Alto Well Site Repairs

City of El Mirage — Regular Meeting (2020-09-10)

View PDF Item 9 Meeting page

Extracted text (via ocr_local) 14113 characters
Good News Construction, LLC

Residential & Commercial
General Contractor
AZ License # ROC 203755-KB-01

THIS PROPOSAL, prepared on June 20th, In the Year of 2020,

For: City of El Mirage

Attn.: Mr. Scott Ketchmark
Utilities Supervisor / Water

10355 N. 121st Avenue

El Mirage, AZ 85335

By: Good News Construction, LLC
782 N. 164th. Drive, Goodyear, AZ 85338

For the Project: Alto Well Site Building Enclosure Project
14402 N. Alto St., El Mirage, AZ 85335

Good News Construction, LLC proposes the following:

¢ Replace existing East side double door panels and hardware with
new, cut in for and install a new 60”in. wide by 84”in exterior hol-
low metal double door on the North side of the building giving ac-
cess to the new chlorine room, and supply and install a 36’x 84”
interior access door. (All doors will receive new hardware/locks/
keys) .

« Supply and install wall and ceiling (steel building) insulation and
scrim paper. Construct an approximately 9’x8’x9’ high with 24”in.x
8”in. thick corrosion resistant concrete wall, topped with CMU
walls to get approximately 9’ ceiling from existing finish floor
(8816 Block supplied by the City), chlorine room inside the exist-
ing building, with 2 doors, construct a retention basin in the floor
with a 6”x6” concrete curbing, and cut in a floor drain in the chlo-
rine room outside of the retention area. (To be plumbed into the
existing 4” sewer drain line) (Also included is the Hach Chlorine
Analyzer drain line)

e Supply and install 8 LED lighting fixtures, (7 in the main areas of
the building, and 1 in the new proposed chlorine room area,( in-

782.N. 164th Drive, Goodyear, AZ 85338, T/F 623-882-3570, C 623-764-2288 goodnewsconstruction@cox.net
lof 1

Good News Construction, LLC

Residential & Commercial
General Contractor
AZ License # ROC 203755-KB-01

cluding two new 120 v. GFI receptacles for the cl2 feeder and an-
alyzer)

Supply and install a 2 Ton A/C package unit for cooling only, in-
stalled on the North side of the building, with exposed ductwork
running through the building with 3 supply registers in the main
building, and 1 supply register inside the new chlorine room.
(Chlorine room will also receive an exhaust fan that runs when the
room light is turned on)

Prep/Paint exterior building, roof, doors & frames. Color & sheen
to match Rockwood’s booster pump building.

Cement stoop to be placed outside new Cl2 room door and a ce-
ment base will be under the new A/C unit

Supply/Install support plates for the Cl2 feeder stand and the
Hach Cl2 Analyzer

Chlorine tank vent pipe hole to the exterior of the building will be
supplied/sealed

Supply/Install two (2) HVAC electrical breakers

Supply labor and materials to complete the above mentioned list of work |$ 29,850.00
items, for the lump sum price of

Subtotal $ 29,850.00

This proposal may be withdrawn by us if not accepted within 10 days.
Respectfully submitted by: Asbed Khosdeghian
Good News Construction, LLC

ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are satisfactory and are hereby accepted.

Authorized Signature Date

782, N. 164th Drive, Goodyear, AZ 85338, T/F 623-882-3570, C 623-764-2288 goodnewsconstruction@cox.net

2of i

GORDON ~
CONTRACTING LLC

Prepared for: Estimate valid for 90 from:
Mike Hibble 06/29/2020

Gordon Enterprises Contracting is pleased to have the opportunity to prepare this work
estimate for you. We hereby propose to complete repairs and improvements shown below.
These figures are within a reasonable range for a project of this nature; however, the final
construction amount can vary beyond these figures based on client selections, and further
evaluation of existing structural and mechanical conditions. The following sections are
included as reference for this work estimate:

Scope of Work - Description of all work to be performed, shown below.
Job Location: 14402 N, Alto Street, El Mirage, AZ 85335

Job Cost: $26,800.00

Overhead 15%: $4,020.00

Total Job Cost: $30,820.00

“Includes Labor & Materials
(Credit card payments incur an additional fee of 3.5% of total charge)

Monthly Installments with Square
* Inquire with Yomi at accounting@gordonbusinesses.com *

Submitted by:

Alex Gordon
GORDON Enterprises Contracting LLC.

