COMPETITION IMPRACTICABLE FORM 
This form is to be used when a department believes an acquisition is considered Competition Impracticable and the acquisition 
dollar amount is above $10,000. The Chief Procurement Officer can approve purchases up to $100,000. Board of Supervisors 
approval is required if the acquisition is over $100,000. This form must be submitted for approval to: Office of Procurement 
Services | 160 S 4th Ave | Phoenix, AZ 85003. Fax number: 602.506.6766. The signed form must be retained in the purchasing 
file. Unless approved by the Board of Supervisors in a formal agenda item or the Chief Procurement Officer in a formal Contract 
a CI form is valid from July 1 thru June 30th of each Fiscal Year. 
DEPARTMENT NAME 
DEPARTMENT RX# 
PROPOSED CONTRACT VENDOR 
NEED IDENTIFIED Date: 
REQUESTED DELIVERY 
Date: 
QUOTED PRICE: 
Accounting String: 
Company: 
Address: 
City, State: 
Zip/Postal Code: 
Phone: 
Fax: 
Contact Name: 
DESCRIPTION OF GOODS OR SERVICES REQUIRED: 
The estimated cost of this Procurement is: 
≤ $100k 
> $100k 
Is this a Technology Procurement? 
Yes 
No 
COMPETITION IMPRACTICABLE CATEGORY (Check applicable box, attach documentation or provide explanation below.)
Maricopa County Procurement Code MC1-351 states: “Competition Impracticable” means an acquisition where, competition is 
impractical because of standardization, warranty, or other factors as approved by the Board of Supervisors. 
NOTE:  The following are unlikely to be sufficient Competition Impracticable justifications: 
• Personal or department preference for a product or vendor
• Department perception that the vendor is the best qualified (this should be determined through a competitive process)
• Lack of department planning resulting in limited time to conduct a competitive procurement
• Special incentive or deal offered (can be assessed in open and competitive solicitation)
• Department  convenience
Grant specified (supporting documents attached) 
Mailing lists, subscriptions or media advertising 
Warranty voided if service provided by other contract vendor 
Other (Provide written explanation below) 
Software license renewals, additions, or upgrades available 
from only one source 
Brand compatibility available from only one source (no other 
distributors) 
Other proprietary situation 
Transportation
Jacobs Engineering Group, Inc.
07/20/2022
101 North 1st Avenue, Suite 2600
602-253-1200
85003
Phoenix, AZ
Judah Cain
TIP Project design services, bidding assistance, and post-design services for TT0342 McKellips Road, 
Loop 101 to Alma School Road. The design shall include an update to the project documents to bid for 
construction in two separate phases. The first phase shall include underground improvements including 
storm drain, water, and sewer lines. The second phase shall include the roadway improvements 
including asphalt paving, curb, gutter, sidewalk, street light pole foundations, and traffic signals.
08/01/2022
$243,525.00



DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

SEARCH 
A search was conducted consisting of: (check all that apply) 
Market research 
Public notice given, list 
Other vendors contacted 
Other 
RESULTS 
no alternatives were identified 
no alternatives were deemed acceptable 
because (explain below): 
Describe the search from above in detail: 
PRICE 
MC1-352-B states: The Using Agency requesting a Competition Impracticable Procurement shall provide written evidence 
to support a Competition Impracticable determination containing an explanation of why the proposed procurement 
process is advantageous to the County; and the scope, duration, and estimated total dollar value of the procurement. 
Price has been fairly and reasonably established by: 
Comparison to previous comparable purchases 
from a different vendor 
Independent estimate 
Comparison to public sector contract pricing 
Discount off published catalog pricing 
Market survey 
Other, explain: 
Describe methodology and results (attach any written supporting data, e.g., survey or market analysis): 
THIS IS A COMPETITION IMPRACTICABLE PROCUREMENT BECAUSE (attach additional page if needed): 
Jacobs Engineering has been the project design consultant since May, 2017, and has 
developed the design from 60-percent stage to Sealed. The project bid in January 2022, but no 
bids were accepted.  MCDOT determined that the project shall be separated into two phases 
for two separate bid solicitations.  Jacobs Engineering has the familiarity regarding the project 
history including design decisions, utility coordination issues, and SRP-MIC coordination 
expectations, to provide these services.  It is in the best interest of MCDOT to utilize Jacobs 
Engineering to complete the design and provide bidding assistance and post-design services 
for consistency and efficiency.  Utilizing a different design consultant at this stage of McKellips 
Road design would be contrary to the public interest.
The alternative would be to use a different design consultant, which would be unacceptable 
because of unfamiliarity with the project, including design issues, agency coordination, utility 
issues and SRP-MIC coordination.  Jacobs Engineering has the history and detailed project 
knowledge to complete the design and provide bidding assistance and post-design services. 
Jacobs Engineering provided a scope and fee proposal which is consistent with their previously 
approved contract rates and acceptable engineering fees for this type of work.



DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

CERTIFICATIONS 
I certify: 
1) I recognize that the Maricopa County Procurement Code requires the use of competitive solicitations unless
exempted by law.  I have reviewed the information and materials relevant to this procurement of goods and  services, 
and am requesting approval of an exception to the competitive process for the reasons described; 
2) the price to be paid to the proposed vendor is fair, reasonable, and provides the best value to Maricopa County; and
3) this request for an exception to the competitive solicitation process is not the result of inadequate advance planning
or for purposes of securing the services of a preferred vendor. 
Department Head or Department Head Delegate Signature (Required) 
Printed Name 
Signature 
Date 
Office of Procurement Services 
The CPO can approve procurements up to $100,000.  If this request is over $100,000 it must be submitted as 
an agenda item to the Board of Supervisors for consideration. 
Approved/Recommended for Approval 
Printed Name 
Signature 
Date 
Office of Enterprise Technology (If this procurement is classified as a technology procurement it must be 
forwarded to OET for coordination and/or approval. If this procurement request is not approved by OET, the form will 
be returned to the requestor.) 
Approved. Recommended purchase is in line with Maricopa County's strategic technology plan or currently installed 
equipment or service, and is considered to be a competition impracticable procurement. 
Not Approved. 
Reasoning: 
Printed Name 
Signature 
Date 
Save 
Email
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A
Jennifer Toth
7/21/2022
7/21/2022
7/21/2022
Kevin Tyne

