B1. 2020P324 - NE UTILITY EASEMENT.PDF
Extracted text (via ocr_local)
12653 characters
When recorded, return to: Flood Control District of Maricopa County 2801 West Durango Street Phoenix, AZ 85009 (MDH) EXEMPT ARS § 11-1134, A2 FCD 1999R016 NON-EXCLUSIVE UTILITY EASEMENT FCD Project: Trilby Wash Detention Basin and Floodway FCD Parcel No.: TW-44C, TW-44F, and TW-43C Portions of APN: 503-97-001B, 503-69- 016, and 503-69-019 FCD Permit No.: 2020P324 This Non-Exclusive Utility Easement is entered into by and between the following parties and becomes effective as of the date of recordation with the Maricopa County Recorder. GRANTOR: FLOOD CONTROL DISTRICT OF MARICOPA COUNTY, a political subdivision of the State of Arizona GRANTEE: ARIZONA PUBLIC SERVICE COMPANY, an Arizona corporation, and/or its successors and assigns In accordance with GRANTOR’S Board of Directors Resolution 2018R013, for and in consideration of the sum of One Hundred Eleven Thousand Seven Hundred Fifty Dollars and 00/100 ($111,750.00), and other valuable consideration, the receipt and sufficiency of which are hereby acknowledged, GRANTOR does hereby grant and convey to GRANTEE a Non- Exclusive Utility Easement (“Easement”) in, upon, over, under, across, through and along the premises described in the attached Exhibit “A” (“Easement Property”) for the purpose of constructing, operating, repairing and maintaining a 69 kV overhead transmission line and appurtenances thereto (collectively, the “Facility”), in accordance with FCD Right-of-Way Use Permit No. 2020P324 (“FCD Permit”). Page 1 of 10 Said Easement is SUBJECT TO all governmental restrictions which include, but are not limited to, environmental, archaeological, and cultural regulations, and all land use regulations, covenants, conditions, restrictions, easements, rights-of-way, and other matters of record, or not of record, that could be disclosed by a visual inspection or accurate survey of the real property. This Easement is, at all times, subject to and subordinate to the rights of GRANTOR to use and access the Easement Property for the purpose of operation and maintenance of the flood control project. GRANTOR shall endeavor to use its best efforts to operate and maintain the flood control project in a manner which will not unreasonably interfere with the GRANTEE’S rights granted by this Easement. GRANTEE assumes all risk of damage to its Facility resulting from the property functioning as a flood control project. In the event that any of GRANTEE’S non-affixed materials, vehicles, equipment, or other personalty, interferes with GRANTOR’S use of the Easement Property, GRANTEE shall, at GRANTOR’S request, and at GRANTEE’S sole expense, eliminate the interference within thirty (30) days of notice from the GRANTOR. In the event the land within the Easement Property is needed to construct, maintain, or relocate any portion of GRANTOR’S flood control project and/or structure, and upon written notification by GRANTOR, GRANTEE shall coordinate the removal or relocation of the Facility through GRANTOR’S right-of-way use permit process comprising review and approval of GRANTEE’S design, construction plan, and contractor selection. Actual construction to remove or relocate such conflicting Facility, or portion(s) thereof, shall begin within thirty (30) days following GRANTOR’S issuance of a right-of-way use permit for such removal/relocation. Upon mutual agreement, the time frame for the start and completion of said work may be extended based on the requirements of the flood control project. If GRANTEE’S relocation effort has not been completed within the mutually agreed time frame and causes GRANTOR to be liable for delay damages, GRANTEE shall reimburse GRANTOR for reasonable damages directly caused by the delay Reimbursement shall be made within sixty (60) days after GRANTEE’S receipt of proof of GRANTOR’S reasonable evidence of a third party’s enforcement of a contractual penalty for said delay. FCD Project: Trilby Wash Detention Basin Page 2 of 10 Portions of APN: 503-97-001B, 503-69-016, Floodway and 503-69-019 FCD Parcel No.: TW-43C, TW-44C, and TW-44F FCD Permit No.: 2020P324 The GRANTEE shall also, at its sole cost