120,283 122,689 651,244 1,352,220 CIPST22063 TRANSPORTATION NETWORK IMPROVEMENTS 0 2,000,000 0 0 0 0 0 2,000,000 CIPST22064 TRANSPORTATION SAFETY PROGRAM 666,478 964,130 458,725 467,900 477,258 486,803 2,584,010 6,105,304 CIPST22065 SCALLOP STREET PROGRAM 7,546,386 0 0 0 0 0 0 7,546,386 CIPST22067 57TH AND GREENWAY INTERSECT IMPROV. 0 0 0 0 0 900,000 0 900,000 CIPST22068 59TH AND NORTHERN INTERSECT IMPROV. 1,038,521 0 0 0 0 0 0 1,038,521 CIPST22120 95TH AVE / MONTEBELLO INTERSECTION 184,164 0 0 0 0 0 0 184,164 CIPST23014 OLIVE AVE 59-67 STREET LIGHTS 41,601 0 0 0 0 0 0 41,601 FY26-35 Streets Projects 49 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST23016 53RD/CAMELBACK NEW HAWK 75,199 0 0 0 0 0 0 75,199 CIPST23017 NORTHERN PARKWAY CABLE BARRIER 2 0 0 0 1,173,236 0 0 0 1,173,236 CIPST23018 TMC UPGRADE - NEW CAMPUS BUILDING 451,649 228,692 2,013,998 0 0 0 0 2,694,339 CIPST23019 MARYLAND ACTIVE TRANSPORTATION IMPR 235,282 0 0 0 0 0 0 235,282 CIPST23020 MISSOURI ACTIVE TRANSPORTATION IMPR 291,782 0 0 0 0 0 0 291,782 CIPST23047 SARIVAL AVE/BETHANY HOME RD SIGNAL 72,956 967,896 0 0 0 0 0 1,040,852 CIPST23048 SARIVAL AVE/GLENDALE AVE SIGNAL 1,040,602 0 0 0 0 0 0 1,040,602 CIPST23049 INFILL STREETLIGHTS PHASE II 500,846 503,499 513,569 0 0 0 0 1,517,914 CIPST23050 58TH AVENUE/BETHANY HOME ROAD 241,533 0 0 0 0 0 0 241,533 CIPST23051 TRAFFIC SIGNAL INTERCONNECT 0 75,000 661,019 671,332 671,332 0 0 2,078,683 FY26-35 Streets Projects 50 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST23052 SPEED FEEDBACK SIGNS SCHOOL ZONES 55,070 0 0 0 0 0 0 55,070 CIPST23053 INFILL SIDEWALK 205,345 168,544 171,916 175,355 178,862 182,438 968,407 2,050,867 CIPST23054 GUARDRAIL UPDATE 111,413 112,363 114,611 116,902 119,241 121,626 798,867 1,495,023 CIPST23057 FLASHING YELLOW ARROWS PHASE 5 0 105,981 882,086 0 0 0 0 988,067 CIPST23071 83RD AVE CARDINALS WAY INTERSECTION 207,260 0 0 0 0 0 0 207,260 CIPST24013 43RD AVE-PEORIA INTERSECTION IMPRV 0 31,212 180,405 0 0 0 0 211,617 CIPST24014 51ST AVE-CAMELBACK INTERSECTION IMP 191,250 0 0 0 0 0 0 191,250 CIPST24016 59TH AVE-THUNDERBIRD INTERSECTION 61,200 353,736 0 0 0 0 0 414,936 CIPST24017 67TH AVE-GREENWAY INTERSECTION 368,012 1,170,450 0 0 0 0 0 1,538,462 CIPST24018 67TH AVE-PEORIA INTERSECTION IMPRV 50,000 200,000 0 0 0 0 0 250,000 FY26-35 Streets Projects 51 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST24022 67TH AVE-THUNDERBIRD INTERSECTION 0 0 332,928 489,600 2,546,899 0 0 3,369,427 CIPST24024 99TH AVE: GLENDALE AVE TO NORTHERN 0 0 0 0 0 1,353,040 0 1,353,040 CIPST24025 BALLPARK BLVD: BHR TO MARYLAND AVE 0 0 0 0 0 468,180 2,706,080 3,174,260 CIPST24027 LITCHFIELD-BHR TRAFFIC SIGNAL 0 0 0 0 115,928 670,067 0 785,995 CIPST24029 NORTHERN: REEMS- LITCHFIELD WIDENING 0 0 0 0 690,050 2,111,555 0 2,801,605 CIPST24030 NORTHERN: SARIVAL-ALSUP WIDENING 0 0 0 0 0 0 2,718,800 2,718,800 CIPST24031 REEMS-HATCHER TRAFFIC SIGNAL 0 0 165,612 506,773 0 0 0 672,385 CIPST24032 SARIVAL: GLENDALE TO NORTHERN ROADW 0 0 0 0 828,060 2,584,543 0 3,412,603 CIPST24033 SARIVAL-OLIVE TRAFFIC SIGNAL 0 0 0 0 248,418 760,160 0 1,008,578 CIPST24034 SARIVAL-PEORIA INTERSECTION IMPRV 0 0 0 0 193,489 591,235 0 784,724 FY26-35 Streets Projects 52 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST24035 RIGHT OF WAY LANDSCAPE PLAN 338,801 946,394 370,144 381,248 392,686 404,466 0 2,833,739 CIPST24036 STREET DESIGN PROJECT 200,000 1,000,000 0 0 0 0 0 1,200,000 CIPST24037 TRANSPORTATION PLAN 1,010,000 0 0 0 552,040 552,040 620,538 2,734,618 CIPST24039 FEDERAL GRANT FUND MATCH 0 2,500,000 2,500,000 0 0 0 0 5,000,000 CIPST24040 51ST AVE CORRIDOR PROJECT 0 0 9,085,254 0 0 0 0 9,085,254 CIPST24041 BELL RD CORRIDOR PROJECT 0 0 8,497,908 0 0 0 0 8,497,908 CIPST24042 MID-GLENDALE ARTL TRANSP STUDY 0 1,600,000 0 0 0 0 0 1,600,000 CIPST24043 GLENDALE SS4A ACTION PLAN 999,834 0 0 0 0 0 0 999,834 CIPST24060 51ST AVE - OLIVE AVE TO CACTUS