Run Date:
06/26/2025
U.S. DEPARTMENT OF TRANSPORTATION
Report: FMISD05A
Run Time:
11:15:27
FEDERAL HIGHWAY ADMINISTRATION
Page 1 of 2
FEDERAL-AID PROJECT AGREEMENT
RECIPIENT:
4-Arizona
FEDERAL PROJECT NO:
MMA0301
UEI (SAM):
MSVMLAKEYJC5
RECIPIENT PROJ. NO(S):
T063701D,T063701X
1. The State through its department of transportation, or other recipient, has complied, or hereby agrees to comply, with the applicable terms and conditions 
set forth in (a) Title 23, U.S. Code, highways;
(b) The regulations issued pursuant thereto, and the policies and procedures promulgated by the 
Federal Highway Administration; and
(c) All other applicable federal laws and regulations.2. The State, or other recipient, stipulates that as a 
condition to payment of the Federal funds obligated, it accepts and will comply with the provisions set forth in 23 CFR 630.112.  These provisions 
incorporate by reference all other federal laws and regulations pertaining to the project or the activity for which the funds are obligated.  Solely for the 
purposes of emphasis, such applicable provisions include, but are not limited to, the requirements of Appendix A to 2 CFR Part 170—Award terms for 
Reporting subaward and executive compensation information, and 2 CFR 200, including for those funds for which such amount will be subawarded to a 
subrecipient, 2 CFR 200.331.3. Relative to the above designated project, the FHWA has authorized certain work to proceed as evidenced by the date entered
opposite the specific item of work.  For such authorized work, the federal funds obligated or advance-construction authorized, are not to exceed the amount 
shown herein.  The balance of the estimated total project cost is an obligation of the State or other direct recipient.4. Such authorization of Federal funds 
extends only to project costs incurred by the State, or other recipient, following Federal Highway Administration’s authorization to proceed with the project.
PROJECT TITLE:
 22 Locations - Maricopa County Department of Transportation (MCDOT)
PROJECT DESCRIPTION:
Detection Upgrades for Advanced Data Analytics
DUNS#:
SUBRECIPIENT PROJECT:
No
SUBRECIPIENT UEI (SAM):
SUBRECIPIENT NAME:
PROJECT END DATE:
06/30/2030
CLASSIFICATION OF PHASE OF WORK
TO BE PUT UNDER AGREEMENT
EFFECTIVE DATE OF
AUTHORIZATION
HIGHWAY PLANNING & RESEARCH
PRELIMINARY ENGINEERING
RIGHT-OF-WAY
CONSTRUCTION
OTHER
06/26/2025
PROGRAM
CODE
FAIN
URBAN/
WITH
TOTAL COST
FEDERAL
SHARE
FEDERAL FUNDS
UNDER
AGREEMENT
ADVANCED
CONST. FUNDS
Y400
693JJ22530000Y400AZMMA0301
$963,925.00
94.30%
$899,551.00
$0.00
TOTAL
$963,925.00
$899,551.00
$0.00
ESTIMATED TOTAL COST:
$963,925.00
TOTAL AUTHORIZED FOR PROJECT:
$899,551.00
DEPARTMENT OF TRANSPORTATION ARIZONA
AVAILABLE FUNDS CERTIFIED BY:
Randall Matthew
DATE:
06/25/2025
APPROVED AND REQUESTED BY:
Alison Hart
DATE:
06/25/2025
AGRMT/MODIFY REQUESTED BY:
Alison Hart
DATE:
06/25/2025
FEDERAL HIGHWAY ADMINISTRATION
PROJECT INFORMATION REVIEWED BY:
Roman Moreno
DATE:
06/25/2025
APPROVAL RECOMMENDED BY:
Kieran Jordan
DATE:
06/26/2025
APPROVED AND AUTHORIZED BY:
Jennifer Acuna
DATE:
06/26/2025
RECIPIENT REMARKS:
*OTH - Establishing Procurement of Advanced video detection systems at 22 MCDOT- owned and maintained 
intersections. This project will provide enhanced real-time and archived data collection and analytics capabilities. 
The total project cost of $963,925.00 includes $10,000.00 of funds provided by MCDOT previously used for PE 
and are not part of the requested Procurement cost in this authorization
Project End Date: 6/30/2030
CFDA Number: 20.205
FY25 ICAP Rate: 7.90%, not applicable to this project

Run Date:
06/26/2025
U.S. DEPARTMENT OF TRANSPORTATION
Report: FMISD05A
Run Time:
11:15:27
FEDERAL HIGHWAY ADMINISTRATION
Page 2 of 2
FEDERAL-AID PROJECT AGREEMENT
FHWA REMARKS:
Project End Date: 6/30/2030
CFDA Number: 20.205
FY25 ICAP Rate: 7.90% not applicable to this project
Establishing Procurement of Advanced video detection systems at 22 MCDOT- owned and maintained 
intersections. This project will
provide enhanced real-time and archived data collection and analytics capabilities.
The total project cost of $963,925.00 includes $10,000.00 of funds provided by MCDOT previously used for PE 
and are not part
of the requested Procurement cost in this authorization
Other authorized on 06/26/2025 by K.Jordan.

UEI (SAM): MSVMLAKEYJC5
SUFFIX
D
GENERAL LOCATION
GENERAL DESCRIPTION OF WORK
Y400
94.30%
Project End Date:
6/30/2030
CFDA Number:
20.205
FY25 ICAP Rate:
7.90% not applicable to this project
C & S Engineer                                        email                                      contact #           
Dana Cherry
by
for Division Administrator
Matt Randall
(602) 712‐8011
6/25/2025
Authorized by
Date
by
for Division Administrator
Title
Form AZPR2X (03/2012) ‐ Approved by FHWA for use by ADOT
The total project cost of $963,925.00 includes $10,000.00 of funds provided by MCDOT previously used for PE and are not part
of the requested Procurement cost in this authorization
A
D
O
T
F
H
W
A
$963,925.00
$953,925.00
OTHER (SPECIFY)
PROJECT TOTALS
Establishing Procurement of Advanced video detection systems at 22 MCDOT‐ owned and maintained intersections. This project will 
provide enhanced real‐time and archived data collection and analytics capabilities.
dcherry@azdot.gov
(602) 712‐7030
mrandall@azdot.gov
Authorization
Agreement
Project Manager                                    email                              contact #                   
Prepared by                              email                               contact #                   date
 
 
THIS AUTHORIZATION
 
$899,551.00
 
$953,925.00
$953,925.00
$899,551.00
Resource Administration
FEDERAL HIGHWAY ADMINISTRATION ‐ ARIZONA DIVISION OFFICE
LETTER OF AUTHORIZATION AND PROJECT AGREEMENT
ARIZONA DEPARTMENT OF TRANSPORTATION
Authorization
Modified Project Agreement
"The FHWA and ADOT Stewardship and Oversight Agreement for Arizona (April, 2015)"
Project Agreement
Grant Agreement
The state agrees that as a condition to payment of the Federal funds obligated, it accepts and will comply 
with the agreement provisions set forth in 23 CFR 630.112; and its signature constitutes the making of the 
certificates.
FEDERAL AID PROJECT NO.
PROGRAM / PHASE (ADOT)
FEDERAL PARTICIPATION AMOUNT($)
COUNTY
 
APPN CODE
TOTAL ESTIMATED PROJECT COST($)
FEDERAL FUNDS($)
YOU ARE AUTHORIZED TO PROCEED WITH THE WORK CHECKED BELOW:
MMA‐0(301)
Maricopa
T063701X
 22 Locations ‐ Maricopa County Department of Transportation (MCDOT)
Detection Upgrades for Advanced Data Analytics
DATE AUTHORIZATION EFFECTIVE
FMIS DATE
 
PREVIOUS 
AUTHORIZATIONS:
PHASE I:  PRELIMINARY ENGINEERING ‐ SCOPING, LOCATION STUDIES, ENVIRONMENTAL 
STUDIES AND PRELIMINARY DESIGN
CONSTRUCTION ‐ ADVERTISE FOR RECEIPT OF BIDS
PHASE II:  PRELIMINARY ENGINEERING ‐ FINAL DESIGN/PREPARATION OF CONTRACT PLANS
CONSTRUCTION ‐ PROCEED ON AN AGREED PRICE AND/OR FORCE 
ACCOUNT BASIS
ACQUISITION OF RIGHT‐OF‐WAY
Other:  Advanced video detection system procurement
RATIO(%)
FUNDING
 