and expense, maintain the Easement Property, and GRANTEE’S Facility located within the Easement Property, in a state of good repair and in asafe condition. The rights granted to GRANTEE herein include the right , but not the obligation, to cut back, trim and remove vegetation now growing, or that may hereafter grow, on the Easement Property, or that may extend over the Easement Property, so as to protect the same from interfering with the maintenance and operation of GRANTEE’S Facility. After the installation of GRANTEE’S Facility in accordance with said FCD Permit, any modification whatsoever to the Easement Property, the Facility, or any appurtenance of GRANTEE located therein, that is not in compliance with said FCD Permit, will require GRANTEE to apply for and obtain a new right- of-way use permit from GRANTOR. GRANTOR will process any such application in accordance with GRANTOR’S right-of-way use permit approval process. GRANTEE agrees to indemnify GRANTOR for any and all damages and costs, including without limitation, reasonable attorney's fees, court costs, and all other expenses relating to the defense of claims or litigation, caused by or arising from the exercise of GRANTEF’S rights pursuant to the terms of this Easement, excepting therefrom any such injury, damage or costs caused by or arising solely from the gross negligence, or actions that are purposeful or undertaken without regard to the consequences, by the GRANTOR, its officers, employees, agents or contractors. In the event GRANTEE fails to install the Facility within the Easement Property, or in the event GRANTEE removes the Facility, or in the event the Facility ceases to function, or in the event of any other event giving evidence to GRANTOR that the GRANTEE has abandoned the use of this Easement, then and in such event, GRANTOR shall notify GRANTEE, in writing, that GRANTOR considers that the Easement has been abandoned. In such event, GRANTEE shall provide confirmation to GRANTOR that the Easement has been abandoned, or in the event GRANTEE shall fail to reply that there has been no intent to abandon the Easement within thirty (30) days of receipt of the aforesaid notice from the GRANTOR, this Easement shall be deemed to be abandoned and GRANTOR shall be permitted to record a termination of this Easement in FCD Project: Trilby Wash Detention Basin Page 3 of 10 Portions of APN: 503-97-001B, 503-69-016, Floodway and 503-69-019 FCD Parcel No.: TW-43C, TW-44C, and TW-44F FCD Permit No.: 2020P324 the public records of Maricopa County. Unless and until such termination is recorded by GRANTOR, this Easement shall remain in full force and effect. The rights and privileges granted in this Easement are solely for the benefit of GRANTEE to use the Easement Property for the purpose stated herein, and do not include the right to permit and/or grant any other use of the Easement Property to another party. This Easement shall run with the land and is binding on all parties. THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK FCD Project: Trilby Wash Detention Basin Page 4 of 10 Portions of APN: 503-97-001B, 503-69-016, Floodway and 503-69-019 FCD Parcel No.: TW-43C, TW-44C, and TW-44F FCD Permit No.: 2020P324 GRANTOR: FLOOD CONTROL DISTRICT OF MARICOPA COUNTY RECOMMENDED FOR APPROVAL: DocuSigned by: | Midval Fulton 10/26/2022 Michael A. Fulton Date Director REAL ESTATE DEPARTMENT APPROVAL: ‘DocuSigned by: (_ 10/26/2022 \—F612R0n585D4cc. Alex Smith, Director Date Maricopa County Real Estate Department APPROVED AS TO FORM and within the powers and authority granted under the laws of the State of Arizona. DocuSigned by: co Puck 10/20/2022 B2E0BD10DB52401... District General Counsel Date FCD Project: Trilby Wash Detention Basin Page 5 of 10 Portions of APN: 503-97-001B, 503-69-016, Floodway and 503-69-019 FCD Parcel No.: TW-43C, TW-44C, and TW-44F FCD Permit No.: 2020P324 APPROVED: BOARD OF DIRECTORS OF FLOOD CONTROL DISTRICT OF MARICOPA COUNTY Bill Gates Date Chairman of the Board ATTEST: Clerk of the Board Date STATE OF ARIZONA ) )ss COUNTY OF MARICOPA ) Before me, Notary Public in and for said County, State of Arizona, on this day personally appeared Bill Gates, known