Z2021160 BOS REPORT_PART2.PDF

Maricopa County — Formal (2022-08-17)

View PDF Item 7 Meeting page

Extracted text (via pymupdf) 68379 characters
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
885
884
885
885
885
884
886
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
885
883
884
886
886
886
886
886
887
887
887
885
886
887
886
885
884
885
884
886
LEGEND:
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-001.dwg
E
AGV-C-CG7-001
-
139547
GRADING PLAN
SITE WORK
FUTURE AGAVE SUBSTATION
ISSUED FOR
PERMITTING
NORTH
EXISTING EASEMENT LINE
EXISTING CHAIN LINK FENCE
EXISTING OVERHEAD ELECTRIC
PROPOSED LIMITS OF GRADING
X
X
OH
OH
PROPOSED SECURITY FENCE
X
X
EXISTING BURIED COMM LINE
COMM
PROPOSED CONTOUR
PROPOSED GRADE BREAK
###
PROPOSED SURFACE COURSE (4" DEPTH)
PROPOSED BASE COURSE (9" DEPTH)
PROPOSED RIPRAP (6" DEPTH)
EXISTING CONTOUR
###
NOTES:
1.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH
PROJECT SPECIFICATIONS AND ALL NOTES ON DRAWING
AGV-C-CA7-002.
2.
REFER TO DRAWING AGV-C-CG7-007 FOR ADDITIONAL
DETAILS.
3.
PROPOSED SUBSTATION SECURITY FENCE MEETS IND-2 IUPD
STANDARDS.
005
B
005
A
0.50%
0.50%
0.20%
EDGE OF PAD
N 850420.98
E 416161.95
FG 886.52'
EDGE OF PAD
N 850418.68
E 416451.95
FG 886.56'
EDGE OF PAD
N 850613.67
E 416453.49
FG 887.50'
EDGE OF PAD
N 850615.97
E 416163.50
FG 887.50'
END CURVE
N 850279.86
E 416457.90
FG 887.27'
GRADE BREAK
N 850283.40
E 416348.48
FG 885.70'
BEGIN CURVE
N 850284.72
E 416337.19
FG 885.51'
GRADE BREAK
N 850273.82
E 416430.80
FG 887.11'
2.5:1
2.5:1
2.5:1
YL
A
3/31/22
NM
30% IFR
YL
B
4/11/22
NM
ISSUED FOR BID
1.45%
0.71%
0.64%
1.42%
GRADE BREAK
N 850615.74
E 416192.40
FG 887.50'
GRADE BREAK
N 850488.96
E 416191.40
FG 886.87'
GRADE BREAK
N 850442.82
E 416268.45
FG 886.64'
GRADE BREAK
N 850487.80
E 416368.06
FG 886.87'
GRADE BREAK
N 850614.34
E 416369.06
FG 887.50'
GRADE BREAK
N 850615.09
E 416269.81
FG 887.89'
GRADE BREAK
N 850488.56
E 416268.81
FG 887.26'
YL
C
4/29/22
NM
IFB - EXTENDED BASIN
YL
D
6/03/22
NM
90% IFR
BEGIN DITCH CL
N 850415.88
E 416161.88
FG 885.62'
END DITCH CL
N 850412.90
E 416270.57
FG 885.08'
EDGE OF ACCESS ROAD
N 850418.74
E 416441.95
FG 886.54'
EDGE OF ACCESS ROAD
N 850418.91
E 416421.95
FG 886.52'
EDGE OF ACCESS ROAD
N 850418.84
E 416431.95
FG 886.52'
BEGIN CURVE
N 850299.78
E 416441.00
FG 887.09'
END CURVE
N 850317.41
E 416384.50
FG 886.09'
CURVE R CENTER
N 850299.62
E 416461.00
CURVE R CENTER
N 850335.01
E 416334.85
R50.00'
R20.00'
0.50%
BEGIN DITCH CL
N 850290.31
E 416186.22
FG 885.18'
END DITCH CL
N 850289.52
E 416270.29
FG 884.89'
0.33%
1.67%
1.55%
1.97%
RETENTION BASIN
PROPOSED BASE COURSE (4" DEPTH)
EAST-WEST
BASELINE
NORTH-SOUTH
BASELINE
0.50%
0.50%
EDGE OF ACCESS ROAD
N 850285.91
E 416186.16
FG 885.77'
EDGE OF ACCESS ROAD
N 850331.47
E 416119.24
FG 886.15'
EDGE OF ACCESS ROAD
N 850385.51
E 416119.67
FG 886.33'
EDGE OF ACCESS ROAD
N 850460.97
E 416162.27
FG 886.73'
BASE COURSE
(6" DEPTH)
SURFACE COURSE
(4" DEPTH)
FINISHED GRADE
SELECT FILL
NOT TO SCALE
TYPICAL SECTION: PAD GRADING
EXISTING GRADE
(STRIP 6" MIN, PROOF ROLL,
AND COMPACT)
X
X
NOT TO SCALE
TYPICAL SECTION: GRADING ALONG SECURITY FENCE
SELECT FILL
EXISTING GRADE
(STRIP 6" MIN, PROOF ROLL,
AND COMPACT)
BASE COURSE
(6" DEPTH)
SURFACE COURSE
(4" DEPTH)
FINISHED GRADE
RIPRAP
(12" DEPTH)
CONTECH C80NW
GEOTEXTILE FABRIC
SECURITY
FENCE
5.00'
VARIES
1.00'
005
C
005
D
YL
E
6/17/22
NM
IFP
280.00'
5.00'
5.00'
185.00'
5.00'
5.00'
SEE NOTE 3
PROPOSED RIPRAP (12" DEPTH)

X
X
X
X
X
ST
ST
ST
ST
886
887
887
X
X
X
X
X
X
X
X
ST
ST
886
887
887
888
ST
0+00
0+50
1+00
1+50
2+00
2+50
3+00
3+50
4+00
4+50
5+00
BP: 0+00.00
PI: 0+13.41
PC: 3+11.81
PT: 4+69.86
PT: 1+82.32
L2
L1
C2
C1
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
1+00
2+00
3+00
4+00
5+00
5+50
1+00
2+00
3+00
4+00
5+00
5+50
ROAD TIE-IN STA = 0+10.48
ELEV =  885.449
PVI STA: 0+84.88
PVI ELEV: 886.74
K: 72.54
LVC: 100.00
BVCS: 0+34.88
BVCE: 885.87
EVCS: 1+34.88
EVCE: 886.92
1.74%
0.36%
ALIGNMENT LINE TABLE
LINE #
L1
L2
L3
LENGTH
13.41'
129.50'
516.98'
DIRECTION
N89° 16' 56.05"W
N24° 45' 50.16"W
N85° 08' 06.03"W
START POINT (N, E)
849921.25, 417383.17
850008.57, 417235.44
850212.79, 417057.71
END POINT (N, E)
849921.42, 417369.76
850126.16, 417181.19
850256.63, 416542.59
ALIGNMENT CURVE TABLE
CURVE #
C1
C2
RADIUS
150.00'
150.00'
RADIUS CENTER (N, E)
850071.40, 417371.64
850063.33, 417044.99
LENGTH
168.909'
158.051'
CHORD DIRECTION
N57° 01' 23.11"W
N54° 56' 58.10"W
PC (N, E)
849921.42, 417369.76
850126.16, 417181.19
PT (N, E)
850008.57, 417235.44
850212.79, 417057.71
TANGENT
94.68
87.25
DELTA
64.52
60.37
ST
ST
ST
ST
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-002.dwg
B
AGV-C-CG7-002
-
139547
SHEET 1 OF 3
ACCESS ROAD PLAN AND PROFILE
SITE WORK
FUTURE AGAVE SUBSTATION
LEGEND:
1.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH PROJECT
SPECIFICATIONS AND ALL NOTES ON DRAWING AGV-C-CA7-002.
2.
PIPE LENGTHS SHOWN ON THIS DRAWING ASSUMES 5 FT END
SECTION LENGTHS. SUBCONTRACTOR SHALL ADJUST PIPE
LENGTHS AS NECESSARY TO MEET GIVEN INVERT
COORDINATES.
3.
SUBCONTRACTOR SHALL MODIFY EXISTING HDPE STORM
SEWER PIPE TO BE ABLE TO DAYLIGHT INTO EXISTING DITCH.
NOTES:
ISSUED FOR
PERMITTING
EXISTING CHAIN LINK FENCE
PROPOSED LIMITS OF GRADING
X
X
EXISTING EDGE OF DIRT ROAD
PROPOSED CONTOUR
PROPOSED GRADE BREAK
###
PROPOSED BASE COURSE (9" DEPTH)
PROPOSED RIPRAP (12" DEPTH)
EXISTING CONTOUR
###
(2) 44.3 LF 36" Ø
CGHDPE PIPE @ 0.24%
SEE NOTE 2
EXISTING SECTION LINE
YL
A
6/03/22
NM
90% IFR
NORTH
0
SCALE IN FEET
30'
60'
H:
V:
0
SCALE IN FEET
30'
60'
SCALE IN FEET
0
3'
6'
BEGIN ALIGNMENT
STA 0+00.00
N 849921.25
E 417383.17
BEGIN R=30' CURVE
TIE-IN TO EXIST. PVMT.
STA 0+10.10, 37.82' L
FG 885.43'
BEGIN R=30' CURVE
TIE-IN TO EXIST. PVMT.
STA 0+10.92, 43.80' R
FG 885.56'
EDGE OF ACCESS ROAD
TIE-IN TO EXIST. PVMT.
STA 0+10.48
FG 885.45
CENTER (2) 36" DIA. HDPE
END SECTIONS
STA 0+33.44, 25.22' L
INV 880.68'
MATCH LINE - CONTINUED ON AGV-C-CG7-003
BEGIN DITCH CL
STA 3+90.96, 20.39' L
FG 885.73'
DITCH CL
STA 3+11.79, 19.54' L
FG 885.36'
DITCH CL
STA 1+82.34, 20.26' L
FG 884.71'
END DITCH CL
STA 0+49.85, 19.16' L
FG 884.00'
FG AND PGL
EG
(2) 44.3 LF 36" Ø
CGHDPE PIPE @ 0.24%
UPSTREAM CULVERT
(2) 36" Ø CGHDPE PIPE @ 0.24%
PER RED HAWK POWER STATION
STORM WATER DRAINAGE REPORT
DOWNSTREAM CULVERT
(2) 36" Ø CGHDPE PIPE @ 0.24%
PER RED HAWK POWER STATION
STORM WATER DRAINAGE REPORT
0.47%
0.50%
0.53%
L3
005
F
CENTER (2) 36" DIA. HDPE
END SECTIONS
STA 0+43.06, 28.27' R
INV 880.81'
3:1
SEE NOTE 3
REFLECTOR
STAKES (TYP.)
REFLECTOR
STAKES (TYP.)
005
E
EXISTING EDGE OF ASPHALT ROAD
EXISTING STORM SEWER
ST
ST
3:1
R=30' CURVE CENTER
STA 0+51.32, 40.00' R
R=30' CURVE CENTER
STA 0+34.55, 40.00' L
END R=30' CURVE
STA 0+51.32, 10.00' R
FG 885.94'
END R=30' CURVE
STA 0+34.55, 10.00' L
FG 885.67'
YL
B
6/17/22
NM
IFP

