PowerPoint Presentation (Added 4/4/2025)*

City of Glendale — Regular Meeting (2025-04-08)

View PDF Item 2 Meeting page

Extracted text (via pymupdf) 3708 characters
Telecom in Glendale
City Council Workshop April 8, 2025
Engineering Department

Glendale ROW Strategic Imperatives
2
•Protect city and private infrastructure 
from damage
• Ensure fair access to the ROW
• Ensure vendors communicate forward to 
impacted neighborhoods
• Promote quality of life and commerce

Terminology
3
• Cable License – allows the entity to construct / upgrade their 
infrastructure  within the ROW that provides cable television 
service.
• Telecom License - allows the entity to construct / upgrade their 
infrastructure  within the ROW that provides voice data phone 
service
• Fiber License - allows the entity to construct / upgrade their 
infrastructure  within the ROW that provides backhaul data so it 
can be processed and used to support internet services.
• Franchise Agreements -allows the entity to construct / upgrade 
their infrastructure  within the ROW  that provides life essential 
services.

Terminology 
4
• Right-of-Way Permits – issued by the city to perform 
construction per City and State standards. (180 days)
• Small Cell Licenses – issued by the city to wireless 
vendors to maintain or install  their infrastructure 
placed within the ROW. (10 Years)
• ROW – a corridor for infrastructure within public 
property
• PUE – a corridor for utilities within private property

Trends in the Industry
5
•Insatiable consumer demand
•Transition from Coax-cable to fiber
•Speed to market
–First in, retains 30% of the customer base
–Less expensive to keep customers than find new ones
•Drives Innovation 
–Improve Speed (Up to 10X faster)
–Improve Bandwidth
–Eliminate Latency- Delay

6
The Marketplace 2022

The Marketplace 2024/25 Additions 
7

8
• How long to download the movie “ET”
– Cable       4 Minutes
– Fiber        3 Seconds
Convenience = Speed & Reliability

Economic Growth  
Access to Data, Drives Business
9
Residential fiber supplies most of the 
demand, but businesses benefit even more.
Reliable high-speed data is essential to 
keeping and attracting businesses.

Engineering by the Numbers
10
• Average 1,200 annual permits/licenses  
issued
• All Permits require a plan review
• Most permits require a “pre-construction 
meeting” 
• Each permit requires a minimum of 3 
inspections

Permit Map (March 2025)
11

By the Numbers 
12

By the Numbers
13

ROW is Finite
14

Public Utility Easement - PUE
15

PUE -   Front Yard
16

17
Blue Staking
• Blue stake is required 
before any new 
construction. 
• Water services is 
required to complete 
Blue Stake within 2 
business days of a 
request being made.
Impact To Other Departments

Impact to Streets
18
•Nearly every road in Glendale will be 
touched in the next 3 years
–Fiber must be brought directly to the home or 
business, conduit has to be installed to every 
address. 
–This will primarily be done by directional boring. 
Residents will have at least some excavation in the 
PUE in front of their house.
–There will be increased pressure to adopt micro-
trenching (MAG)

Impacts to Residents
19

What this Looks Like
20
Red dots     = Installation of Equipment
Blue dots    = Excavation to verify waterline depth
Green dots = Excavation to verify sewer depth
20 homes
62 holes dug in PUE

Future Issues
21
• Supplement staff for oncoming peak
– Staff for normal, supplement for peak
• Continue to evolve city standards
– Pavement Management
– Trenching standards
• Closely monitor and engage in legislation
– Continue work with the CAO on the evolving regulations  
• Update our Standard License Agreement(s)
– Be consistent with the term of the agreement (5 years)
– Move towards a % of revenue
• Common among peer cities
• Familiarizes the  process for all players
• Competitive neutrality