This estimate is solely for completing the job described and is based on our evaluation. It does not include additional
labor that may be needed should unforeseen problems following the start of the job.

GORDON
CONTRACTING LLC

Paint: (Existing Well House)

Basic labor to exterior with favorable site conditions. Roll / brush 2 coats of paint. Includes
planning, equipment and material acquisition, area preparation and protection, setup and cleanup.

Insulation:

Basic labor to install insulation with favorable site conditions. Fit and secure. Includes planning,
equipment and material acquisition, area preparation and protection, setup and cleanup.

*Includes cool shield thermal

Install Lighting:

Basic labor to install (6) workshop HD lights with favorable site conditions. Wire from existing.
Includes planning, equipment and material acquisition, area preparation and protection, setup and
cleanup.

Install A/C Unit: 4 ton

Basic labor to install air conditioning with favorable site conditions. Add AC to existing heating
system. Mount and secure condenser to new pad. Install heat exchanger. Seal ducting. Connect,
insulate lines between condenser and heat exchanger. Verify operation. Includes planning,
equipment and material acquisition, area preparation and protection, setup and cleanup.

Basic labor to install ductwork with favorable site conditions. Install 10" diameter metal ducting,
with 1 damper and | register per 20 ft. Assemble, secure, support and connect duct sections. Air
seal and tape joints. Includes planning, equipment and material acquisition, area preparation and
protection, setup and cleanup.

Install Doors: Front and Back

Basic labor to install doors with favorable site conditions. Measure, trim and plane door to fit
existing door jamb. Mark and mortise hinge locations. Install hinges. Fabricate holes, mortises
for door handle set and jamb strike plate. Includes planning, equipment and material acquisition,
area preparation and protection, setup and cleanup.

Build Chlorine House:
Basic labor to build a 9 ft. by 11 ft. chlorine house with favorable site conditions. Includes
planning, equipment and material acquisition, area preparation and protection, setup and cleanup.

*Main Drain Line
*Wall Drain
*Disconnection Box
*Outlets

*HD Workshop Light

Please make all checks payable to Gordon Enterprises Contracting LLC
Thank you for your business!

GORDON
CONTRACTING LLC

Repair Concrete:

Basic labor to repair cracked concrete with favorable site conditions. For cracks widths to 1/4 in.
Brush to remove loose cement and debris. Fill void with patching concrete and blend patch
texture with trowel. Includes planning, equipment and material acquisition, area preparation and
protection, setup and cleanup.

Please make all checks payable to Gordon Enterprises Contracting LLC
Thank you for your business!

ROC 305569 CLASS BL Page #1
13951 W HOPE DR. 7/23/2020
SURPRISE, AZ 85379

623-594-9797
info@pridecontractingaz.com

wsdl PRIDE CONTRACTING, INC PROPOSAL

PROJECT NAME JOBSITE ADDRESS
City of El Mirage
Alto Water Facility

OWNER
City of El Mirage, AZ

Pride Contracting, Inc. proposes to furnish, install and service under warranty the work hereinafter outlined, upon the terms and
conditions specified in this document in accordance with the specifications described herein of our Clarifications and Exclusions.
Pricing will remain effective for sixty (30) days from the date of this document.

