3. A692 TCE L&E_304-81-973.PDF
Extracted text (via ocr_local)
10229 characters
EXHIBIT "A"
LEGAL DESCRIPTION FOR
APN: 304-81-973
TEMPORARY CONSTRUCTION EASEMENT
A PORTION OF THAT PARCEL OF LAND DESCRIBED IN DOCUMENT NUMBER 2020-1252105,
RECORDS OF MARICOPA COUNTY, ARIZONA, LOCATED IN THE NORTHEAST QUARTER OF
SECTION 29, TOWNSHIP 2 SOUTH, RANGE 6 EAST OF THE GILA AND SALT RIVER MERIDIAN,
MARICOPA COUNTY, ARIZONA, AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 29, BEING A BRASS CAP IN
HAND HOLE, FROM WHICH THE NORTH QUARTER CORNER THEREOF, BEING A BRASS CAP IN
HAND HOLE BEARS SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, 2654.81 FEET;
THENCE SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, ALONG THE NORTH THE OF
SAID NORTHEAST QUARTER, 628.38 FEET;
THENCE SOUTH 0 DEGREES 22 MINUTES 14 SECONDS EAST, 55.00 FEET TO THE POINT OF
BEGINNING;
THENCE CONTINUING SOUTH 0 DEGREES 22 MINUTES 14 SECONDS EAST, 45.00 FEET TOA
POINT ON THE SOUTH LINE OF THE NORTH 100.00 FEET OF SAID NORTHEAST QUARTER;
THENCE NORTH 89 DEGREES 37 MINUTES 46 SECONDS EAST, ALONG SAID SOUTH LINE,10.00
FEET;
THENCE SOUTH 0 DEGREES 22 MINUTES 14 SECONDS EAST, 15.00 FEET TO A POINT ON THE
SOUTH LINE OF THE NORTH 115.00 FEET OF SAID NORTHEAST QUARTER;
THENCE SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, ALONG SAID SOUTH LINE, 47.63
FEET;
THENCE SOUTH 0 DEGREES 22 MINUTES 14 SECONDS EAST, 15.00 FEET TO A POINT ON THE
SOUTH LINE OF THE NORTH 130.00 FEET OF SAID NORTHEAST QUARTER;
THENCE SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, ALONG SAID SOUTH LINE, 10.00
FEET;
THENCE NORTH 0 DEGREES 22 MINUTES 14 SECONDS WEST, 15.00 FEET OT A POINT ON THE
SOUTH LINE OF THE NORTH 115.00 FEET OF SAID NORTHEAST QUARTER;
THENCE SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, ALONG SAID SOUTH LINE,
145.68 FEET;
Page 5 of 11
Title: TEMP. CONSTRUCTION ESMT.
EPS Project #; 18-241 & FP C
City of Chandler Project #: ST1804-201
og oe ae GROUP
Section: 29 Township: 2S Range: 6 E .
— —_ —_ 1130 N. Alma School Road, Suite 120
Date: 01/27/21 Mesa, Arizona 85201
T:480.503.2250 | F:480.503.2258
Page 1 of 7 www.epsgroupinc.com
S
THENCE NORTH 0 DEGREES 22 MINUTES 14 SECONDS WEST, 50.00 FEET TO A POINT ON THE
SOUTH LINE OF THE NORTH 65.00 FEET OF SAID NORTHEAST QUARTER;
THENCE SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, ALONG SAID SOUTH LINE,
160.04 FEET;
THENCE NORTH 0 DEGREES 22 MINUTES 14 SECONDS WEST, 10.00 FEET TO A POINT ON THE
SOUTH LINE OF THE NORTH 55.00 FEET OF SAID NORTHEAST QUARTER, SAID POINT
HEREINAFTER REFERRED TO AS POINT "A";
