City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
Project Name: GLENDALE-PHOENIX WATER SUPPLY INTERCONNECTS
Project No.:
212238.2
Amendment No: 01
Date:
This Amendment to that certain Standard Form Agreement dated October 22, 2024 by and between the City of
Glendale and MGC Contractors, Inc., (CM@Risk) for services, deliverables and work related to Project No.
212238.2, Project Name: Glendale-Phoenix Water Supply Interconnects, (the “Agreement”) is made and entered
into effective this day of , 2025.
1. This Amendment #01 establishes a Guaranteed Maximum Price (“GMP”) and Construction Phase Fee for
Construction Services and incorporates such terms into the Agreement, making the Agreement effective
for Construction Phase Services:
a.
The total fee for Construction Phase Services, which is included in the Guaranteed Maximum Price (GMP)
as defined under the Agreement, shall be fixed at One Hundred Seventy-Nine Thousand Three Hundred
Ninety-Seven and 51/100 Dollars ($179,397.51). [INSERT ADDITIONAL LANGUAGE HERE IF
PHASED AGREEMENT.]
b. The Guaranteed Maximum Price (“GMP”) for Construction Services, as defined under the Agreement, shall
be Two Million One Hundred Ten Thousand Five Hundred Fifty-Eight and 96/100 Dollars
($2,110.558.96). [INSERT ADDITIONAL LANGUAGE HERE IF PHASED AGREEMENT.]
c.
The total compensation under the Agreement, as amended by this Amendment, shall be:
Pre-Construction Phase
Construction Phase
Total
Original Agreement:
$601,931.20
$
$601,931.20
Previous Amendments:
$
$
$
This Amendment:
$
$2,110,558.96
$2,110,558.96
Total (including this
Amendment):
$601,931.20
$2,110,558.96
$2,712,490.16
2. DELETE the blank template “Exhibit C – Cost of the Work – Schedule of Values” from the Agreement,
and ADD “Exhibit C – MGC Contractors, Inc. Cost of the Work – Schedule of Values” dated April 23,
2025 (12 Pages), attached herein.
3. ADD “Exhibit E – Construction Documents necessary to define Scope of Work and deliverables for the
Construction Phase Services, including plans, designs, drawings, specifications and other required
Contract Documents” dated March 25, 2025 (15 Pages), attached herein.
4. ADD “Exhibit F - Statement of All Clarifications and Assumptions” dated March 25, 2025 (3 Pages),
attached herein.
5. ADD “Exhibit G – Schedule of Major Milestones” dated March 14, 2025 (3 Pages), attached herein.
6. All other provisions, terms and conditions of the Agreement shall remain unchanged and in full effect.
(Signature on following page)
Michael Caruso
Associate Vice President
16 May 2025
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
EXHIBIT C
Cost of the Work
(One (1) page - template)
(12 pages - final document to be included with GMP Amendment)
See attached
3URMHFW7LWOH
$02817
',5(&7&2676
&RVWRI&RQVWUXFWLRQ*OHQGDOH3\UDPLG3HDN,QWHUFRQQHFW
&RVWRI&RQVWUXFWLRQ*OHQGDOH7RQRSDK,QWHUFRQQHFW
68%727$/',5(&7&2676
,1',5(&7&2676
&$/&8/$7('
5$7(
$
%
&
'
68%727$/*(1(5$/&21',7,216&2676
(
68%727$/',5(&7$1',1',5(&7&2676
)
*
68%727$/',5(&7$1',1',5(&7&2676,1&/8',1*)((
+
6DOHV7D[
- $OORZDQFHV
5HPRYHG3URMHFW'LUHFWRU*HQHUDO6XSHUDQG2IILFH7UDLORU
5HGXFHG'XUDWLRQV)RU3URMHFW(QJLQHHU3URMHFW0DQDJHU6DIHW\0DQDJHU4$4&0DQDJHUDQG7UXFN7RWDOV
5HGXFHG&RQVWUXFWLRQ)HHWR
. 7RWDO&RQWUDFW$PRXQW
*HQHUDO&RQGLWLRQV([FOXGLQJ%RQGVDQG,QVXUDQFH
3D\PHQWDQG3HUIRUPDQFH%RQGV
,QVXUDQFH
&RQVWUXFWLRQ)HH2YHUKHDG 3URILW
, 'LUHFW ,QGLUHFW&RVW3OXV6DOHV7D[
&216758&7,216(59,&(6
*036800$5<6+((75(9
3URMHFW1XPEHU
$SU
*OHQGDOH3KRHQL[:DWHU6XSSO\,QWHUFRQQHFWV
1R
'HVFULSWLRQ
4XDQWLW\
8QLW
7RWDO$OORZDQFH
$GGLWLRQDO7UDIILF&RQWURO$OORZDQFH
/6
/DQGVFDSH5HVWRUDWLRQ$OORZDQFH3\UDPLG3HDN6LWH
/6
/DQGVFDSH5HVWRUDWLRQ$OORZDQFHVW 7RQRSDK6LWH
/6
+DUG'LJ$OORZDQFH
/6
$VSKDOW6WULSLQJ$OORZDQFH
/6
*UDWLQJ0RGLILFDWLRQ$OORZDQFH#0HWHULQJ6WUXFWXUH
/6
3LSH6XSSRUW'HVLJQ$OORZDQFH
/6
&RQWUDFWRU
V&RQWLQJHQF\
/6
*OHQGDOH3KRHQL[:DWHU6XSSO\,QWHUFRQQHFWV*035(9
$OORZDQFH%UHDNGRZQ
%727$/*03$//2:$1&(
dŚĞŝƚLJŽĨ'ůĞŶĚĂůĞͲ'DWϭWƌŽƉŽƐĂů±'ůĞŶĚĂůĞͬ WŚŽĞŶŝdž/ŶƚĞƌĐŽŶŶĞĐƚƐͲWƌŽũĞĐƚEŽ͘ ϮϭϮϮϯϴ͘ Ϯ
7$%
&2672)&216758&7,21
6&+('8/(2)9$/8(6
&%6
3RVLWLRQ&RGH
'HVFULSWLRQ
)RUHFDVW
724XDQWLW\
8QLWRI
0HDVXUH
8QLW&RVW
7RWDO&RVW
)RUHFDVW
/DERU7RWDO&RVW
0DQ+RXUV
7RWDO
QHG(TXLSPHQW7RWDOXEFRQWUDFW7RWDO&RV6XSSOLHV7RWDO&RVDWHULDOV7RWDO&RHQWHG(TXLSPHQW7RWDO&R)HHV7RWDO&RV7/&DWHJRU\7RWDO&RV
&LW\RI*OHQGDOH3KRHQL[:DWHU6XSSO\,QWHUFRQQHFW*03
/XPS6XP
3ULPH%RQG
/XPS6XP
*/,QVXUDQFH
/XPS6XP
%XLOGHUV5LVN,QVXUDQFH
/XPS6XP
6PDOO7RROV/DERU
/XPS6XP
6DIHW\/DERU
/XPS6XP
3URMHFW([HFXWLYH7;
/XPS6XP
*HQHUDO6XSHU7;
/XPS6XP
6DOHV7D[&LW\
/XPS6XP
*HQHUDO([SHQVH
/XPS6XP
*(1(5$/&21',7,216
(DFK
3URMHFW6WDII
(DFK
3URMHFW0DQDJHU
:HHN
3URMHFW6XSHULQWHQGHQW
:HHN
3URMHFW(QJLQHHU
:HHN
4$4&0DQDJHU
:HHN
6DIHW\0DQDJHU
:HHN
/LJKW'XW\3LFNXS
:HHN
+HDY\'XW\3LFNXS
:HHN
*HQHUDO6XSHULQWHQGHQW
:HHN
3URMHFW'LUHFWRU
:HHN
*(1(5$/5(48,5(0(176
(DFK
&RQWUDFWRU)LHOG2IILFH
0RQWK
0*&6&23('85$7,21
:HHN
6HWXS7DNHGRZQ&RQVWUXFWLRQ<DUG
($
7HPSRUDU\(OHFWULFLW\
0RQWK
)LHOG2IILFH3ULQWHU
0RQWK
)LHOG2IILFH6XSSOLHV
0RQWK
,QWHUQHW
0RQWK
,7&RVWV
0RQWK
2IILFH7UDLOHU5HQWDO
0RQWK
*HQHUDO5HTXLUHPHQWV
0RQWK
0RE 'HPRE
/6
*(1(5$/5(48,5(0(176
(DFK
&RQWUDFWRU)LHOG2IILFH
0RQWK
0*&6&23('85$7,21
:HHN
6HWXS7DNHGRZQ&RQVWUXFWLRQ<DUG
($
7HPSRUDU\(OHFWULFLW\
0RQWK
)LHOG2IILFH3ULQWHU
0RQWK
)LHOG2IILFH6XSSOLHV
0RQWK
,QWHUQHW
0RQWK
,7&RVWV
0RQWK
2IILFH7UDLOHU5HQWDO
0RQWK
*HQHUDO5HTXLUHPHQWV
0RQWK
0RE 'HPRE
/6
*(1(5$/&21',7,216
(DFK
3URMHFW6WDII
(DFK
3URMHFW0DQDJHU
:HHN
3URMHFW6XSHULQWHQGHQW
:HHN
3URMHFW(QJLQHHU
:HHN
4$4&0DQDJHU
:HHN
6DIHW\0DQDJHU
:HHN
/LJKW'XW\3LFNXS
:HHN
+HDY\'XW\3LFNXS
:HHN
*HQHUDO6XSHULQWHQGHQW
:HHN
3URMHFW'LUHFWRU
:HHN
*(1(5$/5(48,5(0(176
(DFK
&RQWUDFWRU)LHOG2IILFH
0RQWK
0*&6&23('85$7,21
:HHN
6HWXS7DNHGRZQ&RQVWUXFWLRQ<DUG
($
7HPSRUDU\(OHFWULFLW\
0RQWK
)LHOG2IILFH3ULQWHU
0RQWK
)LHOG2IILFH6XSSOLHV
0RQWK
,QWHUQHW
0RQWK
,7&RVWV
0RQWK
2IILFH7UDLOHU5HQWDO
0RQWK
*HQHUDO5HTXLUHPHQWV
0RQWK
0RE 'HPRE
/6
*(1(5$/5(48,5(0(176
(DFK
&RQWUDFWRU)LHOG2IILFH
0RQWK
0*&6&23('85$7,21
:HHN
6HWXS7DNHGRZQ&RQVWUXFWLRQ<DUG
($
7HPSRUDU\(OHFWULFLW\
0RQWK
)LHOG2IILFH3ULQWHU
0RQWK
)LHOG2IILFH6XSSOLHV
0RQWK
,QWHUQHW
0RQWK
,7&RVWV
0RQWK
2IILFH7UDLOHU5HQWDO
0RQWK
*HQHUDO5HTXLUHPHQWV
0RQWK
0RE 'HPRE
/6
*HQHUDO6XSHULQWHQGHQW
:HHN
3URMHFW'LUHFWRU
:HHN
*(1(5$/5(48,5(0(176
(DFK
&RQWUDFWRU)LHOG2IILFH
0RQWK
0*&6&23('85$7,21
:HHN
6HWXS7DNHGRZQ&RQVWUXFWLRQ<DUG
($
7HPSRUDU\(OHFWULFLW\
0RQWK
)LHOG2IILFH3ULQWHU
0RQWK
)LHOG2IILFH6XSSOLHV
0RQWK
*(1(5$/5(48,5(0(176
(DFK
&RQWUDFWRU)LHOG2IILFH
0RQWK
0*&6&23('85$7,21
:HHN
6HWXS7DNHGRZQ&RQVWUXFWLRQ<DUG
($
7HPSRUDU\(OHFWULFLW\
0RQWK
)LHOG2IILFH3ULQWHU
0RQWK
)LHOG2IILFH6XSSOLHV
0RQWK
,QWHUQHW
0RQWK
,7&RVWV
0RQWK
,7&RVWV
0RQWK
2IILFH7UDLOHU5HQWDO
0RQWK
*HQHUDO5HTXLUHPHQWV
0RQWK
0RE 'HPRE
/6
*HQHUDO5HTXLUHPHQWV
0RQWK
0RE 'HPRE
/6
&%6
3RVLWLRQ&RGH
'HVFULSWLRQ
)RUHFDVW
724XDQWLW\
8QLWRI
0HDVXUH
8QLW&RVW
7RWDO&RVW
)RUHFDVW
/DERU7RWDO&RVW
0DQ+RXUV
7RWDO
QHG(TXLSPHQW7RWDOXEFRQWUDFW7RWDO&RV6XSSOLHV7RWDO&RVDWHULDOV7RWDO&RHQWHG(TXLSPHQW7RWDO&R)HHV7RWDO&RV7/&DWHJRU\7RWDO&RV
(TXLSPHQW0RE)UHLJKWRI3LHFHV
(DFK
(TXLSPHQW'HPRE)UHLJKWRI3LHFHV
(DFK
&RQVWUXFWLRQ<DUG
/6
&RQVWUXFWLRQ:DWHU0RQWKO\8VDJH)HHV
0RQWK
&RQVWUXFWLRQ:DWHU+\GUDQW0HWHU6HWXS)HHV
(DFK
--RQ
V
0RQWK
+DQGZDVK6WDWLRQV
0RQWK
&RQVWUXFWLRQ)HQFH5HQW7HPSRUDU\&KDLQ/LQN
/)
&RQVWUXFWLRQ)HQFH6HWXS7HPSRUDU\&KDLQ/LQN
/)
&RQQH[%R[
0RQWK
6LWH6HFXULW\&DPHUDV
0RQWK
5ROO2II'XPSVWHULQFOGXPSIHHV
0RQWK
3URMHFW,GHQWLILFDWLRQ
($
,FH :DWHU
0RQWK
2 03UHS&RQWUDFW&ORVHRXW
:HHN
3RWKROH8WLOLWLHV
'D\
3URMHFW3KRWRV
0RQWK
6DIHW\6XSSOLHV 7UDLQLQJRI7RWDO/DERU&RVW
/6
0DWHULDO7HVWLQJ 6SHFLDO,QVSHFWLRQV
/6
3<5$0,'3($.6,7(
(DFK
6,7(:25.3<5$0,'3($.