DESCRIPTION:
EXISTING PRE-FAB METAL BUILDING. REMOVE EXTERIOR GRATES, ENCLOSE AND INSULATE ENTIRE BUILDING. ADDING (1) EXTERIOR DOOR,
CONCRETE PAD FOR AC UNIT AND WALK OUT DOOR. RELOCATE 1 FLOOR DRAIN, 1 NEW CONCRETE STEM WALL AND NEW BLOCK WALLS FOR
NEW CHLORINATING UNIT. 8 NEW LIGHT FIXTURES, NEW AC UNIT, NEW EXHAUST FAN, NEW OUTLETS AND SWITCHES, 1 INTERIOR DOOR.
INTERIOR AND EXTERIOR PAINTING.
LINE # {LINE ITEM cost
GENERAL CONDITIONS $ 7,970.00
SUPERVISION INCLUDED
DUMPSTER INCLUDED
RENTAL EQUIPMENT/LIFTS INCLUDED
PROGRESS CLEANING INCLUDED
FINAL CLEANING INCLUDED
CONCRETE $ 3,502.00
Excavate and pour exterior pad for walk out door and A/C unit INCLUDED
24" stem wall for interior buildout INCLUDED
6" curbing at chlorination areas INCLUDED
Sales tax INCLUDED
MASONRY $ 2,000.00
Interior (3) walls up to 104” high INCLUDED
Steel and (1) lentil INCLUDED
Block provided by City of El Mirage INCLUDED
Sales tax (block provided by City) $ -
STRUCTURAL AND MISC. STEEL $ 7,850.00
Remove and replace damaged corrugated steel on exterior INCLUDED
Frame in door at North side of building INCLUDED
Remove vent at roof and cover INCLUDED
Remove and replace grated material in 4 areas INCLUDED
Sales tax INCLUDED
METAL STUD FRAMING AND DRYWALL $ 1,800.00
Furrout of wall and frame lid at chlorination room INCLUDED
ERP INCLUDED

This bid/proposal is valid for 30 day from latest form date. If you have any questions or require further clarification on any line items presented in this proposal
please contact our office either via email ar phone.

) PRIDE CONTRACTING, INC PROPOSAL
Page #2

ROC 305569 CLASS B1
13951 W HOPE DR. 7/23/2020
SURPRISE, AZ 85379
623-594-9797
info@pridecontractingaz.com

Sales tax $ 105.00
INSULATION $ 4,292.00
R-19 vinyl backed insulation full interior of building wired in place INCLUDED
Sales tax INCLUDED
DOORS FRAMES HARDWARE $ 2,512.00
Interior 3070 HM door and knock down frame plus hardware INCLUDED
Exterior walk out 4070 split door with frame and hardware INCLUDED
Install $ 400.00
Sales tax INCLUDED
PAINTING $ 4,513.00
Complete exterior of building including roof. (2) exterior doors INCLUDED
Interior block walls INCLUDED
Sales tax INCLUDED
PLUMBING $ 1,750.00
Saw cut and add floor drain at chlorination room INCLUDED
Sales tax INCLUDED
HVAC $ 10,280.00
New 4 ton unit INCLUDED
Exposed metal ductwork and hangers INCLUDED
Air distribution devices INCLUDED
Wall mounted exhaust fan INCLUDED
Sales tax INCLUDED
ELECTRICAL $ 8,073.00
HVAC unit power, disconnect and fuses INCLUDED
{8) LED exposed light fixtures and hangers INCLUDED
{4) duplex outlets and (3) switches INCLUDED
Sales tax INCLUDED
SUBTOTAL] $ 55,047.00

OVERHEAD] S$ 3,302.82

PROFIT] S$ 3,302.82

SUBTOTAL] $ 61,652.64

GENERAL LIABILITY INSURANCE| $ 308.26

SUBTOTAL $ 61,960.90

SALES TAX INCLUDED

TOTAL $ 61,960.90

This bid/proposal is valid for 30 day from latest form date. If you have any questions or require further clarification on any line items presented in this proposal
please contact our office either via email or phone.

mene PRIDE CONTRACTING, INC PROPOSAL

ROC 305569 CLASS Bi Page #3
13951 W HOPE DR. 7/23/2020
SURPRISE, AZ 85379

623-594-9797
info@ pridecontractingaz.com

PRICE PER SQUARE FOOT | ¢ 77.45

CLARIFICATIONS & EXCLUSIONS

1 OUR PROPOSAL IS BASED ON THE SITE VISIT CONDUCTED ON TUESDAY 7/14/2020 & FRIDAY 7/17/2020 AND CONSIST OF A
CONSTRUCTION DURATION OF 30 DAYS / 4 WEEKS. OUR GENERAL CONDITIONS INCLUDE SUPERVISION, TEMP SANITARY FACILITY, ROLL
OFF DUMPSTERS, MISC. SMALL TOOLS, GENERAL CLEAN UP. DELAYS DUE TO OTHERS/MUNICIPALITIES MAY BE SUBJECT TO CHANGE
ORDER FOR ADDITIONAL GENERAL CONDITIONS COSTS. ALL SALES TAX ON MATERIAL WILL BE PAID AT POINT OF SALE.