THENCE NORTH 89 DEGREES 37 MINUTES 46 SECONDS EAST, ALONG SAID SOUTH LINE,
353.35 FEET TO THE POINT OF BEGINNING.
TOGETHER WITH THE FOLLOWING DESCRIBED PARCEL:
COMMENCING AT THE AFOREMENTIONED POINT "A",
THENCE SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, ALONG THE SOUTH LINE OF
THE NORTH 55.00 FEET OF SAID NORTHEAST QUARTER, 158.00 FEET TO THE POINT OF
BEGINNING;
THENCE SOUTH 0 DEGREES 22 MINUTES 14 SECONDS EAST, 72.00 FEET TO A POINT ON THE
SOUTH LINE OF THE NORTH 127.00 FEET OF SAID NORTHEAST QUARTER;
THENCE SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, ALONG SAID SOUTH LINE, 20.00
FEET;
THENCE NORTH 0 DEGREES 22 MINUTES 14 SECONDS WEST, 62.00 FEET TO A POINT ON THE
SOUTH LINE OF THE NORTH 65.00 FEET OF SAID NORTHEAST QUARTER;
THENCE SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, ALONG SAID SOUTH LINE,
104.53 FEET;
THENCE SOUTH 44 DEGREES 48 MINUTES 53 SECONDS WEST, 63.85 FEET TO A POINT ON THE
SOUTH LINE OF THE NORTH 110.00 FEET OF SAID NORTHEAST QUARTER;
THENCE SOUTH 89 DEGREES 37 MINUTES 46 SECONDS WEST, ALONG SAID SOUTH LINE, 18.50
FEET TOA POINT ON THE WEST LINE OF SAID PARCEL;
THENCE NORTH 0 DEGREES 02 MINUTES 25 SECONDS WEST, ALONG SAID WEST LINE, 25.00
FEET TOA POINT ON THE SOUTH LINE OF THE NORTH 85.00 FEET OF SAID NORTHEAST
QUARTER;
Page 6 of 11
Title: TEMP. CONSTRUCTION ESMT.
EPS Project #; 18-241 & FP C
City of Chandler Project #: ST1804-201
og oe ae GROUP
Section: 29 Township: 2S Range: 6 E .
— —_ —_ 1130 N. Alma School Road, Suite 120
Date: 01/27/21 Mesa, Arizona 85201
T:480.503.2250 | F:480.503.2258
Page 2 of 7 www.epsgroupinc.com
S
THENCE NORTH 89 DEGREES 37 MINUTES 46 SECONDS EAST, ALONG SAID SOUTH LINE, 29.33
FEET;
THENCE NORTH 44 DEGREES 48 MINUTES 53 SECONDS EAST, 42.56 FEET TO A POINT ON THE
SOUTH LINE OF THE NORTH 55.00 FEET OF SAID NORTHEAST QUARTER;
THENCE NORTH 89 DEGREES 37 MINUTES 46 SECONDS EAST, ALONG SAID SOUTH LINE,
128.65 FEET TO THE POINT OF BEGINNING.
CONTAINING 17,135 SQUARE FEET OR 0.3934 ACRES, MORE OR LESS.
SUBJECT TO EXISTING RIGHT-OF-WAY AND EASEMENTS.
Page 7 of 11
Title: TEMP. CONSTRUCTION ESMT.