(DFK
&UDIW6XSHUYLVLRQ6LWH:RUN
:HHN
&RQVXPDEOH&RQVWUXFWLRQ6XSSOLHV6LWH:RUNRI&UDIW/DERU&RVW
/6
3ROH7UXFN6WDELOL]H3RZHU3ROH#3\UDPLG3HDN6LWH
(DFK
6LWH'HPROLWLRQ
(DFK
6DZFXW68%
/)
6DZFXW([LVWLQJ&RQFUHWH&KDQQHO
/)
6DZFXW([LVWLQJ&XUERI&XWV
(DFK
6DZFXW([LVWLQJ$VSKDOW3DYHPHQWIRU'HPR
/)
6DZFXW([LVWLQJ$VSKDOW3DYHPHQW3DWFK%DFN
/)
+DXO2II68%
(DFK
+DXO2II&RQFUHWH'HEULV&RQFUHWH&KDQQHO
(DFK
+DXO2II&RQFUHWH'HEULV&RQFUHWH6LGHZDON
(DFK
&%6
3RVLWLRQ&RGH
'HVFULSWLRQ
)RUHFDVW
724XDQWLW\
8QLWRI
0HDVXUH
8QLW&RVW
7RWDO&RVW
)RUHFDVW
/DERU7RWDO&RVW
0DQ+RXUV
7RWDO
QHG(TXLSPHQW7RWDOXEFRQWUDFW7RWDO&RV6XSSOLHV7RWDO&RVDWHULDOV7RWDO&RHQWHG(TXLSPHQW7RWDO&R)HHV7RWDO&RV7/&DWHJRU\7RWDO&RV
+DXO2II&RQFUHWH'HEULV&RQFUHWH&XUE
(DFK
+DXO2II$VSKDOW'HEULV3\UDPLG3HDN3DUNZD\
(DFK
+DPPHU /RDGRXW'HPR
G&RQFUHWH&RQFUHWH&KDQQHO#3\UDPLG3H
&<
5HPRYH /RDGRXW&RQFUHWH&XUE3\UDPLG3HDN3DUNZD\
/)
5HPRYH&RQFUHWH6LGHZDON3DQHO /RDGRXW&RQFUHWH3\UDPLG3HDN3
(DFK
+DPPHU /RDGRXW'HPR
G$VSKDOW3DYHPHQW3\UDPLG3HDN3DUNZD\
6)
(DUWKZRUNVIRU&RQFUHWH
(DFK
3XUFKDVH6XEEDVH%DFNILOO0DWHULDOV
7RQ
7UXFNLQJ6XE+DXO2II6SRLOV
($
(DUWKZRUNVIRU%DFNIORZ3UHYHQWRU6ODE
/6
([FDYDWHWR6XEJUDGH%DFNIORZ3UHYHQWRU6ODE
&<
3ODFHDQG&RPSDFW$%&6XEEDVH%DFNIORZ3UHYHQWRU6ODE
7RQ
)LQH*UDGH%DFNIORZ3UHYHQWRU6ODE6XEEDVH
6)
/RDG2XW6SRLOV%DFNIORZ3UHYHQWRU6ODE6XEEDVH
&<
(DUWKZRUNVIRU(OHFWULFDO(TXLSPHQW3DGV
/6
([FDYDWHWR6XEJUDGH(OHFWULFDO(TXLSPHQW3DGV
&<
3ODFH &RPSDFW$%&6XEEDVH(OHFWULFDO(TXLSPHQW3DGV
7RQ
/RDG2XW6SRLOV(OHFWULFDO(TXLSPHQW3DGV
&<
6LWH&RQFUHWH
&<
3XUFKDVH5HDG\0L[0DWHULDOV
&<
36,&RQFUHWH
&<
5HDG\0L[)XHO)HH
($
5HDG\0L[(QYLURQPHQWDO)HH
($
5HDG\0L[,FH 1LWUR)HH
&<
5HDG\0L[6KRUW/RDG)HH
($
3XUFKDVH)RUPZRUN0DWHULDOV
6)
)366ODE2Q*UDGHV
7KLFN
&<
%DFNIORZ3UHYHQWRU6ODE
&<
)RUP 6WULS%DFNIORZ3UHYHQWRU62*
6)
3XUFKDVH5HEDU%DFNIORZ3UHYHQWRU62*
/6
,QVWDOO5HEDU%DFNIORZ3UHYHQWRU62*
/6
3ODFH )LQLVK%DFNIORZ3UHYHQWRU62*
&<
&XUH&RQFUHWH%DFNIORZ3UHYHQWRU62*
6)
&%6
3RVLWLRQ&RGH
'HVFULSWLRQ
)RUHFDVW
724XDQWLW\
8QLWRI
0HDVXUH
8QLW&RVW
7RWDO&RVW
)RUHFDVW
/DERU7RWDO&RVW
0DQ+RXUV
7RWDO
QHG(TXLSPHQW7RWDOXEFRQWUDFW7RWDO&RV6XSSOLHV7RWDO&RVDWHULDOV7RWDO&RHQWHG(TXLSPHQW7RWDO&R)HHV7RWDO&RV7/&DWHJRU\7RWDO&RV
(OHFWULFDO(TXLSPHQW3DGV
&<
3XUFKDVH5HEDU(OHF(TXLSPHQW3DGV
/6
/&33/&($&(OHFWULFDO(TXLSPHQW3DG
[
[
&<
)RUP 6WULS/&33/&($&(OHFWULFDO(TXLSPHQW3DG
6)
,QVWDOO5HEDU/&33/&($&(OHFWULFDO(TXLSPHQW3DG
/6
3ODFH )LQLVK/&33/&($&(OHFWULFDO(TXLSPHQW3DG
&<
&XUH&RQFUHWH/&33/&($&(OHFWULFDO(TXLSPHQW3DG
6)
31/&7(OHFWULFDO(TXLSPHQW3DG
[
[
&<
)RUP 6WULS31/&7(OHFWULFDO(TXLSPHQW3DG
6)
,QVWDOO5HEDU31/&7(OHFWULFDO(TXLSPHQW3DG
/6
3ODFH )LQLVK31/&7(OHFWULFDO(TXLSPHQW3DG
&<
&XUH&RQFUHWH31/&7(OHFWULFDO(TXLSPHQW3DG
6)
)36&RQFUHWH&KDQQHO
&<
)RUP 6WULS&RQFUHWH&KDQQHO6XSHU6ODEV($
[
[
6)
3ODFH )LQLVK&RQFUHWH&KDQQHO6XSHU6ODEV($
&<
)RUP 6WULS&RQFUHWH&KDQQHO%RWWRP6ODE
[
[
6)
'RZHO,QWR([LVWLQJ&KDQQHO%RWK6LGHV
($
,QVWDOO:HOGHG:LUH)DEULF&RQFUHWH&KDQQHO%RWWRP6ODE
[
[
6)
3ODFH )LQLVK&RQFUHWH&KDQQHO%RWWRP6ODE
&<
,QVWDOO:HOGHG:LUH)DEULF&RQFUHWH&KDQQHO6ORSHV
6)
3ODFH )LQLVK&RQFUHWH&KDQQHO6ORSHV
&<
)36$QWHQQD3ROH%DVH
&<
'ULOOIRU$QWHQQD3ROH%DVH
(DFK
3XUFKDVH5HEDU$QWHQQD%DVH3ROH
/6
)RUP 6WULS$QWHQQD3ROH%DVH
6)
3ODFH )LQLVK$QWHQQD3ROH%DVH
&<
0HWDOV
/6
3LSH%ROODUGV
(DFK
3XUFKDVH3LSH%ROODUGV
(DFK
,QVWDOO3LSH%ROODUGV
(DFK
$VSKDOW3DYLQJ6OXUU\6HDO6WULSLQJ
(DFK
68%$VSKDOW3DYLQJ
6<
([SRVH([LVWLQJ8WLOLWLHV
'D\
&%6
3RVLWLRQ&RGH
'HVFULSWLRQ
)RUHFDVW
724XDQWLW\
8QLWRI
0HDVXUH
8QLW&RVW
7RWDO&RVW
)RUHFDVW
/DERU7RWDO&RVW
0DQ+RXUV
7RWDO
QHG(TXLSPHQW7RWDOXEFRQWUDFW7RWDO&RV6XSSOLHV7RWDO&RVDWHULDOV7RWDO&RHQWHG(TXLSPHQW7RWDO&R)HHV7RWDO&RV7/&DWHJRU\7RWDO&RV
352&(663,3,1*3<5$0,'3($.
(DFK
&UDIW6XSHUYLVLRQ3URFHVV3LSLQJ
:HHN
&RQVXPDEOH&RQVWUXFWLRQ6XSSOLHV3URFHVV3LSLQJRI&UDIW/DERU
/6
%XULHG3LSH 9DOYHV
/)
3XUFKDVH%XULHG3LSH 9DOYHV3\UDPLG3HDN6LWH
/6
3XUFKDVH%XULHG3LSH7UHQFK%DFNILOO0DWHULDOV
/6
$%&%XULHG7UHQFK%DFNILOO
7RQ
6DQG%XULHG7UHQFK%DFNILOO
7RQ
&/60%XULHG7UHQFK%DFNILOO
&<
7UXFNLQJ6XE+DXO2II%XULHG3LSH7UHQFK6SRLOV
(DFK
5HQW7UHQFK6KRULQJ%XULHG3LSH 9DOYHV
:HHN
8QORDG +DQGOH%XULHG3LSH 9DOYHV
/)
7HVW%XULHG3LSH 9DOYHV
/)
'LVLQIHFW%XULHG3LSH 9DOYHV
/)
'/%3:/LQH
'HHS
/)
&RPSOHWH3:7DSSLQJ6OHHYH 9DOYH%R[
($
+RW7DS3:/LQH
($
'/%)OXVKLQJ/LQHIURP%DFNIORZ3UHYHQWRUWR&RQFUHWH&KDQQHO
/)
5HSODFH([LVWLQJ)LUH)ORZ0HWHU
(DFK
5HPRYH([LVWLQJ)LUH)ORZ0HWHU
(DFK
,QVWDOO1HZ)LUH)ORZ0HWHU
(DFK
6OXUU\%DFNILOO3:8QGHU0DVRQU\:DOO
/6
7HPSRUDU\6XSSRUWRI0DVRQU\:DOO)RRWHU
/6
3XUFKDVH&/60%DFNILOO
&<
6DFN&/606OXUU\
&<
5HDG\0L[)XHO)HH
($
5HDG\0L[(QYLURQPHQWDO)HH
($
3ODFH&/60%DFNILOO8QGHU0DVRQU\:DOO)RRWHU
3DVW(DFKVLGHRI
&<
$ERYH*URXQG3LSH 9DOYHV
(DFK
3XUFKDVH$ERYH*URXQG3LSH 9DOYHV3\UDPLG3HDN6LWH
/6
8QORDG +DQGOH$ERYH*URXQG3LSH 9DOYHV
/)
7HVW$ERYH*URXQG3LSH 9DOYHV
/)
'LVLQIHFW$ERYH*URXQG3LSH 9DOYHV
/)
&%6
3RVLWLRQ&RGH
'HVFULSWLRQ
)RUHFDVW
724XDQWLW\
8QLWRI
0HDVXUH
8QLW&RVW
7RWDO&RVW
)RUHFDVW
/DERU7RWDO&RVW
0DQ+RXUV
7RWDO
QHG(TXLSPHQW7RWDOXEFRQWUDFW7RWDO&RV6XSSOLHV7RWDO&RVDWHULDOV7RWDO&RHQWHG(TXLSPHQW7RWDO&R)HHV7RWDO&RV7/&DWHJRU\7RWDO&RV
%DFNIORZ3UHYHQWHU3LSH 9DOYHV
/)
7ULPWR)LW%DFNIORZ3UHYHQWHU3LSH 9DOYHV
/)
,QVWDOO%DFNIORZ3UHYHQWHU3LSH 9DOYHV
/)
5HVHUYRLU0HWHULQJ6WUXFWXUH3LSH 9DOYHV
/)
7ULPWR)LW5HVHUYRLU0HWHULQJ6WUXFWXUH3LSH 9DOYHV
/)
,QVWDOO5HVHUYRLU0HWHULQJ6WUXFWXUH3LSH 9DOYHV
/)
68%&RPSOHWH:HOG2Q7DSSLQJ6OHHYH
/6
3DLQW &RDWLQJV3\UDPLG3HDN6LWH
/6
75$)),&&21752/3<5$0,'3($.
(DFK
7UDIILF&RQWURO68%3\UDPLG3HDN
:HHN
(/(&75,&$/3<5$0,'3($.
(DFK
&UDIW6XSHUYLVLRQ(OHFWULFDO6XE6SSRUW
:HHN
(OHFWULFDO68%3<5$0,'3($.(;&/8',1*/21*/($'352&85(0(17
(DFK
0*&6XE6XSSRUW
(DFK
(OHFWULFDO'XFWEDQN
/)
3XUFKDVH'XFWEDQN%DFNILOO0DWHULDOV
&<
36,&RQFUHWH
&<
5HDG\0L[)XHO)HH
($
5HDG\0L[(QYLURQPHQWDO)HH
($
5HDG\0L[,FH 1LWUR)HH
&<
8WLOLW\5HG&RORU
&<
&RORU:DVKRXW&KDUJH
($
'LJ %DFNILOO(OHFWULFDO'XFWEDQNV
/)
+DXO2II'XFWEDQN6SRLOV
($
67 72123$+6,7(
(DFK
6,7(:25.VW 72123$+
(DFK
&UDIW6XSHUYLVLRQ6LWH:RUN
:HHN
&RQVXPDEOH&RQVWUXFWLRQ6XSSOLHV6LWH:RUNRI&UDIW/DERU&RVW
/6
6LWH'HPROLWLRQ
(DFK
'HPROLVK([LVWLQJ3LSLQJ,QVLGH9DXOW
/6
([SRVH 5HPRYH8QGHUJURXQG3LSHDW(DVWVLGHRI9DXOW
/6
([SRVH 5HPRYH8QGHUJURXQG3LSHDW:HVWVLGHRI9DXOW
/6