X
X
X
X
X
X
X
M
COMM
887
888
889
889
885
884
886
887
888
888
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
885
885
883
884
886
886
887
888
50
6+00
6+50
7+00
7+50
8+00
8+50
9+00
9+50
10+00
10+50
11+00
11+50
PC: 9+86.84
PC: 10+95.45
PT: 9+91.07
PT: 11+04.30
L3
L4
C3
C4
X
X
883
884
885
886
887
888
889
890
891
892
893
894
895
896
883
884
885
886
887
888
889
890
891
892
893
894
895
896
5+50
6+00
7+00
8+00
9+00
10+00
11+00
11+50
5+50
6+00
7+00
8+00
9+00
10+00
11+00
11+50
PVI STA: 6+06.60
PVI ELEV: 888.63
K: 125.98
LVC: 100.00
BVCS: 5+56.60
BVCE: 888.45
EVCS: 6+56.60
EVCE: 888.42
PVI STA: 10+56.29
PVI ELEV: 887.92
K: 48.81
LVC: 100.00
BVCS: 10+06.29
BVCE: 887.79
EVCS: 11+06.29
EVCE: 887.02
PVI STA: 8+78.20
PVI ELEV: 887.46
K: 145.23
LVC: 100.00
BVCS: 8+28.20
BVCE: 887.68
EVCS: 9+28.20
EVCE: 887.59
-0.43%
0.26%
-1.79%
ALIGNMENT LINE TABLE
LINE #
L3
L4
L5
LENGTH
516.98'
104.38'
277.66'
DIRECTION
N85° 08' 06.03"W
N81° 05' 57.37"W
N89° 32' 44.92"W
START POINT (N, E)
850212.79, 417057.71
850257.14, 416538.40
850274.01, 416426.46
END POINT (N, E)
850256.63, 416542.59
850273.29, 416435.27
850276.21, 416148.81
ALIGNMENT CURVE TABLE
CURVE #
C3
C4
RADIUS
60.00'
60.00'
RADIUS CENTER (N, E)
850316.41, 416547.68
850214.01, 416425.98
LENGTH
4.226'
8.845'
CHORD DIRECTION
N83° 07' 01.70"W
N85° 19' 21.15"W
PC (N, E)
850256.63, 416542.59
850273.29, 416435.27
PT (N, E)
850257.14, 416538.40
850274.01, 416426.46
TANGENT
2.11
4.43
DELTA
4.04
8.45
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-003.dwg
B
AGV-C-CG7-003
-
139547
SHEET 2 OF 3
ACCESS ROAD PLAN AND PROFILE
SITE WORK
FUTURE AGAVE SUBSTATION
LEGEND:
1.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH
PROJECT SPECIFICATIONS AND ALL NOTES ON DRAWING
AGV-C-CA7-002.
2.
PIPE LENGTHS SHOWN ON THIS DRAWING ASSUMES 8 FT END
SECTION LENGTHS. SUBCONTRACTOR SHALL ADJUST PIPE
LENGTHS AS NECESSARY TO MEET GIVEN INVERT
COORDINATES.
NOTES:
005
G
ISSUED FOR
PERMITTING
EXISTING CHAIN LINK FENCE
PROPOSED LIMITS OF GRADING
X
X
EXISTING BURIED COMM LINE
COMM
PROPOSED CONTOUR
PROPOSED GRADE BREAK
###
PROPOSED BASE COURSE (9" DEPTH)
PROPOSED RIPRAP (12" DEPTH)
EXISTING CONTOUR
###
EXISTING SECTION LINE
NORTH
YL
A
6/03/22
NM
90% IFR
0
SCALE IN FEET
30'
60'
H:
V:
0
SCALE IN FEET
30'
60'
SCALE IN FEET
0
3'
6'
CENTER (2) 45X29
 RCEP END SECTIONS
STA 10+60.50, 24.80' R
INV 883.93'
MATCH LINE - CONTINUED ON AGV-C-CG7-002
FG AND PGL
EG
MATCH LINE - CONTINUED ON AGV-C-CG7-004
CENTER (2) 45X29
 RCEP END SECTIONS
STA 10+52.06, 24.67' L
INV 883.75'
(2) 34.2 LF 45X29
RCEP @ 0.36%
SEE NOTE 2
(2) 34.2 LF 45X29
RCEP @ 0.36%
REFLECTOR
STAKES (TYP.)
REFLECTOR
STAKES (TYP.)
L5
24' DOUBLE
SWING GATE
CULVERT SIZING CALCULATIONS:
PER PG. 104 FROM "RED HAWK POWER STATION STORM WATER
DRAINAGE REPORT", NEAREST ANALYSIS POINT IS "PT. 3". PER PG.
102 TABLE 4, PT. 3 DESIGN FLOW  = 69 CFS.
MANNING'S FORMULA:
Q = A x 1.486/n x R2/3 x S1/2
Q = DISCHARGE (CFS)
A = CROSS-SECTIONAL AREA OF FLOW (SF)
n = ROUGHNESS COEFFICIENT
R = HYDRAULIC RADIUS (FT)
S = PIPE SLOPE (FT/FT)
A = 7.07 SF (EQUIVALENT 36" Ø PIPE)
n = 0.015 (CONCRETE PIPE)
R = 0.75 FT
S = 0.0036 FT/FT
Q = 34.67
34.67 x 2 = 69.33 CFS > 69 CFS
YL
B
6/17/22
NM
IFP

COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
OH
OH
O
OH
OH
OH
OH
O
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
883
884
885
884
X
X
X
X
X
X
X
X
X
883
886
886
886
886
887
886
885
884
885
884
886
+50
12+00
12+50
13+00
13+50
14+00
14+50
15+00
15+50
16+00
16+34
EP: 16+34.49
PC: 13+81.96
PC: 15+59.66
PT: 14+44.79
PT: 16+22.49
L5
L6
L7
C5
C6
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
11+50
12+00
13+00
14+00
15+00
16+00
16+34
11+50
12+00
13+00
14+00
15+00
16+00
16+34
GRADE BREAK STA = 11+93.65
ELEV =  885.460
GRADE BREAK STA = 16+34.49
ELEV =  886.775
0.00%
0.33%
ALIGNMENT LINE TABLE
LINE #
L5
L6
L7
LENGTH
277.66'
114.87'
12.00'
DIRECTION
N89° 32' 44.92"W
N00° 27' 15.08"E
S89° 32' 44.92"E
START POINT (N, E)
850274.01, 416426.46
850316.53, 416109.12
850471.07, 416150.35
END POINT (N, E)
850276.21, 416148.81
850431.39, 416110.04
850470.97, 416162.35
ALIGNMENT CURVE TABLE
CURVE #
C5
C6
RADIUS
40.00'
40.00'
RADIUS CENTER (N, E)
850316.21, 416149.12
850431.07, 416150.03
LENGTH
62.832'
62.832'
CHORD DIRECTION
N44° 32' 44.92"W
N45° 27' 15.08"E
PC (N, E)
850276.21, 416148.81
850431.39, 416110.04
PT (N, E)
850316.53, 416109.12
850471.07, 416150.35
TANGENT
40.00
40.00
DELTA
90.00
90.00
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-004.dwg
B
AGV-C-CG7-004
-
139547
SHEET 3 OF 3
ACCESS ROAD PLAN AND PROFILE
SITE WORK
FUTURE AGAVE SUBSTATION
LEGEND:
1.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH
PROJECT SPECIFICATIONS AND ALL NOTES ON DRAWING
AGV-C-CA7-002.
NOTES:
ISSUED FOR
PERMITTING
EXISTING EASEMENT LINE
EXISTING OVERHEAD ELECTRIC
PROPOSED LIMITS OF GRADING
OH
OH
EXISTING EDGE OF DIRT ROAD
PROPOSED SECURITY FENCE
X
X
EXISTING BURIED COMM LINE
COMM
PROPOSED CONTOUR
PROPOSED GRADE BREAK
###
PROPOSED SURFACE COURSE (4" DEPTH)
PROPOSED BASE COURSE (9" DEPTH)
PROPOSED RIPRAP (12" DEPTH)
EXISTING CONTOUR
###
EXISTING SECTION LINE
NORTH
YL
A
6/03/22
NM
90% IFR
0
SCALE IN FEET
30'
60'
H:
V:
0
SCALE IN FEET
30'
60'
SCALE IN FEET
0
3'
6'
MATCH LINE - CONTINUED ON AGV-C-CG7-003
FG AND PGL
EG
EDGE OF ACCESS ROAD
BEGIN CURVE
N 850336.60
E 416099.28
FG 886.02'
EDGE OF ACCESS ROAD
END CURVE
N 850287.00
E 416048.89
FG 884.03'
EDGE OF ACCESS ROAD
TIE-IN TO EG
N 850287.36
E 416003.36
FG 882.99'
EDGE OF ACCESS ROAD
TIE-IN TO EG
N 850282.57
E 415979.39
FG 883.04'
EDGE OF ACCESS ROAD
TIE-IN TO EG
N 850267.74
E 415944.55
FG 882.71'
EDGE OF ACCESS ROAD
TIE-IN TO EG
N 850263.75
E 415924.45
FG 882.51'
EDGE OF ACCESS ROAD
TIE-IN TO EG
N 850263.13
E 415984.78
FG 883.07'
EDGE OF ACCESS ROAD
TIE-IN TO EG
N 850267.36
E 416003.21
FG 883.03'
EDGE OF ACCESS ROAD
N 850266.21
E 416148.73
FG 885.75'
EDGE OF ACCESS ROAD
STA 16+34.49, 10.00' R
FG 886.73'
EDGE OF ACCESS ROAD
STA 16+34.49, 10.00' L
FG 886.82'
END ALIGNMENT
CL OF ACCESS ROAD
STA 16+34.49
N 850470.97
E 416162.35
FG 886.77'
EDGE OF ACCESS ROAD
STA 13+44.69, 10.00' R
FG 885.77'
EDGE OF ACCESS ROAD
STA 13+78.32, 32.51' R
FG 885.93'
EDGE OF ACCESS ROAD
STA 14+59.81, 10.00' R
FG 886.15'
EDGE OF ACCESS ROAD
STA 15+13.86, 10.00' R
FG 886.33'
R40.00'
R50.00'
CURVE R CENTER
N 850337.00
E 416049.29
CURVE R CENTER
N 850227.36
E 416002.89
EDGE OF ACCESS ROAD
TIE-IN TO EG
N 850287.21
E 416022.99
FG 883.14'
EDGE OF ACCESS ROAD
STA 15+51.76, 31.00' R
FG 886.11'
EDGE OF ACCESS ROAD
TIE-IN TO EG
N 850267.21
E 416022.83
FG 883.13'
NORTH-SOUTH
BASELINE
1.55%
1.67%
0.44%
RETENTION
BASIN
PROPOSED BASE COURSE (4" DEPTH)
YL
B
6/17/22
NM
IFP
GRADE BREAK STA = 12+33.65
ELEV = 885.460
PROPOSED RIPRAP (6" DEPTH)