 
6/25/2025

Begin:
Ending:
STIP/TIP #:
STIP Year:
2025
3/6/2025
County 
Name:
urban
3
100.00%
%
Toll Road?
Safety 
100%:
Temp 
Matching?
Indian 
Resv?
FTA?
Construction?
FHWA Area:
A-4
GREYED OUT SECTIONS TO BE COMPLETED BY PROGRAM FINANCE:
LINE ITEM
IMPROVEMENT 
TYPE
PROG 
CODE
OTHER SRC
1
44
Y400
MCDOT
AZFMIS4                                                                                                                                                                                                                                               FMIS4FORM
Project Description & 
Type of Work:
Standard Place Code:
Inventory Rte No.:
FHWA - ARIZONA DIVISION FMIS4 CODING FORM
Federal Aid Project No.:
MMA-0(301)
ADOT Project No.
T063701X
Project Type:
C
(Conventional, Emergency
Relief, Demo, STP, SIB)
Route/County/MP
Maricopa
 22 Locations - Maricopa County Department of Transportation (MCDOT)
Detection Upgrades for Advanced Data Analytics
Maricopa
Urbanized Area:
Urban/Rural:
Mile Point Number:
Est Constr Date:
10/1/2025
103939
Environmental Document:
2A - CE, Prog
Enviro Doc Date: 
Functional System:
3
(0- No Functional System, 1- Interstate, 2- PA Other Freeways and Expressways, 3- PA Other, 4- Minor Arterial, 
5- Major Collector, 6- Minor Collector, 7- Local)
FEDERAL AMT
OTHER AMT
TOTAL AMT
NBI #
$899,551
$54,374
$953,925
Fed Aid System:
Congressional District(s) & %:
Contracts and Specifications Engineer:
2
(1-Interstate, 2-NHS Non-Interstate, 3-Other Federal-Aid Highway, 4- Not on any Federal-Aid System)
GRAND TOTAL:
$899,551
$54,374
$953,925
T0637XXX.xlsx

1
4
Org Number:
2
5
Org Name:
3
6
Org Manager:
EMAIL
7
8
ADOT Project No.
9
10
Route/County/MP:
11
12 STIP Year:
14
15 Program Estimate:
13 STIP/TIP #:
16
$0
/
0.00%
17
18 Est. Constr. Date:
Project End Date:
19
/
/
Execution date or Status:
/
Execution date or Status:
20A
20B Advertised by:
21
22 Sub / Ph:
23 Item#
24 Sub Project Funds:
25 ICAP:
26 Total Costs:
01X
80401
$899,551
$0
$899,551
01X
60000
$54,374
$0
$54,374
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
27 Totals:
$953,925
$0
$953,925
28
THIS SECTION RESERVED FOR PROGRAM FINANCE USE ONLY:
Fed Fund Source/OFS
Amount:
  Federal:
94.30%
Y400
$899,551
  Local IN-KIND:
5.70%
MCDOT
$54,374
  Bond:
$0
  Local:
$0
 FY25 ICAP:
7.90%
$0
Total:
$953,925
Funds Available From: (listed in order of Activity):
Item #
Program Yr:
80401
/
2025
/
60000
/
2025
/
/
/
/
/
/
/
6/25/2025
/
/
Date
/
/
/
/
Totals:
Finance Remarks:
Approving Official:
FEDERAL AID REQUEST FOR AUTHORIZATION - PROCUREMENT
ADOT OFFICE OF RESOURCE ADMINISTRATION
Date:
June 25, 2025
4983
Location:
Maricopa
Description of Work:
Project Manager:
Dana Cherry
PMG
Project Manager Phone #:
(602) 712-7030
Steve O'Brien
dcherry@azdot.gov
Federal Aid Project No.:
MMA-0(301)
T063701X
 22 Locations - Maricopa County Department of 
Transportation (MCDOT)
Detection Upgrades for Advanced Data Analytics
Required Agreement Numbers
JPA:
N/A
Execution date or Status:
2025
ADOT Estimate:
$953,925
$953,925
103939
Estimate Cost Variance by $ and %:
Local Matching Funds Received? (Yes  No  N/A):
N/A
10/1/2025
6/30/2030
Utility:
N/A
Other (identify):
N/A
Additional Inform
Activity:
Procurement
Procurement
Responsible Manager:
Steve O'Brien
6/25/2025
Name
Date
$0
Funding Type
Amount
$899,551
$54,374
$0
$0
Matt Randall
$0
RESOURCE ADMIN
Signature
Date
$0
$0
$953,925
Add Rows
6/25/2025

LOCATION:
DESCRIPTION OF WORK:
Federal Aid Project No.
6/2/2025
ADOT Project Number
MCDOT
FHWA
 ESTIMATED 
FEDERAL
FEDERAL
LOCAL
LOCAL
DESCRIPTION
CODE
 COST 
PARTICIPATING
FUNDS
FUNDS
FUNDS
94.30%
5.70%
100.00%
Other
44
$953,925
$953,925
$899,551
$54,374
$0
SUBTOTAL
$953,925
$953,925
$899,551
$54,374
$0
$0
$0
$0
$0
$0
CONSTRUCTION CONTINGENCIES
0%
$0
$0
$0
$0
$0
 PROJECT TOTAL:
$953,925
$953,925
$899,551
$54,374
$0
MMA-0(301)
T063701X
DETAILED  ESTIMATE
RECAPITULATION
 22 Locations - Maricopa County Department of Transportation (MCDOT)
Detection Upgrades for Advanced Data Analytics

Our True North: Safely Home 
Rev. 2/23
       ARIZONA DEPARTMENT OF TRANSPORTATION  
1 | P a g e
    1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
Katie Hobbs, Governor 
Jennifer Toth, Director 
Greg Byres, Deputy Director for Transportation/State Engineer 
ƵĚƌĂDĞƌƌŝĐŬ, Division Director 
Project Delivery and Operations 
Ms. Karla S. Petty 
Division Administrator 
Federal Highway Administration 
4000 N. Central Ave., Suite 1500 
Phoenix, Arizona  85012-1906 
RE:  
ADOT PROJECT NO.: 
 
FEDERAL PROJECT NO.: 
 
PROJECT TERMINI: 
 
PROJECT LOCATION: 
CONTRACT TIME: 
    (       WORKING DAYS  or     CALENDAR DAYS), or   
FIXED DATE:  
ESTIMATED CONTRACT COST:  $ 
Dear Ms. Petty, 
The Arizona Department of Transportation (ADOT) is ready to request authorization for the above mentioned 
Certification Acceptance Agency project. 
The final set of Plans, Specification and Estimate (PS&E) for this project was approved on:  
by:                                             and verified by ADOT on:  
The Proposed Work is: 
    Pavement Preservation: 
Pavement Preservation – Surface treatments up to two-inches. 
Pavement Rehabilitation (3R) – Mill and Fill greater than two-inches. 
    Other (Indicate Type of Work): 
    Procurement: 
Materials only procurement – Installation will be completed by Local Agency forces without any Federal 
participation or reimbursement for installation.  Cost of installation is included as non-participating. 
Materials only procurement – Installation will be completed by Contractor without any Federal participation 
or reimbursement for installation.  Cost of installation is included as non-participating. 
Procurement of materials and installation completed by Contractor using Federal funds. 
Procurement of materials and resources for the Safe Routes to School (SRTS) Support Program. 










