1
01/28/2025
C
PROFESSIONAL SERVICES AGREEMENT
BETWEEN
THE CITY OF GLENDALE AND
CLEARWING SYSTEMS INTEGRATION, LLC
City of Glendale Solicitation RFP 25-36 Amphitheater Audio Visual and Theatrical Lighting System
This Professional Services Agreement ("Agreement") is entered into and effective between CITY OF GLENDALE,
an Arizona municipal corporation ("City") and Clearwing Systems Integration, LLC, a Wisconsin limited liability
company, authorized to do business in the State of Arizona, ("Consultant") as of the _____ day of
_________________, 2025 (“Effective Date”).
RECITALS
A.
City intends to undertake a project for the benefit of the public and with public funds that is more fully set
forth in Exhibit A, Scope of Work (the "SOW") and the original City of Glendale RFP 25-36;
B.
City desires to retain the professional services of Consultant to develop, create, make, generate, supply, deliver,
provide and/or perform the specific benefits, services, tasks, activities, expertise, etc. as set forth in the Scope
of Work; and
C.
City and Consultant desire to memorialize their agreement with this document.
AGREEMENT
The parties hereby agree as follows:
1.
Key Personnel; Other Consultants and Subcontractors.
1.1
Professional Services. Consultant will provide all Services necessary to assure all portions, tasks,
activities and specifications of the SOW (the “Services”) are completed timely and efficiently
consistent with the SOW’s requirements, including, but not limited to, working in close interaction
and interfacing with City and its designated employees, and working closely with others, including
other consultants or contractors, retained by City.
1.2
Project Team.
a.
Project Manager.
(1)
Consultant will designate an employee as Project Manager with sufficient training,
knowledge, and experience to, in the City's opinion, complete the project and handle
all aspects of the SOW such that the work produced by Consultant is consistent
with applicable standards as detailed in this Agreement; and
(2)
The City must approve the designated Project Manager.
b.
Project Team.
(1)
The Project Manager and all other employees assigned to the perform the SOW by
Consultant will comprise the "Project Team."
(2)
Project Manager will have responsibility for and will supervise all other employees
assigned to the perform the SOW by Consultant.
c.
Discharge, Reassign, Replacement.
(1)
Consultant acknowledges the Project Team is comprised of the same persons and
roles for each as may have been identified in Exhibit A.
2
01/28/2025
(2)
Consultant will not discharge, reassign, replace or diminish the responsibilities of
any of the employees assigned to perform the SOW who have been approved by
City without City's prior written consent unless that person leaves the employment
of Consultant, in which event the substitute must first be approved in writing by
City.
(3)
Consultant will change any of the members of the Project Team at the City's request
if an employee's performance does not equal or exceed the level of competence that
the City may reasonably expect of a person performing those duties, or if the acts
or omissions of that person are detrimental to the completion of the SOW.
d.
Subcontractors.
(1)
Consultant may engage specific technical contractors (each a "Subcontractor") to
furnish certain Service.
(2)
Consultant will remain fully responsible for Subcontractor's Services.
(3)
Subcontractors must be approved by the City.
(4)
Consultant will certify by letter that all contracts with Subcontractors have been
executed incorporating requirements and standards as set forth in this Agreement.
2.
Schedule. The Services will be undertaken in a manner that ensures the SOW is completed on time and in
a cost- efficient manner. The Services, including any interim milestones, shall be completed in accordance
with the schedule contained in Exhibit A.
3.
Consultant’s Work.
3.1
Standard. Consultant must perform Services in accordance with the standards of due diligence, care,
and quality prevailing among consultants having substantial experience with the successful furnishing
of Services for projects that are equivalent in size, scope, quality, and other criteria under the SOW
and identified in this Agreement.
3.2
Licensing. Consultant warrants that:
a.
Consultant and its Subconsultants or Subcontractors will hold all appropriate and required
licenses, registrations and other approvals necessary for the lawful furnishing of Services
("Approvals"); and
b.
Neither Consultant nor any Subconsultant or Subcontractor has been debarred or otherwise
legally excluded from contracting with any federal, state, or local governmental entity
("Debarment").
(1)
City is under no obligation to ascertain or confirm the existence or issuance of any
Approvals or Debarments, or to examine Consultant's contracting ability.
(2)
Consultant must notify City immediately if any Approvals or Debarment changes
during the Agreement's duration. The failure of the Consultant to notify City as
required will constitute a material default under the Agreement.
3.3
Compliance.
a.
Services will be furnished in compliance with applicable federal, state, county and local
statutes, rules, regulations, ordinances, building codes, life safety codes, and other standards
and criteria designated by City.
b.
Consultant must not discriminate against any employee or applicant for employment on the
basis of race, color, religion, sex, national origin, age, marital status, sexual orientation, gender
identity or expression, genetic characteristics, familial status, U.S. military veteran status or
any disability. Consultant will require any Sub-contractor to be bound to the same
requirements as stated within this section. Consultant, and on behalf of any subcontractors,
warrants compliance with this section.
3
01/28/2025
3.4
Coordination; Interaction.
a.
For projects that the City believes requires the coordination of various professional services,
Consultant will work in close consultation with City to proactively interact with any other
professionals retained by City ("Coordinating Professionals").
b.
Consultant will meet to review the Services to be provided in the SOW, Schedule and in-
progress work with Coordinating Professionals and City as often and for durations as City
reasonably considers necessary in order to ensure the timely work delivery and SOW
completion.
c.
For projects not involving Coordinating Professionals, Consultant will proactively interact
with any other contractors when directed by City to obtain or disseminate timely information
for the proper execution of the SOW.
3.5
Work Product.
a.
Ownership. Upon receipt of payment for Services furnished, Consultant grants to City, and
will cause its Subconsultants or Subcontractors to grant to the City, the exclusive ownership
of and all copyrights, if any, to evaluations, reports, drawings, specifications, project manuals,
surveys, estimates, reviews, minutes, all "architectural work" as defined in the United States
Copyright Act, 17 U.S.C § 101, et seq., and other intellectual work product as may be
applicable ("Work Product").
(1)
This grant is effective whether the Work Product is on paper (e.g., a "hard copy"),
in electronic format, or in some other form.
(2)
Consultant warrants, and agrees to indemnify, hold harmless and defend City for,
from and against any claim that any Work Product infringes on third-party
proprietary interests.
b.
Delivery. Consultant will deliver to City copies of the preliminary and completed Work
Product promptly as they are prepared.
c.
City Use.
(1)
City may reuse the Work Product at its sole discretion.
(2)
In the event the Work Product is used for another project without further
consultations with Consultant, the City agrees to indemnify and hold Consultant
harmless from any claim arising out of the Work Product.
(3)
In such case, City will also remove any seal and title block from the Work Product.
4.
Compensation.
4.1
Compensation. Consultant's compensation for the Services, including those furnished by its
Subconsultants or Subcontractors will not exceed $726,547.10 for the Materials and Services of the
primary project at the unit rates set forth in the Price Workbook submitted in accordance with RFP
25-36. Additional support services if any, will be billed at the hourly rates as detailed in the Price
Workbook.
Thereafter, the City shall pay the Consultant an amount not to exceed of $4,347.60 for services for
the subsequent years of the contract. The maximum aggregate amount for this Agreement, including
any additional equipment, Services, or renewal terms, shall not exceed $776,000, as specifically
detailed in Exhibit B ("Compensation").
4.2
Change in Scope of Work. The Compensation may be equitably adjusted if the original SOW is
significantly modified, but only as provided below.
a.
Adjustments to the SOW, including adding any additional Services or any change in the
amount of Compensation available hereunder, require a written amendment to this
Agreement and may require City Council approval.
4
01/28/2025
b.
Additional services which are outside the scope of the original SOW contained in this
Agreement may not be performed by the Consultant without prior written authorization
from the City.
c.
Notwithstanding the incorporation of the Exhibits to this Agreement by reference, should
any conflict arise between the provisions of this Agreement and the provisions found in the
Exhibits and accompanying attachments, the provisions of this Agreement shall take priority
and govern the conduct of the parties.
4.3
Expenses. City will reimburse Consultant for certain out-of-pocket expenses necessarily incurred by
Consultant in connection with this Agreement, without mark-up (the “Reimbursable Expenses”),
including, but not limited to, document reproduction, materials for book preparation, postage,
courier and overnight delivery costs incurred with Federal Express or similar carriers, travel and car
mileage, subject to the following:
a.
Mileage, airfare, lodging and other travel expenses will be reimbursable only to the extent
these would, if incurred, be reimbursed to City of Glendale personnel under its policies and
procedures for business travel expense reimbursement made available to Consultant for
review prior to the Agreement’s execution, and which policies and procedures will be
furnished to Consultant;
b.
The Reimbursable Expenses in this section are approved in advance by City in writing; and
c.
The total of all Reimbursable Expenses paid to Consultant in connection with this
Agreement will not exceed the “not to exceed” amount identified in Section 4.1 above.
5.
Billings and Payment.
5.1
Applications.
a.
Consultant will submit monthly invoices (each, a "Payment Application") to City's Project
Manager and City will remit payments based upon the Payment Application as stated below.
b.
The period covered by each Payment Application will be one calendar month ending on the
last day of the month.
5.2
Payment.
a.
After a full and complete Payment Application is received, City will process and remit
payment within 30 days.
b.
Payment may be subject to or conditioned upon City's receipt of:
(1)
Completed work generated by Consultant and its Subconsultants and
Subcontractors; and
(2)
Unconditional waivers and releases on final payment from all Subconsultants and
Subcontractors as City may reasonably request to assure the City will be free of
claims arising from required performances under this Agreement.
5.3
Review and Withholding. City's Project Manager will timely review and certify Payment Applications.
a.
If the Payment Application is rejected, the Project Manager will issue a written listing of the
items not approved for payment.
b.
City may withhold an amount sufficient to pay expenses that City reasonably expects to incur
in correcting the deficiency or deficiencies rejected for payment.
6.
Termination.
6.1
For Convenience. City may terminate this Agreement for convenience, without cause, by delivering
a written termination notice stating the effective termination date, which may not be less than 15
days following the date of delivery.
5
01/28/2025
a.
Consultant will be equitably compensated for Services furnished prior to receipt of the
termination notice and for reasonable costs incurred.
b.
Consultant will also be similarly compensated for any approved effort expended, and
approved costs incurred, that are directly associated with Project closeout and delivery of the
required items to the City.
6.2
For Cause. City may terminate this Agreement for cause if Consultant fails to cure any breach of this
Agreement within seven days after receipt of written notice specifying the breach.
a.
Consultant will not be entitled to further payment until after City has determined its damages.
If City's damages resulting from the breach, as determined by City, are less than the equitable
amount due but not paid Consultant for Services furnished, City will pay the amount due to
Consultant, less City's damages, in accordance with the provision of Sec. 5.
b.
If City's direct damages exceed amounts otherwise due to Consultant, Consultant must pay
the difference to City immediately upon demand; however, Consultant will not be subject to
consequential damages more than $2,000,000 or the amount of this Agreement, whichever
is greater.
7.
Conflict. Consultant acknowledges this Agreement is subject to A.R.S. § 38-511, which allows for
cancellation of this Agreement in the event any person who is significantly involved in initiating, negotiating,
securing, drafting, or creating the Agreement on City's behalf is also an employee, agent, or consultant of any
other party to this Agreement.
8.
Insurance. For the duration of the term of this Agreement, Consultant shall procure and maintain insurance
against claims for injuries to persons or damages to property which may arise from or in connection with the
performance of all tasks or work necessary to complete the Project as herein defined. Such insurance shall
cover Consultant, its agent(s), representative(s), employee(s) and any subcontractors.
8.1
Minimum Scope and Limit of Insurance. Coverage must be at least as broad as:
a.
Commercial General Liability (CGL). Insurance Services Office Form CG 00 01, including
products and completed operations, with limits of no less than $2,000,000 per occurrence
for bodily injury, personal injury, and property damage. If a general aggregate limit applies,
either the general aggregate limit shall apply separately to this project/location or the general
aggregate limit shall be twice the required occurrence limit.
b.
Automobile Liability. Insurance Services Office Form Number CA 0001 covering Code 1
(any auto), with limits no less than $2,000,000 per accident for bodily injury and property
damage.
c.
Professional Liability. Consultant must maintain a Professional Liability insurance covering
errors and omissions arising out of the work or services performed by Consultant, or anyone
employed by Consultant, or anyone for whose acts, mistakes, errors and omissions
Consultant is legally liability, with a liability insurance limit of $2,000,000 for each claim and
a $4,000,000 annual aggregate limit.
d.
Worker’s Compensation. Insurance as required by the State of Arizona, with Statutory
Limits, and Employers’ Liability insurance with a limit of no less than $2,000,000 per
accident for bodily injury or disease.
8.2
Indemnification.
a.
To the fullest extent permitted by law, Consultant must defend, indemnify, and hold
harmless City and its elected officials, officers, employees and agents (each, an "Indemnified
Party," collectively, the "Indemnified Parties") for, from, and against any and all claims,
demands, actions, damages, judgments, settlements, personal injury (including sickness,
disease, death, and bodily harm), property damage (including loss of use), infringement,
governmental action and all other losses and expenses, including attorneys' fees and litigation
expenses (each, a "Demand or Expense" collectively "Demands or Expenses") asserted by a
6
01/28/2025
third-party (i.e. a person or entity other than City or Consultant) and that arises out of or
results from the breach of this Agreement by the Consultant or the Consultant’s negligent
actions, errors or omissions (including any Subconsultant or Subcontractor or other person
or firm employed by Consultant), whether sustained before or after completion of the SOW
and/or Services.
b.
This indemnity and hold harmless provision applies even if a Demand or Expense is in part
due to the Indemnified Party's negligence or breach of a responsibility under this Agreement,
but in that event, Consultant will be liable only to the extent the Demand or Expense results
from the negligence or breach of a responsibility of Consultant or of any person or entity
for whom Consultant is responsible.
c.
Consultant is not required to indemnify any Indemnified Parties for, from, or against any
Demand or Expense resulting from the Indemnified Party's sole negligence or other fault
solely attributable to the Indemnified Party.
8.3
Other Insurance Provisions. The insurance policies required by the Section above must contain, or
be endorsed to contain the following insurance provisions:
a.
The City, its officers, officials, employees and volunteers are to be covered as
additional insureds of the CGL and automobile policies for any liability arising from or in
connection with the performance of all tasks or work necessary to complete the Services as
herein defined. Such liability may arise, but is not limited to, liability for materials, parts or
equipment furnished in connection with any tasks, or work performed by Consultant or on
its behalf and for liability arising from automobiles owned, leased, hired or borrowed on
behalf of the Consultant. General liability coverage can be provided in the form of an
endorsement to the Consultant’s existing insurance policies, provided such endorsement is
at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 23 37, if later
revisions are used.
b.
For any claims related to the SOW and/or Services, the Consultant’s insurance coverage
shall be primary insurance with respect to the City, its officers, officials, employees, and
volunteers. Any insurance or self-insurance maintained by the City, its officers, officials,
employees or volunteers shall be in excess of the Consultant’s insurance and shall not
contribute with it.
c.
Each insurance policy required by this Section shall provide that coverage shall not be
canceled, except after providing notice to the City.
8.4
Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of
no less than A: VII, unless the Consultant has obtained prior approval from the City stating that a
non-conforming insurer is acceptable to the City.
8.5
Waiver of Subrogation. Consultant hereby agrees to waive its rights of subrogation which any
insurer may acquire from Consultant by virtue of the payment of any loss. Consultant agrees to
obtain any endorsement that may be necessary to effect this waiver of subrogation. The Workers’
Compensation Policy shall be endorsed with a waiver of subrogation in favor of the City for all work
performed by the Consultant, its employees, agent(s) and subcontractor(s).
8.6
Verification of Coverage. Within 15 days of the Effective Date of this Agreement, Consultant shall
furnish the City with original certificates and amendatory endorsements, or copies of any applicable
insurance language making the coverage required by this Agreement effective. All certificates and
endorsements must be received and approved by the City before work commences. Failure to obtain,
submit or secure the City’s approval of the required insurance policies, certificates or endorsements
prior to the City’s agreement that work may commence shall not waive the Consultant’s obligations
to obtain and verify insurance coverage as otherwise provided in this Section. The City reserves the
right to require complete, certified copies of all required insurance policies, including any
endorsements or amendments, required by this Agreement at any time during the Term stated herein.
7
01/28/2025
Consultant’s failure to obtain, submit or secure the City’s approval of the required insurance policies,
certificates or endorsements shall not be considered a Force Majeure or defense for any failure by
the Consultant to comply with the terms and conditions of the Agreement, including any schedule
for performance or completion of the Project.
8.7
Subcontractors. Consultant shall require and shall verify that all subcontractors maintain insurance
meeting all requirements of this Agreement.
8.8
Special Risk or Circumstances. The City reserves the right to modify these insurance requirements,
including any limits of coverage, based on the nature of the risk, prior experience, insurer, coverage
or other circumstances unique to the Consultant, the Project or the insurer.
9.
E-verify, Records and Audits. To the extent applicable under A.R.S. § 41-4401, the Consultant warrants
their compliance and that of its subconsultants with all federal immigration laws and regulations that relate to
their employees and compliance with the E-verify requirements under A.R.S. § 23-214(A). The Consultant or
subconsultant’s breach of this warranty shall be deemed a material breach of the Agreement and may result
in the termination of the Agreement by the City under the terms of this Agreement. The City retains the legal
right to randomly inspect the papers and records of the other party to ensure that the other party is complying
with the above-mentioned warranty. The Consultant and subconsultant warrant to keep their respective
papers and records open for random inspection during normal business hours by the other party. The parties
shall cooperate with the City’s random inspections, including granting the inspecting party entry rights onto
their respective properties to perform the random inspections and waiving their respective rights to keep such
papers and records confidential.
10.
No Boycott of Israel. To the extent A.R.S § 35-393 through § 35-393.03 are applicable, the parties hereby
certify that they are not currently engaged in, and agree for the duration of the Agreement to not engage in, a
boycott of goods or services from Israel, as that term is defined in A.R.S § 35-393.
11.
Uyghur Forced Labor Prevention Act (UFLPA). Consultant certifies that it does not currently, and during
the term of this Agreement, will not use:
a.
the forced labor of ethnic Uyghurs in the People’s Republic of China;
b.
any goods or services produced by the forced labor of ethnic Uyghurs in the People’s
Republic of China; and
c.
any contractors, subcontractors or suppliers that use the forced labor or any goods or
services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China.
12.
Attestation of PCI Compliance. When applicable, the Consultant will provide the City annually with a
Payment Card Industry Data Security Standard (PCI DSS) attestation of compliance certificate signed by an
officer of Consultant with oversight responsibility.
13.
Notices.
13.1
A notice, request or other communication that is required or permitted under this Agreement (each
a "Notice") will be effective only if:
a.
The Notice is in writing; and
b.
Delivered in person or by overnight courier service (delivery charges prepaid), certified or
registered mail (return receipt requested).
c.
Notice will be deemed to have been delivered to the person to whom it is addressed as of
the date of receipt, if:
(1)
Received on a business day before 5:00 p.m. at the address for Notices identified
for the Party in this Agreement by U.S. Mail, hand delivery, or overnight courier
service; or
(2)
As of the next business day after receipt, if received after 5:00 p.m.
d.
The burden of proof of the place and time of delivery is upon the Party giving the Notice.
8
01/28/2025
e.
Digitalized signatures and copies of signatures will have the same effect as original signatures.
13.2
Representatives.
a.
Consultant. Consultant's representative (the "Consultant's Representative") authorized to
act on Consultant's behalf with respect to the SOW and/or Services, and his or her address
for Notice delivery is:
Clearwing Systems Integration, LLC
4025 W. Buckeye Rd.
Phoenix, AZ 85009
Phone: 602-850-6333
Email ndressler@clearwing.com
with copies to dwilson@clearwing.com
b.
City. City's representative ("City's Representative") authorized to act on City's behalf, and
his or her address for Notice delivery is:
City of Glendale
c/o Eddie Garcia
5850 West Glendale Avenue
Glendale, Arizona 85301
With required copy to:
City Manager
City Attorney
City of Glendale
City of Glendale
5850 West Glendale Avenue
5850 West Glendale Avenue
Glendale, Arizona 85301
Glendale, Arizona 85301
c.
Concurrent Notices.
(1)
All notices to City's representative must be given concurrently to City Manager and
City Attorney.
(2)
A notice will not be deemed to have been received by City's representative until the
time that it has also been received by the City Manager and the City Attorney.
(3)
City may appoint one or more designees for the purpose of receiving notice by
delivery of a written notice to Consultant identifying the designee(s) and their
respective addresses for notices.
d.
Changes. Consultant or City may change its representative or information on Notice, by
giving Notice of the change in accordance with this section at least ten days prior to the
change.
14.
Financing Assignment. City may assign this Agreement to any City-affiliated entity, including a non-profit
corporation or other entity whose primary purpose is to own or manage the SOW or Services.
15.
Entire Agreement; Survival; Counterparts; Signatures.
15.1
Integration. This Agreement contains, except as stated below, the entire agreement between City
and Consultant and supersedes all prior conversations and negotiations between the parties regarding
the SOW or this Agreement.
a.
Neither Party has made any representations, warranties or agreements as to any matters
concerning the Agreement's subject matter.
b.
Representations, statements, conditions, or warranties not contained in this Agreement will
not be binding on the parties.
9
01/28/2025
c.
Inconsistencies between the solicitation, any addenda attached to the solicitation, the
response or any excerpts attached as Exhibit A, and this Agreement, will be resolved by the
terms and conditions stated in this Agreement.
15.2
Interpretation.
a.
The parties fairly negotiated the Agreement's provisions to the extent they believed necessary
and with the legal representation they deemed appropriate.
b.
The parties are of equal bargaining position and this Agreement must be construed equally
between the parties without consideration of which of the parties may have drafted this
Agreement.
c.
The Agreement will be interpreted in accordance with the laws of the State of Arizona.
15.3
Survival. Except as specifically provided otherwise in this Agreement, each warranty, representation,
indemnification and hold harmless provision, insurance requirement, and every other right, remedy
and responsibility of a Party, will survive completion of the SOW, or the earlier termination of this
Agreement.
15.4
Amendment. No amendment to this Agreement will be binding unless in writing and executed by
the parties. Electronic signature blocks do not constitute execution for purposes of this Agreement.
Any amendment may be subject to City Council approval.
15.5
Remedies. All rights and remedies provided in this Agreement are cumulative and the exercise of
any one or more right or remedy will not affect any other rights or remedies under this Agreement
or applicable law.
15.6
Severability. If any provision of this Agreement is voided or found unenforceable, that determination
will not affect the validity of the other provisions, and the voided or unenforceable provision will be
reformed to conform with applicable law.
15.7
Counterparts. This Agreement may be executed in counterparts, and all counterparts will together
comprise one instrument.
16.
Term.
16.1
Extensions. The term of this Agreement commences upon the effective date and continues for a
one (1) year initial period. The City may, at its option and with the approval of the Consultant, extend
the term of this Agreement an additional four (4) years, on an annual basis. Consultant will be notified
in writing by the City of its intent to extend the Agreement period at least thirty (30) calendar days
prior to the expiration of the original or any extension period. Price adjustments will only be reviewed
during the Agreement extension period and will be a determining factor for any extension. There
are no automatic extensions or renewals of this Agreement.
16.2
Extension for Procurement Process. Upon the expiration of the Term of this Agreement, including
the initial term and any extensions, at the City’s sole discretion, this Agreement may be extended on
a month-to-month basis for a maximum of six (6) months to allow for the City to complete its
procurement process to select a vendor to provide the services/materials similar to those provided
under this Agreement. The City will notify the Contractor in writing of its intent to extend the
Agreement at least thirty (30) calendar days prior to the expiration of the Term. Any extension
provided under this subsection will continue under the same terms and conditions as in effect
immediately prior to the expiration of the then-current term.
17.
Dispute Resolution. Any controversy or claim arising out of or relating to this contract, or the breach
thereof, shall be settled by arbitration administered according to the American Arbitration Association’s
Commercial Arbitration Rules, and judgment on the award rendered by the arbitrator may be entered in any
court having jurisdiction thereof.
18.
Cooperative Use of Contract. This agreement may be extended for use by other governmental agencies
and political subdivisions of the State. Any such usage by other entities must be in accord with the ordinances,
10
01/28/2025
charter, rules and regulations of the respective entity and the approval of the Contractor and City. For a list
of SAVE members, click on the following link:
http://www.mesaaz.gov/business/purchasing/save
19.
Exhibits. The following exhibits, with reference to the term in which they are first referenced, are
incorporated by this reference.
Exhibit A
Scope of Work
Exhibit B
Compensation
Exhibit C
Project Specific Provisions and Project Plans and Specifications
The parties enter into this Agreement effective as of the date shown above.
City of Glendale,
an Arizona municipal corporation
_____________________________________
By: Kevin R. Phelps
Its: Interim City Manager
ATTEST:
Julie K. Bower
(SEAL)
City Clerk
APPROVED AS TO FORM:
Michael D. Bailey
City Attorney
Clearwing Systems Integration, LLC,
a Wisconsin limited liability company
_____________________________________
By: Nick Dressler
Its: Vice President- Sales and Marketing
EXHIBIT A
Professional Services Agreement
SCOPE OF WORK
City of Glendale Solicitation RFP 25-36
Amphitheater Audio Visual and Theatrical Lighting System
1.
Introduction: The Contractor shall supply a turnkey system including equipment, labor, installation
materials, DSP programming, training, and follow-up support for all systems, as described in the original RFP. The
system is scheduled to be complete, installed, and operational, by February 14, 2026. Milestone dates will be defined
and coordinated between Okland and the awarded Contractor.
2.
Contractor Requirements. The Contractor shall provide the following this general list of requirements:
2.1
Initial Bill of Materials
2.2
Shop drawings to be completed and submitted prior to ordering Bill of Materials
2.3
Shop drawings to be completed and submitted prior to ordering Bill of Materials
2.4
Coordination with Electrical Contractor to confirm infrastructure is located correctly
2.5
Procurement and installation of equipment
2.6
Performance Testing and System Tuning
2.7
Training
2.8
As Built Documentation
3.
Project Specific Provisions. If there are any additional conditions that apply to this Project, they are set
forth in the Attached Exhibit C. and are incorporated herein by reference.
4.
Project Plans and Specifications A detailed list of the plans and specifications for this project are set forth in
the attached Exhibit C.
City of Glendale
RFP 25-36 / 42500051
Amphitheater Audio Visual and
Theatrical Lighting System
Presented by
Derek Wilson
March 26, 2025
Clearwing Systems Integration, LLC.
4025 W. Buckeye Rd. Phoenix, AZ 85009
AZ ROC 296081, 299258
Clearwing Systems Integration is pleased to provide the following Technical Proposal for
your review. The intent of this Technical Proposal is to provide the City of Glendale with
responses to their questions about Solicitation Number: RFP 25-36 / 42500051 –
Amphitheater Audio Visual and Theatrical Lighting System.
With nearly 50 years of experience, Clearwing excels in transforming visions and ideas into
reality. We deliver cutting-edge audio, video, lighting, rigging, and special effects solutions
that blend seamlessly into every environment. Our extensive expertise across multiple
industries ensures innovative, tailored results that elevate storytelling and visitor
engagement. We transform events, performance spaces, and attractions into unforgettable
environments through modern technology and integrated systems.
The project scope of work detailed in the City of Glendale’s RFP solicitation for Audio Visual
and Theatrical Lighting Systems is positioned at the heart of what Clearwing excels at,
performance-based entertainment solutions for venues, theaters and entertainment
spaces. Our dedicated staff of professionals work tirelessly to bring the excitement of a
touring production system to installed systems like yours as noted in your project design and
scope of work. If given the opportunity, we would like to bring your design to reality.
Cost Summary
Equipment and Materials
Shop Drawings and Submittals
In Shop Fab – Labor
On-site Install – Labor
Control and DSP Development
Final Test and Systems Performance
Owner Training and Documentation
Project Management and Coordination
Freight
Warranty
Clearwing Systems Integration is confirming the receipt of Solicitation Number: RFP 25-36,
Addendum #1 and has addressed all the Questions and City of Glendale responses and has
reflected any required changes/omissions/additions in our bid response.
clearwing.com
1. EXECUTIVE SUMMARY/COVER LETTER
$520,523.00
$15,000.00
$7,950.00
$80,600.00
$1,875.00
$12,600.00
$2,750.00
$22,675.00
$17,500.00
$0.00
Sub-total $681,473.00
Tax $45,074.10
Total $726,547.10
Our Experience
2.1 OFFEROR EXPERIENCE, PROVEN PERFORMANCE AND QUALIFICATIONS
Clearwing was founded in 1976 in Milwaukee, Wisconsin, by Gregg Brunclik and his partner,
initially offering audio and staging rentals for Midwest festivals. The company rose to
prominence after supporting Eddie Rabbitt’s “I Love a Rainy Night” tour and a co-headlining
tour with Kenny Rogers. Securing a $75,000 loan, Clearwing built an arena-capable sound
system, later touring with Blackfoot and Def Leppard on the High 'n' Dry tour, while also
establishing a road case division under Clearwing Audio and Case Company.
Incorporated in 1987, Clearwing grew its footprint over four decades, expanding into sales,
service, and installations. A 1993 partnership with a Phoenix production firm led to a full
Arizona office by 2005, rebranding as Clearwing Productions with locations in Milwaukee and
Phoenix to primarily serve performing arts and corporate clients. In 2009, the Design & Build
department was created to meet increasing client demand and steadily grew to be a large
division. Clearwing Systems Integration (CSI) was then created and is based in Milwaukee
and Phoenix, delivering permanent audio, video, lighting, rigging, drapery and custom
solutions across 29 states and Washington, D.C. so far. CSI has over 60 employees—
consisting of engineers, installers, technicians, and programmers performing most work
alongside select designers and contractors.
Today, Clearwing stands as an industry leader with over 49 years of expertise, employing
over 160 people alongside a portfolio of 500+ brands available for installation, sale, rent, and
service. Clearwing Productions supports musicians, corporations, organizations, and houses
of worship, while CSI’s dedicated teams in sales, engineering, project management,
operations, and technical services ensure meticulous oversight, delivering complex
installations on time and within budget.
clearwing.com
Project Team
2.1 OFFEROR EXPERIENCE, PROVEN PERFORMANCE AND QUALIFICATIONS
clearwing.com
Max Brunclik
Principal
12 Years with Clearwing
Recent Projects: Oversees all projects company-wide.
Trainings / Certifications:
Loras College, BA Finance, BA Marketing
Living as Leader
Strategic Coach – Entrepreneurial Leadership
Our staff brings a dynamic mix of expertise, passion, and creativity to every project. From
seasoned audio engineers to experienced lighting designers and dedicated service and
support teams, we’re a crew that thrives on collaboration and problem solving. With a
shared commitment to excellence and a love for what we do, we turn ideas into
unforgettable experiences—every time.
Ken Gardner
Project Manager
9 Years with Clearwing
Recent Projects: Phoenix Theatre - Lighting and Rigging / Peoria
Center – Vortek Maintenance and Lighting Upgrades
Trainings / Certifications:
Marymount Manhattan College, BA Theatre Arts
ETC Certified Lighting Technician
ETC EOS Family Programming Level 1
OSHA 30
Forklift, Boom & Scissor Lift
IATSE Local 260
Zach Toporek
Chief Engineer
3 Years with Clearwing
Recent Projects: Christ’s Church of the Valley – Audio, Video,
Lighting, & Rigging / Ak Chin Casino Audio Upgrade / Desert
Diamond Casino - Lighting
Trainings / Certifications:
University of Arizona, BA Fine Arts
AVIXA CTS Certified
2.1 OFFEROR EXPERIENCE, PROVEN PERFORMANCE AND QUALIFICATIONS
clearwing.com
Josh Barnhill
Qualified Rigger
6 Years with Clearwing
Recent Projects: Christ’s Church of the Valley – AVLRD – New Build /
Phoenix Theatre / Scottsdale Center for the Performing Arts –
Outdoor Venue
Trainings / Certifications:
University of Arizona, BFA Theatre Design & Technology
ETCP Certified Rigger
ETC EOS Level 1 & 2
ETC Prodigy
Shure Integrated Systems Level 1 & 2
AutoCad Drafting 2D & 3D
L-Acoustics Soundvision
Aerial Work Platforms
Vectorworks Spotlight
BlueBeam Revu
Audinate Dante Level 1 & 2
Mandy Brommel
Senior Field Technician
10 Years with Clearwing
Recent Projects: Christ’s Church of the Valley – Queen Creek and
Maricopa – AVLRD for New Build / Phoenix Theatre / Corona del Sol
High School - Rigging Replacement
Trainings / Certifications:
ETC Prodigy
ETC Certified Lighting Technician
ETC Mosiac
OSHA 30
Fiber Optic Safety
ST/SC/LC Connector Terminations
Hotmelt/Anaerobic
Epoxy Connector
Clearwing installed audio, lighting and associated supporting
systems across the Scottsdale Civic Center Plaza.
Contact: Zach Ciaburri
Phone: +1 480-499-8587
Email: zachc@scottsdale.org
Contractors Fees: $2,200,000
SCOTTSDALE CITY CENTER
CITY OF SCOTTSDALE, AZ
2.1 OFFEROR EXPERIENCE, PROVEN PERFORMANCE AND QUALIFICATIONS
clearwing.com
Clearwing upgraded audio, video, and lighting within the multi-
use venue.
Contact: Melissa Lipska
Phone: +1 262-524-3721
Email: mlipska@waukesha-wi.gov
Contractors Fees: $52,000
LES PAUL PERFORMANCE CENTER
CITY OF WAUKESHA, WI
Clearwing annually deploys large format PA Systems for 12+
stages at the Summerfest grounds each year, supporting with
control, engineering, design, deployment and staff.
Contact: Steve Vallee
Phone: +1 414-313-6335
Email: stvallee@mac.com
Contractors Fees: $300,000 Per Annual Deployment
SUMMERFEST
MILWAUKEE WORLD FESTIVALS / MILWAUKEE, WI
Clearwing installed a unique center-hung loudspeaker array
within the amphitheater. The system supports a wide range of
performers and entertainers throughout the season for the
Rockford Park District.
Contact: Curt Johnsen
Phone: +1 815-969-4076
Email: curtjohnsen@rockfordparkdistrict.org
Contractors Fees: $57,000
SINNISSIPPI PARK MUSIC SHELL
CITY OF ROCKFORD, IL
3.1 - 3.2 METHOD OF APPROACH
Upon award of the contract to fulfill the City of Glendale’s – Amphitheater Audio Visual and
Theatrical Lighting System project, Clearwings Operations team will be assigned. First a
Project Manager and Project Coordinator will be assigned to the project to facilitate the
following processes.
An internal project “Kick-off” meeting will take place with the core project team to review key
information about the new project. This meeting is to be conducted within the first two weeks
of the Project Manager being assigned to the project. This meeting will inform the project
team of the Scope of Work, client's vision, timeline, assumptions, and any open questions. The
Sales and Estimation team provides Ops with the information needed to own and lead the
management and deployment of the project moving forward, and for Ops to ask any
questions to support that.
The salesperson will lead this meeting and will present the project Scope of Work, project
outline and summary. This includes the overall concept of the project, intended functionality,
timeline and milestones, deliverables, budget, exclusions and any other pertinent project
information.
Within one week of the internal kick-off meeting, the salesperson will coordinate an External
Kick-off meeting which will include the Project Manager and the client (optional based on
client availability) and will confirm the Scope of Work, timeline/key dates, and any open
questions. After this meeting the Project Manager will be the main point of contact moving
forward to project completion.
At this point, the project team has been established and is working towards project design
documentation. Once the project drawings are in a 90% position, a cross-departmental
team will discuss, clarify and troubleshoot any potential issues. If significant changes or
drawings updates are required, this meeting will happen again until all information has been
confirmed. Once consensus has been reached and design intent has been confirmed, the
material list will be approved for ordering.
A pre-deployment site survey will be conducted to confirm site conditions, and to review any
site information that was noted in past meetings. This will happen 1-2 weeks prior to the
project prep/build-shop prep or installation commencement. This site survey is a useful way
for the project foreman and site leads to become familiar with the scope of work and the
installation plan.
On-site installation will commence once the team has a full understanding of the design
requirements and site conditions and has coordinated our timing intention with the General
Contractor. During the installation time frame, the Project Manager will stay engaged with
the on-site team to address any concerns daily so that if changes are required, they will be
addressed in a timely manner.
At the completion of the project, the core project team will have a “project debrief” meeting
to identify action items for the management team to address, and share lessons learned as
to improve our efforts for continued success in our next project.
