08 CTOC - Traffic Mitigation
Extracted text (via pymupdf)
4310 characters
Traffic Mitigation By: Tony S. Abbo, P.E., PTOE City Traffic Engineer Presentation to CTOC – January 6, 2022 Traffic Mitigation - Overview 2 •Staffing: –One Engineer (PE) –Two field staff that report to the Engineer Our Goal 3 •To create a safe roadway for all modes of Travel –Vehicular –Pedestrian –Bike –Equestrian •Move people and goods efficiently and safely through our roadway network Traffic Mitigation - Overview 4 • Functions –Signing and striping request • GlendaleOne – Phone Calls – E-mails – Walk in request –Traffic Studies –Speed Cushions –School Zones • School Traffic Circulation Traffic Mitigation - Overview 5 –Traffic Safety – All Modes • Vehicular • Pedestrian • Bike –Crash data collection/roadway safety analysis –Traffic Count Program –New signal/signal timing requests Signing & Pavement Markings 6 •Traffic Staff receive numerous requests for: –New Signing –New pavement markings –Repair of signing • Damaged by crash • Vandalized (Graffiti) • Non reflective –Staff prepares a work order –Work done by Signing and pavement marking crew Traffic Studies 7 •Signal Warrant Studies •Speed Studies •Pedestrian Hybrid Beacon (HAWK) Studies •Crash Cushion Warrant Studies •No Parking Studies •Left turn Warrant Studies •Other Speed Cushion 8 •Requirements that need to be met –Residential Street –Minor collector only if homes front the road –85% speed 7 MPH over the posted speed limit –No less than 500 Vehicles per Day (VPD) and no more than 3,000 VPD on the road Speed Cushion 9 •Petition process –Identify effected homeowners –70% of affected homeowners have to agree –100% of the people adjacent to the speed Cushion have to agree Sample Letter 10 Sample Petition 11 Sample Petition 12 School Zones 13 •Establishing School Zones •Enhancing striping and/or pavement markings within School Zone –Upgrade the signing and striping –Install High visibility crosswalks •Address congestion around school zones School Zones 14 •Traffic Circulation –Work with school resource officers –Recent example was had staff working with the Legacy Charter School and Glendale PD relating to ingress and egress issues onto 67th Avenue and Thunderbird Road School Zones 15 •Speed feedback signs •Recent installs include –Ironwood HS –Cactus HS –Legacy Charter School Zone 16 Schools Rank Notes Expected Completion year Independence HS 1 Done 2/1/2020 Arrowhead Elementary 1 Update to bring to current standard - missing radar speed sign on Union Hills. 7/1/2022 Apollo High 1 Update to bring to current standard - missing radar speed sign - Designed - 3/1/2022 Mountain Ridge HS 2 Done 2/1/2020 Legacy Traditional School 2 Done 10/1/2021 Deer Valley HS 4 51st Avenue is Phoenix roadway. Need to coordinate with the City of Phoenix. 12/31/2023 Ironwood HS 5 Done Done Cactus HS 5 Done Done Copper Canyon HS 5 Not designed 7/1/2022 Glendale HS 9 Not designed Planned for November of 2022 Coyote Ridge Elementary School 11 Not designed 7/1/2024 Kellis HS 12 Not designed - 91st Avenue is MCDOT roadway Luke Elementary 13 Not designed -Speed can only be reduced to 35 MPH. SCHOOL ZONE INSTALLATIONS Request for No parking 17 •City receives numerous request for to establish “No Parking” zones •There is a petition process –Less than 10 houses 100% approval –More than 10 houses, 70% Approval •Numerous request around schools •Enforcement is a concern Traffic Safety 18 •Investigate high crash locations •Work with MAG to obtain funding •Work with Glendale PD to implement low-cost improvements that can help mitigate safety issues •Work with neighboring cities •Road Safety Assessments (RSA) Pedestrian Safety 19 •Rectangular Rapid Flashing Beacon (RRFB) – Install on Glendale Ave •One more location planned on Glendale Ave Pedestrian Safety 20 •Buffered Bike lanes •Green pavement markings Traffic Count Program 21 •Every arterial is counted every even year •Major collectors are counted every odd year Traffic Count Program 22 How Can We report a Problem? 23 •Easiest way to report an issue is through GlendaleOne –Online –There is also a Phone Ap –This is the best way to do so as every Ticket is tracked through the system •Contact us Via E-mail •Contact by Phone How Can a Problem Be Reported? 24 Tony Abbo’s Contact Info 25 Questions