Contract No. EM21-ST01 
Page 1 of 10 
 
CITY OF EL MIRAGE  
PROFESSIONAL SERVICES CONTRACT 
 
 
THIS PROFESSIONAL SERVICES CONTRACT is made and entered into this 10th day of September 
2020, by and between the City of El Mirage, an Arizona municipal corporation (“City”), and NFra, Inc. 
an Arizona corporation (“Consultant”). 
 
RECITALS 
 
A. The City of El Mirage is authorized and empowered by provisions of the City Code to execute 
contracts for professional services by and through its City Manager;  
 
B. The City desires to contract for Consultant to provide professional engineering services for the 
Cactus Road Improvements project (“Services”) as described in the attached scope of work (Exhibit 
“A”) in accordance with the terms of this Contract; 
 
C. Consultant is duly qualified to perform the requested Services. 
 
AGREEMENT 
 
NOW, THEREFORE, in consideration of the mutual promises and obligations set for herein, the parties 
hereto agree as follows: 
 
1.1  
DESCRIPTION, ACCEPTANCE, DOCUMENTATION  
 
Consultant shall act under the authority and approval of the Contract Administrator for the City to 
provide the Services required by this Contract. The Contract Administrator for the City shall be 
Jorge Gastelum, Community Development Director/City Engineer, or designee. The Contract 
Administrator shall oversee the execution of this Contract, assist the Consultant in accessing the 
organization, audit billings, and approve payments. The Consultant shall channel reports and 
special requests through the Contract Administrator. City reserves the right to change the Contract 
Administrator for the City without prior approval of the Consultant.  
 
1.2  
SERVICE DESCRIPTION 
 
Consultant shall provide the Services described in Exhibit “A.” All work will be reviewed, 
evaluated, approved, and monitored by the Contract Administrator to determine acceptable 
completion. Review and approval by the Contract Administrator shall not relieve Consultant of any 
liability for improper, negligent or inadequate services rendered pursuant to this Contract. 
Consultant shall provide all work necessary to assure the Services are completed in a timely and 
efficient manner consistent with service requirements, including, but not limited to, working in 
close interaction with, and interfacing with, City and its designated employees, and working closely 
with others, including other consultants or contractors retained by City.

Contract No. EM21-ST01 
 
 
 
Page 2 of 10 
1.3 
DOCUMENTATION AND DATA 
 
All documents, including but not limited to, data compilations, studies, and reports which are 
prepared in the performance of this Contract are to be, and remain the property of, the City and are 
to be delivered to the Contract Administrator before final payment is made to the Consultant. 
 
2.1 
FEE SCHEDULE, RECORDS, AUDIT RIGHTS 
 
 
The fee Consultant shall be paid for all Services provided pursuant to the terms of this Contract, 
inclusive of all expenses under this Contract, shall not exceed Thirty-Two Thousand Nine Hundred 
and Eighty Dollars ($32,980.00). 
 
 
The Contract Administrator reserves the exclusive right to determine the amount of work performed 
and payment due the Consultant on a monthly basis. Consultant shall maintain all books, paper 
documents, accounting records and other evidence pertaining to such monthly billings and shall 
make such materials available at all reasonable times to the Contract Administrator. Monthly 
billings shall be accompanied by such documentation as the Contract Administrator may require to 
make a determination of work performed and payment due. 
 
Consultant’s records (hard copy, as well as computer readable data) and any other supporting 
evidence deemed necessary by the City to substantiate charges and claims related to this Contract 
shall be open to inspection and subject to audit and/or reproduction by City’s authorized 
representative to the extent necessary to adequately permit evaluation and verification of cost of 
the work, and any invoices, change orders, payments or claims submitted by the Consultant or any 
of its payees pursuant to the execution of the Contract. The City’s authorized representative shall 
be afforded access, at reasonable times and places, to all of the Consultant’s records and personnel 
pursuant to the provisions of this article throughout the term of this contract and for a period of 
three years after last or final payment. 
 
 
Consultant shall require all subconsultants, insurance agents, and material suppliers (payees) to 
comply with the provisions of this article by insertion of the requirements hereof in a written 
contract agreement between Consultant and payee. Such requirements will also apply to any and 
all subconsultants. 
 
 
If any audit in accordance with this article discloses overcharges of any nature by the Consultant 
to the City in excess of one percent (1%) of the total contract billings, the actual cost of the City’s 
audit shall be reimbursed to the City by the Consultant. Any adjustments and/or payments which 
must be made as a result of any such audit or inspection of the Consultant’s invoices and/or records 
shall be made within a reasonable amount of time (not to exceed 90 days) from presentation of 
City’s findings to Consultant.  
 
2.2 
ADDITIONAL SERVICES; PRICE ADJUSTMENT 
   
 
The total Scope of Work to be performed by Consultant in accordance with this Contract is set forth 
herein and in Exhibit “A.” Services not included in this Contract, including Exhibit “A,” will be 
considered Additional Services. Consultant shall not perform any Additional Services without 
written authorization from the City. It shall be presumed that all Services performed/provided by 
Consultant were included in the Contract and contemplated by Consultant as being part of the 
original Scope of Work and the fees set forth herein, unless such Services have been separately 
approved by the City, in writing, as Additional Services. Consultant shall not be paid for any 
Additional Services that are not authorized by the City in writing.

Contract No. EM21-ST01 
 
 
 
Page 3 of 10 
2.3 
OWNERSHIP 
 
Upon receipt of payment for Services, Consultant grants to City, and shall cause its subconsultants 
to grant to City, the exclusive ownership of any and all copyrights, if any, to evaluations, reports, 
drawings, specifications, project manuals, surveys, estimates, reviews, minutes, and other 
intellectual work product as may be applicable ("Work Product"). This grant is effective whether 
the Work Product is on paper (e.g., a "hard copy"), in electronic format, or in some other form. 
Consultant warrants, and agrees to indemnify, hold harmless and defend City for, from and against 
any claim that any Work Product infringes on third-party proprietary interests. City may reuse the 
Work Product at its sole discretion. In the event the Work Product is used for another project 
without further consultations with Consultant, the City agrees to indemnify and hold Consultant 
harmless from any claim arising out of the Work Product. In such case, City will also remove any 
title block from the Work Product. 
  
3.1 
TERM AND EXTENSION 
 
 
This Contract shall be in full force and effect only when approved and signed by City’s City 
Manager as attested by the City Clerk. This Contract begins on the Effective Date.  All work shall 
be completed by February 28, 2021.    
 
 
In the event the work cannot be completed within the time specified, the Contract Administrator 
may approve a change order extending the time for completion of the work when Contract 
Administrator determines it is in the best interest of the City for such period as the Contract 
Administrator deems reasonable.  A modification for a time extension for completion of the work 
pursuant to this subparagraph shall not entitle Consultant to additional compensation.   
 
3.2 
TERMINATION 
 
3.2.1 
Termination for Cause 
 
 
The City has the right to terminate this Contract for cause in the event Consultant materially 
breaches any provision of this Contract or portion of the Services and fails to remedy the 
breach within five (5) business days of notification of the breach, if the breach is remedial. 
If Consultant fails to remedy the breach or if the breach is not remedial, City may terminate 
this Contract for cause immediately upon written notice to Consultant. In the event the City 
terminates this Contract or any part of the Services as herein provided pursuant to this 
Section 3.2.1, the City shall notify the Consultant in writing, and immediately upon receipt 
of such notice, the Consultant shall discontinue all work under this Contract. 
 