to me to be the person whose name is subscribed to the forgoing instrument as Chairman of the Board of the Political Subdivision in the foregoing instrument. Given under my hand and seal of the office this FCD Project: Trilby Wash Detention Basin Floodway FCD Parcel No.: TW-43C, TW-44C, and TW-44F day of. 202__. Notary Public (signature) Page 6 of 11 Portions of APN: 503-97-001B, 503-69-016, and 503-69-019 FCD Permit No.: 2020P324 ARIZONA PUBLIC SERVICE COMPANY, an Arizona corporation ACCEPTANCE AND APPROVAL: Name: Paul J. Baumgardt Its: Supervisor, Land Services STATE OF ARIZONA ) )ss COUNTY OF MARICOPA) The foregoing instrument was acknowledged before me this [3 day of _( ) cto bee »20 22 by Paul J. Baumgardt, its Land Services Supervisor of Arizona Public Service Company, an Arizona corporation, on behalf of the GRANTEE. C7? 4 Notary Public (signature) GER APRIL CARROLL (x Notary Public - Arizona Maricopa County ee | commission # 627038 Sit” My Comm. Expires May 18, 2026 FCD Project: Trilby Wash Detention Basin Page 7 of 10 Portions of APN: 503-97-001B, 503-69-016, Floodway and 503-69-019 FCD Parcel No.: TW-43C, TW-44C, and TW-44F FCD Permit No.: 2020P324 April 7, 2022 EXHIBIT “A” ARIZONA PUBLIC SERVICE JOB #WE014146 An Area of Land situated within the Southwest quarter of Section 9 and the Northwest quarter of Section 16, Township 4 North, Range 1 West of the Gila and Salt River Meridian, Maricopa County, Arizona, more particularly described as follows: BEGINNING at the Southwest corner of Section 9, from which the West quarter corner of said Section 9 bears North 00 degrees 08 minutes 14 seconds West, a distance of 2646.63 feet, and also from which the South quarter comer of said Section 9 bears South 89 degrees 54 minutes 09 seconds East, a distance of 2627 44 feet; THENCE North 00 degrees 08 minutes 14 seconds West, along the West line of the Southwest quarter of said Section 9, a distance of 1726.88 feet to the Northwest corner of that parcel owned in fee by Flood Control District of Maricopa County and as described in Doc. No. 1993- 0424821, M.C.R.; THENCE departing said West Section line and contiguous with the North line of the aforementioned parcel, North 83 degrees 16 minutes 58 seconds East, a distance of 60.40 feet; THENCE departing said North parcel line, South 00 degrees 08 minutes 14 seconds East, a distance of 1346.34 feet; THENCE North 74 degrees 01 minutes 36 seconds East, a distance of 255.96 feet; THENCE South 16 degrees 18 minutes 05 seconds East, a distance of 564.18 feet to a point on the Southerly line of that parcel owned in fee by Flood Control District of Maricopa County and as described in Doc. No. 1990-207836, M.C.R.; THENCE South 74 degrees 15 minutes 09 seconds West, contiguous with said South line, a distance of 60.00 feet; THENCE departing said South line, North 16 degrees 18 minutes 05 seconds West, a distance of 503.94 feet; THENCE South 74 degrees 01 minutes 36 seconds West, a distance of 213.32; THENCE South 00 degrees 08 minutes 14 seconds East, a distance of 522.35 feet to the aforementioned South parcel line; THENCE South 74 degrees 15 minutes 09 seconds West, contiguous with said South line, a distance of 62.30 feet: THENCE North 00 degrees 08 minutes 14 seconds West, contiguous with the West line of the aforementioned parcel, a distance of 204.01 feet to the POINT OF BEGINNING. Containing an area of 162280.22 square feet or 3.72 acres, more or less. SHEET 1 OF 3 FCD Project: Trilby Wash Detention Basin Page 8 of 10 Portions of APN: 503-97-001B, 503-69-016, Floodway and 503-69-019 FCD Parcel No.: TW-43C, TW-44C, and TW-44F FCD Permit No.: 2020P324 EXHIBIT “A” continued AAEM AREA APNG BOM ORE 12462 est 4b EE paren EXAM OR 343 FCD Project: Trilby Wash Detention Basin Page 9 of 10 Floodway FCD Parcel No.: TW-43C, TW-44C, and TW-44F Portions of APN: 503-97-001B, 503-69-016, and 503-69-019 FCD Permit No.: 2020P324 EXHIBIT “A” continued LINE TABLE LINE BEARING uf Lee La _o Lé L? SOM IONE ASE 2 | NOD Osta yw | 44. FCD Project: Trilby Wash Detention Basin Page 10 of 10 Portions of APN: 503-97-001B, 503-69-016, Floodway and 503-69-019 FCD Parcel No.: TW-43C, TW-44C, and TW-44F FCD Permit No.: 2020P324