Extracted text (via pymupdf)
12470 characters
115th Avenue and Happy Valley Traffic Impact Analysis fdensity Broadstone Arrowhead Glendale, Arizona Traffic Impact Analysis January 2025 Prepared for: ALLIANCE RESIDENTIAL For Submittal to: CITY OF GLENDALE ARIZONA DEPARTMENT OF TRANSPORTATION Prepared by: Paul E. Basha, PE, PTOE Kayla Amado Theint Nwe Office: 480.505.3931 pbasha@summitlandmgmt.com SUMMIT LAND MANAGEMENT 7144 E Stetson Drive Suite 300 Scottsdale Arizona 85251 Approved for Transportation by Becca Fastje 2/18/25 Broadstone Arrowhead Traffic Impact Analysis Page 1 Executive Summary Introduction Alliance Residential is planning to develop 370 multi-family homes on approximately 19 acres adjacent to and south of Rose Garden Lane, and west of 75th Avenue in the City of Glendale. Results The proposed Broadstone Arrowhead is anticipated to generate; as a total of both directions; 2,494 daily; 148 morning peak hourly; and 189 evening peak hourly vehicles. Per the City of Glendale policy, the opening year and five (5) years into the future must be analyzed. The 2026 and 2031 ambient traffic volumes were determined by a 3% annual increase, based upon recent historic 75th Avenue, south of Deer Valley Road, traffic counts on the City of Glendale website. Table 1 summarizes the signalized intersection level-of-service results for 2026 and 2031; without and with Broadstone Arrowhead. The signalized intersections are 75th / Rose Garden, 75th / Aspera, 75th / SR-101 WB, and 75th / SR-101 EB. This table indicates the number of intersections, approaches, and turning movements at each level-of-service for each condition. Their purpose is a convenient comparison between the different years, without and with Broadstone Arrowhead. Detailed delay and level-of-service by individual intersection and by individual turning movement are provided late in this Executive Summary. Complete detailed delay and level-of-service printouts for all intersections are provided in Appendix D. Table 1: Level-of-Service Summary Signalized Intersections Morning Peak Hour Evening Peak Hour 2024 2026 2031 EXISTING AMBIENT WITH SITE AMBIENT WITH SITE A 12 11 11 11 10 B 8 12 12 6 8 C 20 20 19 14 14 D 9 6 7 15 11 E 0 0 0 1 6 F 0 0 0 2 0 ALL 49 49 49 49 49 2024 2026 2031 EXISTING AMBIENT WITH SITE AMBIENT WITH SITE A 12 12 12 11 10 B 12 13 12 11 10 C 16 18 17 13 15 D 6 3 4 5 7 E 0 1 4 5 3 F 3 2 0 4 4 ALL 49 49 49 49 49 Broadstone Arrowhead Traffic Impact Analysis Page 2 Table 2 summarizes the unsignalized intersection level-of-service results for 2026 and 2031; with Broadstone Arrowhead. The unsignalized intersections are the two Broadstone Arrowhead accesses: main access with Rose Garden Lane, and Joy Boulevard with Aspera Boulevard. These tables indicate the number of intersections, approaches, and turning movements at each level-of-service for each condition. Their purpose is a convenient comparison between 2026 and 2031. Table 2: Level-of-Service Summary Unsignalized Intersections Table 3 