ROAD 4,260,176 0 0 0 0 0 0 4,260,176 CIPST24064 ROW XERISCAPE LANDSCAPE PROGRAM 1,059,433 0 0 0 0 0 0 1,059,433 FY26-35 Streets Projects 53 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST24068 67TH AVE - BEARDSLEY TO PINNACLE PK 2,894,685 0 9,110,684 0 0 0 0 12,005,369 CIPST25012 GLENDALE AVE RADAR DET & ADAPT CONT 0 397,192 0 0 0 0 0 397,192 CIPST25013 ADVANCE DETECTION & STOP BAR INSTAL 0 513,746 0 0 0 0 0 513,746 CIPST25037 ST RECON 59TH AVE & BEARDSLEY AREA 0 2,990,656 0 0 0 0 0 2,990,656 CIPST25039 ST RECON 59TH AVE & CACTUS AREA 0 869,715 0 0 0 0 0 869,715 CIPST25040 RECON ST, 51ST AVE & PEORIA AV AREA 0 2,963,522 0 0 0 0 0 2,963,522 CIPST25041 ST RECON 67TH & BETHANY HM AREA 0 5,791,725 0 0 0 0 0 5,791,725 CIPST25042 ST RECON 71ST AVE & BEARDSLEY AREA 0 0 6,693,728 0 0 0 0 6,693,728 CIPST25043 ST RECON 63RD AVE & BEARDSLEY AREA 0 0 3,298,687 0 0 0 0 3,298,687 CIPST25044 RECON 55TH AVE, CACTUS TO CHOLLA ST 0 0 585,954 0 0 0 0 585,954 FY26-35 Streets Projects 54 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST25045 ST RECON, 51ST AVE & NORTHERN AREA 0 0 1,537,875 0 0 0 0 1,537,875 CIPST25046 ST RECON, 51ST AVE & GLENDALE AREA 0 0 2,807,025 0 0 0 0 2,807,025 CIPST25047 ST RECON, 83RD AVE & MARYLAND AREA 0 0 738,686 0 0 0 0 738,686 CIPST25048 RECON GLENN DR, 88TH LN TO 87TH DR 0 0 264,084 0 0 0 0 264,084 CIPST25049 MOUNTAIN VIEW RD, 43RD TO 59TH 0 0 0 2,320,263 0 0 0 2,320,263 CIPST25050 ST RECON, 75TH AVE & NORTHERN AREA 0 0 0 6,636,112 0 0 0 6,636,112 CIPST25051 RECON ROSE LN, GRAND CANAL TO 99TH 0 0 0 311,011 0 0 0 311,011 CIPST25052 ST RECON, 75TH AVE & DENARO DR AREA 0 0 0 209,846 0 0 0 209,846 CIPST25053 46TH AVE, McLENNAN TO OCOTILLO 0 0 0 0 106,400 0 0 106,400 CIPST25054 ST RECON, 59TH AVE & BETHANY AREA 0 0 0 0 6,692,271 0 0 6,692,271 FY26-35 Streets Projects 55 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST25055 ST RECON, 69TH AVE & GREENWAY AREA 0 0 0 0 4,040,248 0 0 4,040,248 CIPST25056 ST RECON, 47TH AVE & NORTHERN AREA 0 0 0 0 0 3,381,193 0 3,381,193 CIPST25057 ROSE LN, CUL-DE-SAC TO 49TH AVE 0 0 0 0 0 125,528 0 125,528 CIPST25058 ST RECON, 71ST AVE & NORTHERN AREA 0 0 0 0 0 2,430,441 0 2,430,441 CIPST25059 ST RECON, 79TH AVE & BETHANY AREA 0 0 0 0 602,916 602,916 0 1,205,832 CIPST25060 ST RECON, 75TH AVE & GLENDALE AREA 0 0 0 0 0 0 851,543 851,543 CIPST25061 UNION HILLS, 51ST AVE TO 59TH AVE 0 0 0 0 0 0 1,185,763 1,185,763 CIPST25062 59TH, DEER VALLEY TO PINNACLE PEAK 0 0 0 0 0 0 1,512,137 1,512,137 CIPST25063 RECON BELL RD, 67TH AVE TO 75TH AVE 0 0 0 0 0 0 5,195,421 5,195,421 CIPST25064 ST RECON, 55TH AVE & BELL RD AREA 0 0 0 0 0 0 2,576,344 2,576,344 FY26-35 Streets Projects 56 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST25065 ST RECON, 79TH AVE & GLENDALE AREA 0 0 0 0 0 0 4,318,081 4,318,081 CIPST25066 NEW RIVER, GLENDALE TO CUL- DE-SAC 0 0 0 0 0 0 466,995 466,995 CIPST25067 ST RECON, OLIVE AVE & 51ST AVE AREA 0 0 0 0 0 0 4,318,185 4,318,185 CIPST25069 ACTIVE TRANSPORTATION PLAN 0 900,000 0 0 0 0 0 900,000 CIPST25070 ST RECON BETHANY HM - 43RD TO 51ST 0 0 0 0 0 0 3,396,161 3,396,161 CIPST25071 ST RECON CAMELBACK - 51ST TO 59TH 0 0 0 0 0 0 3,323,265 3,323,265 CIPST25072 ST RECON GREENWAY - 59TH TO 51ST 0 0 0 0 0 2,591,411 0 2,591,411 CIPST25073 ST RECON CAMELBACK - 59TH TO 79TH 5,866,825 0 0 0 0 0 0 5,866,825 CIPST25074 ST RECON CAMELBACK - 75TH TO 83RD 0 1,343,608 0 0 0 0 0 1,343,608 CIPST25075 ST RECON 75TH-DEER VLLY TO BEARDSLY 0 1,376,220 0 0 0 0 0 1,376,220 FY26-35 Streets Projects 57 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPST25080 DOWNTOWN PEDESTRIAN LIGHT SYSTEM 236,595 0 0 0 0 0 0 236,595 CIPST26014 UPGRADE TO OUTDATED SIGNAL 0 0 100,000 1,000,000 100,000 1,000,000 1,100,000 3,300,000 CIPST26015 CLIMATE ACTION PLAN 0 350,000 0 0 0 0 0 350,000 CIPST65005 ITS UPGRADES (LOCAL MATCH) 412,314 213,491 217,760 222,115 226,557 231,089 1,226,646 2,749,972 CIPST65006 BUS