101 N. 1st Avenue
Suite 2600
Phoenix, AZ 85003
United States
T +1.602.253.1200
www.jacobs.com
Jacobs Engineering Group Inc.
R1
June 28, 2022
Attention: Ben Markert, PE
Maricopa County Department of Transportation
2901 W. Durango Street
Phoenix, AZ 85009
Reference: Contract No. 2021-25
Project Name: McKellips Rd, Loop 101 to Alma School Road
Project No. TT0342
Modification
Dear Mr. Markert,
Please find enclosed JACOB’s Scope of Services and Cost Proposal for Modification 1 for the above
referenced project.
The cost for these services is $243,525. The derivation of the fee is attached. All salaries and rates
are in line with the contract.
Our Subconsultants on this contract are:
Huit-Zollars
J2 Engineering and Environmental Design
We trust you will find that our submittal is in order. If you should have questions or require
additional information, please contact me at (602) 650-4030 or email at judah.cain@jacobs.com.
Sincerely,
Judah Cain, PE
Project Manager
Enclosures
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Scope of Services – Project
Specific
Final Design
PROJECT NAME: MCKELLIPS ROAD
Consultant:
JACOBS
Project No:
Contract No.:
TT0342
2021-025
Maricopa County
Department of Transportation
2901 W. Durango Street
Phoenix, AZ 85009
JUNE 2022
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: August 2019
Page 2 of 8
Table of Contents
SCOPE OF SERVICES – PROJECT SPECIFIC .............................................................................. 4
Project Overview .............................................................................................................................. 4
Project Location ............................................................................................................................ 4
Project Background ....................................................................................................................... 4
Project Purpose ............................................................................................................................. 4
Length of Services ............................................................................................................................ 5
SECTION 100
PROJECT MANAGEMENT .................................................................................. 5
100.2.2
Matrix of Deliverables .................................................................................................. 5
100.4
Design Criteria ............................................................................................................. 5
100.5
Design Exceptions ........................................................................................................ 5
100.6
Project Progress Meetings ............................................................................................. 5
SECTION 200
SUBMITTALS ........................................................................................................ 5
1200.1
Phase No. 1 95% PS&E Submittal ............................................................................. 6
1200.2
Phase No. 1 100% PS&E Submittal ........................................................................... 6
1200.3
Phase No. 1 Sealed PS&E Submittal .......................................................................... 6
1200.4
Phase No. 2 95% PS&E Submittal ............................................................................. 6
1200.5
Phase No. 2 100% PS&E Submittal ........................................................................... 6
1200.6
Phase No. 2 Sealed PS&E Submittal .......................................................................... 6
1200.7
Phase No. 2 Design Exception .................................................................................... 6
SECTION 300
BIDDING PHASE ................................................................................................... 6
1300.1
Phase No. 1 Technical Assistance ............................................................................... 6
1300.2
Phase No. 1 Preparation of Addenda ......................................................................... 6
1300.3
Phase No. 1 Pre-Bid Conference ................................................................................ 6
1300.4
Phase No. 1 Bid Opening ............................................................................................ 7
1300.5
Phase No. 2 Technical Assistance ............................................................................... 7
1300.6
Phase No. 2 Preparation of Addenda ......................................................................... 7
1300.7
Phase No. 2 Pre-Bid Conference ................................................................................ 7
1300.8
Phase No. 2 Bid Opening ............................................................................................ 7
SECTION 400
POST DESIGN ........................................................................................................ 7
1400.1
Phase No. 1 Pre-Construction Conference ................................................................. 7
1400.2
Phase No. 1 Request for Information (RFIs) ............................................................. 7
1400.3
Phase No. 1 Begin Construction ................................................................................. 7
1400.4
Phase No. 1 End Construction .................................................................................... 7
1400.5
Phase No. 1 Project Administration and Close-Out .................................................. 8
1400.6
Phase No. 2 Pre-Construction Conference ................................................................. 8
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: August 2019
Page 3 of 8
1400.7
Phase No. 2 Request for Information (RFIs) ............................................................. 8
1400.8
Phase No. 2 Begin Construction ................................................................................. 8
1400.9
Phase No. 2 End Construction .................................................................................... 8
1400.10 Phase No. 2 Project Administration and Close-Out ......................................................... 8
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: August 2019
Page 4 of 8
SCOPE OF SERVICES – PROJECT SPECIFIC
Project Overview
Project Location
McKellips Road between Loop 101 Price Freeway and Alma School Road is approximately 1.97 miles
in length located entirely within the Salt River Pima-Maricopa Indian Community (SRP-MIC).
McKellips Road is classified as a principal arterial roadway and is typically an un-curbed 2-lane
roadway with widening at major intersections within the limit of the project corridor.
Project Background
A Design Concept Report (DCR) was developed for this project in 2009. That DCR also included the
evaluation of bridges crossing the Salt River at McKellips Road, Dobson Road and Gilbert Road. The
recommended alternative for widening McKellips Road between Loop 101 and Alma School Road was
to widen the roadway symmetrically about the existing centerline.
Utilizing the recommended alignment from the DCR, a Scoping Study was completed in 2015 that
included a raised median, curb and gutter, sidewalk, irrigation improvements and a storm drain that
outlet to the Loop 101 channel.
A Safety Evaluation was performed for the corridor in 2016 which identified short-term and long-term
countermeasures for implementation.
In 2016, a Value Engineering (VE) Analysis was performed on the scoping design which identified cost
saving modifications to the scoping design and added improvements recommended in the Safety
Evaluation.
Some of the significant items from the VE Analysis included utilizing retention basins in lieu of an
underground storm drain pipe and salvaging the existing pavement rather than a complete reconstruction
of the roadway.
Jacobs completed a 60% Design that implemented the VE recommendations which included reusing the
existing pavement by widening rather than reconstructing the roadway, as recommended in the VE
Report. However, the proposed widening created complicated milling and overlay thickness along with
a differential in the median curb height that was undesirable to MCDOT.
After further collaboration with MCDOT, SRPMIC and key stakeholders, Jacobs completed a revised
60% design and then 95% and 100% Design Documents. The revised design developed some of the VE
recommendations that were agreeable to MCDOT as well as safety countermeasures and drainage
options. The Final Design includes revisions to the roadway profile that requires constructing a majority
of the existing pavement to simplify construction and provide the required pavement structure while
maintaining minimum roadway cross-slopes and grades. Right-turn lanes were added to the Saddleback
Communications site along with modifications to the landscaping, drainage, and irrigation.
In January 2022 the project advertised for construction. MCDOT rejected the one bid received and has
opted to repackage TT0342 into two projects. Phase No. 1 will construct underground facilities
including sewer lines, waterlines and storm drain. Phase No. 2 will construct the remaining
aboveground facilities.
Project Purpose
This project is for preparing final PS&E for Phases No. 1 and No. 2 and for post design services for the
construction of Phases No. 1 and No. 2.
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: August 2019
Page 5 of 8
Length of Services
It is anticipated the length of service for this task will be 36 months to include production of sealed
documents and post design services for Phases No. 1 and No. 2.
SECTION 100 PROJECT MANAGEMENT
100.2.2 Matrix of Deliverables
In accordance with Contract No. 2015-030, WA#6, MicroStation V8i and InRoads will be used to
develop CADD deliverables and the Consultant will use MCDOT’s CADD Standards for MicroStation
V8i.
100.4 Design Criteria
In accordance with Contract No. 2015-030, WA#6, the project design will be in accordance with the
MCDOT 2018 Roadway Design Manual (RDM) and current Maricopa County Drainage Policy and
Standard Manual (DPSM) and the 60% Design Documents.  MCDOT references and publications shall
control the work, and any necessary supplementation should be provided by appropriate AASHTO,
FHWA, Maricopa Association of Governments (MAG) and/or MCDOT references. All designs shall
conform to the latest ADA Accessibility Guidelines Title I and II.
100.5 Design Exceptions
The Consultant will complete a Design Exception for superelevation.
100.6 Project Progress Meetings
Regular progress meetings with MCDOT staff and other project stakeholders will be held for Phases No. 1
and No. 2 as MCDOT deems necessary. Eight (8) progress meetings are anticipated during the Final Design
stages for Phases No. 1 and No. 2. The Consultant will prepare the agenda, sign-in sheet, and meeting notice
and provide them to the MCDOT PM for distribution prior to the meetings. The Consultant will prepare
presentation materials and handouts for each meeting. Each progress meeting is anticipated to last one hour.
No more than three (3) of the Consultant’s staff will attend each progress meeting.
SECTION 200 SUBMITTALS
The Consultant will make three (3) submittals for this project, at the 95%, 100% and Sealed stages.
The Consultant will provide each submittal in electronic format, including CADD files, to the MCDOT
Project Manager for distribution to the project team members and stakeholders.
The Project Manager will return all comments to the Consultant within 14 calendar days following the
submittal. With each resubmittal, the Consultant shall return any prior review check prints along with
prior review comments annotated with Consultant responses.
The Consultant shall submit quality assurance documentation demonstrating that the proposed QA/QC
procedures have been implemented. The Consultant shall be required to resubmit any scheduled
submittal deemed by MCDOT to be incomplete or lacking in sufficient detail.
Final sealed reports such as drainage reports, soils report and other prepared reports and data shall be
submitted electronically by the Consultant in addition to the specified number of hard copies. Each
report including cover with signed professional seal, text, photos, engineering and other drawings,
tables, maps, all appendices, and hand calculations shall be provided to MCDOT as one Acrobat Reader
(.PDF) formatted file on a compact disk, suitable for publishing on the MCDOT website. Cost estimates
and other data prepared on spreadsheets shall be submitted electronically (Microsoft Excel) by the
Consultant along with the specified number of hard copies.
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: August 2019
Page 6 of 8
1200.1 Phase No. 1 95% PS&E Submittal
The Consultant will prepare 95% level design documents, specifications, and cost estimates. Jacobs
will attend a 95% comment review meeting, provide a summary of comments and respond to comments.
1200.2 Phase No. 1 100% PS&E Submittal
The Consultant will prepare 100% level sealed for construction documents, specifications, and cost
estimates. Jacobs will attend a 100% comment review meeting, provide a summary of comments and
respond to comments.
1200.3 Phase No. 1 Sealed PS&E Submittal
The Consultant will prepare and submit sealed construction documents, specifications, and cost
estimates.
1200.4 Phase No. 2 95% PS&E Submittal
The Consultant will prepare 95% level design documents, specifications, and cost estimates. Jacobs
will attend a 95% comment review meeting, provide a summary of comments and respond to comments.
1200.5  Phase No. 2 100% PS&E Submittal
The Consultant will prepare 100% level sealed for construction documents, specifications, and cost
estimates. Jacobs will attend a 100% comment review meeting, provide a summary of comments and
respond to comments.
1200.6 Phase No. 2 Sealed PS&E Submittal
The Consultant will prepare and submit sealed construction documents, specifications, and cost
estimates.
1200.7 Phase No. 2 Design Exception
The Consultant will prepare a Design Exception for superelevation for the McKellips Road horizontal
curve at Alma School Road, following the latest template in the current MCDOT RDM (page 1-1). The
submittal will include a fully compliant design which meets current standards for superelevation. The
fully compliant design will be at 15% level of development and submitted as an exhibit on a roll plot.
Jacobs will attend a comment review meeting, provide a summary of comments and respond to
comments.
SECTION 300 BIDDING PHASE
1300.1 Phase No. 1 Technical Assistance
The Consultant shall provide technical assistance and respond to design questions during the
advertisement period of the project.
1300.2 Phase No. 1 Preparation of Addenda
The Consultant shall prepare addenda that may be required to clarify or correct the plans or Special
Provisions.
1300.3 Phase No. 1 Pre-Bid Conference
The Consultant shall attend a pre-bid conference for all contractors interested in bidding on the project
and shall be prepared to answer contractor’s questions.
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: August 2019
Page 7 of 8
1300.4 Phase No. 1 Bid Opening
After bid opening, the Consultant shall assist MCDOT in analyzing bids when requested to do so.
1300.5 Phase No. 2 Technical Assistance
The Consultant shall provide technical assistance and respond to design questions during the
advertisement period of the project.
1300.6 Phase No. 2 Preparation of Addenda
The Consultant shall prepare addenda that may be required to clarify or correct the plans or Special
Provisions.
1300.7 Phase No. 2 Pre-Bid Conference
The Consultant shall attend a pre-bid conference for all contractors interested in bidding on the project
and shall be prepared to answer contractor’s questions.
1300.8 Phase No. 2 Bid Opening
After bid opening, the Consultant shall assist MCDOT in analyzing bids when requested to do so.
SECTION 400 POST DESIGN
Post Design Services shall be provided as outlined herein.
1400.1 Phase No. 1 Pre-Construction Conference
The Consultant shall attend a pre-construction conference and shall be prepared to answer Contractor’s
questions.
1400.2 Phase No. 1 Request for Information (RFIs)
The Consultant shall review and respond to the Contractor’s request for information (RFI) or
clarification of design issues contained within the project plans and specifications. For estimating
purposes, it is assumed the Contractor will have 15 RFIs.
1400.3  Phase No. 1 Begin Construction
The Consultant shall attend weekly construction meetings and shall be prepared to answer the
Contractor’s questions. For estimating purposes, it is assumed there will be 8 construction meetings that
will be attended by the Consultant.
The Consultant shall attend on-site construction meetings as necessary and shall be prepared to answer
the Contractor’s questions. For estimating purposes, it is assumed there will be 3 on-site construction
meetings that will be attended by the Consultant.
The Consultant shall review and approve Contractor submittals and shop drawings associated with
products and procedures for construction of improvements specified in the project plans and
specifications. For estimating purposes, it is assumed the Contractor will have 4 submittals.
1400.4 Phase No. 1 End Construction
The Consultant shall attend a final walk-thru inspection of the project once the Contractor has obtained
substantial completion from MCDOT. The Consultant shall not be responsible for providing record
drawings.
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: August 2019
Page 8 of 8
1400.5   Phase No. 1 Project Administration and Close-Out
The Consultant shall finalize project documentation. A certificate of performance will be submitted to
MCDOT once all work is complete and final invoice submitted.
1400.6 Phase No. 2 Pre-Construction Conference
The Consultant shall attend a pre-construction conference and shall be prepared to answer Contractor’s
questions.
1400.7 Phase No. 2 Request for Information (RFIs)
The Consultant shall review and respond to the Contractor’s request for information (RFI) or
clarification of design issues contained within the project plans and specifications. For estimating
purposes, it is assumed the Contractor will have 15 RFIs.
1400.8  Phase No. 2 Begin Construction
The Consultant shall attend weekly construction meetings and shall be prepared to answer the
Contractor’s questions. For estimating purposes, it is assumed there will be 8 construction meetings that
will be attended by the Consultant.
The Consultant shall attend on-site construction meetings as necessary and shall be prepared to answer
the Contractor’s questions. For estimating purposes, it is assumed there will be 3 on-site construction
meetings that will be attended by the Consultant.
The Consultant shall review and approve Contractor submittals and shop drawings associated with
products and procedures for construction of improvements specified in the project plans and
specifications. For estimating purposes, it is assumed the Contractor will have 4 submittals.
1400.9 Phase No. 2 End Construction
The Consultant shall attend a final walk-thru inspection of the project once the Contractor has obtained
substantial completion from MCDOT. The Consultant shall not be responsible for providing record
drawings.
1400.10 Phase No. 2 Project Administration and Close-Out
The Consultant shall finalize project documentation. A certificate of performance will be submitted to
MCDOT once all work is complete and final invoice submitted.
END SCOPE OF SERVICES
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