Docusign Envelope ID: D3645403-60D3-4284-B035-4664D50ECF0D
Maricopa County, Phoenix, AZ
X
365
Scott D. Beck
X
 
 
Video Detection System
X
T0637 01X
 
N/A
03/20/2025
 
953,925.00
N/A
MMA-0(301)D
06/24/2025

Rev. 2/23
        ARIZONA DEPARTMENT OF TRANSPORTATION  
2 | P a g e
     1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
The Project Description is: 
Has the project been approved for Increased Federal Share for Innovative Technology Deployment? 
      No. 
      Yes, a 5% increase in Federal Aid participation for Innovative Technology Deployment (ITD) is included in this 
    request.  ITD funds will be used for: 
Project Funding: 
The project is included in the approved 5-Year program. 
The project is included in STIP Number  
 approved by FHWA on: 
The STIP amendment number             if applicable was approved by FHWA on: 
The project is included in TIP Number   
Is this project using HSIP funding?        No.           Yes, eligibility approved on: 
   by: 
Is there a Local / 3rd Party contribution of funds above the required match?   
No. 
Yes, all work is eligible.  The Local / 3rd Party is committed to funding $ 
  of the project.  Should the bids 
come in low, no local funding will be deobligated. 
Yes, the total Local / 3rd Party contribution above the required match is $  
        
Of this amount: 
$   
       is eligible for Federal reimbursement, including if bids are low or major changes occur. 
$   
 is not eligible for Federal reimbursement; should bids be low or any major changes occur, this 
portion cannot be replaced with Federal Aid.  The reason for the overmatch is: 
Design Exceptions:   
     Were not required for this project. 
     Were approved for this project on: 
    by: 
System Engineering: 
Was not required on this project. 
Was approved for this project on: 
 by: 
Is a Utility Clearance Letter required for this project? 
  No.  
  Yes. 
  If Yes, the Utility Clearance Letter for this project was issued on: 
































Docusign Envelope ID: D3645403-60D3-4284-B035-4664D50ECF0D
X
 
 
Susan Anderson
 
46496
X
X
X
03/12/2025
25-06
Procurement Material Only- video image detection systems with 3 or 4 approaches to be installed by MCDOT Staff. 
TE081- Advanced video detection system procurement at 22 MCDOT- owned and maintained intersections. This project 
will provide enhanced real-time and archived data collection and analytics capabilities. 
X
X
X
 
 
103939
X
 
03/14/2025
06/15/2023
 
X
03/25/2025

Rev. 2/23
        ARIZONA DEPARTMENT OF TRANSPORTATION  
3 | P a g e
     1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
Choose the appropriate statement: 
  Type 1 – All utilities have been cleared and relocated prior to construction. 
Type 2 – Conditional Clearance – Utilities will be cleared or relocated prior to bid opening.    
Type 3 – Conditional Clearance – Project can be authorized but will not be advertised prior to completion of 
utility relocation.  
Type 4 – Conditional Clearance – All utilities are mitigated.  Contractor and/or Utility will coordinate final  
relocation during construction.  See the Special Provisions for additional information. 
Choose the appropriate statement: 
There is no railroad within ½ mile of the project limits. 
There is a railroad within ½ mile of the project limits.  There is no railroad work on this project.  The railroad 
 was notified. 
There is a railroad within the project limits.  Railroad work was completed prior to the advertisement of this 
project.  
There is a railroad within the project limits.  Railroad work will be completed by the railroad and/or the 
contractor during this project.  See attached special provisions for required coordination and impacts to this 
project. 
Is a Right of Way Clearance Letter required for this project? 
  No.  
  Yes. 
  If yes, the Right of Way Clearance Letter for this project was issued on: 
The Conditional Clearance, if applicable was approved by FHWA on: 
Choose the appropriate clearance type: 
Type 1 – In accordance with 23 CFR 635.309(c)(1) – All property rights including legal and physical possession 
have been obtained to construct the project and all relocation has been completed. 
Type 2 – is considered a Conditional Clearance:  In accordance with 23 CFR 635.309(c)(2) – All property rights 
have not been fully acquired, but the right to occupy and to use all rights of way required for the proper 
execution of the project has been acquired.  Trial or appeal of some parcels may be pending in court and on 
other parcels full legal possession has not been obtained but the right of entry has been obtained. 
Type 3 – is considered a Conditional Clearance:  In accordance with 23 CFR 635.309(c)(3)-All property rights 
have not been obtained, but appropriate notification will be provided in the request for bids, identifying all 
locations where right of occupancy and use has not been obtained.  FHWA has received appropriate 
notification identifying all locations where right of occupancy and use has not been obtained.   Prior to the 
ADOT/LPA issuing a notice to proceed with construction to the contractor, the ADOT/LPA shall provide an 
updated notification to FHWA identifying all locations where right of occupancy and use has not been 
obtained along with a realistic date when physical occupancy and use is anticipated.  
Business Engagement and Compliance (BECO) has established a DBE participation rate of  
   % for this phase of 
the project. 
Department Furnished Materials:       Are not required for this project. 
   This project contains Department Furnished Materials.  Specify the following: 
 Manufactured Material (Use by the contractor must be Mandatory and PIF was approved on: 
 Local Natural Materials –  
Use by the contractor is Mandatory, PIF was approved on: 
Use by the contractor is Optional, no PIF is required 








Docusign Envelope ID: D3645403-60D3-4284-B035-4664D50ECF0D
X
 
0.00
 
 
 
 
 
 
 
03/20/2025
X
 
X
X
 
X

Rev. 2/23
        ARIZONA DEPARTMENT OF TRANSPORTATION  
4 | P a g e
     1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
A VE Study:        Was not conducted on this project. 
     Was conducted on this project on: 
The NEPA Approval for this project was issued on:  
A formal Re-Evaluation (CE, EA, EIS), if applicable, was issued on:   
326 MOU   
   327 MOU         
ADOT certifies that NEPA requirements consistent with the scope of work of the project have been met and the 
project incorporates all environmental commitments per 23 CFR 771.109(d). 
Project Environmental Clearance information provided by Environmental Planner: 
______________________________ 
___________________   
Signature of Environmental Planner 
Date 
____________________________ 
Printed Name 
The Department respectfully requests authorization to proceed with advertisement of bids for construction work on 
this project. 
Sincerely,  
_____________________________ 
___________________   
Signature of Project Manager 
 
Date 
____________________________ 
Printed Name 








O    N/A
Docusign Envelope ID: D3645403-60D3-4284-B035-4664D50ECF0D
 
X
n/a
3/7/2025
6/24/2025
Katie Rodriguez
X
 
06/24/2025
Dana Cherry

Strategic Communications & Outreach Division 
Intergovernmental Relations Branch 
2901 W. Durango Street 
Phoenix, Arizona 85009 
P: 602.506.8600 
F: 602.506.4750 
 
 
June 2, 2025 
 
Dana Cherry  
Transportation Engineering Specialist  
Arizona Department of Transportation 
205 S. 17th Ave., MD 614E  
Phoenix, Arizona 85007 
 
Subject: Detection Upgrade of Advance Data Analytics  
 
Federal-aid Project # MMA-0(301) D 
 
TRACS # T0637 01X 
 
MAG TIP # MMA25-263C 
 
MCDOT Project # TE081 
 
Maricopa County Department of Transportation 
 
Request for Obligation Authority of $899,551 
 
Dear Ms. Cherry: 
 
On behalf of the Maricopa County Department of Transportation (MCDOT), I am respectfully 
requesting obligation authority in the amount of $899,551 in Congestion Mitigation and Air 
Quality (CMAQ) funding for the project referenced above. 
 
The total estimated cost of the project at this time per the Engineer’s Sealed Construction 
Estimate is $953,925.  Please see Additional Information (on the next page) for further details.    
 
This MCDOT project consists of procurement of video detection systems that is inclusive of all 
hardware and software at each of the 22 MCDOT-owned and maintained intersections. 
Necessary field infrastructure upgrades will be installed on existing MCDOT traffic signal 
infrastructure. All communication infrastructure will tie into existing MCDOT communications 
infrastructure. Removal of existing technology to be performed at relevant intersections. 
 
Enclosed is a highlighted excerpt of the current MAG TIP January 28, 2025, which reflects this 
project’s still-current programmed construction funds. 
 
Clearances 
Environmental: 
Approval was granted by the Arizona Department of Transportation (ADOT) on 
March 7, 2025. A copy of the clearance is included with this letter and in the 
enclosed Bid Package. 
Utilities: 
The County issued a comprehensive utility clearance on March 25, 2025. This 
document is included. Individual utility clearance response letters can be 
provided upon request. There are no railroad facilities within ½ mile of the 
project limits. 
Right of Way: 
Right of way clearance was executed on March 20, 2025, and is included.