3RWKROH([LVWLQJ8WLOLWLHV
'D\
&%6
3RVLWLRQ&RGH
'HVFULSWLRQ
)RUHFDVW
724XDQWLW\
8QLWRI
0HDVXUH
8QLW&RVW
7RWDO&RVW
)RUHFDVW
/DERU7RWDO&RVW
0DQ+RXUV
7RWDO
QHG(TXLSPHQW7RWDOXEFRQWUDFW7RWDO&RV6XSSOLHV7RWDO&RVDWHULDOV7RWDO&RHQWHG(TXLSPHQW7RWDO&R)HHV7RWDO&RV7/&DWHJRU\7RWDO&RV
(DUWKZRUNVIRU&RQFUHWH
/6
3XUFKDVH6XEEDVH%DFNILOO0DWHULDOV
7RQ
7UXFNLQJ6XE+DXO2II6SRLOV
($
(DUWKZRUNVIRU1HZ(OHFWULFDO(TXLSPHQW3DG
/6
([FDYDWHWR6XEJUDGH1HZ(OHFWULFDO(TXLSPHQW3DG
&<
3ODFHDQG&RPSDFW$%&6XEEDVH1HZ(OHFWULFDO(TXLSPHQW3DG
7RQ
)LQH*UDGH1HZ(OHFWULFDO(TXLSPHQW3DG
6)
/RDG2XW6SRLOV1HZ(OHFWULFDO(TXLSPHQW3DG
($
6LWH&RQFUHWH
&<
3XUFKDVH5HDG\0L[0DWHULDOV
&<
36,&RQFUHWH
&<
5HDG\0L[)XHO)HH
($
5HDG\0L[(QYLURQPHQWDO)HH
($
5HDG\0L[,FH 1LWUR)HH
&<
5HDG\0L[6KRUW/RDG)HH
($
3XUFKDVH)RUPZRUN0DWHULDOV
6)
1HZ(OHFWULFDO(TXLSPHQW3DG
&<
)RUP 6WULS1HZ(OHFWULFDO(TXLSPHQW3DG
6)
3XUFKDVH5HEDU1HZ(OHFWULFDO(TXLSPHQW3DG
&<
,QVWDOO5HEDU1HZ(OHFWULFDO(TXLSPHQW3DG
/6
3ODFH )LQLVK1HZ(OHFWULFDO(TXLSPHQW3DG
&<
&XUH&RQFUHWH1HZ(OHFWULFDO(TXLSPHQW3DG
6)
352&(663,3,1*67 72123$+
(DFK
&UDIW6XSHUYLVLRQ3URFHVV3LSH
:HHN
&RQVXPDEOH&RQVWUXFWLRQ6XSSOLHV3URFHVV3LSLQJRI&UDIW/DERU
/6
%XULHG3LSH 9DOYHV
(DFK
3XUFKDVH%XULHG3LSH 9DOYHVVW 7RQRSDK6LWH
/6
3XUFKDVHG%XULHG3LSH7UHQFK%DFNILOO0DWHULDOV(DVW :HVWVLGH
7RQ
$%&%XULHG7UHQFK%DFNILOO(DVW :HVWVLGH
7RQ
6DQG%XULHG7UHQFK%DFNILOO(DVW :HVWVLGH
7RQ
7UXFNLQJ6XE+DXO2II%XULHG3LSH7UHQFK6SRLOV(DVW :HVWVLGH
(DFK
5HQW7UHQFK6KRULQJ%XULHG3LSH 9DOYHV
:HHN
8QORDG +DQGOH%XULHG3LSH 9DOYHV
/)
&%6
3RVLWLRQ&RGH
'HVFULSWLRQ
)RUHFDVW
724XDQWLW\
8QLWRI
0HDVXUH
8QLW&RVW
7RWDO&RVW
)RUHFDVW
/DERU7RWDO&RVW
0DQ+RXUV
7RWDO
QHG(TXLSPHQW7RWDOXEFRQWUDFW7RWDO&RV6XSSOLHV7RWDO&RVDWHULDOV7RWDO&RHQWHG(TXLSPHQW7RWDO&R)HHV7RWDO&RV7/&DWHJRU\7RWDO&RV
7HVW%XULHG3LSH 9DOYHV
/)
'LVLQIHFW%XULHG3LSH 9DOYHV
/)
'/%',3IURP%)3WR9DXOW(DVWVLGH
/)
'/%',3IURP9DXOW&XWDQG&DS:HVWVLGH
/)
&RUH%RWK6LGHVRI9DXOWWR
(DFK
$ERYH*URXQG3LSH 9DOYHV
(DFK
3XUFKDVH$ERYH*URXQG3LSH 9DOYHVVW 7RQRSDK6LWH
/6
8QORDG +DQGOH$*3LSH 9DOYHV
/)
7HVW$*3LSH 9DOYHV
/)
'LVLQIHFW$*3LSH 9DOYHV
/)
%)3/LQH
/6
7ULPWR)LW%)3/LQH
/6
,QVWDOO%)3/LQH
/6
',3,QVLGH9DXOW
/)
7ULPWR)LW ',3,QVLGH9DXOW
/)
,QVWDOO ',3,QVLGH9DXOW
/)
3DLQW &RDWLQJVVW 7RQRSDK
/6
(/(&75,&$/67 72123$+
(DFK
&UDIW6XSHUYLVLRQ(OHFWULFDO6XE6XSSRUW
:HHN
(, &6XEVW 7RQRSDK(;&/8',1*/21*/($'352&85(0(17
(DFK
0*&6XE6XSSRUW
(DFK
(OHFWULFDO'XFWEDQN
/)
3XUFKDVH'XFWEDQN%DFNILOO0DWHULDOV
&<
36,&RQFUHWH
&<
5HDG\0L[)XHO)HH
($
5HDG\0L[(QYLURQPHQWDO)HH
($
5HDG\0L[,FH 1LWUR)HH
&<
8WLOLW\5HG&RORU
&<
&RORU:DVKRXW&KDUJH
($
'LJ %DFNILOO(OHFWULFDO'XFWEDQNV
/)
+DXO2II'XFWEDQN6SRLOV
($
$//2:$1&(6&217,1*(1&<
(DFK
$GGLWLRQDO7UDIILF&RQWURO$OORZDQFH
(DFK
&%6
3RVLWLRQ&RGH
'HVFULSWLRQ
)RUHFDVW
724XDQWLW\
8QLWRI
0HDVXUH
8QLW&RVW
7RWDO&RVW
)RUHFDVW
/DERU7RWDO&RVW
0DQ+RXUV
7RWDO
QHG(TXLSPHQW7RWDOXEFRQWUDFW7RWDO&RV6XSSOLHV7RWDO&RVDWHULDOV7RWDO&RHQWHG(TXLSPHQW7RWDO&R)HHV7RWDO&RV7/&DWHJRU\7RWDO&RV
/DQGVFDSH5HVWRUDWLRQ$OORZDQFH3\UDPLG3HDN6LWH
(DFK
/DQGVFDSH5HVWRUDWLRQ$OORZDQFHVW 7RQRSDK6LWH
(DFK
+DUG'LJ$OORZDQFH
(DFK
$VSKDOW6WULSLQJ$OORZDQFH
(DFK
*UDWLQJ0RGLILFDWLRQ$OORZDQFH#3\UDPLG3HDN
(DFK
3LSH6XSSRUW'HVLJQ$OORZDQFH
(DFK
&RQWUDFWRU
V&RQWLQJHQF\
(DFK
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
T H I S P A G E I S B L A N K
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
EXHIBIT E
Construction Documents necessary to define Scope of Work and Deliverables for the
Construction Phase Services, including plans, designs, drawings, specifications and other
required Contract Documents
(15 pages - To be Incorporated by Amendment)
See attached
ÍŜĖŜϙĺċϙ(ŜťĖıÍťôϙϯϙ@aϙ
@ôIJôŘÍīϙIIJċĺŘıÍťĖĺIJϙ
ŘĺĤôèťϙIIJċĺŘıÍťĖĺIJϙ
ēĖŜϙ@aϙĖŜϙċĺŘϙťēôϙĖťƅϙĺċϙ@īôIJîÍīôϱēĺôIJĖƄϙ®ÍťôŘϙŪŕŕīƅϙIIJťôŘèĺIJIJôèťŜϙŘĺĤôèťϠϙſēĖèēϙĖŜϙīĺèÍťôîϙ
ÍťϙıŪīťĖŕīôϙŜĖťôŜϙīĖŜťôîϙĖIJϙťēôϙŕŘĺĤôèťϙîĺèŪıôIJťŜϟϙϙϙϙϙ
iſIJôŘϡϙϙϙ
ϙ
Ėťƅϙĺċϙ@īôIJîÍīôϙ
(IJČĖIJôôŘϡϙϙϙ
ϙ
īÍèħϙÍIJîϙ«ôÍťèēϙ
aϡϙϙϙ
ϙ
a@ϙĺIJťŘÍèťĺŘŜϙ
iſIJôŘϙĺIJťŘÍèťϙbĺϡϙϙ͑͐͑͑͒͗
ϟ͑ ϙ
ŘĺĤôèťϙèĺŕôϙ"ôŜèŘĖŕťĖĺIJϙ
ēĖŜϙŕŘĺĤôèťϙſĖīīϙèĺıŕīƅϙſĖťēϙ(ϙČŘÍIJťϙŘôŗŪĖŘôıôIJťŜϙŜŪèēϙÍŜϙťēôϙ"ÍŽĖŜϙÍèĺIJϙèťϙÍIJîϙϙſēôŘôϙ
ŕĺŜŜĖæīôϟϙēĖŜϙŕŘĺĤôèťϙĖIJèīŪîôŜϙŪŕČŘÍîôŜϙÍIJîϙÍîîĖťĖĺIJŜϙťĺϙťēôϙƅŘÍıĖîϙôÍħϙÍIJîϙĺIJĺŕÍēϙ«ÍŪīťϙ
īĺèÍťĖĺIJŜϙÍŜϙIJĺťôîϙæôīĺſϡϙϙϙ
Ėťôϙ͐ ϙϱϙƅŘÍıĖîϙôÍħϙÍŘħſÍƅϙÍIJîϙĖIJIJÍèīôϙ«ĖŜťÍϙ"ŘĖŽôϙϼƅŘÍıĖîϙÍIJîϙĖIJIJÍèīôϽϡϙĖťôϙ͐ ϙĖŜϙ
īĺèÍťôîϙĖIJϙťēôϙŜĺŪťēſôŜťϙèĺŘIJôŘϙĺċϙťēôϙĖťƅЍŜϙƅŘÍıĖîϙôÍħϙ®ÍťôŘϙŘôÍťıôIJťϙīÍIJťϙϼ®ϽϠϙīĺèÍťôîϙÍťϙ͑͗͐͏͐
ϙbϟϙ͕͒
Řîϙ"ŘĖŽôϠϙēĺôIJĖƄϠϙ¾ϠϙſĖťēĖIJϙťēôϙĖťƅϙĺċϙēĺôIJĖƄϙıŪIJĖèĖŕÍīϙèĖťƅϙīĖıĖťŜϟϙēĖŜϙŕŘĺĤôèťϙ
ĖIJèīŪîôŜϙťēôϙĖIJŜťÍīīÍťĖĺIJϙĺċϙÍŕŕŘĺƄĖıÍťôīƅϙ͕͐͏
ϙċťϟϙĺċϙIJôſϙ͐͑
ϱĖIJèēϙſÍťôŘīĖIJôϠϙſēĖèēϙſĖīīϙèĺIJIJôèťϙťĺϙÍIJϙ
ôƄĖŜťĖIJČϙĖťƅϙĺċϙēĺôIJĖƄϙťŘÍIJŜıĖŜŜĖĺIJϙīĖIJôϙĖIJϙƅŘÍıĖîϙôÍħϙÍŘħſÍƅϙϼſĖťēĖIJϙēĺôIJĖƄϙŘĖČēťϱĺċϱſÍƅϽϟϙ
ēôϙIJôſϙ͐͑
ϱĖIJèēϙſÍťôŘīĖIJôϙſĖīīϙæôϙŘĺŪťôîϙæôīĺſϙČŘÍîôϙťĺϙèĺIJIJôèťϙťĺϙťēôϙƅŘÍıĖîϙôÍħϙ®ϙ͕͒
ϱĖIJèēϙ
îĖŜťŘĖæŪťĖĺIJϙīĖIJôϙīĺèÍťôîϙĺIJϙťēôϙ®ϙŕŘĺŕôŘťƅϟϙťϙťēôϙŕĺĖIJťϙĺċϙèĺIJIJôèťĖĺIJϠϙťēôϙIJôſϙſÍťôŘīĖIJôϙſĖīīϙ
èĺIJIJôèťϙÍæĺŽôϙČŘÍîôϙťĺϙÍϙIJôſϙŕĖŕĖIJČϙÍŜŜôıæīƅϙèĺIJŜĖŜťĖIJČϙĺċϙÍϙæÍèħċīĺſϙŕŘôŽôIJťôŘϠϙċīĺſϙıôťôŘϠϙċīĺſϙ
èĺIJťŘĺīϙŽÍīŽôϠϙÍIJîϙÍϙĖťƅϙĺċϙēĺôIJĖƄϙĖŜĺīÍťĖĺIJϙŽÍīŽôϟϙ>ĖIJÍīīƅϠϙťēôϙÍæĺŽôϙČŘÍîôϙŕĖŕĖIJČϙÍŜŜôıæīƅϙſĖīīϙ
ŕŘĺŽĖîôϙÍϙťôôϙèĺIJIJôèťĖĺIJϙťĺϙÍϙIJôſϙ͕ ϱĖIJèēϙċīŪŜēĖIJČϯîĖŜèēÍŘČôϙŕĖŕôϙťĺϙÍIJϙôƄĖŜťĖIJČϙĺIJϱŜĖťôϙèĺIJèŘôťôϙ
ŜſÍīôϙæôċĺŘôϙĖťϙèĺIJťĖIJŪôŜϙĖIJťĺϙťēôϙƅŘÍıĖîϙôÍħϙ®ϙîĖŜťŘĖæŪťĖĺIJϙŽÍŪīťϙÍIJîϙèĺIJIJôèťŜϙťĺϙťēôϙ͕͒
ϱĖIJèēϙ
îĖŜťŘĖæŪťĖĺIJϙīĖIJôϟϙēôϙIJôſϙŕĖŕĖIJČϙÍŜŜôıæīƅϙſĖīīϙŘôŗŪĖŘôϙťēôϙĖIJŜťÍīīÍťĖĺIJϙĺċϙIJôſϙôīôèťŘĖèÍīϙŕÍIJôīŜϠϙ
ÍŕŕŘĺƄĖıÍťôīƅϙ͕͑͏
ϙ[ϟ>ϙĺċϙ͐ ϱĖIJèēϙÍIJîϙ͑ ϱĖIJèēϙôīôèťŘĖèÍīϙèĺIJîŪĖťϙÍIJîϙſĖŘĖIJČϠϙÍIJîϙÍIJϙÍIJťôIJIJÍϙſĖťēĖIJϙťēôϙ
ŕīÍIJťϙŜĖťôϙċôIJèôϟϙ
ϙĖťôϙ͑ ϙϳϙ͔͐
ŜťϙŽôIJŪôϙЭϙĺIJĺŕÍēϙ"ŘĖŽôϙϼ͔͐
ŜťϙЭϙĺIJĺŕÍēϽϡϙ
Ėťôϙ͑ ϙĖŜϙīĺèÍťôîϙĺIJϙťēôϙŜĺŪťēôÍŜťϙèĺŘIJôŘϙĺċϙbϟϙ͔͐
ŜťϙŽôIJŪôϙÍIJîϙ®ϟϙĺIJĺŕÍēϙ"ŘĖŽôϟϙēĖŜϙŕŘĺĤôèťϙ
ŘôŗŪĖŘôŜϙÍϙIJôſϙ͐͑
ϱĖIJèēϙæÍèħċīĺſϙŕŘôŽôIJťôŘϙťĺϙÍīīĺſϙċīĺſϙĖIJϙťēôϙĺŕŕĺŜĖťôϙîĖŘôèťĖĺIJϙÍIJîϙÍIJϙ
ÍîîĖťĖĺIJÍīϙĖťƅϙĺċϙēĺôIJĖƄϙĖŜĺīÍťĖĺIJϙŽÍīŽôϙŪŕŜťŘôÍıϙĺċϙťēôϙæÍèħċīĺſϙŕŘôŽôIJťôŘϟϙēôϙôƄĖŜťĖIJČϙ
ŜŪæŜŪŘċÍèôϙèĺIJèŘôťôϙŽÍŪīťϙſĖīīϙæôϙŘôŪŜôîϠϙÍIJîϙťēôϙŕĖŕĖIJČϙſĖīīϙæôϙıĺîĖċĖôîϟϙēôϙÍŘôÍŜϙĺIJϙæĺťēϙ