McKellips Road, Loop 101 to Alma School Road
Engineering Firm JACOBS
PROJECT NO. TT0342
Contract No. 2021-25
ESTIMATED DIRECT LABOR
PERSON
BILLING
CLASSIFICATION
HOURS
RATE/HOUR
TOTAL
Project Manager/Senior Task Manager
260
68.56
$
17,826
$
Senior Project Engineer
244
74.83
$
18,259
$
Project Engineer
262
62.83
$
16,461
$
Traffic Engineer
36
36.94
$
1,330
$
CADD Technician
336
35.73
$
12,005
$
Electrical Engineer
18
38.60
$
695
$
Project Controls
4
43.26
$
173
$
Project Administration
70
26.46
$
1,852
$
1,230   Hours
Estimated Labor Cost
68,601
$
Overhead
99.41%
68,196
$
Subtotal
136,797
$
ESTIMATED DIRECT EXPENSES
(Listed By Item At Estimated Actual Cost - NO MARKUP)
Travel
-
$
Plotting
-
$
Miscellaneous Expenses
-
$
Total Estimated Expenses
-
$
ESTIMATED OUTSIDE SERVICES AND CONSULTANTS
Firm
Cost
Huitt-Zollars
86,341
$
J2 Engineering & Environmental
6,707
$
Total Estimated Outside Services
93,048
$
PROFIT (Direct Labor +Overhead)
10%
13,679.73
TOTAL ESTIMATED FEE
243,525
$
CONTRACT TIME
Calendar Days
(Figures Rounded To The Nearest $1)
Consultant Firm Signature
Date
DERIVATION OF COST PROPOSAL SUMMARY
3/26/2013
Page 1 of 1
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