provides the summary of delays and levels-of-service by intersection, approach, and turning movement; for the intersections of 75th Avenue with Rose Garden Lane and with Aspera Boulevard for the morning peak hour. The yellow highlighting indicates those levels-of-service that are different from the previous condition. MORNING PEAK EVENING PEAK HOUR 2026 2031 2026 2031 WITH SITE WITH SITE WITH SITE WITH SITE A 6 8 8 8 B 4 2 2 2 C 0 0 0 0 D 0 0 0 0 E 0 0 0 0 F 0 0 0 0 ALL 10 10 10 10 Broadstone Arrowhead Traffic Impact Analysis Page 3 Table 3: Level-of-Service Detailed Summary 75th at Rose Garden and at Aspera – AM Peak Hour Table 4 provides the same information for the two (2) interchanges of 75th Avenue with State Route 101. EXISTING 2024 2026 2026 WITH SITE 2031 2031 WITH SITE DELAY LOS DELAY LOS DELAY LOS DELAY LOS DELAY LOS 75th / ROSE GARDEN 29.9 C 24.0 C 24.2 C 29.6 C 41.7 D Northbound 25.6 C 19.0 B 19.8 B 23.0 C 25.6 C Left 53.7 D 25.8 C 31.4 C 36.3 D 38.9 D Through 20.3 C 20.3 C 20.3 C 23.7 C 26.7 C Right 3.2 A 5.0 A 5.0 A 7.9 A 6.7 A Southbound 34.5 C 29.5 C 29.3 C 36.6 D 60.6 E Left 12.5 B 12.7 B 12.7 B 14.2 B 16.4 B Through 41.8 D 33.1 C 33.1 C 41.1 D 69.2 E Right 5.3 A 1.8 A 2.6 A 2.3 A 3.0 A Eastbound 27.9 C 17.3 B 19.8 B 21.7 C 21.2 C Left 38.5 D 24.5 C 27.5 C 29.7 C 28.8 C Through 34.1 C 29.2 C 29.7 C 32.4 C 29.3 C Right 6.4 A 0.3 A 2.7 A 2.4 A 4.3 A Westbound 24.7 C 15.8 B 16.0 B 21.4 C 18.9 B Left 35.4 D 23.6 C 23.6 C 28.2 C 24.4 C Through 34.2 C 28.9 C 29.0 C 32.4 C 29.2 C Right 7.9 A 0.8 A 0.8 A 0.8 A 0.7 A 75th / ASPERA 12.3 B 12.9 B 13.2 B 14.3 B 13.5 B Northbound 9.9 A 11.0 B 11.0 B 11.4 B 11.3 B Left 25.3 C 29.3 C 29.1 C 31.3 C 32.0 C Through 4.9 A 5.0 A 5.0 A 5.1 A 4.7 A Southbound 14.8 B 15.0 B 15.6 B 17.5 B 15.9 B Through 15.4 B 15.7 B 16.3 B 18.3 B 16.6 B Right 3.5 A 3.4 A 3.4 A 3.2 A 3.0 A Eastbound 8.7 A 9.0 A 8.8 A 9.2 A 10.0 B Left 18.6 B 19.1 B 19.2 B 21.3 C 23.9 C Right 5.6 A 5.6 A 5.6 A 5.8 A 6.4 A Broadstone Arrowhead Traffic Impact Analysis Page 4 Table 4: Level-of-Service Detailed Summary 75th & SR-101 – AM Peak Hour Table 5 and Table 6 provide the same information as Table 3 and Table 4 for the evening peak hour. EXISTING 2024 2026 2026 WITH SITE 2031 2031 WITH SITE DELAY LOS DELAY LOS DELAY LOS DELAY LOS DELAY LOS 75th / SR-101 NORTH (WB) RAMP 31.6 C 32.3 C 34.2 C 51.4 D 47.7 D Northbound 44.2 D 39.5 D 41.1 D 89.7 F 68.3 E Left 23.7 C 23.0 C 23.1 C 39.9 D 31.0 C Through 45.7 D 42.7 D 44.5 D 99.1 F 75.3 E Southbound 32.3 C 35.3 D 38.2 D 42.5 D 47.6 D Through 41.0 D 44.2 D 48.0 D 52.8 D 60.3 E Right 7.5 A 7.4 A 7.4 A 9.9 A 7.3 A Westbound 19.3 B 18.4 B 18.7 B 27.6 C 25.8 C Left 44.3 D 42.4 D 42.9 D 66.6 E 63.2 E Through 13.3 B 12.4 B 12.8 B 18.5 B 16.6 B Right 8.0 A 8.1 A 8.0 A 9.1 A 9.0 A 75th / SR-101 SOUTH (EB) RAMP 27.0 C 27.6 C 28.9 C 40.4 D 37.7 D Northbound 21.0 C 21.0 C 21.1 C 33.0 C 28.0 C Through 22.6 C 22.2 C 22.0 C 31.5 C 27.1 C Right 17.8 B 18.9 B 19.5 B 35.6 D 29.7 C Southbound 28.7 C 29.4 C 32.7 C 45.3 D 42.8 D