EPS Project #: 18-241 & FP C
City of Chandler Project #: ST1804-201
ne GROUP
1130 N. Alma School Road, Suite 120
Section: 29 Township: 2S Range: 6 E
Date: 01/27/21 Mesa, Arizona 85201
T:480.503.2250 | F:480.503.2258
Page 3 of 7 www.epsgroupinc.com
S
EXHIBIT "B"
LEGAL EXHIBIT FOR
APN: 304-81-973
TEMPORARY CONSTRUCTION EASEMENT
E CHANDLER HEIGHTS ROAD |
A _ SB9°37°46"W 2654.81
K 1327.40 POINT OF =
HH [ BEGINNING iy
faa x=
nm Pw ieean vf
s S89°37'46"W 158.00 Lu
a op)
oO
+ S uw
“ ” =
Wn c
O
a
<x
=
|
LINE TABLE LINE TABLE LINE TABLE
LINE | BEARING | LENGTH LINE | BEARING | LENGTH LINE | BEARING | LENGTH
L10 | so0'22'14"E | 72.00" Li4. | $44°48'53°W | 65.85 Li8 | N44"48'53"E | 42.56"
Li1_ | S89°37'46"W | 20.00" LIS | S89°37'46"W | 18.50" Li9 | N89°37'46"E | 128.65
L12 | NO0"22'14"W | 62.00" L16 | Noo‘02'25"W | 25.00"
L13. | $89°37'46"W | 104.53 LI7 | N89°S7'46"E | 29.33 Page 8 of 11
NET TEMPORARY CONSTRUCTION EASEMENT (WIDTH VARIES) = 17,135 SQ. FT. 0.3934 AC.
THIS EXHIBIT IS FOR GRAPHICAL REPRESENTATION ONLY TO BE USED IN CONJUCTION WITH
THE ATTACHED LEGAL DESCRIPTION AND DOES NOT CONSTITUTE A BOUNDARY SURVEY.
Title: TEMP. CONSTRUCTION ESMT.
EPS Project #: 18-241 @ FP C
City of Chandler Project #: ST1804-201
Section: 29 Township: 2S Range: 6 E
1130 N. Alma School Road, Suite 120
Date: 01/27/21 Mesa, Arizona 85201
T:480.503.2250 | F:480.503.2258
Page 4 of 7 www.epsgroupinc.com
S
MATCCH LINE SEE SHEET 4
E CHANDLER HEIGHTS ROAD
—__}_
EXHIBIT "B"
LEGAL EXHIBIT FOR
APN: 304-81-973
TEMPORARY CONSTRUCTION EASEMENT
POINT OF COMMENCEMENT
S. VAL VISTA prive ©
me $89'37'46"W 2654.81 7
; - 1) 628.38
- POINT "A xo
Sis)
no SS) POINT OF
au + N89°37'46"E 353.35 Fe FCINNING
1 s89°37'46"W 160.04" 5
~ L2
J in)
{ 9
seos746e"w 145.68 SLITS 4
16
LINE TABLE LINE TABLE LINE TABLE
LINE | BEARING | LENGTH LINE | BEARING | LENGTH LINE | BEARING | LENGTH
Li} s00'2214"E | 45.00" L4 | sgg'37'46e"w | 47.63" L7 | noor22"4’w | 15.00"
L2 } N89°37’46"E | 10.00" L5 | so0'2214"E | 15.00" L8 | noo'22"14”"w | 50.00"
L3} soo'2214’E | 15.00" L6 | Sg9°37'46"W | 10.00" L9 | noov22"14’w | 10.00"
Page 9 of 11
Title: TEMP. CONSTRUCTION ESMT.
