A1. NON-EXCLUSIVE UTILITY EASEMENT.PDF

Maricopa County — Formal (2022-07-27)

View PDF Item 144 Meeting page

Extracted text (via pymupdf) 9009 characters
When recorded, return to: 
Flood Control District of Maricopa County 
2801 West Durango Street 
Phoenix, AZ 85009 (MDH) 
 
Page 1 of 10 
 
 
 
EXEMPT ARS § 11-1134, A2 
 
 
 
 
 
 
 
 
 
FCD 1999R016 
 
NON-EXCLUSIVE UTILITY EASEMENT 
FCD Project: Trilby Wash Detention 
Basin and Floodway 
FCD Parcel No.: TW-04C, TW-04F, and 
TW-05C 
APN: 502-07-001 and 502-07-006 ptns 
FCD Permit No.: 2013P073 
 
This Non-Exclusive Utility Easement is entered into by and between the following parties and 
becomes effective as of the date of recordation with the Maricopa County Recorder. 
 
 
GRANTOR: 
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY, a 
political subdivision of the State of Arizona 
 
GRANTEE: 
ARIZONA PUBLIC SERVICE COMPANY, an Arizona corporation, 
and/or its successors and assigns   
 
In accordance with GRANTOR’S Board of Directors Resolution 2018R013, for and in 
consideration of the sum of Thirty-Nine Thousand Seven Hundred Eighty and 00/100 Dollars 
($39,780.00), and other valuable consideration, the receipt and sufficiency of which are hereby 
acknowledged, GRANTOR does hereby grant and convey to GRANTEE a Non-Exclusive Utility 
Easement (“Easement”) in, upon, over, under, across, through and along the premises described in 
the attached Exhibit “A” (“Easement Property”) for the purpose of constructing, operating, 
repairing and maintaining a 230 kV overhead transmission line and appurtenances thereto 
(collectively, the “Facility”), in accordance with FCD Right-of-Way Use Permit No. 2013P073 
(“FCD Permit”).

Page 2 of 10 
 
FCD Project: Trilby Wash Detention Basin and 
Floodway 
FCD Parcel No.: TW-04C, TW-04F, and TW-05C 
APN: 502-07-001 and 502-07-006
FCD Permit No.: 2013P073
Said Easement is SUBJECT TO all governmental restrictions which include, but are not limited 
to, environmental, archaeological, and cultural resource regulations, and all land use regulations, 
covenants, conditions, restrictions, easements, rights-of-way, and other matters of record, or not 
of record, that could be disclosed by a visual inspection or accurate survey of the real property. 
This Easement is, at all times, subject to and subordinate to the rights of GRANTOR to 
use and access the Easement Property for the purpose of operation and maintenance of the flood 
control project.  GRANTOR shall endeavor to use its best efforts to operate and maintain the flood 
control project in a manner which will not unreasonably interfere with the GRANTEE’S rights 
granted by this Easement.  GRANTEE assumes all risk of damage to its Facility resulting from 
the property functioning as a flood control project.    
In the event that any of GRANTEE’S non-affixed materials, vehicles, equipment, or other 
personalty, interferes with GRANTOR’S use of the Easement Property,  GRANTEE shall, at 
GRANTOR’S request, and at GRANTEE’S sole expense, eliminate the interference within thirty 
(30) days of notice from the GRANTOR. 
 
In the event the land within the Easement Property is needed to construct, maintain, or 
relocate any portion of GRANTOR’S flood control project and/or structure, and upon written 
notification by GRANTOR, GRANTEE shall coordinate the removal or relocation of the 
Facility through GRANTOR’S right-of-way use permit process comprising review and 
approval of GRANTEE’S design, construction plan, and contractor selection.  Actual 
construction to remove or relocate such conflicting Facility, or portion(s) thereof, shall begin 
within thirty (30) days following GRANTOR’S issuance of a right-of-way use permit for such 
removal/relocation.  Upon mutual agreement, the time frame for the start and completion of said 
work may be extended based on the requirements of the flood control project.  If GRANTEE’S 
relocation effort has not been completed within the mutually agreed time frame and causes 
GRANTOR to be liable for delay damages, GRANTEE shall reimburse GRANTOR for 
reasonable damages directly caused by the delay Reimbursement shall be made within sixty (60) 
days after GRANTEE’S receipt of proof of GRANTOR’S reasonable evidence of a third 
party’s enforcement of a contractual penalty  for said delay.