)RKMRIIVMRK(MZMWMSR
;(YVERKS7XVIIX
4LSIRM\%VM^SRE
4




hd/>/d/^ΘZ/>ZKKKZ/Ed/KE^d/KE

hd/>/dzΘZ/>ZK>ZE>ddZ



ĂƚĞ͗  

dŽ͗ 



&ƌŽŵ͗  


^ƵďũĞĐƚ͗ 
DĂƌĐŚϮϱ͕ ϮϬϮϱ
^ƚŝŶtĞďĞƌ͕ dƌĂĨĨŝĐKƉĞƌĂƚŝŽŶƐƌĂŶĐŚDĂŶĂŐĞƌ 
:ŽĞŽƚƚƌĞůů͕ dƌĂĨĨŝĐdĞĐŚŶŽůŽŐLJƌĂŶĐŚDĂŶĂŐĞƌ 
ŚƵĐŬtŝůůŝĂŵƐ͕ &ŝŶĂŶĐĞ^ƵƉƉŽƌƚ^ƵƉĞƌǀŝƐŽƌ
^ŚĂǁŶŽůĞŵĂŶ͕ W͕ hƚŝůŝƚLJŶŐŝŶĞĞƌŝŶŐΘZZŽŽƌĚŝŶĂƚŝŽŶƌĂŶĐŚDĂŶĂŐĞƌ 
dƌĂŶƐƉŽƌƚĂƚŝŽŶŶŐŝŶĞĞƌŝŶŐŝǀŝƐŝŽŶ
WƌŽũĞĐƚEĂŵĞ͗ Z^ZĞĂůͲdŝŵĞŶĂůLJƚŝĐƐĂƚĂ 
&ĞĚĞƌĂů/EŽ͗͘ DDͲϬ;ϯϬϭͿ
K'ͬ DWKd/WEŽ͗͘ DDϮϱͲϮϲϯ 
KdWƌŽũĞĐƚEŽ͗͘ dϬϲϯϳϬϭy
DKdWƌŽũĞĐƚEŽ͗͘ dϬϴϭ


dŚĞƌĞĂƌĞŶŽŬŶŽǁŶƵƚŝůŝƚLJĐŽŶĨůŝĐƚƐǁŝƚŚŝŶƚŚĞƉƌŽũĞĐƚůŝŵŝƚƐ͘ 

WƌŽũĞĐƚĂĐƚŝǀŝƚŝĞƐǁŝůůŽĐĐƵƌǁŝƚŚŝŶŽŶĞͲŚĂůĨŵŝůĞŽĨĂƌĂŝůƌŽĂĚƚƌĂĐŬ͘ 

WůĞĂƐĞďĞĂǁĂƌĞƚŚĂƚƐĞƌǀŝĐĞĚƌŽƉƐĂŶĚƵƚŝůŝƚLJĐƌŽƐƐŝŶŐƐĂƌĞŶŽƚĂůǁĂLJƐŝĚĞŶƚŝĨŝĞĚďLJůƵĞ^ƚĂŬĞƐĞƌǀŝĐĞƐ
ŽƌŽŶĂƐͲďƵŝůƚĚƌĂǁŝŶŐƐĂŶĚǁŝůůďĞĚĞĂůƚǁŝƚŚŽŶĂĐĂƐĞďLJĐĂƐĞďĂƐŝƐŝĨƚŚĞLJĂƌĞĚŝƐĐŽǀĞƌĞĚĚƵƌŝŶŐ
ĐŽŶƐƚƌƵĐƚŝŽŶĂĐƚŝǀŝƚLJ͘ 




ϯͬ Ϯϱͬ ϮϬϮϱ
hƚŝůŝƚLJƌĂŶĐŚDĂŶĂŐĞƌ
ĂƚĞ

ĐĐ͗ 
&ŝůĞ

Real Estate Department
2801 W Durango St
Phoenix, Arizona 85003
P: 602.506.4897
C: 602.818.5488
E: jennifer.rodriguez@maricopa.gov
March 20, 2025
Stin Weber
Maricopa County Department of Transportation 
2901 W. Durango St. 
Phoenix, Arizona 85009
RE: 
MCDOT Project- TE081 
ADOT Project Number: 0000 MMA MA T0637 01X
Federal Aid Number: MMA-0 (301) D
Mr. Weber: 
The Maricopa County Real Estate Department hereby certifies on behalf of the Maricopa County Department 
of Transportation the right of way for the above referenced project is clear of any and all conflicts. No new 
right of way is needed for this project and all traffic signal equipment will be placed on existing traffic signals 
that are within existing right of way.
Enclosed please find the right of way certification package consisting of the following:
• Right of Way Clearance Memo
• ADOT Right of Way Clearance Concurrence
• Real Property Interest Right of Way Certification
If you require any additional information, please contact me at 602-506-4897 or 
Jennifer.Rodriguez@maricopa.gov
Sincerely, 
Jennifer Rodriguez, SR/WA
Right of Way Supervisor
Maricopa County Real Estate Department
Enclosures:  
y,
J
if
R d i
SR/WA

Rev. 12/17 
Memo of R/W Clearance: 
 
 
Local Public Agency:  _Maricopa County Department of Transportation________ 
 
Federal Project Number & ADOT TRACS _MMA-0 (301) D 
 
ADOT Project Number: MMA MA T0637 01X 
 
 
 
Road, Street and/or Alleyway:  Roadway Traffic Signals  
 
Name of Project: MCDOT Detection Upgrades for Advanced Data Analytics  
 
 
 
I, Jennifer Rodriguez have reviewed the Real Property Interest for the above 
referenced project and completed the Real Property Interest Certification form.  I 
certify that all was done in accordance with all Federal and State rules & 
regulations including  ARS 12-1122, subsection C, 49 CFR 24, 23 CFR parts 450 
and 771, (23 USC 128; Federal Aid Policy Guide 710-777  &  (23 CFR 635.309 
(c) and the ADOT LPA manual. 
 
This memo serves as notice that no Real Property Interests have been acquired 
because they will not be impacted by Project Design, and that Right of Way is 
hereby cleared.   
 
 
 
Printed Name: _Jennifer Rodriguez____________ 
 
Title: _Right of Way Supervisor___________ 
 
Signature: ___________________________ 
Date: __3/19/2025__________ 
 
 
 
Note:  Only an authorized official of the LPA can sign this form 
 
 
 
 
ADOT LPA Coordinator Concurrence: 
 
_______________________________________ Date: ________________ 
Matt Tolman 
Docusign Envelope ID: 84BFD26C-F5C6-40C7-8D17-84E748AB36F5
3/20/2025

REAL PROPERTY INTEREST - RIGHT OF WAY CERTIFICATION 
 
Page 1 of 3 
Updated 8/15/17 
ADOT PROJECT NAME: 
 
_____________________________________________ 
ADOT PROJECT DESCRIPTION: 
_____________________________________________ 
PROJECT NUMBERS (Federal & State): _____________________________________________ 
 
The County/City/Town of _____________________________ hereby certifies the following: 
 
1. 
STATUS OF NEW REAL PROPERTY INTEREST - RIGHT OF WAY: 
 
A.   Total number of parcel(s) required for project 
 
______ 
 
[The parcel number count should relate to ownership and not the number 
 
of different property interest(s)] 
 
         1. Number of parcel interests acquired with Federal Aid monies 
 
______ 
 
(Number of below parcel interests may total more than “1-A”) 
 
 
Parcel interest(s) acquired by Fee 
 
 
______ 
 
Parcel interest(s) acquired by Donation 
 
______ 
 
Parcel interest(s) acquired by Dedication 
 
______ 
 
Parcel interest(s) acquired by Easements* 
 
______ 
 
Parcel interest(s) acquired by TCE 
 
 
______ 
 
Parcel interest(s) using access by Right of Entry for Construction ______ 
 
Parcel interest(s) using access by Order of Immediate Possession ______ 
 
Parcel interest)s) requiring “Administrative Settlement” 
______ 
 
 
*(Please include other interest acquired such as permits and licenses under Easements) 
 
         2. Number of parcel interests acquired with Local monies 
 
 ______ 
 
(Number of below parcel interests may total more than “1-A”) 
 
 
Parcel interest(s) acquired by Fee 
 
 
______ 
 
Parcel interest(s) acquired by Donation 
 
______ 
 
Parcel interest(s) acquired by Dedication 
 
______ 
 
Parcel interest(s) acquired by Easements* 
 
______ 
 
Parcel interest(s) acquired by TCE 
 
 
______ 
 
Parcel interest(s) using access by Right of Entry for Construction ______ 
 
Parcel interest(s) using access by Order of Immediate Possession ______ 
 
Parcel interest(s) requiring “Administrative Settlement” 
______ 
 
*(Please include other interest acquired such as Permits and licenses under Easements) 
 
B.   Real Property Interests acquired by purchase (Totals of A1. & A2.) 
 
_______ 
 
1. Total amount paid with Federal Aid monies to vest title or possession. 
$__________ 
 
 
2. Total amount paid with Local Funds to vest title or possession. 
$__________ 
 
 
(Includes consultant fees and staff charges.) 
 