Left 27.6 C 28.8 C 29.9 C 44.7 D 40.6 D Through 30.7 C 30.5 C 37.6 D 46.4 D 46.8 D Eastbound 29.3 C 29.9 C 28.4 C 37.9 D 36.5 D Left 36.0 D 36.6 D 35.1 D 44.5 D 43.5 D Through 30.8 C 31.0 C 29.4 C 40.3 D 38.5 D Right 6.1 A 4.3 A 3.3 A 7.0 A 6.7 A Broadstone Arrowhead Traffic Impact Analysis Page 5 Table 5: Level-of-Service Detailed Summary 75th at Rose Garden and at Aspera – PM Peak Hour EXISTING 2024 2026 2026 WITH SITE 2031 2031 WITH SITE DELAY LOS DELAY LOS DELAY LOS DELAY LOS DELAY LOS 75th / ROSE GARDEN 33.0 C 26.3 C 25.0 C 28.8 C 28.8 C Northbound 47.1 D 30.6 C 27.7 C 33.6 C 33.9 C Left 14.7 B 12.9 B 17.5 B 13.2 B 20.4 C Through 54.8 D 34.1 C 31.1 C 37.8 D 37.8 D Right 4.6 A 3.8 A 3.8 A 4.3 A 9.6 A Southbound 28.6 C 25.6 C 26.0 C 26.6 C 26.4 C Left 15.4 B 13.6 B 13.6 B 13.2 B 13.3 B Through 30.6 C 27.0 C 28.6 C 28.2 C 28.8 C Right 0.2 A 0.1 A 0.3 A 0.1 A 1.0 A Eastbound 11.6 B 12.5 B 13.4 B 19.8 B 20.2 C Left 16.5 B 16.8 B 18.5 B 23.7 C 25.4 C Through 21.9 C 23.8 C 24.2 C 29.8 C 30.0 C Right 0.2 A 0.1 A 0.2 A 0.2 A 0.2 A Westbound 16.6 B 11.4 B 12.2 B 18.2 B 18.5 B Left 22.9 C 17.6 B 18.3 B 24.8 C 24.8 C Through 21.4 C 23.7 C 23.9 C 29.8 C 30.1 C Right 5.2 A 0.5 A 0.6 A 2.5 A 2.5 A 75th / ASPERA 10.5 B 12.9 B 10.6 B 13.0 B 13.3 B Northbound 8.2 A 11.0 B 8.4 A 11.3 B 11.6 B Left 22.3 C 29.3 C 22.4 C 30.1 C 30.1 C Through 5.3 A 5.0 A 5.9 A 8.0 A 8.3 A Southbound 13.0 B 15.0 B 13.2 B 15.2 B 15.7 B Through 13.6 B 15.7 B 13.7 B 15.7 B 16.3 B Right 3.6 A 3.4 A 3.7 A 3.6 A 3.6 A Eastbound 10.7 B 9.0 A 10.4 B 11.2 B 11.1 B Left 18.9 B 19.1 B 18.8 B 19.3 B 19.4 B Right 5.7 A 5.6 A 5.6 A 5.3 A 5.3 A Broadstone Arrowhead Traffic Impact Analysis Page 6 Table 6: Level-of-Service Detailed Summary 75th & SR-101 – PM Peak Hour At the four (4) signalized study intersections, only the 75th / SR-101 interchange ramps experience level- of-service “E” or “F”. These are the northbound, southbound, and westbound approaches and left turns. This is typical of urban freeway interchange ramps during peak traffic periods. With the Broadstone Arrowhead multi-family homes, the average delay increases by less than five (5) seconds – too minimal to be noticeable by drivers. At the 75th / Rose Garden intersection, during the morning peak hour, all movements are acceptable at level-of-service “C” or better. In 2031, without or with the Broadstone Arrowhead homes, three (3) movements (northbound left, southbound left, and southbound approach) are at level-of-service “D” in the morning peak hour and one (1) movement (northbound through) is at “D” in the evening peak hour. On the eastbound approach of Rose Garden Lane at 75th Avenue, all movements experience an average delay of 30 seconds or less in both peak periods, through 2031, without and with Broadstone Arrowhead. The 75th Avenue interchange with State Route 101, westbound ramp, is anticipated to experience some levels-of-service “E” and “F” in 2031 without the Broadstone Arrowhead apartments, during both the morning and evening peak