June 27, 2022
Mr. Judah Cain, P.E.
Jacobs
101 N. First Ave., Suite 2600
Phoenix, Arizona 85003
Reference:
McKellips Road – Project No. TT0342
Scope of Work - Project Specific Final Design; Projects 1 & 2
Huitt-Zollars Proposal No.  P313700.02
Dear Mr. Cain:
Huitt-Zollars, Inc. (Huitt-Zollars) (Subconsultant) appreciates the opportunity to provide this 
proposal for professional engineering consulting services to Jacobs (Client) on the Project Specific 
Final Design; Projects 1 & 2 for the McKellips Road project; Salt River Pima - Maricopa Indian 
Community (Project).  Our proposal is based upon the scope of services, compensation, schedule, 
terms and conditions and attachments contained herein.  
In January 2022 the project advertised for construction. McDOT rejected the one bid received and 
has opted to repackage TT0342 into two projects. Project 1 will construct underground facilities 
including sewer lines, waterlines and storm drain. Project 2 will construct the remaining above 
ground facilities. Huitt-Zollars is tasked specifically with the completion of all storm drain and 
drainage related tasks. 
Specifically, we understand that we will provide the following:
I.
SCOPE OF SERVICES:
1
SECTION 100 PROJECT MANAGEMENT
1.1
Project Progress Meetings (100.6): Regular progress meetings with McDOT staff 
and other project stakeholders will be held for Projects No. 1 and No. 2 as McDOT 
deems necessary. Eight virtual progress meetings are anticipated during the Final 
Design stages for Projects No. 1 and No. 2. The Subconsultant will attend each 
meeting prepared to discuss design concerns and comment resolutions. No more 
than two (2) of the Subconsultant’s staff will attend each progress meeting.
2
SECTION 200 SUBMITTALS
2.1
Project No. 1 95% PS&E Submittal (200.1): Prepare 95% level design    
documents, specifications, and cost estimates. Huitt-Zollars will attend a 95% 
comment review meeting, provide a summary of comments and respond to 
comments.
2.2
Project No. 1 100% PS&E Submittal (200.2): Prepare 100% level sealed for 
construction documents, specifications, and cost estimates. Huitt-Zollars will attend 
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