885
886
887
888
889
890
884
883
882
881
X
X
885
886
887
888
889
890
884
883
882
881
885
886
887
888
889
890
884
883
882
X
X
885
886
887
888
889
890
884
883
882
X
885
886
887
888
884
883
882
881
880
879
878
885
886
887
888
884
883
882
881
880
879
878
885
886
887
888
889
890
884
883
882
881
885
886
887
888
889
890
884
883
882
881
885
886
887
888
884
883
882
890
889
885
886
887
888
884
883
882
890
889
885
886
887
888
884
883
882
889
X
885
886
887
888
884
883
882
889
885
886
887
888
884
883
882
889
885
886
887
888
884
883
882
889
SECURITY FENCE
NORTH-SOUTH
BASELINE
EXISTING GRADE
(STRIP 6" MIN, PROOF ROLL,
AND COMPACT)
4:1
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-005.dwg
D
AGV-C-CG7-005
-
139547
GRADING SECTION VIEWS
SITE WORK
FUTURE AGAVE SUBSTATION
ISSUED FOR
PERMITTING
NOTES:
1.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE
WITH PROJECT SPECIFICATIONS AND ALL NOTES
ON DRAWING AGV-C-CA7-002.
2.
PIPE LENGTHS SHOWN ON THIS DRAWING
ASSUMES 8 FT (RCEP) AND 5 FT (HDPE) END
SECTION LENGTHS. SUBCONTRACTOR SHALL
ADJUST PIPE LENGTHS AS NECESSARY TO MEET
GIVEN INVERT COORDINATES ON PLAN DRAWINGS.
5.00'
77.00'
VARIES
VARIES
5.00'
133.00'
BASE COURSE
(6" DEPTH)
BASE COURSE
(6" DEPTH)
BASE COURSE
(9" DEPTH)
EXISTING GRADE
(STRIP 6" MIN, PROOF ROLL,
AND COMPACT)
SECURITY FENCE
SECURITY
FENCE
SECURITY
FENCE
SURFACE COURSE
(4" DEPTH)
SURFACE COURSE
(4" DEPTH)
2.5:1
3:1
3:1
2.5:1
2.5:1
RIPRAP
(12" DEPTH)
RIPRAP
(12" DEPTH)
RIPRAP
(12" DEPTH)
RIPRAP
(12" DEPTH)
SELECT FILL
SELECT FILL
H:
V:
H:
V:
MIRAFI RS380i
GEOTEXTILE FABRIC
CONTECH C80NW
GEOTEXTILE FABRIC
CONTECH C80NW
GEOTEXTILE FABRIC
CONTECH C80NW
GEOTEXTILE FABRIC
CONTECH C80NW
GEOTEXTILE FABRIC
YL
A
3/31/22
NM
30% IFR
YL
B
4/11/22
NM
ISSUED FOR BID
5.00'
108.00'
VAR.
VARIES
0.50%
0.50%
1.36%
EAST-WEST
BASELINE
147.00'
5.00'
VARIES
23.90'
77.42'
31.68'
67.57'
74.43'
5.00'
0.51%
0.40%
YL
C
6/03/22
NM
90% IFR
SELECT FILL
36" DIA. HDPE
END SECTION
36" DIA. HDPE
END SECTION
(2) 44.3 LF 36" Ø
CGHDPE PIPE @ 0.24%
SEE NOTE 2
INV 880.81'
INV 880.68'
FINISHED GRADE
FINISHED GRADE
FINISHED GRADE
EXISTING GRADE
(STRIP 6" MIN, PROOF ROLL,
AND COMPACT)
H:
V:
BASE COURSE
(9" DEPTH)
4:1
4:1
RIPRAP
(12" DEPTH)
SELECT FILL
RCEP END
SECTION
RCEP END
SECTION
(2) 34.2 LF 45X29
RCEP @ 0.36%
SEE NOTE 2
INV 883.93'
INV 883.75'
FINISHED GRADE
EG
CONTECH C80NW
GEOTEXTILE FABRIC
MIRAFI RS380i
GEOTEXTILE FABRIC
H:
V:
RIPRAP
(12" DEPTH)
EXISTING
FENCE
BASE COURSE
(9" DEPTH)
4:1
RIPRAP
(12" DEPTH)
MIRAFI RS380i
GEOTEXTILE FABRIC
FINISHED GRADE
EXISTING GRADE
H:
V:
CONTECH C80NW
GEOTEXTILE FABRIC
4:1
VARIES
3.00'
VAR.10.00' 10.00'
VARIES
2.00%
2.00%
15.10'
RIPRAP
(12" DEPTH)
RIPRAP
(12" DEPTH)
RIPRAP
(12" DEPTH)
RIPRAP
(12" DEPTH)
H:
V:
5.00'
VAR.
3.00'
VAR.
SURFACE COURSE
(4" DEPTH)
EXISTING GRADE
(STRIP 6" MIN, PROOF
ROLL, AND COMPACT)
SELECT FILL
CONTECH C80NW
GEOTEXTILE FABRIC
BASE COURSE
(4" DEPTH)
FINISHED GRADE
4:1
H:
V:
VAR.
3.00'
VAR.
4:1
4:1
BASE COURSE
(6" DEPTH)
BASE COURSE
(9" DEPTH)
FINISHED GRADE
SELECT FILL
CONTECH C80NW
GEOTEXTILE FABRIC
MIRAFI RS380i
GEOTEXTILE FABRIC
RIPRAP
(6" DEPTH)
RIPRAP
(6" DEPTH)
BASE COURSE
(4" DEPTH)
EXISTING GRADE
(STRIP 6" MIN, PROOF
ROLL, AND COMPACT)
YL
D
6/17/22
NM
IFP
4:1

