Request
2
Variance approval to increase the detached accessory 
structure height to twenty feet (20’) and reduce the side 
and rear accessory setbacks from twenty-nine feet (29’) to 
five feet (5’) in the R1-8 PRD (Single Residence, Planned 
Residential Development) zoning district for a detached 
RV garage.
Applicant/Owner : Danny Walls

Vicinity Map
3
Southeast of 
the intersection 
of 83rd Avenue 
and Glendale 
Avenue
SITE
CITY 
HALL

Zoning Map
4

Aerial Map
5

Project Details
6
SUBJECT
CURRENT
PROPOSED
LOT AREA
11,016 SF
11,016 SF
COVERED AREA
2,904 SF
3,070 SF
LOT COVERAGE 
(MAX 40%)
26%
28%
DETACHED ACSY 
STBK (20’ HT)
29’-0”
5’-0”
RECORDED 
EASEMENTS
FRONT: 8’ PUE
FRONT: 8’ PUE

Project Details (continued)
7
1. Blue Dashed Lines are 
existing building 
setbacks
2. Red Dashed Lines are 
current accessory 
building setbacks
3. Yellow Dashed Lines 
are building separation 
for fire rated materials

Site Plan
8
1. Blue Dashed Lines are 
existing building setbacks 
(west side covered by 
proposed)
2. Red Dashed Lines are 
proposed accessory building 
setbacks
3. Yellow Dashed Lines are 
building separation for fire 
rated materials
4. Proposed structure in Yellow

Public Involvement 
9
• Notification Letters: January 10, 2025
– No neighborhood meeting
– No comments received
• Reminder Postcards: February 14, 2025
• Site Posting: February 19, 2025
• Notice of Public Hearing: February 19, 2025

Findings & Analysis
10
• Special conditions to property not self-imposed:
– Pentagonal shape of property on a cul-de-sac
• Standard deprives appellant common rights:
– Setbacks create non-functional buildable area
• No detrimental effect on area:
– Behind existing block wall
– Single structure replacing three existing sheds

Recommendation
11
If the Board decides to grant the variance, the following 
stipulations are recommended:
 
1. Development shall be in conformance with the 
narrative, date stamped approved September 12, 
2024, and the site plan, date stamped approved 
September 13, 2024. 
2. Building materials shall be rated for a fire separation 
of six feet (6’).