For your project, the project team will be made up of personnel that will be assigned to
perform certain duties according to their areas of expertise. Our teams consist of industry
veterans who have spent their careers honing their skills in our industry and hold numerous
industry certifications and are encouraged to continue the education process throughout
their careers with Clearwing Systems Integration.
clearwing.com
4. PROPOSED SCHEDULE – NARRATIVE FORM
As noted in the “Method of Approach” above, the CSI Operations Department follows a
detailed internal process to keep our numerous projects on track. Once Sales kicks off the
project to the teams, our deliverables will follow the layout outlined below:
Project management reviews project deadlines and works backwards to create a Gantt
chart or task list with durations to be added to an Owner’s or General Contractors Gantt
chart to achieve the timeline.
Submittals including cutsheets begin. Engineers work together with other contractors on
shared AutoCAD or Revit files to identify conflicts. Provide any installation details needed.
Once approvals for equipment are received, equipment to be purchased, brought to the
Clearwing warehouse for testing and labeling for quick onsite deployment.
Pre-programming in-house begins once equipment has been confirmed. GUI layouts
and Magic Sheets are submitted for review and discussed with client stakeholders.
Throughout these pre-deployment tasks, progress site visits are conducted to catch
issues, and support the other contractors.
The installation of the Audio and Lighting systems will commence and scope of work will
be realized. Installation of the Lighting equipment is performed including aim and focus,
onsite programming adjustments, client review, incorporation of any client and designer
notes, address any punch list items and finally staff training. Audio will have many of the
same milestones. Installation of the Audio system components will be encompass the
rack location, structured cabling will be installed to tie the devices together, Input/Output
panels will be installed and terminated, speakers will be installed/terminated and once
all systems are installed, programming and tuning of the system will begin. As with the
Lighting systems, Audio onsite programming/tuning adjustments will begin along with
client review to incorporation any client touch panel design changes, address any punch
list items and to provide staff training.
Back at the office, As-built paperwork is created consisting for Lighting fixture addresses,
focus info, equipment manuals and specific site Operational Manuals. For the Audio
systems, a similar approach to As-built drawings will be created and will include
information regarding the speaker’s array hang requirements and install details. The
DSP/controller programming, Touch Screen layout and speaker tuning information will be
gathered for client closeout documents.
The scheduled completion date of February 14th, 2026, should provide the time required to
procure the needed equipment, complete installation, and provide training for a complete
installation. Clearwing will work with other trades to coordinate needs/requirements and will
make every effort to meet the desired project completion time frame.
clearwing.com
PM reviews deadlines, creates Gantt
chart with durations for timeline.
4. PROPOSED SCHEDULE – GRAPHIC FORM
clearwing.com
Submittals start, engineers
collaborate on CAD, resolve conflicts
and provide installation details.
Approved equipment purchased,
tested, labeled at warehouse.
Pre-programming begins, GUI and
Magic Sheets reviewed.
Site visits monitor progress, support
contractors.
Audio/Lighting install begins, includes
programming, training.
As-built docs created for Lighting and
Audio systems.
Once this project has been contracted and the project team has been assigned, a highly
detailed graphical gantt style chart will be provided to show the project milestones and
timing durations for these milestone events/actions.
EXHIBIT B
Professional Services Agreement
COMPENSATION
METHOD OF PROCUREMENT AND AMOUNT OF COMPENSATION
Consultant/Contractor submitted a proposal in resonse to the City of Glendale RFP 25-36 per Section 5 of this
Agreement.
NOT-TO-EXCEED AMOUNT
The total amount of compensation paid to Consultant for Services as defined herein during the entire term of the
Project must not exceed $776,000. to include the base bid and any combination of support services thereof; at the
hourly rates as specified in the attached Price Workbook from the original RFP 25-36.
DETAILED PROJECT COMPENSATION
See Attached Offeror price proposal in the completed and signed Price Workbook.
$()")
)
"%&"!)'# ) 20) )
+.V#V! V
&FB1RG3;3=KV3E0GL<3>MV
V,4JNV:CT?V)OH44PV
*S6Q5VV
83@2/93VI7UDA0V
V
'("V-$(%%V
qi}!(
q}£ d£ 'qcsX0
0£ <0£ }C(Dj;£ (=0)Y0£ "0Zq£ i £ E0b£ kq£ (Y0!}[ £ \F
0)£ ri£
qi
}!(
qv£#bG0*£swC(0£s}qsq!X£C\[£$0£(qnJ+0}/+£Cl(\)0)£Cm£qk}!(q}£sxC(0£!£
iq£ !,)HIri!X£ (q
£ q£ >0£ C
£ Z[£ s}C(Jk;£ ?q\,£ (qi0cs]!0£ (qcs\C!n(0£ K
<£ @0£
s0}5qyd!i(0£z0uI}0e0i£!£s0(L6C0)£Ci£A0£(qs0£q1£ q}V
£
!
=0£(q£s{qtq!\£c£ "0£%fC0+£0s!}!0\¡£7}qc£<0£|0£q2£B0
}C
0k£s}qsq!\
"
q£sqsq!\£@!\[£"0£uq0)£!£!k£!^ZMk(\C0£8C0)£900£9q}£0~C(0
(
\\£Ni(aO0£ (q0}£![\£,C0(£!k)£Pk)Q0(£i0(0!}¡£0t0o0£Ro(\,Sp;
&
£iq£ZCgT0-£
q£
}!0_£
0\0s=qi0£(qs¢Ci;£!i.£q<0}£qq3 sq(W0
0s0i0
)
q
£q£'00*£
<0£!(
!`£900£=![\£iq
£0(00*£@0£!hqi
£s0(C4C0*£ Ui
:00£t}qtq![
A
!
+$A683A
,<@A6&A0%4$"1%A 37(+<)%"<%9A=$-6?.;>"2A"4$A(%"<:+#"1A/'*<+5'A@;<%3;A
3.Q=á3A7á
>¶Ó{³rÏáa láJaÇr·|aÄá
Ry®á8ÀaÚ} àÅáa¡máRÔe~ÏÐaÅá
B¡Ry¯´á@af¸ja̯¢áFag¯Áá
L¢RÇráC£ÄÇaa˯¤áGah¯¹á
5¡Èº¯áRÞÄËráa¤ná/Õná9ROáS¯uÈÛa¿rá:rØrµr¥Éá
@¢báUrÅʪsáa¢oáRÙÆËrÅáOr¹t°»c¤jrá]r¼~t|ja˯¡á
LÜ¥r½áV»a
¦¥vác§oá6Är¯ÖÉá;¯k×r¢Ëa̯¡á
P¯rjËáKa¨awrr©Íáa¢pá6±Âq¥aѰ¥á
@¹rxzËá
WÚ`raºá^aº¾a¢Éßá
4D:á\MX0Há^áX1_?R,á
1«²jairáYaÝrÅáZaÝá*&á áËaÝá¿aÎrá
3E<á[N[2I-á
T¬ÒdÃá
## á
%á á
á(á+%
á
á*á&á
á*($á
áá&
á
áá(#á
áá&'%
á
á'á%á
á
á&*(!á
á"%á)"á
á(&á $"(á
OnwyeIyXEaC=YFy
1f]UBVo=pPgby +t^@Fiy 0.y y y
y
(.!#4!50y9#-y:#29%y,y4!40$%y
&#!6#,y2<27(y
1?UYíI;í<A9F4+B9í
J´©bà²jkÎí5l°Z³ÏjÐí
!'$íWmÈÑí/¨æíQÒnnÓí
Rá|Ôoíí
=jeZjí,´}ë©Zí&"í
QDyfj_y
QsyfJy ZGcD>[Gy `hLRqMG>rEjyuDQfvSku>\y?cDy8NH>rjQA?\y'WKNrTdKy3xlrH_my
>©âµèíO[ÕjÍív©¶í-ff~Ö©\íX©·í
Kj¸í>©ã¹íP\×jÍí
LºªpcØí: w
¡pp»6qÉx¢p¼í
í#
MůpcÙíE]£]wp½í
í#
#
NÅ®wº]p¾í
í%#
VÆa¤p¿í
í#
0ghpÀí2«±`¤éíG`p(í
3r^Çç¥yíSêÊÚsËí@¥Ûtzº_ܬ¦íCD3
í
.äÝ{ÁìpiíT
w§`ÞåÂp)í
Hdí7ÃuÌÌuÄí
8`ßp*í
%#
/<),4y PGj\hP[ d.>> V]Pu1! DPHh,>z dij!D!Hkd Q# 2j!C3~! d!Yv1!e
{D!Ijw4>?!Z!u1!w!KUV[Pu!zj-! PHj[jD5I6djbjQ\P[!d7)J!!
.!8l!D1! ejj!D!Hjd/>@HQm!y!!j-!W]QUQd?(!!8Hj.1d!j9QK
5;y*-9,4y!$:H!jycj!rd!.Qw;jRjAw1n0jy
>"^x<L*|fo"EfMo"+_p=SN
-0-0y,)y %&!`Dsgj!Iq!a'tB>TFXO}D!
Proposal For:
Amphitheater Audio System - RFP 25-36 - 42500051
Customer:
Procurement
City Of Glendale
Site:
City Of Glendale
5850 West Glendale Avenue
Glendale, AZ 85301
4025 W Buckeye Rd
Phoenix, AZ 85009
ROC299258, 296081
Page 1 of 8
Proposal Valid for 30 days
As of: 2025-03-27
Presented By: Derek Wilson
clearwing.com
AMPHITHEATER AUDIO SYSTEM - RFP 25-36 - 42500051
PROPOSAL 138732072
Clearwing Systems Integration is pleased to present the following Service Contract proposal for your review. This service contract
proposal is provided to the City of Glendale as a part of Solicitation RFP 25-36 / 42500051 - Amphitheater Audio Visual and
Theatrical Lighting System.
Noted in Section 27 40 00 - Amphitheater Audio System - 1.15 - Service Contract, The City of Glendale has requested Warranty
Service Contract options to extend the included 2-year warranty provided in our RFP response.
We have provided (3) Warranty Extensions options that will extend the Warranty for a total of 5 years. Please note that Clearwing
is of the position that extending a Warranty for more than 5 years would be cost prohibitive, so options to extend the Warranty for
a total of 5 years is presented.
There are (3) options, a 1-year extension, 2-year extension and a 3-year extension option that can be added to the included 2-
year Warranty.
For each year of Warranty Extension, there will be (2) site visits to assess the systems operation and to perform basic
maintenance of the systems. If during this inspection any issues are found, a report will be provided to the Cities preferred
contact that explains the issue and the options for repair/replacement.
If it is determined to be a Manufacturer's Warranty issue, Clearwing will assess the proper way to address this issue. Please note
that any shipping incurred for the Warranty returns will be the responsibility of the client and will not be covered under this
Warranty Contract. In addition, if the removal of the equipment in question requires lifts or any equipment more than is required
for the scheduled service call, it will be the responsibility of the client to provide and will not be covered under this Warranty.
Project Specific Inclusions:
1.
For each year of extended Warranty, there shall be (2) visits to the site to assess the lighting and audio systems. During
these service calls, all systems will be assessed for proper operation and to provide basic maintenance.
Project Specific Exclusions:
1.
For all Manufacturer's Warranty repairs and/or replacements, shipping will be the responsibility of the client to provide and
is not included in this Warranty.
2.
If repair/replacement of equipment requires a lift or equipment above and beyond what is required for the annual Warranty
maintenance, it will not be covered under this Warranty and will be the responsibility of the client to provide.
Scope of Work
Page 2 of 8
clearwing.com
AMPHITHEATER AUDIO SYSTEM - RFP 25-36 - 42500051
PROPOSAL 138732072
CONTINUING SERVICE CONTRACT OPTIONS - 1 YEAR - QUOTE Q10027 - OPTIONAL
PART NUMBER
MANUFACTURER
DESCRIPTION
QTY
1-Year Adder (3-Years Total)
Year 3 - Visit #1
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 3 - Visit #2
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
1-Year Adder (3-Years Total) Total:
$4,296.00
Subtotals:
Equipment:
$886.00
Labor, Travel, & Fees:
$3,410.00
Taxes:
$51.60
GRAND TOTAL:
$4,347.60
Proposal Details
Page 3 of 8
clearwing.com
AMPHITHEATER AUDIO SYSTEM - RFP 25-36 - 42500051
PROPOSAL 138732072
CONTINUING SERVICE CONTRACT OPTIONS - 2 YEAR - QUOTE Q10049 - OPTIONAL
PART NUMBER
MANUFACTURER
DESCRIPTION
QTY
2-Year Adder (4-Years Total)
Year 3 - Visit #1
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 3 - Visit #2
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 4 - Visit #1
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 4 - Visit #2
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
2-Year Adder (4-Years Total) Total:
$9,446.00
Subtotals:
Equipment:
$2,626.00
Labor, Travel, & Fees:
$6,820.00
Taxes:
$120.40
GRAND TOTAL:
$9,566.40
Page 4 of 8
clearwing.com
AMPHITHEATER AUDIO SYSTEM - RFP 25-36 - 42500051
PROPOSAL 138732072
CONTINUING SERVICE CONTRACT OPTIONS - 3 YEAR - QUOTE Q10050 - OPTIONAL
PART NUMBER
MANUFACTURER
DESCRIPTION
QTY
3-Year Adder (5-Years Total)
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 3 - Visit #1
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 3 - Visit #2
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 4 - Visit #1
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 4 - Visit #2
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 5 - Visit #1
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
Year 5 - Visit #2
Includes the Following:
- Service Tech Visit of (1) Day to Verify Systems are in Working Order
- Report of Issues that need to be addressed, including pricing
- Small allowance for minor repairs that can be resolved during the Service Call
3-Year Adder (5-Years Total) Total:
$15,396.00
Subtotals:
Equipment:
$5,166.00
Labor, Travel, & Fees:
$10,230.00
Taxes:
$206.40
GRAND TOTAL:
$15,602.40
Page 5 of 8
clearwing.com
AMPHITHEATER AUDIO SYSTEM - RFP 25-36 - 42500051
PROPOSAL 138732072
Proposal Summary
BILL TO:
SHIP TO:
City Of Glendale
City Of Glendale
5850 West Glendale Avenue
5850 West Glendale Avenue
Glendale, AZ 85301
Glendale, AZ 85301
CONTINUING SERVICE CONTRACT OPTIONS - 1 YEAR - QUOTE Q10027 - OPTIONAL
Equipment:
$886.00
Labor, Travel, & Fees:
$3,410.00
Taxes:
$51.60
GRAND TOTAL:
$4,347.60
CONTINUING SERVICE CONTRACT OPTIONS - 2 YEAR - QUOTE Q10049 - OPTIONAL
Equipment:
$2,626.00
Labor, Travel, & Fees:
$6,820.00
Taxes:
$120.40
GRAND TOTAL:
$9,566.40
CONTINUING SERVICE CONTRACT OPTIONS - 3 YEAR - QUOTE Q10050 - OPTIONAL
Equipment:
$5,166.00
Labor, Travel, & Fees:
$10,230.00
Taxes:
$206.40
GRAND TOTAL:
$15,602.40
Page 6 of 8
clearwing.com
AMPHITHEATER AUDIO SYSTEM - RFP 25-36 - 42500051
PROPOSAL 138732072
Terms & Conditions
Standard Terms and Conditions:
1.
This proposal is valid for thirty (30) days, after which time pricing must be confirmed. If this proposal is not executed in
thirty (30) days, the proposal will need to be revised for pricing accuracy pre-execution.
2.
Clearwing Systems Integration is a licensed, bonded, and insured contractor, and provides a one-year warranty on
installed equipment, and a two-year warranty on workmanship.
3.
Clearwing requires a fully executed contract to begin work, and prior to ordering equipment.
4.
Clearwing accepts government agency and school purchase orders for initial order placement. Purchase order must be
emailed or mailed to Clearwing; a verbal number will not be accepted.
5.
All projects will be billed per the terms listed in the contract documents.
6.
Sales tax will be added to all invoices unless a valid tax exemption certificate is on file.
7.
Lead times for materials and services vary by manufacturer/vendor and may fluctuate depending on market conditions.
Any lead times on equipment or services provided with this quotation are estimates only. Projected lead times will be
provided upon ordering of equipment.
◦
Please note that the global manufacturing slowdowns and shortages are affecting the construction industry and
may impact Clearwing's ability to procure equipment for your project. Global supply chain issues are completely
outside of Clearwing's control. Clearwing will make every effort to work around back orders, but project timing may
be affected.
8.
All work will be coordinated with and through the Clearwing operations management team. Schedules for submittals,
deliveries, installation, etc. will be arranged at the time of contract execution.
9.
Clearwing standard working hours are between 6:00a-5:00p Mon-Fri local time to project location.
10.
Specific site requirements to be mutually agreed upon with Owner and Clearwing's project operations team post execution
of contract, prior to project deployment.
11.
Clearwing will require unobstructed and unimpeded access to all spaces for the duration of installation. For safety reasons,
no other trades will be allowed to work in any space while overhead work is taking place.
12.
Clearwing assumes with the proposal acceptance that pictures and press regarding the project are available for Clearwing
to use for positive advertising. If project marketing is restricted, please notify Clearwing before contract execution.
13.
Clearwing reserves the right to have a lien placed on the facility for the purpose of assuring payment. Lien is to be
released after the final payment is received.
Clearwing Return Policies:
•
Return Policies can be found at the following Link: Clearwing Return Policies
Page 7 of 8
clearwing.com
AMPHITHEATER AUDIO SYSTEM - RFP 25-36 - 42500051
PROPOSAL 138732072
Warranty Statement
Warranty
A. Clearwing Systems Integration, LLC shall warranty that the equipment is free of defective components, faulty workmanship or
improper adjustment, for a period not to exceed ONE (1) YEAR, within the restrictions of the manufacturers' warranties, unless
otherwise noted.
B. Clearwing Systems Integration, LLC shall warranty labor, workmanship and installations provided by its own entity or any
subcontractors provided by Clearwing Systems Integration, LLC for a period not to exceed TWO (2) YEARS, unless otherwise
noted.
C. The Warranty period shall commence on the date of record for 100% completion and acceptance of Clearwing Systems
Integration' installation and delivery of goods, by the Owner or Owner's representative. The date of record is: xx/xx/xxxx.
D. Some manufacturers may offer warranties that exceed one year in duration. Clearwing Systems Integration, LLC shall inform
the Owner or Owner's representative of such warranties in writing. Clearwing Systems Integration, LLC will honor all extended
warranties provided by the manufacturers within the restrictions set forth by the manufacturers.
E. All warranties shall be voided if unauthorized service, replacements, programming or adjustments were performed on the
warranted equipment provided by Clearwing Systems Integration, LLC.
F. Any manufacturers' software warranties shall be honored by Clearwing Systems Integration, LLC. No extensions exceeding
the manufacturers' software warranties will be offered unless the manufacturer has provided an extended warranty in writing.
Service
A. Clearwing Systems Integration, LLC agrees to provide service for all equipment delivered and/or installed by its own entity or
authorized subcontractor with whom they have contracted.
B. The Owner or Owner's Representative should contact Clearwing Systems Integration as soon as service is needed on any
equipment. For the fastest response, visit www.clearwing.com/service-intake-form.
C. In case of an emergency after normal business hours, please call your local Clearwing office and press ‘0' for emergency
assistance. An on-call representative will be notified.
D. If warranty service is requested and it is determined that the issue is not warranty related, regular Clearwing service charges
shall be applied to the trip. Issues not covered under warranty include, but are not limited to, damage caused by owner or others,
unapproved reprogramming of equipment, environmental damage such as lightning strikes, water infiltration, heat damage due to
facility HVAC issues, pest infiltration, and acts of God.
Page 8 of 8
clearwing.com
13
01/28/2025
EXHIBIT C
Professional Services Agreement
PROJECT SPECIFIC PROVISIONS AND PROJECT PLANS AND SPECIFICATIONS
City of Glendale Solicitation RFP 25-36
Amphitheater Audio Visual and Theatrical Lighting System
LIGHTING ABBREVIATIONS
LIGHTING SYMBOL LEGEND
DESCRIPTION
SYMBOL
GENERAL
DESCRIPTION
SYMBOL
WIRING DEVICES
DESCRIPTION
SYMBOL
DIAGRAMS
DESCRIPTION
SYMBOL
POWER DISTRIBUTION
DESCRIPTION
SYMBOL
LIGHTING
LIGHTING GENERAL NOTES
DESCRIPTION
SYMBOL
MOTOR AND CONTROLS
DESCRIPTION
SYMBOL
SWITCHING CONTROLS
DESCRIPTION
SYMBOL
BRANCH CIRCUITS AND FEEDERS
DESCRIPTION
SYMBOL
EXISTING DEVICE LEGEND
#
NUMBER
+18"
MOUNTING HEIGHTS ARE TO
CENTERLINE OF DEVICE ABOVE FINISH
FLOOR OR FINISH GRADE
A, AMP
AMPERES
A/C
AIR CONDITIONING
AC
ALTERNATING CURRENT
ADA
AMERICAN WITH DISABILITIES ACT
AF
AMPERE FRAME
AFCI
ARC FAULT CIRCUIT INTERRUPTER
AFF
ABOVE FINISHED FLOOR
AFG
ABOVE FINISHED GRADE
AHJ
AUTHORITY HAVING JURISDICTION
AHU
AIR HANDLING UNIT
AIC
AMPERE INTERRUPTING CAPACITY
AL
ALUMINUM
APPROX
APPROXIMATE
ARCH
ARCHITECT
ATS
AUTOMATIC TRANSFER SWITCH
AUTO
AUTOMATIC
AVG
AVERAGE
AWG
AMERICAN WIRE GAUGE
B
BURIED
BKR
BREAKER
BLDG
BUILDING
C
CONDUIT
CA
CABLE
CAB
CABINET
CAT
CATALOG
CATV
CABLE TELEVISION
CB
CIRCUIT BREAKER
CCTV
CLOSED CIRCUIT TELEVISION
CEC
CALIFORNIA ELECTRICAL CODE
CKT
CIRCUIT
CL
CENTERLINE
CLF
CURRENT LIMITING FUSE
CLG
CEILING
COL
COLUMN
COMB
COMBINATION
CONN
CONNECTION
CONST
CONSTRUCTION
CONTR
CONTRACTOR
CPU
CENTRAL PROCESSING UNIT
CS
CONTROL SWITCH
CTRL
CONTROL
CU
COPPER
(D)
DEMO
dB
DECIBEL
DB
DISTRIBUTION BOARD
DC
DIRECT CURRENT
DET
DETAIL
DIA
DIAMETER
DISC
DISCONNECT
DIST
DISTRIBUTION
DN
DOWN
DWG
DRAWING
(E), EXIST
EXISTING
EA
EACH
EC
ELECTRICAL CONTRACTOR
EHU
ELECTRIC HEATING UNIT
EL
ELEVATION
ELEC
ELECTRICAL
ELR
END OF LINE RESISTOR
EMERG
EMERGENCY
EMT
ELECTRIC METALLIC TUBING
ENG
ENGINEER
EQUIP
EQUIPMENT
(ER)
EXISTING TO BE RELOCATED
ETC
ELAPSED TIME CONTROLLER
EWH
ELECTRIC WATER HEATER
F/A
FIRE ALARM
FAAP
FIRE ALARM ANNUNCIATOR PANEL
FACP
FIRE ALARM CONTROL PANEL
FDR
FEEDER
FIXT
FIXTURE
FL
FLOOR
FLA
FULL LOAD AMPS
FLMT
FLEXIBLE LIQUID TIGHT METALLIC
TUBING
FLUOR
FLUORESCENT
FR
FRAME
FREQ
FREQUENCY
FT
FOOT
G, GND
GROUND
GEC
GROUNDING ELECTRODE CONDUCTOR
GEN
GENERATOR
GFI, GFCI
GROUND FAULT CIRCUIT INTERRUPTER
GFP
GROUND FAULT PROTECTION
HH
HANDHOLE
HID
HIGH INTENSITY DISCHARGE
HOA
HAND OFF AUTOMATIC
HORZ
HORIZONTAL
HP
HORSEPOWER
HTR
HEATER
HV
HIGH VOLTAGE
HVAC
HEATING, VENTILATING, AND AIR CONDITIONING
HZ
HERTZ
IBC
INTERNATIONAL BUILDING CODE
IG
ISOLATED GROUND
IMC
INTERMEDIATE METALLIC CONDUIT
INCAND
INCANDESCENT
JB
JUNCTION BOX
JCT
JUNCTION
kCMIL
THOUSAND CIRCULAR MILS
KO
KNOCK OUT
kV
KILOVOLT
kVA
KILOVOLT AMPERES
KW
KILOWATT
KWH
KILOWATT HOURS
SHEET NOTE
1
REVISION NUMBER
RECEPTACLE RATED 20A, 125V. MOUNTED AT +18" UNLESS NOTED OTHERWISE.
RECEPTACLE HEIGHTS SHALL COMPLY WITH ANSI 117.1 REQUIREMENTS
"5" - INDICATES CIRCUIT NUMBER
"CR" - CONTROLLED RECEPTACLE FOR TITLE 24 AND OTHER APPLICABLE ENERGY CODE
REQUIREMENTS WHEN SHOWN WITH A DIAGONAL SLASH. TO BE ROUTED VIA
ROOM CONTROLLER OR LCP AS REQUIRED
"F" - INDICATED FOOD CART RECEPTACLE
"H" - INDICATES RECEPTACLE INSTALLED HORIZONTAL.
"IG" - INDICATES ISOLATED GROUND TYPE
"WP" - INDICATES WEATHERPROOF GFCI RECEPTACLE
"SP" - INDICATES SURGE PROTECTION
"T" - INDICATES TAMPER RESISTANT
"TK" - INDICATES TECHNOLOGY RECEPTACLE, REFER TO TECHNOLOGY DRAWINGS FOR
ADDITIONAL INFORMATION
"C" - INDICATES COUNTER HEIGHT
"TC" - INDICATES TIME CLOCK
"U2" - DUPLEX RECEPTACLE WITH INTEGRAL LOW VOLTAGE TRANSFORMER
AND (2) USB PORTS
"U4" - RECEPTACLE WITH INTEGRAL LOW VOLTAGE TRANSFORMER AND (4) USB PORTS
"GF" - GFCI RECEPTACLE
IG
5
DUPLEX RECEPTACLE
SINGLE RECEPTACLE
FLUSH FLOOR/CEILING DUPLEX RECEPTACLE
FLUSH FLOOR/CEILING DOUBLE DUPLEX RECEPTACLE
SPECIAL PURPOSE RECEPTACLE - WALL / FLOOR / CEILING. "XX" INDICATES TAG
NUMBER. REFER TO SPECIAL PURPOSE RECEPTACLE SCHEDULE
WALL JUNCTION BOX
J
FLOOR/CEILING JUNCTION BOX
BRANCH CURCUIT HOME RUN TICKS INDICATE QUANTITY OF CONDUCTORS, GROUND
CONDUCTORS ARE NOT INDICATED, NO TICKS INDICATES 2@12 & 1#12G IN 3/4"C
MINIMUM. R22A-1,3,5 INDICATES PANEL AND CIRCUIT DESIGNATION FROM WHICH
HOMERUN SHALL ORIGINATE. EACH CIRCUIT SHALL BE 20A-1P (20AMP SINGLE POLE)
UNLESS NOTED OTHERWISE.
CLOCK RECEPTACLE AT +90" UNLESS NOTED OTHERWISE
C
HOSPITAL GRADE RECEPTACLE
MULTI-OUTLET PLUGSTRIP
SPECIALTY BOX - WALL / FLOOR / CEILING
SB
J
JUNCTION BOX AND SWITCH WITH CONNECTION TO FIRE/SMOKE DAMPER. COORDINATE
REQUIREMENTS WITH FIRE ALARM SYSTEM AND MECHANICAL CONTROL DIAGRAMS
FS
J
JUNCTION BOX AND SWITCH WITH CONNECTION TO VARIABLE AIR VOLUME BOX.
COORDINATE REQUIREMENTS WITH MECHANICAL CONTROL DIAGRAMS
V
CIRCUIT BREAKER
SHUNT TRIP CIRCUIT BREAKER
-
SPD
ST
DRAW-OUT CIRCUIT BREAKER - MEDIUM VOLTAGE
DRAW-OUT CIRCUIT BREAKER - LOW VOLTAGE
SWITCH FUSE
GROUNDING ELECTRODE
METER
CAPACITOR
SURGE PROTECTION DEVICE
CONDUIT STUB-OUT
CONDUIT AND/OR WIRE TURNED UP
(THIS IS A MASTER LEGEND, NOT ALL SYMBOLS MAY APPEAR ON DRAWINGS.)
LOC
LOCATION
LOR
LOCK OUT RELAY
LTG
LIGHTING
LV
LOW VOLTAGE
(M)
EXISTING EQUIPMENT TO BE REWORKED/MODIFIED
M, MTR
MOTOR
M/G
MOTOR/GENERATOR SET
MAN
MANUAL
MAX
MAXIMUM
MCA
MINIMUM CIRCUIT AMPS
MCB
MAIN CIRCUIT BREAKER
MCC
MOTOR CONTROL CENTER
MCP
MOTOR CONTROL PANEL
MEC
MASSACHUSETTS ELECTRICAL CODE
MECH
MECHANICAL
MFR
MANUFACTURER
MH
MAINTENANCE HATCH
MIN
MINIMUM
MISC
MISCELLANEOUS
MLO
MAIN LUGS ONLY
MOCP
MAXIMUM OVER CURRENT PROTECTION
MSB
MAIN SWITCHBOARD
MTD
MOUNTED
MTG
MOUNTING
MTS
MANUAL TRANSFER SWITCH
(N)
NEW LOCATION OF EXISTING WORK
N
NEUTRAL
NA
NOT APPLICABLE
NC
NORMALLY CLOSED
NEC
NATIONAL ELECTRICAL CODE
NEMA
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NF
NON-FUSED
NFPA
NATIONAL FIRE PROTECTION ASSOCIATION
NIC
NOT IN CONTRACT
NO
NORMALLY OPEN
NORM
NORMAL
NRTL
NATIONALLY RECOGNIZED TESTING LABORATORY
NTS
NOT TO SCALE
NVE
NEVADA ENERGY
OC
ON CENTER
OFCI
OWNER FURNISHED CONTRACTOR INSTALLED
OH
OVERHEAD
OPD
OVER CURRENT PROTECTION DEVICE
OSHPD
OFFICE OF STATEWIDE HEALTH PLANNING AND
DEVELOPMENT
P
POLE
PB
PUSH BUTTON
PDU
POWER DISTRIBUTION UNIT
PF
POWER FACTOR
PH(ø)
PHASE
PL
PILOT LIGHT
PNL
PANEL
POC
POINT OF CONNECTION
POD
POINT OF DISCONNECTION
POS
PROVIDED UNDER OTHER SECTIONS
PP
POWER POLE
PTZ
PAN, TILT, ZOOM
PVC
POLYVINYL CHLORIDE
PWR
POWER
(R)
EXISTING WORK TO BE RELOCATED
RECEPT
RECEPTACLE
REFRIG
REFRIGERATOR
REQ'D
REQUIRED
RGS
RIGID GALVANIZED STEEL
RM
ROOM
RMS
ROOT MEAN SQUARE VALUE
RND
ROUND
RPM
REVOLUTIONS PER MINUTE
SEC
SECOND
SN
SOLID NEUTRAL
SNEC
SOUTHERN NEVADA ELECTRICAL CODE AMENDMENTS
SPD
SURGE PROTECTIVE DEVICE
SPEC
SPECIFICATION
SQ
SQUARE
SQFT
SQUARE FEET
SS
SAFETY SWITCH
SYNC SWITCH
STR
STARTER
STRUCT
STRUCTURAL
SW
SWITCH
SWBD
SWITCHBOARD
SWGR
SWITCHGEAR
SYM
SYMMETRICAL
T, XFMR
TRANSFORMER
TB
TERMINAL BLOCK
TEL
TELEPHONE
TERM
TERMINAL
TS
TEMPERATURE SWITCH
TSP
TWISTED SHIELDED-PAIR
TT
THERMAL SWITCH
TV
TELEVISION
TVSS
TRANSIENT VOLTAGE SURGE SUPPRESSER
TYP
TYPICAL
UFD
UNDERFLOOR DUCT
UG
UNDERGROUND
UH
UNIT HEATER
UL
UNDERWRITERS LABORATORIES
UNO
UNLESS NOTED OTHERWISE
UPS
UNINTERRUPTIBLE POWER SUPPLY
UTP
UNSHIELDED TWISTED-PAIR
V
VOLT
VA
VOLT AMPERE
VA
VOLT-AMP
VAV
VARIABLE AIR VOLUME
VD
VOLTAGE DROP
VENT
VENTILATION
VERT
VERTICAL
VFD
VARIABLE FREQUENCY DRIVE
VSD
VARIABLE SPEED DRIVE
W
WATT
WP
WEATHER-PROOF (NEMA 3R)
XP
EXPLOSION PROOF
DOUBLE DUPLEX RECEPTACLE
WP
5
C
5
TRANSFORMER
IG
5
CONDUIT AND/OR WIRE TURNED DOWN
DOOR HOLDER
DH
SB
SB
XX
MULTI-OUTLET ASSEMBLY, DEVICES AS INDICATED
J
R22A-1,3,5
CONDUIT BELOW FLOOR OR BELOW GRADE
A1
LIGHTING FIXTURE (SEE LIGHTING FIXTURE SCHEDULE)
"A1" - INDICATES LIGHTING FIXTURE TYPE
"2" - INDICATES CIRCUIT NUMBER
"a" - INDICATES SWITCH CONTROL
2,a
FIXTURE SHADING INDICATES FIXTURE ON EMERGENCY CIRCUIT, LIFE SAFTEY OR
INTEGRAL BATTERY BACK-UP
POLE MOUNTED FIXTURE
EXIT SIGN WITH DIRECTIONAL ARROWS AND EXIT FACE (SHADED) AS INDICATED
CEILING MOUNTED
EXIT SIGN WITH DIRECTIONAL ARROWS AND EXIT FACE (SHADED) AS INDICATED
WALL MOUNTED
WALL MOUNTED FIXTURE
WALL WASH / ACCENT LIGHT
STEP LIGHT
DOWNLIGHT FIXTURE
FIXTURE HALF SHADING INDICATES FIXTURE ON CRITICAL BRANCH CIRCUITING
PENDANT FIXTURE
TRACK LIGHT WITH FIXTURE HEADS
EMERGENCY BATTERY LIGHTING UNIT WITH TWIN HEADS
BOLLARD FIXTURE
LINEAR STRIP FIXTURE
EMERGENCY BATTERY LIGHTING UNIT WITH TWIN HEADS AND EXIT SIGN
T5
SURFACE MOUNTED PANELBOARD
FLUSH MOUNTED PANELBOARD
DRY TYPE TRANSFORMER
"T5" - INDICATES KVA RATING OF TRANSFORMER
REFER TO DRY TYPE K-RATED TRANSFORMER SCHEDULE
SWITCHBOARD, MOTOR CONTROL CENTER OR DISTRIBUTION BOARD
LIGHTING CONTROL PANEL
CONTROL PANEL
RECESSED LINEAR SLOT LIGHT
SPECIALTY FIXTURE - PROFILE SPOT LIGHT
SPECIALTY FIXTURE - WASH LIGHT
LINEAR PENDANT FIXTURE
LINEAR LED FIXTURE
BW
LADDER CABLE TRAY
CHANNEL CABLE TRAY
BUSWAY, HORIZONTAL, REFER TO RISER FOR RATING
BUSWAY, VERTICAL, REFER TO RISER FOR RATING
BW
BW
BUSWAY, HORIZONTAL, WITH FUSED PLUG-IN DISCONNECT
GROUND BAR
M
CUSTOMER METER
UTILITY METER AND SOCKET
DARK SHADING ON EQUIPMENT INDICATES 208/120V, LIGHT SHADING INDICATES 480/277V
CORD DROP WITH DUPLEX RECEPTACLE
CORD DROP WITH DOUBLE DUPLEX RECEPTACLE
CORD DROP WITH SPECIAL PURPOSE RECEPTACLE, "XX" INDICATES TAG NUMBER.
REFER TO SPECIAL PURPOSE RECEPTACLE SCHEDULE
1.
DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF WORK.
2.
ALL RECEPTACLES TO BE MOUNTED AT +18" UNLESS OTHERWISE NOTED. RECEPTACLE HIGHTS SHALL COMPLY WITH
ANSI 117.1 REQUIREMENTS
3.
REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR LOCATION AND EXTENT OF DEMOLITION REQUIRED.
CONTRACTOR SHALL VISIT SITE PRIOR TO BID TO DETERMINE EXTENT OF WORK INVOLVED. PROVIDE LABOR AND
MATERIALS AS REQUIRED TO MAINTAIN AND/OR RESTORE CONTINUITY OF SERVICE TO EXISTING CIRCUITS.