 
Upon termination for cause, Consultant shall immediately deliver to the City all drawings, 
research, data, studies, reports, estimates and any and all other documents or work product 
generated by the Consultant under the Contract, together with all unused material supplied 
by the City. Consultant shall be responsible only for such portion of the work which has 
been completed and accepted by the City. Use of incomplete data by the City shall be the 
City’s sole responsibility. 
 
 
In the event of termination for cause, Consultant shall only be compensated a portion of 
the agreed upon fee for such portion of the work that City agrees, in its sole discretion to 
accept. City shall have no obligation to accept any portion of Consultant’s work if the 
contract is terminated for cause, and shall have no obligation to pay Consultant for any 
portion of the work, if any, not accepted by City.

Contract No. EM21-ST01 
 
 
 
Page 4 of 10 
 
 
If the Consultant materially fails to fulfill in a timely and proper manner its obligations 
under this Contract, of if the Consultant violates any of the covenants, agreements, or 
stipulations of this Contract, the City may withhold from payment due to the Consultant 
such amounts as are necessary to protect the City’s position for the purpose of set-off until 
such time as the exact amount of damages can be determined. 
 
3.2.2. Termination for Convenience 
 
The City has the right to terminate this Contract for convenience or to abandon any portion 
of the work for which Services have not been performed by the Consultant. In the event 
the City terminates this Contract or any part of the Services as herein provided pursuant to 
this Section 3.2.2, the City shall notify the Consultant in writing, and immediately upon 
receipt of such notice, the Consultant shall discontinue all work under this Contract. 
 
Upon such termination for convenience or abandonment, the Consultant shall immediately 
deliver to the City all drawings, research, data, studies, reports, estimates and any and all 
other documents or work product generated by the Consultant under the Contract, together 
with all unused material supplied by the City. Consultant shall be responsible only for such 
portion of the work which has been completed and accepted by the City. Use of incomplete 
data by the City shall be the City’s sole responsibility. 
 
The Consultant shall receive as compensation in full for Services performed to the date of 
such termination or abandonment, a fee for the percentage of Services actually completed 
and accepted by the City. This fee shall be in an amount to be mutually agreed upon by the 
Consultant and the City, based upon the scope of work set forth in Exhibit “A’ and the 
payment schedule set forth in Article 2, hereof. If mutual agreement cannot be reached 
after reasonable negotiation, the Contract Administrator shall determine the percentage of 
satisfactory completion of each task set forth in the scope of work contained in Exhibit “A” 
and the amount of compensation Consultant is entitled to for such work and the Contract 
Administrator’s determination in this regard shall be final. The City shall make such final 
payment within sixty (60) days after the Consultant has delivered the last of the partially 
completed items. 
 
3.3 
FUNDS APPROPRIATION 
 
If the City Council does not appropriate funds to continue this Contract and pay for charges 
hereunder, the City may terminate this Contract at the end of the current fiscal period. The City 
agrees to give written notice, pursuant to Section 3.2, Termination, of this Contract to the 
Consultant at least thirty (30) days prior to the end of its current fiscal period and will pay to the 
Consultant all approved charges incurred through the end of such period. 
 
The City's fiscal year begins July 1st and ends June 30th each calendar year. The City may make 
payment for Services rendered or costs encumbered only during a fiscal year and for a period of 
sixty (60) days immediately following the close of the fiscal year, under the provisions of Arizona 
Revised Statutes § 42-17108. Therefore, Consultant must submit billings for Services performed 
or costs incurred prior to the close of a fiscal year within forty-five (45) days to allow payment 
within this period.

Contract No. EM21-ST01 
 
 
 
Page 5 of 10 
4.1 
ENTIRE AGREEMENT 
 
This Contract constitutes the entire understanding of the parties and supersedes all previous 
representations, written or oral, with respect to the Services specified herein. This Contract may 
not be modified or amended except by a written document, signed by authorized representatives of 
each party. 
 
4.2  
ARIZONA LAW 
 
This Contract shall be governed and interpreted according to the laws of the State of Arizona. Any 
action brought to interpret or enforce any provision of this Contract that cannot be administratively 
resolved, or otherwise related to or arising from this Contract, shall be commenced and maintained 
in the state or federal courts of the State of Arizona, Maricopa County, and each of the parties, to 
the extent permitted by law, consents to jurisdiction and venue in such courts for such purposes. 
 
4.3 
COMPLIANCE WITH LAWS 
 
Consultant shall comply with all existing and subsequently enacted federal, state and local laws, 
ordinances, codes, and regulations that are, or become applicable to this Contract. If a subsequently 
enacted law imposes substantial additional costs on Consultant, a request for an amendment may 
be submitted pursuant to this Contract. 
 
4.4 
MODIFICATIONS 
 
Any amendment, modification or variation from the terms of this Contract shall be in writing and 
shall be effective only after approval of all parties signing the original Contract. 
 
4.5 
ASSIGNMENT 
 
Services covered under this Contract shall not be assigned or sublet in whole or in part 
without the prior written consent of the Finance Director and Contract Administrator. 
 
4.6 
SUCCESSORS AND ASSIGNS 
 
This Contract shall extend to and be binding upon Consultant, its successors and assigns, including 
any individual, company, partnership or other entity with or into which Consultant shall merge, 
consolidate or be liquidated, or any person, corporation, partnership or other entity to which 
Consultant shall sell its assets. 
 
4.7 
ATTORNEY’S FEES 
 
In the event either party brings any action for any relief, declaratory or otherwise, arising out of 
this Contract, or on account of any breach or default hereof, the prevailing party may be entitled to 
receive from the other party reasonable attorneys’ fees and reasonable costs and expenses 
determined by the court sitting without a jury or arbitration board, which shall be deemed to have 
accrued on the commencement of such action and shall be enforceable whether or not such action 
is prosecuted to judgment or by arbitration award. 
 
4.8  
INDEPENDENT CONTRACTOR 
 
The Services Consultant provides under the terms of this Contract to the City are that of an

Contract No. EM21-ST01 
 
 
 
Page 6 of 10 
Independent Contractor, not an employee or agent of the City. The City will report the value paid 
for these Services each year to the Internal Revenue Service (I.R.S.) using Form 1099. 
 
City shall not withhold income tax as a deduction from contractual payments. As a result of this, 
Consultant may be subject to I.R.S. provisions for payment of estimated income tax. Consultant is 
responsible for consulting the local I.R.S. office for current information on estimated tax 
requirements. Consultant will not be entitled to any benefits provided by City to its employees, 
including, but not limited to, health benefits, workers’ compensation, unemployment coverage, 
deferred compensation, and all other typical employee benefits. 
 