PULLOUTS 91,413 337,298 344,045 350,927 357,942 365,101 1,938,003 3,784,729 CIPST65016 NORTHERN PARKWAY 112,931 670,000 670,000 0 0 0 0 1,452,931 CIPST68918 INFILL LIGHTING PROGRAM PHASE I 679,492 168,545 171,916 175,355 178,861 182,439 968,404 2,525,012 CIPST68922 STREETLIGHT POLE PROGRAM 0 84,273 85,958 87,677 89,430 91,219 484,202 922,759 TOTAL 47,208,645 53,062,800 73,761,518 37,416,009 41,724,695 45,910,071 174,747,411 473,831,149 58 FY26-35 Solid Waste CIP Overview • Funding Source: 100% Enterprise – User Fee Revenues • Focus On Programmed Vehicle Replacements • Follow industry standard replacement cycles FY26-35 Solid Waste by Funding Source 59 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 6120 SOLID WASTE 2,583,886 5,282,383 4,932,236 4,327,059 3,813,456 5,845,889 30,927,208 57,712,117 TOTAL 2,583,886 5,282,383 4,932,236 4,327,059 3,813,456 5,845,889 30,927,208 57,712,117 FY26-35 Solid Waste Projects 60 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPSW19027 REPLACE STREET SWEEPERS 0 951,419 998,990 0 549,445 576,917 3,441,038 6,517,809 CIPSW78001 REPLACE ROLLOFF TRUCKS - COMMERCIAL 0 236,500 0 248,325 0 273,158 300,473 1,058,456 CIPSW78002 REPLACE FRONTLOAD TRUCKS- COMMERCIAL 518,074 907,092 952,447 500,035 0 525,036 4,292,195 7,694,879 CIPSW78003 REPLACE SIDELOAD TRUCKS- RESIDENTIAL 446,596 2,043,576 2,145,754 2,816,303 2,365,694 3,104,974 15,166,652 28,089,549 CIPSW78004 REP BULK TRASH EQUIP- RESIDENTIAL 1,381,993 1,059,877 639,930 671,926 705,523 1,288,287 7,474,531 13,222,067 CIPSW78005 REPLACE PICKUPS / SERVICE TRUCKS 187,349 63,919 175,115 70,470 192,794 77,517 252,319 1,019,483 CIPSW78009 ALLEY GATING 49,874 20,000 20,000 20,000 0 0 0 109,874 TOTAL 2,583,886 5,282,383 4,932,236 4,327,059 3,813,456 5,845,889 30,927,208 57,712,117 61 FY26-35 Public Safety CIP Overview • Funded by Public Safety G. O. Bonds (61%), General Fund (23%), Special Revenue Funds (13%), Fire DIF (2%) and Police DIF (1%) • Focus on: – Improving existing facilities • Follow industry standard replacement cycles • Health, safety, and functional improvements – Replacing existing assets as needed FY26-35 Public Safety by Funding Source 62 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 1080 GENERAL GOVERNMENT CAPITAL PRJ 12,634,352 5,875,545 1,550,000 50,000 2,410,007 8,546,769 38,972,528 70,039,201 2200 TRAINING FACILITY REVENUE 378,220 1,330,000 900,000 1,700,000 177,341 35,226,337 0 39,711,898 4040 PUBLIC SAFETY CONSTRUCTION 270,799 14,059,282 17,964,730 23,223,328 24,634,857 91,735,546 0 171,888,542 4041 2024 PUBLIC SAFETY BONDS 12,514,506 0 0 0 0 0 0 12,514,506 4173 2019-DIF FIRE 37,500 0 0 6,500,000 0 0 0 6,537,500 4223 2019-DIF POLICE 0 0 0 0 0 4,417,090 0 4,417,090 TOTAL 25,835,377 21,264,827 20,414,730 31,473,328 27,222,205 139,925,742 38,972,528 305,108,737 FY26-35 Public Safety Projects 63 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPFC20036 GRPSTC DRIVERS TRAINING TRACK 0 0 0 1,200,000 0 0 0 1,200,000 CIPPS19029 FIRE STATION #153 REPLACEMENT 2,720,283 0 0 0 0 0 0 2,720,283 CIPPS19030 POLICE EVIDENCE STORAGE FACILITY 3,207,431 0 0 0 0 0 0 3,207,431 CIPPS19041 MAIN PUBLIC SAFETY BLDG RENOVATION 2,257,591 6,632,670 4,659,210 0 0 0 0 13,549,471 CIPPS19042 FOOTHILLS POLICE STATION RENOVATION 0 0 1,448,350 2,514,680 3,752,120 0 0 7,715,150 CIPPS19043 GATEWAY POLICE STATION RENOVATION 0 75,750 0 0 2,517,574 10,871,616 0 13,464,940 CIPPS19044 FIRE STATION #154 RELOCATION 100,000 4,970,140 7,470,140 0 0 0 0 12,540,280 CIPPS19049 FIRE STATION 1511 - WESTERN AREA 0 0 0 0 2,000,000 15,845,630 0 17,845,630 CIPPS19050 FIRE STATION #155 RENOVATION 0 1,017,222 187,030 3,302,998 3,553,183 0 0 8,060,433 CIPPS19051 FIRE STATION #156 RENOVATION 0 0 0 312,940 3,739,980 0 0 4,052,920 FY26-35 Public Safety Projects 64 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPS19052 FIRE STATION #157 RENOVATION 0 0 0 0 0 4,546,300 0 4,546,300 