hours. The 75th Avenue interchange with State Route 101, westbound ramp, is anticipated to experience some levels-of-service “E” and “F” in 2026 with the Broadstone Arrowhead apartments, during both the morning and evening peak hours. Table 7 provides the delays and levels-of-service by intersection, approach, and turning movement for the two (2) accesses of Broadstone Arrowhead. The main access is with Rose Garden Lane, and the secondary access is via Joy Boulevard to Aspera Boulevard. EXISTING 2024 2026 2026 WITH SITE 2031 2031 WITH SITE DELAY LOS DELAY LOS DELAY LOS DELAY LOS DELAY LOS 75th / SR-101 NORTH (WB) RAMP 49.4 D 44.3 D 49.2 D 67.7 E 68.8 E Northbound 81.8 F 71.7 E 65.2 E 94.7 F 92.9 F Left 33.8 C 28.6 C 35.4 D 55.4 E 55.4 E Through 94.6 F 81.1 F 71.5 E 104.1 F 101.5 F Southbound 33.5 C 33.2 C 50.0 D 63.5 E 67.2 E Through 42.5 D 41.8 D 64.0 E 81.8 F 86.5 F Right 9.6 A 7.7 A 8.8 A 9.6 A 10.3 B Westbound 38.8 D 34.1 C 34.3 C 49.4 D 49.9 D Left 87.5 F 80.1 F 76.9 E 106.8 F 110.4 F Through 29.2 C 24.4 C 27.0 C 42.5 D 42.1 D Right 8.3 A 8.2 A 8.2 A 8.3 A 8.4 A 75th / SR-101 SOUTH (EB) RAMP 22.8 C 24.2 C 24.7 C 38.4 D 31.5 C Northbound 14.4 B 14.9 B 15.1 B 16.5 B 17.7 B Through 14.4 B 19.9 B 20.1 C 21.8 C 23.7 C Right 5.8 A 5.3 A 5.3 A 5.8 A 5.5 A Southbound 26.8 C 28.5 C 29.1 C 57.4 E 40.2 D Left 25.5 C 28.8 C 29.5 C 62.5 E 39.8 D Through 28.5 C 28.1 C 28.7 C 51.8 D 40.6 D Eastbound 25.4 C 27.1 C 28.1 C 23.6 C 30.6 C Left 36.8 D 37.7 D 39.6 D 32.3 C 42.8 D Through 20.2 C 22.7 C 22.9 C 20.5 C 25.4 C Right 0.6 A 1.1 A 1.1 A 2.0 A 3.2 A Broadstone Arrowhead Traffic Impact Analysis Page 7 Table 7: Level-of-Service Detailed Summary Site Accesses – AM and PM Peak Hours The two (2) unsignalized accesses to Broadstone Arrowhead will operate at level-of-service “A” or “B” during peak traffic periods. There are no collision patterns that suggest intersection configuration or traffic control modifications at the two (2) intersections or near the interchange vicinity. Recommendations without Broadstone Arrowhead No improvements to the lane configuration or traffic signal operation are recommended at any of the four (4) study intersections in 2026 or 2031 without the development of the Broadstone Arrowhead multi-family homes. Recommendations with Broadstone Arrowhead No improvements to the lane configuration or traffic signal operation are recommended at any of the four (4) study intersections in 2026 or 2031 with the development of the Broadstone Arrowhead multi-family homes. MORNING PEAK HOUR EVENING PEAK HOUR 2026 WITH SITE 2031 WITH SITE 2026 WITH SITE 2031 WITH SITE DELAY LOS DELAY LOS DELAY LOS DELAY LOS MAIN ACCESS / ROSE GARDEN 2.1 A 2.8 A 3.4 A 2.8 A Northbound 10.5 B 9.8 A 9.5 A 9.8 A Right 10.5 B 9.8 A 9.5 A 9.8 A Westbound 0.9 A 3.3 A 4.2 A 3.3 A Left 7.9 A 7.9 A 7.8 A 7.9 A JOY BOULEVARD / ASPERA 0.2 A 0.1 A 0.2 A 0.1 A Southbound 14.7 B 14.2 B 12.8 B 14.2 B Left 14.7 B 14.2 B 12.8 B 14.2 B Westbound 0.0 A 0.0 A 0.0 A 0.0 A Right 0.0 A 0.0 A 0.0 A 0.0 A