Ad Hoc Task Force Committee
Final Report & Recommendations
Andrew Linton  :  Director : November 3, 2025

Andy Linton
Director
Maricopa County Environmental 
Services Department
David Pounders
Professional Engineer
Committee Chair
02
PRESENTERS

03
OVERVIEW
At the 7/31/25 kickoff meeting, the committee members were tasked with developing 
recommendations to streamline review processes, enhance communication, and improve 
regulatory clarity.
Evaluation of Onsite Wastewater Program
Onsite Ad Hoc Task 
Force Committee

Recommendations
Ad Hoc Task Force Committee 
David Pounders : Committee Chair

05
Issue: Staff Interpretation￿of￿rules￿and￿statutes￿can￿be￿communicated￿to￿customers￿more￿
effectively.￿
01
Recommendation
Status
Develop a procedure for customers to escalate concerns/disagreements 
regarding rule requirements
Complete by 11/30/25
Provide direction in the staff training manual for resolving conflicts with 
general permits related to proprietary products
Complete by 12/31/25
Provide customers with guidance when deviations between General Permits, 
proprietary products, and product installation manuals present themselves
Complete by 11/30/25

06
(Continued) Issue: Interpretation￿of￿requirements￿needs￿to￿be￿communicated￿more￿
effectively.￿
 
01
Recommendation
Status
Provide the Department’s procedure for accepting Certificates of Completion 
to stakeholders via the Waterworks Bulletin
Complete by 01/31/26
Share new rule interpretations a with stakeholders via the Waterworks 
Bulletin prior to implementation
Complete by 12/31/25
Schedule a quarterly check-in meeting between Environmental Services and 
Planning & Development to ensure consistency
Completed

07
Issue: Requirements￿related￿to￿alluvial￿basins￿are￿unclear￿due￿to￿inconsistencies￿with￿
publicly￿available￿maps.￿
02
Recommendation
Status
Provide a directive in the staff training manual that staff utilize the ADEQ 
online alluvial map to make compliance determinations
Complete by 11/30/25
Issue: Redundant￿soil￿testing￿causes￿delays￿and￿unnecessary￿expense.
03
Recommendation
Status
Create a procedure that allows a health certificate to be issued based on the 
submittal of a geological report
Completed

08
Issue: Sometimes,￿designers￿get￿a￿second￿hold￿letter￿with￿new￿items￿that￿were￿not￿
addressed￿on￿the￿first￿hold￿letter.￿
04
Recommendation
Status
The Onsite Program will develop written guidance for staff to:
•
Ensure the same plan reviewer reviews plans for contiguous lots
•
Ensure plan reviewers include all deficiencies on initial hold letters
•
Prohibit the addition of hold items based on phone conversations and 
email exchanges
•
Provide red line annotations when they are required by a municipality
Complete by 11/30/25
Develop a list of top hold letter items/deficiencies and other common 
mistakes and best practices when submitting applications
  
Complete by 11/30/25

09
Issue: Wait￿times￿tend￿to￿average￿3-5￿days￿for￿inspections.￿Ideal￿wait￿times￿should￿be￿1-2￿
business￿days￿to￿align￿with￿building￿inspections.￿
05
Recommendation
Status
Maintain a 1-2 day response time to inspection requests by developing a 
procedure that allows for virtual re-inspections
Complete by 12/31/25
Provide direction in the staff training manual that approval from the designer 
is sufficient to issue Construction Authorizations for alternative systems
Complete by 12/31/25
Develop procedures to better train Onsite Wastewater Program inspectors on 
alternative systems and network with industry for in-person training 
Complete by 12/31/25

10
Issue: If￿a￿significant￿change￿is￿needed￿on￿a￿conventional￿system￿after￿Construction￿
Authorization￿is￿issued,￿the￿original￿designer￿should￿be￿involved￿in￿approving￿it.￿
06
Recommendation
Status
Develop guidance in the staff training manual to ensure revisions submitted 
after the Construction Authorization has been issued are completed by the 
original designer or their designee when available
Complete by 11/30/25

11
Issue: ADEQ’s￿onsite￿wastewater￿rules￿cause￿delays￿and￿unnecessary￿expense￿because￿they￿
are￿outdated,￿unclear,￿and￿do￿not￿adequately￿consider￿￿current￿practices.￿
07
Recommendation
Status
Send a formal letter to the ADEQ director summarizing the regulatory 
concerns caused by outdated on-site wastewater rules, to be signed by 
the Director of MCESD and the Ad Hoc Task Force:
Complete by 11/30/25
• There is no process for new owners of 
properties with alternative systems to be 
make aware of O&M requirements
• Clarification is needed on where SPPT 
locations should be in relation to the 
proposed disposal area
• Greater consideration should be given to 
not requiring a reserve area in septic 
subdivisions
• Subdivision soil testing requirements are 
not clear for health certification approval 
• The interpretation of a 
“contiguous site” is inconsistent 
• Clarity and clear parameters are needed 
for a determination of sewer availability
• There is no way to extend or renew a 
septic permit construction authorization. 
Consideration should be given to renew 
them without a reapplication

Action 
Requested
To consider the 
recommendations, 
accept the report, 
whole or in part, as 
submitted by the Ad 
Hoc Task Force and 
to provide guidance 
and direction to staff.
12

Thank You
ONSITE AD HOC TASK FORCE COMMITTEE: 
David Pounders (Committee Chair), Brian Mings, Dan Caparros, David Bartholomew, Jaime Griffin, Kathy Mills, Mark 
Basic, Tabitha Zapata
 
 
STAFF: 
Ryan Hall, Brian Knisley, Logan Peiman, and Andy Linton