10 Pavement Management Program
Extracted text (via pymupdf)
5224 characters
Pavement Management Program Plan October 5, 2023 Agenda 2 1 • Overview of Pavement Conditions 2 • Pavement Management Process 3 • Pavement Condition Survey 4 • Representative Conditions 5 • Analysis and Project Planning 3 Typical Asphalt Pavement Section (Or Slurry Seal) 6”-12” 2”-4” 4”-12” 4”-12” 7”-18” 17”-42” 1”-2” 4 Typical Asphalt Pavement Section • Aggregate Base Course is a very important element of any pavement section. • It is typically composed of crushed rock about ¾” in size down to dust. • When properly compacted, it provides the foundation upon which asphalt or concrete is placed on. Surface Course Binder Course Base Course Subbase Course Compacted Subgrade Natural Subgrade Seal Coat (Or Slurry Seal) Pavement 5 Pavement Management Process • Develop and organize the pavement inventory. • Assess the current condition of pavements. • Develop models to predict future conditions. • Report on past and future pavement performance. • Develop scenarios for pavement management based on the budget or condition requirements. • Plan and prioritize projects. • Suggest most cost-effective treatments for the projects. 6 MicroPaver 7 Cost of Deferral Pavement Age 15% drop in condition 15% of pavement life Costs $ to Preserve Costs $$$$ to Rehabilitate 40% of pavement life 40% drop in condition 100 82 70 60 50 40 25 0 Excellent Good Fair/Critical Marginal Poor Very Poor Failed (~$1) (~$8-10) Where we are (PCI of 58) Pavement Condition Index (PCI) 8 Right Treatment, Right Time 100 82 70 60 50 40 25 0 Excellent Good Fair/Critical Marginal Poor Very Poor Failed Time Pavement Condition Target Zone for Pavement Preservation Pavement Life Cycle Increased Pavement Life Target Zone for Pavement Rehabilitation Target Zone for Pavement Reconstruction Pavement Condition Index (PCI) 9 Pavement Condition Survey 10 Various Pavement Distresses Alligator Cracking Raveling Bleeding Rutting Longitudinal & Transverse Cracking Block Cracking Patching Edge Cracking Distortion Weathering • Two downward mounted lasers – 3D, high-speed scanning and pattern recognition – Collect additional International Roughness Index (IRI) – Also, collects pavement distress and deformation to full depth of the roadway 11 Data Collection and Validation • High-definition 4k cameras – Collect forward, downward, and rearward pavement distress/deformation • Realtime validation of collected data by the technician in the field – Distress severities and extents 12 Data Collection and Validation 13 Laser Crack Measurement System (LCMS-2) Pavement Distress Analysis Sealed Cracks Utilities Concrete Joints Cracks 14 Pavement Condition Index (PCI) 100 82 70 60 50 40 25 0 Excellent Good Fair/Critical Marginal Poor Very Poor Failed PCI [0-100] Requiring Reconstruction, PCI < 40 At about a 40 PCI or below Routine Repair & Maintenance is no longer an option! 15 Overview of Pavement Conditions 16 2023 Pavement Conditions Centerline Miles: 774 Network Average PCI: 58 Reconstruction Needed: 24% Percent Area (%) 7% 17% 10% 15% 21% 16% 14% 54 Miles 131 Miles 77 Miles 115 Miles 162 Miles 125 Miles 110 Miles 17 2023 Pavement Conditions per Functional Class Functional Class Area (SY) Length (Mile) PCI 2,499,961 65 58 2,008,287 62 54 2,280,652 91 64 11,092,455 556 57 14% 11% 13% 62% Major Arterial Arterial Collector Local • Recent 7 years – Stabilized pavement throughout the City. • Next 10 years – Bring pavement up to good condition (70-82 PCI), so that we spend less and thereby maximize spending to provide longer pavement life. • Ultimate target – Bring pavement to excellent (82+ PCI) condition. 18 PMP Strategy 19 Analysis and Project Planning • Based on current funding levels (PMP budget + Bonds) ~30M/Yr. • Identify annual budget to: – Maintain current PCI. – Funding for PCI of 72 in 5 years & 10 years. – Funding for PCI of 82 in 5 years & 10 years. 20 Analysis and Project Planning 21 Funding Level Impact on PCI Duration Post PCI Annual Budget ($M/Yr) 10 58 20.8 10 72 31.0 10 82 35.9 Duration Post PCI Annual Budget ($M/Yr) 5 58 12.5 5 72 41.7 5 82 51.5 22 Funding Level Impact on PCI FY PMP Budget (Transportation Sales Tax & HURF) ($M)* Bond Budget** ($M) Total Budget ($M) Mileage to Rehab/Reconst. FY24 17.1 11.4 28.5 141 FY25 18.1 11.6 29.6 145 FY26 19.0 12.0 31.0 150 FY27 19.9 11.5 31.4 152 FY28 20.9 6.8 27.7 135 FY29 21.9 7.0 28.9 141 FY30 23.0 7.2 30.2 146 FY31 24.1 7.4 31.5 152 FY32 25.3 5.6 30.8 150 FY33 26.5 1.0 27.5 134 FY24-28 Total: 94.9 53.3 148.2 723 FY29-33 Total: 120.8 28.2 149.0 723 FY24-33 Total: 215.7 81.5 297.2 1446 Current Funding Duration Post PCI Annual Budget ($M/Yr) 5 63 30 10 70 30 *FY 2024-2033 CIP **Annual budget amounts identified do not include adjustments needed for inflation. 23 Fiscal Year 2024 Proposed PMP 24 Fiscal Year 2024 Proposed PMP • Pavement Preservation – 135 miles (2,937,122 SY) • Reconstruction – 6 miles of reconstruction • 83rd Ave from Glendale Ave to Northern (Yucca) 1 Mile • 51st Ave from Olive Ave to Cactus Rd (Cactus, Barrel, & Sahuaro) 2 Miles • 67th Ave from Greenway Rd to Bell Rd (Sahuaro) 1 Mile • 67th Ave from Beardsley Rd to Pinnacle Peak Rd (Cholla) 2 Miles Questions?