4.9 
CONFLICT OF INTEREST 
 
The City may cancel any contract or agreement, without penalty or obligation, if any person 
significantly involved in initiating, negotiating, securing, drafting or creating the contract on behalf 
of the City’s departments or agencies is, at any time while the contract or any extension of the 
contract is in effect, an employee of any other party to the contract in any capacity or a consultant 
to any other party to the Contract with respect to the subject matter of the Contract. The cancellation 
will be effective when written notice from the City is received by all other parties to the Contract, 
unless the notice specifies a later time (A.R.S. §38-511). 
 
4.10 
 NOTICES 
 
All notices or demands required to be given pursuant to the terms of this Contract shall be given 
to the other party in writing, delivered by hand or registered or certified mail, at the addresses set 
forth below, or to such other address as the parties may substitute by written notice given in the 
manner prescribed in this paragraph. 
 
In the case of Consultant: 
NFra, Inc.  
 
 
 
 
Attn:  Randy Weyrauch, P.E. 
 
 
 
 
77 East Thomas Road, Suite 200 
 
 
 
 
Phoenix, AZ 85012 
 
In the case of City 
 
City of El Mirage 
 
 
 
 
Attn: City Manager 
 
 
 
 
10000 N. El Mirage Road 
 
 
 
 
El Mirage, Arizona 85335 
 
With a copy to: 
 
City of El Mirage 
 
 
 
 
Attn: City Attorney 
 
 
 
 
10000 N. El Mirage Road 
 
 
 
 
El Mirage, Arizona 85335 
 
Notices shall be deemed received on date delivered, if delivered by hand, and on the delivery date 
indicated on receipt if delivered by certified or registered mail. 
 
4.11  
FORCE MAJEURE 
 
Neither party shall be responsible for delays or failures in performance resulting from acts beyond 
their control. Such acts shall include, but not be limited to, acts of God, riots, acts of war, epidemics, 
governmental regulations imposed after the fact, fire, communication line failures, power failures, 
or earthquakes.

Contract No. EM21-ST01 
 
 
 
Page 7 of 10 
 
4.12  
TAXES 
 
Consultant shall be solely responsible for any and all tax obligations which may result out of the 
Consultant’s performance of this Contract. The City shall have no obligation to pay any amounts 
for taxes of any type incurred by the Consultant. 
 
4.13  
ADVERTISING AND PROMOTION 
 
Consultant shall not publish, release, disclose or announce to any member of the public, press, 
official body, or any other third party: (1) any information concerning this Contract, the Services, 
or any part thereof; or (2) any documentation or the contents thereof, without the prior written 
consent of the City, except as required by law or judicial or regulatory process. The name of any 
site on which Services are performed shall not be used in any advertising or other promotional 
context by Consultant without the prior written consent of the City. 
 
4.14 
COUNTERPARTS 
 
 
This Contract may be executed in one or more counterparts, and each originally executed duplicate 
counterpart of this Contract shall be deemed to possess the full force and effect of the original. 
 
4.15 
CAPTIONS 
 
 
The captions used in this Contract are solely for the convenience of the parties, do not constitute a 
part of this Contract and are not to be used to construe or interpret this Contract. 
 
4.16  
SUBCONSULTANTS 
 
During the performance of the Contract, the Consultant may engage such additional subconsultants 
as may be required for the timely completion of this Contract. The addition of any subconsultants 
shall be subject to the prior approval of the City. 
 
In the event of subcontracting, the sole responsibility for fulfillment of all terms and conditions of 
this Contract rests with the Consultant. 
 
4.17  
INDEMNIFICATION 
 
The Consultant agrees, to the fullest extent permitted by law, to indemnify and hold harmless the 
City, its officers, directors and employees (collectively, City) against all damages, liabilities or 
costs, including reasonable attorneys’ fees and defense costs, to the extent caused by the 
Consultant’s negligent performance of professional services under this Contract and that of its 
subcontractors or anyone for whom the Consultant is legally liable. 
 
The City agrees, to the fullest extent permitted by law, to indemnify and hold harmless the 
Consultant, its officers, directors, employees and subcontractors (collectively, Consultant) against 
all damages, liabilities or costs, including reasonable attorney’s fees and defense costs, to the extent 
caused by the City’s negligent acts in connection with the Services and the acts of its contractors, 
subcontractors or consultants or anyone for whom the City is legally liable. 
 
 
Neither the City nor the Consultant shall be obligated to indemnify the other party in any manner

Contract No. EM21-ST01 
 
 
 
Page 8 of 10 
whatsoever for the other party’s own negligence or for the negligence of others. 
 
4.18 
INSURANCE 
 
The Consultant shall secure and maintain at all times that this Contract is in effect, insurance 
coverage which shall include statutory workers’ compensation, comprehensive general and 
automobile liability, owner’s and Consultant’s protective liability insurance and errors and 
omissions professional liability. The comprehensive general and automobile liability limits shall 
be no less than one million dollars ($1,000,000) combined single limit. The owner’s and 
Consultant’s protective liability limits shall be no less than one million dollars ($1,000,000) for 
each occurrence and one million dollars ($1,000,000) policy aggregate naming the City as an 
additional insured. The minimum amounts of coverage for Consultant’s professional liability shall 
be one million dollars ($1,000,000). In other than errors and omissions professional liability, City’s 
and Consultant’s protective liability and worker’s compensation, the City of El Mirage shall be 
named as an additional insured.  
 
All insurance coverage shall be written through a carrier licensed in Arizona, or an approved non-
admitted list of carriers published by the Arizona Department of Insurance, and possessing an A.M. 
Best rating of at least A- or above with policies and forms satisfactory to the City.  
 
The Consultant shall submit to the City a certificate of insurance evidencing the coverage and limits 
stated in the foregoing paragraph within ten (10) days of award of this Contract. City shall not issue 
a “Notice to Proceed” until after Consultant has submitted the certificate of insurance to City. 
Insurance evidenced by the certificate shall not expire or be canceled or materially changed without 
thirty (30) days prior written notice to the City, and a statement to that effect must appear on the 
face of the certificate and the certificate shall be signed by a person authorized to bind the insurer.  
 
The insurance policies, except Workers’ Compensation required by this Contract, shall name the 
City, its agents, representatives, officers, directors, officials and employees as Additional Insureds. 
 
4.19 
FEDERAL AND STATE EMPLOYMENT IMMIGRATION LAWS 
 
To the extent applicable under A.R.S. § 41-4401, Consultant warrants its and its subconsultants’ 
compliance with all federal immigration laws and regulations that relate to their compliance with 
the E-verify requirements under A.R.S. § 23-214(A). Consultant’s or its subconsultants’ breach of 
the above-mentioned warranty shall be deemed a material breach of the Contract and may result in 
the termination of the Contract by the City. The City retains the legal right to randomly inspect the 
papers and records of Consultant and its subconsultants to ensure that the Consultant and its 
subconsultants are complying with the above-mentioned warranty. 
 
The Consultant warrants to keep the papers and records open for random inspection during normal 
business hours by the City. The Consultant shall cooperate with the City’s random inspections 
including granting the City entry rights to Consultant’s property to perform the random inspections 
and waiving its right to keep such papers and records confidential. The failure of Consultant to 
comply with this warranty regarding the keeping of papers and records and cooperating with City’s 
random inspections shall constitute a material breach of the Contract and the City will have the 
right to immediately terminate the Contract.  
 