2. 
WAS ANY REAL PROPETY INTEREST NEEDED FOR PROJECT NOT INCLUDED ABOVE 
ACQUIRED AFTER JANUARY 2, 1971?  
Yes  ________ 
No  ________ 
 
(If answer is "Yes", Please attach a statement listing each parcel indicating the date and how it was 
acquired; e.g., fee, donation, dedication, annexation, easement) 
 
 
MCDOT Detection Upgrades for Advanced Data Analytics
Traffic Signal upgrades
MMA MA T0637 01X 
Maricopa
0
0
0
0
X
Docusign Envelope ID: 84BFD26C-F5C6-40C7-8D17-84E748AB36F5

REAL PROPERTY INTEREST - RIGHT OF WAY CERTIFICATION 
 
Page 2 of 3 
Updated 8/15/17 
 
3. 
PARCEL INVENTORY OF REAL PROPERTY INTEREST: 
 
Attach a list of each “Real Property Interest” required for this project.  The list MUST include: Parcel 
Number, Name of Owner, Real Property Interest Acquired and date or if not acquired the anticipated 
date of acquisition. If interest has not been acquired include a summary of the current status of the 
Acquisition. (Real Property Interest refers to the type of interest in the real property to be acquired 
as defined by 23 CFR 710.105 such as: Fee, Right of Entry, Order of Immediate Possession, TCE, 
easement, permit, license and any other similar action.) 
 
N/A________   ATTACHED________ (N/A only applies if there was no new real property interest.) 
 
4. 
COMPLIANCE WITH RELOCATION ASSISTANCE AND PAYMENTS PROVISIONS OF 
FEDERAL AND STATE LAW: 
 
 
Initial one (1) of the following two (2) statements: 
 
a. 
No families or businesses are being displaced. 
 
 
_______ 
 
b. 
Provisions of 49CFR PART 24 relating to assistance for 
 
 
displaced families and businesses are being complied with.  
_______ 
 
 
(If there are displacements, initial "b" and complete the schedule below) 
 
 
1. 
Number of households displaced: 
 
 
_______ 
 
 
a. 
Owner-occupied 
 
 
_______ 
 
 
b. 
Rental units 
 
 
_______ 
 
 
c. 
Residential relocations under the Uniform Act - 
 
 
 
Total amount paid for moving expenses 
 
$_______ 
 
 
 
Total amount paid for replacement housing payments 
$_______ 
 
 
 
Total relocation expenses and payments  
 
 
$_______ 
 
 
 
Number of households’ replacement dwelling as part of 
 
 
 
Last Resort Housing Assistance 
 
 
_______ 
 
 
 
Number of tenants’ households using Down Payment 
 
 
 
Assistance payment 
 
 
_______ 
 
 
2. 
Number of non-residential displacements: 
 
 
_______ 
 
 
a. 
Businesses displaced 
 
 
_______ 
 
 
b. 
Farm operations displaced 
 
 
_______ 
 
 
c. 
Non-profit organizations displaced 
 
 
_______ 
 
 
d. 
Non-Residential relocations under the Uniform Act - 
 
 
 
 
 
Total amount paid for Moving Expenses 
 
$_______ 
 
 
 
Total amount paid for Re-Establishment Expenses 
$_______ 
 
 
 
Total relocation expenses and payments 
 
$_______ 
 
 
 
Total number of Relocation appeals 
 
 
_______ 
 
5. 
SCHEDULE FOR REMOVAL OF IMPROVEMENTS AND OBSTRUCTIONS 
 
 
Initial one (1) statement below: 
 
 
a. 
No existing improvements or obstructions are in the required right of way. 
_______ 
 
 
b. 
Removal of improvements or obstructions is included in the construction 
 
 
contract.  
 
 
_______ 
 
 
c. 
Improvements and obstructions will be removed by City/County forces 
 
 
or by separate contract prior to ______________________________. 
_______ 
 
 
                                                                 (Date) 
 
 
 
 
   X
N/A
JR
JR
Docusign Envelope ID: 84BFD26C-F5C6-40C7-8D17-84E748AB36F5

REAL PROPERTY INTEREST - RIGHT OF WAY CERTIFICATION 
 
Page 3 of 3 
Updated 8/15/17 
 
 
(If "c" is checked, attach detailed list with schedule of their removal.) 
 
CERTIFICATION OF REAL PROPERTY INTEREST 
  
 
 
This project may now be certified as conforming to one of the Statement Nos. (1, 2, 3, 4) below, 
 
please initial by one of the numbers 23 CFR 635.309 (c) 
 
 
 
. 
 
________ 1. No new real property interests are required. All existing real property rights were 
 
obtained prior to January 2, 1971. 
 
 
________ 2. All necessary real property interests have been acquired including legal and 
 
 
 
physical possession. 23 CFR part 635.309 c(1)  
 
 
________ 3. Although all necessary real property interests have not been fully acquired, the right 
 
to occupy and to use all right of way required for the proper execution of the project 
 
have been acquired. 23 CFR part 635.309 c(2) 
 
 
_______ 4. The acquisition or right of occupancy and use of a few remaining parcels is not 
 
complete. The circumstances with respect to acquisition and use of a few 
 
parcels warrant proceeding with the advertisement of bids on the basis it will 
 
be in the best public interest to do so in advance of completion of the acquisition 
 
of the rights of the said few remaining parcels.  
 
 
 
    
It is understood the completion of the acquisitions and relocations if applicable of 
the remaining parcels must be completed before the award of the construction 
contract. A clearance issued at this stage shall be a conditional clearance only. 
23 CFR part 635.309 c(3) 
 
 
Verifying all laws have been followed. 
 
 
I certify that all applicable state and Federal rules and regulations including the Uniform Act and 
associated updates have been complied with.  Please initial here >>>>>>>> 
_______ 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
County/City/Town: _______________________ 
 
 
 
 
 
 
 
 
Title: ___________________________________ 
 
 
 
 
 
 
By:  ____________________________________ 
 
 
 
 
 
 
  (Please print name) 
 
 
 
 
 
 
 
Signature:  ______________________________ 
 
 
 
 
 
 
Date:          ______________________________ 
 
 
 
JR
JR
Maricopa
Right of Way Supervisor
Jennifer Rodriguez
Jennifer Rodriguez
Digitally signed by Jennifer 
Rodriguez 
Date: 2025.03.19 07:23:39 -07'00'
March 19, 2025
Docusign Envelope ID: 84BFD26C-F5C6-40C7-8D17-84E748AB36F5

Strategic Communications & Outreach Division 
Intergovernmental Relations Branch 
2901 W. Durango Street 
Phoenix, Arizona 85009 
P: 602.506.8600 
F: 602.506.4750 
Page 2   T0637 01X (TE081) Authorization Request 
Additional Information Included with this Submittal 
•
The County will be not use proprietary products on this project
•
The County has no design exceptions on this project.
•
Engineer-stamped, detailed cost estimate
•
Agreement Estimate Recapitulation
•
Project Location Map is included
•
Complete copy of the full bid package
•
DBE Goal Assessment Response
•
SE Checklist has been included
The County is prepared to work towards soliciting bids promptly upon approval by 
ADOT and the Federal Highway Administration and notice of the federal funding 
obligation.  
We greatly appreciate your review and subsequent approval of the obligation package. 
If you need additional information, please contact me at (602) 506-1630 or at 
kimberly.richards@maricopa.gov. Thank you for your prompt attention to this matter. 
Sincerely, 
Kimberly Richards 
Intergovernmental Coordinator 
Enclosures 
cc:  Mitch Wagner-MCDOT; Stin Weber-MCDOT; Antonia Middleton-MCDOT

