FCD_AGREEMENT_LOA_MCMICKEN_OH_TO_UG_CONVERSION_PROJECT_NOVEMBER_16_2021.DOCX.PDF
Extracted text (via pymupdf)
4118 characters
MAIL STATION 3177
Tel:
602-371-7989
PO. BOX 53933
Fax:
602-371-6653
PHOENIX, ARIZONA 85072-3933
e-mail:Baldemar.garza@aps.com
March 10, 2022
David Degerness
Project Manager FCD
Flood Control District of Maricopa County
2801 W. Durango Rd
Phoenix AZ 85009
RE: Flood Control District of Maricopa County / APS Letter of Agreement
McMicken Dam Rehabilitation Project Control No. 202.02.31
Overhead to Underground 12KV Relocation / Conversion
Location: McMicken Wash South of US60
APS Work Order No: WA495223 12KV Overhead to Underground Conversion Final Cost
Dear David,
This letter serves as a letter of agreement for Arizona Public Service Company ("APS") Work Authorization Number
WA495223 relating to the above-mentioned project. The following is an outline of the costs and responsibilities of APS
and the Flood Control District of Maricopa County (FCD). The FCD has asked APS to relocate and convert the APS 12KV
overhead facilities to underground that are conflict with the McMicken Dam Rehabilitation Improvements at the above
location. The APS 12KV facilities that are conflict with the new McMicken Dam improvements are located within an
existing easement therefore the FCD is responsible to pay APS 100% of the relocation cost. The location of the APS
facilities that are in conflict and need to be relocated run parallel with the Beardsley Canal that is located south of US60 and
west of Loop 303. The relocation / conversion work of the APS 12KV facilities was completed on 12/22/2021. This
Agreement shall be interpreted, governed by, and construed under applicable Federal law. In the absence of applicable
Federal law, the laws of the State of Arizona shall govern and this Agreement is subject to cancelation pursuant to A.R.S. §
38-511.
The final cost for the conversion / relocation of the APS 12KV overhead facilities that FCD is responsible to pay APS is
$1,556,952.81.
To be provided by the APS
APS will provide all the 12KV electrical, labor, materials, excavation trench and conduit to
construct, convert, remove and relocate the existing 12KV overhead facilities that are in conflict
with the new McMicken Wash Rehabilitation improvements.
FCD shall pay APS a grand total of up to $1,556,952.81 or the actual APS relocation cost
for the overhead to underground conversion of the relocation of the 12KV overhead facilities after the APS
relocation work has been completed. APS attached a detailed cost sheet as backup for the cost incurred for the relocation.
Please review and return a signed copy of the Letter of Agreement to me to indicate your approval of the above costs and
responsibility.
APS would like to thank you for your continued cooperation and partnership.
Sincerely,
Bobby Garza
APS Customer Project Consultant
DocuSign Envelope ID: D9302A94-2824-4EA0-B8BF-CDBCD2601A22
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY
A Political Subdivision of the State of Arizona
Recommended by:
Michael A. Fulton Date
Director
Approved and Accepted:
By:
Chairman, Board of Directors Date
Attest:
By:
Clerk of the Board Date
The foregoing APS Letter of Agreement has been reviewed pursuant to Arizona Revised Statutes § 11-952, as amended, by
the undersigned General Counsel, who has determined that it is in proper form and within the powers and authority granted
to the Flood Control District of Maricopa County under the laws of the State of Arizona
Flood Control District General Counsel Date
APS Letter of Agreement Page 2 of 2
DocuSign Envelope ID: D9302A94-2824-4EA0-B8BF-CDBCD2601A22
3/10/2022
3/10/2022
3/10/2022