SUMMARY / FINAL REPORT 
Total individuals notified: 39 
Total Participants: 2 
CONCERNS, ISSUES, PROBLEMS EXPRESSED 
No problems, concerns or issues were expressed. One neighbor had a question 
regarding the variance process, and if the reducing the setbacks would lead to 
the property being rezoned. However, I informed him that the setback 
reduction does not change the current zoning of the property. 
HOW CONCERNS WILL BE ADDRESSED? 
No concerns were brought up about the project, just questions about the 
process. All questions were addressed thoroughly. After speaking with the two 
participants, there were no issues about the project. 
CONCERNS APPLICANT IS UNWILLING TO ADDRESS 
None 
Planner Approved - 04/22/2021
VAR21-02
Hayes Variance

10 
 
HOW THE PROPOSAL HAS BEEN REVISED TO ADDRESS CONCERNS 
The proposed project does not require revision because no concerns were 
brought up with any of the participants. 
APPLICANT SIGNATURE AND DATE 
  
4/19/2021

March  23,  2021   
  
Magdalena  Mayer   
4814  W  Banff  Ln   
Glendale,  AZ  85306   
maggie.l.mayer@gmail.com   
(480)  468-6091   
  
Subject:  Setback  Variance   
  
Dear  Neighbor:   
  
This  letter  is  to  inform  you  that  I  am  applying  for  a  setback  variance  with  the  City  of  Glendale. 
The  property  is  located  at  6613  W  Surrey  Ave   in  the  Sahuaro  District.   
  
The  desire  of  this  variance  proposal  is  to  give  the  homeowners  the  opportunity  to  add  a  garage  to 
their  existing  residence.  Unfortunately,  due  to  the  existing  zoning  on  the  property,  the  homeowners 
cannot  make  any  additions  to  their  existing  building  envelope.   
  
Mike  and  Rene  have  been  contacting  the  City  of  Glendale  for  the  past  few  years,  trying  to  find  a 
way  to  build  on  to  their  existing  house  and  add  a  garage.  Their  current  house  does  not  have  an 
attached  garage,  so  the  addition  of  this  garage  would  simply  allow  them  to  have  a  typical 
residence  with  an  attached  garage,  something  that  most  homeowners  have.  This  request  is  to 
allow  them  to  build  an  attached  garage  to  their  existing  house.  
  
  
Unfortunately,  the  existing  neighborhood  has  been  zoned  as  A-1.  The  A-1  zoning  states  that  the 
residence  should  be  a  minimum  of  40  acres;  however,  the  site  is  only  0.84  acres.  Due  to  the 
current  zoning,  the  setbacks  that  are  being  imposed  on  the  property  are  setbacks  that  were 
intended  for  lots  40  times  the  size  of  this  one.  Currently,  the  property’s  building  setbacks  are  75’ 
for  the  front,  50’  for  the  sides,  and  50’  for  the  rear  setback.  As  a  result,  when  these  setbacks  are 
imposed  on  the  existing  0.84  acre  property,  that  leaves  a  44’  x  109’  potential  buildable  area,  which 
is  less  than  14  percent  of  the  total  property  to  potentially  build  upon.  These  restrictive  setbacks 
make  the  existing  residence  a  non  conforming  structure,  since  the  existing  residence  is  infringing 
upon  the  side  and  rear  setbacks  currently.  This  issue  happens  on  almost  all  properties  in  this  area, 
making  it  a  requirement  for  almost  everyone  to  get  a  variance  because  of  this  zoning  discrepancy. 
Through  this  variance,  we  hope  to  decrease  the  side  setbacks  from  50’  to  10’-6”  to  allow  for  the 
attached  garage  to  be  located  at  the  west  side  of  the  house.  Additionally,  we  hope  through  the 
variance  process,  to  decrease  the  rear  setback  from  50’  to  30’.  This  setback  reduction  would  allow 
the  existing  residence  to  be  in  conformance  and  no  longer  encroach  upon  the  existing  setbacks.

These  existing  setbacks  are  not  self  imposed,  and  have  been  enforced  onto  this  site  for  many  years. 
It  is  unfortunate  that  for  years,  the  people  in  this  neighborhood  have  not  been  given  the 
opportunity  to  make  adjustments  and  changes  to  their  residence  in  a  simple  manner,  but  instead 
have  to  begin  their  process  through  filing  a  variance  to  make  their  house  conform  to  the  existing 
zoning  issues.  These  setback  issues  create  a  hardship  for  each  property  owner  in  this 
neighborhood,  since  the  lots  are  not  zoned  for  the  property’s  respective  size.  
  