1 
Version Date: July 20, 2023
14-461
Systems Engineering Checklist 
41-2000
Prior to design, complete or update a Systems Engineering and Architecture Compliance Checklist or report (depending on 
the complexity of the project) for projects containing any Intelligent Transportation Systems (ITS) elements. Submit the 
checklist or report to the Arizona Department of Transportation (ADOT) Systems Technology Group manager for review 
and approval. If federally funded, submit the approved checklist or report to the Federal Highway Administration (FHWA) 
as part of the federal authorization paperwork. 
Section 1 – Project Information 
1.1a ADOT Project Manager and Contact Information: 
1.1b Consultant Project Manager and Contact Information:  N/A 
1.1c Local Public Agency Project Manager and Contact Information:  N/A 
1.2 
Project Location: 
1.3 
ADOT Project Number (also known as TRACS): 
Federal-Aid:     YES    NO 
Federal-Aid Project Number:     N/A 
1.4 
Project Description, Title, and Type of Work: 
1.5 
Funding and Source of Each (Including State and Federal): 
Fiscal Year: 
Other (Please Specify): 
1.6 
Nature of Work (select all appropriate boxes): 
Software/Integration

Planning
Construction
 
Equipment Upgrades
Operations

Preliminary Engineering
Evaluations

Other (Please Specify):
Dana Cherry dcherry@azdot.gov 602.712.7030 
Scott Beck, WSP USA, scott.beck@wsp.com, 480.449.4628
Stin Weber, MCDOT, stin.weber@maricopa.gov, 602.881.8225
Locations include 22 existing signalized intersections within Maricopa County.
T0637 (01D)
MMA-0(301)D
Detection Upgrades for Advanced Data Analytics
The proposed project will procure advanced video detection systems, inclusive of hardware and software, with installation provided 
by County staff. No ground disturbance is anticipated as all new equipment will be on existing structures.
CMAQ: $899,551
Local: $54,374
2025
Docusign Envelope ID: C2984120-CC0F-4FF7-8F19-C79CBEFC1B62

2 
Version Date: July 20, 2023
14-461
Systems Engineering Checklist 
41-2000
Section 2 – ITS Architecture Conformance 
National, Arizona, MAG, and PAG all have ITS Architectures available online. 
If the project is located on a local jurisdiction facility within MAG, search MAG 2013 Architecture. 
If the project is located on a local jurisdiction facility within PAG, search PAG 2004 Architecture. 
All others, search Arizona 2018 Architecture. 
2.1 
Service Packages identified in MAG Architecture 
http://azmag.gov/Programs/Transportation/Road-Safety-and-Technology/MAG-Regional-ITS-Architecture/MAG-ITS-
Architecture 
Service (formerly “market”) Packages identified in PAG Architecture 
http://www.pagnet.org/documents/its/2004-ITS-SDP.pdf 
Service Packages identified in Arizona 2018 Architecture 
https://apps.azdot.gov/files/its-architecture/services.htm 
Search the online architectures to identify the service packages in the project. 
List the service packages in the space provided: 
2.2 
Identify which ITS elements are not already included in the relevant architecture and list them here so they can be
identified in future Architecture updates: 
Section 3 – Participating Agencies and Their Roles 
3.1 
Lead Agency: 
3.2 
Participating Agencies: 
3.3 
Is an Intergovernmental Agreement (IGA/JPA) Needed for This Project? 
Existed 
 To Be Developed
IGA #
No
Please describe operational and budgetary relationships: 
TM01 - Infrastructure-Based Traffic Surveillance
TM03 - Traffic Signal Control
TM07 - Regional Traffic Management (AZTech C2C TMS Network)
None
Maricopa County Department of Transportation (MCDOT)
None
The equipment upgrades will be limited to Maricopa County-operated intersections and not require other local agency participation.
Docusign Envelope ID: C2984120-CC0F-4FF7-8F19-C79CBEFC1B62

3 
Version Date: July 20, 2023
14-461
Systems Engineering Checklist 
41-2000
Section 4 – Requirements Definitions and Alternatives Analysis 
4.1 
Project Purpose and Need Summary: 
Is there a project scoping document defining the issue? 
If “No,” please provide information: 
Yes
No
Is there a project scoping document defining proposed alternatives? 
If “No,” please provide information: 
 Yes
No
(Tip: List what types of planning documents have been or will be completed.) 
4.2 
Project Documentation 
List the name and date of the existing document or what 
is to be developed in the space below: 
Feasibility Study with alternatives 
and cost benefits 
(Tip: List what types of planning 
documents have been or will be 
completed.) 
 Existing 
 Existing to Be Modified 
 To Be Developed 
Concept of Operations
 (ConOPS) 
 Existing 
Existing to Be Modified 
 To Be Developed 
Requirements 
 Existing 
 Existing to Be Modified 
To Be Developed 
Design / Post-Design 
 Existing 
 Existing to Be Modified 

To Be Developed 
    Systems Engineering 
Management Plan (SEMP)
(Required for Complex 
ITS Projects)
Existing 
Existing to Be Modified 
To Be Developed 
 

 
These 22 intersections have traditionally had poor detection reliability and currently do not have advanced analytics capabilities or 
support ATSPM. The project will provide newer video detection equipment to improve operational capabilities. As an 
equipment-only procurement, a scoping document has not been developed.
This project is considered an extension of the County's existing practices in terms of vehicle detection and intersection operations. As 
such, alternatives were not developed.
This is an extension of current County practice.
This is an extension of current County practice.
This is an extension of current County practice.
This is an extension of current County practice.
This is an extension of current County practice.
Docusign Envelope ID: C2984120-CC0F-4FF7-8F19-C79CBEFC1B62

4 
Version Date: July 20, 2023
14-461
Systems Engineering Checklist 
41-2000
Section 5 – Procurement 
5.1 
Procurement Methods: 
Construction Contract
Procurement Contract
Request for Proposal
Other (Please Specify):
Invitation to Bid
5.2 
Equipment to Be Purchased: 
5.3 
Procurement Contract Numbers to Be Used: app.az.gov (if using existing contract) 
Section 6 – ITS Standards 
6.1 
Which specific National ITS Standards will be used in this project such as NTCIP and IEEE? 
These standards are online: https://www.standards.its.dot.gov/DevelopmentActivities/PublishedStandards.  Identify  
the project specific ones: 
If no National ITS Standards can be identified please explain why not: 
Section 7 – Systems Testing 
7.1 
Systems Testing Documentation 
List the name of the existing document or what is to be 
developed in the space below: 
System Test Plan 
 Existing 
 Existing to Be Modified 
 To Be Developed 
System Validation 
 Existing 
 Existing to Be Modified 
 To Be Developed 
Intersection vehicle detection inclusive of all hardware and software.
n/a
NTCIP 2303, NTCIP 2202, NTCIP 1209, NTCIP 1103, NTCIP 2104
This is an extension of current County practice.
This is an extension of current County practice.
Docusign Envelope ID: C2984120-CC0F-4FF7-8F19-C79CBEFC1B62

