Heroes Regional Park Timeline

City of Glendale — Regular Meeting (2026-05-20)

View PDF Item a Meeting page

Extracted text (via pymupdf) 6162 characters
Heroes Regional Park Timeline
May 20, 2026

Timeline
2
• 1998 – Land acquisition
• 2002 – Master plan completed
• 2003 – Public Safety Facility completed
• 2005 – Initial park amenities opened
• 2007 – Infrastructure and recreation expansion
• 2009 – Additional recreation amenities added
• 2019 – Heroes Regional Library completed
• 2022 – Community Fishing Lake completed

Park Acquisition & Planning (1998–2002)
3
• 88 acres purchased in December 1998
• Regional Park Master Plan 
• Completed in 2002
• 7 acres carved out for Public Safety Facility (PSF)
• Completed in 2003

Initial Park Development (2005)
4
• Basketball courts constructed
• Restrooms installed
• 34-car parking lot completed
• Open turf areas developed
• Splash pad and playground added

Infrastructure Expansion (Spring 2007)
5
• Underground utilities installed
• Road paving and street lighting completed
• Entry road to Bethany Home Road constructed
• 275-car parking lot added
• Electrical distribution facility and public restrooms 
completed

Additional Park Amenities (Fall 2007)
6
• X-Court constructed
• Concessions building completed

Expanded Recreation Features (Fall 2009)
7
• Large group ramada added
• Sand volleyball courts installed
• Additional playground and open turf developed

Community Investment & Growth (2019–
2022)
8
• Heroes Regional Library completed in May 2019
• Community Fishing Lake completed in January 2022

Additional Park Development (2025)
9
• Sports fields
• Sports courts
• Additional parking
• Open turf
• Restrooms
• Inclusive playground
Completed May 2025

GLENDALE HEROES REGIONAL PARK
PARK FEATURES
Soccer Fields
Fields #1, #2 & #3
Library
Heroes Branch
Fishing Lake
Stocked fishing lake
Pickleball Courts
& Mini-Pitch
Basketball Courts
Full-size courts
Dog Parks
Off-leash areas
Archery Range
& X-Court
Splash Pad
& Playground
83rd Avenue & Bethany Home Road  ·  Glendale, AZ  ·  33.5223°N, 112.2377°W

Heroes Park Lighting Improvements 
11
Project Description
This project is for lighting improvements at Heroes Park, including electrical 
infrastructure, replacement of light poles, and concrete foundations for light poles, 
if necessary. These improvements are designed to accommodate the increased use 
and demand at the park.
Funding Source 
 
 
 
FY24-FY25 Actual Spending
ARPA  
 
 
 
 
$ 312,841
Total Actual Spending  
 
 
$ 312,841
Funding Source 
 
 
 
FY26 Budget
ARPA  
 
 
 
 
$ 187,399
Total Remaining Budget 
 
 
$ 187,399
Grand Total (Actual + Budget) 
 
$ 500,240

Heroes Regional Park Splash Pad 
12
Project Description:
This project consists of retrofitting and replumbing the aging 
infrastructure of the existing splash pad in Heroes Regional 
Park.
Funding Source 
 
 
 
FY24-FY25 Actual Spending
ARPA  
 
 
 
 
$580,293 
Total Actual Spending 
 
 
$580,293

Heroes Park Lake
13
Project Description:
This project is for the construction of an urban lake at Heroes Regional Park. 
The originally approved concept is for an urban lake sized to provide the 
necessary pumping and irrigation system needs for the proposed turf and 
landscaping throughout the park and provide storage capacity. The lake 
would be part of the Urban Fishing Program. 
Funding Source 
 
 
 
FY20-FY24 Actual Spending
General Fund Capital 
 
 
$1,217,912
Park Bonds  
 
 
 
$3,602,810
Total Actual Spending 
 
 
$4,820,722

Heroes Park Library Expansion
14
Project Description:
Expand programming and community space based on population growth in the area and 
availability of funding. The addition is planned to be on the north side of the existing building 
and will provide “flex” space to accommodate additional programming, meeting space, and/or 
space for additional materials or technology.
Funding Source  
 
 
FY25 Actual Spending
ARPA 
 
 
 
 
$      12,914
DIF 
 
 
 
 
$    157,532
Total Actual Spending 
 
 
$    170,446
Funding Source  
 
 
FY26 Budget
ARPA 
 
 
 
 
$    935,735
DIF 
 
 
 
 
$ 1,139,932
Total Remaining Budget  
 
$ 2,075,667  
Grand Total (Actual + Budget) 
 
$ 2,246,113

Heroes Park Library Shade Structures
15
Project Description
Install permanent commercial grade shade structures on the east and west patios, add 
lighting, adjust cameras, and replace opaque patio barrier panels with transparent panels to 
expose the view of the lake.
Funding Source  
 
 
 
FY25 Actual Spending
General Fund Capital 
 
 
 
$ 343,762
Total Actual Spending 
 
 
 
$ 343,762
Funding Source  
 
 
 
FY26 Budget
General Fund Capital 
 
 
 
$  6,238
Total Remaining Budget  
 
 
$  6,238
Grand Total (Actual + Budget) 
 
 
$350,000

Heroes Park Ballfields
16
Project Description:
This project will further develop the next phase of development for Heroes Regional Park.  An 
updated park master plan will determine design plans to identify amenities which may include 
ballfields and other park amenities.
Funding Source  
 
 
 
FY23-FY25 Actual Spending
ARPA 
 
 
 
 
 
$16,688,275
DIF 
 
 
 
 
 
$  6,289,912
Total Actual Spending 
 
 
 
$22,978,187  
Funding Source  
 
 
 
FY2026 Budget
ARPA 
 
 
 
 
 
$     739,590  
DIF 
 
 
 
 
 
$     208,646
Total Remaining Budget  
 
 
$     948,236 
Grand Total (Actual + Budget) 
 
 
$23,926,423

Heroes Park Rec and Aquatics Center 
17
Project Description:
This project is for the design and construction of the recreation and 
aquatics center at Heroes Regional Park.
Funding Source 
 
 
 
FY23-FY25 Actual Spending
Park Bonds 
 
 
 
 
$ 84,817
Total Actual Spending  
 
 
$ 84,817
Funding Source 
 
 
 
FY26 Budget
Park Bonds 
 
 
 
 
$ 119,763
Total Remaining Budget 
 
 
$ 119,763
Grand Total (Actual + Budget) 
 
$ 204,580

Heroes Recreation and Aquatic Center Concept
May 20, 2026

Concept 
Design - 
Aerial
19

Programming Elements
20
• Recreation Center – 55,000 sq. ft.
• Gymnasium – 3 multi-use sport courts
• Walk / Jog Track
• Weight & Cardio Rooms
• Functional Training Spaces
• Group Exercise / Multipurpose Rooms

Programming Elements
21
• Aquatics Center – 40,000 sq. ft.
• Lap Swim Pool (25 yards – 8 lanes)
• Dive well
• Shade structures
• Recreation Play Pool
• Zero depth entry
• Beach entry
• 25’ Slide with 2 open flume slides

22
 
 
 
 
 
 
 
Questions?