01072026 CUAC CIP Presentation
Extracted text (via pymupdf)
2141 characters
WATER SERVICES CIP PROJECT UPDATE Citizen Utility Advisory Commission Jan 7, 2026 Meeting Agenda 2 • Project Drivers • System Operations Infrastructure Project Updates • Waterlines, booster stations, valves, wells, interconnects • Sewerlines, lift stations, manholes • Treatment Facility Project Updates • Water Treatment (Pyramid Peak, Cholla, Oasis) • Wastewater Treatment (West Area, Arrowhead Ranch) • Questions Project Drivers 3 • Items in need of rehabilitation or replacement • Items to address based on system evaluation and condition assessments • Emergency/unplanned efforts System Operations Infrastructure Project Updates - Water 4 • Construction • 59th Ave Glenn to Northern • Transmission Main • 61st & State • Wells COG 50 & 51 • Design • Bethany 43rd Ave to 51st Ave • Booster Station No. 3 • Wells COG 52, 53, 54 5 59th Ave Waterline Replacement 6 67th Ave Transmission Line ARV Replacement 7 Next Stage of Transmission Main Inspection 8 Well COG 50 Construction System Operations Infrastructure Project Updates - Sewer 9 • Construction • Sewer Main Union Hills & 101 Freeway • Forcemain Skunk Creek Crossing • Sewer Rehabilitation Phase 6 • Design • Sewer Rehabilitation Phase 7 • RSPS Forcemain & Diversion Structure 10 Sewer Rehabilitation CIPP Under 101 at Union Hills 11 Sewer Forcemain Crossing at Skunk Creek 12 RSPS Forcemain & Diversion Structure Water Treatment Facility Project Updates 13 • Construction • PPWTP Lagoon Erosion Control, Train 3 Chain & Flight • Cholla WTP Chlorine Dioxide, Chemical Trenches • Design • PPWTP Backwash Flowmeter, Electrical UPS, HVAC • Cholla WTP Filter Air Scour, Electrical Replacements, Solids Handling • Oasis WTP Ion Exchange PLC 14 Pyramid Peak WTP Sedimentation Basin 3 Chain & Flight Replacement 15 Cholla Water Treatment Plant Improvements Wastewater Treatment Facility Project Updates 16 • Construction • WAWRF PLC Replacements, Electrical, HVAC System • ARWRF ERDS Line Repair • Design • ARWRF Assessment Priorities 17 West Area WRF PLC Replacements, Electrical, HVAC System 18 ARWRF Effluent Reuse Distribution System (ERDS) Questions