McKellips Road – Project No. TT0342
Scope of Work - Project Specific Final Design; Projects 1 & 2
Huitt-Zollars Proposal No.  P313700.02
Page | 2 
a 100% comment review meeting, provide a summary of comments and respond to 
comments.
2.3
Project No. 1 Sealed PS&E Submittal (200.3): Prepare and submit sealed 
construction documents, specifications, and cost estimates.
2.4
Project No. 2 95% PS&E Submittal (200.4): Prepare 95% level design documents, 
specifications, and cost estimates. Huitt-Zollars will attend a 95% comment review 
meeting, provide a summary of comments and respond to comments.
2.5
Project No. 2 100% PS&E Submittal (200.5): Prepare 100% level sealed for 
construction documents, specifications, and cost estimates. Huitt-Zollars will attend 
a 100% comment review meeting, provide a summary of comments and respond to 
comments.
2.6
Project No. 2 Sealed PS&E Submittal (200.6):  Prepare and submit sealed 
construction documents, specifications, and cost estimates.
3
SECTION 300 BIDDING PHASE
Not Applicable for Huitt-Zollars
4
SECTION 400 POST DESIGN
4.1
Project No. 1 Pre-Construction Conference (400.1): Attend a pre-construction 
conference and be prepared to answer Contractor’s questions.
4.2
Project No. 1 Request for Information (400.2): Review and respond to the   
Contractor’s Request for Information (RFI) or clarification of design issues contained 
within the project plans and specifications. For estimating purposes, it is assumed 
the Contractor will have 5 RFIs to comments.
4.3
Project No. 1 Begin Construction (400.3): Attend weekly construction meetings 
and be prepared to answer the Contractor’s questions. For estimating purposes, it is 
assumed there will be 6 on-site construction meetings that will be attended by the 
Subconsultant. 
Attend on-site construction meetings as necessary and be prepared to answer the 
Contractor’s questions. For estimating purposes, it is assumed there will be 2
 on-site construction meetings attended by the Subconsultant. 
Review and approve Contractor submittals and shop drawings associated with 
products and procedures for construction of improvements specified in the project 
plans and specifications. For estimating purposes, it is assumed the Contractor will 
have 2 submittals.
4.4
Project No. 1 End Construction (400.4): Attend final walk-thru inspection of the 
project once the Contractor has obtained substantial completion from McDOT. The 
Subconsultant shall not be responsible for providing record drawings.
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

McKellips Road – Project No. TT0342
Scope of Work - Project Specific Final Design; Projects 1 & 2
Huitt-Zollars Proposal No.  P313700.02
Page | 3 
4.5
Project No. 1 Project Administration and Close-Out (400.5): Finalize project 
documentation.
4.6      Project No. 2 Pre-Construction Conference (400.6): Attend a pre-construction 
conference and shall be prepared to answer Contractor’s questions.
4.7
Project No. 2 Request for Information (400.7): Review and respond to the 
Contractor’s Request for Information (RFI) or clarification of design issues contained 
within the project plans and specifications. For estimating purposes, it is assumed the 
Contractor will have 2 RFIs.to comments.
4.8
Project No. 2 Begin Construction (400.8): Attend weekly construction meetings 
and be prepared to answer the Contractor’s questions. For estimating purposes, it is 
assumed there will be 2 on-site construction meetings that will be attended by the 
Subconsultant. 
Attend on-site construction meetings as necessary and be prepared to answer the 
Contractor’s questions. For estimating purposes, it is assumed there will be 1 on-site 
construction meetings attended by the Subconsultant. 
Review and approve Contractor submittals and shop drawings associated with 
products and procedures for construction of improvements specified in the project 
plans and specifications. For estimating purposes, it is assumed the Contractor will 
have 2 submittals.
4.9
Project No. 2 End Construction (400.9): Attend final walk-thru inspection of the 
project once the Contractor has obtained substantial completion from McDOT. The 
Subconsultant shall not be responsible for providing record drawings.
4.10
Project No. 2 Project Administration and Close-Out (400.10): Finalize project 
documentation.
III.
COMPENSATION:
Since the level of effort for these scope elements are not easily defined, the fee for these services 
has been established with an estimated budget and will be billed monthly on a Time and Materials 
(T&M) basis using the attached Hourly Rate Sheet (see Attachment A).
1
SECTION 100 PROJECT MANAGEMENT
 