4.20 
SEVERABILITY 
 
If any term or provision of this Contract shall be found to be illegal or unenforceable, then

Page 10 of 10 
EXHIBIT “A”

NFra Inc.                                       77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937 
                                   
                               
                                  
                               a transportation engineering firm 
 
 
August 12, 2020 
 
 
Mr. Bryce Christo, PE 
Assistant City Engineer 
City of El Mirage 
10000 N. El Mirage Road 
El Mirage, AZ 85335 
 
RE: 
 
Cactus Road Roadway Improvements 
 
 
 
City of El Mirage Project No. EM21-ST01 
 
 
 
NFra Project No. 2009xx 
 
Revised Scope and Fee Proposal 
 
Dear Mr. Christo: 
 
Thank you for the opportunity to provide engineering design services for your Cactus Road Roadway 
Improvements project. Attached is NFra’s and our subconsultants revised scope of work and fee 
proposals for the project. 
 
The insurance certificates are also attached.  
 
If you have any questions or need additional information, please call me at (602) 443-6066 or email 
at rweyrauch@nfrainc.us.  
 
Sincerely, 
 
Randy Weyrauch, P.E. 
Project Manager 
 
Enclosures: As noted 
 
 
L:\Project Management\El Mirage\Cactus Road- 125th-El Mirage\Submittal 081220\Bryce Christo Butler Recst 081220.doc

NFra Inc.                                             77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937 
                                   
                               
                                  
                   a transportation engineering firm 
 
EXHIBIT A 
 
SCOPE OF WORK 
 
CACTUS ROAD ROADWAY IMPROVEMENTS 
 
CITY OF EL MIRAGE - PROJECT NO. EM21-ST01 
 
 
A. 
BRIEF DESCRIPTION OF PROJECT 
This project will involve the preparation of construction documents to add concrete curb/gutter and 
sidewalk along the north side of Cactus Road from just west of 123rd Lane to El Mirage Road. New 
concrete curb/gutter and sidewalk will also be added to both sides of 123rd Lane from Cactus Road to 
the existing concrete sidewalks near Charter Oak Road. New curb returns with valley gutter/aprons 
and ADA compliant ramps will be provided at the Cactus Road and 123rd Lane intersection. Drainage 
along the north side of Cactus Road will be intercepted and conveyed via a scupper to the existing 
retention basin along the development on the north side of Cactus Road. Pavement runoff west of the 
scupper will follow existing sheet flow drainage patterns. Project is expected to be constructed using a 
JOC. 
 
B. 
GENERAL REQUIREMENTS 
 
 
1. 
DESIGN STANDARDS – All design work shall conform to: 
a. 
2020 Maricopa Association of Governments (MAG) Uniform Standard Specifications 
and Details for Public Works Construction with latest revisions. 
 
b. 
City of El Mirage September 2019 Supplement to MAG Uniform Standard Details. 
 
c. 
City of El Mirage 2019 Design and Development Standards Manual. 
 
d. 
Applicable Arizona Public Service specifications and details. 
 
e. 
AASHTO “Policy on Geometric Design of Highways and Streets” 2011 edition. 
 
f. 
Manual on Uniform Traffic Control Devices, 2009 edition. 
 
g. 
Arizona Department of Environmental Quality, latest bulletins. 
 
h. 
City of El Mirage General Notes & Details. 
 
2. 
PROJECT SCHEDULE  
Prior to commencing design work, NFra (ENGINEER) and the City of El Mirage’s Contract 
Administrator (CITY) will meet to determine the project schedule. The ENGINEER will meet 
with the CITY to assess the project’s progress in relationship to the design schedule. The 
design for this project is anticipated to begin in August 2020 and be completed by December 
2020. 
 
3. 
SUBMITTALS 
a. 
Electronic pdf’s of the construction plans, specifications and cost estimates will be 
submitted at the 60%, 95% and 100% completion stages of the project. 
 
b.   
The ENGINEER will coordinate with agencies having utilities within the project 
limits.

City of El Mirage 
Cactus Road Roadway Improvements 
Project No. EM21-ST01 
Exhibit A 
 
 
1.2
 
c.   
Drawings will be prepared electronically in MicroStation V8 format. These drawings 
will be converted into the latest version of AutoCAD for the CITY’s use. Review 
drawings (11"x17" and 22"x34" to the City and 11"x17" to utility companies) will be 
provided to the CITY and each utility company at each submittal stage. Final 22"x34" 
pdf drawings will be sealed by an Arizona professional engineer. The ENGINEER 
will submit an electronic copy (pdf) of the final drawings and bid documents to the 
CITY for reproduction. The ENGINEER will also provide the CITY electronic 
versions of all bid documents, reports, and other project related information at the 
completion of the project. 
 
Note: 
Standard plan sheet size is 22"x34" (ANSI “D” size). All plan sheets shall be suitable 
for plotting at true half size.  
 
4. 
MEETING PARTICIPATION. The ENGINEER will attend and prepare meeting minutes for 
the following meetings. The minutes will be furnished to the CITY’s Contract Administrator 
for review and approval. 
 
a. 
Pre-Design Meeting: The ENGINEER will coordinate with the CITY to establish the 
project scope of work, schedule and budget. NFra will conduct a site visit to 
understand the project features. 
 
b. 
Progress Meetings: The ENGINEER will attend meetings with the Contract 
Administrator at the CITY to keep the CITY abreast of the project status. These 
meetings will be used to address design issues and issues that will arise in the 
preparation of the construction documents. Meetings are anticipated at the 60% and 
95% submittal stages. 
 
C. 
TASKS 
 
 
1. 
DATA COLLECTION 
 
The ENGINEER will visit the project area and take photos to clearly define the nature of the 
work to be completed. 
 
The CITY will supply to the ENGINEER at no cost the following items if they are available: 
 
a. 
CADD standards and index of AutoCAD/Microstation levels. 
 
b. 
Recorded plats and record drawings for the streets involved and developments within 
the project limits. 
 
c. 
Fees for other agencies to conduct reviews. 
 
d. 
Utility Maps and list of known utility contacts. 
 
e. 
Master water and sewer plans. 
 
f. 
Sample plans, specifications and estimates from similar projects. 
 
g. 
Bid tabulations for recent projects in El Mirage.