4.
CONTRACTOR SHALL PROVIDE ALL NECESSARY DEMOLITION TO REMOVE EXISTING UNUSED CONDUIT, WIRE, CABLE,
JUNCTION BOXES, RECEPTACLES, SWITCHES, LIGHTS, ETC COMPLETE WITH ASSOCIATED CIRCUITING TO SOURCE.
5.
SYSTEM OUTAGES SHALL BE PERMITTED ONLY AT TIMES APPROVED BY OWNER, IN WRITING. WORK WHICH COULD
RESULT IN AN ACCIDENTAL OUTAGE (BEYOND BRANCH CIRCUITS) SHALL BE PERFORMED WITH THE OWNER'S
MAINTENANCE PERSONNEL ADVISED OF SUCH WORK.
6.
PRIOR TO COMMENCEMENT OF ROUGH-IN WORK, COORDINATE WITH ARCHITECT, DRAWING NOTES, ELEVATIONS,
SECTIONS, SPECIFICATIONS, FURNITURE, FIXTURES, AND EQUIPMENT FOR ALL RECEPTACLE AND COMMUNICATION
DEVICE MOUNTING HEIGHT AND MOUNTING LOCATION.
7.
ALL 125V, SINGLE PHASE, 15 AND 20 AMP RECEPTACLE OUTLETS THAT ARE USED AS TEMPORARY POWER DURING
CONSTRUCTION SHALL HAVE GFCI PROTECTION.
8.
ALL PENETRATIONS, SLEEVES, OPENINGS, ETC, THROUGH SMOKE OR FIRE RATED WALLS, CEILINGS, OR FLOORS SHALL
BE PROPERLY CAULKED WITH AN APPROVED FIRE CAULKING MATERIAL, APPROVED BY ENGINEER, UNLESS NOTED
OTHERWISE.
9.
ALL PENETRATIONS THROUGH SOUND, SECURITY OR FIRE WALLS SHALL BE SLEEVED FOR MECHANICAL PROTECTION.
ALL PENETRATIONS AND SLEEVES SHALL BE SEALED WITH CAULKING AND INTUMESCENT MATERIAL (WHERE
APPROPRIATE) TO MAINTAIN RESPECTIVE RATINGS OF WALL.
10. PROVIDE EQUIPMENT BONDING JUMPER GROUND CONNECTION IN ALL BOXES, ENCLOSURES, ETC, FROM THE
EQUIPMENT GROUNDING CONDUCTOR.
11. ALL EMPTY RACEWAY SYSTEMS SHALL HAVE A #12 PULLWIRE OR EQUAL AND SHALL BE IDENTIFIED AT ALL JUNCTIONS,
PULL AND TERMINATION POINTS, USING PERMANENT METALLIC TAGS. TAG SHALL INDICATE INTENDED USE OF
CONDUIT, ORIGINATION AND TERMINATION POINTS OF EACH INDIVIDUAL CONDUIT.
12. CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL LIGHT FIXTURES TO ENSURE THAT THE LIGHT FIXTURES DO NOT
INTERFERE WITH ANY STRUCTURAL, MECHANICAL, OR PLUMBING COMPONENTS AND EQUIPMENT. COORDINATE RELOCATION
OF ANY LIGHT FIXTURE DUE TO INTERFERENCES WITH STRUCTURAL, MECHANICAL, OR PLUMBING COMPONENTS AND
EQUIPMENT.
13. FIXTURES RECESSED IN "T-BAR" CEILING SHALL BE SUPPORTED INDEPENDENTLY OF CEILING SYSTEM, WITH TWO #12
HANGER WIRES UP TO STRUCTURE. SECURE HANGER WIRES TO OPPOSITE CORNERS OF FIXTURE. CLIP FIXTURE TO GRID ON
TWO SIDES WITH FACTORY-FURNISHED CLIPS. FINAL CONNECTION TO FIXTURE SHALL BE MADE WITH A FLEXIBLE UL
APPROVED ASSEMBLY.
14. CONDUITS PENETRATING THROUGH ROOF SHALL HAVE ROOF FLASHING WITH CAULK TYPE COUNTER FLASHING SLEEVE.
INSTALLATION SHALL BE WATERTIGHT. CONDUITS SHALL NOT BE RUN HORIZONTALLY ON THE ROOF. PENETRATIONS SHALL
BE AT EQUIPMENT LOCATIONS ONLY AND SHALL BE COORDINATED WITH MECHANICAL EQUIPMENT.
15. FINAL CONNECTIONS TO MOTORS, TRANSFORMERS AND OTHER VIBRATING EQUIPMENT SHALL BE WITH FLEXIBLE METAL
CONDUIT (INDOORS) OR LIQUIDTIGHT FLEXIBLE METAL CONDUIT (OUTDOORS) AND APPROVED FITTINGS. DO NOT SECURE
CONDUITS, DISCONNECTS OR DEVICES TO DUCTWORK OR MECHANICAL EQUIPMENT.
16. WIRE TERMINATION PROVISIONS FOR PANELBOARDS, CIRCUIT BREAKERS, SAFETY SWITCHES, AND ALL OTHER ELECTRICAL
APPARATUS SHALL BE LISTED AS SUITABLE FOR 75°C.
17. CONTRACTOR SHALL PROVIDE A VOLTAGE BARRIER IN BOXES CONTAINING MULTIPLE SWITCHES WITH A VOLTAGE POTENTIAL
OF 300V OR GREATER.
18. COORDINATE ELECTRICAL DEVICES AND EQUIPMENT WITH THE INTERIOR AND ARCHITECTURAL DRAWINGS. IF CONFLICTS
OCCUR, BRING THEM TO THE ARCHITECTS ATTENTION PROMPTLY.
19. CONTRACTOR SHALL COORDINATE WITH OTHER TRADES TO INSURE THAT PIPING, DUCTS, ETC INSTALLED WITHIN
ELECTRICAL ROOMS OR SPACES SHALL BE INSTALLED PER NEC 110-26, ALL PIPING, DUCTS, ETC SHALL BE INDICATED ON THE
SHOP DRAWINGS.
20. EACH RECEPTACLE INSTALLED OUTDOORS, WITHIN 72" OF SINKS, ELECTRIC WATER COOLERS, IN DAMP OR WET AREAS, ON
ROOF, BELOW GRADE ELEVATOR PITS, JANITOR CLOSETS AND TOILET ROOMS, SHALL HAVE INDIVIDUAL GROUND FAULT
(GFCI) PROTECTION.
21. REFER TO MECHANICAL CONTROL DIAGRAMS FOR ADDITIONAL WIRING REQUIREMENTS. PROVIDE ALL RACEWAYS, WIRING,
CONTROL SWITCHES, ETC AS REQUIRED.
22. FINAL CONNECTIONS TO EQUIPMENT SHALL BE PER MANUFACTURER'S APPROVED WIRING DIAGRAMS, DETAILS AND
INSTRUCTIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE MATERIALS AND EQUIPMENT COMPATIBLE
WITH EQUIPMENT SUPPLIED.
M
G
XX
XX
FEEDER NOTE
XX-XXX
KITCHEN EQUIPMENT TAG
XX
XX
XX
HOSPITAL GRADE DOUBLE DUPLEX RECEPTACLE
LED
CURRENT TRANSFORMER CABINET
CT
LCP
CP
HALF SWITCHED RECEPTACLE
RECEPTACLE ON EMERGENCY POWER
J
J
FLEXIBLE CONNECTION TO EQUIPMENT. RACEWAY AND CONDUCTOR
RATING TO MATCH ASSOCIATED BRANCH CIRCUIT OR FEEDER
BRANCH CIRCUIT FOR EMERGENCY BATTERY DC CIRCUIT, MINIMUM 2#10 IN
3/4"C. UNLESS OTHERWISE NOTED
FLOOR MOUNTED BOX FOR POWER CONNECTION TO PRE-WIRED
FURNITURE PARTITIONS
P
WALL MOUNTED BOX FOR POWER CONNECTION TO PRE-WIRED
FURNITURE PARTITIONS
P
FLOOR MOUNTED BOX WITH MULTIPLE DEVICES.
"FB1"-INDICATES TYPE AS DEFINED IN NOTES/SCHEDULES.
FB1
PULL BOX
PB
POWER POLE
PP
E
GENERATOR
G
M
POTENTIAL TRANSFORMER
CURRENT TRANSFORMER
AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFER SWITCH WITH BYPASS MAINTENANCE
KIRK KEY INTERLOCK
K
AMMETER
A
VOLTMETER
V
WATT METER
W
WATTHOUR METER
WH
SHUNT TRIP DEVICE
ST
N
E
L
N
E L
HEAT TRACE
HT
MANUAL MOTOR STARTING SWITCH WITH THERMAL OVERLOAD
PROTECTION
MAGNETIC MOTOR STARTER, REFER TO MAGNETIC MOTOR
STARTER & VFD SCHEDULE FOR TYPE, SIZE AND ENCLOSURE
COMBINATION FUSED DISCONNECT MAGNETIC MOTOR STARTER.
REFER TO MAGNETIC MOTOR STARTER AND VFD SCHEDULE
FOR TYPE, SIZE AND ENCLOSURE
CONTACTOR IN NEMA 1 ENCLOSURE UNLESS OTHERWISE NOTED
MOTOR CONTROL CENTER
EQUIPMENT CONTROL PANEL
VARIABLE SPEED DRIVE
MOTOR, NUMERAL INDICATES HORSEPOWER
"2" - INDICATES HORSEPOWER RATING
DISCONNECT SWITCH RATED 30AMP, 3-POLE, IN NEMA TYPE 1
ENCLOSURE, UNLESS OTHERWISE NOTED
"3R" - INDICATES NEMA TYPE 3R ENCLOSURE
"2P" - INDICATES 2 POLE SINGLE PHASE DISCONNECT
"60AS" - INDICATES 60A SWITCH
FUSED DISCONNECT SWITCH, 3-POLE, IN NEMA TYPE 1
ENCLOSURE, UNLESS OTHERWISE NOTED.
"3R" - INDICATES NEMA TYPE 3R ENCLOSURE
"60AS" - INDICATES 60AMP SWITCH
"50AF" - INDICATES 50AMP FUSES
ENCLOSED CIRCUIT BREAKER IN NEMA TYPE 1 ENCLOSURE,
UNLESS OTHERWISE NOTED
SM
60AS
50AF
C
MCC
CP
VFD
2
N
60AS
60AS
50AF
CB
S
SINGLE POLE SWITCH AT +44" UNLESS NOTED OTHERWISE. MOUNTING HEIGHTS SHALL
COMPLY WITH ANSI 117.1 REQUIREMENTS (AT +44" UNLESS NOTED OTHERWISE)
"a" - INDICATES SWITCH CONTROL
"2" - INDICATES 2 POLE SINGLE THROW SWITCH
"3" - INDICATES 3-WAY SWITCH
"4" - INDICATES 4-WAY SWITCH
"P" - INDICATES SWITCH WITH LED PILOT LIGHT
"L" - INDICATES BACKLIT SWITCH
"D" - INDICATES DIMMER SWITCH - SOLID STATE TYPE
"DF" - INDICATES FLUORESCENT DIMMER
"FC - INDICATES FAN SPEED CONTROL SWITCH
"K" - INDICATES KEY OPERATED
"LV" - INDICATES LOW VOLTAGE SWITCH
"M" - INDICATES SWITCH WITH MOTION SENSOR
"OS" - INDICATES SWITCH WITH OCCUPANCY SENSOR
"MC" - INDICATES MOMENTARY CONTACT SWITCH
"TC" - INDICATES TIME CLOCK
"TM" - INDICATES SWITCH WITH DIGITAL TIMER
"TD" - INDICATES SWITCH WITH TIME DELAY
"W" - WIRELESS SWITCH
"WP" - INDICATES WEATHERPROOF
S2
DIMMING MODULE
DM
CEILING/WALL OCCUPANCY SENSOR (XX REFERS TO TYPE DESIGNATION, SEE
OCCUPANCY SENSOR SCHEDULE - WALL / CEILING
CEILING/WALL DAYLIGHT SENSOR
DL
PHOTO CELL - WALL / CEILING
RELAY - WALL / CEILING
DL
a
SWITCHING MODULE
SM
PUSHBUTTON TYPE CONTROL STATION, "EPO" INDICATES EMERGENCY POWER OFF
EPO
ROOM CONTROLLER
RC
TOUCH PANEL
TP
PRESET STATION
PS
EMERGENCY SUPERVISORY BYPASS RELAY
ER
FEEDER HOMERUN. REFER TO LEGEND OF FEEDER SIZES FOR CONDUCTOR AND
RACEWAY REQUIREMENTS DESIGNATED INSTDE TAG. H42B-1 INDICATES PANEL AND
CIRCUIT NUMBER DESIGNATION FROM WHICH HOME RUN SHALL ORIGINATE, 100A-3P
INDICATES 100 AMPERE, 3 POLE CIRCUIT BREAKER.
H42B-1
100A-3P
6
MECHANICAL EQUIPMENT NUMBER
- SEE HVAC AND PLUMBING DRAWINGS.
MECHANICAL EQUIPMENT TYPE
-
-
-
-
SECTION DRAWING NUMBER
REFERENCING SHEET
CALLOUT DRAWING NUMBER
REFERENCING SHEET
MSB
-
-
ELECTRICAL EQUIPMENT TAG
PC
R
PC
R
OS
XX
OS
XX
PANEL
R21A
PANELBOARD
EXISTING WORK TO REMAIN
EXISTING WORK TO BE REMOVED (DEMO)
NEW WORK
EXISTING WORK TO BE RELOCATED
NEW LOCATION OF EXISTING WORK
XM/(E)
X/(D)
XR/(R)
XN/(N)
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:44:54 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
LV0.01
LIGHTING LEGENDS
AND NOTES
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
LIGHTING SHEET INDEX
ISSUE
SHEET NUMBER
SHEET DESCRIPTION
2024-07-11 CD PERMIT 2
2024-04-18 CD
2024-03-01 90% CD
●
●
●
LV0.01
LIGHTING LEGENDS AND NOTES
●
●
●
LV0.02
LIGHTING SCHEDULES
●
●
●
LV2.20
LIGHTING SYSTEMS FLOOR PLAN - COUNCIL - LEVEL 1
●
●
●
LV2.30
LIGHTING SYSTEMS FLOOR PLAN - AMPHITHEATER - GARDEN LEVEL + LEVEL 1 STAGE
●
●
●
LV2.60
LIGHTING SYSTEMS RCP - COUNCIL - LEVEL 1
●
●
●
LV2.70
LIGHTING SYSTEMS RCP - AMPHITHEATER - GARDEN LEVEL + LEVEL 1 STAGE
●
●
●
LV6.01
LIGHTING CONTROL SYSTEM DIAGRAMS
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:44:55 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
LV0.02
LIGHTING
SCHEDULES
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
SPECIALTY POWER DEVICE SCHEDULE
TAG
DESCRIPTION
MANUFACTURER
MODEL
ENCLOSURE DESCRIPTION
MOUNTING STYLE
NOTES
PG1
PRODUCTION POWER OUTDOOR GROUNDBOX - (1) 20A/120V NEMA
5-20R QUAD
LEGRAND
WIREMOLD OUTDOOR
GROUND BOX
XB814C520XX
OUTDOOR WEATHERPROOF GROUND BOX
FLUSH MOUNT AT FINISHED GRADE
PG2
PRODUCTION POWER OUTDOOR GROUNDBOX - (1) 30A/208V NEMA
L6-30R
LEGRAND
WIREMOLD OUTDOOR
GROUND BOX
XB814CL630XX
OUTDOOR WEATHERPROOF GROUND BOX
FLUSH MOUNT AT FINISHED GRADE
PR3
PRODUCTION POWER RECEPTICLE - (1) 20A/120V NEMA L5-20R TWIST
LOCK
ETC
9801C
SINGLE GANG BACK BOX
RECESS MOUNT FLUSH AT CANOPY CEILING
PR4
PRODUCTION POWER RECEPTICLE - (1) 20A/120V NEMA L5-20R TWIST
LOCK
ETC
9101C-OU
SINGLE GANG BACK BOX + U-BOLT KIT
PIPE MOUNT TO TOP OF PIPE WITH U-BOLT KIT WITH 2" STAND-OFFS
PP1
PRODUCTION POWER PANEL - 120/208V 3PH - 84P
LYNTEC
RPC 383
PANELBOARD
SURFACE MOUNT AT PROJECT STANDARD PANELBOARD HEIGHT - REFER TO ARCH
DRAWINGS
PR2
PRODUCTION POWER RECEPTICLE - (2) 20A/120V NEMA 5-20R
ETC
9802AD
REFER TO SB1 AND SB2 DEVICE TYPES
INSTALL IN OUTDOOR BOX WITH LOCKING COVER
SB1 (PR2,D1)
OUTDOOR WALL BOX WITH POWER AND CONTROL
FSR
0WB-500P
OUTDOOR BOX WITH LOCKING COVER
PER PROJECT STANDARD OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH.
DRAWINGS
SB2 (PR2,D2)
OUTDOOR WALL BOX WITH POWER AND CONTROL
FSR
0WB-500P
OUTDOOR BOX WITH LOCKING COVER
PER PROJECT STANDARD OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH.
DRAWINGS
NOTES:
1.
.
NOTES:
1.
.
LIGHTING CONTROL DEVICE SCHEDULE
TAG
DESCRIPTION
MANUFACTURER
MODEL
ENCLOSURE DECRIPTION
MOUNTING STYLE
NOTES
D1
LIGHTING NETWORK RECEPTACLE - (1) NET + (1) DMX OUT
ETC
ECPB DMX OUT/NET
REFER TO SB1 AND SB2 DEVICE TYPES
INSTALL IN OUTDOOR BOX WITH LOCKING COVER
D2
LIGHTING NETWORK RECEPTACLE - (2) NET + (2) DMX IN
ETC
ECPB DMX2IN/NET/NET
REFER TO SB1 AND SB2 DEVICE TYPES
INSTALL IN OUTDOOR BOX WITH LOCKING COVER
D3
LIGHTING NETWORK RECEPTACLE - (1) NET + (1) DMX OUT
ETC
ECPB DMX OUT/NET
DOUBLE GANG BACK BOX
RECESS MOUNT FLUSH AT CANOPY CEILING
D4
LIGHTING NETWORK RECEPTACLE - (1) NET + (1) DMX OUT
ETC
ECPB DMX OUT/NET
DOUBLE GANG BACK BOX W/ U-BOLT PIPE MOUNT KIT
PIPE MOUNT TO TOP OF PIPE WITH U-BOLT KIT WITH 2" STAND-OFFS
D6
LIGHTING NETWORK RECEPTACLE - (1) DMX IN + (1) DMX OUT
ETC
ECPB DMXIN/OUT
DOUBLE GANG BACK BOX
RECESS MOUNT FLUSH PER PROJECT STANDARD OUTLET HEIGHT
(UNO) - REFER TO ARCH DRAWINGS
LC1
LIGHTING NETWORK EQUIPMENT RACK
MIDDLE ATLANTIC PRODUCTS
REFER TO SPECIFICATIONS
FREESTANDING EQUIPMENT RACK
FREESTANDING
PS1
PRESET RECALL STATION - 4-SCENE + ON/OFF/RAISE/LOWER
nLIGHT
nPODMA 4S DX
SINGLE GANG BACK BOX
RECESS MOUNT FLUSH PER PROJECT STANDARD SWITCH HEIGHT
(UNO) - REFER TO ARCH DRAWINGS
PS2
PRESET RECALL STATION - 2-SCENE + ON/OFF/RAISE/LOWER
nLIGHT
nPODMA 2S DX
SINGLE GANG BACK BOX
RECESS MOUNT FLUSH PER PROJECT STANDARD SWITCH HEIGHT
(UNO) - REFER TO ARCH DRAWINGS
TS1
TOUCHSCREEN CONTROL STATION
ETC
P-TS7-E-4
SPECIALTY BACK BOX
SURFACE MOUNT PER PROJECT STANDARD SWITCH HEIGHT (UNO) -
REFER TO ARCH DRAWINGS
TS2
TOUCHSCREEN CONTROL STATION + DMX CONTROLLER
nLIGHT
FCS 7TSN X
THREE GANG BACK BOX
RECESS MOUNT FLUSH PER PROJECT STANDARD SWITCH HEIGHT
(UNO) - REFER TO ARCH DRAWINGS
LIGHTING FIXTURE SCHEDULE
TAG
DESCRIPTION
MOUNTING
MANUFACTURER
MODEL
TYPE
COLOR
LUMENS
DIMMER
VOLTS
WATTS
NOTES
TL1
STAGE LIGHTING - RGBW LINEAR WASH
PIPE
CHAUVET
COLORADO PXL BAR 16
LED
RGBW
0
DMX
120
790
3
TL2
STAGE LIGHTING - RGBW FLOOD / STROBE
PIPE
ELATION
PALADIN BRICK PAL264
LED
RGBW
0
DMX
120
390
3
TM1
STAGE LIGHTING - MOVING HEAD
PIPE
ELATION
PROTEUS LUCIUS
LED
6500K
0
DMX
120
580
3
TS1
STAGE LIGHTING - RGBW PROFILE SPOT
PIPE
CHAUVET
OVATION E-910FC IP 26 DEGREE
LED
RGBW
0
DMX
120
225
3
TT1
6" FRESNEL SPOT LIGHT - PORTABLE PLUG LOAD
PIPE
ETC
CSFRESVMV
LED
RGBIL
5300
DMX
120
149
1, 2
TW1
STAGE LIGHTING - RGBL PAR
PIPE
ALTMAN
HYDRA AIP-200-RGBL
LED
RGBL
2800
DMX
120
222
3
NOTES:
1.
REFER TO ELECTRICAL DRAWINGS AND SPECIFICATION SECTION 26 55 61 TECHNICAL LIGHTING SYSTEMS FOR SUPPLEMENTAL INFORMATION. PROVIDE EACH FIXTURE WITH THE ACCESSORIES NOTED IN THE SPECIFICATION SECTION.
2.
PORTABLE PLUG LOAD EQUIPMENT. EACH FIXTURE WILL MOUNT TO EXISTING PIPE LOCATED WITHIN THE SLOTS ABOVE THE COUNCIL CHAMBERS CEILING USING A CLAMP TO BE PROVIDED WITH THE FIXTURE. THE FIRST FIXTURE WILL PLUG INTO AVAILABLE POWER RECEPTACLE LOCATED IN THE SLOT ABOVE
THE CEILING, AND SUBSEQUENT FIXTURES WILL DAISY CHAIN POWER USING POWERCON JUMPER CABLES. REFER TO ELECTRICAL DRAWINGS FOR POWER RECEPTACLE LOCATIONS AND ADDITIONAL INFORMATION.
3.
PORTABLE PLUG LOAD EQUIPMENT. EACH FIXTURE WILL MOUNT TO PIPE BATTENS LOCATED UNDER AMPHITHEATER CANOPY USING A CLAMP TO BE PROVIDED WITH THE FIXTURE. ALL FIXTURES WILL CONNECT TO DEDICATED POWER AND DMX RECEPTACLES AT THE AMPHITHEATER CANOPY. USE POWERCON
JUMPER CABLES AS NEEDED TO DAISY-CHAIN ADJACENT FIXTURES FOR CONNECTION TO POWER AND DMX CONTROL. REFER TO SPECIFICATION SECTION 26 55 63 PORTABLE STAGE LIGHTING EQUIPMENT FOR SUPPLEMENTAL INFORMATION.
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
PP1
TP
LN
SB
SB
SB
SB
SB SB
SB
SB
TS1
LC1
A.1
A.2
A.5
A.6
A.A
A.B
A.C
A.D
A.3
A.4
A.8
REFER TO ELECTRICAL DRAWINGS
FOR "LAMGA" PANEL SCHEDULE
SB1 (PR2,D1)
SB2 (PR2,D2)
DEVICES TO BE INSTALLED IN
WALL BOX SHARED WITH AV.
REFER TO TECHNOLOGY PLANS
FOR BOX LOCATION AND TYPE
REFER TO ENLARGED PLAN ON T4.02
SB1 (PR2,D1)
SB1 (PR2,D1)
PG2
PG1
PG1
PG2
D2
rack room
GL191
rack room
storage
GL190
storage
electrical
GL192
electrical
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:45:00 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
LV2.30
LIGHTING SYSTEMS
FLOOR PLAN -
AMPHITHEATER -
GARDEN LEVEL +
LEVEL 1 STAGE
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
LIGHTING CONTROL DEVICE SCHEDULE
TAG
DESCRIPTION
D1
LIGHTING NETWORK RECEPTACLE - (1) NET + (1) DMX OUT
D2
LIGHTING NETWORK RECEPTACLE - (2) NET + (2) DMX IN
D3
LIGHTING NETWORK RECEPTACLE - (1) NET + (1) DMX OUT
D4
LIGHTING NETWORK RECEPTACLE - (1) NET + (1) DMX OUT
D6
LIGHTING NETWORK RECEPTACLE - (1) DMX IN + (1) DMX OUT
LC1
LIGHTING NETWORK EQUIPMENT RACK
PS1
PRESET RECALL STATION - 4-SCENE + ON/OFF/RAISE/LOWER
PS2
PRESET RECALL STATION - 2-SCENE + ON/OFF/RAISE/LOWER
TS1
TOUCHSCREEN CONTROL STATION
TS2
TOUCHSCREEN CONTROL STATION + DMX CONTROLLER
LIGHTING FIXTURE SCHEDULE
TAG
DESCRIPTION
TL1
STAGE LIGHTING - RGBW LINEAR WASH
TL2
STAGE LIGHTING - RGBW FLOOD / STROBE
TM1
STAGE LIGHTING - MOVING HEAD
TS1
STAGE LIGHTING - RGBW PROFILE SPOT
TT1
6" FRESNEL SPOT LIGHT - PORTABLE PLUG LOAD
TW1
STAGE LIGHTING - RGBL PAR
1/8" = 1'-0"
LV2.30
1
LIGHTING SYSTEMS PLAN - AMPHITHEATER - GARDEN LEVEL
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
WAP
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
LN
WAP
PR4
PR4
PR4
PR4
PR4
PR4
PR3
PR3
D3
PR3
D3
PR3
D3
PR3
D3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
PR3
STAGE LIGHTING PIPE BATTEN
SUSPENDED FROM STRUCTURE AT 0'6"
BELOW THE CEILING PLANE TO CENTER
OF PIPE
STAGE LIGHTING PIPE BATTEN SUSPENDED
FROM STRUCTURE AT 0'6" BELOW THE
CEILING PLANE TO CENTER OF PIPE
A.1
A.2
A.5
A.6
A.A
A.B
A.C
A.D
A.3
A.4
A.8
idf
idf
187
a/v booth
a/v booth
185
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D4
D4
D4
D4
D4
D4
A.1
A.2
A.5
A.6
A.A
A.B
A.C
A.D
A.3
A.4
A.8
TL1
TW1
TL2
TL2
TL2
TL2
TL2
TL2
TL2
TL2
TL2
TL2
TL2
TL2
TL1
TW1
TL1
TW1
TL1
TW1
TL1
TW1
TL1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TW1
TM1
TL2
TL2
TW1
TW1
TL2
TS1
TW1
TL2
TW1
TW1
TS1
TL2
TW1
TW1
TS1
TL2
TW1
TW1
TS1
TS1
TW1
TW1
TW1
TM1
TS1
TS1
TS1
TS1
TS1
TL2
TL2
TL2
TL2
TL2
TL2
TW1
TW1
TM1
TW1
TM1
TW1
TW1
TW1
TM1
TW1
TW1
TW1
TW1
TW1
TM1
TM1
TM1
NOTES:
1.
REFER TO SPECIFICATIONSECTION 26.55.63 PORTABLE STAGE
LIGHTING EQUIPMENT FOR SUPLEMENTAL INFORMATION
2.
THIS LIGHT PLOT IS TO BE USED AS A BASIS FOR THE INITIAL
INSTALLTION OF PORTABLE STAGE LIGHTING EQUIPMENT. THE LAYOUT IS
SUBJECT TO CHANGE WHILE EQUIPMENT IS BEING INSTALLED.
3.
CONTRACTOR IS RESPONCIBLE FOR PRODUCTION PAPERWORK
(DMX/CHANNEL HOOKUP, FIXTURE SCHEDULE, AS-BUILT LIGHT PLOT)
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:45:11 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
LV2.70
LIGHTING SYSTEMS
RCP -
AMPHITHEATER -
GARDEN LEVEL +
LEVEL 1 STAGE
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
LIGHTING CONTROL DEVICE SCHEDULE
TAG
DESCRIPTION
D1
LIGHTING NETWORK RECEPTACLE - (1) NET + (1) DMX OUT
D2
LIGHTING NETWORK RECEPTACLE - (2) NET + (2) DMX IN
D3
LIGHTING NETWORK RECEPTACLE - (1) NET + (1) DMX OUT
D4
LIGHTING NETWORK RECEPTACLE - (1) NET + (1) DMX OUT
D6
LIGHTING NETWORK RECEPTACLE - (1) DMX IN + (1) DMX OUT
LC1
LIGHTING NETWORK EQUIPMENT RACK
PS1
PRESET RECALL STATION - 4-SCENE + ON/OFF/RAISE/LOWER
PS2
PRESET RECALL STATION - 2-SCENE + ON/OFF/RAISE/LOWER
TS1
TOUCHSCREEN CONTROL STATION
TS2
TOUCHSCREEN CONTROL STATION + DMX CONTROLLER
LIGHTING FIXTURE SCHEDULE
TAG
DESCRIPTION
TL1
STAGE LIGHTING - RGBW LINEAR WASH
TL2
STAGE LIGHTING - RGBW FLOOD / STROBE
TM1
STAGE LIGHTING - MOVING HEAD
TS1
STAGE LIGHTING - RGBW PROFILE SPOT
TT1
6" FRESNEL SPOT LIGHT - PORTABLE PLUG LOAD
TW1
STAGE LIGHTING - RGBL PAR
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
1/8" = 1'-0"
LV2.70
1
LIGHTING REFLECTED CEILING PLAN - AMPHITHEATER - INFRASTRUCTURE
1/8" = 1'-0"
LV2.70
2
LIGHTING REFLECTED CEILING PLAN - AMPHITHEATER - REPERTORY PLOT
4
date
phase
Construction
Documents
18 April 2024
SCALE:
(1) 20A/120V CKT, TYP.
(1) 20A/120V CKT, TYP.
(2) 20A/120V CKTS, TYP.
120V POWER, TYP.
DMX, TYP.
CONTROL WIRING, TYP.
1
LV6.01
LIGHTING CONTROL SYSTEM DIAGRAM - AMPHITHEATER & COUNCIL CHAMBERS
NTS
LIGHTING CONTROL
NETWORK
RACK LC1
(48) PORTS UNMANAGED
NETWORK SWITCHES PoE,
FAN-COOLED
BRUSH GROMMET PANEL
(48) PORTS NETWORK PATCH
PANEL
(6) 8-PORT DMX GATEWAY -
PATHWAY PATHPORT
PWPP-RM-P8-TERM-
REAR-DCPOE
ARCHITECTURAL CONTROL
PROCESSOR WITH POWER
SUPPLY AND RM ENCLOSURE
-
ETC P-ACP
(1) 20A/120V
POWER PANEL
(BY OTHERS)
(1) NETWORK
3 PH 4W + G
120V/208V
200A
SHEET KEYED NOTES:
1.
REFER TO ELECTRICAL PLANS FOR POWER PANEL AND RECEPTACLE TYPES AND LOCATIONS IN THE COUNCIL CHAMBERS
2.
WIRELESS DMX TRANSCEIVER NOT SHOWN IN THE PLANS. REFER TO SPECIFICATION SECTION 265561TECHNICAL LIGHTING SYSTEMS FOR PRODUCT INFORMATION
3.
PANEL 'LAMGA' IN THE ELECTRICAL DRAWINGS
4.
PORTABLE TOUCHSCREEN CONTROLLER TO BE LOCATED WITH OTHER PORTABLE FOH EQUIPMENT. REFER TO SPECIFICATION SECTION
265561 TECHNICAL LIGHTING SYSTEMS FOR MORE INFORMATION.
5.
ALL CONDUIT FEEDING THESE DEVICES SHALL RUN VERTICALLY UP THE AMPHITHEATER CANOPY COLUMNS. REFER TO ARCHITECTURAL DRAWINGS.
##
(1) NETWORK, (1) DMX, TYP.
D2
PS2
PORTABLE TS
D1
D3
PS1
(2) NETWORK, (2) DMX
(1) NETWORK, (1) DMX
CANOPY
HOUSE
LIGHTING
CIRCUITS
Z1,Z2,Z3
PR2
D4
TS2
PRODUCTION POWER PANEL
PP1
(84) RELAY-CONTROLLED
CIRCUIT BREAKERS WITH
NETWORK
CONTROL
TECH LIGHTING FIXTURES
TT1
120V POWER
(SOFT CABLING
FEEDER CABLE)
PR3
PR4
CEILING
SLOT
POWER
RECEPTACLES
01
01
D6
02
(1) DMX
(SOFT CABLING)
(2) DMX
AMPHITHEATER
COUNCIL CHAMBERS
03
04
(1) NETWORK SOFT CABLING
PG1
(1) 20A/120V CKT, (1) 30A/208V, TYP.
05
05
05
05
TECH LIGHTING FIXTURES
TT1
120V POWER
(SOFT CABLING
JUMPER CABLE)
AS NEEDED
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:45:11 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
LV6.01
LIGHTING CONTROL
SYSTEM DIAGRAMS
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
TECHNOLOGY ABBREVIATIONS
DESCRIPTION
SYMBOL
GENERAL
TECHNOLOGY SYMBOLS LEGEND
PROJECTION TYPE
DISPLAY TYPE
TELECOM DESIGNATORS
VERTICAL PLACEMENT
DESCRIPTION
SYMBOL
TECHNOLOGY DEVICES
GENERAL
TECHNOLOGY SPECIFIC
TECHNOLOGY TAG DESIGNATIONS
DESCRIPTION
SYMBOL
TECHNOLOGY DEVICES
CONTRACTOR RESPONSIBILITY MATRIX
DESCRIPTION
SYMBOL
TELECOM BUILDING RISER
DESCRIPTION
SYMBOL
AUDIOVISUAL ROOM RISERS
TECHNOLOGY GENERAL NOTES
RISER GENERAL NOTES
TELECOM GENERAL NOTES
AV JUNCTION BOX
TELECOM JUNCTION BOX
POWER OUTLET
JUNCTION BOX W/ AV AND TELECOM
JUNCTION BOX W/ AV AND POWER
JUNCTION BOX W/ AV, TELECOM AND POWER
FLOOR BOX
FLOOR BOX W/ TELECOM
J#
N#
P#
J#(N#)
J#(P#)
J#(N#,P#)
F#
F#(N#)
#
#
T###
T###
T###
RISER
#
CONDUIT RISER - DETAIL # / SHEET #
SECTION SYMBOL - DETAIL # / SHEET #
ELEVATION SYMBOL - DETAIL # / SHEET #
N2A
LETTER DESIGNATES
CABLE PULL TYPE
N-NUMBER DESIGNATES
BOX-TYPE &
MOUNTING STYLE
(REFER TO THE TELECOM CABLING LEGEND FOR MORE INFORMATION)
(DENOTES DEVICES WHICH FALL ON THE SAME VERTICAL PLANE)
CEILING JUNCTION BOX
WALL JUNCTION BOX
FLOOR BOX / FLOOR POKE-THRU DEVICE /
FLOOR CONDUIT STUB
CEILING TELECOM OUTLET
WALL TELECOM OUTLET
FLOOR TELECOM OUTLET
FLOOR POWER DUPLEX RECEPTACLE
FLOOR POWER DOUBLE DUPLEX RECEPTACLE
FLOOR POWER CIRCUIT
FLAT PANEL DISPLAY BY AV CONTRACTOR - SHOWN FOR
COORDINATION PURPOSES ONLY. REFER TO DETAIL
SHEETS FOR MORE INFORMATION.
CEILING AV CAMERA BY AV CONTRACTOR - SHOWN FOR
COORDINATION PURPOSES ONLY. EXACT LOCATION TO
BE COORDINATED BY THE AV CONTRACTOR.
