01072026 CUAC Water Resources Presentation
Extracted text (via pymupdf)
4922 characters
Water Resources Update Zacary Richards, Water Resources Program Manager For Information and Discussion: ➢Glendale’s Water Supplies ➢Drought Mitigation Projects ➢Water Conservation Rebate Program ➢Building and Fire Codes Adoption 2 Water Resources Topics 3 Where does our water come from? DIVERSE WATER SUPPLIES Surface Water Salt & Verde Rivers Colorado River Groundwater Effluent (Reclaimed Water) 4 2024 Glendale Total Potable Water Use 51% 47% 2% CAP 2024 Total Water Use = 40,590 acre-feet 2023 Total Water Use = 37,477 acre-feet 2022 Total Water Use = 38,699 acre-feet SRP Groundwater Central Arizona Project (CAP) - 47% Salt River Project (SRP) - 51% Groundwater (GW) - 2% 5 Salt and Verde Rivers Annual SRP Supply = 55,455 Acre-Feet 2024 Use: 22,600 Acre-Feet ➢On-project = SRP member lands. ➢Off-project = Does not include SRP member lands. • Primarily CAP water is served off-project. • If SRP water is used, it needs to be replaced. 6 Salt River Project (SRP) On-/Off-Project OASIS CHOLLA ➢Up to 28,770 AF when the New Conservation Space (NCS) fills ➢Up to 5,500 AF if Flood Control Space (FCS) fills in 2026, 2027, or 2028 ➢NCS and FCS water can be used off-project. 7 Additional Supplies via SRP System SRP Watershed Conditions 8 • Cumulative precipitation in WY2025 was 69% of normal precipitation on the Salt and Verde watersheds with a resulting runoff total of 30% of median which is a new record low. • 57% full on SRP system compared to 72% last year at the same time. • More SRP groundwater added to the system to compensate for reduced flows. DEC 28, 2025 9 Colorado River Watershed Conditions Annual CAP Supply = 22,582 Acre-Feet 2024 Use: 20,900 Acre-Feet 10 New Colorado River Operations in 2027 ➢Pumped from wells and treated onsite or at the Oasis Water Treatment Plant. ➢5 active City-owned wells. ➢Plus 5 wells in design/construction or planned ➢City uses 7 SRP-owned wells. ➢Plus 2 wells under construction 11 Groundwater Annual Groundwater Allocation = 7,525 Acre-Feet 2024 Use: 1,100 Acre-Feet 12 Glendale Effluent Production and Use Glendale Effluent: 9,217 AF o Recharge accounted for 70% of effluent use o Reuse accounted for 30% of effluent use 2024 Effluent Production = 17,914 Acre-Feet 91st Avenue WWTP: 8,696 AF o Palo Verde Nuclear Generating Station (PVNGS) o Tres Rios Wetlands 13 Long-Term Storage Credits as of 2024 Total: 209,121 Well Construction 14 Drought Mitigation Projects Verde River Sedimentation Mitigation Project Advanced Water Purification Zone 4 Well Water Conservation Update Joanne Toms, Environmental Programs Administrator 15 Landscape Rebate History ➢1986 – Council approved a $100 landscape rebate for residential customers ➢2005 – Council approved updates to the landscape rebate: 1. Increased rebate amount for residential customers 2. Created a new rebate for non-residential customers ➢2023 – Council approved funding to expand the water conservation rebate program 16 Water Infrastructure Finance Authority (WIFA) Water Conservation Grant Fund 17 ➢2024 – WIFA awarded the City of Glendale Water Services Department $450,000 to help expand the water conservation rebate program. ➢Grant funds disbursed (through Nov. 2025) = $319,796.38 ➢Remaining grant funds available (through May 2026) = $130,203.62 Current Water Conservation Rebate Program 18 REBATE TYPE SINGLE-FAMILY RESIDENTIAL NON-RESIDENTIAL WaterSense Toilet Up to $100 Up to $250 EnergySTAR Clothes Washer Up to $200 Not Available Landscape Conversion Up to $3,000 Up to $10,000 WaterSense Irrigation Technology Up to $750 Up to $10,000 Pool/Spa Removal Up to $800 Not Available Cooling Tower Technology Not Available Up to $1,000 2024 Building and Fire Codes Adoption 19 ➢Most of the codes the City adopts are published by the International Code Council: ➢International Residential Code ➢International Building Code ➢International Plumbing Code ➢Last code adoption occurred in 2019 with the 2018 Building and Fire Codes ➢Glendale typically adopts updated codes every 6 years (every other code cycle). 2024 Building and Fire Codes Adoption 20 ➢Staff analyzed the new codes and wrote code amendments in early 2025 ➢City published draft amendments and gathered public input in May 2025 ➢Presented proposed code adoption to City Council at 8/28/25 workshop ➢Ratification of Code Adoption Ordinance by City Council at 12/9/25 voting meeting ➢All plans submitted after 7/9/2026 must comply with the 2024 Building Codes, Fire Code and amendments. Code Amendments for Plumbing Fixtures 21 2018 Building Codes (effective through 2025) EPA WaterSense Criteria New 2024 Code Amendment Lavatory, private 2.2 gpm 1.5 gpm 1.5 gpm Showerhead 2.5 gpm 2.0 gpm 2.0 gpm Sink faucet 2.2 gpm 1.8 gpm Urinal 1.0 gallon/flush 0.5 gallon/flush 0.5 gallon/flush Water closet 1.6 gallon/flush 1.28 gallon/flush 1.28 gallon/flush 22