Exhibit - Sierra Verde Well Project

City of Glendale — Regular Meeting (2022-05-09)

View PDF Item b Meeting page

Extracted text (via pymupdf) 2062 characters
20'
87'
WB-40 - Intermediate Semi-Trailer
WB-40 - Intermediate Semi-Trailer
30'
20'
31'
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
200'
127'
100'
18'
155'
45'
8'
100'
APPROXIMATE SITE
BOUNDARY (100'X100')
PLOT DATE: 5/2/2022 2:25 PM    BY: JSILBERMAN
File: C:\USERS\JSILBERMAN\DESKTOP\PROJECTS\COG WELL 51\CAD\COG WELL AR-15 EXHIBIT_5-2 Saved by JSILBERMAN Save date: 5/2/2022 2:24 PM
CONCEPT DESIGN - NOT FOR CONSTRUCTION
GLENDALE WELLS PROGRAM
WELL LAYOUT AND DESIGN
CITY OF GLENDALE, ARIZONA
APRIL 2022
XX
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING IS
NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV
ISSUED FOR
DATE
BY
0
1"
1/2"
DATE:
HAZEN AND SAWYER
1400 E. SOUTHERN AVENUE, SUITE 340
TEMPE, ARIZONA 85282
XX
XX
XX
CITY OF GLENDALE, WELL AR-15
VEHICLE TRACKING LAYOUTS
N. 71ST AVENUE
W. ROSE GARDEN LN
SIERRA VERDE PARK
VEHICLE PROPERTIES
VEHICLE: WB-40 SEMI
LENGTH: 45.5'
WIDTH: 8'
W/W RADIUS: 41'
20-FOOT ACCESS GATE
4-FOOT TEMPORARY
ASPHALT WALKWAY,
(ADA COMPLIANT)
NEW WELL
PROTECT THIS TREE IN PLACE
PROTECT THESE TREES (2)
REMOVE THIS
PINE TREE (1)
PROTECT TREE IN PLACE
REMOVE IF NEEDED
REMOVE TREE (1)
TEMPORARY LIMITS FOR
DRILLING. 24-FOOT-TALL
SOUND WALL - ~200' X 127'
4-FOOT TEMPORARY
ASPHALT WALKWAY,
(ADA COMPLIANT)
0
20'
10'
SCALE: 1" = 20'
20'
TEMPORARY PULLOUT AND
FUTURE PERMANENT PARKING
8-FOOT
STRIPED OUT
TURNAROUND
4-FOOT-WIDE DG
NEW SIDEWALK
CONTRACTOR TO REMOVE
PLANTS WITHIN TURNOUT
AND RELOCATE AND
RESTORE IRRIGATION
SYSTEM
GENERAL NOTES
CONTRACTOR  TO POTHOLE ALL UTILITIES PRIOR TO
CONSTRUCTION.
CONTRACTOR TO CALL BLUESTAKE BEFORE ANY
CONSTRUCTION/DRILLING ACITIVITY.
CONTRACTOR TO PROVIDE TEMPORARY IRRIGATION TO
ALL PLANTS DURING CONSTRUCTION, 
CONTRACTOR TO RESTORE ALL IRRIGATION WITHIN THE
CONSTRUCTION AREA TO ITS ORIGINAL OR BETTER
CONDITION.
CONTRACTOR TO RESTORE ALL DAMAGED
HARDSCAPING AND LANDSCAPING TO ITS ORGINAL OR
BETTER CONDITION.
CONTRACTOR TO REPLACE TREES PER PARKS
DEPARTMENT RECCOMMENDATION.