NON EXCLUSIVE RECREATIONAL TRAIL EASEMENT SC1 MT9.PDF
Extracted text (via pymupdf)
9539 characters
When recorded, return to:
Flood Control District of Maricopa County
2801 West Durango Street
Phoenix, AZ 85009 (MDH)
Page 1 of 8
EXEMPT ARS § 11-1134, A2
FCD 1999R016
IGA FCD 2006A002
NON-EXCLUSIVE RECREATIONAL TRAIL EASEMENT
FCD Projects: Tres Rios and Holly
Acres Salt River Corridor
FCD Parcel Nos.:CW-009B and F00311
APN: 500-69-088 ptn.
FCD Permit No.: 2021P254
Maricopa County C# ____________
a portion of Maricopa Trail Segment 9/
Sun Circle Trail Segment 1
This Non-Exclusive Recreational Trail Easement is entered into by and between the following
parties and becomes effective as of the date of recordation with the Maricopa County Recorder.
GRANTOR:
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY, a
political subdivision of the State of Arizona
GRANTEE:
MARICOPA COUNTY, a political subdivision of the State of Arizona,
and/or its successors and assigns
In accordance with GRANTOR’S Board of Directors Resolutions 2018R013 dated
October 24, 2018 and 88-5 dated January 16, 1989, for good and valuable consideration, the receipt
and sufficiency of which are hereby acknowledged, GRANTOR does hereby grant and convey to
GRANTEE a non-exclusive Recreational Trail Easement in, upon, over, under, across, through
and along a portion of the premises set forth in instrument numbers 19850373446, recorded August
8, 1985 and 20090671049, recorded July 21, 2009 in the official records of Maricopa County
(“Burdened Property”). The granted easement, described and depicted on the attached Exhibit
“A” (“Easement”), is for the purpose of operating, repairing, maintaining, and using a recreational
trail, and appurtenances thereto (collectively, the “Facility”), in accordance with FCD Right-of-
Way Use Permit No. 2021P254 (“FCD Permit”).
FCD Projects: Tres Rios and Holly Acres Salt River Corridor
FCD Parcel Nos.: CW-009B and F00311
Page 2 of 8
APN: 500-69-088 ptn.
FCD Permit No.: 2021P254
Said Easement is SUBJECT TO all governmental restrictions which include, but are not
limited to, environmental, archaeological, and cultural resource regulations, and all land use
regulations, covenants, conditions, restrictions, easements, rights-of-way, and other matters of
record, or not of record, that could be disclosed by a visual inspection or accurate survey of the
real property.
This Easement is, at all times, subject to and subordinate to the rights of GRANTOR to
have unrestricted access to and use of the Easement for the purpose of operation and maintenance
of the flood control projects known as Tres Rios and Holly Acres Salt River Corridor (Projects).
GRANTOR shall endeavor to use its best efforts to operate and maintain the Project in a manner
which will not unreasonably interfere with the GRANTEE’S rights granted by this Easement.
GRANTEE assumes all risk of damage to its Facility resulting from the Burdened Property
functioning as a flood control project.
In the event any use or activity conducted pursuant to the rights granted in this easement
by the GRANTEE interferes with GRANTOR’S use of the Burdened Property or the Burdened
Property is needed to construct, maintain, or relocate any portion of GRANTOR’S Project
(collectively “Interference”), GRANTEE shall, at GRANTOR’S request and GRANTEE’S sole
expense, eliminate the Interference upon notice from the GRANTOR. If elimination of
Interference, including but not limited to the relocation of the Facility, or any part thereof, requires
a right of way use permit, actual construction shall begin within thirty (30) days following
GRANTOR’S issuance of a right-of-way use permit. Upon mutual agreement, the time frame
for the start and completion of said work may be extended based on the requirements of
GRANTOR. If GRANTEE’S effort to eliminate Interference delays construction by
GRANTOR, and causes GRANTOR to be liable for damages, GRANTEE shall reimburse
GRANTOR for those damages attributable to the delay created by GRANTEE within thirty (30)
days after GRANTEE’S receipt of the GRANTOR’S invoice for said delay.
The GRANTEE shall, at its sole cost and expense, maintain the Easement, and
GRANTEE’S Facility located within the Easement, in a state of good repair and in a safe
condition, including without limitation the removal of trash and debris from the Easement. The
FCD Projects: Tres Rios and Holly Acres Salt River Corridor
FCD Parcel Nos.: CW-009B and F00311
Page 3 of 8
APN: 500-69-088 ptn.