CIPPS19053 POLICE STATION - WEST AREA (L303) 0 0 0 0 0 4,417,090 0 4,417,090 CIPPS23002 LP15 HEART MONITOR REPLACEMENT 0 0 0 0 0 0 3,500,000 3,500,000 CIPPS23003 FIRE RADIO REPLACEMENT 78,163 50,000 50,000 50,000 50,000 2,422,500 0 2,700,663 CIPPS23031 POLICE CRIME LABORATORY 4,000,000 0 0 11,056,000 8,472,000 8,472,000 0 32,000,000 CIPPS23074 POLICE MOBILE COMMAND VEHICLE 596,338 0 0 0 0 0 0 596,338 CIPPS24004 FIRE CAPITAL ASSET REPLACEMENT PROG 0 0 0 0 0 285,000 5,859,312 6,144,312 CIPPS24005 GRPSTC FIRE HYDRANT REPLACEMENT 3,800 0 0 0 177,341 226,337 0 407,478 CIPPS24050 FIRE STATION 1510 - AIRPORT AREA 537,500 0 3,000,000 11,936,710 0 0 0 15,474,210 CIPPS24054 REPLACE GRPSTC CLASS A BURN BLDG 336,222 0 0 0 0 0 0 336,222 FY26-35 Public Safety Projects 65 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPS24057 POLICE DEPARTMENT RADIO REPLACEMENT 13,495 1,250,000 1,500,000 0 0 0 0 2,763,495 CIPPS24063 GRPSTC MASTER PLAN 38,198 0 0 0 0 0 0 38,198 CIPPS25002 PUBLIC SAFETY DRIVING SIMULATOR 0 250,000 0 0 0 0 0 250,000 CIPPS25003 FIRE MOBILE COMPUTER TERMINALS-MCTs 0 402,800 0 0 1,125,000 0 0 1,527,800 CIPPS25024 FIRE STATION - 75TH ORANGEWOOD 0 0 0 0 0 12,000,000 0 12,000,000 CIPPS25026 GRPSTC CIP PROGRAM (MASTER PLAN) 0 0 0 0 0 35,000,000 0 35,000,000 CIPPS25027 CONNEX BOX BASIC SKILLS PROP 0 0 0 500,000 0 0 0 500,000 CIPPS26005 FIRE RESOURCE CENTER REPLACEMENT 0 151,500 0 0 0 40,000,000 0 40,151,500 CIPPS26006 GRPSTC LIFT STATION ASSESS & REHAB 0 430,000 0 0 0 0 0 430,000 CIPPS26007 FIRE STATIONS INGRESS & EGRESS ENHA 0 1,212,000 1,200,000 600,000 600,000 0 0 3,612,000 FY26-35 Public Safety Projects 66 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPS26008 GRPSTC HVAC RENEWAL 0 200,000 200,000 0 0 0 0 400,000 CIPPS26009 FIRING RANGE REDESIGN 0 700,000 700,000 0 0 0 0 1,400,000 CIPPS70814 FIRE APPARATUS REPLACEMENT 11,946,356 3,922,745 0 0 1,235,007 5,839,269 29,613,216 52,556,593 TOTAL 25,835,377 21,264,827 20,414,730 31,473,328 27,222,205 139,925,742 38,972,528 305,108,737 67 FY26-35 Parks CIP Overview • Funded by Parks G. O. Bonds (77%), Open Space/Trail G. O. Bonds (18%), General Fund (4%) DIF (1%) • Projects include: – Bonsall Park North Improvements – Grand Canal Linear Park Improvements – Thunderbird Conservation Park Improvements – Thunderbird Paseo Improvements FY26-35 Parks by Funding Source 68 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 1080 GENERAL GOVERNMENT CAPITAL PRJ 3,574,536 1,365,000 0 0 0 0 0 4,939,536 2160 OTHER GRANTS 423,523 0 0 0 0 0 0 423,523 4050 PARKS CONSTRUCTION 4,114,622 0 6,817,685 4,681,640 6,453,749 0 71,139,369 93,207,065 4090 OPEN SPACE/TRAIL CONSTRUCTION 8,975,701 1,700,966 0 0 0 0 0 10,676,667 4091 2024 OPEN SPACE/TRAIL CONSTRUCTION 10,622,563 0 0 0 0 0 0 10,622,563 4383 2019-DIF PARKS & REC 1,084,564 0 0 0 0 0 0 1,084,564 4610 ARPA CAPITAL PROJECTS 25,395 0 0 0 0 0 0 25,395 TOTAL 28,820,904 3,065,966 6,817,685 4,681,640 6,453,749 0 71,139,369 120,979,313 FY26-35 Parks Projects 69 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPK19008 SAHUARO RANCH PARK IMPROVEMENTS 21,103 0 0 0 0 0 0 21,103 CIPPK19077 THUNDERBIRD CONSV. PARK IMPS. 10,605,132 0 0 0 0 0 0 10,605,132 CIPPK21033 HEROES PARK REC AND AQUATICS CENTER 394,982 0 0 0 0 0 42,500,000 42,894,982 CIPPK21042 PARK RESTROOM REPLACEMENT 0 0 0 700,000 0 0 0 700,000 CIPPK22009 ACOMA PARK IMPROVEMENTS 353,157 0 0 0 0 0 0 353,157 CIPPK22011 MARY SILVA PARK IMPROVEMENTS 0 0 0 0 555,300 0 0 555,300 CIPPK22013 HERITAGE PARK IMPROVEMENTS 0 0 0 0 252,300 0 0 252,300 CIPPK22016 MISSION PARK IMPROVEMENTS 0 0 316,710 0 0 0 0 316,710 CIPPK22022 COUNTRY GABLES PARK IMPROVEMENTS 0 0 62,328 0 0 0 0 62,328 CIPPK22023 SUNNYSIDE PARK IMPROVEMENTS 0 0 0 0 1,138,440 0 0 1,138,440 FY26-35 Parks Projects 70 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPK22024 TARRINGTON RANCH PARK IMPROVEMENTS 275,000 0 278,230 0 277,650 0 0 830,880 CIPPK22025 