NUMBER
MOUNTING HEIGHTS ARE TO CENTERLINE OF DEVICE
ABOVE FINISHED FLOOR OR FINISHED GRADE
ALTERNATING CURRENT
AMERICAN WITH DISABILITIES ACT
ABOVE FINISHED CEILING
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTHORITY HAVING JURISDICTION
ARCHITECT
AUDIOVISUAL
AUDIOVISUAL CONTRACTOR
AMERICAN WIRE GAUGE
BURIED
BLACK DROP
BUILDING
BUILDING ENTRANCE TERMINAL
CONDUIT
CABLE
CABINET
CASE HEIGHT
CASE WIDTH
CASE DEPTH
CATALOG
CABLE TELEVISION
CLOSED CIRCUIT TELEVISION
CENTERLINE
CEILING
ELECTRIC METALLIC TUBING
ELECTRICAL CONTRACTOR
ESTIMATE
EQUIPMENT
EXISTING
FIRE ALARM CONTROL PANEL
FLAT PANEL DISPLAY
HANDHOLE
IMAGE HEIGHT
BOTTOM OF IMAGE HEIGHT ABOVE FINISHED FLOOR
IMAGE WIDTH
GENERAL CONTRACTOR
#
+18"
AC
ADA
AFC
AFF
AFG
AHJ
ARCH
AV
AVC
AWG
B
BD
BLDG
BET
C
CA
CAB
CH
CW
CD
CAT
CATV
CCTV
CL
CLG
EMT
EC
EST
EQUIP
EXIST, (E)
FACP
FPD
HH
IH
IHAF
IW
GC
FLOOR BOX W/ AV AND POWER
FLOOR BOX W/ AV, TELECOM AND POWER
FLOOR POKE-THRU DEVICE
FLOOR POKE-THRU DEVICE W/ TELECOM
FLOOR POKE-THRU DEVICE W/ AV AND POWER
FLOOR POKE-THRU DEVICE W/ AV, TELECOM
AND POWER
FLOOR CONDUIT STUB
F#(P#)
F#(N#,P#)
PT#
PT#(N#)
PT#(P#)
PT#(N#,P#)
FS#
(THIS IS A MASTER LEGEND, NOT ALL SYMBOLS MAY APPEAR ON DRAWINGS.)
POWER DESIGNATIONS
AUDIOVISUAL JUNCTION BOX
TELECOM JUNCTION BOX
AN AUDIOVISUAL DEVICE WHICH CONTAINS A
POWER RECEPTACLE AND A TELECOM OUTLET
CONDUIT STUB
FLEXIBLE CONDUIT RUN
CEILING POWER CIRCUIT
WALL POWER DUPLEX RECEPTACLE
WALL POWER DOUBLE DUPLEX RECEPTACLE
WALL POWER CIRCUIT
CEILING DUPLEX RECEPTACLE
CEILING DOUBLE DUPLEX RECEPTACLE
48 - PORT OPTICAL FIBER PANEL, RACK MOUNT
110 - STYLE PUNCHDOWN BLOCK, WALL MOUNT
PRIMARY CABLE PROTECTION, WALL MOUNT
CATV HEAD END EQUIPMENT
CATV TAP
48 - PORT COPPER PATCH PANEL, RACK MOUNT
CONDUIT - REFER TO PLANS FOR SIZE
CABLE BASKET - REFER TO PLANS FOR SIZE
CONDUIT - REFER TO PLANS FOR SIZE
LARGE JUNCTION BOX
ACCESS PANEL
J-HOOK
CABLE RUNWAY - REFER TO PLANS FOR SIZE
PROJECTOR BY AV CONTRACTOR - SHOWN FOR
COORDINATION PURPOSES ONLY. REFER TO DETAIL
SHEETS FOR MORE INFORMATION.
PROJECTION SCREEN - REFER TO THE PROJECTION
SCREEN TYPE LEGEND AND NOTES FOR MORE
INFORMATION.
EQUIPMENT RACK
FIRE RATED ASSEMBLY
/
RACK - 2 POST
BUILDING ENTRANCE TERMINAL
CATV TAP
GROUNDING BUSBAR
MAIN GROUNDING BUSBAR
ELECTRICAL / SECURITY PANEL
TERMINATION BLOCK - 66 STYLE
TERMINATION BLOCK - 110 STYLE
VERTICAL CABLE MANAGER
RACK - 4 POST
PLYWOOD BACKBOARD
CONDUIT - RESERVED FOR SECURITY
SC
CONDUIT - RESERVED FOR FUTURE
FC
CONDUIT - RESERVED FOR HORIZONTAL CABLING
HC
CONDUIT - RESERVED FOR COPPER BACKBONE
CB
CONDUIT - RESERVED FOR FIBER BACKBONE
FB
CEILING AV MICROPHONE BY AV CONTRACTOR - SHOWN
FOR COORDINATION PURPOSES ONLY. EXACT LOCATION
TO BE COORDINATED BY THE AV CONTRACTOR.
SYMBOL DESIGNATES
FLOOR, WALL OR CEILING
C
S
M
TELECOM MAIN GROUNDING BUSBAR (TMGB),
WALL MOUNT
TELECOM GROUNDING BUSBAR (TGB),
WALL MOUNT
TGB
TMGB
110
OPTICAL
COPPER
A
N
N
A
UNISTRUT, THREADED ROD, SUPPORT CABLE, FASTENERS OR OTHER HARDWARE REQUIRED TO ATTACH
AUDIOVISUAL WALL OR CEILING MOUNTS TO STRUCTURE
LOW VOLTAGE AV CONTROL INTERFACE FOR LIGHTING SYSTEM (DIMMER SIDE) AND PATHWAY TO
AUDIOVISUAL CONTROL SYSTEM EQUIPMENT RACK
STRUCTURAL BACKING ("BLOCKING") AS REQUIRED TO SUPPORT WALL MOUNTED AUDIOVISUAL
COMPONENTS AND STRUCTURAL WORK FOR SPECIAL CONSTRUCTION
AC POWER SYSTEMS, CONDUIT, RACEWAYS, ELECTRICAL BACK BOXES, JUNCTION BOXES, PULL BOXES,
FLOOR BOXES AND OTHER INFRASTRUCTURE
LIGHTING FIXTURES, DIMMING SYSTEMS AND WALL CONTROLLERS
TELECOMMUNICATIONS STRUCTURED CABLING SYSTEMS, HORIZONTAL AND BACKBONE CABLING AND
TERMINATION, ASSOCIATED CABINETS, RACKS, RACEWAYS AND CABLE MANAGEMENT SYSTEMS
TELECOMMUNICATIONS CONNECTOR INSERT PLATES FOR FLOOR BOXES AND / OR WALL BOXES
PROJECTION SCREENS - WALL MOUNTED, CEILING MOUNTED, OR FIXED FRAME
AUDIOVISUAL CONNECTOR INSERT PLATES FOR FLOOR BOXES AND / OR WALL BOXES
PROJECTORS, FLAT PANEL DISPLAYS, CONTROL PANELS, MICROPHONES, SPEAKERS AND OTHER
AUDIOVISUAL EQUIPMENT
LECTERNS / SPECIALTY TECHNICAL FURNITURE
AUDIOVISUAL EQUIPMENT RACKS
ROUGH OR FINISHED TRIM, CASEWORK AND MILLWORK
AUDIOVISUAL CABLING AND TERMINATIONS FOR AUDIOVISUAL SYSTEMS
ITEM / TASK
FURNISH INSTALL
GC
GC
GC
SCC
GC
GC
SCC
GC
AVC
AVC
AVC
AVC
GC
AVC
GC
GC
GC
SCC
GC
GC
SCC
GC
AVC
AVC
AVC
AVC
GC
AVC
J#J#
J#N#
N#N#
OR
OR
EXISTING WORK TO REMAIN
EXISTING WORK TO BE REMOVED (DEMO)
NEW WORK
BELOW FLOOR OR GRADE
(JUNCTION BOX "J#" LETTER CODE MAY VARY BY BOX JUNCTION)
RISER DRAWINGS AND CONDUIT ROUTING
THE ROOM RISER DRAWINGS ARE DIAGRAMMATIC IN NATURE. CONDUIT PATHS SHOWN ON THE ROOM RISERS ARE INTENDED TO CONVEY REQUIRED DEVICE
INTERCONNECTION AND SIZES ONLY. ACTUAL CONDUIT ROUTING IN THE FIELD MAY BE REQUIRED TO FOLLOW ROUTING CONTRARY TO THAT IMPLIED BY THE
ROOM RISER. CONDUIT ROUTING IS AT CONTRACTOR'S DISCRETION, BUT THE CONTRACTOR SHALL PROVIDE A PULL BOX IMMEDIATELY BEFORE AND AFTER
ANY CONDUIT RUN SECTION CONTAINING TWO NINETY-DEGREE TURNS, OR ANY SINGLE RUN EXCEEDING FIFTY FEET IN LENGTH REGARDLESS OF WHETHER
PULL BOXES ARE SHOWN ON THE DRAWINGS OR NOT. IN ALL CASES, CONDUIT ROUTES SHALL FOLLOW THE SHORTEST PATH POSSIBLE WHILE COMPLYING
WITH INDUSTRY STANDARDS AND BEST PRACTICES.
CONDUIT RUNS:
ALL CONDUIT RUNS SHALL BE STEEL, THIN-WALL ELECTRICAL METALLIC TUBING (EMT) UNLESS OTHERWISE INDICATED. THE USE OF FLEXIBLE CONDUIT IS NOT
PERMISSIBLE EXCEPT WHERE INDICATED ON THE DRAWINGS. CONDUIT SIZES AND INTERCONNECTIONS SHALL BE AS INDICATED ON THE DRAWINGS.
CONDUIT STUBS
TERMINATE CONDUIT STUBS INTO CLEAR SPACE 18 INCHES ABOVE ACCESSIBLE CEILING IN ROOM INDICATED.
NYLON BUSHINGS
PROVIDE A NYLON BUSHING ON ALL CONDUIT STUBS AND NON-TERMINATING CONDUIT ENDS TO PROTECT WIRE PULLS.
PULL STRINGS
ALL CONDUIT RUNS SHALL BE PROVIDED WITH A #12 PULL STRING OR EQUAL.
DRAWINGS:
NOTIFY THE DESIGNER OF ANY DISCREPANCIES BETWEEN THESE CONTRACT DRAWINGS AND FIELD CONDITIONS.
INSTALLATION:
INSTALL ALL COMPONENTS AS PER MANUFACTURERS RECOMMENDATIONS AND PER ALL APPLICABLE CODES.
SUBSTITUTIONS:
THE MAKE AND MODEL OF LOW VOLTAGE INFRASTRUCTURE DEVICES IN THE TECHNOLOGY LEGENDS HAVE BEEN LISTED TO ESTABLISH THE DESIRED LEVEL
OF QUALITY AND PERFORMANCE FOR EACH DEVICE. UNLESS OTHERWISE INDICATED, THE INSTALLING CONTRACTOR MAY SUBSTITUTE THESE DEVICES WITH
EQUIVALENT APPROVED PRODUCT BY OTHER MANUFACTURERS.
DEVICE MOUNTING:
DEVICE SPECIFIED MOUNTING ELEVATIONS ARE "ON CENTER" UNLESS OTHERWISE NOTED. ALL DEVICE HEIGHTS SHALL COMPLY WITH ANSI 117.1 CHAPTER 3,
SECTION 307, PROTRUDING OBJECTS AND CHAPTER 3, SECTION 308, REACH RANGES. IF ANY DEVICE OR BOX SPECIFIED WITHIN IS FOUND TO BE IN CONFLICT
WITH ABOVE SECTIONS A CONFIRMING RFI SHOULD BE PLACED PRIOR TO RELOCATING.
FLOOR BOX, JUNCTION BOX, AND PULL BOX COVERS:
UNLESS OTHERWISE DIRECTED, ALL FLOOR BOXES, JUNCTION BOXES, AND PULL BOXES MUST BE PROVIDED WITH A COVER. WHERE SINGLE OR MULTI-DEVICE
RAISED DEVICE COVERS ARE SPECIFIED IN THE SCHEDULE, MATCH THE RAISED COVER DEPTH TO THE WALL THICKNESS. PROVIDE ALL FLOOR BOXES,
JUNCTION BOXES, AND PULL BOXES WITH APPROPRIATE KNOCKOUTS TO MATCH CONDUIT REQUIREMENTS. WHERE JUNCTION BOXES AND PULL BOXES ARE
MOUNTED AT OR ABOVE FINISHED CEILING HEIGHT, INSTALL BOXES WITH OPEN SIDE FACING DOWN.
FIRE STOPPING:
THE FIRE STOP SYSTEM SHALL COMPLY WITH THE IBC, NEC AND WITH NFPA 101-LIFE SAFETY CODE (LATEST EDITION) AND SHALL BE MADE AVAILABLE FOR
INSPECTION BY THE LOCAL INSPECTION AUTHORITIES PRIOR TO CABLE SYSTEM ACCEPTANCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING
THE FIRE RATING OF ALL WALLS AND FLOORS HAVING PENETRATIONS. COORDINATE SEALANT INSTALLATION WITH WORK OF OTHER TRADES. REFER TO
GENERAL AND / OR ELECTRICAL SPECIFICATION SECTIONS FOR FURTHER MATERIAL AND INSTALLATION PARAMETERS.
EMERGENCY COMMUNICATIONS:
CONTRACTOR TO VERIFY ALL CODE AND TELECOMMUNICATIONS REQUIREMENTS FOR AEDS, EMERGENCY PHONES, AND AREA OF REFUGE SYSTEMS AND
SIGNAGE PER THE AHJ. REFERENCE ARCHITECTURAL DRAWINGS FOR EMERGENCY COMMUNICATIONS SIGNAGE AND ELECTRICAL AND FIRE PROTECTION
DRAWINGS FOR EMERGENCY COMMUNICATIONS REQUIREMENTS.
GROUNDING:
GROUND COMMUNICATIONS SYSTEMS AND EQUIPMENT IN ACCORDANCE WITH THE ANSI/TIA-607-C GROUNDING STANDARD AND APPLICABLE NEC
REQUIREMENTS EXCEPT WHERE THE DRAWINGS OR SPECIFICATIONS EXCEED NEC REQUIREMENTS. ALL RACKS, METALLIC BACKBOARDS, CABLE SHEATHS,
METALLIC STRENGTH MEMBERS, SPLICE CASES, CABLE TRAYS, ETC. ENTERING OR RESIDING IN TECHNICAL EQUIPMENT SPACES SHALL BE GROUNDED TO
THEIR RESPECTIVE GROUND SYSTEM USING A MINIMUM #6 AWG STRANDED COPPER BONDING CONDUCTOR AND COMPRESSION CONNECTORS. ALL WIRES
USED FOR TECHNICAL POWER SYSTEMS GROUNDING PURPOSES SHALL BE IDENTIFIED WITH GREEN INSULATION OR IDENTIFIED AT EACH TERMINATION POINT
WITH A WRAP OF GREEN TAPE. ALL CABLES AND BUS BARS SHALL BE IDENTIFIED AND LABELED "TECHNICAL POWER SYSTEM GROUND".
TECHNICAL POWER & GROUNDING SYSTEM:
DUE TO THE SENSITIVE NATURE OF ELECTRONIC EQUIPMENT THAT IS BEING USED, POWER QUALITY MUST BE ASSURED. POWER FOR TECHNOLOGY SYSTEMS
SHOULD BE DERIVED FROM DEDICATED TECHNICAL POWER PANELS WHICH DO NOT SHARE CIRCUITS WITH EQUIPMENT LOADS THAT GENERATE ELECTRICAL
NOISE ON THE POWER LINE. THIS MIGHT INCLUDE: AIR CONDITIONING EQUIPMENT, MOTORS, HEAVY INDUSTRIAL EQUIPMENT, OR DIMMED LIGHTING LOADS;
ALL OF WHICH CREATE TRANSIENTS, HARMONICS, SURGES AND SPIKES. FOR ADDITIONAL GUIDELINES REFER TO THE IEEE STD. 1100 (2005) EMERALD BOOK
'RECOMMENDED PRACTICE FOR POWERING AND GROUNDING ELECTRONIC EQUIPMENT'. WHERE PRACTICAL, ALL TECHNICAL POWER CIRCUITS FOR
EQUIPMENT WITHIN A ROOM SHOULD BE ON THE SAME PHASE TO ENSURE PROPER EQUIPMENT TIMING WITHIN THE SYSTEM.
TRANSIENT VOLTAGE SURGE SUPPRESSION (TVSS) DEVICES SHOULD BE PROVIDED AT POWER DISTRIBUTION PANELS SERVING TECHNICAL POWER CIRCUITS.
THESE TVSS DEVICES MUST BE INSTALLED ACCORDING TO NEC ARTICLE 285. ALL DEVICES MUST BE UL 1449 COMPLIANT. IN BROADCAST APPLICATIONS OR IN
LARGE SYSTEMS, A SEPARATELY DERIVED TECHNICAL POWER SOURCE PROVIDED BY AN ELECTROSTATICALLY SHIELDED ISOLATION TRANSFORMER MAY BE
REQUIRED.
ALL TECHNICAL POWER OUTLETS MUST BE WIRED AS “ALWAYS ON”. NO OUTLETS SERVING TECHNOLOGY SYSTEMS SHALL BE ON SWITCHED, TIME OF DAY, OR
OCCUPANCY CONTROLLED OUTLETS.
TECHNICAL GROUND SYSTEM (TGS)
TECHNICAL GROUND SHALL CONSIST OF AN INSULATED GROUND CONDUCTOR FROM THE PANEL BOARD TO EACH TECHNICAL GROUND RECEPTACLE. AT THE
RECEPTACLE, THE GROUND CONDUCTOR SHALL BE ELECTRICALLY ISOLATED FROM THE ELECTRICAL BOX AND CONDUIT SYSTEM.
TECHNICAL ELECTRICAL SUPPLY GROUNDING SHALL BE VIA A GROUNDING ELECTRODE AND MEET NEC ARTICLE 250 REQUIREMENTS. A TECHNICAL POWER
SYSTEM IS FURTHER DEFINED IN NEC ARTICLE 640 AS "AN ELECTRICAL DISTRIBUTION SYSTEM WITH GROUNDING IN ACCORDANCE WITH 250.146(D), WHERE
THE EQUIPMENT GROUNDING CONDUCTOR IS ISOLATED FROM THE PREMISES GROUNDING CONDUCTOR EXCEPT AT A SINGLE GROUNDED TERMINATION
POINT WITHIN A BRANCH-CIRCUIT PANEL BOARD, AT THE ORIGINATING (MAIN BREAKER) BRANCH-CIRCUIT PANEL BOARD, OR AT THE PREMISES GROUNDING
ELECTRODE".
INSULATED GROUNDING CONDUCTORS FROM THE BREAKER PANEL BOARDS SHALL BE IN A "STAR" CONFIGURATION AND NOT LOOP FROM ONE PANEL TO THE
NEXT PANEL. AT EACH BREAKER PANEL, PROVIDE AN INSULATED GROUND BUS BAR FOR CONNECTIONS OF ALL TGS INSULATED GROUND CONDUCTORS AND
NO OTHERS. THE GREEN SAFETY GROUND WIRES FROM EACH TGS RECEPTACLE OR CIRCUIT ARE BROUGHT TO THIS BUS. EACH TECHNICAL POWER
RECEPTACLE SHALL BE OF A UNIQUE COLOR AND / OR CLEARLY AND PERMANENTLY LABELED "TECHNICAL POWER".
POWER DESIGNATORS AND RECEPTACLES
POWER DESIGNATORS AND RECEPTACLES WHICH APPEAR ON THE ROOM RISER DRAWINGS ARE SHOWN TO INDICATE THEIR ASSOCIATION WITH AND
REQUIRED ADJACENCY TO AUDIOVISUAL COMPONENTS. NOTE THAT NOT ALL POWER RECEPTACLES REQUIRED TO SUPPORT THE AUDIOVISUAL SYSTEMS ARE
SHOWN ON THE ROOM RISER DIAGRAMS; ONLY THOSE THAT ARE PART OF OR INTERFACE WITH THE AUDIOVISUAL JUNCTION BOXES ARE SHOWN. REFER TO
THE AUDIOVISUAL INFRASTRUCTURE PLANS, ELEVATIONS AND DETAILS FOR ADDITIONAL GUIDANCE REGARDING AUDIOVISUAL POWER LOCATIONS. REFER TO
THE ELECTRICAL DRAWINGS FOR COMPLETE POWER LAYOUTS AND CIRCUITING DETAILS.
TELECOM OUTLETS
JUNCTION BOXES FOR TELECOM OUTLETS WHICH APPEAR ON THE ROOM RISER DRAWINGS ARE SHOWN TO INDICATE THEIR ASSOCIATION WITH AND
REQUIRED ADJACENCY TO AUDIOVISUAL COMPONENTS.
AV SPECIFIC ROOM RISERS
NOT ALL TELECOM OUTLETS REQUIRED TO SUPPORT THE AUDIOVISUAL SYSTEMS ARE SHOWN ON THE ROOM RISER DIAGRAMS; ONLY THOSE THAT ARE PART
OF OR INTERFACE WITH AUDIOVISUAL JUNCTION BOXES ARE SHOWN. REFER TO THE AUDIOVISUAL INFRASTRUCTURE PLANS, ELEVATIONS AND DETAILS FOR
ADDITIONAL GUIDANCE REGARDING AUDIOVISUAL TELECOM OUTLET LOCATIONS. REFER TO THE STRUCTURED CABLING DRAWINGS FOR COMPLETE
TELECOMMUNICATIONS PATHWAYS, OUTLETS AND CABLING REQUIREMENTS.
CONDUITS SHOWN ON THE ROOM RISER DRAWINGS ARE FOR AV ONLY AND SHALL NOT BE USED FOR TELECOM CABLES.
1.
CONTRACTOR SHALL REFERENCE CIVIL AND ELECTRICAL SITE DRAWINGS AND UTILITY PLANS FOR PATHWAYS IN SUPPORT OF OUTSIDE CABLING PLANT,
EMERGENCY/BLUE LIGHT PHONES, SITE SURVEILLANCE CAMERAS, SITE WIRELESS ACCESS POINTS, AND OTHER SITE-RELATED DEVICES NOT DIRECTLY
ATTACHED TO THE BUILDING.
2.
ALLOW CABLING, INFRASTRUCTURE AND LABOR FOR (50) ADDITIONAL NETWORK OUTLETS NOT REPRESENTED ON THE DRAWINGS. THESE ADDITIONAL
LOCATIONS WILL BE DETERMINED BY THE OWNER PRIOR TO INSTALLATION.
#
CEILING LOUDSPEAKER BY AV CONTRACTOR - SHOWN
FOR COORDINATION PURPOSES ONLY. EXACT LOCATION
TO BE COORDINATED BY THE AV CONTRACTOR.
SUBSCRIPT NUMBER DESIGNATES THE SPEAKER ZONE.
JUNCTION BOX
KNOCK OUT
LOW VOLTAGE
MANHOLE
MICROPHONE
MOTOR
MAXIMUM
MANUFACTURER
MINIMUM
MISCELLANEOUS
NOT APPLICABLE
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NOT IN CONTRACT
NOT TO SCALE
PROJECTOR
PROJECTION SCREEN
ON CENTER
OWNER FURNISHED CONTRACTOR INSTALLED
OWNER FURNISHED OTHER INSTALLED
QUANTITY
REQUIRED
BOTTOM OF ROLLER HOUSING ABOVE
FINISHED FLOOR
RIGID GALVANIZED STEEL
STRUCTURED CABLE CONTRACTOR
SECURITY CONTRACTOR
TYPICAL
UNDERGROUND
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
UNSHIELDED TWISTED-PAIR
WEATHER-PROOF
EXPLOSION PROOF
JB
KO
LV
MH
M, MIC
M, MTR
MAX
MFR
MIN
MISC
NA
NEC
NEMA
NIC
NTS
PR
PRS
OC
OFCI
OFOI
QTY
REQ'D
RHAFF
RGS
SCC
SC
TYP
UG
UNO
UPS
UTP
WP
XP
NOTES:
1.
ALL ITEMS AND TASKS LISTED ARE THE RESPONSIBILITY OF THE NOTED CONTRACTOR.
ELECTRONIC SECURITY SYSTEMS EQUIPMENT AND SECURITY CABLING FOR ACCESS CONTROL,
INTRUSION ALARM, DURESS, VIDEO SURVEILLANCE, OTHERS AS SPECIFIED
SC
SC
A
LETTER DESIGNATES
THE PROJECTION
SCREEN TYPE
2
(REFER TO THE DISPLAY TYPE LEGEND FOR MORE INFORMATION)
(REFER TO THE PROJECTION SCREEN TYPE LEGEND FOR MORE
INFORMATION)
NUMBER DESIGNATES
THE DISPLAY TYPE
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
2/4/2025 5:35:08 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T0.01
TECHNOLOGY
INFRASTRUCTURE
LEGENDS AND
NOTES
COORDINATION
06 FEBRUARY 2025
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
TECHNOLOGY SHEET INDEX
ISSUE
SHEET NUMBER
SHEET DESCRIPTION
2025-02-06 OWNER COMMENT + CONSTRUCTION COORDINATION
2024-10-03 PERMIT+OWNER COMMENTS
2024-07-11 CD PERMIT 2
2024-04-06 CD COORD
2024-04-18 CD
●
●
●
●
●
T0.01
TECHNOLOGY INFRASTRUCTURE LEGENDS AND NOTES
T0.02
TECHNOLOGY INFRASTRUCTURE LEGENDS AND LEGEND NOTES
●
●
T0.03
TECHNOLOGY INFRASTRUCTURE LEGENDS AND SCHEDULES
●
●
●
●
T2.10
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN - LOWER LEVEL
●
●
●
●
T2.11
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN - GARDEN LEVEL
●
●
●
●
T2.12
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN - LEVEL 1
●
●
●
●
T2.13
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN - LEVELS 2 + 3
●
●
●
●
T2.14
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN - LEVELS 4 + ROOF
●
●
●
T2.20
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN - GARDEN LEVEL + LEVEL 1
●
●
T2.30
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN - AMPHITHEATER - GARDEN LEVEL + LEVEL 1 STAGE
●
●
T2.40
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN - GARAGE - LEVELS 1 + 2
●
●
T2.41
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN - GARAGE - LEVELS 3 + 4
●
●
T2.50
TECHNOLOGY INFRASTRUCTURE RCP - LOWER LEVEL
●
●
●
●
T2.51
TECHNOLOGY INFRASTRUCTURE RCP - GARDEN LEVEL
●
●
T2.52
TECHNOLOGY INFRASTRUCTURE RCP - LEVEL 1
●
●
T2.53
TECHNOLOGY INFRASTRUCTURE RCP - LEVELS 2 + 3
●
●
T2.54
TECHNOLOGY INFRASTRUCTURE RCP - LEVEL 4
●
●
●
T2.60
TECHNOLOGY INFRASTRUCTURE RCP - GARDEN LEVEL + LEVEL 1
●
●
T2.70
TECHNOLOGY INFRASTRUCTURE RCP - AMPHITHEATER - GARDEN LEVEL + LEVEL 1 STAGE
●
●
●
●
T3.10
TELECOM PLAN - LOWER LEVEL
●
●
●
●
T3.11
TELECOM PLAN - GARDEN LEVEL
●
●
●
●
T3.12
TELECOM PLAN - LEVEL 1
●
●
●
●
T3.13
TELECOM PLAN - LEVELS 2 + 3
●
●
●
●
T3.14
TELECOM PLAN - LEVELS 4 + ROOF
●
●
●
T3.20
TELECOM PLAN - GARDEN LEVEL + LEVEL 1
●
●
T3.30
TELECOM PLAN - AMPHITHEATER - GARDEN LEVEL + LEVEL 1 STAGE
●
●
T3.40
TELECOM PLAN - GARAGE - LEVELS 1 + 2
●
●
T3.41
TELECOM PLAN - GARAGE - LEVELS 3 + 4
●
●
T4.01
TELECOM ENLARGED PLANS AND ELEVATIONS
●
●
T4.02
TELECOM ENLARGED PLANS AND ELEVATIONS
●
●
T5.01
AUDIOVISUAL INFRASTRUCTURE ROOM RISERS
●
●
T6.01
TELECOM BUILDING RISER
●
●
●
T6.02
TYPICAL TELECOM RISER
●
●
●
●
T7.01
TECHNOLOGY INFRASTRUCTURE ELEVATIONS
●
●
●
●
T7.02
TECHNOLOGY INFRASTRUCTURE ELEVATIONS
●
●
●
T7.03
TECHNOLOGY INFRASTRUCTURE ELEVATIONS
●
●
T8.01
TECHNOLOGY INFRASTRUCTURE DETAILS
●
●
T9.01
TELECOM DETAILS
●
T9.02
TELECOM DETAILS
No.
Description
Date
3
CD COORDINATION
2024-04-06
4
PERMIT + OWNER
COMMENTS
2024-07-11
6
PERMIT + OWNER
COMMENTS
2024-10-03
7
OWNER COMMENT +
CONSTRUCTION
COORDINATION
2025-02-06
7
sheet number
project no.
date
phase
Construction
Documents
18 April 2024
115
TECHNOLOGY LEGEND NOTES
[A] FLOOR BOXES AND FLOOR PENETRATIONS:
VERIFY EXACT LOCATION, COVER STYLE AND FINISH WITH ARCHITECT PRIOR TO INSTALLATION. PROVIDE ON-GRADE OR FIRE-RATED VERSION FLOOR BOXES
AS REQUIRED.
[B] F1(N1,P1) FLOOR BOX CONFIGURATION:
WIREMOLD EVOLUTION SERIES EFB6S/-OG FLOOR BOX WITH FINISHED COVER. VERIFY COVER STYLE AND FINISH WITH ARCHITECT PRIOR TO ORDERING.
INCLUDED COMPONENTS: TEMPORARY CONSTRUCTION COVER, TUNNEL SYSTEM, TWO REMOVABLE MODULES, CABLE MANAGEMENT GUIDES, MOUNTING
CLAMPS AND LEVELING SUPPORT LEGS. PROVIDE AS REQUIRED: POWER RECEPTACLES, COMMUNICATION JACKS, MOUNTING BRACKETS, DEVICE PLATES,
BLANK DEVICE PLATES, DIVIDER PLATES, AND OTHER ACCESSORIES AS NEEDED. CONFIGURE BOX ACCORDING TO DETAILS. VERIFY EXACT LOCATION WITH
ARCHITECT PRIOR TO INSTALLATION.
[C] PT2(N1,P1) POKE-THRU CONFIGURATION:
WIREMOLD EVOLUTION SERIES 6AT POKE-THRU DEVICE WITH FINISHED COVER. VERIFY COVER STYLE AND FINISH WITH ARCHITECT PRIOR TO ORDERING.
INCLUDED COMPONENTS: TEMPORARY CONSTRUCTION COVER, 5PTHA 1/2-GANG PASS-THRU HOUSING, 1PTHA 1-GANG PASS-THRU HOUSING ASSEMBLY, AND
575CHA 1/2-GANG ¾” CONDUIT HOUSING ASSEMBLY. PROVIDE AS REQUIRED: POWER RECEPTACLES, COMMUNICATION JACKS, CENTER MOUNT DEVICE
PLATES, SIDE MOUNT DEVICE PLATES, BOTTOM FEED ASSEMBLIES, AND OTHER ACCESSORIES AS NEEDED. CONFIGURE BOX ACCORDING TO DETAILS. VERIFY
EXACT LOCATION WITH ARCHITECT PRIOR TO INSTALLATION.
[D] D11(N2,P2) FLAT PANEL DISPLAY BOX CONFIGURATION:
CHIEF PAC525FC IN-WALL STORAGE FLAT PANEL DISPLAY WALL BOX. VERIFY COLOR WITH ARCHITECT PRIOR TO ORDERING. INCLUDED COMPONENTS: ONE
FLANGE, AND ONE COVER. PROVIDE AS REQUIRED: UL LISTED ELECTRICAL BOXES, POWER RECEPTACLES, COMMUNICATION JACKS, DEVICE BLANK PLATES,
AND OTHER ACCESSORIES AS NEEDED. CONFIGURE BOX ACCORDING TO DETAILS.
[E] R9(N3,P3) LARGE CAPACITY WALL BOX CONFIGURATION:
FSR WB-X3-GNG LARGE CAPACITY WALL BOX WITH LOCKING COVER. VERIFY COVER COLOR AND STYLE WITH ARCHITECT PRIOR TO ORDERING. INCLUDED
COMPONENTS: INTERNAL BRACKETS, CENTER DIVIDERS, AND MOUNTING BRACKETS. PROVIDE AS REQUIRED: POWER RECEPTACLES, COMMUNICATION JACKS,
DEVICE PLATES, DEVICE BLANK PLATES, AND OTHER ACCESSORIES AS NEEDED. CONFIGURE BOX ACCORDING TO DETAILS.
[F] R13(N3,P3) OUTDOOR WALL BOX CONFIGURATION:
FSR OWB-500P SERIES OWB-500P WALL BOX WITH FINISHED COVER. VERIFY COVER COLOR WITH ARCHITECT PRIOR TO ORDERING. INCLUDED COMPONENTS:
INTERNAL BRACKETS, CENTER DIVIDERS, AND MOUNTING BRACKETS. PROVIDE AS REQUIRED: POWER RECEPTACLES, COMMUNICATION JACKS, DEVICE
PLATES, DEVICE BLANK PLATES, INTERNAL BRACKETS AND OTHER ACCESSORIES AS NEEDED. CONFIGURE BOX ACCORDING TO DETAILS. VERIFY EXACT
LOCATION WITH ARCHITECT PRIOR TO INSTALLATION.
[G] R14(N3,P3) OUTDOOR WALL POWER BOX CONFIGURATION:
FSR OWB-500P SERIES OWB-500P WALL BOX WITH FINISHED COVER. VERIFY COVER COLOR WITH ARCHITECT PRIOR TO ORDERING. INCLUDED COMPONENTS:
INTERNAL BRACKETS, CENTER DIVIDERS, AND MOUNTING BRACKETS. PROVIDE AS REQUIRED: POWER RECEPTACLES, COMMUNICATION JACKS, DEVICE
PLATES, DEVICE BLANK PLATES, INTERNAL BRACKETS AND OTHER ACCESSORIES AS NEEDED. CONFIGURE BOX ACCORDING TO DETAILS. VERIFY EXACT
LOCATION WITH ARCHITECT PRIOR TO INSTALLATION.
[H] PT11(N1,P1) POKE-THRU CONFIGURATION:
WIREMOLD EVOLUTION SERIES 6AT POKE-THRU DEVICE WITH FINISHED COVER. VERIFY COVER STYLE AND FINISH WITH ARCHITECT PRIOR TO ORDERING.
INCLUDED COMPONENTS: TEMPORARY CONSTRUCTION COVER, 5PTHA 1/2-GANG PASS-THRU HOUSING, 1PTHA 1-GANG PASS-THRU HOUSING ASSEMBLY, AND
575CHA 1/2-GANG ¾” CONDUIT HOUSING ASSEMBLY. PROVIDE AS REQUIRED: POWER RECEPTACLES, COMMUNICATION JACKS, CENTER MOUNT DEVICE
PLATES, SIDE MOUNT DEVICE PLATES, BOTTOM FEED ASSEMBLIES, AND OTHER ACCESSORIES AS NEEDED. CONFIGURE BOX ACCORDING TO DETAILS. VERIFY
EXACT LOCATION WITH ARCHITECT PRIOR TO INSTALLATION.
[J] PT4(N1,P1) POKE-THRU CONFIGURATION:
WIREMOLD EVOLUTION SERIES 4AT POKE-THRU DEVICE WITH FINISHED COVER. VERIFY COVER STYLE AND FINISH WITH ARCHITECT PRIOR TO ORDERING.
INCLUDED COMPONENTS: VARY BY DEVVICE SELECTION. PROVIDE AS REQUIRED: POWER RECEPTACLES, COMMUNICATION JACKS, CENTER MOUNT DEVICE
PLATES, SIDE MOUNT DEVICE PLATES, BOTTOM FEED ASSEMBLIES, AND OTHER ACCESSORIES AS NEEDED. CONFIGURE BOX ACCORDING TO DETAILS. VERIFY
EXACT LOCATION WITH ARCHITECT PRIOR TO INSTALLATION.
[K] TELECOM OUTLETS AND ASSOCIATED CONDUITS:
CONDUIT MUST BE PROVIDED FOR ALL TELECOM JUNCTION BOXES. SEE THE "TELECOM TYPICAL CONDUIT RISER" FOR CONDUIT REQUIREMENTS BY TELECOM
JUNCTION BOX TYPE. REFER TO THE TELECOM PLANS FOR THE LOCATIONS OF JUNCTION BOXES AND FLOOR BOXES, AND THE "TELECOM CABLING LEGEND"
FOR OUTLET CONFIGURATION REQUIREMENTS. TELECOM CABLING, OUTLETS AND COVER PLATES PROVIDED BY THE STRUCTURED CABLING SYSTEMS
CONTRACTOR.