1.1 Project Progress Meetings (100.6):.......................................
(T&M)
Total for Section 200 Submittals: ..................................
$3,527
(T&M)
2
SECTION 200 SUBMITTALS
 
2.1 Project No. 1 95% PS&E Submittal (200.1):.........................
(T&M)
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

McKellips Road – Project No. TT0342
Scope of Work - Project Specific Final Design; Projects 1 & 2
Huitt-Zollars Proposal No.  P313700.02
Page | 4 
2.2 Project No. 1 100% PS&E Submittal (200.2):.......................
(T&M)
2.3 Project No. 1 Sealed PS&E Submittal (200.3):  ..................
(T&M)
2.4 Project No. 2 95% PS&E Submittal (200.4):.........................
(T&M)
2.5 Project No. 2 100% PS&E Submittal (200.5):.......................
(T&M)
2.6 Project No. 2 Sealed PS&E Submittal (200.6):  ..................
(T&M)
Total for Section 200 Submittals: .................................. $62,350
(T&M)
 
3
SECTION 300 BIDDING PHASE
 
Not Applicable for Huitt-Zollars
4
SECTION 400 POST DESIGN
 
4.1 Project No. 1 Pre-Construction Conference (400.1):...........
(T&M)
4.2 Project No. 1 Request for Information (400.2): ....................
(T&M)
4.3 Project No. 1 Begin Construction (400.3): ...........................
(T&M)
4.4 Project No. 2 End Construction (400.4):...............................
(T&M)
4.5 Project No. 2 Project Admin. and Close-Out (400.5): ..........
(T&M)
4.6 Project No. 1 Pre-Construction Conference (400.1):...........
(T&M)
4.7 Project No. 1 Request for Information (400.2): ....................
(T&M)
4.8 Project No. 1 Begin Construction (400.3): ...........................
(T&M)
4.9 Project No. 2 End Construction (400.4):...............................
(T&M)
4.10 Project No. 2 Project Admin. and Close-Out (400.5): ........
(T&M)
Total for Section 400 Post Design: ............................... $20,240
(T&M)
5
Reimbursables
5.2
Reimbursable expenses include deliveries, mileage, reproductions, etc.  Expenses 
shall be compensated based upon the attached Hourly Rate Sheet.  
Total Estimated Budget
Our estimated budget for this project is $86,117. The total is $86,341 including the reimbursable 
expenses of $224. See Attachment A.
III.
EXCLUDED SERVICES:
Excluded Scope Items include, but are not limited to the following: 
1.
Meeting minutes
2.
As-built survey
IV.       CLIENT PROVIDED ITEMS:
Client shall provide Huitt-Zollars with the following:
1.
Signed Contract
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

McKellips Road – Project No. TT0342
Scope of Work - Project Specific Final Design; Projects 1 & 2
Huitt-Zollars Proposal No.  P313700.02
Page | 5 
V.         SCHEDULE:
Following receipt of your notice to proceed and a signed contract we anticipate starting on the work 
at the yet to be established pre-construction kickoff meeting.
VI.
AUTHORIZATION:
Should this proposal meet with your approval and acceptance, please sign and return to our office 
by e-mail to phoskin@huitt-zollars.com.  We will schedule the above services as soon as we 
receive your authorization.  If you have any questions about any aspect of this proposal, please 
do not hesitate to give us a call.
Sincerely,
HUITT-ZOLLARS, INC.
Doug Both
Project Manager
Paul Hoskin
Vice President 
Attachments:  
A- Derivation of Cost
B- Derivation of Hours
C- Expenses
Accepted and Approved for 
Jacobs
(Signature)
(Name)
(Title)
(Date)
   
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Attachment A
Derivation of Cost
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