FOOTHILLS PARK IMPROVEMENTS 0 0 841,645 0 0 0 0 841,645 CIPPK22026 NORTHERN HORIZON PARK IMPROVEMENTS 0 0 0 766,520 0 0 0 766,520 CIPPK22027 MYRTLE PARK IMPROVEMENTS 0 0 0 47,870 0 0 0 47,870 CIPPK22028 CLAVELITO PARK IMPROVEMENTS 0 0 0 0 442,010 0 0 442,010 CIPPK22029 BUTLER PARK IMPROVEMENTS 0 0 0 342,940 0 0 0 342,940 CIPPK22030 CHOLLA PARK IMPROVEMENTS 425,254 0 0 344,900 0 0 0 770,154 CIPPK22032 SKUNK CREEK LINEAR TRAIL 1,000,000 0 0 0 0 0 0 1,000,000 CIPPK22033 GRAND CANAL LINEAR PARK IMPROVEMENT 4,004,199 0 0 0 0 0 0 4,004,199 CIPPK22034 THUNDERBIRD PASEO IMPROVEMENTS 3,436,445 1,700,966 0 0 0 0 0 5,137,411 FY26-35 Parks Projects 71 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPK22036 NEW RIVER TRAIL IMPROVEMENTS 552,488 0 0 0 0 0 0 552,488 CIPPK22097 SIERRA VERDE PARK IMPROVEMENTS 0 0 0 391,860 0 0 0 391,860 CIPPK22100 BONSALL PARK NORTH IMPROVEMENTS 1,246,222 0 0 0 0 0 0 1,246,222 CIPPK22101 HEROES REGIONAL PARK BALLFIELDS 1,075,105 0 0 0 0 0 0 1,075,105 CIPPK23004 PLAZA ROSA PARK IMPROVEMENTS 0 0 0 0 380,949 0 0 380,949 CIPPK23005 KINGS PARK IMPROVEMENTS 0 0 0 0 716,900 0 0 716,900 CIPPK23006 DESERT VALLEY PARK IMPROVEMENTS 300,000 0 887,400 0 0 0 0 1,187,400 CIPPK23007 DESERT ROSE PARK IMPROVEMENTS 0 0 856,700 0 0 0 0 856,700 CIPPK23026 PASEO SPORTS COMPLEX 3,266 1,365,000 0 0 0 0 0 1,368,266 CIPPK23027 CHAPPARAL PARK IMPROVEMENTS 0 0 1,121,722 0 0 0 0 1,121,722 FY26-35 Parks Projects 72 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPK23044 MURPHY PARK 4,116,741 0 0 0 0 0 0 4,116,741 CIPPK24001 SRP HISTORICAL ROOF REPLACEMENT 0 0 0 1,120,000 0 0 0 1,120,000 CIPPK24002 ADA UPGRADES 356,732 0 0 0 0 0 0 356,732 CIPPK24003 PARKING LOT IMPROVEMENTS 0 0 0 700,000 0 0 0 700,000 CIPPK24067 COMMUNITY CENTER TECH INVESTMENT 423,523 0 0 0 0 0 0 423,523 CIPPK25014 HORIZON PARK IMPROVEMENTS 0 0 0 0 277,650 0 0 277,650 CIPPK25015 ARROWHEAD LAKES PARK IMPROVEMENTS 200,000 0 0 0 0 0 0 200,000 CIPPK25016 UTOPIA PARK IMPROVEMENTS 0 0 0 0 656,300 0 0 656,300 CIPPK25017 FOOTHILLS PARK SKATE PARK RENOVATIO 0 0 2,302,950 0 0 0 0 2,302,950 CIPPK25018 SUNSET VISTA PARK IMPROVEMENTS 0 0 0 0 267,550 0 0 267,550 FY26-35 Parks Projects 73 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPK25019 GREENWAY GRANADA PARK IMPROVEMENTS 0 0 0 0 817,500 0 0 817,500 CIPPK25020 SUNSET RIDGE PARK IMPROVEMENTS 0 0 0 0 267,550 0 0 267,550 CIPPK25068 SAHUARO RANCH PARK BUILDOUT 0 0 0 0 0 0 27,627,489 27,627,489 CIPPK25076 ROSE LANE POOL REPAIRS 22,096 0 0 0 0 0 0 22,096 CIPPK26004 PARK SIGNAGE IMPROVEMENTS 0 0 150,000 0 0 0 1,011,880 1,161,880 CIPPK26010 DOS LAGOS PARK IMPROVEMENTS 0 0 0 267,550 0 0 0 267,550 CIPPK73576 FOOTHILLS PARK PICKLEBALL COURTS 9,459 0 0 0 403,650 0 0 413,109 TOTAL 28,820,904 3,065,966 6,817,685 4,681,640 6,453,749 0 71,139,369 120,979,313 74 FY26-35 Parking Lots CIP Overview • Funded by General Fund (100%) • Projects Include: – Annual funding for existing parking lots/garage repairs – VAI Garage Space Use Agreement FY26-35 Parking Lots by Funding Source 75 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 1080 GENERAL GOVERNMENT CAPITAL PRJ 14,940,374 2,286,000 500,000 500,000 500,000 500,000 2,500,000 21,726,374 TOTAL 14,940,374 2,286,000 500,000 500,000 500,000 500,000 2,500,000 21,726,374 FY26-35 Parking Lots Projects 76 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPPL19059 RENEW PARKING GARAGES / LOTS 65,374 2,286,000 500,000 500,000 500,000 500,000 2,500,000 6,851,374 CIPPL24055 VAI GARAGE SPACE USE AGREEMENT 14,875,000 0 0 0 0 0 0 14,875,000 14,940,374 2,286,000 500,000 500,000 500,000 500,000 2,500,000 21,726,374 77 FY26-35 Library CIP Overview • Funded by Library G. O. Bonds (80%), General Funds (13%), Library DIF (4%), and Grants (3%) • Focus on: – Improving existing facilities • Follow industry standard replacement cycles – Replacing existing assets as needed FY26-35 Library by Funding Source 78 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 1080 GENERAL GOVERNMENT CAPITAL PRJ 0 5,003,527 0 0 0 0 0 5,003,527 4100 LIBRARY CONSTRUCTION 956,182 0 1,972,000 6,193,900 10,786,700 6,874,600 0 26,783,382 4101 2024 LIBRARY BONDS 2,850,009 0 0 0 0 0 0 2,850,009 4284 2019-DIF LIBRARIES 1,358,840 0 0 0 0 0 0 1,358,840 4610 ARPA CAPITAL PROJECTS 935,735 0 0 0 0 0 0 935,735 TOTAL 6,100,766 5,003,527 1,972,000 6,193,900 10,786,700 6,874,600 0 36,931,493 FY26-35 Library Projects 79 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPLB19045 VELMA TEAGUE INFRASTRUCTURE IMPROV. 