COMM
COMM
COMM
COMM
COMM
COMM
COMM
X
X
X
X
X
X
X
X
X
X
885
883
884
886
886
88
885
886
887
888
889
884
883
882
881
885
886
887
888
889
884
883
882
881
880
880
885
886
887
888
889
890
884
883
882
881
885
886
887
888
889
890
884
883
882
881
880
880
X
LEGEND:
-
G
-
F
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-006.dwg
B
AGV-C-CG7-006
-
139547
RETENTION BASIN PLAN
SITE WORK
FUTURE AGAVE SUBSTATION
ISSUED FOR
PERMITTING
NORTH
EXISTING SECTION LINE
PROPOSED LIMITS OF GRADING
PROPOSED SECURITY FENCE
X
X
EXISTING BURIED COMM LINE
COMM
PROPOSED CONTOUR
PROPOSED GRADE BREAK
###
PROPOSED SURFACE COURSE (4" DEPTH)
PROPOSED BASE COURSE (9" DEPTH)
PROPOSED RIPRAP (12" DEPTH)
EXISTING CONTOUR
###
NOTES:
1.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH
PROJECT SPECIFICATIONS AND ALL NOTES ON DRAWING
AGV-C-CA7-002.
TOE OF SLOPE
N 850403.98
E 416400.71
FG 882.75'
TOE OF SLOPE
N 850322.03
E 416371.97
FG 882.75'
TOE OF SLOPE
N 850295.76
E 416337.28
FG 882.75'
GRADE BREAK
TOP OF SPILLWAY
N 850283.40
E 416348.48
FG 885.70'
GRADE BREAK
SPILLWAY BOTTOM
N 850284.72
E 416337.19
FG 885.51'
GRADE BREAK
SPILLWAY BOTTOM
N 850285.03
E 416297.11
FG 885.51'
GRADE BREAK
SPILLWAY BOTTOM
N 850265.03
E 416297.11
FG 885.41'
GRADE BREAK
SPILLWAY BOTTOM
N 850264.72
E 416337.11
FG 885.41'
GRADE BREAK
TOP OF SPILLWAY
N 850264.63
E 416348.48
FG 885.61'
YL
A
6/03/22
NM
90% IFR
TOE OF SLOPE
N 850404.94
E 416279.83
FG 882.75'
TOE OF SLOPE
N 850296.44
E 416278.97
FG 882.75'
GRADE BREAK
TOP OF SPILLWAY
N 850285.52
E 416236.15
FG 885.71'
GRADE BREAK
TOP OF SPILLWAY
N 850265.52
E 416236.15
FG 885.61'
4:1
SECURITY
FENCE
RIPRAP
(12" DEPTH)
SELECT FILL
-
G
SECTION
0
SCALE IN FEET
2'
4'
H:
V:
CONTECH C80NW
GEOTEXTILE FABRIC
FINISHED GRADE
EXISTING GRADE
BASE COURSE
(9" DEPTH)
MIRAFI RS380i
GEOTEXTILE FABRIC
VARIES
VARIES
VARIES
108.73'
20.00'
BASE COURSE
(9" DEPTH)
MIRAFI RS380i
GEOTEXTILE FABRIC
BASE COURSE
(4" DEPTH)
4:1
4:1
4:1
RIPRAP
(12" DEPTH)
CONTECH C80NW
GEOTEXTILE FABRIC
EXISTING GRADE
FINISHED GRADE
SELECT FILL
5.00'
SELECT FILL
BASE COURSE
(6" DEPTH)
SURFACE COURSE
(4" DEPTH)
0.50%
-
F
SECTION
0
SCALE IN FEET
2'
4'
H:
V:
CONTOUR EL
884.0
13179.31
884.1
13364.21
884.2
13550.39
CUMULATIVE VOLUME (CF)
14525.43
15852.59
17198.31
CONTOUR AREA (SF)
884.3
12045.26
18562.71
884.4
13926.60
19945.92
884.5
14116.62
21348.07
884.6
14307.93
22769.29
884.7
14500.52
24209.70
884.8
14694.39
25669.44
884.9
14889.55
27148.62
885.0
15085.98
28647.39
885.1
15283.74
30165.86
885.2
15483.49
31704.21
885.3
15685.57
33262.66
885.4
15898.07
34841.83
883.9
12995.69
13216.69
883.8
12813.36
11926.25
883.7
12632.30
10653.97
883.6
12452.53
9399.74
883.5
12274.04
8163.42
883.4
12096.83
6944.89
883.3
11920.90
5744.02
STAGE STORAGE TABLE
RETENTION VOLUME CALCULATIONS:
V = C(P/12)A
V = REQUIRED VOLUME (CFS)
C = RUNOFF COEFFICIENT
P = 100-YR, 2-HR STORM DEPTH (IN)
A = DRAINAGE AREA (SF)
C = 0.86 (SEE AGV-C-CG7-009 FOR C SUMMARY)
P = 2.56 IN (NOAA ATLAS 14, ARLINGTON, AZ)
A = 106722 SF (SEE AGV-C-CG7-009 AREA 2)
V = 19580 CF (0.449 ACRE-FT) (CONTAINED BETWEEN BASIN
ELEVATIONS 884.3 AND 884.4, SEE STAGE STORAGE TABLE.
RETENTION DRAIN TIME CALCULATIONS:
Pd = Pr/Dr
Pd = DESIGN PEROCLATION RATE, IN INCHES/HOUR
Pr = LOWEST MEASURED PERCOLATION RATE, IN INCHES/HOUR
Dr = DE-RATING FACTOR
Pr = 1.25 INCHES/HOUR (SEE GEOTECH REPORT)
Dr = 2
Pd = 0.625 INCHES/HOUR
Td = V/(Ap(Pd/12))
Td = RETENTION DRAIN TIME, HOURS
V = RETAINED VOLUME, ACRE-FT
Ap = PERCOLATION AREA (BASIN BOTTOM), ACRE
Pd = DESIGN PEROCLATION RATE, IN INCHES/HOUR
V = 0.449 ACRE-FT
Ap = 0.252 ACRE
Pd = 0.625 INCHES/HOUR
Td = 34.210 HOURS < 36 HOURS
0.50%
0.60%
1.86%
NORTH-SOUTH
BASELINE
RETENTION BASIN
0.20%
1.97%
EMERGENCY SPILLWAY
SEE DWG AGV-C-CG7-007
FOR DETAILS
15.10'
11.04'
100-YR, 2-HR RETAINED EL = 884.4'
100-YR, 2-HR RETAINED EL = 884.4'
PROPOSED BASE COURSE (9" DEPTH)
883.2
11746.26
4560.67
883.1
11572.90
3394.72
883.0
11400.82
2246.05
882.9
11230.02
1114.52
882.8
11060.50
0
TOP OF SLOPE
N 850408.06
E 416267.21
FG 885.91'
TOP OF SLOPE
N 850294.49
E 416266.94
FG 885.63'
TOP OF SLOPE
N 850317.41
E 416384.50
FG 886.09'
TOP OF SLOPE
N 850418.91
E 416421.95
FG 886.52'
YL
B
6/17/22
NM
IFP
PROPOSED RIPRAP (6" DEPTH)

-
A
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-007.dwg
B
AGV-C-CG7-007
-
139547
GRADING AND DRAINAGE DETAILS
SITE WORK
FUTURE AGAVE SUBSTATION
ISSUED FOR
PERMITTING
NOTES:
1.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH
PROJECT SPECIFICATIONS AND ALL NOTES ON DRAWING
AGV-C-CA7-002.
2.
REFER TO DRAWING AGV-C-CG7-001 FOR ADDITIONAL
DETAILS.
YL
A
6/03/22
NM
90% IFR
BACKFILL AND COMPACT THE
TRENCH WITH SELECT FILL
OR BASE COURSE AS INDICATED
ON THE DRAWINGS
HAND TAMPED PROTECTIVE
BACKFILL OR GRANULAR
BEDDING MATERIAL
COMPACTED TO 100%
MIN. OD+1'
MAX. OD+2'
6" MIN.
PIPE OD
6"
CL
1'-0" MIN.
X
X
4:1
4:1
BASE COURSE
(9" DEPTH)
SELECT FILL
MIRAFI RS380i
GEOTEXTILE FABRIC
RIPRAP
(12" DEPTH)
NOT TO SCALE
2.00%
2.00%
10.00'
10.00'
CONTECH C80NW
GEOTEXTILE FABRIC
RIPRAP
(12" DEPTH)
CONTECH C80NW
GEOTEXTILE FABRIC
TYPICAL SECTION: ACCESS ROAD GRADING
EXISTING GRADE
(STRIP 6" MIN, PROOF ROLL,
AND COMPACT)
NOT TO SCALE
TYPICAL SECTION: GRADING ALONG SECURITY GATE
BASE COURSE
(9" DEPTH)
SELECT FILL
SURFACE COURSE
(4" DEPTH)
EXISTING GRADE
(STRIP 6" MIN, PROOF ROLL,
AND COMPACT)
BASE COURSE
(6" DEPTH)
MIRAFI RS380i
GEOTEXTILE FABRIC
FINISHED GRADE
NOT TO SCALE
TYPICAL SECTION: PIPE BEDDING
SECURITY
FENCE
5.00'
CL
BEDDING MATERIAL
BASE COURSE
COMPACTED TO 100%
FINISHED GRADE
-
B
MIRAFI RS380i
GEOTEXTILE FABRIC
CONTECH C80NW
GEOTEXTILE FABRIC
RIPRAP
(12" DEPTH)
0.50%
4:1
NOT TO SCALE
EMERGENCY SPILLWAY DETAILS
SECTION B
SECTION A
PLAN
EMERGENCY SPILLWAY WEIR CALCULATIONS:
Q = 3.33Lh3/2+1.84Sh5/2 (TRAPEZOIDAL WEIR)
Q = FLOW CAPACITY (CFS)
L = WEIR BOTTOM LENGTH (FT)
h = WEIR HEIGHT (FT)
S = SLOPE (X:1)
L = 40 FT
h = 0.2 FT
S = 179.45 (AVERAGE OF 303.03 AND 55.87)
Q = 17.82 CFS > 13.49 CFS (AREA 2 Q, SEE AGV-C-CG7-009)
h = 0.2'
0.33%
(303.03:1)
1.79%
(55.87:1)
L = 40.00'
FG 882.75'
FG 885.51'
FG 885.41'
BASE COURSE
(9" DEPTH)
MIRAFI RS380i
GEOTEXTILE FABRIC
BASE COURSE
(9" DEPTH)
1.50'
1.50'
NOT TO SCALE
TYPICAL SECTION: GEOTEXTILE ANCHORING
BASE COURSE
(6" DEPTH)
SURFACE COURSE
(4" DEPTH)
SELECT FILL
RIPRAP
(12" DEPTH)
CONTECH C80NW
GEOTEXTILE FABRIC
EG
FINISHED GRADE
FINISHED
GRADE
EXISTING GRADE
(STRIP 6" MIN, PROOF ROLL,
AND COMPACT)
NOT TO SCALE
TYPICAL SECTION: DITCH GRADING
4:1
4:1
3.00'
RIPRAP
(12" DEPTH)
CONTECH C80NW
GEOTEXTILE FABRIC
EXISTING GRADE
BASIN BOTTOM
1.00'
1.00'
1.00'
VARIES
RIPRAP (12" DEPTH)
D50=5"
CONTECH C80NW
GEOTEXTILE FABRIC
MIRAFI RS380i
GEOTEXTILE FABRIC
TYPICAL SECTION: CULVERT ENDS
NOT TO SCALE
TOE OF SLOPE
SECTION
PLAN
RIPRAP (12" DEPTH)
D50=5"
RIPRAP (12" DEPTH)
D50=5"
PIPE END SECTION
CULVERT
PIPES
PIPE END SECTION
12.00'
DITCH BOTTOM
INV (SEE PLANS)
CULVERT
PIPES
YL
B
6/17/22
NM
IFP
FINISHED GRADE

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
G
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
885
881
882
883
884
886
885
884
886
885
885
885
884
884
885
886
LEGEND:
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-008.dwg
D
AGV-C-CG7-008
-
139547
PRE-DEVELOPMENT
DRAINAGE PLAN
SITE WORK
FUTURE AGAVE SUBSTATION
ISSUED FOR
PERMITTING
NORTH
EXISTING EASEMENT LINE
EXISTING CHAIN LINK FENCE
EXISTING OVERHEAD ELECTRIC
PROPOSED LIMITS OF GRADING
X
X
OH
OH
EXISTING EDGE OF DIRT ROAD
EXISTING BURIED GAS LINE
G
G
EXISTING BURIED COMM LINE
COMM
EXISTING CONTOUR
###
MAX. FLOW LENGTH = 0.202 MI
AVERAGE SLOPE = 0.61%
AREA = 7.24 AC
RUNOFF COEFFICIENT = 0.50
PEAK DISCHARGE CALCULATION:
Kb = m log10 A + b
m = -0.01375 (DESERT RANGELAND)
b = 0.08 (DESERT RANGELAND)
A = 7.240 ACRES
Kb = 0.06818
Tc = 11.4L0.5Kb
0.52S-0.31i-0.38 (PAPADAKIS AND KAZAN)
Tc = TIME OF CONCENTRATION, IN HOURS.
L = LENGTH OF THE LONGEST FLOW PATH, IN MILES.
Kb = WATERSHED RESISTANCE COEFFICIENT.
S = WATERCOURSE SLOPE, IN FEET/MILE.
i = RAINFALL INTENSITY, IN INCHES/HOUR.
L = 0.202 MILES
Kb = 0.06818
S = 0.61%
i = 5.566 INCHES/HOUR
Tc = 0.26 HOURS
Q = CiA (RATIONAL EQUATION)
Q = THE PEAK DISCHARGE, IN CFS, FROM A GIVEN AREA.
C = A COEFFICIENT RELATING THE RUNOFF TO RAINFALL.
i = AVERAGE INTENSITY, IN INCHES/HOUR, LASTING FOR A Tc.
C = 0.50 (DESERT LANDSCAPING 2, 100 YEAR MAX)
i = 5.566 INCHES/HOUR
A = 7.240 ACRES
Q = 20.150 CFS
YL
A
3/31/22
NM
30% IFR
0
SCALE IN FEET
40'
20'
80'
YL
B
4/11/22
NM
ISSUED FOR BID
YL
C
6/03/22
NM
90% IFR
YL
D
6/17/22
NM
IFP