ŜĖîôŜϙĺċϙťēôϙŽÍŪīťϙſĖīīϙæôϙôƄèÍŽÍťôîϠϙÍIJîϙťēôϙôƄĖŜťĖIJČϙ͗ ϱĖIJèēϙŕĖŕĖIJČϠϙĖIJèīŪîĖIJČϙ͗ Ƅ͐͑
ϙŘôîŪèôŘŜϠϙſĖīīϙ
æôϙŘôıĺŽôîϙÍIJîϙŘôŕīÍèôîϙſĖťēϙIJôſϙ͐͑
ϱĖIJèēϙŕĖŕĖIJČϟϙēôϙôƄĖŜťĖIJČϙ͗ ϱĖIJèēϙċīĺſϙıôťôŘϙſĖťēĖIJϙťēôϙ
ŽÍŪīťϙſĖīīϙæôϙŘôŕīÍèôîϙſĖťēϙÍϙIJôſϙ͐͑
ЋϙċīĺſϙıôťôŘϟϙϙIJôſϙċīĺſϙèĺIJťŘĺīϙŽÍīŽôϙſĖīīϙæôϙÍîîôîϙťĺϙťēôϙ
ŕĖŕĖIJČϙèĺIJċĖČŪŘÍťĖĺIJϙſĖťēĖIJϙťēôϙIJôſϙŽÍŪīťϟϙϙϙIJôſϙÍIJťôIJIJÍϙÍIJîϙôīôèťŘĖèÍīϙŕÍIJôīϙſĖīīϙæôϙĖIJŜťÍīīôîϙ
ĺIJϙťēôϙŜĖťôДŜϙŜĺŪťēϙŜĖîôϙťĺϙŕŘĺŽĖîôϙÍîîĖťĖĺIJÍīϙèĺııŪIJĖèÍťĖĺIJϙťĺϙťēôϙĖťƅϙĺċϙ@īôIJîÍīôϙÍIJîϙťēôϙ
ĖťƅϙĺċϙēĺôIJĖƄϟϙ
(ŜťĖıÍťĖIJČϙaôťēĺîĺīĺČƅϙϙ
ēôϙŕŘĖıÍŘƅϙôŜťĖıÍťĖIJČϙıôťēĺîĺīĺČƅϙŪŜôîϙťĺϙŕŘôŕÍŘôϙťēôϙ@aϙĖŜϙæÍŜôîϙĺIJϙťēôϙèŪŘŘôIJťϙ͐͏͏҇
ϙŕīÍIJŜϙ
ċĺŘϙƅŘÍıĖîϙôÍħϠϙťēôϙèŪŘŘôIJťϙ͐͏͏҇
ϙŕīÍIJŜϙŕôIJîĖIJČϙèĖťƅϙÍŕŕŘĺŽÍīϙċĺŘϙĺIJĺŕÍēϠϙÍIJîϙ͐͏͏҇
ϙ
ŜŕôèĖċĖèÍťĖĺIJŜϙĖŜŜŪôîϙæƅϙīÍèħϙÍIJîϙ«ôÍťèēϟϙϙēôϙŕŘĖèĖIJČϙĖIJèīŪîôîϙſĖťēϙťēĖŜϙ@aϙſÍŜϙîôŽôīĺŕôîϙſĖťēϙ
ťēôϙŜħĖīīϙÍIJîϙèÍŘôϙôƄôŘèĖŜôîϙæƅϙÍϙŘôÍŜĺIJÍæīôϙèĺIJťŘÍèťĺŘЍŜϙŜħĖīīϠϙôƄŕôŘťĖŜôϠϙÍIJîϙôƄŕôŘĖôIJèôϙŪIJîôŘϙ
IJĺŘıÍīϙıÍŘħôťϙèĺIJîĖťĖĺIJŜϟϙϙϙ
@aϙ͐ ϙĖŜϙŕŘôŕÍŘôîϙÍIJîϙŜŪæıĖťťôîϙťĺϙÍīīĺſϙċĺŘϙÍIJϙÍèèŪŘÍťôϙèĺŜťϙôŽÍīŪÍťĖĺIJϙĺċϙŕŘĺĤôèťϙèĺıŕĺIJôIJťŜϟϙϙ
ēĖŜϙ@aϙèĺŽôŘŜϙæĺťēϙƅŘÍıĖîϙôÍħϙÍIJîϙĺIJĺŕÍēϙ«ÍŪīťϙīĺèÍťĖĺIJŜϟϙa@ϙēÍŜϙÍIJϙÍŕŕŘĺŽôîϙ
ŘôèĺIJŜťŘŪèťĖĺIJϙĺIJťŘÍèťϙťēÍťϙèĺŽôŘŜϙťÍċċϙÍIJîϙīĺIJČϱīôÍîϙıÍťôŘĖÍīϙèĺŜťŜϟϙēĖŜϙſĖīīϙæôϙôƄôèŪťôîϙŽĖÍϙ
ťēôϙīīĺſÍIJèôϙŜôϙŪťēĺŘĖƏÍťĖĺIJϙŕŘĺèôŜŜϟϙ
®ϡϙĺϙÍèèŪŘÍťôīƅϙŕŘĖèôϙÍīīϙŜèĺŕôŜϙċĺŘϙťēôϙ@aϠϙa@ϙĺIJťŘÍèťĺŘŜϙſĖīīϙîĖŽĖîôϙťēôϙŕŘĺĤôèťϙĖIJťĺϙÍIJϙ
ÍŘôÍϱŜŕôèĖċĖèϙſĺŘħϙæŘôÍħîĺſIJϙŜťŘŪèťŪŘôϙèĺIJŜĖŜťĖIJČϙĺċϙťēôϙċĺīīĺſĖIJČϡϙ
•͏͑
ϙϳϙ@ôIJôŘÍīϙôŗŪĖŘôıôIJťŜϙϙ
•͏͒
ϙϳϙƅŘÍıĖîϙôÍħϙĖťôϙϙ
•͏͓
ϙϳϙ͔͐
ŜťϙÍIJîϙĺIJĺŕÍēϙĖťôŜϙ
a@ϙĺIJťŘÍèťĺŘŜϙſĖīīϙîôŽôīĺŕϙťēĖŜϙ®ϙťĺϙıÍťèēϙťēôϙŕŘĺĤôèťϙîŘÍſĖIJČŜϙÍIJîϙŜŕôèĖċĖèÍťĖĺIJŜϠϙÍīīĺſĖIJČϙ
ŜťÍħôēĺīîôŘŜϙťĺϙèĺıŕÍŘôϙÍIJîϙŘôŽĖôſϙťēôıϙôÍŜĖīƅϟϙa@ϙſĖīīϙŪŜôϙťēôϙŜÍıôϙŜťŘŪèťŪŘôϙċĺŘϙÍīīϙôŜťĖıÍťôŜϙ
ÍIJîϙŜèēôîŪīôŜϙċĺŘϙŪIJĖċĺŘıĖťƅϟϙϙϙ
"ôŜĖČIJϙÍŜĖŜϙ
ēôϙŘôċôŘôIJèôϙîĺèŪıôIJťŜϙÍŘôϙÍŜϙċĺīīĺſŜϡϙ"ŘÍſĖIJČŜϡϙ"ŘÍſĖIJČŜϠϙŜŕôèĖċĖèÍťĖĺIJŜϠϙŜŕôèĖċĖèÍťĖĺIJŜϠϙÍIJîϙ
îÍťôϟϙϙϙ
•
ƅŘÍıĖîϙôÍħϙ®ÍťôŘϙŪŕŕīƅϙIIJťôŘèĺIJIJôèťϙϳϙēĺôIJĖƄϡϙôèēIJĖèÍīϙŕôèĖċĖèÍťĖĺIJŜϙ͐͏͏҇
ϙ
ŪæıĖťťÍīϢϙ"Íťôîϙ"ôèôıæôŘϙ͑͏͓͑
ϙ
•͔͐
ŜťϙÍIJîϙĺIJĺŕÍēϙIIJťôŘèĺIJIJôèťϙϳϙēĺôIJĖƄϯ@īôIJîÍīôϡϙôèēIJĖèÍīϙŕôèĖċĖèÍťĖĺIJŜϙ͐͏͏҇
ϙ
ŪæıĖťťÍīϢϙ"ÍťôîϙôŕťôıæôŘϙ͑͏͓͑
ϙϙ
•
ƅŘÍıĖîϙôÍħϙ®ÍťôŘϙŪŕŕīƅϙIIJťôŘèĺIJIJôèťϙϳϙēĺôIJĖƄϡϙīÍIJϙôťϙ͐͏͏҇
ϙŪæıĖťťôîϢϙ"Íťôîϙ
bĺŽôıæôŘϙ͑͐
Ϡϙ͑͏͑͑
ϙ
•͔͐
ŜťϙÍIJîϙĺIJĺŕÍēϙIIJťôŘèĺIJIJôèťϙϳϙēĺôIJĖƄϯ@īôIJîÍīôϡϙīÍIJϙôťϙ͐͏͏҇
ϙŪæıĖťťôîϙϼŕôIJîĖIJČϙèĖťƅϙ
ÍŕŕŘĺŽÍīϽϢϙ"ÍťôîϙôŕťôıæôŘϙ͐͐
Ϡϙ͑͏͓͑
ϙ
īÍIJIJĖIJČϙÍŜĖŜϙ
ēôϙĖťôıŜϙŕŘĺŽĖîôîϙÍŘôϙťēôϙÍŜŜŪıôîϙſĺŘħϙſôôħϠϙſēĖèēϙſĖīīϙĖIJèīŪîôϙa@ЍŜϙŕīÍIJIJôîϙŪŜôϙĺċϙ
ĺŽôŘťĖıôϠϙĺŽôŘIJĖČēťϠϙĺŘϙſôôħôIJîϙſĺŘħϙϼĖċϙŘôŗŪĖŘôîϽϟϙ"ŪŘĖIJČϙťēôϙôŜťĖıÍťôϙŕŘĺèôŜŜϠϙa@ϙôIJČÍČôîϙ
īĺèÍīϙŜŪæèĺIJťŘÍèťĺŘŜϙÍIJîϙŜŪŕŕīĖôŘŜϙĖIJϙĺŘîôŘϙťĺϙŕŘĺŽĖîôϙæôIJôċĖèĖÍīϙıÍŘħôťϙèĺŜťϟϙ
ēôϙŜèēôîŪīĖIJČϙÍŜŜŪıŕťĖĺIJŜϙŪŜôîϙĖIJϙŕŘôŕÍŘĖIJČϙťēôϙŜèēôîŪīôϙÍIJîϙôŜťĖıÍťôϙĖIJèīŪîôϡϙ
•
ēôϙôŜťĖıÍťôϙÍIJîϙŜèēôîŪīôϙÍŘôϙèŪŘŘôIJťīƅϙæÍŜôîϙĺIJϙ͔ ôÍϙ͗ ϱēĺŪŘϙŜēĖċťŜϟ
ĺŜťϙIîôIJťĖċĖèÍťĖĺIJϙ
ēôϙċĺīīĺſĖIJČϙèĺŜťϙæÍŜĖŜϠϙċÍèťĺŘŜϠϙÍIJîϙŕŘĖèĖIJČϙŜĺŪŘèôŜϙſôŘôϙŪŜôîϡϙ
[ÍæĺŘϙÍIJîϙĺIJŜťŘŪèťĖĺIJϙ(ŗŪĖŕıôIJťϙÍťôŜϡϙϙ
•
[ÍæĺŘϙēÍŜϙæôôIJϙĖIJèīŪîôîϙÍèèĺŘîĖIJČϙťĺϙŕŘôŽÍĖīĖIJČϙſÍČôϙŘÍťôŜϙÍŕŕīĖèÍæīôϙÍťϙťēôϙťĖıôϙĺċϙťēô
ôŜťĖıÍťôϟϙϙÍťôŜϙĖIJèīŪîôϙÍīīϙÍŕŕīĖèÍæīôϙæÍŜôϙŕÍƅϠϙťÍƄôŜϠϙÍIJîϙċŘĖIJČôŜϟ
•
(ŗŪĖŕıôIJťϙŘÍťôŜϙſôŘôϙæÍŜôîϙĺIJϙĖIJťôŘIJÍīϙŘÍťôŜϙîôťôŘıĖIJôîϙæƅϙa@ϙĺIJťŘÍèťĺŘŜДϙôŗŪĖŕıôIJť
ŜôŘŽĖèôŜϙîôŕÍŘťıôIJťϟ
•
ēôϙſôôħīƅϙŪIJĖťϙèĺŜťϙċĺŘϙôÍèēϙĖIJîĖŽĖîŪÍīϙĖIJèīŪîôŜϙťēôĖŘϙīÍæĺŘϙÍIJîϙæŪŘîôIJϙèĺŜťŜϠϙĖIJèīŪîĖIJČϙÍ
ťĺĺīϙħĖťϙťēÍťϙĖIJèīŪîôŜϙÍϙèĺıŕŪťôŘϙÍIJîϙèôīīϙŕēĺIJôϟ
[ÍæĺŘϙŘĺîŪèťĖŽĖťƅϡϙ
•
a@ϙēÍŜϙŪŜôîϙÍϙèĺıæĖIJÍťĖĺIJϙĺċϙēĖŜťĺŘĖèÍīϙŕŘĺîŪèťĖĺIJŜϙċŘĺıϙŜĖıĖīÍŘϙŕŘĺĤôèťŜϙÍIJîϙĖIJîŪŜťŘƅ
ŜťÍIJîÍŘîŜϟ
IIJîĖŘôèťϙĺŜťŜϠϙIIJŜŪŘÍIJèôŜϠϙÍIJîϙ>ôôŜϡϙ
•
a@ϙēÍŜϙĖIJèīŪîôîϙĖIJîĖŘôèťϙèĺŜťŜϠϙĖIJèīŪîĖIJČϙĖťŜϙŜŪŕôŘŽĖŜĖĺIJϙŜťÍċċϙÍIJîϙôƄŕôIJŜôŜϙċĺŘϙťēôϙŜťÍċċЍŜ
ſĺŘħĖIJČϙÍèèĺııĺîÍťĖĺIJŜϠϙŜŪèēϙÍŜϙťŘÍĖīôŘŜϠϙĺċċĖèôϙŜŪŕŕīĖôŜϠϙŜÍċôťƅϙĖťôıŜϠϙôťèϟϙēôŜô
èĺıŕĺIJôIJťŜϙÍŘôϙŕŘĖıÍŘĖīƅϙīĖŜťôîϙŪIJîôŘϙťēôϙ@ôIJôŘÍīϙôŗŪĖŘôıôIJťŜϙŜôèťĖĺIJϙĺċϙťēĖŜϙ@a
ŜŪæıĖŜŜĖĺIJДŜϙîôťÍĖīôîϙĺŕôIJϙæĺĺħϙôŜťĖıÍťôϟ
•
a@ϙēÍŜϙĖIJèīŪîôîϙĖIJŜŪŘÍIJèôŜϠϙæĺIJîŜϠϙÍIJîϙċôôŜϙÍŜϙŕÍŘťϙĺċϙťēĖŜϙ@aϟ
ÍƄôŜϙÍIJîϙ"ŪťĖôŜϡϙa@ϙĺIJťŘÍèťĺŘŜϙēÍŜϙĖIJèīŪîôîϙťÍƄôŜϙÍŜϙħIJĺſIJϙÍIJîϙôIJÍèťôîϙĖIJťĺϙīÍſϙÍŜϙĺċϙťēôϙ
îÍťôϙĺċϙa@ДŜϙĺŘĖČĖIJÍīϙŕŘĺŕĺŜÍīϟϙIJƅϙIJôſϙťÍƄϙôIJÍèťôîϙĖIJťĺϙīÍſϙÍċťôŘϙŜŪæıĖŜŜĖĺIJϙĺċϙťēĖŜϙ@aϙſĖīīϙæôϙ
ÍîîôîϙŽĖÍϙŪŕîÍťôîϙ@aϙĺŘϙèēÍIJČôϙĺŘîôŘϟϙ
(ŜèÍīÍťĖĺIJϡϙēĖŜϙôŜťĖıÍťôϙĖŜϙæÍŜôîϙĺIJϙЊťĺîÍƅЍŜϙîĺīīÍŘŜЋϟϙ
īīĺſÍIJèôŜϙ
īīĺſÍIJèôŜϙēÍŽôϙæôôIJϙĖîôIJťĖċĖôîϙÍIJîϙĖIJèīŪîôîϙĖIJϙťēĖŜϙ@aϟϙēôϙôŜťĖıÍťôϙĖîôIJťĖċĖôŜϙÍīīϙÍīīĺſÍIJèôŜϙ
ÍŜϙÍīīĺſÍIJèôŜϟϙ
ēôϙċĺīīĺſĖIJČϙÍīīĺſÍIJèôŜϙēÍŽôϙæôôIJϙĖIJèīŪîôîϡϙ
îîĖťĖĺIJÍīϙŘÍċċĖèϙĺIJťŘĺīϙīīĺſÍIJèôϙѱϙщ͔͐
Ϡ͏͏͏
[ÍIJîŜèÍŕôϙôŜťĺŘÍťĖĺIJϙīīĺſÍIJèôϙϱϙƅŘÍıĖîϙôÍħϙĖťôϙѱϙщ͓͏
Ϡ͏͏͏
[ÍIJîŜèÍŕôϙôŜťĺŘÍťĖĺIJϙīīĺſÍIJèôϙϱϙ͔͐
ŜťϙЭϙĺIJĺŕÍēϙĖťôϙѱϙ
щ͐͏
Ϡ͏͏͏
FÍŘîϙ"ĖČϙīīĺſÍIJèôϙѱϙщ͔͏
Ϡ͏͏͏
ŜŕēÍīťϙťŘĖŕĖIJČϙīīĺſÍIJèôϙѱϙщ͔͐
Ϡ͏͏͏
@ŘÍťĖIJČϙaĺîĖċĖèÍťĖĺIJϙīīĺſÍIJèôϙЬϙıôťôŘĖIJČϙŜťŘŪèťŪŘôϙѱϙщ͔͑
Ϡ͏͏͏
ĖŕôϙŪŕŕĺŘťϙ"ôŜĖČIJϙīīĺſÍIJèôϙѱϙщ͐͏
Ϡ͏͏͏
ĺIJťŘÍèťĺŘДŜϙĺIJťĖIJČôIJèƅϙѱϙщ͔͏
Ϡ͏͏͏
ĺťÍīϙŽÍīŪôϙĺċϙÍīīϙīīĺſÍIJèôŜϙѱϙщ͔͑͐
Ϡ͏͏͏
īīĺſÍIJèôŜϙÍŘôϙťĺťÍīϙīŪıŕϙŜŪıŜϠϙĖIJèīŪîĖIJČϙĖIJîĖŘôèťϙèĺŜťŜϙŜŪèēϙÍŜϙæĺIJîŜϠϙĖIJŜŪŘÍIJèôϠϙÍIJîϙ
aϙċôôŜϟ
CITY OF GLENDALE
5850 WEST GLENDALE AVENUE
SUITE 315
GLENDALE, AZ 85301
MARTY SOMA
(623) 930-3630
VICINITY MAP
JOMAX
63RD
51ST AVE
T
HAPPY VALLEY ROAD
PINNACLE PEAK ROAD
BLACK CANYON FREEWAY
N
ROAD
AVE
ROAD
67TH AVE
59TH AVE
51ST AVE
43RD AVE
35TH AVE
BEARDSLEY ROAD
BELL ROAD
GREENWAY ROAD
Y
RHODES
63RD AVE
HEDGEPETH
H
ROAD
LEY
DEER
VAL
59TH AVENUE
Y
TH
E
HE
ET
GEP
EPE
PE
EDG
EDG
HE
H
PINNACLE
THUNDERBIRD
H
PARKSIDE
LANE
PARK
A K
RK
R
AR
A
67TH
PILCHER
HE
HE
HILL
H
CH
CH
CH
IL
IL H R
ER
HE
D
51ST
HAPPY
LUDDEN
AVENUE
ROAD
JOMAX
D
UD
UDDE
D
MOUNTAIN
O NTAI
AIN
U
OU
IN
I
EN
NTA
TA
MO
MO
EN
PROJECT SITE
AVENUE
VALLEY
43RD
PEAK
AVENUE
DEEMS
E
DEE
HILLS
LS
L
IL
IL
H
PEAK
HAYDEN
TURNOUT
CAP
EA
EAK
AK
PYRAMID
YR M D
I
KEY MAP
I-17
AQUEDUCT (CAP)
AP)
AQUEDUCT
C
HAYDEN
NO SCALE
NO SCALE
28101 N. 63RD AVE
VE
VE
PHOENIX, ARIZONA
A
ED
HAYD
HA
HA
PYRAMID PEAK WTP
PROJECT BENCHMARK
BRASS TAG AT SOUTH 1/4 CORNER OF SECTION 31 WITH
ELEVATION OF 1502.65 (CITY OF GLENDALE DATUM)
DATE
MCESD No.
