08 Sept 2022 PMP update for CTOC
Extracted text (via pymupdf)
1143 characters
Pavement Management Program/ Arterial Reconstruction Program/Bridge Repair Program September 1, 2022 CTOC Meeting FY 2023 PMP Activity 2 • $13.21M Allocation • Primarily all sealcoat and slurry seal treatments • ~119 Miles FY 2023 PMP Activity 3 PMP Activity 4 For more information go to: www.GlendalePavementManagement.com Or call: PMP Hotline – 602.532.6250 ARP Activity 5 • Glendale Ave (91st Ave – Loop 101) – Construction Started June 6 – Anticipated Construction Completion September 2022, by 9/09 – PCI 38 (2019) – AADT 25,500 (2018) – A very important economic corridor for the City! ARP Activity 6 • Cactus Rd (59th Ave – 67th Ave) – Final design complete – Anticipated construction start Sept/Oct 2022 • 67th Ave (Greenway Rd – Bell Rd) – Final design nearing completion – Anticipated construction start Feb 2023 FY 2023 Bridge Repair Activity 7 • New River Bridge @ Glendale Ave – Spall repairs on substructure – Joints repairs – Reset bearings • Arizona Canal Bridge @ Cactus Rd – Replace joints • Arizona Canal/Diversion Channel Bridge @ Cactus Rd – Repair concrete on superstructure 8 Questions on PMP/ARP/Bridge Repair