City of El Mirage 
Cactus Road Roadway Improvements 
Project No. EM21-ST01 
Exhibit A 
 
 
1.3
2. 
UTILITY AND INTERGOVERNMENTAL AGENCY COORDINATION 
 
a. 
The ENGINEER will notify and coordinate with the utility companies in accordance 
with the Central Arizona Coordinating Committee’s Public Improvement Project 
Guide. Initial contact with utility companies will be made under the data collection 
task when record drawings are being collected. Existing and proposed utilities that are 
known will be shown on the preliminary and final construction plans. Services to 
individual properties will not be shown on the plans unless this information is 
provided by the CITY. 
 
b. 
Base mapping prepared by the ENGINEER and detailing of known utility facilities 
will be transmitted to the utility companies. Their comments will be incorporated into 
the base maps. 
 
c. 
The ENGINEER will obtain approvals from the various utilities and governmental 
agencies that include APS, CenturyLink, Cox, SW Gas, and other utilities identified. 
The ENGINEER will submit plans for review to each agency and assist the agency in 
resolving utility conflicts. 
 
c. 
Underground utilities such as water lines, sewer lines, storm drains, electric, gas, 
telephone, cable TV, irrigation, etc., that are shown to conflict with the new design, 
shall be coordinated for relocation. Potholing of existing utilities will be conducted as 
necessary; an allowance of 5 potholes has been included. The ENGINEER will 
provide the CITY a list of conflicts that require potholing for the CITY’s approval. 
 
d. 
The ENGINEER will be responsible for reviewing relocation plans produced by 
utility companies to confirm utility conflicts are eliminated and that proposed utility 
installations conform to the CITY’s requirements. 
 
e. 
The ENGINEER will request a design Blue Stake to assist with locating existing 
utilities. 
 
f. 
The utility special provisions shall include the following: 
 
i. 
List of utility companies in the area, and contact person’s name and telephone 
number. 
 
ii. 
A statement that there are no conflicts or a statement utility is in conflict. 
 
iii. 
Work to be performed by utility companies during project construction. 
 
iv. 
Completion date or schedule for each utility conflict to be removed by utility 
company. 
 
v. 
Work to be performed for the utility company by the Contractor. 
 
3. 
SURVEY 
 
ENGINEER will perform a conventional ground survey that provides comprehensive design 
level topographic mapping. Roadway centerline controls will be established by locating 
monuments along streets. Horizontal and vertical control shall be based on NAD83/NAVD88 
Datum per City of El Mirage. Topographic data shall be collected electronically with Point 
Number, Elevation, and Description; all shall be on separate levels. Survey format shall follow

City of El Mirage 
Cactus Road Roadway Improvements 
Project No. EM21-ST01 
Exhibit A 
 
 
1.4
ADOT’s guidelines with cells suitable for plotting at 1"=20' scale. Topographic points and 
survey control points will be provided in an ASCII points file format, topographic mapping 
furnished in Microstation format, an electronic DTM file in inroads format, and hard copies of 
all field notes. 
 
a. Locate existing monuments and establish control for each roadway within the project 
limits. The horizontal and vertical accuracy shall be suitable for final design that includes 
removal and replacement of existing pavement with positive roadway cross slopes.  
b. GPS procedures will be used for the topographic survey. 
c. Prepare base map showing all data derived from the survey.  
d. Cross sections on Cactus Road shall extend from the left turn stripe lane of Cactus Road to 
the bottom of retention basin on the north side of Cactus Road. The cross sections shall 
begin just west of 123rd Lane to El Mirage Road and will be taken at 50-foot intervals (25-
foot intervals near 123rd Lane). Cross sections will be taken at 25-foot intervals on 123rd 
Lane. 
e. Cross sections shall include at a minimum, edges of asphalt, edges of concrete, driveways, 
fences, signs, walls, drainage features, manholes, valves – including top of nut elevations, 
power poles, light poles, and irrigation boxes. 
f. Survey northwest corner of El Mirage Road / Cactus Road intersection including return, 
ramps, traffic signals, curb and gutter and sidewalk from return north to catch basin. 
g. Identify and survey any blue staked utilities. 
h. See attached scope of work from Hubbard Engineering for more details. 
 
4. 
GEOTECHNICAL INVESTIGATION 
 
A geotechnical investigation is not warranted, the City’s minimum pavement structural 
sections will be used for Cactus Road and 123rd Lane.  
 
5. 
ROADWAY DESIGN  
 
ENGINEER will prepare roadway plans for the following items. 
 
a. Asphaltic Concrete Pavement: Existing asphalt pavement will be removed by sawcutting 
to accommodate new concrete curb and gutter on the north side of Cactus Road and 
existing pavement will be removed and replaced on 123rd Lane from the new valley gutter 
to the existing curb and gutter match point. 
 
b. Curb and Gutter: New curb and gutter installed on the north side of Cactus Road from the 
123rd Lane intersection to the existing curb return on the northwest corner of El Mirage 
Road. New curb and gutter will extend from the 123rd Lane intersection north to the 
existing curb and gutter locations on both sides of 123rd Lane. 
 
c. Sidewalks: New concrete sidewalks will replace existing asphalt sidewalks and will be 
provided at locations where sidewalks do not exist within the new curb and gutter 
locations. No new driveways are anticipated. 
 
d. Valley Gutter and Apron: New six foot wide concrete valley gutter and aprons will be 
provided at the Cactus Road and 123rd Lane intersection. 
 
e. Directional Ramps: ADA compliant directional ramps will be provided at the Cactus Road 
/ 123rd Lane intersection.

City of El Mirage 
Cactus Road Roadway Improvements 
Project No. EM21-ST01 
Exhibit A 
 
 
1.5
f. Manholes and Valves: Manholes and valves will be adjusted to finished grade and 
concrete collars will be constructed around each new or existing valve or manhole that 
falls within a paved surface.  
 
6. 
DRAINAGE 
 
a. Pavement drainage will be intercepted and conveyed via a scupper to the existing 
retention basin located between 123rd Lane and El Mirage Road on the north side of 
Cactus Road. Pavement drainage west of the proposed scupper will continue to follow 
existing drainage patterns and sheet flow across Cactus Road into the Lower El Mirage 
Wash. A Floodplain Use Permit is not warranted or included in this proposal. 
 
b. The rock riprap between existing curb and gutter and the existing asphalt sidewalk will be 
evaluated. Rock riprap will be removed with the new concrete sidewalk improvements or 
the rock riprap will be incorporated into the new design. A toe down on the new concrete 
sidewalk may be warranted to control erosion. 
 
7. 
WATER, SEWER AND OTHER UTILITY LINES 
 
 
a. No new or relocated utilities are anticipated with the project.  
 
8. 
ROW/EASEMENTS 
 
New ROW and/or easement takes are not anticipated for this project. New improvements will 
be constructed within existing City ROW. 
 
9. 
LANDSCAPING / IRRIGATION 
 
Existing landscaping and irrigation that is disturbed between 123rd Lane and El Mirage Road 
will be restored. 
 
10. 
DEMOLITION AND RELOCATION 
 
The ENGINEER will be responsible for the identification of removals and relocations. These 
will be included on the plans where appropriate. Pavement replacement, asphalt sidewalk, and 
riprap are anticipated. 
 
11. 
TRAFFIC PAVEMENT MARKING/SIGNING/SIGNALIZATION 
 
Signing and striping plans are not required for this project, any signing and striping 
modifications will be shown on the roadway plans. 
 
12. 
TRAFFIC MANAGEMENT PLAN/CONSTRUCTION PHASING 
 
The Contractor shall be responsible for maintenance of traffic for construction and will 
comply with the most current editions of the City of El Mirage and MUTCD Specifications 
for Traffic Control Devices. The ENGINEER will prepare detailed special provisions to 
provide access to all residents and businesses, and minimize the time access will be 
unavailable during construction. Emergency access and mail delivery will be available at all 
times. 
 
The Contractor shall be responsible for obtaining construction permits from the CITY.

City of El Mirage 
Cactus Road Roadway Improvements 
Project No. EM21-ST01 
Exhibit A 
 
 
1.6
13. 
BIDDING PHASE 
 
 
The CITY will handle the bidding phase with the JOC. 
 