5 
Version Date: July 20, 2023
14-461
Systems Engineering Checklist 
41-2000
Section 8 – Operational Resources 
8.1 
Procedures and Resources Needed for the Operation and Maintenance: 
(Tip: If the operation is expanding, how will existing agreements, staff, processes, or networks manage the additional 
equipment?  If the operation is new, what agreements, staff, processes, or networks will ensure success?) 
8.2 
Operation/Maintenance Staff Contact Information:
(Tip: Once the construction is completed who will operate/maintain the equipment?) 
Section 9 – Schedule 
9.1 
Expected Design Completion Date and Construction Completion Date: 
9.2 
Relationship to Other Federal, State, County, and Local Projects and Phases (within TIP and/or Five-Year Program): 
(Tip: Does this project depend on another project to operate successfully?  Is the project one of a series or projects for a 
phased approach?) 
Section 10 – Strategic Plans for System Update 
10.1 Plans for Systems Upgrade and Lifecycle 
List the name and date of the existing document or what 
is to be developed in the space below: 
System Update Plan 
 Existing 
 Existing to Be Modified 
 To Be Developed 
Section 11 – Completed and Approved 
11.1 Name of person completing the form, contact information, date when submitting: 
11.2 ADOT Systems Technology Group Manager Signature and Date: 
Signature 
Date 
MCDOT will be responsible for installation and integration of the detection.  
System performance will be provided through the existing MCDOT ATSPM platform.
Future operation and maintenance will be performed through the MCDOT Transportation Systems Management and Operations 
Division.
Additional design is not anticipated. Installation completion is June 2026.
None
This is an extension of current County practice.
Stin Weber
stin.weber@maricopa.gov
(602) 881-8225
March 13, 2025
Docusign Envelope ID: C2984120-CC0F-4FF7-8F19-C79CBEFC1B62
3/14/2025

Arizona Department of Transportation 
Categorical Exclusion (CE) Checklist  
for Actions Approved Under    
23 CFR 771.117(c) & (d)  
CE and NEPA Assignment – 2/14/2025 
1 
2A - (c) Listed
2B - (d) Listed
2C - (d) Unlisted
Project Information: 
Project Name: MCDOT Detection Upgrades for Advanced 
Data Analytics 
ADOT Project Number: 0000 MMA MA T0637 01X 
Federal-Aid Number: MMA-0(301)D 
Estimated Project Construction Cost: $611,500 
Planning Requirements: 
STIP/Line Item
ADOT Sub-program
CE Start Date: 3/3/2025 
Construction Project Administration 
ADOT 
CA Agency
Categorical Exclusion Approval for FMIS 
Re-evaluation: 
This project has been re-evaluated pursuant to 23 CFR 771.129 due to a change in the project scope, location, or 
termini or because of the need to evaluate new impacts not previously considered, or because significant time has 
passed since the date of the CE Approval. The information on this form reflects all updates to the project information.  
Location and Limits: 
This Advanced Data Analytics project includes Detection Upgrades procurement for 22 signalized intersections located 
within Maricopa County. 
Purpose and Description (scope of work): 
The overall project purpose is to advance, upgrade, and improve data analytics to support operational performance within 
the Maricopa County traffic signal system. This project will include the procurement of video detection systems for 22 
existing signalized intersections within Maricopa County. The intersection locations either currently run on loop detection or 
vehicle detection that is considered unreliable, do not have the capabilities to report advanced analytics, and / or do not 
support the existing Automated Traffic Signal Performance Measures (ATSPM). The upgraded vehicle detection units 
acquired under this procurement-only project will be installed, maintained, and operated by MCDOT staff under separate 
efforts. 
The scope of work includes: 
Procuring video detection equipment, including all necessary materials, mounting hardware, software, wiring for 
communications, and warranty support.. 
No right-of-way will be required, and no ground disturbance is anticipated. 
Docusign Envelope ID: C6FCA9FC-C49A-42F5-A887-7F8C1A93703C

2 
CE and NEPA Assignment – 2/14/2025 
Type of CE - Choose one from (c) or (d) or Appendix A drop-down lists: 
(c) - list: (c)(1) Activities which do not involve or lead 
directly to construction, such as planning and research 
activities; grants for training; engineering to define the 
elements of a proposed action or alternatives. 
 
(d) - list:   
 
Note: If the project qualifies for a (c)(1) or a (c)(9) emergency repair CE then no technical review is required and the CE is 
complete. A (d)(6) CE requires only a cultural resources and biology review to the level necessary to approved the disposal 
and a full technical review is not required. Proceed to NEPA Certification and Determination and Categorical Exclusion 
Approval.  
 
 
 
Environmental Review Section 
Each category below will be reviewed and a determination from a drop-down menu will be selected for each. The checkbox 
will indicate review has been completed and the appropriate documentation placed in the Project File as applicable.  
 
Air Quality – Clean Air Act 
 
Select a determination from the drop-down menu 
 
Noise – 23 CFR 772 
 
Select a determination from the drop-down menu 
 
Biological Resources – Endangered Species Act 
 
Select a determination from the drop-down menu 
 
Cultural Resources – Section 106  
 
Select a determination from the drop-down menu 
 
Section 4(f) 
 
Select a determination from the drop-down menu 
 
Section 404 – Clean Water Act 
 
Select a determination from the drop-down menu 
 
 
Section 401 – Clean Water Act 
 
Select a determination from the drop-down menu 
 
Docusign Envelope ID: C6FCA9FC-C49A-42F5-A887-7F8C1A93703C

3 
CE and NEPA Assignment – 2/14/2025 
Hazardous Materials 
 
Select a determination from the drop-down menu 
 
Public Involvement 
 
Select a determination from the drop-down menu 
 
Other Considerations 
 
Other potential environmental impacts such as Prime and Unique Farmlands, Sole Source Aquifers, Section 6(f) 
property, visual resources, etc. have been considered for this project and additional documentation as applicable is 
contained in the Project File.   
Briefly cite if there are other applicable considerations and reference the appropriate file documentation. If no 
other considerations apply cite “n/a”  
n/a 
 
Complete this section only for CEs determined under 23 CFR 771.117(c)(26), (c)(27) and (c)(28) for  
evaluation of the constraints under 23 CFR 771.117(e):  
If the answer to all questions 1 through 11 below is No then the project can be approved as a (c)(26), (c)(27) or (c)(28) CE.  
If the answer to any question 1through 11 for a project listed under (c)(26), (c)(27) or (c)(28) is Yes then the project 
exceeds the constraints listed under 23 CFR 771.117(e) and must be processed under (d)(13). Additional information 
regarding any constraint exceeded is included below.  
Constraints:  
Yes 
No 
1. Does the project involve the permanent acquisition of more than a minor amount of right-of-
way? 
 
 
2. Does the project involve any residential or non-residential displacements? 
 
 
3. Does the project require a bridge permit from the U.S. Coast Guard? 
 
 
4. Does the project require an Individual Permit under Section 404 of the Clean Water Act or 
Section 10 of the Rivers and Harbors Act? 
 
 
5. Does the project have a finding of “Adverse Effect” on historic properties protected by Section 
106 of the NHPA by FHWA? 
 
 
6. Does the project involve the use of a resource protected under Section 4(f) except for actions 
resulting in de minimis impacts? 
 
 
7. Does the project have a finding of “may affect, likely to adversely affect” threatened or 
endangered species or critical habitat under the Endangered Species Act? 
 
 
8. Does the project involve construction of temporary access, or the closure of an existing road, 
bridge, or ramp, that would result in major traffic disruptions? 
 
