A-00905225-0-MCAQD- AWARD.PDF

Maricopa County — Formal (2025-08-01)

View PDF Item 46 Meeting page

Extracted text (via pymupdf) 18192 characters
A - 00905225 - 0      Page 1
U.S. ENVIRONMENTAL
PROTECTION AGENCY
Grant Agreement
GRANT NUMBER (FAIN):
00905225
MODIFICATION NUMBER:
0
PROGRAM CODE:
A
DATE OF AWARD
08/04/2025
TYPE OF ACTION:
New
MAILING DATE
08/07/2025
PAYMENT METHOD:
ASAP
ACH#
90179
RECIPIENT TYPE:
County
Send Payment Request to:
Contact EPA RTPFC at: rtpfc-grants@epa.gov
RECIPIENT:
MARICOPA COUNTY AIR QUALITY DEPARTMENT
301 W JEFFERSON ST STE 410
PHOENIX, AZ 85003-2157
EIN: 86-6000472
PAYEE:
MARICOPA COUNTY AIR QUALITY DEPARTMENT
301 W JEFFERSON ST STE 410
PHOENIX, AZ 85003-2157
PROJECT MANAGER
Eric Poole
2145 S 11TH AVE
SUITE 170
PHOENIX, AZ 85007
Eric.Poole@maricopa.gov
Email:
602-506-6737
Phone:
EPA PROJECT OFFICER
Jean Samolis
75 Hawthorne Street, AIR-1
San Francisco, CA 94105
samolis.jean@epa.gov
Email:
415-972-3939
Phone:
EPA GRANT SPECIALIST
Karla CarrilloCastillo
Grants Branch, MSD-6
75 Hawthorne Street
San Francisco, CA 94105
carrillocastillo.karla@epa.gov
Email:
415-972-3372
Phone:
PROJECT TITLE AND DESCRIPTION
FY 25 Air Pollution Control Program
See Attachment 1 for project description.
BUDGET PERIOD
10/01/2024 - 09/30/2025
PROJECT PERIOD
10/01/2024 - 09/30/2025
TOTAL BUDGET PERIOD COST
$ 9,830,381.00
TOTAL PROJECT PERIOD COST
$ 9,830,381.00
NOTICE OF AWARD
Based on your Application dated 07/31/2024 including all modifications and amendments, the United States acting by and through the US Environmental
Protection Agency (EPA) hereby awards $ 1,147,680.00. EPA agrees to cost-share 11.67% of all approved budget period costs incurred, up to and not
exceeding total federal funding of $ 1,147,680.00. Recipient's signature is not required on this agreement. The recipient demonstrates its commitment to carry
out this award by either: 1) drawing down funds within 21 days after the EPA award or amendment mailing date; or 2) not filing a notice of disagreement with
the award terms and conditions within 21 days after the EPA award or amendment mailing date. If the recipient disagrees with the terms and conditions
specified in this award, the authorized representative of the recipient must furnish a notice of disagreement to the EPA Award Official within 21 days after the
EPA award or amendment mailing date. In case of disagreement, and until the disagreement is resolved, the recipient should not draw down on the funds
provided by this award/amendment, and any costs incurred by the recipient are at its own risk. This agreement is subject to applicable EPA regulatory and
statutory provisions, all terms and conditions of this agreement and any attachments.
ISSUING OFFICE (GRANTS MANAGEMENT OFFICE)
ORGANIZATION / ADDRESS
U.S. EPA, Region 9, U.S. EPA, Region 9 Grants Branch, MSD-6
75 Hawthorne Street
San Francisco, CA 94105
AWARD APPROVAL OFFICE
ORGANIZATION / ADDRESS
U.S. EPA, Region 9, Air and Radiation Division, AIR-1
R9 - Region 9
75 Hawthorne Street
San Francisco, CA 94105
THE UNITED STATES OF AMERICA BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY
Digital signature applied by EPA Award Official Ellen Blake - Assistant Director
DATE
08/04/2025