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
O
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
885
881
882
883
884
886
885
884
886
885
885
885
884
884
885
886
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
885
883 884
886
886
886
886
886
887
887
887
885
886
887
886
885
884
885
884
886
AREA 1
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-009.dwg
D
AGV-C-CG7-009
-
139547
POST-DEVELOPMENT
DRAINAGE PLAN
SITE WORK
FUTURE AGAVE SUBSTATION
ISSUED FOR
PERMITTING
NORTH
EXISTING EASEMENT LINE
EXISTING CHAIN LINK FENCE
EXISTING OVERHEAD ELECTRIC
PROPOSED LIMITS OF GRADING
X
X
OH
OH
EXISTING EDGE OF DIRT ROAD
PROPOSED SECURITY FENCE
X
X
EXISTING BURIED GAS LINE
G
G
EXISTING BURIED COMM LINE
COMM
PROPOSED CONTOUR
###
PROPOSED SURFACE COURSE (4" DEPTH)
PROPOSED BASE COURSE (9" DEPTH)
PROPOSED RIPRAP (12" DEPTH)
EXISTING CONTOUR
###
MAX. FLOW LENGTH = 0.209 MI
AVERAGE SLOPE = 0.59%
AREA 1 = 4.740 AC
RUNOFF COEFFICIENT = 0.50
PEAK DISCHARGE CALCULATIONS:
Kb = m log10 A + b
Tc = 11.4L0.5Kb
0.52S-0.31i-0.38 (PAPADAKIS AND KAZAN)
Tc = TIME OF CONCENTRATION, IN HOURS.
L = LENGTH OF THE LONGEST FLOW PATH, IN MILES.
Kb = WATERSHED RESISTANCE COEFFICIENT.
S = WATERCOURSE SLOPE, IN FEET/FEET.
i = RAINFALL INTENSITY, IN INCHES/HOUR.
Q = CiA (RATIONAL EQUATION)
Q = THE PEAK DISCHARGE, IN CFS, FROM A GIVEN AREA.
C = A COEFFICIENT RELATING THE RUNOFF TO RAINFALL.
i = AVERAGE INTENSITY, IN INCHES/HOUR, LASTING FOR A Tc.
*RUNOFF COEFFICENT SUMMARY FOR AREA 2:
m
-0.01375 (DESERT RANGELAND)
b
0.08 (DESERT RANGELAND)
A
4.740 ACRES
Kb
0.07071
Area 2
-0.00625 (INDUSTRIAL AREAS)
0.04 (INDUSTRIAL AREAS)
2.45 ACRES
0.03757
AREA 1
0.209 MILES
L
0.07071
Kb
0.59%
S
5.423 INCH/HOUR
i
0.237 HOURS
Tc
AREA 1
0.060 MILES
0.03757
1.49%
6.400 INCH/HOUR
0.167 HOURS
Area 1
C
0.50 (DL2, 100-YR MAX)
i
5.423 INCHES/HOUR
A
4.740 ACRES
Q
12.852 CFS
Area 2
0.86*
6.400 INCHES/HOUR
2.45 ACRES
13.485 CFS
AREA (ACRES)
1
1.30
2
0.40
C
0.95
0.88
DESCRIPTION
INDUSTRIAL 2, 100 YEAR MAX
GRAVEL ROADWAYS, 100 YEAR MAX
AREA 2 = 2.450 AC
RUNOFF COEFFICIENT = 0.86
MAX. FLOW LENGTH = 0.060 MI
AVERAGE SLOPE = 1.49%
RETENTION
BASIN
0
SCALE IN FEET
40'
20'
80'
YL
A
3/31/22
NM
30% IFR
YL
B
4/11/22
NM
ISSUED FOR BID
LEGEND:
YL
C
6/03/22
NM
90% IFR
3
0.75
0.50
RETENTION BASIN
PROPOSED BASE COURSE (4" DEPTH)
YL
D
6/17/22
NM
IFP
PROPOSED RIPRAP (6" DEPTH)

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
COMM
COMM
COMM
COMM
COMM
COMM
COMM
OH
OH
OH
OH
OH
OH
OH
OH
OH
H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
885
883
884
886
886
887
887
888
888
889
889
885
884
886
887
887
888
888
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
ST
ST
885
885
885
884
884
885
886
T
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
885
883884
886
886
886
886
886
887
887
887
885
886
887
886
887
887
888
888
886
885
884
885 884
886
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CG7-010.dwg
B
AGV-C-CG7-010
-
139547
EROSION AND SEDIMENT CONTROL PLAN
SITE WORK
FUTURE AGAVE SUBSTATION
LEGEND:
1.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH
PROJECT SPECIFICATIONS AND ALL NOTES ON DRAWING
AGV-C-CA7-002.
NOTES:
TEMPORARY  SEDIMENT LOG
ISSUED FOR
PERMITTING
NORTH
EXISTING EASEMENT LINE
EXISTING CHAIN LINK FENCE
EXISTING OVERHEAD ELECTRIC
PROPOSED LIMITS OF GRADING
X
X
OH
OH
EXISTING EDGE OF DIRT ROAD
PROPOSED SECURITY FENCE
X
X
EXISTING BURIED COMM LINE
COMM
PROPOSED CONTOUR
PROPOSED GRADE BREAK
###
PROPOSED SURFACE COURSE (4" DEPTH)
PROPOSED BASE COURSE (9" DEPTH)
PROPOSED RIPRAP (12" DEPTH)
EXISTING CONTOUR
###
EXISTING SECTION LINE
0
SCALE IN FEET
50'
100'
YL
A
6/03/22
NM
90% IFR
FLOW
6" EXCELSIOR SEDIMENT LOG
6" EXCELSIOR SEDIMENT LOG
1" X 1" WOOD STAKES (TYP)
2" - 3"
24" MIN
12" MIN
1" X 1" WOOD STAKES
SLOPE
PLAN VIEW
SECTION A-A
ELEVATION VIEW
NOTES:
1.  DRIVE STAKES AT EACH END AT 4' SPACING UNTIL FIBER LOG IS SECURE TO
SLOPE. DO NOT CRUSH FIBER LOG WHILE STAKING.
2.  USE DRAINAGE DITCH INSTALLATION ONLY IN LOW FLOOD CONDITIONS.
10 MIL. PLASTIC LINING
10' MIN.
10' MIN.
3'
LATH & FLAGGING
ON ALL SIDES
SANDBAG
(TYP.)
NOT TO SCALE
TEMPORARY CONCRETE WASHOUT DETAILS
PLAN
SECTION
1.
EXCESS CONCRETE SHALL NOT BE DISPOSED OF ON SITE.
ALL EXCESS CONCRETE SHALL BE TRANSPORTED OFF-SITE
AND DISPOSED OF PROPERLY.
2.
IT IS PROHIBITED TO WASHOUT THE MIXING DRUM OF
CONCRETE TRUCKS ON-SITE.
NOTES:
NOT TO SCALE
TEMPORARY SEDIMENT LOG DETAILS
TEMPORARY
SEDIMENT LOG
EAST-WEST
BASELINE
NORTH-SOUTH
BASELINE
RETENTION
BASIN
TEMPORARY
SEDIMENT LOG
TEMPORARY
SEDIMENT LOG
EXISTING ROAD
10 MIL. PLASTIC
LINING
SANDBAG
EXISTING EDGE OF ASPHALT ROAD
PROPOSED BASE COURSE (9" DEPTH)
TEMPORARY
CONCRETE
WASHOUT
YL
B
6/17/22
NM
IFP
PROPOSED RIPRAP (6" DEPTH)

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
LEGEND:
REV
DATE
DESCRIPTION
BY
date
detailed
checked
designed
project
contract
rev.
drawing
file
CKD
COPYRIGHT © 
BURNS & McDONNELL ENGINEERING COMPANY, INC.
2022
9400 WARD PARKWAY
KANSAS CITY, MO 64114
816-333-9400
Y. LI
N. MILLER
N. MILLER
6/17/2022
AGV-C-CF7-001.dwg
B
AGV-C-CF7-001
-
139547
FENCE PLAN
SITE WORK
FUTURE AGAVE SUBSTATION
ISSUED FOR
PERMITTING
NORTH
EXISTING EASEMENT LINE
EXISTING CHAIN LINK FENCE
PROPOSED LIMITS OF GRADING
X
X
PROPOSED SECURITY FENCE
X
X
EXISTING BURIED COMM LINE
COMM
NOTES:
1.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH
PROJECT SPECIFICATIONS AND ALL NOTES ON DRAWING
AGV-C-CA7-001.
2.
REFER TO DRAWING CF1 AND CF2 FOR SECURITY FENCE AND
GATE DETAILS.
3.
PROPOSED SUBSTATION SECURITY FENCE MEETS IND-2 IUPD
STANDARDS.
N 850610.93
E 416168.46
YL
A
6/03/22
NM
90% IFR
N 850608.71
E 416448.45
N 850480.93
E 416167.43
N 850460.93
E 416167.27
N 850425.94
E 416166.99
N 850423.91
E 416421.99
N 850423.76
E 416441.99
N 850423.72
E 416446.99
END PROP. CHAIN LINK FENCE
N 850282.49
E 416453.38
BEGIN EXIST. FENCE DEMO
BEGIN PROP. CHAIN LINK FENCE
TIE-IN TO EXIST. FENCE
N 850288.89
E 416453.43
BEGIN PROP. CHAIN LINK FENCE
N 850258.49
E 416453.13
END EXIST. FENCE DEMO
END PROP. CHAIN LINK FENCE
TIE-IN TO EXIST. FENCE
N 850253.22
E 416453.12
SECURITY GATE
SECURITY GATE
24' DOUBLE SWING GATE
(MATCH ADJACENT
FENCE MATERIAL)
EAST-WEST
BASELINE
NORTH-SOUTH
BASELINE
EXISTING SECTION LINE
YL
B
6/17/22
NM
IFP
280.00'
185.00'