544,884 5,003,527 0 0 0 0 0 5,548,411 CIPLB19046 MAIN LIBRARY RENOVATION 64,494 0 1,972,000 5,240,000 6,288,000 0 0 13,564,494 CIPLB19066 FOOTHILLS LIBRARY RENOVATION 0 0 0 953,900 4,498,700 6,874,600 0 12,327,200 CIPLB22088 YUCCA DISTRICT MEETING SPACE STUDY 13,106 0 0 0 0 0 0 13,106 CIPLB23029 HEROES PARK LIBRARY EXPANSION 2,281,469 0 0 0 0 0 0 2,281,469 CIPLB25081 MAIN LIBRARY ROOF PROJECT 3,196,813 0 0 0 0 0 0 3,196,813 TOTAL 6,100,766 5,003,527 1,972,000 6,193,900 10,786,700 6,874,600 0 36,931,493 80 FY26-35 Landfill CIP Overview • Funding Source: 100% Enterprise – User Fee Revenues • Focus On Programmed Vehicle Replacements • Follow industry standard replacement cycles • North Cell Landfill Project • North Cell Phased Construction • Landfill Gas Extraction System • Stormwater Controls FY26-35 Landfill by Funding Source 81 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 6110 LANDFILL 2,500,875 4,621,297 3,218,588 6,647,799 4,965,124 6,367,480 15,654,370 43,975,533 TOTAL 2,500,875 4,621,297 3,218,588 6,647,799 4,965,124 6,367,480 15,654,370 43,975,533 FY26-35 Landfill Projects 82 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPLF19019 LANDFILL COMPACTOR REPLACEMENT 184,854 850,000 900,000 0 1,821,000 0 1,900,000 5,655,854 CIPLF19024 BULLDOZER REPLACEMENTS AND REBUILDS 340,000 270,000 170,000 0 1,500,000 2,727,000 0 5,007,000 CIPLF19025 NORTH CELL LINER 267,714 0 0 0 0 3,525,480 3,494,480 7,287,674 CIPLF19091 LANDFILL SCRAPER REPLACEMENT 0 0 0 0 1,305,060 0 0 1,305,060 CIPLF21030 CLOSED LANDFILLS 596,528 709,300 115,000 119,500 115,000 115,000 450,000 2,220,328 CIPLF22005 BUILDING IMPROVEMENTS 273,636 400,000 0 0 0 0 0 673,636 CIPLF22006 SITE PAVING AND MARKINGS 0 209,600 0 0 0 0 628,800 838,400 CIPLF78503 LANDFILL CLOSURE SOUTH 0 0 0 640,000 0 0 0 640,000 CIPLF78505 LF NORTH CELL PHASED CONSTRUCTION 0 100,000 0 5,010,600 0 0 7,066,900 12,177,500 CIPLF78506 LANDFILL 4x4 REPLACEMENT TRUCKS 0 430,000 0 0 0 0 0 430,000 FY26-35 Landfill Projects 83 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPLF78514 SOLID WASTE INSPECTION TRUCKS 10,000 0 67,115 0 224,064 0 439,190 740,369 CIPLF78522 LANDFILL WATER PULL/TRUCK 70,000 0 275,000 0 0 0 1,600,000 1,945,000 CIPLF78532 AUXILIARY EQUIPMENT 348,069 495,000 500,000 0 0 0 75,000 1,418,069 CIPLF78534 STORMWATER CONTROLS 292,305 472,149 556,261 327,699 0 0 0 1,648,414 CIPLF78535 LANDFILL GAS EXTRACTION SYSTEM 117,769 685,248 635,212 550,000 0 0 0 1,988,229 TOTAL 2,500,875 4,621,297 3,218,588 6,647,799 4,965,124 6,367,480 15,654,370 43,975,533 84 FY26-35 Facility Maintenance CIP Overview • Primarily Funded with General Fund (61%), Enterprise Funds (15%), G. O. Bonds (12%), Special Revenue Funds (11%), Grants (1%) • Focus on: – Improving existing assets through programmatic replacements • Follow industry standard replacement cycles – Replacing existing assets as needed – Downtown Campus Reinvestment FY26-35 Facility Maintenance by Funding Source 85 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 1080 GENERAL GOVERNMENT CAPITAL PRJ 15,667,986 7,172,000 5,104,000 5,165,000 4,704,000 5,693,000 20,758,000 64,263,986 4030 TRANSPORTATION CAPITAL PROJ 978,005 599,360 3,297,600 5,271,040 52,800 1,273,960 0 11,472,765 4060 GOVERNMENT FACILITIES 1,166,944 539,471 3,194,550 5,106,320 59,700 1,554,395 0 11,621,380 4061 2024 