 
9. Does the project involve a change in access control on a controlled access highway? 
 
 
Docusign Envelope ID: C6FCA9FC-C49A-42F5-A887-7F8C1A93703C

4
CE and NEPA Assignment – 2/14/2025
Complete this section only for CEs determined under 23 CFR 771.117(c)(26), (c)(27) and (c)(28) for 
evaluation of the constraints under 23 CFR 771.117(e): 
If the answer to all questions 1 through 11 below is No then the project can be approved as a (c)(26), (c)(27) or (c)(28) CE. 
If the answer to any question 1through 11 for a project listed under (c)(26), (c)(27) or (c)(28) is Yes then the project 
exceeds the constraints listed under 23 CFR 771.117(e) and must be processed under (d)(13). Additional information 
regarding any constraint exceeded is included below. 
Constraints: 
Yes 
No 
10. Does the project involve a floodplain encroachment for other than functionally dependent uses
(e.g. bridges, wetlands) or actions that facilitate open space use (e.g. recreational trails, bicycle
and pedestrian paths)?
11. Does the project involve construction activities in, across, or adjacent to a river component
designated or proposed for inclusion in the National System of Wild and Scenic Rivers?
23 CFR 771.117(e) – Constraints Exceeded (If any “Yes” on Checklist) 
Certification and Determination by ADOT 
The State has determined that this project has no significant impact(s) on the environment and that there are no 
unusual circumstances as described in 23 CFR 771.117(b). As such, the project is categorically excluded from the 
requirements to prepare an environmental assessment or environmental impact statement under NEPA. The action 
complies with NEPA requirements relating to connected actions and segmentation [23 CFR 771.111(f)]. The State 
has been assigned, and hereby certifies that it has carried out, the responsibility to make this determination 
pursuant to 23 U.S.C. 326 and a Memorandum of Understanding dated December 20, 2023, executed between 
FHWA and the State. 
The State has determined that this project has no significant impact(s) on the environment and that there are no 
unusual circumstances as described in 23 CFR 771.117(b). As such, the project is categorically excluded from the 
requirements to prepare an environmental assessment or environmental impact statement under NEPA. The action 
complies with NEPA requirements relating to connected actions and segmentation [23 CFR 771.111(f)]. The 
environmental review, consultation, and other actions required by applicable Federal environmental laws for this 
project are being, or have been, carried out by ADOT pursuant to 23 U.S.C. 327 and a Memorandum of 
Understanding dated June 25, 2024 and executed by FHWA and ADOT. 
Environmental Commitments 
Environmental commitments are included with this project and will be incorporated into the project plans, 
specifications and estimates as required. 
Environmental Permits Issues and Commitments (EPIC) sheet to be included. 
Docusign Envelope ID: C6FCA9FC-C49A-42F5-A887-7F8C1A93703C

5 
CE and NEPA Assignment – 2/14/2025 
Categorical Exclusion Approval 
  
                                                                                            
        
        
       Prepared By:                                                                  Date:   
       Katie Rodriguez 
       Environmental Planner 
 
 
                                                                                            
       
      
     Approved By:                                                              Date:   
     Paul O'Brien, PE   
     Administrator, Environmental Planning  
 
 
Docusign Envelope ID: C6FCA9FC-C49A-42F5-A887-7F8C1A93703C
3/6/2025
3/7/2025

	

		
	
 
	


!	
""	#"$%$
&'()*+
	
 

,-.01

2&301
445
678)9+
	
 
:
2;<(=


&>9(?
@(>7?(
AB)(=
C7?DEFB=(G=H
-79B<
I8)J;)'&K78)9G=H
L9B98=
-0.01
I(J(?B<01
&1M-01
.?7'?BK
1(=*?;E9;7)
C7?D
N5"O
P#
4

QRS

T""U#V	

	WX

N%4OY%%
T

P
NO"
Z
N%5YO
P#
4"

QRS

T""U#V
	

X

N%YOY
T

P
NO5%
Z
A7*B9;7)
I(J[I8)*
!	
T


	
 

2&327J(
Q
I.L
.?7\(*9-79B<
N"O5%O
]=9[67KE<(9;7) S^_4
__W

	`PUPaP
&'()*+
	
 

,-.01

2&301
Y"
678)9+
	
 
:
2;<(=


&>9(?
@(>7?(
AB)(=
C7?DEFB=(G=H
-79B<
I8)J;)'&K78)9G=H
L9B98=
-0.01
I(J(?B<01
&1M-01
.?7'?BK
1(=*?;E9;7)
C7?D
N"O4O"
P#
b
V54X^
	
b

	

	

Q	c

	W

N"OYY%ObY
Q
N%bO45
Qd
A7*B9;7)
I(J[I8)*
	
 P		PS	
SP#eQ%	
U#
PU#
2&327J(
Qc
I.L
.?7\(*9-79B<
N"Ob5O4
]=9[67KE<(9;7) f$
"Qc
&'()*+
	
 

,-.01
fSU
2&301
Y4
678)9+
	
 
:
2;<(=
Y
Y
&>9(?
@(>7?(
AB)(=
C7?DEFB=(G=H
-79B<
I8)J;)'&K78)9G=H
L9B98=
-0.01
I(J(?B<01
&1M-01
.?7'?BK
1(=*?;E9;7)
C7?D
N%O45"O"4
P#
"Yd
V%X^
T
"%%
U
#	
	



N4O%O%"
T

P
NO4bOY%
Qgh
i_Q
NOY4O5"4
P#
4"YUg V%X^
T
"%%
U
#	
	


V
	

X
4
N%Ob5%O%Y"
T

P
N"4O4%Ob
Qg
A7*B9;7)
I(J[I8)*
	
 P		PS	
f
			j	
"	#`
2&327J(
Q	
I.L
.?7\(*9-79B<
Nb4OY%Ob
]=9[67KE<(9;7) Ukefb
	`PUPaP
&'()*+
	
 

,-.01

2&301
Y4Y54
678)9+
	
 
:
2;<(=


&>9(?
@(>7?(
AB)(=
C7?DEFB=(G=H
-79B<
I8)J;)'&K78)9G=H
L9B98=
-0.01
I(J(?B<01
&1M-01
.?7'?BK
1(=*?;E9;7)
C7?D
Nb4O
P#
4

QRS

!#
#

W
^S
##W#
	

V	

	WX

NYO"4%
T

P
NO%
Z
NbbO5
P#
4T 
QRS

!#
#

W
^S
##W#
	

V	

	WX

N4O%
T

P
N"OY
Z
A7*B9;7)
I(J[I8)*
!	
T


	
 

2&327J(
Q
I.L
.?7\(*9-79B<
N5%5OY
]=9[67KE<(9;7) S^_4
__W

	`PUPaP

ADOT Project No:  T0637 01X 
Federal Project No.:  MMA-0(301)D 
MCDOT Project No.: TE081 
Project Name:  Detection Upgrade to Adv Data Analytics


	


  !"
#$
%&
'()

*++, 
-&./
!"
,
+0+.
123224$2566
!#37879211!21
:22!);8:<=!!)6> 
6?#@!!)6> 6?# #
A<252B@!!)6> 6?3
A32CB@!!)6> 6?3	A)378
32CD2E29F22B
*GHI./
!"#$
-JKLMJ
!);
%H-LN
O
G+,
+ 	
P.I+.
+.I
+,
+
#
-.
QRSTU
VWXY[\W]^U
Q]_\]
V`abac
V`abad
V`abae
V`abaf
V`abag
VWhW]U
i\hSj
78klD
#!)m
 
no@>>	
 
 
 
 
 
no@>>	
78klD
p;E
n>@>

n>q@rq
 
 
 
 
 
no@orq
sJt
n>@>

n>@6>
 
 
 
 
 
no@q6>
uvwxy{|v}|x~~€
‚cƒcbb
gc‚ƒgac
„
„
„
„
„
gfgƒ…ac
†
‡U]T_\Xˆ_Th\]‰&.MJH00
ŠsH00
Šs‹ŒHH00
Šs‹HH00
Šs6 
o)521526
6 6
6r
q(6?(6
6 >(	(6
6?(	>(6'()6q 

)1"6
6q 6
6o 
?(	?(6
6 ?(	?(6	6(	(6	6(	(66q 
>)521526
6q 6
6o		(6(6
6
	(6(6
6q 
	(6>(6
6q
	(6>(6
6q6> 

)1"6
6> 6
6 
?(6	(6
6q 
?(6	(6
6q 
?(6	(6
6q
?(6	(6
6q6> 
>Ž	)521526
6> 6
6
	(66(6
6> 
(
q(6
6> 
(
r(6
6>
(
?(6
6>6> 
?)521526
6> 6
6
6(6r(6
6> 
(		(6
6> 
(	6(6
6>
(	6(6
6>||‘w’x‘}“x”v‘
4#kl3•l(F•'3:';(4#7<l )11"12"–2:3
‹&.G+.I-t.I—,˜™
8p"–2$š252no@q6>
›œžœŸ ¢£¤¤¥¦
¥§¨©ª«¬­ª®¨§¬
¯¬¬®°£œœª°¬±®²³´µ¨¬²¶¨·œ¸ªµ¹¬º®ª¹®©¹»±°¬²³°®¼½¬±®¹·ª§°±¨¾¿ŸÀ¤›Á®§¨©ª«¬¹±µ¿¢¤ÂžÂ¤Á·ª§°±¨¾¿›
¢œ¢