Arizona Public Service Company 
Rezoning Application Narrative Report 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Vicinity Map 
 
Project Name: Agave Solar 
General Location: Approximately 6,400 feet south of the southwest corner of West Elliot Road 
and South 363rd Avenue, west, southwest and south of the Redhawk Power Station (Case Z99-
111) 
Case No.: Z2021160 
Date Submitted: December 3, 2021 
1st Resubmittal: April 14, 2022 
2nd Resubmittal: June 1, 2022 
3rd Resubmittal: June 17, 2022 
 
 
   A.  Title Page

Page 2 of 10 
 
B. Purpose of Request 
 
The purpose of this request is to change the existing zoning designation of the approximately 
1,423-acre property generally located ½ mile south of Elliot Road along the 363rd Avenue 
alignment and then north and south of the Union Pacific railroad, otherwise known as Maricopa 
County Assessor’s Office Parcel Numbers (“APNs”) 401-44-019C, 401-44-020, 401-44-022, 401-
44-008, 401-44-023B, 401-44-006B, 401-44-002, 401-44-011, 401-44-010, 401-44-021, 401-44-
009, and a portion of 401-44-007C (collectively, the “Site”), from its current designation of (i) 
“Rural-190—190,000 Square Feet Per Dwelling Unit” (“Rural-190”) (Ordinance Section 501) and 
“Special Use Permit” (“SUP”) (Ordinance Section 1301) and (ii) Rural-190 to “IND-2—Light 
Industrial” (“IND-2”) (Ordinance Section 902) and “IUPD—Industrial Plan of Development” 
(“IUPD”) (Ordinance Section 1004). 
 
This rezoning request (and concurrent Plan of Development application) seeks to develop 46 
“blocks” of solar panel arrays over approximately 1066 acres to provide an estimated 195 MW of 
clean energy for Arizona Public Service (“APS”) customers. As depicted on the provided site plan, 
future development of the Site may also include a substation outside of the project boundary for 
the solar facility, but within the boundary of this rezoning request. 
 
C. Description of Proposal 
 
On May 17, 2000, the Maricopa County Board of Supervisors approved Major Comprehensive 
Plan amendment request (Case No. CPA1999003) to amend the Tonopah/Arlington Area Plan 
Land Use Category of the Site from “Rural” to “Industrial” on an approximately 460 acre portion 
of the Site, and “Rural” to “Open Space” for the remainder of the Site (approximately 1,388 acres). 
The purpose of this request was to permit the subsequent rezoning for the development of the now 
existing 1,060 MW natural gas fueled Redhawk Power Plant (Case Z99-111). 
 
At the time of its development, it was anticipated that the Redhawk Power Plant would be 
comprised of four (4) natural gas fueled combined cycle units, each of which would generate 530 
MW. All four (4) units were scheduled to be operational by the second quarter of 2007 and were 
proposed to generate a combined total of 2,120 MW. Given the proposed generating capacity of 
the Redhawk Power Plant, it was anticipated that the maximum water demand would be 
approximately 13,300 acre-feet per year. More specifically, it was estimated that approximately 
90 to 95 percent of the water demand for the Redhawk Power Plant would be met by treated 
effluent purchased from the nearby Palo Verde Nuclear Generating Station. Groundwater was 
intended to serve as a supplementary resource only when needed to meet demand when delivery 
rates and/or supply of treated effluent were insufficient.  
 
However, as a result of three major factors, the Redhawk Power Plant has not developed as 
extensively as originally proposed in 1999.  
 
First, from approximately 1999 to 2004, construction and operation of several merchant combined 
cycle generation facilities commenced. The region became a competitive hot spot for electric 
generation intended to serve the wholesale market in California. The demand for wholesale power 
in California did not fully materialize as expected, however, due to shifting demands of California

Page 3 of 10 
 
utilities for energy produced by solar and other renewable sources; this demand shift increased the 
availability of merchant power to other areas and users. The resulting influx of available merchant 
power lessened the near- and short-term needs for combined cycle generation at the Redhawk 
Power Plant.  
 
Second, production advancements and cost reductions in solar voltaic technology over the last 
twenty plus years spurred greater individual consumer and commercial large-scale participation in 
electric generation from solar generation facilities. Because electricity generation from solar 
voltaic technology is dynamic and variable depending on cloud and solar conditions and the time 
of day, APS must be able to respond quickly to changing conditions. To reliably meet continued 
electric demands, APS planned for more flexible and rapidly deployable generation methods such 
as combustion turbine units. Combustion turbine units, like those installed at APS’ Ocotillo Power 
Plant, can start up and begin delivering electricity to customers in less than six (6) minutes and be 
fully operational in ten (10) minutes compared to six (6) hours for the combined cycle generation 
at the Redhawk Power Plant.  
 
Lastly, APS has witnessed an overall increase in consumer desire for cleaner energy. While 
combined cycle generation is more efficient than combustion turbine generation in a side-by-side 
comparison, combustion turbine generation is more agile and more responsive, which allows for a 
greater accommodation of renewable sources and offers a combined overall cleaner energy 
product. 
 
Therefore, this request seeks to (i) amend by removal from the Z99-111 rezoning and Special Use 
Permit approval limited to those portions of the Redhawk Power Plant that are now proposed for 
development under this application (as generally shown on Exhibit A) to match the boundary 
provided for in the 2019 Major Comprehensive Plan Amendment (Case CPA2019005) and (ii) 
approval of a rezoning to IND-2 with IUPD for the proposed solar voltaic utility scale power plant 
for the Site as conceptually shown on the provided site plan. As depicted on the provided site plan, 
future development of the Site may also include a substation outside of the project boundary for 
the solar facility, but within the boundary of this rezoning request.  
 
The existing Redhawk Power Plant approvals were done in 1999, case Z99-111 (currently under 
minor amendment Z2022071). This application seeks to remove the Site from the prior approval, 
inclusive of all of the prior stipulations, and replace them with this new project and its project 
specific conditions. In other words, the Z99-111 boundary will be reduced to 460 acres to retain 
the existing gas-powered facility; this request is for a 1,388-acre solar facility and its unique 
operating needs, hence the appropriateness of new project specific conditions of approval.   
 
As to the operational characteristics of the facility, solar power plants are excellent transitional 
land uses, particularly in close proximity to a traditional power generation facility. Except during 
construction, there will be minimal traffic to/from the Site after development with a Solar Facility. 
Employees are few, with the occasional field visit by staff for testing, maintenance, and operational 
needs. While the facility is operated 24/7, there are no noise, odor or other off-site impacts by its 
operation. In addition, the facility will be secure, with a perimeter chain link fence providing access 
control. With other directly adjacent solar facilities to the east, the neatly installed solar arrays will

Page 4 of 10 
 
be visually consistent with its neighbors, with clean, organized blocks of solar panels and 
supporting infrastructure linked via internal access roads.  
 
With this limited activity, the project seeks to customize a few development standards from base 
IND-2 standards as follows: 
 
 
 
1. Front Yard Regulations per Article 902.4.b. The Site is bifurcated by several public 
roadways, including Southern Pacific Trail, that provide access to the Site. The proposed 
front yard setback will vary throughout the project, as depicted on the provided site plan. 
However, because of this condition, additional flexibility with respect to the proposed 
placement of the solar panels is required to facilitate the development of the project. 
Therefore, this application requests modification of this standard to allow for a minimum 
0-foot front yard setback.  
 
2. Lot Coverage per Article 902.5.3. Zoning Ordinance Section 201 defines “Lot 
Coverage” as “[t]he percentage of the area of a lot which is occupied by all buildings. …” 
Solar panels are not intended to be structures, however, could be identified as such. In order 
to remain consistent in determining the lot coverage for the solar panels, the design team 
utilized a similar method for determining the impervious area of the Site for the hydrology 
calculations. In this regard, the Maricopa County Flood Control District considers the area 
between the solar arrays as open space. Therefore, the lot coverage calculation for the solar

Page 5 of 10 
 
panels is approximately 30 percent. This application requests that, for the purposes of 
calculating lot coverage, solar panels be allowed to be calculated consistent with the 
Maricopa County Flood Control method described above. For any structures (excludes 
solar panels), the maximum lot coverage standard defers to the IND-2 zoning district.  
 
3. Parking Area Design Standards per Article 1102.7. This project will have minimal traffic 
and any parking will be on occasion on a gravel surface located near the operations and 
maintenance building. Pavement is not necessary because there will not be daily trips to 
the site, nor any guest traffic. The lighting and screening requirements are not best applied 
to this project due to the very few vehicles that would be parked onsite, and that overnight 
parking is very unlikely. The application requests modification of this standard to allow for 
the use of decompose granite surface for any identified parking space(s) and waiver of 
screening, lighting and striping requirements.  
 
4. Screening per Article 902.9.3. This project is located near other solar facilities and is not 
adjacent to residences or other land uses that would require screening of views to/from the 
property. In addition, solar facilities such as this are visually uniform and can result in an 
interesting view when seen from roadways. Because of the surrounding compatible land 
uses as well as the other solar facilities in the area not providing solid masonry walls, this 
application seeks to waive these generally applicable perimeter standards.  
 
It is important to note that this area is dedicated to electric power production, with traditional and 
renewable facilities being the dominate current and future land uses in the area. There are no 
nearby residential subdivisions nor known plans for any; the closest non-power-oriented land uses 
are farming operations to the west and localized zoning is RU-190 (see Exhibit 2). The nearest 
homes are several miles to the east. Therefore, the use of opaque screening is not necessary for 
this development. Additionally, the requested parking lot design modifications are appropriate as 
this use will see little vehicular traffic and minimal parking use.   
 