3/26/2013
Page 1 of 1
McKellips Road - Project 1; PS&E Submittal
Huitt-Zollars
PROJECT NO. TT0342
Contract No. 2015-30
(Figures Rounded To The Nearest $1)
ESTIMATED DIRECT LABOR
PERSON
BILLING
CLASSIFICATION
HOURS
RATE/HOUR
TOTAL
Project Principal
29
$
87.57
$
2,540
Project Manager
161
$
51.90
$
8,356
Sr. Project Engineer
-
$
55.29
$
-
Sr. Project Representative
16
$
43.99
$
704
Project Engineer
309
$
41.47
$
12,814
Engineer/Designer
90
$
32.74
$
2,947
605
  Hours
Estimated Labor Cost
$
27,361
Overhead
186.13%
$
50,927
Subtotal
$
78,288
ESTIMATED DIRECT EXPENSES
(Listed By Item At Estimated Actual Cost - NO MARKUP)
Travel
$
224
Plotting
Miscellaneous Expenses
$
-
Total Estimated Expenses
$
224
ESTIMATED OUTSIDE SERVICES AND CONSULTANTS
Firm
Cost
Consultant Y
$
-
Consultant Z
$
-
Total Estimated Outside Services
$
-
PROFIT (Direct Labor +Overhead)
10%
86,117
TOTAL ESTIMATED FEE
$
86,341
CONTRACT TIME 
Calendar Days
Consultant Firm Signature
Date
DERIVATION OF COST PROPOSAL SUMMARY
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Attachment B
Derivation of Hours
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

3/26/2013
Page 1 of 1
Huitt-Zollars
Contract No. 2015-30
TASK
Project
Principal
Project
Manager
Sr. Project
Rep.
Project
Engineer
Engineer/
Designer
Total
$
87.57
$
51.90
$
43.99
$
41.47
$
32.74
1.1
Project Progress Meetings (Assumes 8 Virtual Mtgs)
12
12
24.0
2.1
Project No. 1 95% PS&E Submittal (200.1)
6
24
8
60
24
122.0
2.2
Project No. 1 100% PS&E Submittal (200.2)
6
12
28
16
62.0
2.3
Project No. 1 Sealed PS&E Submittal (200.3)
3
8
16
8
35.0
2.4
Project No. 2 95% PS&E Submittal (200.4)
6
28
8
80
24
146.0
2.5
Project No. 2 100% PS&E Submittal (200.5)
4
12
24
12
52.0
2.6
Project No. 2 Sealed PS&E Submittal (200.6)
2
6
12
6
26.0
3.1
Project No. 1 Technical Assistance (300.1) Not Applicable
3.2
Project No. 1 Preparation of Addenda (300.2) Not Applicable 
3.3
Project No. 1 Pre-Bid Conference (300.3) Not Applicable
3.4
Project No. 1 Bid Opening (300.4) Not Applicable
3.5
Project No. 2 Technical Assistance (300.5) Not Applicable
3.6
Project No. 2 Preparation of Addenda (300.6) Not Applicable
3.7
Project No. 2 Pre-Bid Conference (300.7) Not Applicable
3.8
Project No. 2 Bid Opening (300.8) Not Applicable
4.1
Project No. 1 Pre-Construction Conference (Assume 1-4 Hour Mtg) (400.1)
4
4
8.0
4.2
Project No. 1 Request for Information; Assume 5 RFIs (400.2)
1
5
15
21.0
4.3
Project No. 1 Begin Construction (Assume 6 Weekly & 2 Additional On-site Mtgs) (400.3)
18
18
36.0
4.4
Project No. 1 End Construction (Assume 1- 6 Hour Mtg) (400.4)
6
6
12.0
4.5
Project No. 1 Project Administration and Close-out (400.5)
6
8
14.0
4.6
Project No. 2 Pre-Construction Conference (Assume 1- 4 Hour Mtg) (400.6)
4
4
8.0
4.7
Project No. 2 Request for Information (Assume 2 RFIs) (400.7)
1
2
6
9.0
4.8
Project No. 2 Begin Construction (Assume 2 Weekly & 1 Additional On-site Mtgs) (400.8)
6
6
12.0
4.9
Project No. 2 End Construction (Assume 1- 4 Hour Mtg) (400.9)
4
4
8.0
4.10
Project No. 2 Project Administration and Close-out (400.10)
4
6
10.0
29
161
16
309
90
605.0
ESTIMATED STAFF HOURS - PHASE
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

Attachment C
Estimate of Direct Expenses
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

3/26/2013
Page 1 of 1
McKellips Road - Project 1; PS&E Submittal
Huitt-Zollars
PROJECT NO. TT0342
Contract No. 2015-30
Travel
A. Local Mileage at
$
0.56
400
miles
Subtotal Travel
$
224
Plotting
B.  Exhibits at
$
0.25
exhibits
$
-
C.  Plots at
$
1.00
1
plots
$
1
D.  Plan Submittals
Half Size Bond Copies at
$
0.10
1
Copies
Full Size Bond Copies at
$
1.00
1
Copies
Subtotal Plotting
Miscellaneous Expenses
C. Other
$
-
Subtotal Miscellaneous Expenses
$
-
ESTIMATED OUTSIDE SERVICES & CONSULTANTS
Consultant Y
$
-
Consultant Z
$
-
TOTAL ESTIMATED OUTSIDE SERVICES
$
-
TOTAL ESTIMATED EXPENSES  
$
224
ESTIMATE OF DIRECT EXPENSES
DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A

DocuSign Envelope ID: DFD45074-9AD7-4BEE-B054-6108D2687E0A