MARICOPA COUNTY ENVIRONMENT SERVICES DEPARTMENT
(MCESD)
I HEREBY CERTIFY THAT ALL UTILITY COMPANIES WITH FACILITIES IN THE AREA OF
THIS PROJECT HAVE BEEN CONTACTED AND THE DATA PROVIDED IS SHOWN ON THIS PLAN.
I AGREE TO INDEMNIFY, DEFEND, SAVE AND HOLD HARMLESS THE CITY OF PHOENIX, ITS
OFFICERS, AGENTS, EMPLOYEES AND VOLUNTEERS FROM ANY AND ALL CLAIMS, DEMANDS,
ACTIONS, LIABILITIES, DAMAGES, LOSSES, OR EXPENSES INCURRED FOR ANY UTILITY
CONFLICTS THAT MAY ARISE.
ONSITE QUANTITIES
8" DIP CLASS 350: 140 LF
AGGREGATE BASE COURSE MATERIAL: 55 CY
OFFSITE QUANTITIES
8" DIP CLASS 350: 65 LF
ASPHALT RESTORATION: 206 SY
ASPHALT PAVEMENT: 3.5 SY
VERTICAL CONCRETE CURB ( 1 FULL LENGTH): 10 LF
CONCRETE SIDEWALK (ONE FULL PANEL): 10 SF
AGGREGATE BASE COURSE MATERIAL: 36 CY
REGISTERED ENGINEER
AS-BUILT CERTIFICATION
REGISTRATION NUMBER
DATE
PROFESSIONAL ENGINEER'S SIGNATURE AND SEAL
DATE
MICHAEL CARUSO
PROJECT MANAGER
2231 E CAMELBACK RD. #250
PHONE (602) 381-4400
GLENDALE INTERCONNECT WATER SUPPLY PIPELINE
THE PROJECT INCLUDES INSTALLING A NEW 12 INCH DUCTILE IRON PIPELINES
FOR EMERGENCY WATER SUPPLY FOR CITY OF GLENDALE'S DISTRIBUTION SYSTEM.
THE EXISTING CITY OF PHOENIX 16" TRANSMISSION LINE WILL BE HOT TAPPED
AND PROVIDED WITH A GATE VALVE, FLOW METER, ISOLATION VALVE AND
BACKFLOW PREVENTER. THE TERMINATION CONNECTION WILL BE MADE ONSITE AT
THE EXISTING GLENDALE DISTRIBUTION LINE LOCATED ON THE WATER TREATMENT
PLANT SITE.
I HEREBY CERTIFY THAT THE "RECORD DRAWING" MEASUREMENTS AS SHOWN HEREON
WERE MADE UNDER MY SUPERVISION OR AS NOTED AND ARE CORRECT TO THE BEST
OF MY KNOWLEDGE AND BELIEF.
FD169535
WATER SUPPLY INTERCONNECTS - PHOENIX
COVER SHEET/ VICINITY MAP / SHEET LIST
G-0-001
CLF
HVT
JMW
212238
1014
100% ISSUED FOR CONSTRUCTION
OF
SHT.
GLENDALE, ARIZONA 85301 (623) 930-3630
5850 W. GLENDALE AVE.
ENGINEERING DEPARTMENT
CITY OF GLENDALE
(
)
(
)
XREF 1:
XREF 2:
XREF 2:
XREF 1:
D412186
USER:
DRAWING VER.:
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING IS
NOT TO FULL SCALE
1/2
0
1
GENERAL
G-0-001
COVER SHEET / VICINITY MAP / SHEET LIST
G-0-002
GENERAL NOTES AND LEGEND
G-0-003
ABBREVIATIONS
G-0-004
OVERALL SITE PLAN
CIVIL
C-Y-101
CIVIL SITE SHEET AREA G-01
C-Y-501
GENERAL - YARD & DRAINAGE DETAILS 1
MECHANICAL PROCESS
M-V-101
RESERVOIR METERING STRUCTURE PLAN & SECTIONS
ELECTRICAL
E-0-001
ELECTRICAL LEGEND
E-0-002
ELECTRICAL ABBREVIATIONS AND NOTES
E-0-501
ELECTRICAL GENERAL DETAILS 1
E-0-601
SCHEDULE & ONE-LINE DIAGRAMS & SCHEMATICS
E-0-602
RTU AND PLC ONE-LINE DIAGRAM
E-Y-101
ELECTRICAL SITE PLAN
E-Y-601
DUCT BANK SCHEDULE & SECTIONS
INSTRUMENTATION
I-0-001
LEGEND & ABBREVIATIONS SHEET 1 OF 4
I-0-002
LEGEND & ABBREVIATIONS SHEET 2 OF 4
I-0-003
LEGEND & ABBREVIATIONS SHEET 3 OF 4
I-0-004
LEGEND & ABBREVIATIONS SHEET 4 OF 4
I-0-501
INSTRUMENTATION DETAILS 1
I-0-502
INSTRUMENTATION DETAILS 2
I-0-503
INSTRUMENTATION DETAILS 3
I-0-504
PHOENIX PLC SCHEMATIC
I-0-505
PHOENIX CONTROL PANEL & SOLAR SHIELD DETAILS
I-0-506
GLENDALE SERVICE WATER PLC CONTROL PANEL DETAILS
I-0-601
PHOENIX CONTROL BLOCK DIAGRAM
I-0-602
GLENDALE CONTROL BLOCK DIAGRAM
I-V-602
EXISTING FIRE WATER INTERCONNECTION
I-V-603
EXISTING RESERVOIR 1 & 2 & EFFLUENT FLOW METER
I-V-604
PHOENIX WATER INTERCONNECTION
KIVA: 004879
SDEV: 0002755
CPFL: 1808123
QS: 50-14
1
100% ISSUED FOR CONSTRUCTION
11/22
CITY OF GLENDALE
5850 WEST GLENDALE AVENUE
SUITE 315
GLENDALE, AZ 85301
MARTY SOMA
(623) 930-3630
VICINITY MAP
KEY MAP
NO SCALE
NO SCALE
WITHIN THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER OF SECTION 21, T. 4 N., R. 2 E. OF GILA
AND SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA
REGISTERED ENGINEER
REGISTRATION NUMBER
DATE
MICHAEL CARUSO
PROJECT MANAGER
2231 E CAMELBACK RD. #250
PHONE (602) 381-4400
I CERTIFY THAT THE LOCATIONS, ELEVATIONS, DEPTHS, AND RECORD DRAWING
COMMENTS ACCURATELY REFLECT THE EXISTING FIELD CONDITIONS AND
MATERIALS ACTUALLY USED DURING CONSTRUCTION. THIS CERTIFICATION IS
BASED ON PERIODIC FIELD OBSERVATIONS AND THE CONTRACTOR'S
REPRESENTATIONS OF THE FACILITIES AS CONSTRUCTED.
PINNACLE PEAK RD.
DEER VALLEY RD.
BEARDSLEY RD.
UNION HILLS RD.
BELLY RD.
GREENWAY RD.
THUNDERBIRD RD.
CATCUS RD.
PEORIA AVE.
OLIVA AVE.
NORTHERN AVE.
GLADEN AVE.
BETHANY HOME RD.
CAMELBACK RD.
115TH
107TH
99TH
91ST
83RD
75TH
67TH
59TH
51ST
43RD
51ST AVE.
43RD AVE.
DEER VALLEY RD.
BEARDSLEY RD.
MOHAWK LN.
TONOPAH DR.
PROJECT
SITE
ASSUMED S 00°42'30"E, PER ADOT RIGHT-OF-WAY MAP NO. D-7-T-796,
ALONG THE WEST LINE OF SECTION 21, TOWNSHIP 4 NORTH, RANGE 2 EAST,
OF THE GILA AND SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY,
ARIZONA, SAID LINE ALSO BEING THE MONUMENT LINE OF 51ST AVENUE.
THE PROJECT INCLUDES REVERSING THE FLOW THROUGH EXISTING PIPING FOR
EMERGENCY WATER SUPPLY FOR CITY OF GLENDALE'S DISTRIBUTION SYSTEM.
THE EXISTING BACKFLOW PREVENTER WILL BE REUSED, AND FLOW FROM CITY
OF PHOENIX WILL CONTINUE THROUGH AN 8" PIPELINE, FLOW METER AND FLOW
CONTROL VALVE FOR CITY OF GLENDALE'S USE.
8" DIP CLASS 350: 10 LF
AGGREGATE BASE COURSE: 10 CY
I HEREBY CERTIFY THAT THIS DESIGN IS BASED ON A SITE VISIT OR ACCURATE
FIELD DATA WHICH HAS BEEN CHECKED IN THE FIELD WITHIN 180 DAYS PRIOR TO
SUBMISSION FOR CITY APPROVAL.
BY:___________________________________ DATE:________________
THE CITY OF GLENDALE ACCEPTS THESE PLANS FOR CONSTRUCTION, AS BEING IN
GENERAL COMPLIANCE WITH PLANS FOR CONSTRUCTION, AS BEING IN GENERAL
COMPLIANCE WITH PLAN PREPARATION REQUIREMENTS OF THE CITY.
RESPONSIBILITY FOR THE COMPLETENESS AND ACCURACY OF THE PLANS AND
RELATED DESIGNS RESIDES WITH THE ENGINEER AND THE ENGINEERING FIRM OF
RECORD
CITY ENGINEER
DATE
PURSUANT TO CHAPTER 32.5 OF THE GLENDALE CITY CODE, ALL
NEW AND EXISTING UTILITIES WITHIN OR CONTIGUOUS TO THIS SITE
SHALL BE PLACED UNDERGROUND IN CONDUIT.
RECORD DRAWING
QUANTITIES
GLENDALE INTERCONNECT WATER SUPPLY PIPELINE SCOPE
PLANS ACCEPTANCE
BASIS OF BEARINGS
PROJECT BENCHMARK
DATE
MCESD No.
MARICOPA COUNTY ENVIRONMENT SERVICES DEPARTMENT
(MCESD)
FD169535
COVER SHEET/ VICINITY MAP / SHEET LIST
G-0-051
CK
HVT
JMW
212238
1014
100% ISSUED FOR CONSTRUCTION
OF
SHT.