In summary, approval of this request would facilitate the development of the Site as a utility scale 
solar voltaic power plant (the “Solar Facility”) for APS adjacent to its existing natural gas fueled 
Redhawk Power Plant. Development of the Solar Facility is anticipated to establish a transitional 
land use (solar voltaic power plant) that will act as a buffer between vacant properties to the east, 
west and south and the existing Redhawk Power Plant. Solar plants generally are visually attractive 
(installed in a uniform and organized manner), are of minimal height (protecting larger vistas) and 
make good neighboring land uses (as they are quiet, have few employees and generate no odors or 
other nuisance impacts). 
 
D. Relationship to Surrounding Properties 
 
The larger surrounding area is focused on electrical power production, anchored by the Palo Verde 
Nuclear Generating Station (a 4,000-acre facility). There are other gas-powered facilities near the 
Site as well as other large utility scale solar voltaic power generation plants. The Maricopa County 
Comprehensive Plan, Vision 2030, and the Old U.S. Highway 80 Area Plan reflect these existing 
uses, identifying most of the area north of the Union Pacific railroad between 363rd and 387th 
Avenues north past Baseline Road as “Industrial” (a designation which historically has been

Page 6 of 10 
 
utilized for legacy utility scale electrical generation facilities). Some of the neighboring power 
facilities utilize natural gas, requiring large storage tanks, tall equipment, and cooling towers, all 
of which create an industrial landscape and vistas, which are also already impacted by significant 
power line corridors that service the area. Unlike gas or nuclear fueled facilities, solar power 
generation operations are of a much lower profile and, due to their low external impacts (i.e. no 
noise, minimal traffic and lack of large features), make excellent buffers between more impactful 
largescale power generation uses and areas of rural character (such as those offering crop 
production or large lot single-family residences).  
 
Approval of this requested rezoning will authorize development of the Site with a utility scale solar 
power generation  facility that will act as a buffer around the “traditional” power facilities, 
compliment the existing solar facilities to the immediate east and act as a transition to those areas 
identified for a more residential and/or rural character, as contemplated by the long range plans 
discussed above, especially CPA2019005, which was recently passed to support this subsequent 
rezoning effort for this specific type of utility scale solar facility.  
 
E. Location and Accessibility 
 
As noted prior, the Site is generally located ½ mile south of Elliot Road along the 363rd Avenue 
alignment and then north and south of the Union Pacific railroad. The Site is accessed from 
Southern Pacific Trail, an unimproved, but County-maintained road, via South 355th Avenue. 
South 355th Avenue is served by Elliot Road, which connects to Wintersburg Road and, ultimately, 
Interstate 10. Access for construction is excellent, with County-maintained roads providing 
primary Site access. Long term access will also be supported by these existing roadway networks. 
The project, once constructed, is not anticipated to generate any abnormal volumes of traffic or 
otherwise create problematic conditions on abutting roadways.  
 
As to direct site access, the Southern Pacific Trail, located south of the railroad tracks, will provide 
access to the site as follows. The portion of the project south of the railroad tracks will be accessed 
at two locations; one west of the powerline corridor (See Sheet C202) and one east of the powerline 
corridor (See Sheet C204). As for the northern part of the project north of the railroad, access is 
over an existing crossing (see the northwest portion of APN 401-44-019C for location) that will 
allow for installation of the roadway to access the site over APN 401-44-007C, which is owned by 
APS. 
 
F. Circulation System 
 
The future use of the Site requires negligible public improvements. Roads already exist to the Site. 
No roadway improvements or dedications are proposed as a part of this application and none have 
been identified as required by the County to date.  
 
Internal circulation is provided by 16-foot-wide access roads that are of a gravel surface. These 
roads provide primary access to the photovoltaic arrays and include “hammerhead” style “ends” 
for turn around purposes. These roads will be utilized by service vehicles to access the solar panel 
fields and will provide all weather access for emergency vehicles.

Page 7 of 10 
 
G. Development Schedule 
 
The development of the Site will be all at once, no staging is proposed.  
 
H. Community Facilities and Services 
 
Because of the low employee count upon commencement of operation, use of the Site as a Solar 
Facility is not anticipated to have a noticeable impact on existing community facilities and services 
such as the Arlington School District.  
 
I. Public Utilities  
 
Water: Private Well 
Wastewater: Private Septic 
Fire Protection: Arizona Fire and Medical Authority 
Police: Maricopa County Sheriff’s Office 
Electric: APS 
Telephone: Century Link 
Refuse Provider: Allied Waste 
 
J.  Other Pertinent Information 
 
None.

Page 8 of 10 
 
Exhibit A – Approximate Rezoning Boundary Exhibit 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Proposed Solar Facility 
Boundary as Per Case CPA2019005 
 
Portion of Existing 
Redhawk Facility 
Case Z99-111 
NOT A PART

Page 9 of 10 
 
Exhibit B – Surrounding Zoning Exhibit

Page 10 of 10 
 
Exhibit C – Surrounding Ownership and APN Exhibit

Bob Fedorka, PE 
Planning & Development 
301 W. Jefferson St.., Suite 170 
Phoenix, Arizona 85003 
Phone: (602) 506-7151 
www.maricopa.gov/planning 
email address: 
Bob.Fedorka@maricopa.gov 
  
Maricopa County 
Planning & Development Department 
 
 
 
Date:    
May 4, 2022 
 
Memo To: Darren Gerard, AICP, Planning Manager, Department of Planning & 
Development 
 
Attn: 
Raymond Banker, Sr. Planner, Planning & Development Services 
 
cc: 
Michael Norris P.E., Engineering Manager, Planning and Development 
 
From: 
Bob Fedorka, PE, Engineering Supervisor, Planning & Development 
 
Subject:   
Z2021160 – Re-Zone for Agave (fka Red Hawk) Solar 
APN(s): 
401-44-007C (+ Several Others) 
Engineering Review has reviewed the second plan and report routed for review on 
4/14//2021, for the subject application and has no objections subject to the conditions 
noted below. 
 
DRAINAGE PLAN REVIEW  
 
1. OFFSITE HYDROLOGY 
 
a. Sheets C303 & 504 – Bypass Swale 2 is shown to directly discharge into 
the perimeter channel located offsite (APN 401-44-001 – AVSE). Written 
permission from the owner is required for this offsite work. An inflow chute 
will be required at this discharge. See conditions below. 
 
b. Sheet C504 - The location of the gen-tie poles in the vicinity of the Bypass 
Swale 2 discharge must be added to the plans. 
 
c. Sheet C304 Provide detail(s) for what appears to be a spreader basin at 
the end of Bypass Swale 3. Note – spreader basins must drain within 36 
hours. Drywells (Maxwell-Plus type) may be required. Provide detail/profile 
for this basin. 
 
2. ONSITE HYDROLOGY 
 
a. Sheets C301 – C308 – Indicate the overflow location of each perimeter 
retention basin (where overflow exits the site). 
 
b. Sheets C301 – C308 – Extend perimeter swales to collect not only solar 
fields, but open areas within the site, including interior access drives. 
(Swales 2.1, 6.1, north of Basin 17.1 
 
c. Sheet C302 – Remove annotation for Swale 2.1 south of Basin 2.2.

Page 2 of 5 
 
 
 
d. Sheet C302 – Provide detail(s) for what appears to be a spreader basin at 
the end of Bypass Swale 1. Note – spreader basins must drain within 36 
hours. Drywells (Maxwell-Plus type) may be required. Provide detail/profile 
for this basin. 
 
e. Sheet C308 – Re-Label “Pond 15.1” to “Swale 15.1” east of Solar Field 
(SF) 32. 
 
f. Sheet C308 – Indicate the overflow elevation of the existing sump area 
south of Basin 22.1. The effective volume of Basin 22.1 must be measured 
from the overflow elevation of the downstream sump. 
 
g. Sheet C309 – The western portion of SF 31 appears to flow offsite, 
bypassing any retention. 
 
h. Sheets C500 – C516 – Several basins collect flow from engineered 
channels. Stabilization of the channel inflow locations is required. Provide 
typical details/cross sections of the inflow chutes. The details must include 
cut-off protection at the upstream end of the chutes. 
 
i. 
Sheets C500 – C516 – Basins slopes that are subject to overland/sheet 
flow must be stabilized. Provide details/typical sections. 
 
j. 
Sheet C515 – Show extension of swales 20.2-A&B into Basin 20.2. 
 
3. ONSITE RETENTION 
 
a. Typical – All Basins with Bleed-Offs – Add the requirement for orifices on 
the basin bleed-off pipes. Add orifice size requirements Basin table(s). Add 
bleed-off pipes to basin cross sections for basins in series. 
 
b. Typical – All Basins - Add the requirement to stabilize basin overflow 
spillways. Provide a typical spillway detail (east/west and north/south) – 
See Comment 5.c below. 
 
4. RETENTION DISPOSAL 
 
a. Cover Sheet - Add a note to the plan indicating that retention basins must 
drain within 36 hours. See conditions below. 
 
b. Drainage Report – Appendix G – Basin drain down via bleed-offs must be 
between 24-36 hours. The Modified Puls method (starting with the basin 
full and no inflow) must be used. 
 
c. Provide profiles of basin bleed-off pipes to ensure positive outflow. Indicate 
proposed grading at downstream ends as required (ref. Sheet C510 for 
Basin 14.4). Bleed-off pipes should be nominally sloped. Bleed-offs for 
basins in series should be lowered to the basin bottom. See comments 4.e-
i and k-m below. 
 
d. For basin using a water quality device, the invert of the basin outlet must 
be at the basin bottom. See comments 4.e-i and k-m below.

