09 Deputy Director's Report
Extracted text (via pymupdf)
500 characters
Deputy Director’s Report January 5, 2023 Northern Parkway 2 1. El Mirage Alternative Access – Construction tentative start mid-January 2023 2. 99th Ave – Agua Fria River – In 60% Design – Construction tentative start 2026 – Cost inflation workshops 3. 87th Ave – 99th Ave – In 60% Design – Construction tentative start 2025 – Cost inflation workshops Regional Project 3 • I-10 and Loop 101 TI – Traffic Study Complete – Design concept report underway – Public Meeting tentative on February 23, 2023