A - 00905225 - 0      Page 2
EPA Funding Information
FUNDS
FORMER AWARD
THIS ACTION
AMENDED TOTAL
EPA Amount This Action
$ 0
$ 1,147,680
$ 1,147,680
EPA In-Kind Amount
$ 0
$ 0
$ 0
Unexpended Prior Year Balance
$ 0
$ 0
$ 0
Other Federal Funds
$ 0
$ 0
$ 0
Recipient Contribution
$ 0
$ 8,682,701
$ 8,682,701
State Contribution
$ 0
$ 0
$ 0
Local Contribution
$ 0
$ 0
$ 0
Other Contribution
$ 0
$ 0
$ 0
Allowable Project Cost
$ 0
$ 9,830,381
$ 9,830,381
Assistance Program
66.001 - Air Pollution Control Program Support
Statutory Authority
Clean Air Act: Sec. 105
Regulatory Authority
2 CFR 200, 2 CFR 1500, 40 CFR 33 and 40 CFR
35 Subpart A
Fiscal
Site Name
Req No
FY
Approp.
Code
Budget
Organization
PRC
Object
Class
Site/Project
Cost
Organization
Obligation /
Deobligation
-
2509M7S026
25
E1
09M1
000A04
4112
-
-
$ 1,147,680
$ 1,147,680

A - 00905225 - 0      Page 3
Budget Summary Page
Table A - Object Class Category
(Non-Construction)
Total Approved Allowable
Budget Period Cost
1. Personnel
$ 5,016,594
2. Fringe Benefits
$ 2,006,641
3. Travel
$ 0
4. Equipment
$ 0
5. Supplies
$ 102,480
6. Contractual
$ 97,195
7. Construction
$ 0
8. Other
$ 0
9. Total Direct Charges
$ 7,222,910
10. Indirect Costs: 0.00 % Base : see General T/C
$ 2,607,471
11. Total (Share: Recipient ______ % Federal ______ %)
88.33
11.67
$ 9,830,381
12. Total Approved Assistance Amount
$ 1,147,680
13. Program Income
$ 0
14. Total EPA Amount Awarded This Action
$ 1,147,680
15. Total EPA Amount Awarded To Date
$ 1,147,680

A - 00905225 - 0      Page 4
Attachment 1 - Project Description
This agreement provides funding to Maricopa County Air Quality Department (MCAQD) in its efforts to
implement air pollution control programs throughout the Maricopa County area.
This assistance agreement provides full funding in the amount of $1,147,680. Pre-award costs are
approved back to 10/01/2024. See terms and conditions.
The activities include implementing activities within the scope of the Section 105 program including: 1)
To implement national priorities as defined in EPA national guidance and consistent with EPA’s Strategic
Plan; 2) actions mandated by statute or regulation; 3) Program activities delegated to the recipient (state,
local or tribe) for which EPA provides section 105 grant funding. A continuing program typically includes,
but is not limited to, such activities as: analysis and planning for attainment and maintenance of national
ambient air quality standards NAAQS; control strategy development and implementation; reduction of
risks from hazardous air pollutants; air quality monitoring; ambient air quality and source modeling;
inventory of emissions; regulation development and implementation; non-Title V related permitting and
enforcement; public outreach; staff training and development; air pollution data analysis and
management; air cross-media analysis and control; air pollution prevention activities; and other
innovative approaches to pollution reduction including economic incentive and market-based (allowance
and trading) programs.The anticipated deliverables include submitting quality assured monitoring data on
a quarterly basis, submitting an air monitoring annual network plan, submitting updates to the quality
assurance plans, stationary source and dust control compliance and enforcement activities and
permitting activities.
The expected outcomes include a broadened awareness of air quality programs that are established to
address the attainment and maintenance of (NAAQS) as well as immediate and emerging threats to
public health and welfare from air pollution (CAA 105(a)).
The intended beneficiaries include Maricopa County residents who will have decreased exposure to
criteria and hazardous air pollutants.
No subawards are included in this assistance agreement.