GLENDALE, ARIZONA 85301 (623) 930-3630
5850 W. GLENDALE AVE.
ENGINEERING DEPARTMENT
CITY OF GLENDALE
XREF 1:
XREF 2:
XREF 2:
XREF 1:
D412186
USER:
DRAWING VER.:
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING IS
NOT TO FULL SCALE
1/2
0
1
GENERAL
G-0-051
COVER SHEET / VICINITY MAP / SHEET LIST
G-0-052
GENERAL NOTES AND LEGEND
G-0-053
ABBREVIATIONS
CIVIL
C-Y-151
CIVIL SITE SHEET AREA G-01
C-Y-551
GENERAL - YARD & DRAINAGE DETAILS 1
C-Y-552
GENERAL - YARD & DRAINAGE DETAILS 2
ELECTRICAL
E-0-051
ELECTRICAL LEGEND
E-0-052
ELECTRICAL ABBREVIATIONS AND NOTES
E-0-551
ELECTRICAL GENERAL DETAILS
E-0-651
SCHEDULE & ONE-LINE DIAGRAMS & SCHEMATICS
E-0-652
RTU AND PLC'S ONE-LINE DIAGRAM
E-Y-151
ELECTRICAL SITE PLAN
E-Y-651
UNDERGROUND CONDUIT SCHEDULE & SECTIONS
INSTRUMENTATION
I-0-051
LEGEND & ABBREVIATIONS SHEET 1 OF 4
I-0-052
LEGEND & ABBREVIATIONS SHEET 2 OF 4
I-0-053
LEGEND & ABBREVIATIONS SHEET 3 OF 4
I-0-054
LEGEND & ABBREVIATIONS SHEET 4 OF 4
I-0-551
INSTRUMENTATION DETAILS 1
I-0-552
INSTRUMENTATION DETAILS 2
I-0-553
PHOENIX PLC SCHEMATIC
I-0-554
PHOENIX CONTROL PANEL & SOLAR SHIELD DETAILS
I-0-555
GLENDALE CONTROL PANEL DETAILS
I-0-651
PHOENIX CONTROL BLOCK DIAGRAM
I-0-652
GLENDALE CONTROL BLOCK DIAGRAM
I-J-651
PHOENIX WATER INTERCONNECTION
1
25
9/11/2024
DSC # 232457
City of Glendale
Glendale Phoenix Interconnect
Pyramid & Pinnacle
TECHNICAL SPECIFICATIONS
DIVISIONS 01 – 48
ISSUED FOR CONSTRUCTION
December 2022
City Project No. 212238
B&V Project No. 412186
Prepared by
&LW\RI*OHQGDOH$=
L
,668(')25&216758&7,21
*OHQGDOH3KRHQL[,QWHUFRQQHFW3\UDPLG 3LQQDFOH
'HFHPEHU
% 93URMHFW1R
&LW\RI*OHQGDOH
*OHQGDOH3KRHQL[,QWHUFRQQHFW3\UDPLG 3LQQDFOH
'HFHPEHU
7KHVHFRQWUDFWGRFXPHQWVKDYHEHHQSUHSDUHGXQGHUWKHJHQHUDOVXSHUYLVLRQDQGGLUHFWLRQRIWKH
IROORZLQJSURIHVVLRQDOVOLFHQVHGLQWKH6WDWHRI$UL]RQD
0LNH&DUXVR±3URMHFW0DQDJHU
-XOLH:RRGZRUWK±(QJLQHHULQJ
0DQDJHU&LYLO
6KDZQ5RKU±, &
3HUR9UFHOM±(OHFWULFDO
6WUXFWXUDO±1$
Table of Contents
City of Glendale, AZ
00 0110 - 1
ISSUED FOR CONSTRUCTION
Glendale Phoenix Interconnect Pyramid & Pinnacle
December 2022
B&V Project No. 412186
SECTION 00 0110
TABLE OF CONTENTS
SECTIONS
PAGES
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
NOT USED
DIVISION 01 — GENERAL REQUIREMENTS
01 1113 - Work Covered by Contract Documents .......................................................... 7
01 3200 - Construction Progress Documentation ........................................................... 1
01 3233 - Photographic Documentation ......................................................................... 1
01 3300 - Submittal Procedures ..................................................................................... 7
01 3300 F1 - F1 Submittal Identification and Contractor's Approval Statement ............. 1
01 4213 - Abbreviations and Acronyms .......................................................................... 6
01080 - Coordination with Owner's Operations ............................................................... 6
01 4500 - Quality Control ............................................................................................... 2
01 5000 - Temporary Facilities and Controls .................................................................. 6
01 6100 - General Equipment Stipulations ..................................................................... 4
01 6500 - Product Delivery Requirements ...................................................................... 1
01 6600 - Product Storage and Handling Requirements ................................................ 2
01 6700.3 - Meteorological and Seismic Design Criteria (IBC 2018) .............................. 5
01 6800 - Equipment and Valve Identification ................................................................ 3
01 7319 - Equipment Installation .................................................................................... 3
01 7700 - Closeout Procedures ...................................................................................... 5
01 7900 - Demonstration and Training ........................................................................... 3
DIVISION 02 — EXISTING CONDITIONS
NOT USED
DIVISION 03 — CONCRETE
NOT USED
DIVISION 04 — MASONRY
NOT USED
DIVISION 05 — METALS
05 8100 - Anchorage in Concrete and Masonry ............................................................. 7
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
NOT USED
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
NOT USED
DIVISION 08 — OPENINGS
NOT USED
DIVISION 09 — FINISHES
09 9611 - Protective Coatings ...................................................................................... 14
Table of Contents
City of Glendale, AZ
00 0110 - 2
ISSUED FOR CONSTRUCTION
Glendale Phoenix Interconnect Pyramid & Pinnacle
December 2022
B&V Project No. 412186
DIVISION 10 — SPECIALTIES
NOT USED
DIVISION 11 — EQUIPMENT
NOT USED
DIVISION 12 — FURNISHINGS
NOT USED
DIVISION 13 — SPECIAL CONSTRUCTION
NOT USED
DIVISION 14 — CONVEYING EQUIPMENT
NOT USED
DIVISION 21 — FIRE SUPPRESSION
NOT USED
DIVISION 22 — PLUMBING
NOT USED
DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING
NOT USED
DIVISION 25 — INTEGRATED AUTOMATION
NOT USED
DIVISION 26 — ELECTRICAL
26 0511 - Electrical ....................................................................................................... 19
DIVISION 27 — COMMUNICATIONS
NOT USED
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
NOT USED
DIVISION 31 — EARTHWORK
31 2333 - Trenching and Backfilling ............................................................................. 10
31 2333 F1 - Temporary Excavation Design Certificate - 1 ............................................ 1
DIVISION 32 — EXTERIOR IMPROVEMENTS
NOT USED
DIVISION 33 — UTILITIES
33 0514 - Manhole and Vault Covers and Accessories .................................................. 2
33 1313 - Cleaning and Disinfection of Water Pipelines ................................................. 4
33 1400 - Pipeline Pressure and Leakage Testing ......................................................... 5
DIVISION 34 — TRANSPORTATION
NOT USED
DIVISION 35 — WATERWAY AND MARINE
NOT USED
DIVISION 40 — PROCESS INTERCONNECTIONS
NOT USED
Table of Contents
City of Glendale, AZ
00 0110 - 3
ISSUED FOR CONSTRUCTION
Glendale Phoenix Interconnect Pyramid & Pinnacle
December 2022
B&V Project No. 412186
DIVISION 40 — PROCESS INTEGRATION
40 0505.11 - Miscellaneous Piping and Accessories Installation ................................... 5
40 0517.13 - Pipe Supports ............................................................................................ 6
40 0517.13 F1A - Hangers and Supports (A) ................................................................. 1
40 0517.13 F1B - Hangers and Supports (B) ................................................................. 1
40 0519 - Ductile Iron Pipe ........................................................................................... 17
40 0551.13 - Valve Installation ....................................................................................... 3
40 0557 - Valve and Gate Actuators .............................................................................. 9
40 0561.23 - Resilient Seated Gate Valves .................................................................... 5
40 0564.11 - AWWA Butterfly Valves ............................................................................. 7
15099A - Pilot-Controlled Globe Valves .......................................................................... 4
40 0586 - Air Valves ....................................................................................................... 3
40 6111 - Instrumentation and Control System ............................................................ 14
40 6111A - City of Glendale Instrument Device Schedule ............................................... 1
40 6400 - PLCs - Software and Programming ................................................................. 4
40 6400A - City of Glendale Input / Output List ............................................................... 1
40 6711 - Panels, Consoles, and Appurtenances ........................................................... 6
40 6883 - Software Control Block Descriptions .............................................................. 8
40 7100 - Flow Instruments ............................................................................................. 4
40 7200 - Pressure Instruments ...................................................................................... 4
40 7800 - Panel Mounted Instruments ........................................................................... 4
17226 - Process Control System I O List ........................................................................ 1
17226A - City of Phoenix Input / Output List ................................................................... 1
17240 - Radio and Antenna Cable Installation and Testing ............................................ 5
17260 - Control Panels .................................................................................................. 27
17262 - PLCs - Software and Programming .................................................................. 11
17340 - Monopole Antenna Towers ................................................................................ 4
DIVISION 41 — MATERIAL PROCESSING AND HANDLING EQUIPMENT
NOT USED
DIVISION 42 — PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
NOT USED
DIVISION 43 — PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND
STORAGE EQUIPMENT
NOT USED
DIVISION 44 — POLLUTION AND WASTE CONTROL EQUIPMENT
NOT USED
DIVISION 45 — INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
NOT USED
DIVISION 46 — WATER AND WASTEWATER EQUIPMENT
NOT USED
DIVISION 48 — ELECTRICAL POWER GENERATION
NOT USED
City of Glendale
Glendale Phoenix Interconnects
TECHNICAL SPECIFICATIONS
DIVISIONS 01 – 48
51st & Tonopah
100% ISSUED FOR CONSTRUCTION
September 2024
City Project No. 212238
B&V Project No. 419344
Prepared by
City of Glendale, AZ
i
B&V Project No. 419344
Glendale Phoenix Interconnects
100% ISSUED FOR CONSTRUCTION
September 2024
City of Glendale
Glendale Phoenix Interconnects
51st & Tonopah
September 2024
These contract documents have been prepared under the general supervision and direction of the
following professionals, licensed in the State of Arizona.
Mike Caruso – Project Manager
Julie Woodworth – Engineering
Manager/Civil/Mechanical
Pero VUcelj – Electrical/I&C
09/11/24
/2024
9/11
9/11/2024
Table of Contents
City of Glendale, AZ
00 0110 - 1
B&V Project No. 419344
Glendale Phoenix Interconnect 51st & Tonopah
100% ISSUED FOR CONSTRUCTION
September 2024
SECTION 00 0110
TABLE OF CONTENTS
SECTIONS
PAGES
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
NOT USED
DIVISION 01 — GENERAL REQUIREMENTS
01 1113 - Work Covered by Contract Documents .......................................................... 7
01 3200 - Construction Progress Documentation ........................................................... 1
01 3233 - Photographic Documentation ......................................................................... 1
01 3300 - Submittal Procedures ..................................................................................... 6
01 3300 - F1 Submittal Identification and Contractor's Approval Statement .................. 1
01 3300 - F2 Submittal Identification and Contractor's Approval Statement ................... 1
01 4213 - Abbreviations and Acronyms .......................................................................... 6
01080 - Coordination with Owner's Operations .............................................................. 5
01 4500 - Quality Control ............................................................................................... 2
01 5000 - Temporary Facilities and Controls .................................................................. 5
01 6100 - General Equipment Stipulations ..................................................................... 4
01 6500 - Product Delivery Requirements ...................................................................... 1
01 6600 - Product Storage and Handling Requirements ................................................ 2
01 6700.2 - Meteorological and Seismic Design Criteria (IBC 2018) ............................. 5
01 6800 - Equipment and Valve Identification ................................................................ 3
01 7319 - Equipment Installation .................................................................................... 3
01 7700 - Closeout Procedures ...................................................................................... 4
01 7900 - Demonstration and Training ........................................................................... 3
DIVISION 02 — EXISTING CONDITIONS
NOT USED
DIVISION 03 — CONCRETE
NOT USED
DIVISION 04 — MASONRY
NOT USED
DIVISION 05 — METALS
05 8100 - Anchorage in Concrete and Masonry .............................................................. 6
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
NOT USED
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
NOT USED
DIVISION 08 — OPENINGS
NOT USED
DIVISION 09 — FINISHES
09 9611 - Protective Coatings ....................................................................................... 14
Table of Contents
City of Glendale, AZ
00 0110 - 2
B&V Project No. 419344
Glendale Phoenix Interconnect 51st & Tonopah