GENERAL GOVT BONDS 686,141 0 0 0 0 0 0 686,141 4080 CULTURAL FACILITY 449,844 0 0 0 0 0 0 449,844 4610 ARPA CAPITAL PROJECTS 1,044,000 0 0 0 0 0 0 1,044,000 6020 WATER 1,012,386 685,510 3,812,850 6,094,640 62,000 1,647,775 0 13,315,161 6120 SOLID WASTE 0 0 0 0 55,100 2,294,270 0 2,349,370 TOTAL 21,005,306 8,996,341 15,409,000 21,637,000 4,933,600 12,463,400 20,758,000 105,202,647 FY26-35 Facility Maintenance Projects 86 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPFC19016 GLENDALE OPS CAMPUS-FIELD STAFF BLD 1,624,721 1,728,341 10,305,000 16,472,000 0 0 0 30,130,062 CIPFC19037 UNDERGROUND STORAGE TANK REPLACE 6,944 0 0 0 0 0 0 6,944 CIPFC19038 CITY HALL BUILDING REMODEL 6,747,026 0 0 0 0 0 0 6,747,026 CIPFC19061 ELECTRICAL SYSTEM RENEWAL 76,970 600,000 500,000 500,000 370,000 370,000 1,850,000 4,266,970 CIPFC19062 ELEVATOR SYSTEM RENEWAL 40,292 640,000 640,000 640,000 425,000 65,000 500,000 2,950,292 CIPFC19063 FIRE PROTECTION RENEWAL 91,863 200,000 200,000 200,000 200,000 200,000 1,000,000 2,091,863 CIPFC19064 SECURITY CAMERA IMPROVEMENTS 177,130 0 0 0 0 0 0 177,130 CIPFC19065 PLUMBING SYSTEM RENEWAL 244,690 100,000 100,000 100,000 100,000 100,000 500,000 1,244,690 CIPFC19068 ROOFING SYSTEM RENEWAL 233,242 335,000 300,000 300,000 300,000 300,000 1,500,000 3,268,242 CIPFC19071 HVAC REPAIR/REPLACEMENTS 0 550,000 300,000 300,000 300,000 300,000 1,500,000 3,250,000 FY26-35 Facility Maintenance Projects 87 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPFC22086 CITY HALL PARKING GARAGE 394,308 0 0 0 0 0 0 394,308 CIPFC23041 GLENDALE OPS CAMPUS RENOVATION 0 0 0 0 229,600 6,770,400 0 7,000,000 CIPFC23043 COUNCIL CHAMBERS 486,148 0 0 0 0 0 0 486,148 CIPFC23070 EXTERIOR BUILDING ENHANCEMENTS 36,525 220,000 0 0 0 0 0 256,525 CIPFC23076 ARENA LEASE AGREEMENT CIP 5,000,000 0 0 0 0 0 0 5,000,000 CIPFC24045 SPRING CITY DEMOLITION 2,062,352 286,000 0 0 0 0 0 2,348,352 CIPFC24046 ADA PROGRAM 103,918 65,000 400,000 400,000 400,000 400,000 2,000,000 3,768,918 CIPFC24047 INTERIOR REFRESH PROGRAM 16,557 1,550,000 750,000 750,000 750,000 750,000 3,750,000 8,316,557 CIPFC24048 RETRO COMMISSIONING PROGRAM 20,500 50,000 75,000 75,000 75,000 75,000 375,000 745,500 CIPFC24049 CEMETERY IMPROVEMENTS 247,561 700,000 250,000 150,000 0 0 0 1,347,561 FY26-35 Facility Maintenance Projects 88 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPFC24051 PERFORMANCE BASED CONTRACTS 49,376 0 0 0 0 0 0 49,376 CIPFC24052 PD EVIDENCE/OPS CAMPUS FIBER 56,222 0 0 0 0 0 0 56,222 CIPFC24056 SYSTEM OF CARE CENTER IMPROVEMENTS 593,887 0 0 0 0 0 0 593,887 CIPFC25001 GATES AND DOORS RENEWAL PROGRAM 0 500,000 300,000 300,000 300,000 1,500,000 0 2,900,000 CIPFC25022 BRIAN ANDERSON FIELD 1,044,000 0 0 0 0 0 0 1,044,000 CIPFC25023 HEROES PARK LIB SHADE STRUCTURES 13,683 0 0 0 0 0 0 13,683 CIPFC70801 CAMELBACK RANCH MAINTENANCE RESERVE 36,424 1,472,000 1,289,000 1,450,000 1,484,000 1,633,000 7,783,000 15,147,424 CIPPK77516 AMPHITHEATER RENOVATIONS 1,600,967 0 0 0 0 0 0 1,600,967 TOTAL 21,005,306 8,996,341 15,409,000 21,637,000 4,933,600 12,463,400 20,758,000 105,202,647 89 FY26-35 Drainage CIP Overview • Funded by Flood Control G. O. Bonds (49%), Grants (46%) and General Fund (5%) • Focus on Designing and Constructing Flood Control Drainage Improvements – Large project broken into stand alone packages to continue progress • Work in coordination with internal and external partners – Maricopa County Flood Control District (MCFlood) – Maximizing matching funds – Arterial Reconstruction Program (Transportation) FY26-35 Drainage by Funding Source 90 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 1080 GENERAL GOVERNMENT CAPITAL PRJ 622,631 241,000 241,000 241,000 241,000 241,000 1,200,000 3,027,631 2160 OTHER GRANTS 5,163,788 13,455,000 3,640,000 2,990,000 0 858,000 0 26,106,788 4110 FLOOD CONTROL CONSTRUCTION 4,765,527 4,705,590 2,054,000 6,053,920 4,251,520 2,749,760 2,635,360 