2 EXCLUSIONS AND CLARIFICATIONS: PERMITS, NESHAP NOTIFICATION, ASBESTOS TESTING OR ABATEMENT, BONDING, SPECIAL
INSPECTIONS, MATERIAL TESTING, MILLWORK, PREVAILING WAGES, BUILDERS RISK INSURANCE, AFTER HOURS OR OVER TIME WORK OR
INSPECTIONS, FINAL CLEANING. BLOCK TO BE PROVIDED BY THE CITY OF EL MIRAGE. TEIMP WATER TO BE PROVIDE BY THE CITY OF EL
MIRAGE.

3 ANY DEVIATIONS OR ALTERATIONS FROM THE SPECIFIED SCOPE OF WORK WILL BE COMPLETED UPON WRITTEN CONSENT FROM.
OWNER'S AUTHORIZED PERSONNEL. CHANGE ORDERS WILL BE BILLED WITH A 12% FEE FOR OVERHEAD AND PROFIT.

4 THIS PROPOSAL SHALL BE CONSIDERED PART OF THE CONSTRUCTION CONTRACT DOCUMENTS AND UPON SIGNING YOU, THE OWNER OR
AUTHORIZED PERSONAL ACTING ON BEHALF OF THE OWNER, AGREE TO ALL TERMS AND CONDITIONS LISTED HEREIN.

TERMS & CONDITIONS

THE UNDERSIGNED AGREES TO PAY PRIDE CONTRACTING, INC. THE CONTRACT SUM, BASED UPON APPLICATIONS FOR PAYMENT SUBMITTED BY
PRIDE CONTRACTING, INC. THE UNDERSIGNED SHALL MAKE PROGRESS PAYMENTS PAYABLE TO PRIDE CONTRACTING, INC. NET THIRTY (30) DAYS
FROM PAY APPLICATION SUBMISSION. INVOICES MAY BE EMAILED TO THE UNDERSIGNED. ALL PAY APPLICATIONS WILL BE DEEMED APPROVED
UNLESS CONTESTED WITHIN TEN (14) DAYS OF PAY APPLICATION SUBMISSION. IT IS CUSTOMARY FOR PRIDE CONTRACTING, INC TO PRE-LIEN ALL
PROJECTS PRIOR TO COMMENCEMENT OF WORK. AFTER FINAL COMPLETION OF THE SCOPE OF WORK, AND WHEN FINAL PAYMENT AS BEEN
RECEIVED, PRIDE CONTRACTING, INC. WILL ISSUE TO THE UNDERSIGNED A FINAL AND UNCONDITIONAL LIEN WAIVER. IF ANY PROVISION OF THIS
CONTRACT IS DECLARED OR DETERMINED BY ANY COURT, ARBITRATOR OR ADMINISTRATIVE BODY TO BE ILLEGAL OR INVALID, THE VALIDITY OF
THE REMAINING PARTS, TERMS, OR PROVISIONS SHALL NOT BE AFFECT, AND THE ILLEGAL OR INVALID PART, TERM OR PROVISION SHALL BE
DEEMED NOT TO BE PART OF THIS CONTRACT. ALL PARTIES INVOLVED IN THIS CONTRACT AGREE TO ARBITRATION HELD WITHIN THE STATE OF
ARIZONA.

PAYMENT TERMS: BILLING AND PAYMENT SCHEDULE TO BE DETERMINED AT TIME OF CONTRACT. ALL UNPAID INVOICES OLDER THEN 30 DAYS
MAY INCUR A 10% LATE PENALTY.

t confirm that | have read this document in it's entirety and understand that my signature below constitutes an acceptance of this proposal (scope
of work, clarifications, exclusions, terms & conditions, and payment terms). Furthermore | certify that | am either the owner of this property or
authorized to sign this proposal on the owner's behalf.

{SIGNATURE}

{NAME & TITLE}

(DATE)

This bid/proposal is valid for 30 day from latest form date. If you have any questions or require further clarification on any line items presented in this proposal
please contact our office either via email or phone.