100% ISSUED FOR CONSTRUCTION
September 2024
DIVISION 10 — SPECIALTIES
NOT USED
DIVISION 11 — EQUIPMENT
NOT USED
DIVISION 12 — FURNISHINGS
NOT USED
DIVISION 13 — SPECIAL CONSTRUCTION
NOT USED
DIVISION 14 — CONVEYING EQUIPMENT
NOT USED
DIVISION 21 — FIRE SUPPRESSION
NOT USED
DIVISION 22 — PLUMBING
NOT USED
DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING
NOT USED
DIVISION 25 — INTEGRATED AUTOMATION
NOT USED
DIVISION 26 — ELECTRICAL
26 0511 - Electrical ....................................................................................................... 18
DIVISION 27 — COMMUNICATIONS
NOT USED
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
NOT USED
DIVISION 31 — EARTHWORK
31 2333 - Trenching and Backfilling ............................................................................. 10
31 2333-F1 - Embedments for Conduits ....................................................................... 1
31 2333-F2 - Temporary Excavation Design Certificate ................................................ 1
DIVISION 32 — EXTERIOR IMPROVEMENTS
NOT USED
DIVISION 33 — UTILITIES
33 1313 - Cleaning and Disinfection of Water Pipelines ................................................. 4
33 1400 - Pipeline Pressure and Leakage Testing ......................................................... 5
DIVISION 34 — TRANSPORTATION
NOT USED
DIVISION 35 — WATERWAY AND MARINE
NOT USED
Table of Contents
City of Glendale, AZ
00 0110 - 3
B&V Project No. 419344
Glendale Phoenix Interconnect 51st & Tonopah
100% ISSUED FOR CONSTRUCTION
September 2024
DIVISION 40 — PROCESS INTERCONNECTIONS
40 0505.11 - Miscellaneous Piping and Accessories Installation ................................... 5
40 0517.13 - Pipe Supports ............................................................................................ 6
40 0517.13 F1A - Hangers and Supports (A) ................................................................. 1
40 0517.13 F1B - Hangers and Supports (B) ................................................................. 1
40 0519 - Ductile Iron Pipe ........................................................................................... 17
40 0551.13 - Valve Installation ....................................................................................... 3
40 0557 - Valve and Gate Actuators .............................................................................. 6
40 0564.11 - AWWA Butterfly Valves ............................................................................. 7
40 0586 - Air Valves ....................................................................................................... 5
40 6111 - Instrumentation and Control System ............................................................ 14
40 6111A - City of Glendale Instrument Device Schedule ............................................... 1
40 6400 - Programmable Logic Controllers .................................................................... 4
40 6400A - City of Glendale Input / Output List ............................................................... 1
40 6711 - Panels, Consoles, and Appurtenances .......................................................... 8
40 6883 - Software Control Block Descriptions .............................................................. 8
40 7100 - Flow Instruments ............................................................................................ 4
40 7200 - Pressure Instruments ..................................................................................... 4
40 7800 - Panel Mounted Instruments ........................................................................... 3
17226 - Process Control System I O List ........................................................................ 1
17226A - City of Phoenix Input / Output List ................................................................... 1
17240 - Radio and Antenna Cable Installation ................................................................ 5
17260 - Control Panels .................................................................................................. 27
17262 - PLCs - Software and Programming .................................................................. 10
17340 - Monopole Antenna Towers ................................................................................ 4
DIVISION 40 — PROCESS INTEGRATION
DIVISION 41 — MATERIAL PROCESSING AND HANDLING EQUIPMENT
NOT USED
DIVISION 42 — PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
NOT USED
DIVISION 43 — PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND
STORAGE EQUIPMENT
NOT USED
DIVISION 44 — POLLUTION AND WASTE CONTROL EQUIPMENT
NOT USED
DIVISION 45 — INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
NOT USED
DIVISION 46 — WATER AND WASTEWATER EQUIPMENT
NOT USED
DIVISION 48 — ELECTRICAL POWER GENERATION
NOT USED
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
T H I S P A G E I S B L A N K
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
EXHIBIT F
Statement of All Clarifications and Assumptions (if any)
(3 pages - To be Incorporated by Amendment)
See attached
ŜŜŪıŕťĖĺIJŜϠϙIIJèīŪîĖIJČϙ"ĖŘôèťϙĺŜťϙīÍŘĖċĖèÍťĖĺIJŜ
@ôIJôŘÍīϡϙ͐
ϟ
[ÍæĺŘϙēÍŜϙæôôIJϙĖIJèīŪîôîϙÍèèĺŘîĖIJČϙťĺϙŕŘôŽÍĖīĖIJČϙſÍČôϙŘÍťôŜϙÍŕŕīĖèÍæīôϙÍťϙťēôϙťĖıôϙĺċϙťēô
ôŜťĖıÍťôϟ͑
ϟ
ŘĖèĖIJČϙÍŜŜŪıôŜϙťēÍťϙťēôϙĺſIJôŘϙſĖīīϙŕŘĺŽĖîôϙÍīīϙÍèèôŜŜϙÍIJîϙôÍŜôıôIJťŜϙÍŜϙŘôŗŪĖŘôîϙťĺ
èĺıŕīôťôϙťēôϙſĺŘħϟ͒
ϟ
ŘĖèĖIJČϙĖŜϙæÍŜôîϙĺIJϙťēôϙèŪŘŘôIJťϙîĺèŪıôIJťŜϙŕŘĺŽĖîôîϙæƅϙťēôϙ(IJČĖIJôôŘϠϙſēĖèēϙŘôŕŘôŜôIJťϙťēô
ŕŘĺĤôèťДŜϙŕŘĺČŘôŜŜϙťĺϙîÍťôϟ͓
ϟ
a@ϙĺIJťŘÍèťĺŘŜϙôƄèīŪîôŜϙŘôıĺŽÍīϙÍIJîϙēÍIJîīĖIJČϙĺċϙēÍƏÍŘîĺŪŜϙıÍťôŘĖÍīŜϟϙϙēôϙiſIJôŘϙſĖīī
æôϙèĺIJŜĖîôŘôîϙťēôϙČôIJôŘÍťĺŘϙċĺŘϙÍIJƅϙŕŘôϱôƄĖŜťĖIJČϙēÍƏÍŘîĺŪŜϙèĺIJîĖťĖĺIJϙôIJèĺŪIJťôŘôîϙîŪŘĖIJČ
ťēôϙſĺŘħϟ͔
ϟ
ôŘıĖťŜϙĺťēôŘϙťēÍIJϙîŪŜťϙèĺIJťŘĺīϙÍIJîϙ®ϙēÍŽôϙæôôIJϙôƄèīŪîôîϟϙēôϙôIJČĖIJôôŘϙſĖīī
ĖIJèĺŘŕĺŘÍťôϙŕôŘıĖťϙŘôŗŪĖŘôıôIJťŜϙťēÍťϙèĺIJċīĖèťϙſĖťēϙĺŘϙèĺıŕīôıôIJťϙťēôϙťôèēIJĖèÍīϙîŘÍſĖIJČŜ
ÍIJîϙŜŕôèĖċĖèÍťĖĺIJŜϙĖIJťĺϙťēôϙċĖIJÍīϙîôŜĖČIJϙîĺèŪıôIJťŜϠϙÍIJîϙÍŕŕŘĺŕŘĖÍťôϙèĺŜťϙÍîĤŪŜťıôIJťŜϙſĖīī
æôϙŕŘĺŽĖîôîϙťĺϙa@ϙĺIJťŘÍèťĺŘŜϟ
@ôIJôŘÍīϙĺIJîĖťĖĺIJŜϙЭϙ@ôIJôŘÍīϙôŗŪĖŘôıôIJťŜϡϙ͐
ϟ
bĺϙèēôıĖèÍīϙèĺŜťϙĖŜϙŘôŗŪĖŘôîϙċĺŘϙŜťÍŘťŪŕϯťôŜťĖIJČϙċĺŘϙťēĖŜϙŕŘĺĤôèťϟ͑
ϟ
"ôŽôīĺŕıôIJťϙÍIJîϙĖıŕÍèťϙċôôŜϙċŘĺıϙťēôϙŕĺſôŘϙŪťĖīĖťƅϙÍŘôϙIJĺťϙôƄŕôèťôîϙċĺŘϙťēĖŜϙŕŘĺĤôèťϟ
îîĖťĖĺIJÍīīƅϠϙťēôϙĺſIJôŘϙĖŜϙÍŜŜŪıôîϙťĺϙŕÍƅϙċĺŘϙŕôŘıÍIJôIJťϙŕĺſôŘϙèĺIJŜŪıŕťĖĺIJϙèĺŜťŜϙċĺŘ
ŜťÍŘťŪŕϠϙťôŜťĖIJČϠϙÍIJîϙèĺııĖŜŜĖĺIJĖIJČϙċŘĺıϙťēôϙôīôèťŘĖèϙŪťĖīĖťƅϟ͒
ϟ
ĺIJŜťŘŪèťĖĺIJϙſÍťôŘϙēÍŜϙæôôIJϙÍŜŜŪıôîϙťĺϙæôϙÍŽÍĖīÍæīôϙĺIJŜĖťôϙÍIJîϙŕŘĺŽĖîôîϙæƅϙi@
ċĺīīĺſĖIJČϙťēôϙôŜťÍæīĖŜēôîϙŕŘĺèôîŪŘôŜϟϙēĖŜϙÍîîôîϙèĺŜťϙĖŜϙĖIJèīŪîôîϙĖIJϙťēôϙ@aϟ
ĖťôſĺŘħϯ´ÍŘîϙĖŕĖIJČϡϙ͐
ϟ
īīϙŜĖťôſĺŘħϯƅÍŘîϙŕĖŕĖIJČϙĖŜϙĖIJèīŪîôîϙĖIJϙťēĖŜϙ@aϟϙîîĖťĖĺIJÍīīƅϠϙa@ϙſĖīīϙæôϙŘôŜŕĺIJŜĖæīôϙċĺŘ
ŜťĺŘĖIJČϙÍīīϙŕŘĺĤôèťϱŘôīÍťôîϙıÍťôŘĖÍīŜϙîŪŘĖIJČϙťēôϙŕŘĺĤôèťДŜϙèĺIJŜťŘŪèťĖĺIJϙŕēÍŜôϟ͑
ϟ
a@ϙÍŜŜŪıôŜϙťēÍťϙÍīīϙôƄèôŜŜϙŜŕĺĖīŜϙèÍIJϙæôϙŜťĺèħŕĖīôîϙĺIJŜĖťôϟ
ĺIJèŘôťôϡϙ͐
ϟ
IJƅϙèĺIJèŘôťôϙŘôŗŪĖŘôıôIJťŜϙÍŘôϙĖIJèīŪîôîϙĖIJϙťēôϙ@aϙÍIJîϙſĖīīϙæôϙŜŪæıĖťťôîϙċĺŘϙÍŕŕŘĺŽÍīϟ
(ŗŪĖŕıôIJťϡϙ͐
ϟ
ŘĺèôŜŜϙôŗŪĖŕıôIJťϙèĺŜťϙĖŜϙæÍŜôîϙŪŕĺIJϙťēôϙ"ôŜĖČIJϙīÍIJŜϠϙŕŘĺŕĺŜÍīŜϠϙÍŜŜŪıŕťĖĺIJŜϠϙÍIJî
ŜŕôèĖċĖèÍťĖĺIJŜϙıÍîôϙæƅϙťēôϙôŗŪĖŕıôIJťϙıÍIJŪċÍèťŪŘôŘŜϙÍIJîϙŕŘĺŽĖîôîϙċĺŘϙťēôϙîôŽôīĺŕıôIJťϙĺċ
ťēôϙ@aϟϙīôÍŜôϙŜôôϙťēôϙŜŪæıĖťťÍīŜϙċĺŘϙÍîîĖťĖĺIJÍīϙĖIJċĺŘıÍťĖĺIJϟ
aôèēÍIJĖèÍīϙ͐
ϟ
IJƅϙıôèēÍIJĖèÍīϙŘôŗŪĖŘôıôIJťŜϙÍŘôϙĖIJèīŪîôîϙĖIJϙťēôϙ@aϟϙīôÍŜôϙŜôôϙťēôϙŜèēôîŪīôϙċĺŘϙıĺŘô
îôťÍĖīŜϟ
(īôèťŘĖèÍīϙ͐
ϟ IJƅϙôīôèťŘĖèÍīϙŘôŗŪĖŘôıôIJťŜϙÍŘôϙĖIJèīŪîôîϙĖIJϙťēôϙ@aϠϙÍIJîϙÍīīϙôīôèťŘĖèÍīϙèĺıŕĺIJôIJťŜϙſĖīīϙæôϙ
ŜŪæıĖťťôîϙċĺŘϙÍŕŕŘĺŽÍīϟϙ
îîϱiIJŜϙϙ
a@ϙĺIJťŘÍèťĺŘŜϙîĺôŜϙIJĺťϙĖIJèīŪîôϙÍIJƅϙÍîîϱĺIJŜϙĺťēôŘϙťēÍIJϙſēÍťϙēÍŜϙæôôIJϙIJĺťôîϙÍæĺŽôϟϙ
(ƄèīŪŜĖĺIJŜϙ
(ƄèīŪîôîϙĖťôıŜϙēÍŽôϙæôôIJϙĖîôIJťĖċĖôîϙſĖťēĖIJϙťēôϙŜèĺŕôϙĺċϙſĺŘħϙèīÍŘĖċĖèÍťĖĺIJŜϙÍIJîϙÍŜŜŪıŕťĖĺIJŜϙÍIJîϙĖIJϙ
ťēôϙiſIJôŘϙĺŜťŜϙŜôèťĖĺIJϙÍæĺŽôϟϙ
ĖŜħŜϙÍIJîϙiŕŕĺŘťŪIJĖťĖôŜϙϙ
•
ŘÍċċĖèϙīÍIJϙèĺĺŘîĖIJÍťĖĺIJϙſĖīīϙæôϙŘôŗŪĖŘôîϙϙ
•
ēôϙ"iŜϙϙ͐͏͐
ϙŕŘĺĤôèťϙŜèēôîŪīôϙèĺŪīîϙĖıŕÍèťϙťēôϙĖIJťôŘèĺIJIJôèťϙŕŘĺĤôèťϟϙ®ĺŘħĖIJČϙèīĺŜôīƅϙ
ſĖťēϙťēôıϙſĖīīϙæôϙÍIJϙĺŕŕĺŘťŪIJĖťƅϙťĺϙċĺŜťôŘϙÍϙŽÍīŪôîϙŕÍŘťIJôŘŜēĖŕϟϙϙϙ
•
bĺϙŜĺĖīϙŘôŕĺŘťŜϙēÍŽôϙæôôIJϙŕŘĺŽĖîôîϙċĺŘϙťēôϙIJôſϙĖIJťôŘèĺIJIJôèťϙÍīĖČIJıôIJťϟϙa@ϙÍŜŜŪıôŜϙťēĖŜϙ
ťĺϙæôϙēÍŘîϱîĖČϙèĺIJîĖťĖĺIJŜϙÍIJîϙĖIJèīŪîôŜϙÍIJϙÍīīĺſÍIJèôϙċĺŘϙťēĖŜϙſĺŘħϟϙϙîîĖťĖĺIJÍīϙŜĺĖīϙŜÍıŕīĖIJČϙ
ÍIJîϙťôŜťϙîĖČŜϙèÍIJϙŕŘĺŽĖîôϙÍIJϙĺŕŕĺŘťŪIJĖťƅϙťĺϙŜĺīĖîĖċƅϙťēĖŜϙèĺŜťϟϙ
ĺIJťĖIJČôIJèĖôŜϙ
•
aϙ ĺIJťĖIJČôIJèƅϡϙ ϙ aϙ èĺIJťĖIJČôIJèƅϙ ĺċϙ щ͔͏
Ϡ͏͏͏
ϙ ēÍŜϙ æôôIJϙ Íîîôîϙ ťĺϙ ťēôϙ ÍīīĺſÍIJèôϙ
æŘôÍħîĺſIJϟϙϙϙϙ
•
"ôŜĖČIJϙĺIJťĖIJČôIJèƅϡϙbĺϙ"ôŜĖČIJϙĺIJťĖIJČôIJèƅϙēÍŜϙæôôIJϙÍîîôîϙťĺϙťēĖŜϙ@aϟϙ
•
aϙ>ôôϡϙϙ>ĖƄôîϙċôôϙĺċϙ͗ ϟ͔͏҇
ϙēÍŜϙæôôIJϙĖIJèīŪîôîϙĺIJϙťēôϙťĺťÍīϙèĺIJťŘÍèťϙÍıĺŪIJťϟϙϙϙ
aϙIIJŜŪŘÍIJèôŜϡϙ
•
ŪæèĺIJťŘÍèťĺŘϟ ĺIJîĖIJČϡϙ ŪæèĺIJťŘÍèťĺŘϙ æĺIJîŜϙ ÍŘôϙ IJĺťϙ ĖIJèīŪîôîϙ ĖIJϙ ťēĖŜϙ @aϟϙ ēĺŪīîϙ Íϙ
ŪæèĺIJťŘÍèťĺŘϙ îôċÍŪīťϙ ĺŘϙ ċÍĖīϙ ťĺϙ ıôôťϙ ŕôŘċĺŘıÍIJèôϙ ŘôŗŪĖŘôıôIJťŜϠϙ a@ϙ ſĖīīϙ ŜŪæıĖťϙ Íϙ
èĺIJťĖIJČôIJèƅϙŪŜôϙÍŪťēĺŘĖƏÍťĖĺIJϟϙ
•
@ôIJôŘÍīϙ[ĖÍæĖīĖťƅϡϙIIJèīŪîôîϙťĺϙÍèèĺŪIJťϙċĺŘϙıĖIJĖıŪıϙèĺŽôŘÍČôϙŘôŗŪĖŘôîϙæƅϙťēôϙŘĖıôϙ
ČŘôôıôIJťϟϟ
(ŜťĖıÍťôϙŪÍīĖťƅϙŜŜŪŘÍIJèôϙ
•
ϙèĺıŕīôťôϙôŜťĖıÍťôϙŘôŽĖôſϙſÍŜϙèĺIJîŪèťôîϙťēôϙſôôħϙĺċϙVÍIJŪÍŘƅϙ͐͏
ťēϠϙ͑͏͔͑
ϟϙϙ
•
ϙċĖIJÍīϙôŜťĖıÍťôϙŘôŽĖôſϙſÍŜϙèĺIJîŪèťôîϙĺIJϙVÍIJŪÍŘƅϙ͖͐
ťēϠϙ͑͏͔͑
ϟϙϙ
•
IJϙôƄôèŪťĖŽôϙôŜťĖıÍťôϙŘôŽĖôſϙſÍŜϙèĺIJîŪèťôîϙĺIJϙVÍIJŪÍŘƅϙ͓͑
ťēϠϙ͑͏͔͑
ϟϙ
(ŜťĖıÍťĖIJČϙôÍıϙ
bÍıôϙ
Ėťīôϙ
ēĖīϙ[īĺƅîϙ
ŘĺĤôèťϙ(ŜťĖıÍťĺŘϙ
èĺťťϙ®ēĖťīôƅϙ
ŘϟϙŘĺĤôèťϙaÍIJÍČôŘϙ
ŪæŘôƅϙĺŪıĺϙϙ
@ôIJôŘÍīϙaÍIJÍČôŘϙ
@ŘôČϙôôťôıϙ
(ƄôèŪťĖŽôϙ«ĖèôϙŘôŜĖîôIJťϙ
ϙ
ĺIJŜťŘŪèťĖĺIJϙaÍIJÍČôıôIJťϙ
ĺIJŜťŘŪèťĖĺIJϙıÍIJÍČôıôIJťϙŜŪŕôŘŽĖŜĖĺIJϙŜťÍċċϙĖŜϙæÍŜôîϙĺIJϙťēôϙŕŘĺŕĺŜôîϙŜèĺŕôϙĺċϙſĺŘħϙÍIJîϙ
ÍIJťĖèĖŕÍťôîϙèĺIJŜťŘŪèťĖĺIJϙŜèēôîŪīôϟϙϙĺŜťŜϙċĺŘϙÍîıĖIJĖŜťŘÍťĖĺIJϠϙČôIJôŘÍīϙèĺIJîĖťĖĺIJŜϠϙČôIJôŘÍīϙ
ŘôŗŪĖŘôıôIJťŜϠϙŗŪÍīĖťƅϙèĺIJťŘĺīϠϙťôıŕĺŘÍŘƅϙċÍèĖīĖťĖôŜϠϙŜÍċôťƅϠϙŜťÍŘťŪŕϠϙÍIJîϙèĺııĖŜŜĖĺIJĖIJČϙēÍŽôϙæôôIJϙ
ĖIJèīŪîôîϙċĺŘϙťēĖŜϙŕôŘĖĺîϟϙϙôċôŘϙťĺϙťēôϙČôIJôŘÍīϙèĺIJîĖťĖĺIJŜϙŜôèťĖĺIJϙĺċϙťēĖŜϙ@aϙċĺŘϙÍîîĖťĖĺIJÍīϙ
ĖIJċĺŘıÍťĖĺIJϙÍIJîϙîôťÍĖīŜϙĺIJϙťēôϙèĺIJŜťŘŪèťĖĺIJϙıÍIJÍČôıôIJťϙċĖôīîϙŜťÍċċϟϙ
iſIJôŘŜϙĺŜťŜϙ
ēĖŜϙôŜťĖıÍťôϙîĺôŜϙIJĺťϙĖIJèīŪîôϙÍIJƅϙèĺŜťϙċĺŘϙťēôϙċĺīīĺſĖIJČϠϙſēĖèēϙÍŘôϙÍŜŜŪıôîϙťĺϙæôϙŕŘĺŽĖîôîϙæƅϙťēôϙ
iſIJôŘϟϙ
•
"ôŜĖČIJϙôŘŽĖèôŜϙЭϙ(IJČĖIJôôŘĖIJČϙ
•
ŕôèĖÍīϙIIJŜŕôèťĖĺIJŜϙſĖīīϙŘôŗŪĖŘôϙÍīīĺſÍIJèôϙŪŜôϙÍŕŕŘĺŽÍīϟϙēĖŜϙĖŜϙIJĺťϙĖIJèīŪîôîϙĖIJϙťēôϙĺŽôŘÍīīϙ
@aϙèĺŜťϙÍIJîϙĖŜϙIJĺťϙôƄŕôèťôîϙċĺŘϙťēĖŜϙŕŘĺĤôèťϟϙϙ
•
ôŘıĖťŜϙĺťēôŘϙťēÍIJϙťŘÍċċĖèϙϼiϽϠϙîŪŜťϙèĺIJťŘĺīϠϙÍIJîϙ®ϙÍŘôϙIJĺťϙĖIJèīŪîôîϙĖIJϙťēĖŜϙ@aϟϙϙ
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
T H I S P A G E I S B L A N K
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
EXHIBIT G
Schedule of Major Milestones
(3 pages - To be Incorporated by Amendment)
See attached
Activity ID
Activity Name
OD
RD Start
Finish
Total
Float
Longest
Path
City of Glen
City of Glendale Interconnect
City of Glendale Interconnect
City of Glendale Interconnect
City of Glendale Interconnect
City of Glendale Interconnect
City of Glendale Interconnect
City of Glendale Interconnect
Project Mi
Project Milestones
Project Milestones
Project Milestones
Project Milestones
Project Milestones
Project Milestones
Project Milestones
A1000
Notice to Proceed
0
0
04-21-2
0
A1010
Substantial Completion
0
0
09-18-25
0
A1022
Demobilize
3
3 09-19-25
09-23-25
0
A1020
Final Completion
0
0
09-23-25
0
Submittals
Submittals
Submittals
Submittals
Submittals
Submittals
Submittals
Submittals
S101
Prepare and Transmit Misc. Submittals
1
1 04-21-25
04-21-25
50
S105
Prepare & Submit Electrical Gear
5
5 04-21-25
04-25-25
0
S103
Prepare & Submit Manifold Flow Meter
5
5 04-21-25
04-25-25
44
S104
Prepare & Submit Fire Flow Meter
5
5 04-21-25
04-25-25
56
S106
Submital Review by Client
8
8 04-22-25
05-01-25
50
S110
Review and Approve Radio Study
10
10 04-21-25
05-02-25
25
S108
Submitals / Drawings Approved
0
0
05-02-25
50
S107
Review & Approve Electrical Gear
10
10 04-28-25
05-09-25
0
Fab and D
Fab and Deliver
Fab and Deliver
Fab and Deliver
Fab and Deliver
Fab and Deliver
Fab and Deliver
Fab and Deliver
F108
Fab & Deliver Radio Mast
20
20 05-05-25
06-02-25
25
F110
Fab & Deliver Manifold Flow Meter
40
40 04-28-25
06-23-25
44
F106
Fab & Deliver Fire Flow Meter
40
40 04-28-25
06-23-25
56
F112
Fab & Deliver Electrical Gear
80
80 05-12-25
09-03-25
0
Construct
Construction Phase Pyramid Peak
Construction Phase Pyramid Peak
Construction Phase Pyramid Peak
Construction Phase Pyramid Peak
Construction Phase Pyramid Peak
Construction Phase Pyramid Peak
Construction Phase Pyramid Peak
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
G203
Mobilize to Site
3
3 06-10-25
06-12-25
25
G204
Pothole Utilities Pyramid Peak Pkwy Tie In
2
2 06-11-25
06-12-25
25
G205
Excavate and Shore Tie in Location
2
2 06-12-25
06-13-25
25
G208
Excavate 12" Line to Masonry Wall
3
3 06-23-25
06-25-25
25
G209
Place Slurry at Masonry Wall
1
1 06-26-25
06-26-25
25
G102
Demo Channel
1
1 06-27-25
06-27-25
25
G103
Excavate 12" Line to Metering Piping
5
5 06-30-25
07-07-25
25
r
May
Jun
Jul
Aug
Sep
Oct
2025
Finish On or After, 03-03-25, , Notice to Proceed
Substantial Com
Demobilize
Final Complet
Prepare and Transmit Misc. Submittals
Prepare & Submit Electrical Gear
Prepare & Submit Manifold Flow Meter
Prepare & Submit Fire Flow Meter
Submital Review by Client
Review and Approve Radio Study
Submitals / Drawings Approved
Review & Approve Electrical Gear
Fab & Deliver Radio Mast
Fab & Deliver Manifold Flow Meter
Fab & Deliver Fire Flow Meter
Fab & Deliver Electrical G
Mobilize to Site
Pothole Utilities Pyramid Peak Pkwy Tie In
Excavate and Shore Tie in Location
Excavate 12" Line to Masonry Wall
Place Slurry at Masonry Wall
Demo Channel
Excavate 12" Line to Metering Piping
Actual Work
Remaining Work
Critical Float
Longest Path
Remaining Level of Effort
City of Glendale Water Supply Interconnect
MGC Contractors, Inc.