EPS Project #: 18-241
City of Chandler Project #: ST1804-201
Section: 29 Township: 2S Range: 6 E
Date: 01/27/21
Page 5 of 7
¢
1130 N. Alma School Road, Suite 120
Mesa, Arizona 85201
T:480.503.2250 | F:480.503.2258
www.epsgroupinc.com
S
TCE 1
North: 812588.4352'
Segment #1 : Line
Course: S00°22'14"E
North: 812543.4362'
Segment #2 : Line
Course: N89°37'46"E
North: 812543.5009'
Segment #3 : Line
Course: S00°22'14"E
North: 812528.5012'
Segment #4 : Line
Course: S89°37'46"W
North: 812528.1931'
Segment #5 : Line
Course: S00°22'14"E
North: 812513.1934'
Segment #6 : Line
Course: S89°37'46"W
North: 812513.1288'
Segment #7 : Line
Course: NO0°22'14"W
North: 812528.1285'
EXHIBIT "C"
CLOSURE REPORT FOR
APN: 304-81-973
TEMPORARY CONSTRUCTION EASEMENT
East: 748686.9699'
Length: 45.00'
East: 748687.2610'
Length: 10.00"
East: 748697 .2608'
Length: 15.00"
East: 748697.3578'
Length: 47.63'
East: 748649.7288'
Length: 15.00"
East: 748649.8258'
Length: 10.00"
East: 748639.8260'
Length: 15.00"
East: 748639.7290'
Segment #8 : Line
Course: S89°37'46"W Length: 145.68"
North: 812527.1863' East: 748494.0520'
Segment #9 : Line
Course: NO00°22'14"W Length: 50.00"
North: 812577.1852' East: 748493.7287'
Segment #10 : Line
Course: S$89°37'46"W Length: 160.04"
North: 812576.1502' East: 748333.6920'
Segment #11 : Line
Course: NO0°22'14"W Length: 10.00'
North: 812586.1500' East: 748333.6273'
Segment #12 : Line
Course: N89°37'46"E_ —_ Length: 353.35'
North: 812588.4352' East: 748686.9699'
Perimeter: 876.69" Area: 13499 Sq. Ft.
Error Closure: 0.0000 Course: N26°33'54"E
Error North: 0.00000 East: 0.00000
Precision 1: 876700000.00
Page 10 of 11
Title: TEMP. CONSTRUCTION ESMT.
EPS Project #: 18-241
City of Chandler Project #: ST1804-201
Section: 29 Township: 2S Range: 6 E
Date: 01/27/21
Page 6 of 7
EPS
GROUP
1130 N. Alma School Road, Suite 120
Mesa, Arizona 85201
T:480.503.2250 | F:480.503.2258
www.epsgroupinc.com
S
TCE 2
North: 812585.1270'
Segment #1 : Line
Course: S00°22'14"E
North: 812513.1285'
Segment #2 : Line
Course: S89°37'46"W
North: 812512.9992'
Segment #3 : Line
Course: N00°22'14"W
North: 812574.9979'
Segment #4 : Line
Course: S89°37'46"W
North: 812574.3218'
Segment #5 : Line
Course: S44°48'53"W
North: 812529.0273'
Segment #6 : Line
Course: S89°37'46"W
North: 812528.9076'
Segment #7 : Line
Course: N00°02'25"W
North: 812553.9076'
EXHIBIT "C"
CLOSURE REPORT FOR
APN: 304-81-973
TEMPORARY CONSTRUCTION EASEMENT
East: 748175.6348'
Length: 72.00'
East: 748176.1004'
Length: 20.00"
East: 748156.1008'
Length: 62.00"
East: 748155.6999'
Length: 104.53'
East: 748051.1720'
Length: 63.85'
East: 748006.1695'
Length: 18.50"
East: 747987.6699'
Length: 25.00"
East: 747987.6523'
Segment #8 : Line
Course: N89°37'46"E_ —_ Length: 29.33'
North: 812554.0973' East: 748016.9817'
Segment #9 : Line
Course: N44°48'53"E — Length: 42.56'
North: 812584.2890' East: 748046.9787'
Segment #10 : Line
Course: N89°37'46"E —_ Length: 128.65'
North: 812585.1210' East: 748175.6260'
Perimeter: 566.41' Area: 3636 Sq. Ft.
Error Closure: 0.0106 Course: S55°30'46"W.
Error North: -0.00602 East: -0.00876
Precision 1: 53435.85
Page 11 of 11
City of Chandler Project #: ST1804-201
Section: 29 Township: 2S Range: 6 E
Date: 01/27/21
Page 7 of 7
Title: TEMP. CONSTRUCTION ESMT.
EPS Project #; 18-241 & FP C
GROUP
1130 N. Alma School Road, Suite 120
Mesa, Arizona 85201
T:480.503.2250 | F:480.503.2258
www.epsgroupinc.com
yy