A - 00905225 - 0      Page 5
Administrative Conditions
General Terms and Conditions
The recipient agrees to comply with the current Environmental Protection Agency (EPA) general terms
and conditions available at: https://www.epa.gov/grants/epa-general-terms-and-conditions-effective-
october-1-2024-or-later
These terms and conditions are in addition to the assurances and certifications made as a part of the
award and the terms, conditions, or restrictions cited throughout the award.
The EPA repository for the general terms and conditions by year can be found at: https://www.epa.
gov/grants/grant-terms-and-conditions#general.
A.  Federal Financial Reporting (FFR)
For awards with cumulative project and budget periods greater than 12 months, the recipient will submit
an annual FFR (SF 425) covering the period from "project/budget period start date" to September 30 of
each calendar year to the EPA Finance Center in Research Triangle Park, NC.  The annual FFR will be
submitted electronically to rtpfc-grants@epa.gov no later than December 30 of the same calendar
year. Find additional information at https://www.epa.gov/financial/grants.  (Per 2 CFR § 200.344(b), the
recipient must submit the Final FFR to rtpfc-grants@epa.gov within 120 days after the end of the project
period.)
The recipient shall identify non-federal, non-recurrent expenditures in Block 12 (Remarks) of the FFR or
include the information as an attachment to the FFR on a separate page. The recipient also agrees to
include a statement certifying that supplanting did not occur.
B.  Procurement 
The recipient will ensure all procurement transactions will be conducted in a manner providing full and
open competition consistent with 2 CFR § 200.319. In accordance with 2 CFR § 200.324, the
recipient and subawardee(s) must perform a cost or price analysis in connection with applicable
procurement actions, including contract modifications. 
State and Tribal government entities must follow procurement standards as outlined in 2 CFR §
200.317.
C.  Cost-Share Requirement and Maintenance of Effort   
The required minimum recipient cost share for this assistance agreement is 40% of total project costs, or
Maintenance of Effort (MOE) level of  $8,682,701 (final MOE for FY-2024), whichever is greater
whichever is greater.  The assistance agreement may reflect a percentage shown under the "Notice of
Award" section which is based on estimated costs requested in the recipient's application.

A - 00905225 - 0      Page 6
Programmatic Conditions
a.]  Performance Reporting and Final Performance Report  
Performance Reports - Content
In accordance with 2 CFR 200.329, the recipient must relate financial data and project or program
accomplishments to the performance goals and objectives of the EPA award and must provide cost
information to demonstrate cost-effective practices (for example, through unit cost data) when reporting
program performance. The recipient agrees to submit performance reports that include information on
each of the following areas:  1) A comparison of accomplishments to the outputs/outcomes established in
the assistance agreement work plan for the reporting period (for example, comparing costs to units of
accomplishment); 2) explanations on why established outputs/outcomes were not met; and 3) Additional
information, analysis, and explanation of cost overruns or higher-than-expected-unit costs.
Additionally, the recipient agrees to notify the EPA when a significant development occurs that could
impact the award. Significant developments include events that enable meeting milestones and
objectives sooner or at less cost than anticipated or that produce different beneficial results than
originally planned. Significant developments also include problems, delays, or adverse conditions which
will impact the ability to meet the milestones or objectives of the award, including outputs/outcomes
specified in the assistance agreement work plan. If the significant developments negatively impact the
award, the recipient must include information on their plan for corrective action and any assistance
needed to resolve the situation.
For State Categorical Program Grants Only: Interim performance and final progress reports must
prominently display the three Essential Elements for state work plans:  1) Strategic Plan Goal; (2)
Strategic Plan Objective; and (3) Workplan Commitments plus time frame.
(See Grants Policy Issuance 11-03 State Grant Workplans and Progress Reports for more information)
Performance Reports - Frequency
The recipient agrees to submit semi-annual performance reports electronically to the EPA Project
Officer due within 30 days after the end of the reporting period (every six-month period). The recipient
must submit the final performance report no later than 120 calendar days after the period of
performance.
b.]  Cybersecurity Grant Condition for Other Recipients, Including Intertribal Consortia
(a) The recipient agrees that when collecting and managing environmental data under this assistance
agreement, it will protect the data by following all applicable State or Tribal law cybersecurity
requirements.
(b) (1) EPA must ensure that any connections between the recipient's network or information system and
EPA networks used by the recipient to transfer data under this agreement, are secure. For purposes of
this Section, a connection is defined as a dedicated persistent interface between an Agency IT system
and an external IT system for the purpose of transferring information. Transitory, user-controlled
connections such as website browsing are excluded from this definition.

