11 GO Bond Street Projects
Extracted text (via pymupdf)
3804 characters
Streets G.O. Bond Funded Capital Projects October 5, 2023 Agenda 2 1) Elements of a Capital Improvement Plan 2) Pavement Management Program a) Crack seal and fog seal are non-capital b) Mill & Overlay, micro seal, and slurry seal are capital and eligible for bond funding 3) Arterial Reconstruction Program a) Eligible for bond funding b) Pavement, sidewalks, landscape, and other improvements 4) GO Bond Funded Streets Capital Projects 5) GO Bond Election Elements of a Capital Improvement Plan 3 • Assets valued over $50,000 with a useful life of 5+ years • Land, buildings, streets & improvements, plants, large equipment • Ten-Year Plan (only FY2023-24 is adopted as part of the FY2023-24 budget) Financial Policy: A. Improve existing assets B. Replace existing assets as needed C. Construct new assets Non-Capital Street Maintenance 4 • Pavement Management Plan – Repairs usually last less than 5 years – All roadways in City included in program – Preservation of Street – Requires coordination with residents, parking, and utilities – Examples of non-capital street maintenance not eligible for Bond funds • Crack seal • Fog seal • Pothole repairs Pavement Deterioration & Life Cycle Costs City of Glendale* 5 *Information based on the 2020 Glendale Pavement Management Analysis Pavement & Rating System 6 • Glendale Roadways – 772 Centerline Miles – 2,532 Lane Miles • Pavement Rating Categories – Excellent 85–100 PCI – Very Good 70–85 PCI – Good 60–70 PCI – Fair 50–60 PCI Pavement Condition & Funding 7 *Information based on the 2020 Glendale Pavement Management Analysis Pavement Condition Index (PCI) Glendale Funding Requirement* 83 $45 Million/Year 73 $30 Million/Year 65 $22 Million/Year 57 $13 Million/Year Arterial Reconstruction Program 8 • Complete/partial removal and replacement of street structure • Includes improvements to extend life of pavement beyond 5 years • ADA ramps brought to current standards • Requires coordination: – Business access – Traffic flow – Other cities, departments, and utilities Safety 9 • Ride Quality • Lane Configuration • Pavement Markings • Signage • Detection • Roadside Safety • ADA Ramps • Cross Walks • Bike Lanes • Bus Pullouts Project Safety Components Lane Markings Crosswalk Signage ADA Ramps Bike Lanes 10 Projects Requiring Additional Voter Authorization 11 Project Location Cost Estimate 1 67TH AVE - DEER VALLEY RD TO PINNACLE PEAK RD $4,841,000 2 CAMELBACK RD - 67TH AVE TO 75TH AVE $4,841,000 3 CAMELBACK RD - 75TH AVE TO 83RD AVE $4,326,000 4 BETHANY HOME RD - 59TH AVE TO 67TH AVE $4,986,230 5 CAMELBACK RD - 59TH AVE TO 67TH AVE $4,986,230 6 BETHANY HOME RD - 67TH AVE TO 75TH AVE $4,986,230 7 BELL RD - 59TH AVE TO 67TH AVE $5,135,817 8 83RD AVE - GLENDALE AVE TO BETHANY HOME RD $5,135,817 9 67TH AVE - PEORIA AVE TO OLIVE AVE $5,135,817 10 GLENDALE AVE - EL MIRAGE RD TO LITCHFIELD RD (2 MILES) $10,579,783 11 BETHANY HOME RD - 43RD TO 51ST AVE $4,727,137 12 NORTHERN AVE - 43RD TO 51ST AVE $5,448,588 Projects Requiring Additional Voter Authorization 12 All estimates assume a cost inflation of 3% per year Project Location Cost Estimate 13 GLENDALE AVE - 43RD TO 51ST AVE $5,448,588 14 THUNDERBIRD RD - 59TH AVE TO 67TH AVE $5,448,588 15 67TH AVE - DEER VALLEY RD TO BEARDSLEY RD $5,015,020 Cactus Rd: 59th Ave – 67th Ave 13 Camelback Rd: 83rd Ave – 91st Ave 14 Streets GO Bond Remaining Voter Authorization 15 TOTAL APPROVED PROJECTS BY FUND 4010 Streets 11,355,749 11,585,029 12,047,311 11,502,161 6,817,493 28,192,255 99,191,998 REMAINING VOTER AUTHORIZATION 4010 Streets (11,355,749) (22,940,778) (34,988,089) (46,490,250) (53,307,743) (81,499,998) (81,499,998) G.O. Bond Election 16 • $81.5 million in additional voter authorization for street Rehabilitation and reconstruction projects. Questions? 17