Page 3 of 10 
 
FCD Project: Trilby Wash Detention Basin and 
Floodway 
FCD Parcel No.: TW-04C, TW-04F, and TW-05C 
APN: 502-07-001 and 502-07-006
FCD Permit No.: 2013P073
 
The GRANTEE shall also, at its sole cost and expense, maintain the Easement Property, 
and GRANTEE’S Facility located within the Easement Property, in a state of good repair and in 
a safe condition.  The rights granted to GRANTEE herein include the right , but not the obligation, 
to cut back, trim and remove vegetation now growing, or that may hereafter grow, on the Easement 
Property, or that may extend over the Easement Property, so as to protect the same from interfering 
with the maintenance and operation of GRANTEE’S Facility.  After the installation of 
GRANTEE’S Facility in accordance with said FCD Permit, any modification whatsoever to the 
Easement Property, the Facility, or any appurtenance of GRANTEE located therein, that is not in 
compliance with said FCD Permit, will require GRANTEE to apply for and obtain a new right-
of-way use permit from GRANTOR.  GRANTOR will process any such application in 
accordance with GRANTOR’S right-of-way use permit approval process. 
GRANTEE agrees to indemnify GRANTOR for any and all damages and costs, including 
without limitation, reasonable attorney's fees, court costs, and all other expenses relating to the 
defense of claims or litigation, caused by or arising from the exercise of GRANTEE’S rights 
pursuant to the terms of this Easement, excepting therefrom any such injury, damage or costs 
caused by or arising solely from the gross negligence, or actions that are purposeful or undertaken 
without regard to the consequences, by the GRANTOR, its officers, employees, agents or 
contractors. 
In the event GRANTEE fails to install the Facility within the Easement Property, or in the 
event GRANTEE removes the Facility, or in the event the Facility ceases to function, or in the 
event of any other event giving evidence to GRANTOR that the GRANTEE has abandoned the 
use of this Easement, then and in such event, GRANTOR shall notify GRANTEE, in writing, 
that GRANTOR considers that the Easement has been abandoned.  In such event, GRANTEE 
shall provide confirmation to GRANTOR that the Easement has been abandoned, or in the event 
GRANTEE shall fail to reply that there has been no intent to abandon the Easement within thirty 
(30) days of receipt of the aforesaid notice from the GRANTOR, this Easement shall be deemed 
to be abandoned and GRANTOR shall be permitted to record a termination of this Easement in

Page 4 of 10 
 
FCD Project: Trilby Wash Detention Basin and 
Floodway 
FCD Parcel No.: TW-04C, TW-04F, and TW-05C 
APN: 502-07-001 and 502-07-006
FCD Permit No.: 2013P073
the public records of Maricopa County.  Unless and until such termination is recorded by 
GRANTOR, this Easement shall remain in full force and effect.  
The rights and privileges granted in this Easement are solely for the benefit of GRANTEE 
to use the Easement Property for the purpose stated herein, and do not include the right to permit 
and/or grant any other use of the Easement Property to another party.  This Easement shall run with 
the land and is binding on all parties. 
 
 
THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK.

Page 6 of 10 
 
FCD Project: Trilby Wash Detention Basin and 
Floodway 
FCD Parcel No.: TW-04C, TW-04F, and TW-05C 
APN: 502-07-001 and 502-07-006
FCD Permit No.: 2013P073
APPROVED: 
 
BOARD OF DIRECTORS OF FLOOD CONTROL DISTRICT OF MARICOPA 
COUNTY 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Bill Gates 
 
 
 
Date 
Chairman of the Board  
 
 
ATTEST: 
 
 
 
 
 
 
 
 
 
Clerk of the Board                              Date 
 
 
STATE OF ARIZONA 
 
) 
 
 
 
 
)ss 
COUNTY OF MARICOPA ) 
 
Before me, 
 
 
 
 
 
, Notary Public in and for said County, State 
of Arizona, on this day personally appeared Bill Gates, known to me to be the person whose name 
is subscribed to the forgoing instrument as Chairman of the Board of the Political Subdivision in 
the foregoing instrument. 
 
Given under my hand and seal of the office this  
   day of 
 
 
, 202 . 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
______________________________
 
 
 
 
 
 
 
 
 
Notary Public (signature) 
 
 
 
 
GRANTEE:

Page 8 of 10 
 
FCD Project: Trilby Wash Detention Basin and 
Floodway 
FCD Parcel No.: TW-04C, TW-04F, and TW-05C 
APN: 502-07-001 and 502-07-006
FCD Permit No.: 2013P073
EXHIBIT “A”

Page 9 of 10 
 
FCD Project: Trilby Wash Detention Basin and 
Floodway 
FCD Parcel No.: TW-04C, TW-04F, and TW-05C 
APN: 502-07-001 and 502-07-006
FCD Permit No.: 2013P073
EXHIBIT “A” continued

Page 10 of 10 
 
FCD Project: Trilby Wash Detention Basin and 
Floodway 
FCD Parcel No.: TW-04C, TW-04F, and TW-05C 
APN: 502-07-001 and 502-07-006
FCD Permit No.: 2013P073
EXHIBIT “A” continued