[L] POWER RECEPTACLES ADJACENT STANDARD TELECOM WALL OUTLETS:
N4 STANDARD TELECOM WALL OUTLETS SHOULD HAVE A DUPLEX POWER RECEPTACLE LOCATED WITHIN 36" OF THE TELECOM WALL OUTLET. IDEALLY, THE
TELECOM OUTLET BOX WILL BE MOUNTED TO ONE SIDE OF A STUD, AND THE POWER BOX TO THE OPPOSITE SIDE OF THE STUD.
[M] POWER RECEPTACLES AND DIRECT CIRCUIT CONNECTIONS:
TECHNICAL POWER RECEPTACLES, INCLUDING THOSE WITHIN FLOOR BOXES, WALL BOXES, OR CEILING BOXES, ARE PROVIDED BY ELECTRICAL CONTRACTOR
AND APPEAR ON THE ELECTRICAL DRAWINGS. THE TECHNICAL POWER RECEPTACLES ALSO APPEAR ON THE TECHNOLOGY INFRASTRUCTURE DRAWINGS FOR
COORDINATION AND LOCATION PURPOSES. THE LOCATION OF TECHNICAL POWER RECEPTACLES IN RELATION TO OTHER TECHNOLOGY INFRASTRUCTURE
MAY BE CRITICAL. REFER TO THE ELECTRICAL DRAWINGS FOR COMPLETE POWER LAYOUTS AND CIRCUITING DETAILS.
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:45:14 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T0.02
TECHNOLOGY
INFRASTRUCTURE
LEGENDS AND
LEGEND NOTES
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
TYPE
FUNCTION
ENCLOSURE DIMENSIONS
ENCLOSURE DESCRIPTION
ENCLOSURE MAKE & MODEL
MOUNTING STYLE
REFERENCE
DETAIL
LEGEND NOTES
SYM
STYLE
LENGTH
WIDTH
DEPTH
F1
FLOOR
FLOOR BOX W/ AV TELECOM AND POWER
11 5/16"
15 1/8"
4 1/16"
FLOOR BOX
WIREMOLD EFB6S
FLUSH WITH FINISHED FLOOR
1/T8.01
A,B, M
FS2
FLOOR
FLOOR CONDUIT STUB
2"
2"
3"
CONDUIT STUB
N/A
STUB TO 3" ABOVE FINISHED FLOOR
-
A
PT2
FLOOR
FLOOR RECESS POKE-THRU W/ AV TELECOM AND POWER
6"
6"
16 1/4"
POKE-THRU DEVICE
WIREMOLD 6AT
FLUSH WITH FINISHED FLOOR
2/T8.01
A, C, M
PT10
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
4"
4"
18 9/16"
POKE-THRU DEVICE
WIREMOLD 4AT
FLUSH WITH FINISHED FLOOR
H
A, J, M
PT11
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
6"
6"
16 1/4"
POKE-THRU DEVICE
WIREMOLD 6AT
FLUSH WITH FINISHED FLOOR
8/T9.01
A, H, M
C1
WALL
CAMERA PULL BOX
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED TWO-DEVICE COVER
RACO 258 259 OR 265
96" AFF - FLUSH (UNO)
-
-
D11
WALL
DISPLAY BOX W/ AV TELECOM AND POWER
9"
14 1/4"
3 15/16"
DISPLAY BOX
CHIEF PAC525
FLUSH (UNO) - REFER TO ROOM DISPLAY SCHEDULE AND ELEVATIONS
3, 4/T8.01
D
R9
WALL
OUTDOOR AV BOX W/ LIGHTING AV AND TELECOM
16 3/4"
12 3/8"
4"
OUTDOOR BOX W/ LOCKING COVER
FSR OWB-X3-GNG
PER PROJECT HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
6/T8.01
E, M
R13
WALL
OUTDOOR AV BOX W/ LIGHTING AV TELECOM AND POWER
10"
12"
7.6
OUTDOOR BOX W/ LOCKING COVER
FSR - OWB-500P
PER PROJECT HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
5/T8.01
F, M
R14
WALL
OUTDOOR AV BOX W/ AV TELECOM AND POWER
10"
12"
7.6"
OUTDOOR BOX W/ LOCKING COVER
FSR OWB-500P
PER PROJECT HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
5/T8.01
G, M
R15
WALL
OUTDOOR AV BOX W/ POWER
10"
12"
7.6"
OUTDOOR BOX W/ LOCKING COVER
FSR OWB-500P
PER PROJECT HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
5/T8.01
G, M
SP1
WALL
SCHEDULING PANEL
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
PER PROJECT STANDARD SWITCH HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
-
TP1
WALL
CONTROL PANEL
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
PER PROJECT STANDARD SWITCH HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
-
W2
WALL
AV IO PANEL
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED TWO-DEVICE COVER
RACO 258 259 OR 265
PER PROJECT STANDARD OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
-
W9
WALL
AV IO PANEL
12
12
4
PULL BOX (PUNCHED AS REQUIRED) W/ PAINTED SCREW COVER
HOFFMAN A-SE12X12X4NK
FLUSH WITH FINISHED WALL
-
W10
WALL
AV IO PANEL
16
16
6
PULL BOX (PUNCHED AS REQUIRED) W/ PAINTED SCREW COVER
HOFFMAN A-SE16X16X6NK
SURFACE MOUNTED ON WALL
-
-
D21
CEILING
DISPLAY BOX W/ AV TELECOM AND POWER
23 5/8"
23 5/8"
6"
LAY-IN CEILING MOUNT W/ PLENUM BOX
FSR CB-22P
SUSPENDED FROM DECK - FLUSH WITH CEILING
-
-
J2
CEILING
CONDUIT CONSOLIDATION PULL BOX
12"
12"
6"
PULL BOX (PUNCHED AS REQUIRED) W/ PAINTED SCREW COVER
HOFFMAN A-SE12X12X6NK
MOUNTED ON BEAM
-
-
TECHNOLOGY JUNCTION BOX LEGEND
TYPE
FUNCTION
ENCLOSURE DIMENSIONS
ENCLOSURE DESCRIPTION
ENCLOSURE MAKE & MODEL
MOUNTING STYLE
REFERENCE
DETAIL
LEGEND NOTES
SYM
STYLE
LENGTH
WIDTH
DEPTH
N1
FLOOR
TELECOM OUTLET - FLOOR
-
-
-
FLOOR DEVICE INDICATED BY BOX NUMBER
COORDINATE W/ ASSOCIATED FLOOR DEVICE
INSTALL IN FLOOR DEVICE PER MFR DIRECTIONS
1, 2/T8.01
B
N2
WALL
TELECOM OUTLET - DISPLAY
-
-
-
WALL BOX INDICATED BY BOX NUMBER
COORDINATE W/ ASSOCIATED DISPLAY BOX
INSTALL IN DISPLAY BOX PER MFR DIRECTIONS
3, 4/T8.01
D
N3
WALL
-
-
-
WALL BOX INDICATED BY BOX NUMBER
COORDINATE W/ ASSOCIATED AV WALL BOX
INSTALL IN EQUIPMENT RACK BOX PER MFR DIRECTIONS
5, 6/T8.01
N4
WALL
TELECOM OUTLET - STANDARD
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
PER PROJECT STANDARD OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
E, F, G, K, L
N5
WALL
TELECOM OUTLET - WALL PHONE
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
PER PROJECT STANDARD SWITCH HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
K
N6
WALL
TELECOM OUTLET - ABOVE COUNTER
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
PER PROJECT STANDARD COUNTER OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
K, L
N7
WALL
TELECOM OUTLET - FURNITURE FEED FROM WALL
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
PER PROJECT STANDARD OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
K
N8
WALL
TELECOM OUTLET - IN FURNITURE
4 11/16"
4 11/16"
2 1/8"
COORDINATE WITH FURNITURE
-
COORDINATE INSTALLATION WITH FURNITURE
-
K
N9
WALL
TELECOM OUTLET - IN RACEWAY
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
120" AFF - FLUSH
-
K
N11
WALL
TELECOM OUTLET - SECURITY CAMERA
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
120" AFF - FLUSH
-
K
N13
WALL
TELECOM OUTLET - UTILITY
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
COORDINATE WITH APPLICABLE TRADE
-
K
N16
WALL
TELECOM OUTLET - SECURITY ACP
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
PER PROJECT STANDARD OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
K
N20
CEILING
TELECOM OUTLET - CEILING DISPLAY
-
-
-
CEILING BOX INDICATED BY BOX NUMBER
COORDINATE W/ ASSOCIATED CEILING DISPLAY BOX
INSTALL IN CEILING DISPLAY BOX PER MFR DIRECTIONS
-
K
N22-1
CEILING
TELECOM OUTLET - AV DEVICE
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ BLANK COVER
RACO 258 259 OR 265
18" ABOVE ACCESSIBLE CEILING
-
K
N22-3
CEILING
TELECOM OUTLET - AV DEVICE
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
SUSPENDED FROM DECK - FLUSH WITH CEILING
-
K
N23-1
CEILING
TELECOM OUTLET - WAP
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ BLANK COVER
RACO 258 259 OR 265
18" ABOVE ACCESSIBLE CEILING
-
K
N23-2
CEILING
TELECOM OUTLET - WAP
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ BLANK COVER
RACO 258 259 OR 265
SURFACE MOUNT TO DECK
-
K
N23-3
CEILING
TELECOM OUTLET - WAP
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
SUSPENDED FROM DECK - FLUSH WITH CEILING
-
K
N24-1
CEILING
TELECOM OUTLET - SECURITY CAMERA
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ BLANK COVER
RACO 258 259 OR 265
18" ABOVE ACCESSIBLE CEILING
-
K
N24-2
CEILING
TELECOM OUTLET - SECURITY CAMERA
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ BLANK COVER
RACO 258 259 OR 265
SURFACE MOUNT TO DECK
-
K
N24-3
CEILING
TELECOM OUTLET - SECURITY CAMERA
4 11/16"
4 11/16"
2 1/8"
PULL BOX W/ RAISED ONE-DEVICE COVER
RACO 258 259 OR 265
SUSPENDED FROM DECK - FLUSH WITH CEILING
-
K
TECHNOLOGY TELECOM JUNCTION BOX LEGEND
TYPE
FUNCTION
VOLTS
AMPS
NEMA
DESCRIPTION
ADDITIONAL REQUIREMENTS
MOUNTING STYLE
REFERENCE
DETAIL
LEGEND NOTES
SYM
STYLE
P1
FLOOR
POWER RECEPTACLE - FLOOR DEVICE
120
20
5-20R
DUPLEX RECEPTACLE INSIDE FLOOR DEVICE
-
INSTALL IN FLOOR DEVICE PER MFR DIRECTIONS
1, 2/T8.01
B, M
P2
WALL
POWER RECEPTACLE - DISPLAY
120
20
5-20R
DUPLEX RECEPTACLE INSIDE DISPLAY BOX
-
INSTALL IN DISPLAY BOX PER MFR DIRECTIONS
3, 4/T8.01
D
P3
WALL
POWER RECEPTACLE - AV WALL BOX
120
20
5-20R
INSTALL IN EQUIPMENT RACK BOX PER MFR DIRECTIONS
-
M
P4
WALL
POWER RECEPTACLE - TECHNOLOGY
120
20
5-20R
DUPLEX RECEPTACLE
-
PER PROJECT STANDARD OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
M
P6
WALL
POWER RECEPTACLE - TECHNOLOGY RACK
120
20
5-20R
DUPLEX RECEPTACLE
DEDICATED CIRCUIT
PER PROJECT STANDARD OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
M (EIGHT 20 AMP 120V
CIRCUITS)
P8
WALL
POWER RECEPTACLE - TELECOM RACK
120
20
L5-20R
TWIST-LOCK RECEPTACLE
DEDICATED CIRCUIT
MOUNT TO CABLE RUNWAY ABOVE EQUIPMENT RACK
-
M
P16
WALL
POWER CIRCUIT - ACCESS CONTROL PANEL
120
20
-
HARDWIRED POWER CIRCUIT DIRECT TO ACCESS CONTROL PANEL
DEDICATED CIRCUIT
REFER TO PLANS & ELEVATIONS
-
M
P17
WALL
POWER RECEPTACLE - CONVENIENCE DUPLEX
120
20
5-20R
DUPLEX RECEPTACLE
-
PER PROJECT STANDARD OUTLET HEIGHT - FLUSH (UNO) - REFER TO ARCH. DRAWINGS
-
-
P28
WALL
POWER RECEPTACLE - AV WALL BOX
120
30
L14-30R
TWIST-LOCK RECEPTACLE
DEDICATED CIRCUIT
INSTALL IN MOUNTING BOX PER MFR DIRECTIONS
-
M
P20
CEILING
POWER RECEPTACLE - CEILING DISPLAY
120
20
5-20R
DUPLEX RECEPTACLE INSIDE CEILING DISPLAY BOX
-
INSTALL IN CEILING DISPLAY BOX PER MFR DIRECTIONS
-
M
TECHNOLOGY POWER LEGEND
TYPE
CAT6
CAT6A
FIBER
HD-SDI
REFERENCE
DETAIL
NOTES
A
1
0
0
0
3/T9.01
-
B
2
0
0
0
3/T9.01
-
C
4
0
0
0
3/T9.01
-
E
0
0
0
0
3/T9.01
PASS-THRU
G
0
2
0
0
3/T9.01
-
J
0
0
0
0
3/T9.01
FUTURE (PULLSTRING ONLY)
K
2
4
0
2
3/T9.01
CAT-6 TO NEAREST IDF, CAT6A TO FOH BOX, HD-SDI TO FOH BOX
L
2
4
0
8
3/T9.01
CAT-6 TO NEAREST IDF, CAT6A TO CG04, HD-SDI FROM STAGE BOXES
M
2
0
0
0
TO LC1 LIGHTING RACK IN CG04
N
4
0
0
0
TO LC1 LIGHTING RACK IN CG04
TELECOM CABLING LEGEND
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
4
date
phase
Construction
Documents
18 April 2024
PROJECTION SCREEN ROLLER HOUSING (CASE)
CEILING RECESSED
MOTORIZED
PROJECTION SCREEN
(SCREEN CENTERLINE)
FINISHED WALL
(IW)
(CW)
(CW)
BLACK DROP
SEE NOTE 6
(IW)
(IHAFF)
SEE ELEVATION DETAILS
(IH)
(CH)
PROJECTION SCREEN ROLLER HOUSING (CASE)
BLACK DROP SEE NOTE 6
(IH)
(D1) SEE NOTES 1 & 2
PROJECTION SCREEN / VIDEO PROJECTOR RELATIONSHIP NOTES:
1. [D1]: !!! CRITICAL DISTANCE !!! - D1 IS THE DISTANCE FROM THE PROJECTION SCREEN SURFACE TO THE CENTER OF THE PROJECTOR CEILING MOUNT ASSEMBLY. IF DISTANCE D2 MUST BE INCREASED FOR ANY
REASON, DISTANCE D1 MUST BE MAINTAINED.
2. [D1x]: IS THE ALLOWABLE +/- VARIANCE IN DISTANCE OF D1 TO ACCOMMODATE STRUCTURAL OR OTHER OBSTRUCTIONS. EXAMPLE: IF D1 = 300" AND D1x = 10" THEN THE CENTER OF THE PROJECTOR CEILING MOUNT
MAY BE LOCATED BETWEEN 290" TO 310" ON SCREEN CENTERLINE FROM THE PROJECTION SCREEN SURFACE.
3. [D2]: IS THE MINIMUM DISTANCE FROM THE PROJECTION WALL TO THE PROJECTION SCREEN SURFACE. IF DISTANCE D2 MUST BE INCREASED TO ACCOMMODATE STRUCTURAL OR OTHER OBSTRUCTIONS TO A
DISTANCE GREATER THAN D2 + D2x CONTACT THE CONSULTANT FOR FURTHER INSTRUCTIONS.
4. [D2x]: IS THE ALLOWABLE +/- VARIANCE IN DISTANCE OF D2 TO ACCOMMODATE STRUCTURAL OR OTHER OBSTRUCTIONS. EXAMPLE: IF D2 = 6" AND D2x = 2" THEN THE PROJECTION SCREEN SURFACE MAY BE LOCATED
BETWEEN 4" TO 8" ON SCREEN CENTERLINE FROM THE PROJECTION WALL.
5. THE PROJECTOR MUST ALWAYS HAVE A CLEAR VIEW OF THE ENTIRE SCREEN IMAGE AREA WITHOUT OBSTRUCTIONS.
6. [BLACK DROP]: THE AMOUNT OF BLACK DROP LISTED IN THE ROOM PROJECTION SCREEN SCHEDULE IS A DESIGN ESTIMATE. BLACK DROP REQUIREMENTS SHALL BE FIELD VERIFIED PER SCREEN INSTANCE PRIOR TO
ISSUING SUBMITTALS. THE AMOUNT OF BLACK DROP (BD) REQUIRED IS DETERMINED BY ADDING THE ELEVATION OF THE BOTTOM OF THE IMAGE HEIGHT ABOVE FINISHED FLOOR (IHAFF) TO THE IMAGE HEIGHT (IH)
AND SUBTRACTING THAT NUMBER FROM THE ELEVATION TO THE UNDERSIDE OF THE PROJECTION SCREEN ROLLER HOUSING (CASE) ABOVE FINISHED FLOOR (RHAFF). THE REMAINDER WILL BE THE AMOUNT OF
REQUIRED BLACK DROP (SEE GRAPHIC ABOVE). THE AMOUNT OF EXCESS BLACK DROP MATERIAL REMAINING ON THE PROJECTION SCREEN ROLLER, WHEN THE SCREEN IS DEPLOYED TO ITS SPECIFIED BOTTOM OF
IMAGE HEIGHT ABOVE FINISHED FLOOR ELEVATION, SHOULD NEVER EXCEED MORE THAN ONE WRAP. IN INSTANCES WHERE CEILING HEIGHT VARIES IN THE FIELD FROM THE DRAWINGS, THE SPECIFIED IMAGE
HEIGHT ABOVE FINISHED FLOOR RULES.
7. LOCATE THE PROJECTION SCREEN POWER JUNCTION BOX ON THE SAME SIDE OF THE SCREEN AS SCREEN ELECTRICAL CONNECTIONS WHICH MAY VARY BY SCREEN TYPE. VERIFY LOCATION PRIOR TO INSTALLATION.
(D1) SEE NOTES 1 & 2
(CD)
PROJECTION SCREEN ROLLER HOUSING (CASE)
(RHAFF)
(D2) SEE NOTES 3 & 4
FINISHED WALL
(D2) SEE NOTES 3 & 4
90°
FINISHED FLOOR
FINISHED FLOOR
BLACK DROP = RHAFF - ( IH + IHAFF )
PROJECTOR SUPPORT
ASSEMBLY CENTERPOINT
THE AREA WITHIN DASHED LINES
INDICATES THE LIGHT PATH FROM
PROJECTOR TO SCREEN
SEE NOTE 5
PROJECTOR SUPPORT
ASSEMBLY CENTERPOINT
THE AREA WITHIN DASHED LINES
INDICATES THE LIGHT PATH FROM
PROJECTOR TO SCREEN
SEE NOTE 5
- (D1x)
+ (D1x)
- (D1x)
+ (D1x)
ACCESSIBLE OR HARD CEILING
IF CEILING RECESSED
ACCESSIBLE OR HARD CEILING
IF CEILING RECESSED
CEILING MOUNTED VIDEO PROJECTION SCREEN (TYP)
( AUDIENCE VIEW )
CEILING MOUNTED VIDEO PROJECTION SCREEN &
PROJECTION LAYOUT (TYP) - SECTION
CEILING MOUNTED VIDEO PROJECTION SCREEN &
PROJECTOR LAYOUT (TYP) - PLAN VIEW
90°
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:45:16 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T0.03
TECHNOLOGY
INFRASTRUCTURE
LEGENDS AND
SCHEDULES
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
TYPE
IMAGE SIZE
CASE SIZE
WEIGHT
INSTALLATION
OPERATION
MAKE & MODEL
IMAGE SURFACE
MATERIAL
CONTROL
CASE
PROVIDED BY
FABRIC & ROLLER
PROVIDED BY
REFERENCE
DETAIL
HEIGHT
(IH)
WIDTH
(IW)
HEIGHT
(CH)
WIDTH
(CW)
DEPTH
(CD)
A
108"
192"
109 1/4"
193 1/4"
2"
76
WALL MOUNTED FIXED
FIXED
DRAPER PROFILE PLUS
TECVISION XH900X ALR
NONE
GENERAL CONTRACTOR
-
PROJECTION SCREEN TYPE LEGEND
ALL DIMENSIONS IN INCHES / WEIGHT IN POUNDS
NOTES:
1. SEE THE ROOM PROJECTION SCREEN SCHEDULE ON THIS SHEET FOR LOCATIONS.
2. PROJECTION SCREEN CASE, PROJECTION SCREEN CONTROL SWITCHES, MOUNTING HARDWARE, CONDUITS, AND ELECTRICAL PROVIDED BY GENERAL CONTRACTOR.
3. REFER TO LEGEND ABOVE TO DETERMINE WHO SHALL PROVIDE THE PROJECTION SCREEN ROLLER AND FABRIC.
4. REFER TO THE DETAILS LISTED IN THE LEGEND FOR EACH PROJECTION SCREEN TYPE.
TYPE
NOMINAL
IMAGE
DIAGONAL
NOMINAL CASE SIZE
NOMINAL
WEIGHT
BACKING
HEIGHT
(H)
WIDTH
(W)
DEPTH
(D)
HEIGHT
(H)
WIDTH
(W)
1
46"
25"
42"
4"
47
24"
48"
2
55"
29"
50"
4"
60
24"
48"
3
75"
39"
67"
4"
113
36"
64"
4
80"
41"
72"
4"
122
36"
64"
5
85"
44"
76"
4"
134
36"
80"
6
90"
46"
80"
4"
175
48"
96"
7
98"
49"
87"
4"
183
48"
96"
DISPLAY TYPE LEGEND
ALL DIMENSIONS IN INCHES / WEIGHT IN POUNDS
NOTES:
1.
SEE THE ROOM DISPLAY SCHEDULE ON THIS SHEET FOR LOCATIONS.
2.
BACKING, JUNCTION BOXES, CONDUIT AND ELECTRICAL BY GENERAL
CONTRACTOR.
3.
DISPLAY, DISPLAY MOUNT AND CABLING PROVIDED BY AV CONTRACTOR.
4.
DISPLAY IMAGE DIAGONAL, CASE SIZE AND WEIGHT ARE PROVIDED TO
ESTABLISH THE APPROPRIATE BACKING REQUIREMENTS. THESE SIZES ARE
SUBJECT TO CHANGE.
5.
WHEN CEILING MOUNTED, NO BACKING IS REQUIRED.
ROOM
NUMBER
QTY
SCREEN
TYPE
SCREEN
PROJECTOR MOUNT
BOTTOM OF
IMAGE AFF
BLACK DROP
(EST)
DISTANCE
[D2]
DISTANCE
[D2x]
DISTANCE
[D1]
DISTANCE
[D1x]
184
1
A
72"
18"
3"
0"
384"
18"
ROOM PROJECTION SCREEN SCHEDULE
ALL DIMENSIONS IN INCHES
PROJECTION SCREEN / VIDEO PROJECTOR RELATIONSHIP IS CRITICAL (SEE GRAPHIC AND NOTES BELOW)
ALL DIMENSIONS IN INCHES
ROOM
NUMBER
DISPLAY
QTY
DISPLAY
TYPE
ELEV
AFF OC
460
1
7
70"
GL104
1
5
66"
GL106
1
1
60"
GL119
1
7
70"
GL120
1
7
70"
GL142
1
5
66"
LL104
2
5
66"
LL109
4
6
66"
LL118
2
2
72"
LL118
2
4
66"
LL124
1
2
72"
ROOM
NUMBER
DISPLAY
QTY
DISPLAY
TYPE
ELEV
AFF OC
116
2
2
62"
125
1
2
66"
127
1
2
60"
177
1
7
72"
178
1
3
66"
184
2
7
204
1
2
66"
205
1
2
66"
218
1
2
60"
219
1
5
66"
221
1
7
66"
251
1
5
66"
258
1
2
60"
260
1
7
70"
312
1
2
60"
318
1
2
60"
319
1
5
70"
321
1
7
60"
351
1
5
60"
358
1
2
60"
360
1
7
70"
418
1
2
60"
419
1
5
66"
421
1
7
60"
451
1
5
60"
458
1
2
60"
ROOM DISPLAY SCHEDULE
NOTES:
1.
CENTER LINE OF DISPLAY AND CENTER LINE OF DISPLAY BACK BOX MAY DIFFER.
REFER TO ELEVATIONS FOR CORRECT HEIGHTS AFF.
12" = 1'-0"
T0.03
1
TYPICAL PROJECTION SCREEN
ALL DIMENSIONS IN INCHES
ROOM DISPLAY SCHEDULE
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
4
date
phase
Construction
Documents
18 April 2024
DN
storage
storage
GL179
rehearsal room
rehearsal room
GL180
open office
open office
GL172
corridor
corridor
GL174
sto.
sto.
GL173
w's dressing
w's dressing
GL187
w's rr
w's rr
GL188
m's rr
m's rr
GL184
m's dressing
m's dressing
GL181
m's rr
m's rr
GL182
sto.
sto.
GL189
mechanical room
mechanical room
GL175
storage
storage
GL178
storage
storage
GL190
lobby
lobby
GL170
N7
N7
N8
N8
stair 4 - exit
stair 4 - exit
GL176
W10
P6
P6
P6
P6
P6
P6
P6
P6
SP1
SP1
N8
N8
N11
N13
N13
N6
T4.02
4
rack room
rack room
GL191
w's rr
w's rr
GL186
rr vestibule
rr vestibule
GL185
open office
open office
GL171
elev. 4 - pass.
elev. 4 - pass.
E4
storage
storage
GL177
R13
R13
N4
N8
N11
N3
N3
council chambers
council chambers
184
a/v booth
a/v booth
185
north lobby /
corridor
north lobby /
corridor
180
executive sessions
room
executive sessions
room
177
lounge
lounge
178
rr 6
rr 6
181
rr 4 - ada
rr 4 - ada
183
jan./sto.
jan./sto.
C112
elec
elec
176
chamber access
chamber access
175
south corridor
south corridor
171
rr 2 - ada
rr 2 - ada
172
storage
storage
173
rr 1
rr 1
174
south lobby (main)
south lobby (main)
170
D11(N2,P2)
3
PT11(N1,P1)
D11(N2,P2)
7
idf
idf
187
jan./sto.
jan./sto.
182
stair 4 - exit
stair 4 - exit
179
FS2
FS2
FS2
D11(N2,P2)
7
D11(N2,P2)
7
N4
N4
N4
N4
W9
T4.02
3
N4
T7.03
4
T7.03
3
T7.03
5
T7.03
7
SP1
SP1
SP1
T4.02
7
F1(N1,P1)
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
T7.03
6
N8
N8
N11
N4
P6
W9
17
65" DISPLAY MOUNTED
TO FURNITURE
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
10/3/2024 5:40:55 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T2.20
TECHNOLOGY
INFRASTRUCTURE
FLOOR PLAN -
GARDEN LEVEL +
LEVEL 1
PERMIT + OWNER
COMMENTS
03 October 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
1/8" = 1'-0"
T2.20
1
TECHNOLOGY INFRASTRUCTURE PLAN - COUNCIL - GARDEN LEVEL
1/8" = 1'-0"
T2.20
2
TECHNOLOGY INFRASTRUCTURE PLAN - COUNCIL - LEVEL 1
TYPE
FUNCTION
SYM
STYLE
N1
FLOOR
TELECOM OUTLET - FLOOR
N2
WALL
TELECOM OUTLET - DISPLAY
N3
WALL
N4
WALL
TELECOM OUTLET - STANDARD
N5
WALL
TELECOM OUTLET - WALL PHONE
N6
WALL
TELECOM OUTLET - ABOVE COUNTER
N7
WALL
TELECOM OUTLET - FURNITURE FEED FROM WALL
N8
WALL
TELECOM OUTLET - IN FURNITURE
N9
WALL
TELECOM OUTLET - IN RACEWAY
N11
WALL
TELECOM OUTLET - SECURITY CAMERA
N13
WALL
TELECOM OUTLET - UTILITY
N16
WALL
TELECOM OUTLET - SECURITY ACP
N20
CEILING
TELECOM OUTLET - CEILING DISPLAY
N22-1
CEILING
TELECOM OUTLET - AV DEVICE
N22-3
CEILING
TELECOM OUTLET - AV DEVICE
N23-1
CEILING
TELECOM OUTLET - WAP
N23-2
CEILING
TELECOM OUTLET - WAP
N23-3
CEILING
TELECOM OUTLET - WAP
N24-1
CEILING
TELECOM OUTLET - SECURITY CAMERA
N24-2
CEILING
TELECOM OUTLET - SECURITY CAMERA
N24-3
CEILING
TELECOM OUTLET - SECURITY CAMERA
TECHNOLOGY TELECOM JUNCTION BOX LEGEND
TYPE
FUNCTION
SYM
STYLE
F1
FLOOR
FLOOR BOX W/ AV TELECOM AND POWER
FS2
FLOOR
FLOOR CONDUIT STUB
PT2
FLOOR
FLOOR RECESS POKE-THRU W/ AV TELECOM AND POWER
PT10
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
PT11
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
C1
WALL
CAMERA PULL BOX
D11
WALL
DISPLAY BOX W/ AV TELECOM AND POWER
R9
WALL
OUTDOOR AV BOX W/ LIGHTING AV AND TELECOM
R13
WALL
OUTDOOR AV BOX W/ LIGHTING AV TELECOM AND POWER
R14
WALL
OUTDOOR AV BOX W/ AV TELECOM AND POWER
R15
WALL
OUTDOOR AV BOX W/ POWER
SP1
WALL
SCHEDULING PANEL
TP1
WALL
CONTROL PANEL
W2
WALL
AV IO PANEL
W9
WALL
AV IO PANEL
W10
WALL
AV IO PANEL
D21
CEILING
DISPLAY BOX W/ AV TELECOM AND POWER
J2
CEILING
CONDUIT CONSOLIDATION PULL BOX
TECHNOLOGY JUNCTION BOX LEGEND
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
6
PERMIT + OWNER
COMMENTS
2024-10-03
6
6
6
R15(N3,P3)
R9(N3,P3)
A.1
A.2
A.5
A.6
A.A
A.B
A.C
A.D
A.3
A.4
A.8
R13
R14(N3,P28)
R13
open office
open office
GL171
rack room
rack room
GL191
rr vestibule
rr vestibule
GL185
w's rr
w's rr
GL186
medium conference
medium conference
GL104
exec. office
exec. office
GL106
elevator lobby
elevator lobby
GL101
R13
R13
REFER TO SHEET LV2.30 FOR R13 LIGHTING
CONTROL BOX CONNECTIVITY (TYP OF 5)
R14(N3,P28)
R14(N3,P28)
R14(N3,P28)
open office
open office
GL172
w's rr
w's rr
GL188
w's dressing
w's dressing
GL187
lobby
lobby
GL170
stair 1 - n exit
stair 1 - n exit
GL141
private office
private office
GL148
open office - east
open office - east
GL103
entry lobby
entry lobby
GL100
private office
private office
GL105
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:46:01 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T2.30
TECHNOLOGY
INFRASTRUCTURE
FLOOR PLAN -
AMPHITHEATER -
GARDEN LEVEL +
LEVEL 1 STAGE
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
TYPE
FUNCTION
SYM
STYLE
N1
FLOOR
TELECOM OUTLET - FLOOR
N2
WALL
TELECOM OUTLET - DISPLAY
N3
WALL
N4
WALL
TELECOM OUTLET - STANDARD
N5
WALL
TELECOM OUTLET - WALL PHONE
N6
WALL
TELECOM OUTLET - ABOVE COUNTER
N7
WALL
TELECOM OUTLET - FURNITURE FEED FROM WALL
N8
WALL
TELECOM OUTLET - IN FURNITURE
N9
WALL
TELECOM OUTLET - IN RACEWAY
N11
WALL
TELECOM OUTLET - SECURITY CAMERA
N13
WALL
TELECOM OUTLET - UTILITY
N16
WALL
TELECOM OUTLET - SECURITY ACP
N20
CEILING
TELECOM OUTLET - CEILING DISPLAY
N22-1
CEILING
TELECOM OUTLET - AV DEVICE
N22-3
CEILING
TELECOM OUTLET - AV DEVICE
N23-1
CEILING
TELECOM OUTLET - WAP
N23-2
CEILING
TELECOM OUTLET - WAP
N23-3
CEILING
TELECOM OUTLET - WAP
N24-1
CEILING
TELECOM OUTLET - SECURITY CAMERA
N24-2
CEILING
TELECOM OUTLET - SECURITY CAMERA
N24-3
CEILING
TELECOM OUTLET - SECURITY CAMERA
TECHNOLOGY TELECOM JUNCTION BOX LEGEND
TYPE
FUNCTION
SYM
STYLE
F1
FLOOR
FLOOR BOX W/ AV TELECOM AND POWER
FS2
FLOOR
FLOOR CONDUIT STUB
PT2
FLOOR
FLOOR RECESS POKE-THRU W/ AV TELECOM AND POWER
PT10
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
PT11
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
C1
WALL
CAMERA PULL BOX
D11
WALL
DISPLAY BOX W/ AV TELECOM AND POWER
R9
WALL
OUTDOOR AV BOX W/ LIGHTING AV AND TELECOM
R13
WALL
OUTDOOR AV BOX W/ LIGHTING AV TELECOM AND POWER
R14
WALL
OUTDOOR AV BOX W/ AV TELECOM AND POWER
R15
WALL
OUTDOOR AV BOX W/ POWER
SP1
WALL
SCHEDULING PANEL
TP1
WALL
CONTROL PANEL
W2
WALL
AV IO PANEL
W9
WALL
AV IO PANEL
W10
WALL
AV IO PANEL
D21
CEILING
DISPLAY BOX W/ AV TELECOM AND POWER
J2
CEILING
CONDUIT CONSOLIDATION PULL BOX
TECHNOLOGY JUNCTION BOX LEGEND
1/8" = 1'-0"
T2.30
1
TECHNOLOGY INFRASTRUCTURE PLAN - AMPHITHEATER - GARDEN LEVEL
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
WAP
storage
storage
GL179
rehearsal room
rehearsal room
GL180
open office
open office
GL172
corridor
corridor
GL174
sto.
sto.
GL173
w's dressing
w's dressing
GL187
w's rr
w's rr
GL188
m's rr
m's rr
GL184
m's dressing
m's dressing
GL181
m's rr
m's rr
GL182
sto.
sto.
GL189
mechanical room
mechanical room
GL175
storage
storage
GL178
storage
storage
GL190
lobby
lobby
GL170
N24-1
N24-1
N23-1
stair 4 - exit
stair 4 - exit
GL176
8"x4" CABLE BASKET
8"x4" CABLE BASKET
8"x4" CABLE BASKET
8"x4" CABLE BASKET
8"x4" CABLE BASKET
(2) 4" CONDUIT TO LEVEL 1
FLOOR OF IDF C116
N24-2
N24-3
T4.02
4
rack room
rack room
GL191
w's rr
w's rr
GL186
rr vestibule
rr vestibule
GL185
elev. 4 - pass.-1
elev. 4 - pass.-1
E4-1
open office
open office
GL171
storage
storage
GL177
N23-1
sto.
sto.
GL183
TRANSITION TO EMT CONDUIT
council chambers
council chambers
184
a/v booth
a/v booth
185
executive sessions
room
executive sessions
room
177
lounge
lounge
178
north lobby /
corridor
north lobby /
corridor
180
rr 6
rr 6
181
rr 4 - ada
rr 4 - ada
183
jan./sto.
jan./sto.
C112
elec
elec
176
chamber access
chamber access
175
south corridor
south corridor
171
rr 2 - ada
rr 2 - ada
172
storage
storage
173
rr 1
rr 1
174
south lobby (main)
south lobby (main)
170
A
D21(N20,P20)
N24-3
N24-3
N24-3
N24-3
N23-3
N23-1
N23-1
N24-3
idf
idf
187
jan./sto.
jan./sto.
