07 67th Avenue Bike Lanes Project Update
Extracted text (via pymupdf)
1843 characters
67th Avenue Bike Lanes Missouri Avenue to Cholla Street Introduction & Background CTOC July 6, 2023 Active Transportation Plan (ATP) 2 • Completed in June 2019 – Inventory of existing bicycle and pedestrian facilities – Gap analysis of the active transportation network – Public outreach • Outcomes – $72 million in active transportation needs identified – Lists of prioritized recommendations • Including 67th Avenue Bikes Lane projects – Ranked #1 out of approx. 200 new bicycle facility recommendations – Basic scope: add bike lanes to 67th Ave in existing right of way Implementation 3 • MAG Design Assistance (DA) Grants – Provides 100% funding for preliminary design – 67th Ave Bike Lanes awarded two DA grants • North section: Myrtle Ave to Cholla Street • South section: Missouri Ave to Myrtle Ave • $144,204 in grants funds ($0 local funds required) • CMAQ/TA design and construction – Two DA projects combined into one – 94.3% federal funding, 5.7% local match - $5.2 million total • $4.9 million in federal grant funds awarded, $297,875 local match – Design initiated in January 2022 and is wrapping up this summer 4 Features & Design Goals 5 • 5-mile long corridor • Adds continuous bike lanes in both directions – By re-allocating existing pavement; no new ROW • Travel lanes narrowed to 11-ft wide • Improved Grand Ave crossing • Links into existing bike facilities – Missouri, Maryland, Myrtle, Mountainview, Cholla • Bicycle detection at signalized intersections 6 7 8 9 10 11 12 13 14 • Construction – Design is complete – Bid opening planned for late September 2023 – Construction may start as early as mid-November – 10-month construction schedule expected • 67th Ave Bike Lanes Phase II – Cholla Street to Greenway Road – MAG Design Assistance grant awarded and kicking off now 15 Coming up…. 16 Questions