14.  
SPECIAL PROVISIONS 
 
The CITY will develop Special Provisions for items, details and procedures not adequately 
covered by MAG Uniform Standard Specifications for Public Works Construction, City of El 
Mirage Supplements, ADOT Standard Specifications for Road and Bridge Construction and 
other specifications. 
 
 
15. 
COST ESTIMATES 
 
 
 
The ENGINEER will prepare cost estimates at the 60%, 95%, and 100% submittals. 
 
D. 
POTHOLING 
Five potholes have been added to this project on an allowance basis to locate existing utilities in the 
field if needed. For additional information, see attached proposal from Safe Site.  
 
E. 
ASSUMPTIONS 
a. Drainage report is not required or included. 
b. No improvements are required to the Lower El Mirage Wash. A Floodplain Use Permit is not 
required or included. 
c. Retention basin on north side of Cactus Road has adequate volume to accept pavement runoff 
between 123rd Lane and El Mirage Road. Volume calculations are not warranted. 
d. ROW services are not required or included, City has sufficient ROW to complete project. 
e. Traffic control and sequencing will be the responsibility of the Contractor. 
f. 
Landscaping and irrigation plans are not required or included. If needed, restoration areas will be 
shown on the roadway plans.  
g. Bidding Services are not required or included. City will negotiate with the JOC. 
h. Construction Administration Services and Post Design Services are not required or included. 
i. 
Signing and striping plans are not required or included. If needed, modifications will be shown on 
the roadway plans. 
j. 
Traffic signal work is not required or included. 
k. Sewer, water or reclaimed water lines are not required or included. 
l. 
Contractor shall be responsible for obtaining permits from City of El Mirage. 
m. Public outreach is not required or included. 
n. Cross sections are not required or included. 
o. No improvements are required on the south side of Cactus Road. 
 
 
L:\Project Management\El Mirage\Cactus Road- 125th-El Mirage\Submittal 081220\Cactus Rd Recst Scope-Exhibit A 081220.doc

EXHIBIT B
NFra Inc.
Client: City of El Mirage 
Project: Cactus Road Roadway Improvements
El Mirage Project No. EM21-ST01
Design Cost Proposal
ESTIMATED DIRECT LABOR (DESIGN)
Estimated
Avg. Hourly
Labor
Classification
Labor Hours
Rate
Cost
Project Manager
9
$192.00
$1,728
Project Engineer
74
$177.00
$13,098
Designer/Technician
60
$97.00
$5,820
143
Total Estimated Labor
$20,646
ESTIMATED DIRECT EXPENSES
Mileage (3 Trips x 55 Miles @ $0.575/mile)
$95
Total Estimate Expenses
$95
ESTIMATED SUBCONSULTANT
Hubbard Engineering - Survey
$5,550
SUBTOTAL SUBCONSULTANTS
$5,550
LUMP SUM TOTAL
$26,291
ESTIMATED SUBCONSULTANT (ALLOWANCE ITEMS)
Safe Site Utility Services, LLC - Potholing - 5 Holes
$6,689
ALLOWANCES
$6,689
LUMP SUM TOTAL WITH ALLOWANCES
$32,980
8/12/2020
CONSULTANT SIGNATURE
DATE
FIGURES ROUNDED TO THE NEAREST DOLLAR
8/12/2020

Exhibit B
NFra Inc.
Client: City of El Mirage 
Project: Cactus Road Roadway Improvements
El Mirage Project No. EM21-ST01
Design Cost Proposal
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
22
23
24
25
26
27
28
29
A
B
C
D
E
F
G
H
Cactus Road Roadway Improvements
TOTAL
Proj.
Proj.
Designer
NO. SHTS.
HRS/SHT
HOURS
Manager
Eng.
/ Tech
Roadway Plans
Cover Sheet / Key Map / Utility Contacts
NA
1
3
3
0
1
2
General Notes and Legend Sheet
NA
1
3
3
0
1
2
Typical Sections / PSS Sheet
NA
1
8
8
0
3
5
Detail Sheet (Corner Ramps / Intersection Grading for VG)
NA
1
15
15
0
5
10
Quantity Summary Sheet
NA
1
2
2
0
1
1
Geometric Control Sheet
NA
1
3
3
0
1
2
Roadway Plan & Profile Sheets
20
3
17
51
3
24
24
Drainage Plan / Profile Sheets and Calculations
20
2
19
38
2
24
12
Roadway Plans Subtotal
11
11.2
123
5
60
58
Miscellaneous Items
Quantities
NA
4
0
2
2
Estimates
NA
6
0
6
0
Meetings (3 Meetings) and/or Coordination
NA
6
0
6
0
General Administration
NA
4
4
0
0
Miscellaneous Items Subtotal
20
4
14
2
TOTAL DESIGN SERVICES
11
13.0
143
9
74
60
SCALE
8/12/2020
Estimate of Labor Hours by Sheets

1201 S. Alma School Rd, Suite 12000     Mesa, Arizona 85210     www.hubbardengineering.com     phone 480 892 3313     fax 480 892 7051 
 
July 7, 2020 
 
Randy Weyrauch, PE 
Vice President 
NFra, Inc. 
77 East Thomas Rd. 
Suite 200 
Phoenix, Az 85012 
602-277-0967 
rweyrauch@NFrainc.us 
 
RE:  CITY OF EL MIRAGE CACTUS & 123RD LANE TOPO 
 
 
Mr. Weyrauch, 
 
We appreciate the opportunity to propose on the topographic survey of Cactus Road and 123rd Lane, in the 
City of El Mirage, Arizona. 
 
Attached you will find an in-depth proposal for Professional Surveying Services detailing the scope of work 
required to complete the Survey as requested. 
 
Hubbard Engineering was founded in 1985 and offers a full range of Civil Engineering and Land Surveying 
Services to Clients interested in quality, personalized service, timely delivery, and a budget-conscious 
approach.  Hubbard Engineering (Hubbard) is a corporation with our offices currently located in Mesa, Arizona.  
Hubbard is staffed by an exceptional team of employees and is fully qualified to perform field survey, 
engineering design, project management, field inspections, and Engineer of Record services.  Our focus is 
always to provide the services required to meet the needs of our Clients and successfully complete the tasks 
requested.  Our proven record of providing quality work, timely performance, and our thorough knowledge of 
Civil Engineering and Surveying procedures, design requirements, construction management and field 
inspections, makes us a truly full-service Engineering Firm.  We perform all our services using our competent 
staff and/or our partner firms that share like-standards and are equally client-centric in their approach. 
 
   
 
If you have any questions, please do not hesitate to call or email. 
 
 
 
 
 
Adrian M. Burcham, PLS 
Director of Land Surveying 
Hubbard Engineering

1201 S. Alma School Rd, Suite 12000     Mesa, Arizona 85210     www.hubbardengineering.com     phone 480 892 3313     fax 480 892 7051 
 
SCOPE OF PROFESSIONAL SURVEYING SERVICES 
 
Description 
 
Hubbard will be performing a topographic survey of Cactus Road from the westbound left turn stripe north to 
the existing basin (south top and toe of basin included).  The survey will commence at the existing concrete 
sidewalk on the north side of Cactus Road, which is approximately 350 feet west of the intersection of Cactus 
Road and 123rd Lane and extend to the existing concrete sidewalk on the west side of El Mirage Road – 
approximate linear footage is 900 feet. 
 