182
stair 4 - exit
stair 4 - exit
179
T7.03
4
N24-3
T4.02
3
(2) 4" PVC CONDUIT TO MDF LL108 & (1) 4" CONDUIT TO LL
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
2/4/2025 5:35:37 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T2.60
TECHNOLOGY
INFRASTRUCTURE
RCP - GARDEN LEVEL
+ LEVEL 1
COORDINATION
06 FEBRUARY 2025
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
1/8" = 1'-0"
T2.60
1
TECHNOLOGY INFRASTRUCTURE REFLECTED CEILING PLAN - COUNCIL - GARDEN LEVEL
1/8" = 1'-0"
T2.60
2
TECHNOLOGY INFRASTRUCTURE REFLECTED CEILING PLAN - COUNCIL - LEVEL 1
TYPE
FUNCTION
SYM
STYLE
N1
FLOOR
TELECOM OUTLET - FLOOR
N2
WALL
TELECOM OUTLET - DISPLAY
N3
WALL
N4
WALL
TELECOM OUTLET - STANDARD
N5
WALL
TELECOM OUTLET - WALL PHONE
N6
WALL
TELECOM OUTLET - ABOVE COUNTER
N7
WALL
TELECOM OUTLET - FURNITURE FEED FROM WALL
N8
WALL
TELECOM OUTLET - IN FURNITURE
N9
WALL
TELECOM OUTLET - IN RACEWAY
N11
WALL
TELECOM OUTLET - SECURITY CAMERA
N13
WALL
TELECOM OUTLET - UTILITY
N16
WALL
TELECOM OUTLET - SECURITY ACP
N20
CEILING
TELECOM OUTLET - CEILING DISPLAY
N22-1
CEILING
TELECOM OUTLET - AV DEVICE
N22-3
CEILING
TELECOM OUTLET - AV DEVICE
N23-1
CEILING
TELECOM OUTLET - WAP
N23-2
CEILING
TELECOM OUTLET - WAP
N23-3
CEILING
TELECOM OUTLET - WAP
N24-1
CEILING
TELECOM OUTLET - SECURITY CAMERA
N24-2
CEILING
TELECOM OUTLET - SECURITY CAMERA
N24-3
CEILING
TELECOM OUTLET - SECURITY CAMERA
TECHNOLOGY TELECOM JUNCTION BOX LEGEND
TYPE
FUNCTION
SYM
STYLE
F1
FLOOR
FLOOR BOX W/ AV TELECOM AND POWER
FS2
FLOOR
FLOOR CONDUIT STUB
PT2
FLOOR
FLOOR RECESS POKE-THRU W/ AV TELECOM AND POWER
PT10
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
PT11
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
C1
WALL
CAMERA PULL BOX
D11
WALL
DISPLAY BOX W/ AV TELECOM AND POWER
R9
WALL
OUTDOOR AV BOX W/ LIGHTING AV AND TELECOM
R13
WALL
OUTDOOR AV BOX W/ LIGHTING AV TELECOM AND POWER
R14
WALL
OUTDOOR AV BOX W/ AV TELECOM AND POWER
R15
WALL
OUTDOOR AV BOX W/ POWER
SP1
WALL
SCHEDULING PANEL
TP1
WALL
CONTROL PANEL
W2
WALL
AV IO PANEL
W9
WALL
AV IO PANEL
W10
WALL
AV IO PANEL
D21
CEILING
DISPLAY BOX W/ AV TELECOM AND POWER
J2
CEILING
CONDUIT CONSOLIDATION PULL BOX
TECHNOLOGY JUNCTION BOX LEGEND
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
7
OWNER COMMENT +
CONSTRUCTION
COORDINATION
2025-02-06
7
7
sheet number
project no.
date
phase
Construction
Documents
18 April 2024
115
WAP
SB
SB
J2
J2
A.1
A.2
A.5
A.6
A.A
A.B
A.C
A.D
A.3
A.4
A.8
N24-2
N24-3
N22-1
open office
open office
GL172
w's dressing
w's dressing
GL187
storage
storage
GL190
rack room
rack room
GL191
lobby
lobby
GL170
open office
open office
GL171
w's rr
w's rr
GL186
sto.
sto.
GL189
w's rr
w's rr
GL188
rr vestibule
rr vestibule
GL185
medium conference
medium conference
GL104
private office
private office
GL105
open office - east
open office - east
GL103
entry lobby
entry lobby
GL100
stair 1 - n exit
stair 1 - n exit
GL141
private office
private office
GL148
corridor
corridor
GL174
N23-1
N23-2
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:46:42 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T2.70
TECHNOLOGY
INFRASTRUCTURE
RCP -
AMPHITHEATER -
GARDEN LEVEL +
LEVEL 1 STAGE
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
TYPE
FUNCTION
SYM
STYLE
N1
FLOOR
TELECOM OUTLET - FLOOR
N2
WALL
TELECOM OUTLET - DISPLAY
N3
WALL
N4
WALL
TELECOM OUTLET - STANDARD
N5
WALL
TELECOM OUTLET - WALL PHONE
N6
WALL
TELECOM OUTLET - ABOVE COUNTER
N7
WALL
TELECOM OUTLET - FURNITURE FEED FROM WALL
N8
WALL
TELECOM OUTLET - IN FURNITURE
N9
WALL
TELECOM OUTLET - IN RACEWAY
N11
WALL
TELECOM OUTLET - SECURITY CAMERA
N13
WALL
TELECOM OUTLET - UTILITY
N16
WALL
TELECOM OUTLET - SECURITY ACP
N20
CEILING
TELECOM OUTLET - CEILING DISPLAY
N22-1
CEILING
TELECOM OUTLET - AV DEVICE
N22-3
CEILING
TELECOM OUTLET - AV DEVICE
N23-1
CEILING
TELECOM OUTLET - WAP
N23-2
CEILING
TELECOM OUTLET - WAP
N23-3
CEILING
TELECOM OUTLET - WAP
N24-1
CEILING
TELECOM OUTLET - SECURITY CAMERA
N24-2
CEILING
TELECOM OUTLET - SECURITY CAMERA
N24-3
CEILING
TELECOM OUTLET - SECURITY CAMERA
TYPE
FUNCTION
SYM
STYLE
F1
FLOOR
FLOOR BOX W/ AV TELECOM AND POWER
FS2
FLOOR
FLOOR CONDUIT STUB
PT2
FLOOR
FLOOR RECESS POKE-THRU W/ AV TELECOM AND POWER
PT10
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
PT11
FLOOR
FLOOR RECESS POKE-THRU W/ TELECOM AND POWER
C1
WALL
CAMERA PULL BOX
D11
WALL
DISPLAY BOX W/ AV TELECOM AND POWER
R9
WALL
OUTDOOR AV BOX W/ LIGHTING AV AND TELECOM
R13
WALL
OUTDOOR AV BOX W/ LIGHTING AV TELECOM AND POWER
R14
WALL
OUTDOOR AV BOX W/ AV TELECOM AND POWER
R15
WALL
OUTDOOR AV BOX W/ POWER
SP1
WALL
SCHEDULING PANEL
TP1
WALL
CONTROL PANEL
W2
WALL
AV IO PANEL
W9
WALL
AV IO PANEL
W10
WALL
AV IO PANEL
D21
CEILING
DISPLAY BOX W/ AV TELECOM AND POWER
J2
CEILING
CONDUIT CONSOLIDATION PULL BOX
TECHNOLOGY TELECOM JUNCTION BOX LEGEND
TECHNOLOGY JUNCTION BOX LEGEND
1/8" = 1'-0"
T2.70
1
TECHNOLOGY INFRASTRUCTURE REFLECTED CEILING PLAN - AMPHITHEATER - GARDEN LEVEL
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
4
date
phase
Construction
Documents
18 April 2024
DN
storage
storage
GL179
rehearsal room
rehearsal room
GL180
open office
open office
GL172
sto.
sto.
GL173
w's dressing
w's dressing
GL187
w's rr
w's rr
GL188
m's rr
m's rr
GL184
m's dressing
m's dressing
GL181
m's rr
m's rr
GL182
sto.
sto.
GL189
mechanical room
mechanical room
GL175
storage
storage
GL178
storage
storage
GL190
lobby
lobby
GL170
N7E
N7E
N8B
N8B
N24-1A
N24-1A
N23-1A
stair 4 - exit
stair 4 - exit
GL176
N24-2A
N8B
N8B
N11A
N24-3A
N13B
N13B
N6B
N3N
rack room
rack room
GL191
T4.02
4
storage
storage
GL177
w's rr
w's rr
GL186
open office
open office
GL171
elev. 4 - pass.
elev. 4 - pass.
E4
corridor
corridor
GL174
rr vestibule
rr vestibule
GL185
N3K
N3K
N23-1A
N8E
N4B
N11A
N3M
council chambers
council chambers
184
a/v booth
a/v booth
185
executive sessions
room
executive sessions
room
177
lounge
lounge
178
north lobby /
corridor
north lobby /
corridor
180
rr 6
rr 6
181
rr 4 - ada
rr 4 - ada
183
jan./sto.
jan./sto.
C112
elec
elec
176
chamber access
chamber access
175
south corridor
south corridor
171
rr 2 - ada
rr 2 - ada
172
storage
storage
173
rr 1
rr 1
174
south lobby (main)
south lobby (main)
170
N2B
N1C
N2B
N24-3A
N24-3A
N24-3A
N24-3A
N23-3A
N23-1A
N23-1A
N24-3A
idf
idf
187
jan./sto.
jan./sto.
182
stair 4 - exit
stair 4 - exit
179
N2B
N2B
N4B
N4B
N4B
N4B
N4B
N24-3A
N1C
N8B
N8B
N8B
N8B
N8B
N8B
N8B
N8B
N8B
N8B
N8B
N8B
N8B
T4.02
3
N8B
N8B
N11A
N4C
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
10/3/2024 5:41:20 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T3.20
TELECOM PLAN -
GARDEN LEVEL +
LEVEL 1
PERMIT + OWNER
COMMENTS
03 October 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
1/8" = 1'-0"
T3.20
1
TELECOM PLAN - COUNCIL - GARDEN LEVEL
1/8" = 1'-0"
T3.20
2
TELECOM PLAN - COUNCIL - LEVEL 1
TELECOM CABLING LEGEND
TYPE
CAT6
CAT6A
FIBER
COAX
REFERENCE
DETAIL
NOTES
A
1
0
0
3/T9.01
-
B
2
0
0
3/T9.01
-
C
4
0
0
3/T9.01
-
E
0
0
0
3/T9.01
PASS-THRU
G
0
2
0
3/T9.01
-
J
0
0
0
3/T9.01
FUTURE (PULLSTRING ONLY)
K
2
4
0
3/T9.01
CAT-6 TO NEAREST IDF, CAT6A TO
FOH BOX, HD-SDI TO FOH BOX
L
2
4
0
3/T9.01
CAT-6 TO NEAREST IDF, CAT6A TO
CG04, HD-SDI FROM STAGE BOXES
M
2
0
0
TO LC1 LIGHTING RACK IN CG04
N
4
0
0
TO LC1 LIGHTING RACK IN CG04
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
6
PERMIT + OWNER
COMMENTS
2024-10-03
6
6
6
N3N
A.1
A.2
A.5
A.6
A.A
A.B
A.C
A.D
A.3
A.4
A.8
N3M
N3L
N3K
w's rr
w's rr
GL186
rr vestibule
rr vestibule
GL185
rack room
rack room
GL191
open office
open office
GL171
medium conference
medium conference
GL104
lobby
lobby
GL170
N3M
N3N
N3N
N3K
N3K
N3K
stair 1 - n exit
stair 1 - n exit
GL141
private office
private office
GL148
entry lobby
entry lobby
GL100
private office
private office
GL105
open office - east
open office - east
GL103
open office
open office
GL172
w's dressing
w's dressing
GL187
w's rr
w's rr
GL188
exec. office
exec. office
GL106
N23-2G
N11z
4
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:47:18 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T3.30
TELECOM PLAN -
AMPHITHEATER -
GARDEN LEVEL +
LEVEL 1 STAGE
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
TELECOM CABLING LEGEND
TYPE
CAT6
CAT6A
FIBER
COAX
REFERENCE
DETAIL
NOTES
A
1
0
0
3/T9.01
-
B
2
0
0
3/T9.01
-
C
4
0
0
3/T9.01
-
E
0
0
0
3/T9.01
PASS-THRU
G
0
2
0
3/T9.01
-
J
0
0
0
3/T9.01
FUTURE (PULLSTRING ONLY)
K
2
4
0
3/T9.01
CAT-6 TO NEAREST IDF, CAT6A TO
FOH BOX, HD-SDI TO FOH BOX
L
2
4
0
3/T9.01
CAT-6 TO NEAREST IDF, CAT6A TO
CG04, HD-SDI FROM STAGE BOXES
M
2
0
0
TO LC1 LIGHTING RACK IN CG04
N
4
0
0
TO LC1 LIGHTING RACK IN CG04
1/8" = 1'-0"
T3.30
1
TELECOM PLAN - AMPHITHEATER - GARDEN LEVEL
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
date
phase
Construction
Documents
18 April 2024
EXISTING MDF ROOM
(5) 4" ENTRANCE CONDUITS
P17
P17
P17
P17
TELECOM GROUNDING
BUSBAR
6" W VERRTICAL CABLE
MANAGER (TYP.)
N16B
P16
2 POST EQUIPMENT RACK (TYP.)
SECURITY ACP
3/4 FIRE RATED PLYWOOD BACKBOARD
SHEETS MOUNTED VERTICALLY @24"
AFF (TYP.)
18" W CABLE
RUNWAY @91" AFF
(TYP.)
P8
P8
FRONT
RACK-1
FRONT
RACK-2
T4.01
5
P17
P17
P17
P17
P16
P8
P8
37"
40"
40"
TELECOM GROUNDING
BUSBAR
(4) 4" CONDUITS FROM
BASEMENT LEVEL
ELECTRICAL PANEL
(PROVIDED BY OTHERS)
SECURITY ACP
18" W CABLE RUNWAY
@ 91" AFF (TYP.)
6" W VERTICAL
CABLE MANAGER (TYP.)
2 POST EQUIPMENT
RACK (TYP.)
N16B
(4) 4" CONDUITS TO
LEVEL 01 IDF 153
(4) 4" EZ PATH
3/4" FIRE RATED PLYWOOD
BACKBOARD SHEETS MOUNTED
VERTICALLY @ 24" AFF (TYP.)
FRONT
RACK-1
FRONT
RACK-2
18" W VERTICAL CABLE
RUNWAY (TYP.)
18" W VERTICAL CABLE
RUNWAY (TYP.)
T4.01
6
P17
P17
P17
P17
N16B
P16
P8
P8
(4) 4" CONDUITS FROM
IDF 153 &
(4) 4" CONDUITS TO
IDF 253
ELECTRICAL PANEL
(PROVIDED BY OTHERS)
(4) 4" EZ PATH
18" W CABLE RUNWAY
@ 91" AFF (TYP.)
2 POST EQUIPMENT
RACK (TYP.)
6" W VERTICAL CABLE
MANAGER (TYP.)
(2) 4" CONDUITS
SECURITY ACP
TELECOM GROUNDING
BUSBAR
3/4" FIRE RATED PLYWOOD
BACKBOARD SHEETS MOUNTED
VERTICALLY @ 24" AFF (TYP.)
RACK-1
FRONT
RACK-2
FRONT
37"
47"
18" W VERTICAL CABLE
RUNWAY (TYP.)
T4.01
7
P17
P17
P17
P17
N16B
P16
P8
P8
ELECTRICAL PANEL
(PROVIDED BY OTHERS)
(4) 4" CONDUITS FROM
IDF 153 &
(4) 4" CONDUITS TO
IDF 353
(4) 4" EZ PATH
(2) 4" CONDUITS
TELECOM GROUNDING
BUSBAR
SECURITY ACP
18" W CABLE RUNWAY
@ 91" AFF (TYP.)
6" W VERTICAL CABLE
MANAGER (TYP.)
2 POST EQUIPMENT
RACK (TYP.)
3/4" FIRE RATED PLYWOOD
BACKBOARD SHEETS MOUNTED
VERTICALLY @ 24" AFF (TYP.)
RACK-1
FRONT
RACK-2
FRONT
37"
18" W VERTICAL CABLE
RUNWAY (TYP.)
T4.01
8
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:47:29 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T4.01
TELECOM ENLARGED
PLANS AND
ELEVATIONS
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
1/2" = 1'-0"
T4.01
1
MDF LL108
1/2" = 1'-0"
T4.01
2
IDF GL153
1/2" = 1'-0"
T4.01
3
IDF 153
1/2" = 1'-0"
T4.01
4
IDF 253
3/4" = 1'-0"
T4.01
5
MDF - LL108 RACK ELEVATION
3/4" = 1'-0"
T4.01
6
IDF - GL153 RACK ELEVATION
3/4" = 1'-0"
T4.01
7
IDF - 153 RACK ELEVATION
3/4" = 1'-0"
T4.01
8
IDF - 253 RACK ELEVATION
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
(4) 4" CONDUITS
FROM IDF 253 &
(4) 4" CONDUITS
TO IDF 453
ELECTRICAL PANEL
(PROVIDED BY OTHERS)
(4) 4" EZ PATH
(2) 4" CONDUITS
TELECOM GROUNDING
BUSBAR
SECURITY ACP
18" W CABLE RUNWAY
@ 91" AFF (TYP.)
6" W VERTICAL CABLE
MANAGER (TYP.)
2 POST EQUIPMENT
RACK (TYP.)
3/4" FIRE RATED PLYWOOD
BACKBOARD SHEETS MOUNTED
VERTICALLY @ 24" AFF (TYP.)
RACK-1
FRONT
RACK-2
FRONT
P17
P17
P17
N16B
P16
P8
P8
18" W VERTICAL CABLE
RUNWAY (TYP.)
T4.02
5
ELECTRICAL PANEL
(PROVIDED BY OTHERS)
(4) 4" CONDUITS FROM
IDF 353
(4) 4" EZ PATH
(2) 4" CONDUITS
TELECOM GROUNDING
BUSBAR
SECURITY ACP
18" W CABLE RUNWAY
@ 91" AFF (TYP.)
6" W VERTICAL CABLE
MANAGER (TYP.)
2 POST EQUIPMENT
RACK (TYP.)
3/4" FIRE RATED PLYWOOD
BACKBOARD SHEETS MOUNTED
VERTICALLY @ 24" AFF (TYP.)
RACK-1
FRONT
RACK-2
FRONT
P17
P17
P17
N16B
P16
P8
P8
18" W VERTICAL CABLE
RUNWAY (TYP.)
T4.02
6
P17
P17
P17
P16
N16B
P8
P8
GROUNDING BUS BAR
SECURITY ACP
(1) 4" CONDUIT TO
CABLE BASKET ON
GARDEN LEVEL
(2) 4" CONDUITS FROM
MDF LL108
3/4" FIRE RATED PLYWOOD
BACKBOARD SHEETS
MOUNTED VERTICALLY @
24" AFF (TYP.)
2 POST EQUIPMENT
RACK (TYP.)
6" W VERTICAL CABLE
MANAGER (TYP.)
T4.02
7
RACK-1
FRONT
RACK-2
FRONT
18" W VERTICAL
CABLE
RUNWAY (TYP.)
LIGHTING CONTROL RACK.
REFER TO LIGHTING
SYSTEMS PLANS
P4
LC1
N9
P6
P6
P6
P6
P6
P6
P6
P6
RACK-1
RACK-2
48 PORT PATCH PANEL
TEST
P8
P8
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:47:34 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T4.02
TELECOM ENLARGED
PLANS AND
ELEVATIONS
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
1/2" = 1'-0"
T4.02
1
IDF 353
1/2" = 1'-0"
T4.02
2
IDF 453
1/2" = 1'-0"
T4.02
3
IDF 187
1/2" = 1'-0"
T4.02
4
RACK ROOM GL191
3/4" = 1'-0"
T4.02
5
IDF - 353 RACK ELEVATION
3/4" = 1'-0"
T4.02
6
IDF - 453 RACK ELEVATIONS
3/4" = 1'-0"
T4.02
7
IDF 187 - RACK ELEVATION
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
FLOOR
CEILING
STRUCTURE
STRUCTURE
CEILING
GROUND
A
A
A
A
N
A
N
A
N
A
N
A
N
A
AMPITHEATER
RACK ROOM
FLOOR
CEILING
STRUCTURE
STRUCTURE
CEILING
GROUND
A
A
A
A
A
N
A
A
N
A
N
A
N
A
LOUDSPEAKER PULL
BOX
NOTES:
1.
JUNCTION BOXES THAT ARE SHARED BY AV AND TELECOM, REFER TO AUDIOVISUAL INFRASTRUCTURE ROOM RISERS FOR ASSOCIATED CONDUIT SIZE AND PATHWAY REQUIREMENTS.
J2
J2
LOUDSPEAKER PULL
BOX
W10
FROM R13 & R14
IN AMPITHEATER
R13 FSR
LEFT REAR
WALL BOX
R13 FSR
LEFT FRONT
WALL BOX
TO IDF
(2)" 1-1/2" C TO
RACK ROOM
TO IDF
R13 FSR
RIGHT REAR
WALL BOX
(2)" 1-1/2" C TO
RACK ROOM
TO IDF
R13 FSR
RIGHT FRONT
WALL BOX
(2)" 1-1/2" C TO
RACK ROOM
TO IDF (1) 1-1/4" CONDUIT
FOH
R9 QWB-X3
FSR WALL BOX
(2)" 1-1/2" CONDUIT TO
RACK ROOM
TO IDF (2) 1-1/4" CONDUIT
(2) 1-1/4" CONDUIT
FROM EACH R13
(1) 2" C
(1)2" C
(2) 1=1/2" C
R14(N3,(4)P3)
FRONT OF HOUSE
POWER BOX
(2)" 1-1/2" C TO
RACK ROOM
TO IDF (1) 1-1/4" CONDUIT
ALL VERTICAL CONDUIT TO BE INSTALLED INSIDE COLUMNS
(1) 1-1/4" C
(1) 1-1/4" C
(1) 1" C
(1) 1" C
(1) 1" C
(1) 1" C
(2) 1-1/4" C
(1) 1-1/4" C
AV WALL BOX
(FLAT PANEL DISPLAY)
D11(N2,P2)
AV/TELECOM
FLOOR BOX
PT2(N1,P1)
CONTROL
PANEL
SCHEDULING
PANEL
VIDEO DISPLAY
TP1
SP1
D21(N20,P20)
W2
AV I/O PLATE
CAMERA
C1
W3
AV / TELECOM
FLOOR BOX
NOTES:
1.
REFER TO TELECOM TYPICAL CONDUIT RISER.
F1(N1,P1)
W1
AV I/O PLATE
(1) 1" C
AV I/O PLATE
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:47:35 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T5.01
AUDIOVISUAL
INFRASTRUCTURE
ROOM RISERS
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
3/4" = 1'-0"
T5.01
2
TELECOM TYPICAL CONDUIT RISER
3/4" = 1'-0"
T5.01
1
AUDIOVISUAL TYPICAL CONDUIT RISER
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
MDF LL108
IDF 453
IDF 353
5
5
5
6
6
1
1
7
7
7
2
7
6
5
DESIGNATION
CABLE TYPE
CABLE CONFIGURATION
1
2
4
5
6
7
(48) FOSM + (24) FOMM, MDF TO IDF
25 - PAIR CAT. 3 COPPER, MDF TO IDF
1.
RE-USE EXISTING ENTRANCE PROTECTION. VERIFY DETAILS WITH OWNER IN THE FIELD.
1.
ALL CABLE BASKET AND CONDUIT FOR TELECOM SHALL BE FURNISHED AND INSTALLED BY DIVISION 26.
2.
TELECOM BONDING BACKBONE (TBB) CONDUCTORS SHALL BE AS SIZED BY THE ELECTRICAL ENGINEER AND SHALL BE FURNISHED AND INSTALLED BY
DIVISION 26.
3.
6 AWG TBB CONDUCTORS SHALL BE FURNISHED AND INSTALLED BY DIVISION 27. INDIVIDUAL "HOME" RUNS SHALL BE MADE FROM THE TMGB/TGB TO EACH
OPEN FRAME EQUIPMENT RACK. RACKS SHALL NOT BE DAISY CHAINED.
4.
CABLE RUNWAY WITHIN MDF AND TELECOM ROOM SPACES SHALL BE FURNISHED AND INSTALL BY DIVISION 27. 6 AWG GROUND CONDUCTORS SHALL BE
FURNISHED AND INSTALLED BY DIVISION 27. EACH CABLE RUNWAY ASSEMBLY SHALL HAVE A MINIMUM OF ONE "HOME" RUN BACK TO THE TGB. ALL
CONTIGUOUS CABLE RUNWAY SEGMENTS SHALL BE BONDED TOGETHER USING 6 AWG STRAPS AND GROUNDED ACCORDING TO SPECIFICATIONS.
COPPER
OPTICAL
FIBER SERVICE ENTRANCE (NOT IN CONTRACT)
UNPROTECTED COPPER, SERVICE ENTRANCE (NOT IN CONTRACT)
OPTICAL
COPPER
6 AWG STRANDED GROUND CONDUCTOR BY DIVISION 27 (WITHIN MDF AND TELE/DATA SPACES)
TELECOM BONDING BACKBONE (TBB) INCLUDING ASSOCIATED PATHWAYS BY DIVISION 26
COPPER
COPPER
3
COPPER
## - PAIR CAT. 3 COPPER, PRIMARY PROTECTION TO 110 CROSSCONNECT
4
6
7
5
5
5
4
6
7
5
5
5
7
6
3
4
(4) 4" EMT
CONDUITS
(4) 4" EMT
CONDUITS
BUILDING RISER CABLE SCHEDULE
BUILDING RISER GENERAL NOTES
BUILDING RISER CODED NOTES
8
4
INCOMING SERVICES
(TBD)
06 LEVEL 04
07 ROOF/LEVEL 05
05 LEVEL 03
01 BASEMENT
06 LEVEL 04
07 ROOF/LEVEL 05
05 LEVEL 03
01 BASEMENT
1
OPTICAL
OPTICAL
OPTICAL
COPPER
OPTICAL
COPPER
TGB
TMGB
COPPER
TGB
110
(1) 2" EMT CONDUIT CAPPED
IDF 253
7
6
4
6
7
5
5
5
(4) 4" EMT
CONDUITS
04 LEVEL 02
04 LEVEL 02
OPTICAL
COPPER
TGB
IDF 153
7
6
4
6
7
5
5
5
(4) 4" EMT
CONDUITS
03 LEVEL 01
03 LEVEL 01
OPTICAL
COPPER
TGB
IDF GL153
7
6
4
6
7
5
5
5
(4) 4" EMT
CONDUITS
02 GARDEN LEVEL
02 GARDEN LEVEL
OPTICAL
COPPER
TGB
4
OSP RATED CABLES
(1) 4" TO CABLE BASKET AT GARDEN LEVEL.
TGB
5
5
4
5
COPPER
7
OPTICAL
6
7
7
7
6
6
6
IDF 187
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:47:36 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T6.01
TELECOM BUILDING
RISER
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
1/4" = 1'-0"
T6.01
1
TELECOM BUILDING RISER
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
FLOOR
CEILING
STRUCTURE
STRUCTURE
CEILING
GROUND
N
N
N
N
A
N
N
A
N
A
A
N
N
N
N
FLOOR
CEILING
STRUCTURE
STRUCTURE
CEILING
GROUND
N
N
A
N
N
N
N
N
N
N
N
N
N
A
N
A
N
A
(1) 1-1/4" C
(1) 1" C
(1) 1-1/4" C
(1) 1" C
N2
AV WALL BOX
(FLAT PANEL DISPLAY)
(1) 1" C
SECURITY CAMERA
(1) 1-1/4" C
D11(N2,P2)
(1) 1-1/4" C
(1) 1-1/4" C
N11
N4
STANDARD
WALL PHONE
ABOVE COUNTER
N6
N5
AV / TELECOM
FLOOR BOX
N1
F1(N1,P1)
TELECOM
POKE THRU
PT10(N1,P1)
N1
FS2
FLOOR FEED
INDIVIDUAL CONDUITS
TO NEAREST TELECOM
CABLE BASKET
(1) 1-1/4" C
AV / TELECOM
POKE THRU
N1
PT2(N1,P1)
(1) 1-1/4" C
N7
WALL FEED
(SYSTEM FURNITURE)
(1) 1-1/4" C
N8
IN FURNITURE
(1) 1-1/4" C
N13
UTILITY
(1) 1-1/4" C
SECURITY
ACP
N16
AV WALL BOX
R9(N3,NONE)
R13(N3,P3)
AV WALL BOX
R14(N3,(4)P3)
AV WALL BOX
(1) 1-1/4" C
(1) 1-1/4" C
(1) 1-1/4" C
(1) 1" C
(1) 1" C
(1) 1" C
N23-1
N24-2
SECURITY CAMERA
WAP
N20
VIDEO PROJECTOR
D21(N20,P20)
INDIVIDUAL CONDUITS
TO NEAREST TELECOM
CABLE BASKET
NOTES:
1.
JUNCTION BOXES THAT ARE SHARED BY AV AND TELECOM, REFER TO AUDIOVISUAL INFRASTRUCTURE ROOM RISERS FOR ASSOCIATED CONDUIT SIZE AND PATHWAY REQUIREMENTS.
(1) 1" C
N23-2
WAP
(1) 1" C
N23-3
WAP
(1) 1" C
N24-3
SECURITY CAMERA
(1) 1" C
N24-1
SECURITY CAMERA
(1) 1-1/4" C
TELECOM
POKE THRU
PT11(N1,P1)
N1
N3
N3
N3
(1) 1" C
IN RACEWAY
N9
(1) 1-1/4" C
AV / TELECOM
POKE THRU
N1
PT10(N1,P1)
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
10/3/2024 5:41:21 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T6.02
TYPICAL TELECOM
RISER
PERMIT + OWNER
COMMENTS
03 October 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
6
PERMIT + OWNER
COMMENTS
2024-10-03
3/4" = 1'-0"
T6.02
1
TELECOM TYPICAL CONDUIT RISER
6
16 1/8"
15 1/8"
11 5/16"
KO TRADE SIZE
4
1"
LOCATION
FRONT & BACK
QTY.
1", 2"
BOTTOM
2
KNOCKOUT CHART
1"
4
BOTTOM
3/4", 1-1/4"
6
SIDES
KNOCKOUT
PLATE
DISPOSABLE COVER
SHOWN IN PHANTOM
EFB6-MB
MOUNTING BRACKET
EFB6-MB
MOUNTING BRACKET
4 1/16"
AV
KNOCKOUT
PLATE
KNOCKOUT
PLATE
1 GANG
1 GANG
1 GANG
1 GANG
1 GANG
1 GANG
AV
AV
AV
POWER
TELECOM
DIVIDER
NOTES:
1. KNOCKOUT PLATES SHOWN COME WITH THE BOX. ADDITIONAL KNOCKOUT PLATES SHALL BE ORDERED
AS NECESSARY TO MEET THE CONDUIT REQUIREMENTS FROM THE AUDIOVISUAL INFRASTRUCTURE
ROOM RISERS AND THE TELECOM TYPICAL CONDUIT RISER.
2. (2) EFB6-MB MOUNTING BRACKETS COME WITH THE BOX.
7 1/4"
AV
(1) 575CHA
(1) 1PTHA
(1) 5PTHA
16 1/4"
POWER
TELECOM
INCLUDED COMPONENTS:
(1) 5PTHA 1/2-GANG PASS-THROUGH HOUSING
(1) 1PTHA 1-GANG PASS-THROUGH HOUSING ASSEMBLY
(1) 575CHA 1/2-GANG 3/4" CONDUIT HOUSING ASSEMBLY
NOTES:
1. NO DEVICE PLATES ARE INCLUDED WITH THE POKE-THRU. DEVICE PLATES SHALL BE ORDERED AS NECESSARY TO MEET
THE TOP CONFIGURATION REQUIREMENTS.
2. BOTTOM FEED MOUNT ASSEMBLIES SHOWN ARE INCLUDED. ADDITIONAL BOTTOM FEED MOUNT ASSEMBLIES SHALL BE
ORDERED TO MEET THE CONDUIT REQUIREMENTS FROM THE AUDIOVISUAL INFRASTRUCTURE ROOM RISERS AND THE
TELECOM TYPICAL CONDUIT RISER.
TOP CONFIGURATION
682A
68MAAP
682A-PT
6AAP
6MAAP2A
6S1
6ACT8A
6MAAP
6" POKE-THRU DEVICES
10 1/4"
15 3/8"
14 1/4"
3 15/16"
AV
KO'S
POWER
J-BOX [P2]
TELECOM
J-BOX [N2]
AV
KO'S
KO TRADE SIZE
LOCATION
QTY.
1/2", 1", 1-1/4"
1
RIGHT SIDE
KNOCKOUT CHART
1/2", 1", 1-1/4"
8
TOP & BOTTOM
9"
POWER J-BOX
KO
TELECOM J-BOX
KO
1/2", 1", 1-1/4"
2
LEFT SIDE
CHIEF PAC525FC FLANGE
(VERIFY COLOR WITH ARCHITECT)
CHIEF PAC525FC COVER
(VERIFY COLOR WITH ARCHITECT)
CHIEF PAC525FC ASSY.
[D11(N2,P2)]
POWER J-BOX [P2]
AV KO'S
TELECOM J-BOX [N2]
STEEL OR WOOD STUDS
STEEL OR WOOD BACKING, SIZED PER
THE DISPLAY TYPE LEGEND AND TO
SUPPORT THE WEIGHT SHOWN WITH A x5
SAFETY FACTOR. THE BACKING SHALL
SPAN A MINIMUM OF 3 STUD CAVITIES.
NOTES:
1. BACKING CENTERED AT LOCATION OF FLAT PANEL DISPLAY.
2. ALWAYS SPAN BETWEEN AT LEAST THREE STUD CAVITIES.
3. SEE PARTITION TYPES FOR STUD SIZE AND MATERIAL.
4. VERIFY LOCATIONS OF BACKING WITH PLANS & ROOM ELEVATIONS.
5. FLAT PANEL DISPLAYS AND MOUNTING BRACKETS BY AV CONTRACTOR.
10.28
7.60
3.83
OPENING
2.43
OPENING
1.24
4.21
4.21
5.53
12.00
10.03
14.50
12.50
1.97
.09
13.50
.50
.50
1.11
1.11
1.25
1.25
1.24
1.24
12.25
1.12
1.13
8.50
2.00
2.00
(4) .31 DIA
DIVIDER HOLDER
GANG MOUNTING BRACKET
5.45
TYP
1.87 TYP
5.87 TYP
.71 TYP
2.17
TYP
45° TYP
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:48:09 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T8.01
TECHNOLOGY
INFRASTRUCTURE
DETAILS
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
3" = 1'-0"
T8.01
1
WIREMOLD EFB6S / EFB6S-OG 6-GANG FLOOR BOX
2" = 1'-0"
T8.01
2
WIREMOLD-LEGRAND 6AT (6ATC2 / 6AT2) 6" POKE-THRU
1 1/2" = 1'-0"
T8.01
3
CHIEF PAC525FC FLAT PANEL DISPLAY WALL BOX
1" = 1'-0"
T8.01
4
WALL BOX - CHIEF PAC525FC BACKING
3" = 1'-0"
T8.01
5
FSR OWB-500P-FM
1/2" = 1'-0"
T8.01
6
OWB-X3-FM-XLR
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
2
4
5
3
1
QTY.
1
2
2
4
4
DESCRIPTION
GROUND BAR
WALL MOUNTING BRACKET
INSULATOR
5/8-11 x 1" HHCS
LOCK WASHER
ITEM
1
2
3
4
5
16"
16"
18"
FOOTER
FINISHED FLOOR
TELECOM OUTLET J-BOX [N4]
4-11/16" W x 4-11/16" H x 2-1/8" D SQUARE BOX
RACO 259 W/SINGLE DEVICE COVER (OR EQUAL)
SINGLE DUPLEX POWER
RECEPTACLE - MOUNTED ON
OPPOSITE SIDE OF STUD FROM
TELECOM OUTLET
CONDUIT TO NEAREST
CABLE BASKET
NOTES:
1. LOCATE POWER RECEPTACLE ON SIDE OF STUD CLOSEST TO ROOM ENTRANCE.
2. POWER RECEPTACLE TO BE LOCATED WITHIN 36" OF THE TELECOM WALL OUTLET.
3. SEE THE "TELECOM TYPICAL CONDUIT RISER" #/T### FOR CONDUIT REQUIREMENTS
BY TELECOM JUNCTION BOX TYPE.
TYPE-A (N#)
TYPE-A
TYPE-B
TYPE-C
TYPE-D
NOTES:
1. CONTRACTOR MUST PROVIDE THE NECESSARY SPECIALTY TERMINATION PLATES AND / OR
ADAPTERS FOR FLOOR BOXES, POKE-THRUS, SPECIALTY BOXES. REFER TO TECHNOLOGY
LEGEND NOTES, DETAILS, AND MANUFACTURER FOR MORE INFORMATION.
TYPE-E
CONDUIT
BUSHING (TYP)
CABLE BASKET
CANTILEVER BRACKET
AS REQUIRED
LINER FOR OPEN
CEILING AREAS
3/8" THREADED ROD
HANGER
6" (TYP.)