  
In  order  to  alleviate  these  hardships,  we  hope  to  receive  a  variance  to  minimize  the  current 
building  setbacks.  This  would  allow  the  property  owner  to  add  an  attached  garage  to  the  existing 
residence.  Additionally,  this  variance  would  allow  the  existing  residence  to  no  longer  be  classified 
as  a  non  conforming  structure.  
  
  
As  a  result,  we  hope  to  receive  a  variance  to  allow  the  homeowners  to  build  an  attached  garage. 
The  proposed  design  is  for  a  four  car  garage  that  will  be  attached  to  the  existing  residence.  The 
exterior  has  been  designed  to  mimic  the  existing  house  proportions  and  style  to  blend  in  with  the 
current  neighborhood  and  site  conditions.  As  a  result,  the  proposed  building  height  will  be  26’  at 
the  highest  peak,  and  the  proposed  size  is  1,626  square  feet.   
  
I  have  included  a  site  plan  and  elevation  with  this  letter  for  your  review.   Please  provide  any 
comments  to  my   variance  request  by  April  6,  2021.   Please  write,  email,  or  call  me  at  the  contact 
information  above.   You  may  also  contact  Joseline  Castaneda  with  the  City  of  Glendale  at  (623) 
930-2823.   
  
Sincerely,   
  
  
         Magdalena  Mayer   
  
Encl: 
Site  Plan   
Elevation

Residence Addition 
Variance 
6613 W Surrey Ave, Glendale, AZ 85304 
21-0009 
3/29/2021 
Magdalena Mayer 
DEVELOPMENT 
PROPOSAL 
HEARING 
REQUEST 
ADDRESS 
SR# 
DATE 
APPLICANT 
CITIZEN PARTICIPATION PLAN 
COMPLETION 
OF 
THE FOLLOWING IS 
NECESSARY 
FOR 
APPROVAL OF YOUR PLAN 
 
 
 
CITIZEN PARTICIPATION PLAN 
 
 
 
 
BRIEF DESCRIPTION OF PROPOSED PROJECT 
The proposed project is a attached garage to the existing residence, that will 
provide the homeowner with the ability to have an attached four-car garage. In 
order for this to happen, the current setbacks need to be minimized to increase 
the potential building envelope on the site. 
DESCRIBE PUBLIC NOTICES, MEETINGS, RELATED OTHER PUBLICITY 
Notification letters were sent out to all interested parties as well as adjacent 
properties to inform them of the proposed project.

IDENTIFY WHO MAY WILL BE DIRECTLY AND INDIRECTLY AFFECTED BY YOUR 
PROPOSAL AND ANYONE WHO EXPRESSED INTEREST OR BELIEVE THEY WILL 
BE AFFECTED. 
Since the proposed garage addition is located along the west property line, the 
neighbor located at 6625 W Surrey Ave would be most affected by this potential 
project. Fortunately, this neighbor has already replied to our notification letter, 
and they have no concerns or oppositions to the proposed project. 
IDENTIFY ANY CONCERNS THE ABOVE INDIVIDUALS MAY HAVE 
They may have had concerns regarding proposed location to property line. 
Fortunately, they have already notified us that they had no issues with proposed 
design or location. 
HOW WILL THEY BE PROIVIDED AN OPPORTUNITY TO DISCUSS THE PROPOSAL 
WITH THE APPLICANT IF ISSUES OR QUESTIONS CONTINUE OR SUDENLY ARISE 
AFTER DISTRIBUTION OF THE NOTIFICATION LETTER. 
If there are issues that arise, we will discuss a resolution. We will also inform our 
planner of these concerns. 
HOW WILL THESE INDIVIDUALS BE INFORMED OF ANY CHANGES AFTER THE 
INITIAL CONTACT? 
We will notify them via mail or email. 
HOW WILL YOU KEEP GLENDALE PLANNING STAFF UPDATED ON THE STATUS 
OF YOUR CITIZEN PARTICIPATION EFFORTS? 
We will update our planner Joseline Castaneda if there are any issues or concerns. 
IMPLEMENTATION SCHEDULE / DATES OF COMPLETI0N 
Date CPP submitted to Planner 03/30/2021

3 
 
Neighborhood Meeting date (if any) 
Distribution date of initial notices 
Number of weeks allowed for responses 
Cut-off date for responses 
Planned Submittal date of CPP Final Report 
 
3/22/2021 
Two 
4/6/2021 
4/7/2021