A - 00905225 - 0      Page 7
If the recipient's connections as defined above do not go through the Environmental Information
Exchange Network or EPA's Central Data Exchange, the recipient agrees to contact the EPA Project
Officer (PO) no later than 90 days after the date of this award and work with the designated
Regional/Headquarters Information Security Officer to ensure that the connections meet EPA security
requirements, including entering into Interconnection Service Agreements as appropriate. This condition
does not apply to manual entry of data by the recipient into systems operated and used by EPA's
regulatory programs for the submission of reporting and/or compliance data.
(2) The recipient agrees that any subawards it makes under this agreement will require the subrecipient
to comply with the requirements in (b)(1) if the subrecipient's network or information system is connected
to EPA networks to transfer data to the Agency using systems other than the Environmental Information
Exchange Network or EPA's Central Data Exchange. The recipient will be in compliance with this
condition: by including this requirement in subaward agreements; and during subrecipient monitoring
deemed necessary by the recipient or subrecipient under 2 CFR 200.332(e), by inquiring whether the
subrecipient has contacted the EPA Project Officer. Nothing in this condition requires the recipient to
contact the EPA Project Officer on behalf of a subrecipient or to be involved in the negotiation of an
Interconnection Service Agreement between the subrecipient and EPA.
c.]  Competency of Organizations Generating Environmental Measurement Data
In accordance with Agency Policy Directive Number FEM-2012-02, Policy to Assure the Competency of
Organizations Generating Environmental Measurement Data under Agency-Funded Assistance
Agreements, Recipient agrees, by entering into this agreement, that it has demonstrated competency
prior to award, or alternatively, where a pre-award demonstration of competency is not practicable,
Recipient agrees to demonstrate competency prior to carrying out any activities under the award
involving the generation or use of environmental data. Recipient shall maintain competency for the
duration of the project period of this agreement and this will be documented during the annual reporting
process.  A copy of the Policy is available online at https://www.epa.gov/measurements-
modeling/documents-about-measurement-competency-under-assistance-agreements or a copy may also
be requested by contacting the EPA Project Officer for this award.    
d.]   Quality Assurance
Authority: Quality Assurance applies to all assistance agreements involving environmental information as
defined in 2 C.F.R. § 1500.12 Quality Assurance.
1. Quality Management Plan (QMP)
a. Prior to beginning environmental information operations, the recipient must:
i. Submit a previously EPA-approved and current QMP,
ii. The EPA Quality Assurance Manager or designee (hereafter referred to as QAM) will notify the
recipient and EPA Project Officer (PO) in writing if the QMP is acceptable for this agreement.
b. The recipient must submit the QMP within 30 days after grant award, and/or no more than 60 days
after grant award.
c. The recipient must review their approved QMP at least annually. These documented reviews shall be

A - 00905225 - 0      Page 8
made available to the sponsoring EPA organization if requested. When necessary, the recipient shall
revise its QMP to incorporate minor changes and notify the EPA PO and QAM of the changes. If
significant changes have been made to the Quality Program that affect the performance of environmental
information operations, it may be necessary to re-submit the entire QMP for re-approval. In general, a
copy of any QMP revision(s) made during the year should be submitted to the EPA PO and QAM in
writing when such changes occur. Conditions requiring the revision and resubmittal of an approved QMP
can be found in section 6 of EPA's Quality Management Plan (QMP) Standard.  
2. Quality Assurance Project Plan (QAPP)
Prior to beginning environmental information operations, the recipient must:
i. Submit a previously EPA-approved QAPP proposed to ensure the collected, produced, evaluated, or
used environmental information is of known and documented quality for the intended use(s).
ii. The EPA Quality Assurance Manager or designee (hereafter referred to as QAM) will notify the
recipient and EPA Project Officer (PO) in writing if the previously EPA-approved QAPP is acceptable for
this agreement.
For Reference:
• Quality Management Plan (QMP) Standard and EPA's Quality Assurance Project Plan (QAPP)
Standard; contain quality specifications for EPA and non-EPA organizations and definitions applicable to
these terms and conditions.
• EPA QA/G-5: Guidance for Quality Assurance Project Plans.
• EPA's Quality Program website has a list of QA managers, and Specifications for EPA and Non-EPA
Organizations.
• The Office of Grants and Debarment Implementation of Quality Assurance Requirements for
Organizations Receiving EPA Financial Assistance.
e.]  Use of Logos
If the EPA logo is appearing along with logos from other participating entities on websites, outreach
materials, or reports, it must not be prominently displayed to imply that any of the recipient or
subrecipient's activities are being conducted by the EPA. Instead, the EPA logo should be accompanied
with a statement indicating that the Maricopa County Air Quality Dept received financial support from
the EPA under an Assistance Agreement. More information is available at: https://www.epa.
gov/stylebook/using-epa-seal-and-logo#policy
__END OF DOCUMENT__