CABLE BASKET
SEE DETAIL 4/T9.01
ACCESSIBLE
CEILING
FIRESTOP ASSEMBLY
SEE DETAIL 6/T9.01
SECTION A-A
(5) EZD44S PATHWAYS
EZP544W
MULTI-GANG PLATE
A
A
24"
1"~ 3"
6"~ 12"
FIRE SEAL BY CONDUIT INSTALLER
APPROVED RISER RATED CABLE
EMT CONDUIT WITH BUSHED ENDS
FIRE SEAL BY CONDUIT INSTALLER
7 1/4"
TOP CONFIGURATION
TELECOM
(1) 575CHA
(1) 1PTHA
(1) 5PTHA
16 1/4"
POWER
POWER
INCLUDED COMPONENTS:
(2) 68REC 20A DUPLEX RECEPTACLES
(1) 5PTHA 1/2-GANG PASS-THROUGH HOUSING
(1) 1PTHA 1-GANG PASS-THROUGH HOUSING ASSEMBLY
(1) 575CHA 1/2-GANG 3/4" CONDUIT HOUSING ASSEMBLY
NOTES:
1. NO DEVICE PLATES ARE INCLUDED WITH THE POKE-THRU. DEVICE PLATES SHALL BE ORDERED AS NECESSARY TO MEET
THE TOP CONFIGURATION REQUIREMENTS.
2. BOTTOM FEED MOUNT ASSEMBLIES SHOWN ARE INCLUDED. ADDITIONAL BOTTOM FEED MOUNT ASSEMBLIES SHALL BE
ORDERED TO MEET THE CONDUIT REQUIREMENTS FROM THE AUDIOVISUAL INFRASTRUCTURE ROOM RISERS AND THE
TELECOM TYPICAL CONDUIT RISER.
682A
68MAAP
682A-PT
6AAP
6MAAP2A
6S1
6ACT8A
6MAAP
6" POKE-THRU DEVICES
EXTERIOR
PIPE FLASHING
ROOF
TELECOM
PULL BOX [N#]
SCHEDULE 40
GALVANIZED 90° ELBOW
SCHEDULE 40
GALVANIZED 1" PIPE
WEATHERHEAD MAST
EMT CONDUIT STUBBED
WITHIN 48" OF NEAREST
CABLE BASKET
ACCESSIBLE
CEILING
FLOOR / CEILING
DECK
CONDUIT
CAT6 DIRECT CONNECT
ADAPTOR PIGTAIL
CAT6
CABLE
CAT6 DIRECT CONNECT
ADAPTOR
AV • IT • SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
9.30.2025
d
e
n
g
i
S
e
t
a
D
A
.
S
.
U
.
A
N
O
Z
I
R
A
.
.
.
.
.
.
.
.
.
.
.
.
.
O
N
E
T
A
C
I
F
I
T
R
E
C
H
C
R
A
D
E
R
E
T
S
I
G
E
R
JACOBS
MICHAEL E
32961
expiration:
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
revisions
C22-0658
GLENDALE AVE. & 59TH AVE.
7/12/2024 2:48:10 PM
BIM 360://115_Glendale/3740 -
115_Glendale - Tech.rvt
T9.01
TELECOM DETAILS
PERMIT + OWNER
COMMENTS
11 July 2024
5850 W GLENDALE AVE., GLENDALE, AZ 85301
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
4" = 1'-0"
T9.01
1
GROUNDING BUSBAR
1" = 1'-0"
T9.01
2
TELECOM OUTLET LOCATION WITH SINGLE DUPLEX POWER RECEPTACLE
6" = 1'-0"
T9.01
3
TELECOM FACEPLATES
1" = 1'-0"
T9.01
4
SUPPORT - SINGLE CABLE BASKET
1/2" = 1'-0"
T9.01
5
THRU WALL SECTION (CABLE BASKET / CABLE BASKET)
2" = 1'-0"
T9.01
6
STI EZP544W - SERIES 44 THRU WALL FIRESTOP ASSEMBLY
2" = 1'-0"
T9.01
7
CONDUIT SLEEVE SECTION - THRU FLOOR SLAB
2" = 1'-0"
T9.01
8
WIREMOLD-LEGRAND 6AT (6ATC2P / 6AT2P) 6" POKE-THRU
1" = 1'-0"
T9.01
9
TERMINATION BLOCK - 50 PAIR 110 TYPE
2" = 1'-0"
T9.01
10
CONDUIT ROOF PENETRATION
1" = 1'-0"
T9.01
11
WIRELESS ACCESS POINT DIRECT CONNECT
No.
Description
Date
4
PERMIT + OWNER
COMMENTS
2024-07-11
4
date
phase
Construction
Documents
18 April 2024
CITY OF GLENDALE
DRAWING INDEX
AUDIOVISUAL SYSTEMS DRAWINGS
AUDIOVISUAL REFERENCE DRAWINGS
NUMBER
DESCRIPTION
NUMBER
DESCRIPTION
AVS.00
AUDIOVISUAL SYSTEMS COVER SHEET
TO.O1
TECHNOLOGY INFRASTRUCTURE LEGENDS AND NOTES
AVS.01
TO.O2
TECHNOLOGY INFRASTRUCTURE LEGENDS AND NOTES
AVS.02
T2.20
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN GARDEN LEVEL + LEVEL 1
T2.30
TECHNOLOGY INFRASTRUCTURE FLOOR PLAN AMPHITHEATER GARDEN LEVEL + LEVEL 1 STAGE
T2.60
TECHNOLOGY INFRASTRUCTURE RCP GARDEN LEVEL + LEVEL 1
T2.70
TECHNOLOGY INFRASTRUCTURE RCP AMPHITHEATER GARDEN LEVEL + LEVEL 1 STAGE
T4.02
TELECOM ENLARGED PLANS AND ELEVATIONS
T5.01
AUDIOVISUAL INFRASTRUCTURE ROOM RISERS
T8.01
TECHNOLOGY INFRASTRUCTURE DETAILS
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
5850 W GLENDALE AVE, GLENDALE, AZ 85301
revisions
No.
Description
Date
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
C22-0658
GLENDALE AVE. & 59TH AVE.
AV• IT• SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
CONTRACTOR RESPONSIBILITY MATRIX
ITEM / TASK
FURNISH
INSTALL
CONDUIT, WALL BOXES, CEILING BOXES, FLOOR BOXES, AND OTHER CABLE PATHWAYS REQUIRED TO SUPPORT AV SYSTEMS.
OT
OT
PROJECTION SCREENS - CASE
OT
OT
PROJECTION SCREENS - ROLLER/FABRIC
OT
OT
IN-WALL BLOCKING, CEILING SUPPORT STRUCTURE, AND OTHER STRUCTURAL SUPPORT FOR AV EQUIPMENT.
OT
OT
AV EQUIPMENT
AVC
AVC
AV CABLING AND TERMINATIONS
AVC
AVC
AV CONTROL SYSTEM AND DSP SOFTWARE DEVELOPMENT
AVC
AVC
AV EQUIPMENT CONFIGURATION, TESTING, COMMISSIONING, TRAINING, AND PROJECT ACTIVATION
AVC
AVC
TV DISTRIBUTION INTRA-BUILDING CABLING/DISTRIBUTION
OT
OT
STRUCTURED CABLING (FOR BUILDING NETWORK) AND TERMINATIONS
OT
OT
STRUCTURED CABLING (FOR AV NETWORK) AND TERMINATIONS
AVC
AVC
MOUNTS, EQUIPMENT RACKS, AND INSTALLATION MATERIALS
AVC
AVC
LECTERN / AV OPERATOR CONSOLE CONTAINING AV EQUIPMENT
AVC
AVC
CREDENZA / OTHER FURNITURE CONTAINING AV EQUIPMENT
AVC
AVC
SITE MILL-WORK
OT
OT
CABLE MANAGEMENT AND BOXES FOR AV EQUIPT. IN CONFERENCE TABLES/FURNITURE
AVC
AVC
MODIFICATIONS TO CONFERENCE TABLES/FURNITURE FOR AV EQUIPMENT
OT
OT
COMPUTERS AND OTHER OWNER-FURNISHED EQUIPMENT
O
AVC
CROSS-REFERENCE LEGEND
#
IN DETAIL
REFERENCE
CROSS DETAIL
REFERENCE
REFERENCE NUMBER
DETAIL / SHEET NUMBER
AVS##
#
RESPONSIBLE PARTIES:
AVC
C
AUDIOVISUAL CONTRACTOR
CONSULTANT
O
OT
OWNER
OTHER TRADES
NOTES:
THIS MATRIX IS PROVIDED AS A CONVENIENCE TO THE CONTRACTOR AND TO DRAW PARTICULAR ATTENTION TO ITEMS THAT REQUIRE SPECIFIC COORDINATION
FROM MULTIPLE PARTIES. THIS IS NOT AN ALL-INCLUSIVE LIST. CONTRACTOR SHALL REFERENCE THE AUDIOVISUAL SPECIFICATION FOR COMPLETE
REQUIREMENTS. IF THERE ARE ANY DISCREPANCIES BETWEEN THIS AND THE SPECIFICATION, THE SPECIFICATION SHALL TAKE PRECEDENCE.
AVS.00
1.
THIS DRAWING PACKAGE IS PART OF THE OVERALL BIDDING DOCUMENTATION WHICH INCLUDES, BUT IS NOT LIMITED TO: THE WRITTEN
SPECIFICATION DOCUMENT, ALL DRAWINGS, ADDITIONS AND/OR MODIFICATIONS AS DETAILED IN WRITTEN ADDENDA, ADDITIONS AND/OR
MODIFICATIONS AS DETAILED IN DRAWING ADDITIONS OR REISSUES. IN THE EVENT THAT THERE ARE CONFLICTS WITHIN THE BIDDING
DOCUMENTATION, THE CONTRACTOR SHALL NOTIFY THE CONSULTANT FOR CLARIFICATION AND DIRECTION.
2.
THE PURPOSE OF THESE DRAWINGS IS TO PROVIDE SUFFICIENT DETAIL FOR THE BIDDER TO UNDERSTAND THE FUNCTIONAL REQUIREMENTS OF
THE SYSTEMS, THE INSTALLATION AND PERFORMANCE STANDARDS THAT MUST BE MET, AND THE REQUIRED SCOPE OF WORK, IN ORDER TO
GENERATE AND SUBMIT A COMPLETE AND ACCURATE BID.
3.
THE CONTRACTOR SHALL REVIEW AND VERIFY ALL CONDUIT, BOXES, AND OTHER CABLING PATHWAYS AS INDICATED IN THE INFRASTRUCTURE
REFERENCE DRAWINGS AND PROVIDED BY OTHERS. THIS REVIEW SHALL INCLUDE THE DRAWINGS AS WELL AS AS-BUILT CONDITIONS ON SITE. THE
CONTRACTOR SHALL NOTIFY THE CONSULTANT, GENERAL CONTRACTOR, AND ARCHITECT OF ANY DEFICIENCIES, ISSUES, OR INCORRECT
INSTALLATIONS ON SITE THAT MAY IMPACT THE INSTALLATION OF THE AUDIOVISUAL SYSTEMS CABLING OR EQUIPMENT AS SPECIFIED. FAILURE TO
PERFORM THIS REVIEW WILL RESULT IN A REVISED CABLING APPROACH TO BE DESIGNED, PROPOSED, AND IMPLEMENTED BY THE CONTRACTOR,
WITH ANY ADDITIONAL COSTS BORNE BY THE CONTRACTOR.
4.
THE CONTRACTOR SHALL VERIFY DIMENSIONS OF EQUIPMENT, EQUIPMENT ARRANGEMENTS, SPACE AVAILABILITY (INCLUDING ANY MILLWORK OR
CABINETRY PROVIDED BY OTHERS) AND PROVIDE SYSTEMS THAT WORK WITHIN THE CONSTRAINTS OF THE SPACE AVAILABLE. THE CONTRACTOR
SHALL NOTIFY THE CONSULTANT OF ANY SITUATION WHERE SPACE CONSTRAINTS ARE A PROBLEM, PRIOR TO THE SUBMISSION OF SHOP
DRAWINGS OR THE ORDERING OR PURCHASE OF EQUIPMENT. THE CONTRACTOR SHALL BEAR THE EXPENSE OF PROVIDING ALTERNATE
EQUIPMENT, WHICH WILL WORK WITHIN THE AVAILABLE SPACE, IF SPACE AVAILABILITY PROBLEMS ARE DISCOVERED AFTER SHOP DRAWINGS ARE
SUBMITTED AND APPROVED.
5.
REFER TO WRITTEN SPECIFICATION FOR INFORMATION REGARDING REQUIRED SUBMITTALS.
6.
THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE ACCURACY OF THE SYSTEM DESIGNS DOCUMENTED IN THE DRAWINGS AND
SPECIFICATION. ANY ISSUES, DISCREPANCIES, SUBSTITUTIONS, OR EXCEPTIONS TO THE SPECIFICATION BY THE CONTRACTOR SHALL BE
COMMUNICATED TO THE CONSULTANT PRIOR TO THE PURCHASE OF ANY EQUIPMENT OR MATERIALS BY WAY OF THE SHOP DRAWINGS SUBMITTAL
PROCESS. UPON APPROVAL OF THE CONTRACTOR'S SHOP DRAWING SUBMITTAL BY THE OWNER'S DESIGNATED REPRESENTATIVE, OR IF THE
CONTRACTOR FAILS TO SUBMIT SHOP DRAWINGS, THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR SUPPLYING SUCH MATERIALS AND
TAKING SUCH ACTIONS AS TO SATISFY THE FULL INTENTIONS OF THE SPECIFICATION WITHOUT CLAIM FOR ADDITIONAL COMPENSATION. THIS
SHALL INCLUDE PROVIDING ANY INCIDENTAL EQUIPMENT, INSTALLATION MATERIALS AND LABOR NEEDED IN ORDER TO RESULT IN A COMPLETE
AND OPERABLE SYSTEM, EVEN IF SUCH EQUIPMENT, MATERIALS OR LABOR ARE NOT LISTED IN THIS SPECIFICATION. EXCEPTIONS INCLUDE
OWNER-REQUESTED CHANGES, UNEXPECTED FIELD ISSUES DUE TO WORK BY OTHER TRADES, OR SCHEDULE CHANGES INITIATED BY OTHERS.
7.
BIDDING EQUIPMENT LISTS ARE PROVIDED TO THE CONTRACTOR FOR USE IN PREPARING THEIR BID RESPONSE. THESE LISTS INCLUDE MAJOR
SYSTEM COMPONENTS AND PERIPHERALS BUT SHOULD NOT BE CONSIDERED TO BE ALL INCLUSIVE. THE COMPLETE EQUIPMENT PACKAGE BID
RESPONSE WILL TAKE INTO ACCOUNT ALL DRAWINGS, SPECIFICATION, WRITTEN ADDENDA, ANY OR ALL DRAWING ADDITIONS OR REISSUES, AS
WELL AS IMPLIED SYSTEM OPERABILITY. THE CONTRACTOR SHALL INCLUDE ANY INCIDENTAL EQUIPMENT NEEDED IN ORDER TO RESULT IN A
COMPLETE AND OPERABLE SYSTEM WITHIN THEIR BID RESPONSE.
8.
THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INSTALLATION MATERIALS INCLUDING, BUT NOT LIMITED TO: INSTALLED CABLE, LOOSE CABLE,
TERMINATIONS, SIGNAL EXTENDERS, CABLE MANAGEMENT, VOICE/DATA/VIDEO PATCH CORDS, ADAPTERS, I/O PANELS, DEVICE MOUNTS FOR (FLAT
PANELS, PROJECTORS, SPEAKERS, CAMERAS, ETC.), CABLE DRESSING, LACING BARS, COPPER BUS BARS, LABELS, RACK SHELVES, RACK MOUNTS,
POWER SUPPLIES AND ADAPTERS, POE INJECTORS, POWER STRIPS/DISTRIBUTION AND OTHER MATERIALS AS NEEDED TO INSTALL THE SYSTEMS
DEFINED HEREIN.
9.
ITEMS SHOWN AS “OFCI” (OWNER FURNISHED CONTRACTOR INSTALLED) WILL BE FURNISHED BY THE OWNER FOR INSTALLATION BY THE
CONTRACTOR. CONTRACTOR IS RESPONSIBLE FOR COORDINATING DIRECTLY WITH OWNER.
10.
THE CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT MOUNTING STYLES AND LOCATIONS COMPLY WITH THE CURRENT ADA STANDARDS FOR
ACCESSIBLE DESIGN. IF ANY DEVICE OR LOCATION SPECIFIED HEREIN IS FOUND TO BE IN CONFLICT, THE CONTRACTOR SHALL NOTIFY THE
CONSULTANT FOR CLARIFICATION AND DIRECTION.
11.
ALL CABLING INSTALLED BY THE CONTRACTOR TO SUPPORT AV SYSTEMS CONNECTIVITY SHALL MEET THE EQUIPMENT MANUFACTURER'S
SPECIFICATIONS FOR CABLE AND CONNECTOR TYPES, INSTALLATION METHODS AND ROUTING, SEPARATION DISTANCE FROM ADJACENT
SERVICES, MAXIMUM NUMBER OF DISCONNECT POINTS AND MAXIMUM OVERALL CABLE RUN LENGTHS REQUIRED TO MEET THE DESIGN INTENT
AND MANUFACTURER'S PERFORMANCE CRITERIA. THE CABLING SYSTEM SHALL BE TESTED AND VERIFIED.
12.
FIELD VERIFY ALL PROJECTOR LOCATIONS AND RESOLVE ANY OBSTRUCTION CONFLICTS FOR OPTIMAL PERFORMANCE. THE CONTRACTOR SHALL
REFERENCE THE INFRASTRUCTURE DRAWINGS FOR SCREEN SIZES AND FIELD VERIFY MEASUREMENTS TO CONFIRM THROW DISTANCES TO
DETERMINE THE APPROPRIATE LENS REQUIRED PRIOR TO PROCUREMENT.
13.
APPROVED CABLING, CONNECTORS, PLATES, RACK ACCESSORIES, AND POWER DISTRIBUTION ARE DETAILED WITHIN THE WRITTEN
SPECIFICATION.
14.
CABLES SHALL BE DRESSED IN CONVENIENTLY SIZED BUNDLES AND EITHER LACED OR BANDED. LACING OR BANDING SHALL NOT BE SO TIGHT AS
TO DEFORM CABLE BUNDLES. HOOK AND LOOP CABLE TIES SHALL BE UTILIZED. PLASTIC ZIP TIES ARE NOT PERMITTED.
15.
ALL CABLING BETWEEN MOBILE EQUIPMENT AND CONNECTION PANELS MUST BE PREFABRICATED, TACTICAL CABLING.
16.
REFER TO WRITTEN SPECIFICATION FOR APPROVED WIRE AND DEVICE LABEL INFORMATION.
GENERAL NOTES
AUDIOVISUAL SYSTEMS
COVER PAGE
OWNER COMMENT +
CONSTRUCTION
COORDINATION
06 FEBRUARY 2025
ELECTROVOICE
X2I-212/90-FGW
LINE ARRAY LOUDSPEAKER R - 1
ELECTROVOICE
X2I-212/90-FGW
LINE ARRAY LOUDSPEAKER R - 2
ELECTROVOICE
X2I-212/120-FGW
LINE ARRAY LOUDSPEAKER R - 3
ELECTROVOICE
X2I-212/120-FGW
LINE ARRAY LOUDSPEAKER R - 4
ELECTROVOICE
X2I-212/120-FGW
LINE ARRAY LOUDSPEAKER R - 5
ELECTROVOICE
X2I-212/120-FGW
LINE ARRAY LOUDSPEAKER R - 6
STAGE CANOPY
MIC/LINE IN 1
MIC/LINE IN 2
MIC/LINE IN 3
MIC/LINE IN 4
MIC/LINE IN 5
MIC/LINE IN 6
MIC/LINE IN 7
MIC/LINE IN 8
FLEX 1
FLEX 2
FLEX 3
FLEX 4
LAN A
OUT 1
OUT 2
OUT 3
OUT 4
OUT 5
OUT 6
OUT 7
OUT 8
LAN B
FLEX 5
FLEX 6
FLEX 7
FLEX 8
TO AV NETWORK
QSC
110f
DIGITAL AUDIO
PROCESSOR W/ VOIP
LOCATE EQUIPMENT RACK
MIDAS
HD96-24-CC-TP
DIGITAL MIXER
PORTABLE
INPUT 1
INPUT 2
INPUT 3
INPUT 4
INPUT 5
INPUT 6
HEADPHONE
OUTPUT 1
OUTPUT 2
OUTPUT 3
OUTPUT 4
OUTPUT 5
OUTPUT 6
OUTPUT 7
OUTPUT 8
INPUT 7
INPUT 8
DANTE
TO AV NETWORK
MIDAS
DL153
AES50 STAGE BOX
PORTABLE
INPUT 1
INPUT 2
INPUT 3
INPUT 4
INPUT 5
INPUT 6
OUTPUT 3
OUTPUT 4
OUTPUT 5
OUTPUT 6
OUTPUT 7
OUTPUT 8
INPUT 7
INPUT 8
INPUT 9
INPUT 10
INPUT 11
INPUT 12
INPUT 13
INPUT 14
INPUT 15
INPUT 16
AES50 1
DANTE MODULE
CLEARCOM
MS-702
COM MASTER STATION
EQUIPMENT RACK
PROGRAM IN
COM B
COM A
COM B
COM A
COM B
COM A
KLARK TEKNIK
DN9680
AES50 EXTENDER
PORTABLE
SNAKE OPTICAL
SNAKE COPPER
AES50 1
AES50 2
AES50 3
AES50 4
AES50 5
AES50 6
AES50 7
AES50 8
AES50 1
AES50 2
AES50 3
AES50 4
SNAKE COPPER 2
SNAKE COPPER 1
AES50 2
DYNACORD
IPX10:4
4-CH
AUDIO AMPLIFIER
EQUIPMENT RACK
OUT 1
OUT 2
OUT 3
OUT 4
IN 1
IN 2
IN 3
IN 4
DANTE PRI
DANTE SEC
DYNACORD
IPX10:4
4-CH
AUDIO AMPLIFIER
EQUIPMENT RACK
OUT 1
OUT 2
OUT 3
OUT 4
IN 1
IN 2
IN 3
IN 4
DANTE PRI
DANTE SEC
ELECTROVOICE
X2I-212/90-FGW
LINE ARRAY LOUDSPEAKER R - 1
ELECTROVOICE
X2I-212/90-FGW
LINE ARRAY LOUDSPEAKER R - 2
ELECTROVOICE
X2I-212/120-FGW
LINE ARRAY LOUDSPEAKER R - 3
ELECTROVOICE
X2I-212/120-FGW
LINE ARRAY LOUDSPEAKER R - 4
ELECTROVOICE
X2I-212/120-FGW
LINE ARRAY LOUDSPEAKER R - 5
ELECTROVOICE
X2I-212/120-FGW
LINE ARRAY LOUDSPEAKER R - 6
STAGE CANOPY
DYNACORD
IPX10:4
4-CH
AUDIO AMPLIFIER
EQUIPMENT RACK
OUT 1
OUT 2
OUT 3
OUT 4
IN 1
IN 2
IN 3
IN 4
DANTE PRI
DANTE SEC
DNYACORD
MXE5
NETWORK AUDIO
DSP
EQUIPMENT RACK
INPUT 1
INPUT 2
OUTPUT 1
OUTPUT 2
OUTPUT 3
OUTPUT 4
OUTPUT 5
OUTPUT 6
OUTPUT 7
OUTPUT 8
DANTE PRI
DANTE SEC
CONTROL
INPUT 3
INPUT 4
INPUT 5
INPUT 6
INPUT 7
INPUT 8
INPUT 9
INPUT 10
INPUT 11
INPUT 12
MIDAS
DL153
AES50 STAGE BOX
PORTABLE
INPUT 1
INPUT 2
INPUT 3
INPUT 4
INPUT 5
INPUT 6
OUTPUT 1
OUTPUT 2
OUTPUT 3
OUTPUT 4
OUTPUT 5
OUTPUT 6
OUTPUT 7
OUTPUT 8
INPUT 7
INPUT 8
INPUT 9
INPUT 10
INPUT 11
INPUT 12
INPUT 13
INPUT 14
INPUT 15
INPUT 16
AES50 1
AES50 2
INSTALLED EQUIPMENT
MIDAS
DL153
AES50 STAGE BOX
PORTABLE
INPUT 1
INPUT 2
INPUT 3
INPUT 4
INPUT 5
INPUT 6
OUTPUT 1
OUTPUT 2
OUTPUT 3
OUTPUT 4
OUTPUT 5
OUTPUT 6
OUTPUT 7
OUTPUT 8
INPUT 7
INPUT 8
INPUT 9
INPUT 10
INPUT 11
INPUT 12
INPUT 13
INPUT 14
INPUT 15
INPUT 16
AES50 1
AES50 2
ELECTROVOICE
ETX-18SP-US
18" ACTIVE SUBWOOFER
ELECTROVOICE
ETX-18SP-US
18" ACTIVE SUBWOOFER
ELECTROVOICE
ETX-18SP-US
18" ACTIVE SUBWOOFER
ELECTROVOICE
ETX-18SP-US
18" ACTIVE SUBWOOFER
ELECTROVOICE
ETX-18SP-US
18" ACTIVE SUBWOOFER
ELECTROVOICE
ETX-18SP-US
18" ACTIVE SUBWOOFER
ELECTROVOICE
ETX-15P
15" ACTIVE TWO WAY
ELECTROVOICE
ETX-15P
15" ACTIVE TWO WAY
ELECTROVOICE
ETX-15P
15" ACTIVE TWO WAY
ELECTROVOICE
ETX-15P
15" ACTIVE TWO WAY
ELECTROVOICE
ETX-15P
15" ACTIVE TWO WAY
ELECTROVOICE
ETX-15P
15" ACTIVE TWO WAY
1
AVS02
2
AVS02
3
AVS02
4
AVS02
5
AVS02
PORTABLE SUBS AND FRONT FILLS
USB
QSC
QIO-GP8X8
I/O EXPANDER
EQUIPMENT RACK
GPIO IN 1
GPIO IN 2
GPIO IN 3
GPIO IN 4
LAN
LAN THRU
GPIO OUT 1
GPIO OUT 2
GPIO OUT 3
GPIO OUT 4
TO AV NETWORK
INPUT 1
INPUT 2
OUTPUT 1
OUTPUT 2
COM A
COM A
COM A
COM A
COM A
COM B
COM B
COM B
COM B
COM B
8
AVS02
6
AVS02
12
AVS02
10
AVS02
14
AVS02
9
AVS02
7
AVS02
13
AVS02
11
AVS02
15
AVS02
16
AVS02
17
AVS02
TO MAIN IN L
TO MAIN IN R
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
5850 W GLENDALE AVE, GLENDALE, AZ 85301
revisions
No.
Description
Date
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
C22-0658
GLENDALE AVE. & 59TH AVE.
AV• IT• SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
AVS.01
AUDIOVISUAL SYSTEMS
OWNER COMMENT +
CONSTRUCTION
COORDINATION
06 FEBRUARY 2025
CUSTOM
I/O PANEL
WALL BOX 1
WALL BOX
D 1
CAT 6 STP
RJ45
IDC
D 2
CAT 6 STP
RJ45
IDC
D 3
CAT 6 STP
RJ45
IDC
D 4
CAT 6 STP
RJ45
IDC
V 1
HD-SDI COAX
BNC
CRIMP
V 2
HD-SDI COAX
BNC
CRIMP
CUSTOM
I/O PANEL
FOH WALL BOX
WALL BOX
D 1
CAT 6 STP
RJ45
IDC
D 2
CAT 6 STP
RJ45
IDC
D 3
CAT 6 STP
RJ45
IDC
D 4
CAT 6 STP
RJ45
IDC
V 1
HD-SDI COAX
BNC
CRIMP
V 2
HD-SDI COAX
BNC
CRIMP
COM A
9451
XLR3-F
SOLDER
COM B
9451
XLR3-F
SOLDER
MIC 2
XLR3-F
SOLDER
MIC 3
XLR3-F
SOLDER
MIC 4
XLR3-F
SOLDER
MIC 1
XLR3-F
SOLDER
CUSTOM
I/O PANEL
WALL BOX 2
WALL BOX
D 1
CAT 6 STP
RJ45
IDC
D 2
CAT 6 STP
RJ45
IDC
D 3
CAT 6 STP
RJ45
IDC
D 4
CAT 6 STP
RJ45
IDC
V 1
HD-SDI COAX
BNC
CRIMP
V 2
HD-SDI COAX
BNC
CRIMP
D 1
CAT 6 STP
RJ45
IDC
D 2
CAT 6 STP
RJ45
IDC
D 3
CAT 6 STP
RJ45
IDC
D 4
CAT 6 STP
RJ45
IDC
V 1
HD-SDI COAX
BNC
CRIMP
V 2
HD-SDI COAX
BNC
CRIMP
CUSTOM
I/O PANEL
WALL BOX3
WALL BOX
D 1
CAT 6 STP
RJ45
IDC
D 2
CAT 6 STP
RJ45
IDC
D 3
CAT 6 STP
RJ45
IDC
D 4
CAT 6 STP
RJ45
IDC
V 1
HD-SDI COAX
BNC
CRIMP
V 2
HD-SDI COAX
BNC
CRIMP
D 1
CAT 6 STP
RJ45
IDC
D 2
CAT 6 STP
RJ45
IDC
D 3
CAT 6 STP
RJ45
IDC
D 4
CAT 6 STP
RJ45
IDC
V 1
HD-SDI COAX
BNC
CRIMP
V 2
HD-SDI COAX
BNC
CRIMP
CUSTOM
I/O PANEL
WALL BOX 4
WALL BOX
D 1
CAT 6 STP
RJ45
IDC
D 2
CAT 6 STP
RJ45
IDC
D 3
CAT 6 STP
RJ45
IDC
D 4
CAT 6 STP
RJ45
IDC
V 1
HD-SDI COAX
BNC
CRIMP
V 2
HD-SDI COAX
BNC
CRIMP
D 1
CAT 6 STP
RJ45
IDC
D 2
CAT 6 STP
RJ45
IDC
D 3
CAT 6 STP
RJ45
IDC
D 4
CAT 6 STP
RJ45
IDC
V 1
HD-SDI COAX
BNC
CRIMP
V 2
HD-SDI COAX
BNC
CRIMP
LAN
CAT 6 STP
RJ45
IDC
LAN
CAT 6 STP
RJ45
IDC
TO IDF
TO IDF
2
AVS01
3
AVS01
4
AVS01
1
AVS01
MIC 1
XLR3-F
SOLDER
5
AVS01
FIRE OVERRIDE INPUT
13
AVS01
12
AVS01
15
AVS01
14
AVS01
MAIN L
XLR3-M
MAIN R
XLR3-M
16
AVS01
17
AVS01
CUSTOM
I/O PANEL
LIGHTING BOX 1
WALL BOX
COM A
9451
XLR3-M
SOLDER
COM B
9451
XLR3-M
SOLDER
7
AVS01
6
AVS01
SOLDER
SOLDER
CUSTOM
I/O PANEL
LIGHTING BOX 2
WALL BOX
COM A
9451
XLR3-M
SOLDER
COM B
9451
XLR3-M
SOLDER
CUSTOM
I/O PANEL
LIGHTING BOX 3
WALL BOX
COM A
9451
XLR3-M
SOLDER
COM B
9451
XLR3-M
SOLDER
CUSTOM
I/O PANEL
LIGHTING BOX 4
WALL BOX
COM A
9451
XLR3-M
SOLDER
COM B
9451
XLR3-M
SOLDER
9
AVS01
8
AVS01
11
AVS01
10
AVS01
© 2023 Holly Street Studio, LLC
sheet number
project no.
date
phase
title
1319 E VanBuren St.
Phoenix, AZ 85006
o: 602.258.8555
hollystreetstudio.com
5850 W GLENDALE AVE, GLENDALE, AZ 85301
revisions
No.
Description
Date
115
CITY OF GLENDALE
DOWNTOWN CAMPUS REINVESTMENT PROJECT
C22-0658
GLENDALE AVE. & 59TH AVE.
AV• IT• SECURITY • ACOUSTICS • LIGHTING
1 West Deer Valley Road
Bldg 2, Suite 305
Scottsdale, AZ 85027
480.831.8580
WWW.NV5.COM/TECH
AVS.02
AUDIOVISUAL SYSTEMS
OWNER COMMENT +
CONSTRUCTION
COORDINATION
06 FEBRUARY 2025
AMPHITHEATER
AV
SPECIFICATIONS
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
Construction Documents | 04-16-24
Prepared By: NV5
PORTABLE STAGE LIGHTING EQUIPMENT
26 55 63 - 1
SECTION 26 55 63
PORTABLE STAGE LIGHTING EQUIPMENT
PART 1 - GENERAL
1.01
SYSTEM DESCRIPTION
A.
Portable stage lighting and grip equipment includes stage lighting fixtures, grip equipment, portable
lighting control equipment, and other performance related devices.
1.02
WORK INCLUDED
A.
The stage lighting Contractor, hereafter referred to as the Contractor, shall provide all equipment,
supplies, and services as specified herein.
B.
Spaces included:
1.
Outdoor Amphitheater
1.03
QUALITY ASSURANCE
A.
Recognizing that each Contractor may choose unique means in provision of the completed system, some
latitude is provided in this specification. However, the Contractor must comply with the performance
requirements of this Section.
B.
Should the Contractor choose to propose equipment substitutions that vary from what is specified, it is the
Contractor’s responsibility to demonstrate that substituted equipment quality and performance is equal to
or better than that which is specified.
C.
It is the Contractor’s responsibility to provide a complete and operational system. Any additional
hardware, fittings, fasteners, electrical connectors, and expendable items not listed in the Bill of Materials
included herein yet necessary for the completion of the work shall be provided by the Contractor.
1.04
SUBMITTALS
A.
The Contractor shall submit complete equipment listings for all portable equipment.
B.
Submit any proposed substitutions at the time of bid. No substitutions shall be made without written
approval by the Consultant.
C.
Submit PDF electronic copies of all documents.
1.05
WARRANTY
A.
The Contractor shall warrant all work under this contract to be free from defects in material and
workmanship for a minimum period of two years from the date of final acceptance by the Owner.
PRODUCTS
1.06
STAGE LIGHTING PORTABLE LIGHTING & CONTROL EQUIPMENT - AMPHITHEATER
A.
Bill of Materials:
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
Construction Documents | 04-16-24
Prepared By: NV5
PORTABLE STAGE LIGHTING EQUIPMENT
26 55 63 - 2
EXECUTION
1.07
INSTALLATION
A.
Produce and submit approval documents for all components in one submittal. No equipment shall be
released for manufacturing or delivery to the job site without written approval by the Consultant.
B.
Follow all manufacturers’ instructions for equipment assembly.
C.
The Contractor shall unpack, assemble, and test all equipment prior to delivery.
D.
When equipment is delivered to the job site, the Contractor shall assist the Owner with the initial
installing, aiming, and programming of all portable equipment per Owner’s directives and information
provided by the Lighting Consultant.
E.
The Contractor shall provide a minimum 8-hour training session to the Owner’s Representatives for each
space included in this section, covering the basic operation for all portable equipment.
END OF SECTION
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 1
SECTION 27 40 00
AMPHITHEATER AUDIO SYSTEM
PART 1 - GENERAL
1.01
PROJECT DESCRIPTION
A.
The City of Glendale is currently undergoing a renovation of the Downtown Campus, which includes the
outdoor amphitheater adjacent to the office building and council chamber building. The renovations to the
amphitheater include a new permanent audio reinforcement system that will be attached to the new roof
structure.
B.
The successful Bidder will supply a turnkey system including equipment, labor, installation materials, DSP
programming, training, and follow-up support for all systems, as described in this Specification. The
system is scheduled to be complete, installed, and operational, by xxx, 2025.
1.02
System Description
1.
The main audio system consists of the following:
a.
144 Input Digital Mixing Console
1)
Dual Power Supply
2)
Lifting-Rolling Stand for Mixer
3)
Digital Snake System
b.
Digital Signal Processor
c.
Line Array Loudspeakers for Left-Right speaker clusters.
d.
Install subwoofer to be installed with hanging arrays.
e.
Rigging Kits for installed speaker arrays
f.
Portable powered subwoofers
g.
Powered Lip-fill speakers
h.
Powered stage monitors
i.
Equipment Racks
j.
Amplifiers
k.
Intercom System
l.
ADA compliant Hearing Assist transmitter
m.
1.03
THE SPECIFICATION
A.
The “Specification” is defined as the body of documentation provided to the Contractor with the Request
for Quotation, as well as all addenda to said documentation. Throughout this document, words such as
“herein” refer to the entire Specification, and not just this written document.
B.
The Specification includes, but is not limited to:
1.
This written specification document.
2.