Page 3 of 5 
 
 
 
 
e. Sheet C505 – Basin 12 series – Provide drywells to drain the first flush 
volume of runoff (or lower outflow inverts to the bottom of basin elevation). 
Note basin data is placed in the As-Built table. 
 
f. Sheet C507 – Basin 13 series - Provide drywells to drain the first flush 
volume of runoff (or lower outflow inverts to the bottom of basin elevation). 
The bleed off from Basin 13.4 must be nominally sloped given its length. 
 
g. Sheet C509 – Basin 14 series - Provide drywells to drain the first flush 
volume of runoff (or lower outflow inverts to the bottom of basin elevation).  
 
h. Sheet C510 – Add proposed contours at west side of Basin 14.4.Lower the 
bleed-off elevation to the basin bottom or provide drywells to drain the first 
flush volume (and remove the storm water quality device). 
 
i. 
Sheet C511 – Basin 15.1 - Lower the bleed-off elevation to the basin 
bottom or provide drywells to drain the first flush volume (and remove the 
storm water quality device). 
 
j. 
Sheet C512 – Basin 16.1 - Lower the bleed-off elevation to the basin 
bottom or provide drywells to drain the first flush volume (and remove the 
storm water quality device). 
 
k. Sheet C513 – Basin 18.2 Show drywells to drain the 100 yr., 2hr. volume. 
 
l. 
Sheet C514 – Basin 19.3 - Lower the bleed-off elevation to the basin 
bottom or provide drywells to drain the first flush volume (and remove the 
storm water quality device). 
 
m. Sheet C515 – Basin 20.2 - Lower the bleed-off elevation to the basin 
bottom or provide drywells to drain the first flush volume (and remove the 
storm water quality device). 
 
n. Sheet C516 – Basins 21.1 & 22.1 - Lower the bleed-off elevation to the 
basin bottom or provide drywells to drain the first flush volume (and 
remove the storm water quality device). 
 
o. Construction of basin bleed-off and spillways to and within the AVSE 
channel south of the site will require written permission from the adjacent 
owner. This applies to Basins 6.1, 9.1, 10.1 11.1, 14.1-14.3 and 16.1. See 
conditions below. 
 
5. CROSS SECTIONS 
 
a. Sheet C306 – Provide a typical section of the berm configuration in the area 
west of SF 35. 
 
b. Sheet C517 – Add conduit outlet protection at downstream end of the triple 
30” culverts.

Page 4 of 5 
 
 
 
c. Sheet C601 – Add storm water quality device to typical basin profile. Add 
orifice plate requirement (table form OK) and add requirement for minimum 
8’ wide berm top width. 
 
d. Sheet 601 – Add trash rack requirement/detail to Orifice Plate Detail. Trash 
rack bar spacing must be less than the calculated orifice diameter. 
 
e. Provide a typical section for the rip rap armored berms north of SFs 1, 2, 7 
and un-numbered SF north of SF35. 
 
f. Table H1 in the Drainage Report indicates rip rap stabilization requirements 
for basin inflow chutes. This information must be added to the plans. 
 
6. FINISHED FLOORS (PADS) 
 
a. This item does not apply 
  
7. TOPOGRAPHY 
 
a. Sheets C500-C515 – Annotate existing and proposed contour lines. 
 
8. FLOODPLAINS 
 
a. The site contains regulatory floodplains (FEMA Zone A – BFE not 
determined). See comments below. 
  
9. EROSION SETBACKS 
 
a. This item does not apply to this application. 
 
FLOOD CONTROL DISTRICT REVIEW 
 
1. Cover Sheet - Add a note requiring that any electrical equipment, including 
inverters within the floodplain must be elevated to be at or above the regulatory 
flood elevation; or otherwise floodproofed. 
 
2. Detail Sheets  – Add a Tracker Rack and Foundation Detail to indicate the 
location of a typical panel electrical connection location (near the top of the 
bearing column) and a graphic showing it to be 2 feet above the base flood 
elevation (BFE)  (Zone A). 
 
3. Work with the floodplains will require a floodplain use permit issued concurrent 
with the building permits. If the project is determined to be building permit 
exempt, Floodplain Use permitting shall be processed by the Flood Control 
District of Maricopa County. See conditions below.

Page 5 of 5 
 
 
 
PND TRANSPORTATION PLAN REVIEW 
 
1. R/W dedication and preservation may be required as a condition of the zone 
change. R/W dedication must occur prior to issuance of building permits or 
within 6 months of Board approval, whichever occurs first. The required 
dedications and preservations must be depicted on the site plan. 
 
R/W dedication and/or preservation requirements will be provided separately. 
NONE REQUIRED. 
 
STORM WATER QUALITY REVIEW/INFORMATION 
 
1. The subject site is not located within the County’s Urbanized Area. A Storm 
Water Pollution Prevention Permit (SWPPP) from the County will not be 
required. This does NOT preclude the requirement to obtain a Notice of Intent 
to Discharge (NOID) from the State (ADEQ), as may be required. 
 
The following conditions will apply: 
 
1. Work with the floodplains will require a floodplain use permit issued concurrent 
with the building permits. If the project is determined to be building permit 
exempt, Floodplain Use permitting shall be processed by the Flood Control 
District of Maricopa County. 
 
2. Prior to the start of work, the owner/applicant must obtain written permission 
from the owner of adjoining parcel(s) on which work is proposed, including, but 
not limited to, construction of bypass swale 2; and basin bleed-offs and 
spillways to and within the AVSE channel south of the site for Basins 6.1, 9.1, 
10.1, 11.1, 14.1-14.3 and 16.1. 
 
3. Retention basins must drain within 36 hours. Owner shall be responsible for 
maintaining basins, drywells and basin storm water quality devices in good 
working order. 
 
4. Utilities for solar facilities  that will occupy County R/W (i.e. gen-ties or other 
offsite electric utility extensions) require a license in addition to any 
construction related permits. The first step in the licensing process is to 
complete the MCDOT Solar License Application Form and email it to: 
MCDOTsolarlicense@maricopa.gov. 
 
5. Engineering review of planning and/or zoning cases is for conceptual design 
only. All development and engineering design shall be in conformance with 
Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and 
Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway 
Design Manual; and current engineering policies, standards and best practices 
at the time of application for construction. 
 
6. Based on the conceptual design nature of the information submitted, changes 
to the site layout may be necessitated by the final engineering design of the 
site’s drainage infrastructure. 
 
Please contact me with any questions.

Subdivision, Infrastructure & 
Planning Program 
1001 N. Central Avenue #150 
Phoenix, Arizona 85004 
Phone: (602) 506-1058 
Fax: (602) 506-5813  
TDD 602 506 6704 
Maricopa County 
Environmental Services Department 
Water and Waste Management Division  
DATE: April 15, 2022  
 
TO : 
Ray Banker, Planning & Development Dept. 
 
 
Planner 
 
 
 
 
 
 
 
FROM: Souren Naradikian, P.E. 
 
 
Senior Civil Engineer 
 
SUBJECT: Rezoning from Rural-190 to IND-2 IUPD to allow a solar voltaic power 
plant. Z2021160 
 
The Maricopa County Environmental Services Department (MCESD) has reviewed 
documents received from the Maricopa County Planning and Development Department 
for the above referenced project. This project is a Rezoning of the subject property 
from Rural-190 to IND-2 IUPD to allow a utility scale solar voltaic power plant at 505-
03-025D. According to the submitted documents, water and sewer services will be 
provided by privet well and septic system, therefore MCESD has concerns, NOID must 
be obtained prior to construction permit approval.  
 
Based on the above, MCESD raised no objection to this project to the Planning & 
Development Department in Accela Automation on April 15, 2022 and the project 
may proceed at this time subject to the following stipulations: 
 
Condition: None. 
 
It should be noted that this document does not approve the referenced project.  
Comments are provided only as advisory to Maricopa County Planning and 
Development Department to assist staff to prepare a staff report.  Other Maricopa 
County agencies may have additional requirements. Final review and approval will be 
made through Planning and Development Department procedures. Applicant may 
need to submit separate applications to the Maricopa County Environmental Services 
Department for approval of proposed facilities regulated by the Department.  Review 
of any such application will be based on regulations in force at the time of 
application.

From:
Richard Peel (EMG)
To:
Ray Banker (PND)
Subject:
RE: New Case: Z2021160 - APS Redhawk
Date:
Wednesday, January 12, 2022 8:24:10 AM
Attachments:
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png
Ray,
 
Thank you. Emergency Management has read the case and has no concerns as it pertains to any Palo
Verde emergency response.
 
Rich Peel
Operations Supervisor
Maricopa County Emergency Management
5630 E. McDowell Rd Phoenix, AZ 85008
richard.peel@maricopa.gov
O: 602.273.1411 | C: 602.725.6879
 
 
From: Ray Banker (PND) <Ray.Banker@Maricopa.Gov> 
Sent: Tuesday, January 11, 2022 5:06 PM
Subject: New Case: Z2021160 - APS Redhawk
 
Good afternoon,
 
You are receiving this email as the above mentioned case is in an area which you are considered an
“Area of Interest”. Attached are documents relating to the subject case and upcoming TAC Meeting.
Please let me know if you if have any questions.
 
Thank you,
 
  
Ray Banker
Senior Planner
Maricopa County Planning & Development Department
301 W. Jefferson Street, Suite 170
Phoenix, AZ 85003
602-506-2364
Ray.Banker@maricopa.gov

From:
Caroline Klebacha
To:
Ray Banker (PND)
Subject:
Re: New Case: Z2021160 - APS Redhawk
Date:
Wednesday, January 12, 2022 2:11:22 PM
Attachments:
image001.png
image002.png
SHPO recommends that a Class I (literature review) and possibly Class III (intensive, pedestrian) survey of the
property should be conducted to determine if historic properties are present. The County or Applicant can use this
link https://statemuseum.arizona.edu/crm to obtain a list of qualified consultants or request a records search. If the
project has a federal or state nexus, consultation with SHPO is required. If there is no state or federal nexus, we are
happy to conducted a non-mandated (voluntary) review.
Thank you, 
---------- Forwarded message ---------
From: Ray Banker (PND) <Ray.Banker@maricopa.gov>
Date: Tue, Jan 11, 2022 at 5:18 PM
Subject: New Case: Z2021160 - APS Redhawk
To: 
Good afternoon,
 
You are receiving this email as the above mentioned case is in an area which you are considered an “Area of
Interest”. Attached are documents relating to the subject case and upcoming TAC Meeting. Please let me know if
you if have any questions.
 
Thank you,
 
  
Ray Banker
Senior Planner
Maricopa County Planning & Development Department
301 W. Jefferson Street, Suite 170
Phoenix, AZ 85003
602-506-2364
Ray.Banker@maricopa.gov                                                                                   
 
 
-- 
Caroline Klebacha, M.A.
Archaeological Compliance Specialist
State Historic Preservation Office
A Division of Arizona State Parks & Trails
Please use azshpo@azstateparks.gov for all consultation!

1110 West Washington Street, Suite 100
Phoenix, AZ 85007-2957
Phone:  480-714-6843
Email:  cklebacha@azstateparks.gov
Web:  http://AZStateParks.com/SHPO