Landfill CIP

City of Glendale — Regular Meeting (2020-01-07)

View PDF Item 6 Meeting page

Extracted text (via pymupdf) 4260 characters
Landfill CIP
January 7, 2020

2
Overview
• Overview of Landfill Capital Improvement Plan 
(CIP)
• Review General Obligation (G.O.) Bond Funded 
Projects
• Committee Discussion and Questions

3
Landfill CIP by Project
Project #
Project Title
CARRYOVER
FY20
FY21
FY22
FY23
FY24
FY25-29
Grand Total
CIPLF19019
LANDFILL COMPACTOR REPLACEMENT
$0
$0
$600,000
$1,400,000
$0
$0
$2,100,000
$4,100,000
CIPLF19024
BULLDOZER REPLACEMENTS AND 
REBUILDS
$0
$0
$0
$1,300,000
$1,400,000
$0
$1,900,000
$4,600,000
CIPLF19025
NORTH CELL LINER
$0
$0
$150,000
$7,400,000
$150,000
$0
$3,000,000 $10,700,000
CIPLF19090
LANDFILL MOTOR GRADER 
REPLACEMENT
$0
$0
$0
$0
$0
$650,000
$0
$650,000
CIPLF19091
LANDFILL SCRAPER EQUIPMENT
$0
$0
$0
$0
$0
$0
$1,900,000
$1,900,000
CIPLF20009
CLOSED LANDFILL
$0
$100,000
$475,000
$0
$0
$0
$0
$575,000
CIPLF78503
LANDFILL CLOSURE (SOUTH)
$0
$125,000
$350,000
$500,000
$125,000
$125,000
$750,000
$1,975,000
CIPLF78505
LF PHASE CONSTRUCTION (NORTH)
$0
$4,600,000
$100,000
$100,000
$2,400,000
$2,800,000
$4,500,000 $14,500,000
CIPLF78506
LANDFILL 4x4 REPLACEMENT TRUCKS
$73,958
$35,000
$0
$35,000
$0
$0
$150,000
$293,958
CIPLF78512
FUEL TANKER REPLACEMENT
$197,600
$225,000
$0
$0
$0
$0
$250,000
$672,600
CIPLF78514
SOLID WASTE INSPECTION TRUCKS
$28,915
$23,711
$23,711
$0
$0
$0
$75,000
$151,337
CIPLF78522
LANDFILL WATER PULL/TRUCK
$0
$0
$742,000
$0
$0
$0
$316,000
$1,058,000
CIPLF78528
NORTHERN AVE IMPROVEMENTS 
(MCDOT)
$247,725
$0
$0
$0
$0
$0
$0
$247,725
CIPLF78532
AUXILIARY EQUIPMENT
$54,891
$0
$29,685
$0
$30,000
$0
$65,000
$179,576
CIPLF78534
STORMWATER CONTROLS
$735,438
$269,223
$280,000
$280,000
$290,000
$300,000
$800,000
$2,954,661
CIPLF78535
LANDFILL GAS EXTRACTION SYSTEM
$60,000
$220,000
$270,000
$400,000
$500,000
$300,000
$1,200,000
$2,950,000
Grand Total
$1,398,527
$5,597,934
$3,020,396 $11,415,000
$4,895,000
$4,175,000 $17,006,000 $47,507,857

4
Landfill CIP by Funding Source
Funding Source
CARRYOVER
FY20
FY21
FY22
FY23
FY24
FY25-29
Grand Total
6110-Landfill
$1,398,527
$5,845,659
$3,020,396 $11,415,000
$4,895,000
$4,175,000 $17,006,000 $47,755,582 
Grand Total
$1,398,527
$5,597,934
$3,020,396 $11,415,000
$4,895,000
$4,175,000 $17,006,000 $47,507,857

5
Landfill G.O. Bond 
• G.O. bond debt
– Use full-faith and credit of the City
• Lower borrowing cost
– Principal and interest paid by the Landfill Fund
• Capital Projects
– Landfill North Cell Construction
– North Cell Liner

6
Landfill Phase Construction (North)
Project Number:CIPLF78505
Project Description
Soil excavation for the North Cell includes stockpiling of dirt as required for the construction of the 
North Cell and continued operation and closure of the South Cell, engineering design, engineered 
fill contingency, and soil excavation provided by in-house personnel. Project includes phased soil 
preparation, liner installation, a leachate and gas collection system construction and placement of 
soil protective cover over the bottom liner system.
Justification
Mandated per regulatory agency requirements for the continued development of the Glendale 
Municipal Landfill.
Category
Funding Source
FY20
FY21
FY22
FY23
FY24
FY25-29
Grand Total
CONSTRUCT
6110-Landfill
$4,500,000
$0
$0
$2,300,000
$2,700,000
$4,200,000
$13,700,000
DESIGN
6110-Landfill
$100,000
$100,000
$100,000
$100,000
$100,000
$300,000
$800,000
Grand Total
$4,600,000
$100,000
$100,000
$2,400,000
$2,800,000
$4,500,000
$14,500,000

7
North Cell Liner
Project Number:CIPLF19025
Project Description
Project is for design/construction of the liner for North Cell (Phases 1 and 2) Glendale Municipal 
Landfill. This liner provides a protective barrier to prevent migration/potential
groundwater contamination, required by the City's permit with Arizona Department of 
Environmental Quality (ADEQ). Includes cost of ADEQ review/permitting FY 2021 (Phase 1) FY 
2023 (Phase 2). Includes construction costs of Phase 1 (FY 2023) Phase 2 (FY 2025). 
Justification
Liners are required per ADEQ's regulatory review and permitting process. 
Category
Funding Source
FY20
FY21
FY22
FY23
FY24
FY25-29
Grand Total
CONSTRUCT
6110-Landfill
$0
$7,400,000
$0
$3,000,000
$10,400,000
DESIGN
6110-Landfill
$150,000
$0
$150,000
$0
$300,000
Grand Total
$150,000
$7,400,000
$150,000
$3,000,000
$10,700,000

8
Questions?