All drawings, as listed in Section 4.
3.
Additions and/or modifications as detailed in written addenda.
4.
Additions and/or modifications as detailed in drawing additions or reissues.
1.04
DEFINITION OF TERMS
A.
Within this section of the specification, the following definitions shall apply:
1.
The term “Owner” is used to indicate the City of Glendale, Arizona
2.
The term “Architect” is used to indicate Holly Street Studios.
3.
The term “Consultant” is used to indicate NV5
B.
The term “Bidder” is used to indicate that entity generating the bid response.
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 2
C.
The term “Contractor” is used to indicate the successful Bidder to whom the Owner has awarded the
contract.
D.
The term “Furnish” is used to indicate the responsibility to ship or deliver the item to the job site, freight
prepaid, for receipt, staging and installation by others.
E.
The term “Install” or “Installation” is used to indicate the responsibility of receiving the item at the job site,
providing adequate storage, unpacking or uncrating the item, physically securing the item or otherwise
making ready the item for its intended use by following the instructions and approved methods of the
manufacturer and those contained herein.
F.
The term “Provide” is used to indicate the responsibility to both “Furnish” and “Install”.
G.
The term “Provided by Others” shall refer to material and work, which is related to this contract, but has
been provided by parties other than the AV Contractor.
H.
The term “OFCI” (Owner Furnished Contractor Installed) shall refer to equipment that will be provided by
the Owner to the Contractor. The Contractor shall be responsible for installing and integrating this
equipment as detailed herein.
I.
The term “shall” is mandatory; the term “will” is informative; and the term “should” is advisory.
1.05
SUBSTITUTIONS
A.
It is not an intention of this specification to limit or restrict Bid Responses to those containing products by
specific manufacturers, but rather to set a baseline of operational performance and functionality that all
Bid Responses must meet or exceed. If a particular Bid Response contains no deviations from this
specification, the Bidder may submit the Bid Form alone. However, if a Bid Response contains deviations
from this specification, additional submittals are required. These submittals shall include, but are not
limited to: manufacturer’s specifications, manufacturer’s suggested list price, drawings reflecting any
modifications to the architectural integration of equipment, if applicable. If substitutes are proposed for the
primary loudspeaker system, drawings and/or documents shall be submitted as part of the bid response
illustrating the performance of the proposed substitute system, in order to thoroughly demonstrate that the
substitute system will meet all intentions of this Specification.
1.06
DEVIATIONS
A.
Should the Bidder have recommendations that will enhance the performance of the systems, or reduce
costs without the loss of performance, such comments shall be made in the Bid Response. All
suggestions that are of value to the Owner shall be taken into consideration in the evaluation of the Bid
Response. The Bidder shall represent all such proposals as “alternates”, with the appropriate cost
modifications shown separate and apart from the costs of the system as specified.
B.
For deviations in equipment, the Bidder shall provide a written statement describing why such deviations
are requested as well as manufacturer’s specifications and warranty information on proposed
substitutions. Furthermore, the Contractor shall be responsible for repaying any additional expenses
incurred by other trades, the Consultant, the Architect, and/or the Owner, as a result of instituting such
deviations.
1.07
EXCEPTIONS
A.
Notwithstanding the detailed information contained in this Specification, the Bidder shall be responsible to
see that a complete and functioning system is installed. The Bidder shall notify the Consultant, prior to
bidding, of any and all exceptions to these specifications and related drawings. This shall include any
errors or omissions in the system design that, in his/her opinion will prevent the system from achieving all
intentions of the Specification. After acceptance of the bid, the Bidder is responsible for supplying such
materials and taking such actions, whether specifically mentioned herein or not, so as to satisfy all
intentions of the Specification without claim for additional compensation.
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 3
1.08
QUALIFICATION OF BIDDERS
A.
Included with the Bid Response, the Contractor shall furnish evidence of his/her qualifications to perform
the work specified. Evidence of Contractor qualifications shall include:
B.
A list of at least four projects of similar size and scope in which the Contractor has completed. For each
project, include the name of the facility, the name of a contact person representing the Owner of the
facility, a phone number and fax number for the listed contact, a brief description of the work performed,
and a listing of the Contractor’s fees for the project.
C.
The Bidder shall clearly identify project team members. Team members to be identified shall be Principal,
Project Manager, Chief Engineer, Qualified Rigger, and Senior Field Technician. The documentation shall
include the individuals name, years with firm, and brief resume of the employees past projects. Resumes
shall include a listing of years of experience and any special training or certification by trade associations.
D.
A list of equipment manufacturer product lines, relevant to the project, for which the Contractor is
authorized as a Distributor or Dealer.
E.
A list of equipment manufacturer product lines, relevant to the project, for which the Contractor is
authorized to provide warranty repair service.
F.
A list of computer software or systems owned by the Contractor, which will be used to communicate,
measure, draw, and/or document the project.
G.
A list of system test equipment owned and used by the Contractor, including manufacturer, model number
and, where applicable, latest software revision.
H.
A statement of the Contractor's highest bonding limit, along with the date and amount of the last bond
secured.
1.09
SUBCONTRACT INFORMATION
A.
The Bidder shall indicate any portion of the project for which the Bidder intends to engage a
Subcontractor. The Bidder shall further identify all responsibilities and all work to be performed by the
Subcontractor. All work performed by the Subcontractor shall be under the supervision of the Contractor
and shall be the responsibility of the Contractor.
1.10
SCOPE OF WORK
A.
The Contractor shall provide a complete, turnkey system performing all of the services and functions as
described herein, together with all other apparatus, cable, materials, labor, tools, transportation, and any
other resources necessary to provide a complete system.
B.
Specifically, the work shall include, but is not limited to:
C.
Furnishing and/or installing all equipment as specified.
D.
Installing or interfacing to existing Owner furnished equipment, as specified on the drawings.
E.
Providing wall and floor box inserts and specialty AV panels.
F.
Interconnecting all components, both internal and external to rack cabinets.
G.
Providing cable management hardware as required including: that required internal to rack cabinets; that
required between pieces of equipment not housed in rack cabinets; and that required to extend cabling
from rack cabinets and equipment to the greater facility cabling infrastructure as outlined in Section 3.2C.
H.
Coordinating with the Owner on cable management needs and equipment installation requirements as
outlined herein. Special attention must be paid to the mix position in particular.
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 4
I.
Generating and submitting all Shop Drawings as required for approvals.
J.
The A/V Contractor shall work in close coordination with the loudspeaker manufacturer and shall be
responsible for establishing the final design of the flown loudspeaker rigging and structural support
systems for the Amphitheater. The A/V Contractor shall submit shop drawings and details on his design
for review and approval by the Consultant, Architect, and Owner prior to purchasing or ordering rigging
system assemblies. The A/V Contractor shall provide all loudspeaker cluster assembly, hanging, and
initial aiming. The A/V Contractor shall terminate all loudspeakers and make fine loudspeaker cluster
assembly aiming adjustments during final system tuning.
K.
Ensuring that all individual components function as intended by this Specification.
L.
Ensuring that the entire audio system functions as intended by this Specification.
M.
Testing, adjusting, and fine-tuning the completed system and components.
N.
Documenting the completed installed systems as defined herein.
O.
Conducting a total of 2 days (6 hours each) of training in systems operation for the Owner’s designated
representative(s).
P.
Where specified, cable lengths for bulk or manufactured cable assemblies have been provided for cost
estimating purposes only. The Contractor shall field verify required cable lengths for all bulk cable or
manufactured cable assemblies prior to ordering as outlined in Section 3.2 Installation Practices.
Q.
WORK EXCLUDED
1.
Work not included under this contract shall be:
a.
Providing conduit, power receptacles, junction boxes, cable raceways, electrical back-boxes,
floor boxes, cable trough, lighting fixtures, lighting dimming systems, data and voice networks,
rough or finished trim, casework, millwork, structural work, or special construction, except where
otherwise specified herein.
1.11
JOB CONDITIONS
A.
SPACE CONDITIONS
1.
The Contractor shall verify dimensions of equipment, equipment arrangements, space availability
(including any millwork or cabinetry provided by others) and provide systems that work within the
constraints of the space available. The Contractor shall notify the Consultant of any situation where
space constraints are a problem, prior to the ordering or purchase of equipment. The Contractor
shall bear the expense of providing alternate equipment, which will work within the available space, if
space availability problems are discovered after equipment is ordered.
2.
Drawings indicate locations of equipment and components. Changes in the location, and offsets of
same to accommodate building conditions, and coordination with the work of other trades shall be
made prior to initial installation, without additional cost the Owner.
3.
The Contractor shall insure during installation that access is provided to equipment and components
requiring operation, service or maintenance within the life of the system.
4.
It shall be the responsibility of the Contractor to identify any condition where the recommended
environmental and electrical operating parameters for specified equipment/products cannot be
assured. Should such condition exist, it shall further be the responsibility of the Contractor to notify
the Architect and Consultant of any such condition.
B.
EQUIPMENT DELIVERY AND STORAGE
1.
Costs of all shipping to the site, and of all unusual storage requirements, shall be borne by the
Contractor. It shall be the responsibility of the Contractor to make appropriate arrangements, and to
coordinate with the authorized personnel at the site, for the proper acceptance, handling, protections,
and storage of equipment so delivered.
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 5
1.12
LAWS AND REGULATIONS
A.
All equipment, cabling, materials, and installation methodology shall conform to the requirements of the
National Board of Fire Underwriters, the current published edition of the National Electrical Code, and all
other applicable laws and regulations. The Contractor shall obtain and pay for any additional permits and
inspections required by all legal authorities and agencies having jurisdiction over the Contractor’s work.
1.13
QUALITY ASSURANCE
A.
All equipment for this installation will be new, less than one year from the date of manufacture, and
without blemish or defect.
B.
The Contractor shall maintain the same project manager and field supervisor throughout the installation,
and where practical, maintain the same installers.
C.
The Contractor shall supply and install any incidental equipment needed in order to result in a complete
and operable system without claim for additional payment, even if such equipment is not listed in this
Specification.
D.
All work related to this Specification shall be completed in a professional manner by fully qualified
workers.
1.14
RELIABILITY
A.
GENERAL
1.
The system is designed to provide professional quality operation over a period of several years
without the need for continual maintenance. Equipment that has a high failure rate is not acceptable
for installation as part of this system.
B.
WARRANTY
1.
The Bidder shall make known, in writing, at time of Bid any exceptions that might exist between
conditions described herein and Bidders policy of warranty. After acceptance of bid, all conditions
and requirements of warranty described herein shall apply.
2.
The Contractor shall guarantee all equipment, materials, and labor for a period of 1 year from the
date of final acceptance.
3.
During the warranty period, within 24 hours of notification, the Contractor shall answer all service
calls and requests for information.
4.
During the warranty period, within 96 hours of original notification, the Contractor shall provide
emergency service to restore operation of the system, replacing defective materials, repairing faulty
workmanship, making temporary repairs, and providing loaner equipment as necessary, all at no
charge.
5.
The Contractor shall notify the owner after any service call whether such call is or is not covered
under warranty. The Owner may be billed for non-warranty calls. The Contractor shall notify the
Owner of any service call or work to be performed for which charges may be incurred before such
work commences.
6.
Improper functioning, for warranty purposes, means failure of the system to meet the intentions of
the specification because of internal defects. It does not include Owner caused malfunctions such
as re-adjustment of the controls, re-tuning of the system, or injury to the system beyond normal
wear. Nor does the warranty cover paint, exterior finishes, fuses, lamps, or associated labor, unless
the damage or failure results from defective materials or workmanship covered by the warranty.
7.
The Contractor shall take such actions at the time of installation to insure that all equipment is
installed in accordance with the manufacturer recommended environmental and electrical operating
conditions and requirements. After installation, the Contractor shall be responsible for the repair or
replacement of said equipment, which the Contractor installed such that a failure occurs due to
environmental or electrical conditions, even if not covered by the manufacturers warranty. The
Contractor shall not be held responsible for damages due to changes in environmental conditions,
which occur after system acceptance.
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 6
8.
Unless otherwise directed, the Contractor shall activate all manufacturer warranties in the Owner’s
name. The start date of the warranties shall be the date of final acceptance.
9.
If the Contractor has modified certain components, the manufacturer warranty may be void. In this
case, the Contractor is responsible for providing warranty coverage equal to that of the
manufacturer.
10. Certain subsystems and system components may require installation by authorized representatives
in order for the complete manufacturer warranty to apply. If this pertains to any subsystem or
component for this project, it is the Contractor’s responsibility to make arrangements for the
complete manufacturer warranty to apply. These arrangements are to be at no additional cost to the
Owner.
1.15
SERVICE CONTRACT
A.
As part of this Specification, the Contractor shall initiate a one-year warranty service contract to
commence on the date of final acceptance and continue to the first anniversary of the date of final
acceptance as defined in section 3.10.
B.
The warranty service contract shall include two semi-annual visits to the site for inspection and routine
maintenance of all equipment.
C.
As part of the Bid Response, the Contractor shall provide the Owner with a proposal for continuation of
the warranty service contract for an additional (1), (2), (3), (4), and (5) years. The Contractor shall outline
completely the scope and conditions of the warranty service contract.
PART 2 - PRODUCTS
2.01
Bidding Equipment List
Audiovisual
Systems
Bidding Equipment List
ID
Manufacturer
Model
Item / Description
Unit
Qty
Bidding
Notes
Name :
Ampitheater
Rm Qty :
1
Source Devices
7
Midas
HD96-24-CC-TP
144-input digital mixing console. Touring Package w/Case and
redundant power supply
1
-
MIdas
DL153
16 input - 8 output stage box
3
-
Klark Teknik
DN9680
Multi Channel AES50 Extender
2
-
QSC Audio
Core 110f v2
8 Mic/Line In x 8 Line Out and 8 Flex I/O Audio DSP with POTS,
VOIP, AES67 and QSYS, Expandable to 32x32 Dante (8x8 Included)
1
-
ProX
EZ-Tilt
Lifting-Rolling Stand for Audio Mixer
1
-
Gator
G-TOUR 14U CAST
14U, Standard Audio Road Rack Case W/ Casters
2
-
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 7
End
Com System, Routing, and Distribution
1
Clearcom
MS-702
2-Channel, 1U Main Intercom Station with Built-In Speaker
1
-
End
Sound Reinforcement System
9
Electro-voice
X1I-212/90-FGW
X1i 12" 90° Install array black fiberglass, biamp operation. Sold only
with Dynacord IPX amplifiers.
4
H
Electro-voice
X1I-212/120-FGB
X1i 12" 120° Install array black fiberglass, biamp operation. Sold only
with Dynacord IPX Amplifiers
8
H
Electro-voice
MXE5
DSP Matrix Mix Engine, 36 x 32 performance audio matrix and
system controller with intuitive zone mixing, Dante network and
AES70 control.
1
H
Electro-voice
X12TC-GRID
Compact grid for X1/X2 tops; supports up to 24 X1 or X2 cabinets
(refer to User Manual)
2
H
Electro-voice
X12TI-Rigkit
Rig kit for install speakers
12
-
Electro-voice
ETX-18SP-US
ETX-18SP Powered 18" Subwoofer 1800W
6
H
Electro-voice
PXM-12MP-US
700 Watt 12” powered coaxial monitor, 90° x 90°
8
H
Dynacord
IPX10:4
DSP power amplifier 4x2500W with OMNEO/Dante & FIR drive,
install. Ships with 32A powerCON power connector.
3
H
ElectroVoice
ETX-15P
15" Two-Way Powered Loudspeaker
6
-
End
Rack, Panels, Misc.
####
Gator
G-TOUR 14U CAST
14U, Standard Audio Road Rack Case W/ Casters
2
-
Middle Atlantic
D4LK
Drawer, 4RU, 14-1/2"D
2
-
Middle Atlantic
PDX-915R-SP
NEXSYS™ 9 Outlet, 15 Amp Rackmount Power with Series Surge
Protection
4
-
Middle Atlantic
MRK-4431-AV
MRK-Series 44RU, 31"D Equipment Rack Configured
2
-
-
-
Structural rigging drawing Stamped by Engineer
1
-
1
Installation Materials as Defined in AV Systems Specification
2
2
Custom Wall/Floor Box and Decorator-Style Plates as Needed
Lot
3
Pre-Made Loose Cabling and Field Cabling as Needed
Lot
4
Rack Panels, Vents, Mounts, Shelves, Other Equipment Rack
Materials as Needed
Lot
5
Wall, Ceiling Mounts and Mounting Hardware as Needed
Lot
6
Control System Accessories as Needed
Lot
7
Power Supplies and Power Distribution as Needed
Lot
8
Cable Terminations, Cable Dressing, Labels, Ties, Cable
Management as Needed
Lot
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 8
PART 3 - EXECUTION
3.01
SUBMITTALS
A.
GENERAL
1.
The Contractor shall maintain a Master Set of this entire Specification, including drawings, at the site
at all times during the installation. Any deviations from the Specification made during the installation
shall be marked on this Master Set.
2.
All documentation, drawings, as-builts, etc. must also be submitted electronically in the authored
format and publication format. For example, documents submitted in the .PDF format, shall also be
accompanied by the .DOC file if authored in Microsoft Word.
B.
SOFTWARE
1.
The Contractor shall submit two (2) copies of DSP device configurations, or other customized
software product applications to the Owner, and two (2) copies to the Consultant for review. Unless
otherwise prearranged, submittals shall be in printed form and may include the printed software
graphical output, screen captures, system block diagrams, or logic flows.
C.
SHOP DRAWINGS
D.
The Contractor must receive written approval from the Owner, in writing, prior to fabricating or installing
any materials. Approval will be given based upon shop drawings. The shop drawings shall indicate
complete details of work to be performed. The Contractor shall submit two (2) copies of shop drawings to
the Owner, and two (2) copies of shop drawings to the Consultant for review and approval. Drawings
shall include a title block naming the Project, Consultant, and Contractor, shall include a drawing title,
drawing number, revision number if applicable and date.
E.
The shop drawings listed below are required of the Contractor. If shop drawings prepared by the
Consultant as part of this Specification do not require revision, those drawings do not require
resubmission.
1.
System Signal Flow – Complete functional system signal flow of all systems described herein and
meeting the functions indicated in the Specification.
2.
Architectural Drawings – Floor plans, sections, and/or elevations showing the locations of all
equipment in this Specification.
3.
Cabling Schedule – A list containing the cable type, cable marker number, and origination and
destination location and connector types for each cable.
4.
Loudspeaker Mounting Details – Scaled drawings of complete loudspeaker mounting details,
hardware and support surfaces, including details on all load requirements, safety factors, and
structural materials. Rigging Drawings to be stamped by structural engineer.
5.
Panels – Scaled drawings of interconnect panels, control surfaces, and other custom interfaces.
6.
Peripheral Equipment – Scaled drawings of mounting arrangements of any peripheral equipment,
which may be included in this Specification.
7.
Equipment Rack Layouts – Fully detailed rack drawings indicating equipment orientation within the
equipment rack.
8.
Others, as may be required by the Architect, Consultant or Owner.
F.
LABELS
1.
Except where otherwise indicated, all rack-mounted equipment, switches, controls, and interface
panels shall be clearly labeled.
2.
Panels and plates shall be a minimum 1/8" thick anodized aluminum etched and filled unless
otherwise specified.
3.
Rack mounted equipment shall be labeled with engraved and filled plastic laminate. Where
appropriate, the function of, or the input, output, or loudspeaker(s), served by each device shall be
indicated.
4.
All cables and cables shall be permanently identified at each end by machine printed cable markers
and protected by the appropriate size clear shrink tubing. Cable markers shall be placed two (2)
inches from where the cable exits the strain relief of the connector, but never within a cable bundle.
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 9
Cable tags shall be Brady Lasertab Markers LAT-17-361-2.5 for small to medium diameter cable,
and Brady Lasertab Markers LAT-18-361-2.5 for medium to large diameter cable or equal.
G.
IDENTIFICATION PANEL
1.
An identification panel shall be installed in a suitable place on or within the equipment rack. The
panel shall be of 1/8” engraved characters on filled plastic laminate. The panel shall identify the
Project, System Designer, and Installation Contractor as indicated below:
2.
Project:
City of Glendale
DCRP - Amphitheater
3.
Systems Consultant:
NV5.
West Deer Valley Road
Suite 305
Phoenix, AZ 85027
PH - 623.374.6637
www.NV5.com
4.
Installation Contractor: (Company Name)
(Address)
(Telephone Number)
(website address)
3.02
INSTALLATION PRACTICES
A.
GENERAL
1.
All equipment shall be installed in accordance with this Specification, approved shop drawings, and
manufacturer’s recommendations.
2.
All equipment with the exception of portable equipment shall be firmly fastened or attached in place.
A safety factor of at least four shall be utilized for all brackets, fasteners and attachments.
3.
In the installation of equipment and cable, consideration shall be given not only to operational
efficiency, but also to overall aesthetic factors.
4.
The Contractor shall insure that all equipment is installed such that proper cooling and ventilation is
insured.
5.
All equipment shall be installed in a manner, which prevents hum, RF/EMI/EMF interference, and
mechanical vibration based noises (e.g. fan mounts, etc.)
6.
All equipment shall be protected from construction dust and debris until final acceptance of the
system.
7.
All equipment shall be protected from theft until final acceptance of the system.
8.
Any equipment designed for use by end-users in the facilities must be installed with theft
deterrence/protection mountings and fasteners. Any tools required to mount/un-mount this
equipment must be furnished to the Owner at the date of Owner acceptance.
9.
The Contractor shall be under obligation to protect completed work and uncompleted work against
damage or loss until the Owner has given final acceptance. Should the need arise to repair work or
replace items, The Contractor shall do so at no cost to the Owner.
B.
EQUIPMENT RACKS AND EQUIPMENT RACK CABLE MANAGEMENT
1.
Racks shall be installed in such a way so as to permit access to all equipment for service.
2.
Racks are considered complete components and should be completely assembled and tested at the
Contractors facility prior to onsite installation.
3.
All equipment in racks shall be fitted with vent panels and/or fans as required to provide ventilation
and cooling according to equipment manufacturer’s recommendations.
4.
Adjacent racks shall be bolted together with appropriate ganging hardware.
5.
As a general practice, all power cables, control cables, and high-level cables shall be dressed to the
left rear of an equipment rack. Audio and video cables shall be dressed to the right rear of the rack.
Audio, video and control cables shall be bundled separately and spaced not less than three (3)
inches apart.
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 10
6.
Internal equipment rack cabling shall be supported by lacing strips, support brackets, or other cable
management systems as required to ensure that all cabling is supported in both the vertical and
horizontal planes within the rack.
7.
With the exception of ganged equipment rack assemblies, cabling routed between equipment racks
or pieces of equipment exterior to equipment racks, or extending to the greater facility cabling
infrastructure, shall be completely protected, end-to-end, by a raceway, wire-way, or duct
appropriately sized for the cable run.
8.
Cabling between rolling pieces of equipment not housed in rack cabinets or a rolling equipment rack
and any device to which it is connected, shall be protected by a split-loom corrugated tubing wrap or
other such flexible cable management system appropriately sized for the cable run.
9.
Any controls not to be adjusted by the user and accessible from the front of the equipment rack must
be furnished with security panels.
C.
CABLING
All cabling and termination shall be executed in adherence to standard industry practices and as
outlined in:
•
Philip Giddings. Audio Systems Design and Installation. Boston: Focal Press, 1990.
•
Kenneth T. Deschler. Cable System Design and Installation. McGraw-Hill, Inc. 1987.
1.
CABLE LENGTH VERIFICATION
a.
Cable lengths where given in the Specification, for bulk or manufactured cable assemblies, have
been provided to assist the Contractor in the bidding process. Cable run lengths, where
specified, are end-point-to-end-point estimates and include consideration for tails. Estimates
may be based upon cable tray systems; raceways, conduit runs, and furniture layouts indicated
on construction drawings and may vary from the actual installed cable pathways. It is
responsibility of the Contractor to field verify required cable lengths for bulk cable or
manufactured cable assemblies prior to ordering.
b.
Provide Cable-pull matrix chart
2.
CABLE INSTALLATION
a.
Non-contiguous cable support mechanisms such as hangers, rings, and hooks shall not be
spaced farther than four (4) feet apart. All manufactured raceways used for cables shall be
installed according to the raceway manufacturer’s specifications
b.
Cable runs shall be supported with devices designed for this purpose and are to be installed
independent of any other structural component.
c.
Cables routed vertically up walls, or between floors as vertical riser, shall be supported with
clamps or other mechanisms. These supports shall occur at least three times per floor.
d.
Cable pulling tension may not exceed manufacturer recommendations. Where cable-pulling
lubricant is used, the lubricant must be compatible (non-damaging) with the conduit and cable
sleeve materials and must not harden over time to prevent future pulls.
e.
Cable stapling of any recognized media type shall not be permitted.
f.
Cables shall be dressed in conveniently sized bundles and either laced or banded. Lacing or
banding shall not be so tight as to deform cable bundles.
g.
Cabling installed with a bend radius less than that recommended by the cabling manufacturer is
not acceptable.
h.
Cables and bundles terminating at equipment or connector panels shall be supported so as not
to put strain on connections or connectors.
i.
All cables, with the exception of video or pulse cables, which must be cut to an electrical length,
shall be cut to the length dictated by the run. No splices shall be permitted in any pull boxes
without prior approval of the Consultant.
j.
Cabling for equipment mounted in drawers or on slides shall be provided with a service loop of
appropriate length. A cable management support for the service loop shall be provided to
prevent the service loop travel from interfering with the operation of the drawer or slide or
snagging on adjacent cabling.
k.
Microphone level, line level, loudspeaker level, and video lines shall be run in separate conduits,
trough, raceway divider, and cable bundles. Low voltage DC may be run along with any but
microphone or line level runs.
3.
TERMINATION
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 11
a.
All termination components must meet or exceed all specifications for given media type and
application as described in this document and system drawings.
b.
Crimp on connectors shall be installed only on the appropriate size cable using the manufacturer
recommended crimp tool and die set.
c.
Connections to electronic devices providing screw terminals shall be terminated using the
appropriate gauge insulated spade or ring crimp terminal connector and crimp tool.
d.
All mechanical solder-on connectors shall be attached to cable ends using rosin core solder.
e.
Audio signal cable shields shall be protected with the appropriate gauge Teflon or heat-
shrinkable tubing. The jacket end of each audio cable shall be fitted with the appropriate gauge
heat shrinkable tubing to provide additional protection to the base of the shield or shield foil. This
also applies to the inside of mechanical connectors and cables that terminate at partitioned
barrier strips.
D.
GROUNDING
1.
TECHNICAL POWER
a.
Separate electrical power for audiovisual systems has been provided at this site and is
designated as “technical power.” The technical power grid incorporates a grounding system
utilizing a dedicated isolated ground cable for each receptacle, each of which is connected to the
main technical power distribution panel. The Contractor shall be responsible for verifying that all
media systems electronics, racks, and components derive their power from technical power
receptacles only.
2.
GENERAL
a.
To avoid system noise, data errors, safety hazards, and equipment damage, all devices and
cabling shall be installed using a consistent grounding scheme. All devices shall be grounded
and all ground conductors shall follow a star topology. Each equipment rack and each piece of
signal bearing equipment shall be connected such that that there is never more than a single
path to ground. This section offers guidelines for grounding and shielding methodology.
Grounding and shielding methodology may need to be augmented or modified for certain pieces
of equipment or interconnections in order to meet the requirements of other sections of this
specification. The Contractor shall be responsible for making necessary alterations in
accordance with industry practices and such that the Performance Standards detailed in Section
3.3 are met.
b.
Ground conductors referred to in this section shall be 10AWG insulated solid copper cable.
Ground conductors shall be terminated using a closed ring lug, of proper size for each
application, which shall be connected to system electronic components and the equipment rack
master bus using nuts, bolts, and lock washers.
c.
Under no circumstances shall an AC neutral conductor be used to ground equipment.
3.
POWER DISTRIBUTION WITHIN EQUIPMENT RACKS
a.
All AC power distribution within equipment racks shall utilize a star grounding topology and
isolated ground receptacles
b.
Equipment rack power distribution systems shall be grounded by way of the 3-conductor AC line
cord(s) provided with such equipment.
4.
EQUIPMENT RACKS
a.
A “master ground bus” shall be established in the equipment rack(s) serving each area. The
master ground bus shall consist of a copper bar, which shall be electrically isolated from the
equipment rack, and of sufficient size to accommodate all attached ground conductors.
b.
The equipment rack master ground bus shall be connected to the ground pin of an isolated AC
outlet of the equipment rack power distribution system using a ground conductor.
c.
Each equipment rack chassis shall be connected to the master ground bus.
d.
The Contractor shall ensure that each equipment rack remains electrically isolated from any
other ground source, including conduits, raceways, and building steel.
e.
Active components having a grounded AC line cord shall be grounded using the supplied AC line
cord connected to the equipment rack power distribution system.
f.
Active components without a grounded AC line cord shall be connected to the master ground
bus using a ground conductor.
g.
Passive signal carrying components, which have no AC line cord, shall be connected to the
master ground bus using a ground conductor.
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 12
5.
INTERCONNECTION
a.
All connectors used on system I/O panels shall be electrically isolated from the panel and
provide a pass through (uninterrupted) ground connection.
b.
Microphone cable shields shall be connected to the microphone frame and grounded only at the
preamplifier input connector.
c.
All audio interconnections with cable lengths greater than 10 feet shall use balanced
(symmetrical) signaling.
d.
All audio signal cable shields shall be grounded only at the input connection of each device.
Signal cable shields, both connected to devices and floating, shall be protected by the
appropriate gauge heat shrinkable tubing. Shields at the output connector shall be folded back
over the cable jacket and covered with heat-shrinkable tubing. Do not cut off unused shields.
6.
PULL STRINGS
a.
A nylon pull string shall be left in every conduit. In the event additional cables are pulled in after
the initial cable pull, a nylon pull string shall be pulled with the added cable.
3.03
PERFORMANCE STANDARDS
A.
AUDIO
1.
POLARITY
a.
Absolute signal polarity will be maintained throughout the signal chain such that a positive signal
at the input produces a corresponding positive excursion at the loudspeakers.
B.
ELECTRONICS
1.
The audio system electronics shall deliver the following minimum performance standards as
measured from all source inputs for microphones, audio tape machines, video tape machines, etc.,
through all mixers, audio distribution amplifiers, routers, etc., to all audio signal destinations.
a.
Frequency Response:
0.5dB, 20-20,000 Hz.
b.
Hum and Noise:
-70 dBu, 20-20,000 Hz, un-weighted.
c.
Distortion:
0.1% THD, 20-20,000 Hz
C.
AUDIO SIGNAL
1.
The system shall provide an audio signal in the audience seating area that meets the following
requirements:
a.
Frequency response within +/- 3 dB from 40 Hz to 18,000 Hz.
b.
Overall SPL variance of +/- 3 dB.
c.
Maximum average SPL of 95 dB (flat), with 10 dB of undistorted headroom available at the mix
position.
3.04
SYSTEM SETUP AND TUNING
A.
OPTIMIZATION
1.
The Contractor shall install, configure, adjust, program, and calibrate all components in order to
optimize the performance of all individual subsystems and the system as a whole.
B.
PRELIMINARY TESTS AND SUBMITTALS
1.
GENERAL
2.
Once the system is installed, the Contractor shall complete the following preliminary tests and
prepare a written test report for the Consultant. The test report will list the results of each of the tests
described in this section and certify that the installation is complete
3.
The Contractor shall perform the following tests:
a.
Prior to the termination of audio amplifiers to speakers, the Contractor shall measure the
resistance of the speaker line with reference to ground to determine that no short circuits or
paths to ground exist in the line. The Contractor shall connect the speaker to the cable and
measure the impedance of each speaker line using a 1,000Hz signal applied to the line. The
Contractor shall submit a list, to the Consultant, by cable number, of the impedance of each
speaker line. This test shall be performed with the amplifier disconnected from the speaker line
and the speaker connected to the speaker line.
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 13
b.
The Contractor shall verify the coverage and frequency response of the system through FFT
analysis. Acceptable testing equipment includes Meyer SIM II, Smaart, TEF, and SpectraFoo.
c.
Verify all loudspeakers are working.
d.
Verify that the system meets all Performance Standards as outlined in Section 3.03 of the
Specification.
e.
Verify that all equipment, panels, and cables are labeled correctly.
f.
Verify each item of equipment is functioning as intended.
g.
Verify the installation is the same as specified.
3.05
FINAL TESTS
A.
Upon approval of the Contractor's test report, and at a time that is mutually acceptable to the Contractor
and Consultant, the Contractor shall assist the Consultant in final system tests and adjustments. The
Contractor shall demonstrate that the system meets the Performance Standards outlined in Section 3.03.
The Contractor shall allow two (2) days to perform the tests. The Contractor's representatives assisting in
the performance of these tests shall be thoroughly familiar with the details of the system and shall include
the field supervisor responsible for installing the system.
3.06
FINAL DOCUMENTATION
A.
Upon completion of the work, the Contractor shall condense the Master Set along with any Shop
Drawings into a single “As Built” drawing set. Any markings or deviations, which cannot be made clear on
the drawings, shall be accompanied by attached documentation, photos, or written addenda.
B.
The Contractor shall prepare to deliver four (4) copies of the documentation listed below at the time of
Final Testing. Two copies are to be submitted to the Owner. The third copy is to be submitted to the
Consultant. The fourth copy is to be kept and maintained by the Contractor to facilitate service of the
system.
C.
DOCUMENTS
1.
The documentation shall be bound in three ring binders and organized as follows:
2.
A cover and spine listing the Owner, Consultant, and Contractor.
3.
A listing of each supplied item with manufacturer, model number and serial number.
4.
Operator's manuals for each piece of equipment supplied by the Contractor.
5.
A complete set of as built drawings. The drawings shall be E size, folded and inserted into the
binders in plastic sleeves.
6.
A detailed documented front view of all equipment racks showing the final settings for every
pushbutton, rotary control, slider control, or indicator. This information may be in the form of
photographs provided that sufficient detail exists to determine equipment settings.
7.
The electronic documentation submitted on CD-ROM shall adhere to the following formats:
8.
.PDF for documents
9.
.DWG for drawings
10. .JPG (1024x768, 24bit – minimum) for photographs
11. Alternately, if the Contractor so chooses, the Final Documentation may be submitted electronically
rather than the binders described above. The preferred formats are .PDF for documents, .DWG for
drawings, and .JPG (1024x768, 24bit – minimum) for photographs. This option requires coordination
with the Owner prior to document preparation to determine the Owner preferred media type.
3.07
PUBLICATION AND PHOTOGRAPHY
A.
Prior written consent from the Owner is required before submitting any information or photographs about
this project for publication. There shall be no exceptions.
3.08
TRAINING
A.
The Contractor shall provide a total of twelve (12) hours of on-site training for the Owner’s staff at a time
that is mutually agreeable for the Owner and Contractor. The Contractor should anticipate two sessions
of six hours each. The Owner may choose to have the sessions spread out over a maximum of 2
Downtown Campus Reinvestment Project
Holly Street Studio with Lightvox Studio
City of Glendale
Project No. 115
Glendale, Arizona
OWNER COMMENT + CONSTRUCTION COORDINATION | 02-06-25
Prepared By: NV5
AUDIOVISUAL SYSTEMS
27 40 00 - 14
different days. Final acceptance and/or final payment for the system shall not be delayed due to
scheduling delays beyond the control of the Contractor.
3.09
SYSTEM ACCEPTANCE
A.
Upon successful completion of Final Tests, Documentation and Training, the Contractor shall notify the
Owner, in writing, that the system is complete. The Consultant shall have fifteen (15) days to generate a
“punch list” of omissions, adjustments, corrections and the like and respond in writing to the Contractor.
In the absence of such a “Punch List”, the system shall be considered to be complete. The warranty shall
commence on the fifteenth day after the Contractor’s notification of completion of work. In the event that
further work is required to complete this project, the Contractor shall be prepared to continue work,
without additional compensation, until the system is accepted.
PART 4 - List of Drawings
A.
Select Sheets of the overall campus infrastructure package provided here for Amphitheater area only.
1.
T0.01 Technology Infrastructure Legends and Notes
2.
T0.02 Technology Infrastructure Legends and Notes
3.
T2.20 Technology Infrastructure Floor Plan Garden Level + Level 1
4.
T2.30 Technology Infrastructure Floor Plan Amphitheater Garden Level + Level 1 Stage
5.
T2.60 Technology Infrastructure RCP Garden Level + Level 1
6.
T2.70 Technology Infrastructure RCP Amphitheater Garden + Level 1 Stage
7.
T4.02 Telecom Enlarged Plans and Elevations
8.
T5.01 Audiovisual Infrastructure Room Risers
9.
T8.01 Technology Infrastructure Details
END OF SECTION