Attachments 
 
• 
Exhibit A: Terms and Conditions  
• 
Exhibit B: 2020 Hubbard Engineering, Materials and Miscellaneous Billing Rates  
• 
Exhibit C: Site Aerial – Topo Limits 
 
Scope of Work 
 
Hubbard proposes the following scope of work to successfully complete the topographic survey requirements 
proposed by NFra. 
 
1. Topographic Survey – Task S01 
1.1. Hubbard will perform a topographic survey of the project site.  The survey will be tied to the 
NAD83/NAVD88 Datum per the City of El Mirage. 
1.2. Topographic data will be collected electronically with Point Number, Elevation and Description 
format; all on separate layers.   
1.3. The topographic survey will include: 
1.3.1. The survey along this corridor will be performed at 25 foot intervals.   
1.3.2. Topo of 123rd Lane to the existing concrete sidewalks south of Charter Oak Road at 25’ 
intervals.   
1.3.3. The drainage channel headwalls, pipes and channel top/bottom (50 feet northwest and 
southeast of the headwalls) running diagonally across Cactus Road, starting near the northeast 
corner of the intersection of Cactus Road and 123rd Lane.   
1.3.4. Any above ground, visible utilities within the survey limits  
1.3.5. The block wall along the east side of 123rd Lane and the east 150 feet +/- of the south block 
wall of the subdivision.  This includes cross sections at 25’ intervals as mentioned above. 
1.3.6. See Exhibit C for full details of survey scope. 
 
NOTE:  This scope of work excludes requesting utilities be blue staked before the survey is performed.  It also 
excludes acquiring and showing as-built data as part of the CAD file Hubbard prepares and provides to NFra.   
If needed, this scope of work can be modified to include any (or all) of these items.

1201 S. Alma School Rd, Suite 12000     Mesa, Arizona 85210     www.hubbardengineering.com     phone 480 892 3313     fax 480 892 7051 
 
Project Schedule: 
 
Hubbard will begin the topographic survey within 5 business days of receiving notice to proceed.  The survey 
will be completed within 15 business days.  Once the survey is complete, the final AutoCAD file will be 
delivered to NFra within 3 business days.   
 
 
Topographic Survey – Task S01 
 
 
 
 
 
 
 
$5,550 FF  
 
 
 
 
 
 
 
 
Total 
 
$5,550 FF 
 
 
 
FF: 
Fixed Fee 
 
Hubbard Engineering's Terms and Conditions are provided in Exhibit A attached.  A signature of this proposal 
along with the attached Terms and Conditions will become the Contract between Hubbard and the Client. 
 
The 2020 Hubbard Engineering, Materials and Miscellaneous Billing Rates are provided in Exhibit B attached. 
 
The Client will be invoiced monthly for hours worked under this contract and shall be due and payable within 
30 days of the date of invoice. 
 
Acceptance of Proposal 
 
 
 
 
 
_____________________________________________________ 
_______________ 
Proposal Accepted - Signature/Name/Title 
 
 
 
                      Date

1201 S. Alma School Rd, Suite 12000     Mesa, Arizona 85210     www.hubbardengineering.com     phone 480 892 3313     fax 480 892 7051 
 
Conditions and/or Exclusions of this Proposal 
 
We have found, through many years of experience, that a clear and precise description of the "Scope of 
Services" is essential to providing a satisfactory service and enjoying a pleasant working relationship.   It is 
important to describe what is not included, as well as what is included in the "Scope of Services".  
Consequently, we include the following statement of "Conditions and/or Exclusions of this Proposal" in all of 
our proposals. 
 
1. All drawings prepared by Hubbard will be prepared in a format acceptable to the Client, the Architect 
(if applicable), the municipality and any other federal or local regulatory agencies. 
2. All drawings will be prepared on Hubbard's CADD System, using AutoCAD Software, for Windows. 
3. Hubbard will coordinate services with the requirements of the Client and/or Architect, and submit 
concepts, preliminary and final drawings as requested. 
4. Hubbard will submit plans and specifications to the appropriate review agencies, and utilities, for 
review and approval.  Revisions and re-submittals will be made as necessary. 
5. The cost of printing relative to the production of our plans printing for regulatory/review agencies is 
included in this proposal.  The cost of printing for all other purposes is not included in our proposal. 
6. Hubbard's original drawings and CAD files will be furnished to the Client and/or Architect upon 
request.  The Client and/or Architect will incorporate the drawings into their drawings and bidding 
documents.  The cost of this item is included in this proposal. 
7. Review fees, permit fees, and any other charges by regulatory/review agencies are not included in 
this proposal. 
8. Preparation of legal descriptions is not included.

1201 S. Alma School Rd, Suite 12000     Mesa, Arizona 85210     www.hubbardengineering.com     phone 480 892 3313     fax 480 892 7051 
 
EXHIBIT B 
 
2020 HUBBARD ENGINEERING, MATERIALS AND MISCELLANEOUS BILLING RATES 
 
Principal of the Firm ...................................................................................................................................... $200/hour 
Project Management ..................................................................................................................................... $175/hour 
Design Engineering Services 
 
Project Engineer (P.E.) ..................................................................................................................... $165/hour 
 
E.I.T. .................................................................................................................................................. $115/hour 
 
Engineering Designer ....................................................................................................................... $100/hour 
Engineering Field Services 
 
Field Services Engineer (P.E.) .......................................................................................................... $140/hour 
 
Field Services Technician .................................................................................................................. $95/hour 
Surveying Services 
 
Registered Land Surveyor (P.L.S) .................................................................................................... $165/hour 
 
Survey Project Manager (P.L.S) ....................................................................................................... $140/hour 
 
Survey Technician .............................................................................................................................. $85/hour 
 
Two Person Survey Crew .................................................................................................................. $135/hour 
 
One Person Survey Crew ................................................................................................................... $85/hour 
CADD Services 
 
Senior Designer ................................................................................................................................ $100/hour 
 
Designer.............................................................................................................................................. $90/hour 
Administrative Services ................................................................................................................................... $75/hour 
Expert Testimony ........................................................................................................................................... $250/hour 
Reproduction 
 
24” x 36” black and white bond prints and copies..................................................................... $ 2.00/each 
 
24” x 36” black and white mylar prints ...................................................................................... $25.00/each 
 
24” x 36” color bond prints ......................................................................................................... $35.00/each 
 
11” x 17” black and white bond prints ......................................................................................... $0.50/each 
 
11” x 17” color bond prints ........................................................................................................... $1.00/each 
 
8.5” x 11” black and white photocopies ...................................................................................... $0.15/each 
 
8.5” x 11” color photocopies......................................................................................................... $1.00/each 
 
11” x 17” black and white photocopies ....................................................................................... $0.20/each 
 
Copies of Reports ........................................................................................................................ $27.00/ream 
Delivery Fees 
 
Within and Outside of Metro Phoenix Area ...................................................................... Delivery Cost + 15% 
Travel Fees 
 