Preliminary Schedule
Page 1 of 3 Report Run Date: 03-14-25
Layout: - Glendale Interconnect
Filter: TASK filter: All Activities
Proj ID: 24479 DD=04-21-25 / Current Project Finish Date:09-
23-25
NTP and completion dates will be updated
based upon actual City approval and NTP
Activity ID
Activity Name
OD
RD Start
Finish
Total
Float
Longest
Path
G107
Vertical Curb restoration
5
5 07-08-25
07-14-25
25
G106
Sidewalk Restoration
5
5 07-08-25
07-14-25
25
G105
Concrete Channel Restoration
5
5 07-08-25
07-14-25
25
G104
Concrete Pad for Metering Piping
5
5 07-08-25
07-14-25
25
Mechanica
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
G206
Install 16x12 Tapping Sleeve and Valve - Test
4
4 06-16-25
06-19-25
25
G207
Pipeline Services Tap Main Line
1
1 06-20-25
06-20-25
25
G110
Install Metering Pipe Above Ground
5
5 07-15-25
07-21-25
25
G116
Install Manifold Flow Meter
1
1 07-22-25
07-22-25
25
G111
6" Pump to Waste
2
2 07-23-25
07-24-25
25
G109
12" Vertical Piping to Manifold Piping
3
3 07-25-25
07-29-25
25
G112
Hydrostatic Testing
5
5 07-30-25
08-05-25
25
G113
Chlorination
3
3 08-04-25
08-06-25
25
G114
Pipe Coating Sub
5
5 08-07-25
08-13-25
25
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
E100
Produce Radio Study
3
3 05-05-25
05-07-25
87
E101
Erect Radio Mast
3
3 06-03-25
06-05-25
70
E108
Replace Fire Flow Meter
2
2 06-24-25
06-25-25
56
E102
Electrical Duct Banks
6
6 07-08-25
07-15-25
29
E103
Backfill Duct Banks
2
2 07-16-25
07-17-25
29
E104
Misc Electrical Slabs
5
5 07-17-25
07-23-25
29
E105
Electrical Cabinets - Gear
3
3 09-04-25
09-08-25
0
E106
Terminations
5
5 09-09-25
09-15-25
0
E107
Startup
3
3 09-16-25
09-18-25
0
Construct
Construction Phase Tonopah
Construction Phase Tonopah
Construction Phase Tonopah
Construction Phase Tonopah
Construction Phase Tonopah
Construction Phase Tonopah
Construction Phase Tonopah
Civil & Me
Civil & Mechanical
Civil & Mechanical
Civil & Mechanical
Civil & Mechanical
Civil & Mechanical
Civil & Mechanical
Civil & Mechanical
A1024
Pothole Utilities
1
1 04-21-25
04-21-25
41
A1026
Excavate & Demo 4" Piping
2
2 04-22-25
04-23-25
41
A1028
Remove & Replace 12" Backflow
2
2 04-24-25
04-25-25
41
A1030
Demo 4" Piping in Vault & Cap Existing
2
2 04-28-25
04-29-25
41
r
May
Jun
Jul
Aug
Sep
Oct
2025
Vertical Curb restoration
Sidewalk Restoration
Concrete Channel Restoration
Concrete Pad for Metering Piping
Install 16x12 Tapping Sleeve and Valve - Test
Pipeline Services Tap Main Line
Install Metering Pipe Above Ground
Install Manifold Flow Meter
6" Pump to Waste
12" Vertical Piping to Manifold Piping
Hydrostatic Testing
Chlorination
Pipe Coating Sub
Produce Radio Study
Erect Radio Mast
Replace Fire Flow Meter
Electrical Duct Banks
Backfill Duct Banks
Misc Electrical Slabs
Electrical Cabinets - G
Terminations
Startup
Pothole Utilities
Excavate & Demo 4" Piping
Remove & Replace 12" Backflow
Demo 4" Piping in Vault & Cap Existing
Actual Work
Remaining Work
Critical Float
Longest Path
Remaining Level of Effort
City of Glendale Water Supply Interconnect
MGC Contractors, Inc.
Preliminary Schedule
Page 2 of 3 Report Run Date: 03-14-25
Layout: - Glendale Interconnect
Filter: TASK filter: All Activities
Proj ID: 24479 DD=04-21-25 / Current Project Finish Date:09-
23-25
Activity ID
Activity Name
OD
RD Start
Finish
Total
Float
Longest
Path
A1032
Excavate 12"x8" Connection
1
1 04-30-25
04-30-25
41
A1034
Remove 12"x8" Connection & Demo 8" Piping
2
2 05-01-25
05-02-25
41
A1036
Core Drill Vault
1
1 05-05-25
05-05-25
41
A1038
Install 12" Piping
2
2 05-06-25
05-07-25
41
A1040
Backfill
2
2 05-08-25
05-09-25
41
A1042
Pipe Tap & Pipe Support
2
2 05-12-25
05-13-25
41
A1044
Restore Landscape & Cleanup
2
2 06-06-25
06-09-25
25
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
E112
Electrical Duct Banks
2
2 04-24-25
04-25-25
87
E116
Backfill Duct Banks
1
1 04-28-25
04-28-25
87
E118
Misc Electrical Slabs
5
5 04-29-25
05-05-25
87
E110
Produce Radio Study
3
3 05-05-25
05-07-25
42
E122
Electrical Cabinets - Gear
3
3 05-06-25
05-08-25
87
E124
Terminations
5
5 05-09-25
05-15-25
87
E114
Erect Radio Mast
3
3 06-03-25
06-05-25
25
E126
Startup
3
3 06-06-25
06-10-25
73
r
May
Jun
Jul
Aug
Sep
Oct
2025
Excavate 12"x8" Connection
Remove 12"x8" Connection & Demo 8" Piping
Core Drill Vault
Install 12" Piping
Backfill
Pipe Tap & Pipe Support
Restore Landscape & Cleanup
Electrical Duct Banks
Backfill Duct Banks
Misc Electrical Slabs
Produce Radio Study
Electrical Cabinets - Gear
Terminations
Erect Radio Mast
Startup
Actual Work
Remaining Work
Critical Float
Longest Path
Remaining Level of Effort
City of Glendale Water Supply Interconnect
MGC Contractors, Inc.
Preliminary Schedule
Page 3 of 3 Report Run Date: 03-14-25
Layout: - Glendale Interconnect
Filter: TASK filter: All Activities
Proj ID: 24479 DD=04-21-25 / Current Project Finish Date:09-
23-25
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
T H I S P A G E I S B L A N K
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
EXHIBIT H
Dispute Resolution Procedures
1.
Disputes.
1.1
Each Dispute arising out of or related to this Agreement (including Disputes
regarding any alleged breaches of this Agreement) shall be initiated and decided
under the provisions of this Exhibit.
1.2
CMAR and City shall each designate in writing to the other party, from time to
time, a member of senior management who shall be authorized to attempt to
expeditiously resolve any Dispute relating to the subject matter of this Agreement
in an equitable manner.
1.3
A party shall initiate a Dispute by delivery of written notice to the members of
management designated by the respective parties under Section 1.2 of this Exhibit.
1.4
The parties must:
(A)
Attempt to resolve all Disputes promptly, equitably and in a good faith
manner; and
(B)
Provide each other with reasonable access during normal business hours to
any and all non-privileged records, information and data pertaining to any
such Dispute.
1.5
With respect to matters concerning modification of the GMP or any schedule,
CMAR must first follow the provisions of any Claim procedure established by the
Design-Build Agreement before seeking relief under these Procedures.
2.
Emergency Arbitration.
2.1
If the parties are unable to accomplish resolution of a Dispute, the expedited
resolution of which either party considers necessary to prevent or mitigate a
material delay to the critical path of the Services (a "Time Sensitive Dispute")
within two days after the Time Sensitive Dispute has been initiated by a party, either
party may thereafter seek emergency relief before an emergency arbitrator (the
"Emergency Arbitrator") appointed as follows:
(A)
The parties will exercise best efforts to pre-select an Emergency Arbitrator
within 20 days after entering into this Agreement;
(B)
If the Emergency Arbitrator has not been selected at the time a party delivers
Notice of a Time Sensitive Dispute, the parties will each select a
representative within one day after the Notice is delivered and the two
representatives will then select the Emergency Arbitrator by the third day
following delivery of the Notice.
(C)
The Emergency Arbitrator shall be an attorney with at least ten (10) years’
experience with commercial construction legal matters in Maricopa County,
Arizona, be independent, impartial, and not have engaged in any business
for or adverse to either party for at least ten (10) years.
2.2
The Emergency Arbitrator will conduct a hearing and render a written
determination on the Dispute to both parties within five business days of the matter
being referred to him or her, all in accordance with Rules O-1 to O-8 of the
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
American Arbitration Association ("AAA") Commercial Rules-Optional Rules for
Emergency Protection Commercial Rules ("AAA Emergency Rules").
2.3
Although the hearing will be conducted using AAA rules, unless both parties agree
otherwise, this dispute process will not be administered by the AAA but will be
conducted by the parties in accordance with these procedures.
2.4
If, however, an Emergency Arbitrator has not selected within three days after
delivery of the Notice, either party may upon three days additional notice, thereafter
seek emergency relief before the AAA, in accordance with the AAA Emergency
Rules, provided that the Emergency Arbitrator meets the qualifications set forth
above.
2.5
All proceedings to arbitrate Time Sensitive Disputes shall be conducted in
Glendale, Arizona.
2.6
Presentation, request for determination (i.e., a party’s prayer), and the Emergency
Arbitrators decision will adhere to the procedures required in Section 3.6 of this
Exhibit.
2.7
The finding of the Emergency Arbitrator with respect to any Time Sensitive
Dispute will be binding upon the parties on an interim basis during progress of the
Services, subject to review de novo by arbitration after the Project Substantial
Completion Date.
2.8
The time and extent of discovery will be as determined by the Emergency
Arbitrator.
(A)
Discovery orders of the Emergency Arbitrator will consider the time
sensitivity of the matter and the parties desire to resolve the issue in the
most time and costs efficient manner;
(B)
The parties are obligated to cooperate fully and completely in the provision
of documents and other information, including joint interviews of
individuals with knowledge such that the matter moves toward resolution
in the most time and costs efficient manner and the Emergency Arbitrator
is empowered to fashion any equitable penalty against a party that fail to
meet this obligation.
3.
Non-Emergency Arbitration.
3.1
Except as provided in Section 5 of this Exhibit, any Dispute that is either a non-
emergency Dispute that has not been resolved by negotiation, or a de novo review
of an AAA emergency arbitration will be decided by binding arbitration by a panel
of three arbitrators in accordance with, but not necessarily administered by, the
Construction Industry Rules of the AAA.
(A)
The parties shall each select an arbitrator within 15 days after notice that a
party desires to resolve a dispute by arbitration.
(B)
The two arbitrators shall then each select a third arbitrator. If an arbitrator
is not selected within any such 15 day period, then the arbitrator shall be
appointed by the AAA.
3.2
The arbitrator(s) shall meet the qualifications of Emergency Arbitrators as provided
in Section 2 of this Exhibit.
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
3.3
The arbitrators do not have the authority to consider or award punitive damages as
part of the arbitrators' award.
3.4
In connection with such arbitration, each party shall be entitled to conduct up to
five depositions, and, no less than 90 days prior to the date of the arbitration hearing,
each party shall deliver to the other party copies of all documents in the delivering
party's possession that are relevant to the dispute.
3.5
The arbitration hearing shall be held within 150 days of the appointment of the
arbitrators.
3.6
At the arbitration hearing, each party will argue its position to the arbitrators in
support of one proposed resolution to the dispute (a “Proposed Resolution”).
(A)
Each party’s Proposed Resolution must be fully dispositive of the dispute.
(B)
The arbitrators must select one Proposed Resolution by majority consent
and are not free to fashion any alternative resolutions.
(C)
The parties must submit their proposed resolution of the matter to the
arbitrators and the other party 15 days prior to the date set for
commencement of the arbitration proceeding.
(D)
The decision of the arbitrators will be forwarded to the parties within 15
days after the conclusion of the arbitration hearing.
(E)
The decision of the arbitration panel is final and binding on the parties and
may be entered in any court of competent jurisdiction for the purpose of
securing an enforceable judgment.
(F)
All costs and expenses associated with the arbitration, including the
reasonable legal fees and costs incurred by the prevailing party, must be
paid by the party whose position was not selected by the arbitrators.
4.
Continuing Work. Unless otherwise agreed to in writing, CMAR must continue to
perform and maintain progress of the Work during any Dispute Resolution or arbitration
proceedings, and City will continue to make payment to CMAR in accordance with the
Agreement.
5.
Exceptions.
5.1
Neither City nor CMAR are required to arbitrate any third-party claim, cross-claim,
counter claim, or other claim or defenses in any action that is commenced by a
third-party who is not obligated by contract to arbitrate disputes with City and
CMAR.
5.2
City or CMAR may commence and prosecute a civil action to contest a lien or stop
notice, or enforce any lien or stop notice (but only to the extent the lien or stop
notice the party seeks to enforce is enforceable under Arizona law), including,
without limitation, an action under A.R.S. § 33-420, without the necessity of
initiating or exhausting the procedures of this Exhibit.
5.3
This Exhibit does not apply to, and may not be construed to require arbitration of,
any claims, actions or other process undertaken, filed, or issued by the City of
Glendale Building Safety Department, Code Compliance Department, Police
Department, Fire Department, or any other agency of City acting in its
City of Glendale Standard Form Agreement Between Owner and CM@Risk (January 28, 2025)
governmental permitting, for the benefit of public health, safety, and welfare, or
other regulatory capacity.
5.4
In connection with any arbitration, the arbitrators do not have the authority to, and
may not enforce, any provision of the Federal or Arizona Rules of Civil Procedure.