27,215,677 TOTAL 10,551,946 18,401,590 5,935,000 9,284,920 4,492,520 3,848,760 3,835,360 56,350,096 FY26-35 Drainage Projects 91 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPDR19040 CAMELBACK ROAD, 51ST TO 58TH 0 0 0 4,313,920 0 0 0 4,313,920 CIPDR19078 83RD AVE, BETHANY HM TO CAMELBACK 0 0 0 0 4,251,520 0 0 4,251,520 CIPDR19079 59TH AVE & T-BIRD RD STORM DRAIN 0 0 0 0 0 0 2,635,360 2,635,360 CIPDR21019 DRAINAGE IMP. GLENN DR., 59TH-52ND 188,000 0 0 0 0 3,607,760 0 3,795,760 CIPDR21034 BETHANY HOME SD, 43RD TO 51ST AVE 9,741,315 18,160,590 5,694,000 4,730,000 0 0 0 38,325,905 CIPDR79004 LOCAL DRAINAGE PROBLEMS 622,631 241,000 241,000 241,000 241,000 241,000 1,200,000 3,027,631 TOTAL 10,551,946 18,401,590 5,935,000 9,284,920 4,492,520 3,848,760 3,835,360 56,350,096 92 FY26-35 Airport CIP Overview • Funded by Airport Grant Funds (85%) and Transportation Sales Tax (15%) • Projects include: • Airport Master Plan Study • South Apron Reconstruct • Airfield Lighting & Signage Rehab • Self-Fuel Station Site Survey FY26-35 Airport by Funding Source 93 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 2190 AIRPORT CAPITAL GRANT 2,066,602 9,648,530 4,542,720 5,765,740 4,693,550 9,342,860 10,089,000 46,149,002 4030 TRANSPORTATION CAPITAL PROJ 960,200 767,366 589,219 527,797 562,163 925,639 4,068,084 8,400,468 TOTAL 3,026,802 10,415,896 5,131,939 6,293,537 5,255,713 10,268,499 14,157,084 54,549,470 FY26-35 Airport Projects 94 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPAP19075 NEW RIVER CHANNELIZATION PROJECT 0 0 0 225,000 900,000 450,000 4,500,000 6,075,000 CIPAP19076 SOUTH APRON PHASE 1 PAVEMENT RECONS 1,701,144 0 0 0 0 0 0 1,701,144 CIPAP21007 AIRPORT MASTER PLAN STUDY 0 764,240 0 0 0 0 0 764,240 CIPAP21009 AIRPORT SECURITY FENCING 0 0 2,250,000 0 0 0 0 2,250,000 CIPAP21010 SOUTHWEST APRON - CAPACITY PROJECT 0 0 0 0 450,000 2,970,000 5,589,000 9,009,000 CIPAP21012 AIRSIDE PAVEMENT MAINTENANCE 43,911 220,895 231,939 243,537 255,713 268,499 1,557,806 2,822,300 CIPAP24009 SOUTH APRON RECONSTRUCT 365,458 7,642,400 0 0 0 0 0 8,007,858 CIPAP25004 CONSTRUCT TAXIWAY BRAVO 0 286,590 573,180 5,063,090 0 4,012,260 0 9,935,120 CIPAP25008 AIRFIELD LIGHTING & SIGNAGE REHAB 0 955,300 1,719,540 0 0 0 0 2,674,840 CIPAP26011 CONSTRUCT EAST SIDE APRON - CAPACITY 0 0 0 477,650 3,343,550 1,910,600 0 5,731,800 FY26-35 Airport Projects PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPAP26012 SELF-FUEL STATION SITE SURVEY 0 60,000 0 0 0 0 0 60,000 CIPAP26013 AIRPORT ADMIN OFFICE REMODEL 0 35,000 0 0 0 0 0 35,000 CIPAP65078 AIRPORT MATCHING FUNDS 916,289 451,471 357,280 284,260 306,450 657,140 2,510,278 5,483,168 TOTAL 3,026,802 10,415,896 5,131,939 6,293,537 5,255,713 10,268,499 14,157,084 54,549,470 96 FY26-35 Arts CIP Overview • Funded by Arts Fund (100%) – 1% of Construction Completed in Current Fiscal Year on Eligible Projects • Projects include: – Municipal Arts Program – Arts Master Plan FY26-35 Arts by Funding Source 97 FUND FUND NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL 2110 ARTS COMMISSION 979,851 0 0 0 0 0 0 979,851 TOTAL 979,851 0 0 0 0 0 0 979,851 FY26-35 Arts Projects 98 PROJECT # PROJECT NAME EST CARRYOVER FY26 FY27 FY28 FY29 FY30 FY31-35 TOTAL CIPAT20035 MUNICIPAL ARTS PROGRAM 879,851 0 0 0 0 0 0 879,851 CIPAT23001 ARTS MASTER PLAN 100,000 0 0 0 0 0 0 100,000 TOTAL 979,851 0 0 0 0 0 0 979,851 99 Questions? Budget Calendar 100 Item Date Workshop #1 – Budget Overview / Revenues / Five-Year Financial Forecasts January 28, 2025 Workshop #2 – FY26-35 Capital Improvement Plan March 4, 2025 Workshop #3 – (All Day) FY26 Operating Budget Department Presentations April 1, 2025 Workshop #4 – FY26 Operating, CIP, Debt, Contingency April 22, 2025 Voting Meeting – Tentative Budget Adoption May 13, 2025 Voting Meeting – Final Budget Adoption / Property Tax Levy June 10, 2025 Voting Meeting – Property Tax Adoption June 24, 2025