Company Vehicle Mileage ......................................................... $0.55/mile (per current IRS approved rate) 
 
Travel Expenses ...................................................................................................................................... At Cost 
Survey Supply Fees 
 
Wooden Stakes .............................................................................................................................. $0.80/each 
 
3/4” Survey Pin / Pipe ................................................................................................................... $3.50/each 
 
Survey Monument / Cap ................................................................................................................ $7.50/each 
 
Pin / Monument Placement in Hard Surface (Concrete, Rock, etc.) ........................................ $30.00/each 
 
Carsonite Marker Post with Label ............................................................................................... $25.00/each 
 
A.T.V. ............................................................................................................................................. $150.00/day 
 
Postage and Shipping ............................................................................................................................. At Cost 
 
Conference Calls ..................................................................................................................................... At Cost

1201 S. Alma School Rd, Suite 12000     Mesa, Arizona 85210     www.hubbardengineering.com     phone 480 892 3313     fax 480 892 7051 
 
 
 
EXHIBIT C 
SITE AERIAL – TOPO LIMITS/Nfra Exhibit

Safe_Site_Proposal_2008118_Cactus Rd Drainage Improvements 
Page 1 of 3 
 
 www.safesitellc.com 
 
 
 
August 12, 2020  
 
 
 
 
 
Proposal No. 2008118 
 
Randy Weyrauch, PE 
NFra, Inc. 
77 E Thomas Rd, #200 
Phoenix, AZ 85012  
Re: Utility Test Hole Services for Cactus Road Drainage Improvements located in El Mirage, 
AZ 
Dear Randy: 
Safe Site Utility Services, LLC (Safe Site) is pleased to provide NFra, Inc. (Client) this proposal for 
utility locating and potholing services at the above-referenced site.  Based on the information received, 
we are offering this proposal.  
Scope of Work 
1. Safe Site will verify 811 markings and assess the success probability of test hole locations 
indicated by client prior to excavation utilizing various geophysical locating means. Test hole 
locations may be adjusted or eliminated based on the results of this investigation and upon 
discussion with, and approval of client.  
2. Safe Site will supply a vacuum excavation crew on the project site for digging test holes and 
documenting utility locations. 
3. Upon exposure of a target utility, Safe Site will record utility type, size, material, and depth of 
cover of each.  
4. Safe Site will provide survey by a Registered Land Surveyor to document the locations and 
elevations of potholed utilities.  
5. Safe Site will provide a Test Hole Summary Report detailing this information.    
6. Safe Site will indicate the locations of utilities by marking the ground surface using PK nails 
or stake chasers (nylon brushes).   
7. Safe Site anticipates approximately 1-2 workdays to complete this project from the time of 
start and expects work to begin within 15 business days of notice to proceed. 
Terms and Conditions 
1. Client will provide available utility location information as well as project datum information 
to Safe Site to aid in facilitating this project.  
2. A “Test Hole” will be considered one excavation up to 8 feet deep with lateral “belling” of up 
to a width of 4 feet. Excavating in excess of 12 feet in depth will be considered out of scope.  
3. Test Holes will be backfilled per owner/agency specifications.

Safe_Site_Proposal_2008118_Cactus Rd Drainage Improvements 
Page 2 of 3 
 
4. Asphalt pavement surfaces will be restored per MAG Spec 212-B per additional fees as 
detailed in Fee section.  Coring pavement in excess of 12” thickness will result in an additional 
fee as shown in Fee section.  
5. Pricing assumes test hole locations are accessible within 15’ with vacuum truck. Further 
distances, such as rear of lots, will be considered out of scope and billed at hourly rate.   
6. Should caliche, tree roots, concrete, rocks in excess of 6” diameter, or other materials encumber 
vacuum excavation, work will be halted for that test hole and referred back to Client for 
alternative solutions which may include authorization to continue work at Hourly Rate. 
7. Traffic control costs are included. 
8. Expected Permitting/Bonding costs, if any, have been included in this proposal. Any out of 
ordinary costs incurred due to governing agency requirements will be presented to Client for 
approval to add to the project fee.  
9. If excavation spoils are determined to be potentially hazardous waste by an enforcement 
agency having jurisdiction, then the cost of testing and disposal will be passed through to client. 
Work will cease until Client has been notified and agreement on how to proceed has been 
reached. 
10. Safe Site will exercise due diligence in identifying and locating all utilities. However, due to 
factors beyond our control including lack of maps, inaccuracy of maps, lack of aboveground 
indications of utilities, the presence of unknown and non-electromagnetically conductive 
utilities and soil conditions being non-conducive to GPR scans, Safe Site cannot guarantee that 
all utilities will be found.  
11. Payment terms are Net 30 days unless other arrangements are made.  
Project Fee 
Contract Services: 
Excavating 5 Test Holes up to 8’ in Depth @ $549.00 each 
 
 
$    2,745.00  
Ancillary Costs (permit fees, survey, back fill, traffic control, etc.) 
 
$    3,278.00  
3 Test Holes–Core/Reinstate per MAG Spec 212-B @ $222 each 
 
$       666.00 
 
$100 Additional Fee for pavement in excess of 12” thickness 
TOTAL FEE  
 
 
 
 
 
 
 
 
$    6,689.00 
Potential Contingencies: 
Additional Test Holes While on Site 
 
 
 
 
 
$    1,205.00 
Hourly Rate for Out of Scope Work 
 
 
 
 
 
$       275.00 
Additional Charge per Test Hole 8’ to 12’ depth* 
 
 
 
$       215.00 
*Potholes exceeding 12 foot in depth will be considered Out of Scope. 
 
We appreciate the opportunity to provide this proposal and look forward to hearing back from you. If 
you have any questions, please do not hesitate to contact us at bids@safesitellc.com  or 602.606.8882. 
Respectfully, 
 
Tim Story 
Principal Partner & COO

Safe_Site_Proposal_2008118_Cactus Rd Drainage Improvements 
Page 3 of 3 
 
ACCEPTANCE STATEMENT AND AUTHORIZATION TO PROCEED 
Proposal # 2008118 
 
This Acceptance becomes a part of the Proposal Letter dated August 12, 2020. 
 
The Proposal is hereby accepted according to the Scope of Work and Terms and Conditions 
contained therein. Safe Site Utility Services, LLC is authorized to proceed with the work described 
therein. Payment will be made according to the payment terms specified in the Proposal. Any 
unpaid balance remaining beyond the due date will be subject to interest at an annual rate of 18% 
(1.5% per month). 
 
For acceptance and scheduling of these services please sign, scan and return this page to 
bids@safesitellc.com or fax to Safe Site @ 602-391-2934. 
 
 
Client Name: _____________________________________ 
 
 
 
 
 
By: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
______________________________ 
Signature 
 
 
 
 
 
Date 
 
 
 
 
 
 
 
 
 
______________________________ 
Printed Name  
 
 
 
 
Title 
 
 
 
 
 
 
 
 
Proposal submitted by: 
Safe Site Utility Services, LLC 
7623 N 73rd Drive 
Glendale, AZ 85303  
O: 602-606-8882 
F: 602-391-2934 
 
www.safesitellc.com 
 
Arizona – ROC211956  |   Nevada NSCB-0078575