FCD Permit No.: 2021P254
rights granted to GRANTEE herein include the right to cut back, trim and remove vegetation now
growing, or that may hereafter grow, within the Easement, or that may extend over the Easement,
so as to protect the same from interfering with the maintenance and operation of GRANTEE’S
Facility.
After the installation of GRANTEE’S Facility in accordance with said FCD Permit, any
modification whatsoever to the Easement, the Facility, or any appurtenance of GRANTEE located
therein, that is not in compliance with said FCD Permit, will require GRANTEE to apply for and
obtain a new right-of-way use permit from GRANTOR. GRANTOR will process any such
application in accordance with GRANTOR’S right-of-way use permit approval process.
GRANTEE shall indemnify GRANTOR for any and all damages and costs, including
without limitation, reasonable attorney's fees, court costs, and all other expenses relating to the
defense of claims or litigation, caused by or arising from the exercise of GRANTEE’S rights
pursuant to the terms of this Easement, excepting therefrom any such injury, damage or costs
caused by or arising solely from the gross negligence, or actions that are purposeful or undertaken
without regard to the consequences, by the GRANTOR, its officers, employees, agents or
contractors.
In the event GRANTEE fails to install the Facility within the Easement, or in the event
GRANTEE removes the Facility, or in the event the Facility ceases to function, or in the event of
any other event giving evidence to GRANTOR that the GRANTEE has abandoned the use of this
Easement, then and in such event, GRANTOR shall notify GRANTEE, in writing, that
GRANTOR considers that the Easement has been abandoned. In such event, GRANTEE shall
provide confirmation to GRANTOR that the Easement has been abandoned, or in the event
GRANTEE shall fail to reply that there has been no intent to abandon the Easement within thirty
(30) days of receipt of the aforesaid notice from the GRANTOR, this Easement shall be deemed
to be abandoned and GRANTOR shall be permitted to record a termination of this Easement in
the public records of Maricopa County. Unless and until such termination is recorded by
GRANTOR, this Easement shall remain in full force and effect.
This Easement shall run with the land and is binding on all parties.
FCD Projects: Tres Rios and Holly Acres Salt River Corridor
FCD Parcel Nos.: CW-009B and F00311
Page 4 of 8
APN: 500-69-088 ptn.
FCD Permit No.: 2021P254
GRANTOR: FLOOD CONTROL DISTRICT OF MARICOPA COUNTY
RECOMMENDED FOR APPROVAL:
Michael A. Fulton
Date
Director
REAL ESTATE DEPARTMENT APPROVAL:
Alex Smith, Director
Date
Maricopa County Real Estate Department
APPROVED AS TO FORM and within the powers and authority granted under the laws of the
State of Arizona.
District General Counsel
Date
FCD Projects: Tres Rios and Holly Acres Salt River Corridor
FCD Parcel Nos.: CW-009B and F00311
Page 5 of 8
APN: 500-69-088 ptn.
FCD Permit No.: 2021P254
APPROVED:
BOARD OF DIRECTORS OF FLOOD CONTROL DISTRICT OF MARICOPA
COUNTY
Bill Gates
Date
Chairman of the Board
ATTEST:
Clerk of the Board Date
STATE OF ARIZONA
)
)ss
COUNTY OF MARICOPA )
Before me,
, Notary Public in and for said County, State
of Arizona, on this day personally appeared Bill Gates, known to me to be the person whose name
is subscribed to the forgoing instrument as Chairman of the Board of the Political Subdivision in
the foregoing instrument.
Given under my hand and seal of the office this
day of
, 202 .
______________________________
Notary Public (signature)
9/15/22
FCD Projects: Tres Rios and Holly Acres Salt River Corridor
FCD Parcel Nos.: CW-009A DE, CW-009B, and F00311
FCD Projects: Tres Rios and Holly Acres Salt River Corridor
FCD Parcel Nos.: CW-009B and F00311
Page 7 of 8
APN: 500-69-088 ptn.
FCD Permit No.: 2021P254
Exhibit “A” - Easement
Attached to Non-Exclusive Recreational Trail Easement
a portion of Maricopa Trail Segment 9/
FCD Projects: Tres Rios and Holly Acres Salt River Corridor
FCD Parcel Nos.: CW-009A DE, CW-009B, and F00311
FCD Projects: Tres Rios and Holly Acres Salt River Corridor
FCD Parcel Nos.: CW-009B and F00311
Page 8 of 8
APN: 500-69-088 ptn.
FCD Permit No.: 2021P254
Exhibit “A” - continued
Attached to Non-Exclusive Recreational Trail Easement
a portion of Maricopa Trail Segment 9/